| event date = 07/30/2013 14:32 CDT
| event date = 07/30/2013 14:32 CDT
| last update date = 07/30/2013
| last update date = 07/30/2013
| title = Reactor Scram Due To Turbine Generator Trip
| title = Reactor Scram Due to Turbine Generator Trip
| event text = Actuation of Reactor Protection System with reactor critical. Reactor Scram occurred at 1432 CDT on 7/30/2013 from 100% Power. The cause of the scram appears to be a Turbine Generator trip.
| event text = Actuation of Reactor Protection System with reactor critical. Reactor Scram occurred at 1432 CDT on 7/30/2013 from 100% Power. The cause of the scram appears to be a Turbine Generator trip.
05-S-01-EP-2, 'Reactor Pressure Vessel Control,' 05-1-02-I-1, 'Reactor Scram Off Normal Event Procedure,' and 05-1-02-I-2, 'Turbine and Generator Trip Off Normal Event Procedure,' were entered to mitigate the transient.  
05-S-01-EP-2, 'Reactor Pressure Vessel Control,' 05-1-02-I-1, 'Reactor Scram Off Normal Event Procedure,' and 05-1-02-I-2, 'Turbine and Generator Trip Off Normal Event Procedure,' were entered to mitigate the transient.  

Latest revision as of 21:00, 1 March 2018

ENS 49225 +/-
Where
Grand Gulf Entergy icon.png
Mississippi (NRC Region 4)
Reporting
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation

10 CFR 50.72(b)(3)(iv)(A), System Actuation
Time - Person (Reporting Time:+-2 h-0.0833 days <br />-0.0119 weeks <br />-0.00274 months <br />)
Opened: Charles Brooks
17:32 Jul 30, 2013
NRC Officer: Pete Snyder
Last Updated: Jul 30, 2013
49225 - NRC Website