ENS 50666: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 12/10/2014 13:44 EST
| event date = 12/10/2014 13:44 EST
| last update date = 12/10/2014
| last update date = 12/10/2014
| title = Inadvertent Loss Of Vital Indication During Maintenance
| title = Inadvertent Loss of Vital Indication During Maintenance
| event text = On December 10, 2014, at 1344 [EST], channel 1 of Refueling Water Storage Tank (RWST) level indication failed low during maintenance activities on channel 2.  At that time, operators entered abnormal procedure 1-AP-3, 'Loss of Vital Indication, on Unit 1.'  Additionally, Technical Specification (TS) 3.0.3 was entered due to 2 channels inoperable that affect Recirculation Spray (RS) pump auto-start capability.  Had a Containment Depressurization Actuation (CDA) occurred during the time that both channels were inoperable, accident mitigation would have been adversely impacted.  At 1356, both level indications returned to normal.  At 1417, channel 2 was declared Operable and TS 3.0.3 was cleared.  At 1439, channel 1 was declared Operable.
| event text = On December 10, 2014, at 1344 [EST], channel 1 of Refueling Water Storage Tank (RWST) level indication failed low during maintenance activities on channel 2.  At that time, operators entered abnormal procedure 1-AP-3, 'Loss of Vital Indication, on Unit 1.'  Additionally, Technical Specification (TS) 3.0.3 was entered due to 2 channels inoperable that affect Recirculation Spray (RS) pump auto-start capability.  Had a Containment Depressurization Actuation (CDA) occurred during the time that both channels were inoperable, accident mitigation would have been adversely impacted.  At 1356, both level indications returned to normal.  At 1417, channel 2 was declared Operable and TS 3.0.3 was cleared.  At 1439, channel 1 was declared Operable.
Therefore, this 8-hour report is being made per 10 CFR 50.72(b)(3)(v)(D) as an event or condition that could have prevented fulfillment of a safety function due to the RS pump auto-start concern.
Therefore, this 8-hour report is being made per 10 CFR 50.72(b)(3)(v)(D) as an event or condition that could have prevented fulfillment of a safety function due to the RS pump auto-start concern.

Latest revision as of 21:49, 1 March 2018

ENS 50666 +/-
Where
North Anna Dominion icon.png
Virginia (NRC Region 2)
Reporting
10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident
Time - Person (Reporting Time:+-1.52 h-0.0633 days <br />-0.00905 weeks <br />-0.00208 months <br />)
Opened: Bob Page
17:13 Dec 10, 2014
NRC Officer: Jeff Rotton
Last Updated: Dec 10, 2014
50666 - NRC Website