ENS 45931: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 05/17/2010 10:17 EDT
| event date = 05/17/2010 10:17 EDT
| last update date = 05/17/2010
| last update date = 05/17/2010
| title = Automatic Reactor Trip Due To Low Steam Generator Water Level
| title = Automatic Reactor Trip Due to Low Steam Generator Water Level
| event text = System Affected: RPS actuation and reactor trip.  Actuation Initiation Signals:  AFW auto initiation.  Cause: Low level 'C' steam generator.  Effect of event on Plant: Reactor and turbine trip. Actions taken or Planned: Standard post trip actions.  Additional information: Plant stabilized at NOP/NOT.
| event text = System Affected: RPS actuation and reactor trip.  Actuation Initiation Signals:  AFW auto initiation.  Cause: Low level 'C' steam generator.  Effect of event on Plant: Reactor and turbine trip. Actions taken or Planned: Standard post trip actions.  Additional information: Plant stabilized at NOP/NOT.
The licensee experienced a feedwater transient which initiated the event.  All safety systems are available.  All control rods fully inserted.  The electrical lineup is normal. The decay heat path is through the condenser steam dumps.  There were no relief valve or safety valve lifted during the transient.  Primary plant temperature is 555 degrees Fahrenheit, and primary plant pressure is 2250 psig.  The licensee is investigating the cause of the feed transient.  
The licensee experienced a feedwater transient which initiated the event.  All safety systems are available.  All control rods fully inserted.  The electrical lineup is normal. The decay heat path is through the condenser steam dumps.  There were no relief valve or safety valve lifted during the transient.  Primary plant temperature is 555 degrees Fahrenheit, and primary plant pressure is 2250 psig.  The licensee is investigating the cause of the feed transient.  

Latest revision as of 22:09, 1 March 2018

ENS 45931 +/-
Where
Millstone Dominion icon.png
Connecticut (NRC Region 1)
Reporting
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation

10 CFR 50.72(b)(3)(iv)(A), System Actuation
Time - Person (Reporting Time:+-1.83 h-0.0763 days <br />-0.0109 weeks <br />-0.00251 months <br />)
Opened: Bob Kastner
12:27 May 17, 2010
NRC Officer: Joe O'Hara
Last Updated: May 17, 2010
45931 - NRC Website
Loading map...