| event date = 02/27/2013 15:38 EST
| event date = 02/27/2013 15:38 EST
| last update date = 02/27/2013
| last update date = 02/27/2013
| title = Planned Maintenance On Unit 2 Plant Process Computer
| title = Planned Maintenance on Unit 2 Plant Process Computer
| event text = Calvert Cliffs Nuclear Power Plant will perform planned maintenance on the Unit 2 Plant Process Computer (PPC) and associated network infrastructure starting on February 27, 2013.  The maintenance will remove the Unit 2 PPC for a planned duration of 5 days and will render the Unit 2 ERDS out of service for this timeframe. The current outage schedule has power being restored on 03/04/2013.
| event text = Calvert Cliffs Nuclear Power Plant will perform planned maintenance on the Unit 2 Plant Process Computer (PPC) and associated network infrastructure starting on February 27, 2013.  The maintenance will remove the Unit 2 PPC for a planned duration of 5 days and will render the Unit 2 ERDS out of service for this timeframe. The current outage schedule has power being restored on 03/04/2013.
Should an emergency be declared during this period, the Control Room will continue to have the capability to retrieve plant data inputs to assess plant conditions and perform core damage assessment at all times.  Control Room Emergency Response personnel will use emergency response procedures to disseminate plant parameter data points to the effected Emergency Response Facilities until the U-2 PPC is restored.  MIDAS (Meteorological Data) transmission will remain functional during the maintenance window. The Unit 2 ERDS data will not be available during the power outage from 02/27/2013 to 03/04/2013.   
Should an emergency be declared during this period, the Control Room will continue to have the capability to retrieve plant data inputs to assess plant conditions and perform core damage assessment at all times.  Control Room Emergency Response personnel will use emergency response procedures to disseminate plant parameter data points to the effected Emergency Response Facilities until the U-2 PPC is restored.  MIDAS (Meteorological Data) transmission will remain functional during the maintenance window. The Unit 2 ERDS data will not be available during the power outage from 02/27/2013 to 03/04/2013.   

Latest revision as of 21:01, 1 March 2018

ENS 48790 +/-
Where
Calvert Cliffs Constellation icon.png
Maryland (NRC Region 1)
Reporting
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness
Time - Person (Reporting Time:+-4.5 h-0.188 days <br />-0.0268 weeks <br />-0.00616 months <br />)
Opened: Ray Hoffman
16:08 Feb 27, 2013
NRC Officer: Pete Snyder
Last Updated: Feb 27, 2013