ENS 48906: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 12/06/2012 08:00 EDT
| event date = 12/06/2012 08:00 EDT
| last update date = 04/10/2013
| last update date = 04/10/2013
| title = Failure To Comply With Conditions Of Construction Permit
| title = Failure to Comply with Conditions of Construction Permit
| event text = 50.55(e) initial notification for failure to comply with requirements of 10 CFR 50 Appendix B, Criterion VII for procurement of safety-related components associated with AP1000 Nuclear Power Plant construction by CB&I (formerly Shaw Nuclear).
| event text = 50.55(e) initial notification for failure to comply with requirements of 10 CFR 50 Appendix B, Criterion VII for procurement of safety-related components associated with AP1000 Nuclear Power Plant construction by CB&I (formerly Shaw Nuclear).
This 50.55(e) initial notification addresses a failure to comply by CB&I, an agent of Southern Company for Vogtle 3&4, to meet the requirements of Appendix B, Criterion VII. It is concluded that the QA programmatic issues, as identified by the root cause analysis associated with NRC violation 05200025/2012-004-02, could have produced a defect and this condition is reportable in accordance with 10 CFR 50.55(e)(3)(iii)(C). The root cause of the programmatic procurement problems was that the existing Shaw Nuclear procurement and quality oversight and inspection program did not include a sufficiently strategic, integrated, and graded approach to assure the required quality of material, equipment, and services. This notification closes the interim report submitted on February 4, 2013 by Southern Company.
This 50.55(e) initial notification addresses a failure to comply by CB&I, an agent of Southern Company for Vogtle 3&4, to meet the requirements of Appendix B, Criterion VII. It is concluded that the QA programmatic issues, as identified by the root cause analysis associated with NRC violation 05200025/2012-004-02, could have produced a defect and this condition is reportable in accordance with 10 CFR 50.55(e)(3)(iii)(C). The root cause of the programmatic procurement problems was that the existing Shaw Nuclear procurement and quality oversight and inspection program did not include a sufficiently strategic, integrated, and graded approach to assure the required quality of material, equipment, and services. This notification closes the interim report submitted on February 4, 2013 by Southern Company.

Latest revision as of 22:01, 1 March 2018

ENS 48906 +/-
Where
Vogtle Southern Nuclear icon.png
Georgia (NRC Region 2)
Reporting
10 CFR 50.55(e)
Time - Person (Reporting Time:+2998.78 h124.949 days <br />17.85 weeks <br />4.108 months <br />)
Opened: Howard Mahan
09:47 Apr 10, 2013
NRC Officer: Howie Crouch
Last Updated: Apr 10, 2013
48906 - NRC Website