ENS 46941: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 06/09/2011 09:20 CDT
| event date = 06/09/2011 09:20 CDT
| last update date = 06/09/2011
| last update date = 06/09/2011
| title = Offsite Notification Concerning Inability To Meet Sludge Pond Discharge Permit Due To River Levels
| title = Offsite Notification Concerning Inability to Meet Sludge Pond Discharge Permit Due to River Levels
| event text = Notification was made to the Nebraska Department of Environmental Quality regarding the inability to conform to the NPDES permit, since the discharges from the sludge pond to the Missouri River are uncontrolled at this time.  As a result of high Missouri River levels, the sludge pond was overtopped.  The discharges into this pond are subject to NPDES requirements.  The inputs into the sludge pond are described in the NPDES permit as low volume wastewater.  There are three outfalls which discharge into the pond.  Outfall 002B is described as Clearwell Discharge plus Outfall 004 Emergency Overflow.  Outfall 002C is described as Floor Drains.  Outfall 004 is described as Reverse Osmosis Reject and Boiler Blowdown Waste streams.  There is no radiological contamination in the pond.
| event text = Notification was made to the Nebraska Department of Environmental Quality regarding the inability to conform to the NPDES permit, since the discharges from the sludge pond to the Missouri River are uncontrolled at this time.  As a result of high Missouri River levels, the sludge pond was overtopped.  The discharges into this pond are subject to NPDES requirements.  The inputs into the sludge pond are described in the NPDES permit as low volume wastewater.  There are three outfalls which discharge into the pond.  Outfall 002B is described as Clearwell Discharge plus Outfall 004 Emergency Overflow.  Outfall 002C is described as Floor Drains.  Outfall 004 is described as Reverse Osmosis Reject and Boiler Blowdown Waste streams.  There is no radiological contamination in the pond.
Additionally, the current and projected flooding conditions of the Missouri River high river levels have resulted in some media inquiries regarding potential changes in plant operation.  Public information personnel and Management have responded to these inquiries with information on the impact of river level and preparations for additional actions should conditions warrant additional protective actions.
Additionally, the current and projected flooding conditions of the Missouri River high river levels have resulted in some media inquiries regarding potential changes in plant operation.  Public information personnel and Management have responded to these inquiries with information on the impact of river level and preparations for additional actions should conditions warrant additional protective actions.

Latest revision as of 22:06, 1 March 2018

ENS 46941 +/-
Where
Cooper Entergy icon.png
Nebraska (NRC Region 4)
Reporting
10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release
Time - Person (Reporting Time:+-0.33 h-0.0138 days <br />-0.00196 weeks <br />-4.52034e-4 months <br />)
Opened: John Myers
14:00 Jun 9, 2011
NRC Officer: Bill Huffman
Last Updated: Jun 9, 2011
46941 - NRC Website
Loading map...