ENS 49932: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 03/18/2014 EDT
| event date = 03/18/2014 EDT
| last update date = 04/17/2014
| last update date = 04/17/2014
| title = Part 21 - Thomas And Betts Printed Circuit Boards  
| title = Part 21 - Thomas and Betts Printed Circuit Boards  
| event text = The following was received via fax:
| event text = The following was received via fax:
This report documents the supply of faulty Logic Power supply assembly printed circuit boards for a Cyberex 20KVA Model AC Power Supply. These power supplies have the incorrect strap installed on the transformers of Cyberex P/N [Part Number] 30-80-56620 which potentially can lead to the transformer being loose and can cause failure of the power supply. Per the manufacturer, the band should have been made of stainless steel but the bands on the installed transformers were made of carbon steel and a corrosion resistant coating. The details of the potential failure of the power supply and the root cause are being evaluated and will be documented in the final report.
This report documents the supply of faulty Logic Power supply assembly printed circuit boards for a Cyberex 20KVA Model AC Power Supply. These power supplies have the incorrect strap installed on the transformers of Cyberex P/N [Part Number] 30-80-56620 which potentially can lead to the transformer being loose and can cause failure of the power supply. Per the manufacturer, the band should have been made of stainless steel but the bands on the installed transformers were made of carbon steel and a corrosion resistant coating. The details of the potential failure of the power supply and the root cause are being evaluated and will be documented in the final report.

Latest revision as of 21:51, 1 March 2018

ENS 49932 +/-
Where
United Controls International
Norcross, Georgia (NRC Region 1)
Organization: United Controls International
Reporting
10 CFR 21.21(d)(3)(i), Failure to Comply or Defect
Time - Person (Reporting Time:+35.6 h1.483 days <br />0.212 weeks <br />0.0488 months <br />)
Opened: Korina Looft
15:36 Mar 19, 2014
NRC Officer: Daniel Mills
Last Updated: Apr 17, 2014
49932 - NRC Website