ENS 48901: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 04/09/2013 02:35 EDT
| event date = 04/09/2013 02:35 EDT
| last update date = 04/09/2013
| last update date = 04/09/2013
| title = Power Lost To Meteorological Instrumentation
| title = Power Lost to Meteorological Instrumentation
| event text = At 0235 EDT on 4-9-13, due to an offsite power transformer fault, power was lost to site support buildings and all meteorological instrumentation.  This event is being reported under 10CFR50.72(b)(3), major loss of emergency assessment capabilities.
| event text = At 0235 EDT on 4-9-13, due to an offsite power transformer fault, power was lost to site support buildings and all meteorological instrumentation.  This event is being reported under 10CFR50.72(b)(3), major loss of emergency assessment capabilities.
   
   

Latest revision as of 21:01, 1 March 2018

ENS 48901 +/-
Where
Nine Mile Point Constellation icon.png
New York (NRC Region 1)
Reporting
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness
Time - Person (Reporting Time:+3.12 h0.13 days <br />0.0186 weeks <br />0.00427 months <br />)
Opened: Matthew Busch
09:42 Apr 9, 2013
NRC Officer: Mark Abramovitz
Last Updated: Apr 9, 2013
48901 - NRC Website
Loading map...