| event date = 04/24/2014 02:30 EDT
| event date = 04/24/2014 02:30 EDT
| last update date = 04/24/2014
| last update date = 04/24/2014
| title = Loss Of Secondary Containment During Routine Swap Of A Power Supplies
| title = Loss of Secondary Containment During Routine Swap of a Power Supplies
| event text = On April 24, 2014 at 0230 [EDT], Secondary Containment Zone 3 (Unit 1&2 Reactor Building) differential pressure lowered to 0.10 [negative inches] WG [Water Gauge] when restoring Unit 1 Zone 3 HVAC during a routine swap of RPS power supplies, due to a trip of the Unit 1 Zone 3 Supply fan.  Zone 3 differential pressure was restored to > 0.25 [negative inches] WG at 0243 hours.  Zone I (Unit 1 Reactor Building) ventilation is isolated with secondary containment relaxed for refuel outage on Unit 1.  Zone II (Unit 2 Reactor Building) ventilation remained in service and stable.
| event text = On April 24, 2014 at 0230 [EDT], Secondary Containment Zone 3 (Unit 1&2 Reactor Building) differential pressure lowered to 0.10 [negative inches] WG [Water Gauge] when restoring Unit 1 Zone 3 HVAC during a routine swap of RPS power supplies, due to a trip of the Unit 1 Zone 3 Supply fan.  Zone 3 differential pressure was restored to > 0.25 [negative inches] WG at 0243 hours.  Zone I (Unit 1 Reactor Building) ventilation is isolated with secondary containment relaxed for refuel outage on Unit 1.  Zone II (Unit 2 Reactor Building) ventilation remained in service and stable.
Zone 3 differential pressure recovered to SR 3.6.4.1.1 requirements of 0.25 WG [negative inches] at 0243 hours and was verified to be stable.  LCO 3.6.4.1 was entered at 0230 hours and exited at 0313 hours.  Tech Spec Secondary Containment Operability requires a negative pressure of at least 0.25 [negative inches] WG for all three Reactor Building Ventilation Zones when secondary containment is required.   
Zone 3 differential pressure recovered to SR 3.6.4.1.1 requirements of 0.25 WG [negative inches] at 0243 hours and was verified to be stable.  LCO 3.6.4.1 was entered at 0230 hours and exited at 0313 hours.  Tech Spec Secondary Containment Operability requires a negative pressure of at least 0.25 [negative inches] WG for all three Reactor Building Ventilation Zones when secondary containment is required.   

Latest revision as of 20:50, 1 March 2018

ENS 50055 +/-
Where
Susquehanna Talen Energy icon.png
Pennsylvania (NRC Region 1)
Reporting
10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material
Time - Person (Reporting Time:+1.33 h0.0554 days <br />0.00792 weeks <br />0.00182 months <br />)
Opened: Martin Lichtner
07:50 Apr 24, 2014
NRC Officer: Vince Klco
Last Updated: Apr 24, 2014