ENS 47079: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 07/20/2011 13:18 PDT
| event date = 07/20/2011 13:18 PDT
| last update date = 07/20/2011
| last update date = 07/20/2011
| title = Offsite Notification - Press Release After Fire On Site
| title = Offsite Notification - Press Release After Fire on Site
| event text = On July 20, 2011 at 1318 PDT, during performance of STP M-9A, 'Diesel Engine Generator Routine Surveillance Test,' personnel reported a fire on the Unit 1 Emergency Diesel Generator (EDG) 1-1.  No abnormal indications were observed in the control room and no annunciator for 'Fire Detected' was received.  Operators shutdown the EDG and the onsite fire department responded immediately.
| event text = On July 20, 2011 at 1318 PDT, during performance of STP M-9A, 'Diesel Engine Generator Routine Surveillance Test,' personnel reported a fire on the Unit 1 Emergency Diesel Generator (EDG) 1-1.  No abnormal indications were observed in the control room and no annunciator for 'Fire Detected' was received.  Operators shutdown the EDG and the onsite fire department responded immediately.
On July 20, 2011 at 1322 PDT, personnel reported that the fire, which was centered around the exhaust insulation material, had been extinguished.
On July 20, 2011 at 1322 PDT, personnel reported that the fire, which was centered around the exhaust insulation material, had been extinguished.

Latest revision as of 22:06, 1 March 2018

ENS 47079 +/-
Where
Diablo Canyon Pacific Gas & Electric icon.png
California (NRC Region 4)
Reporting
10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release
Time - Person (Reporting Time:+-0.13 h-0.00542 days <br />-7.738095e-4 weeks <br />-1.78074e-4 months <br />)
Opened: Dave Bahner
20:10 Jul 20, 2011
NRC Officer: Mark Abramovitz
Last Updated: Jul 20, 2011
47079 - NRC Website
Loading map...