ML14360A007: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(5 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 12/23/2014
| issue date = 12/23/2014
| title = Task Order No. NRC-HQ-20-14-T-0012 Under Delivery Order No. NRC-HQ-50-14-E-0001
| title = Task Order No. NRC-HQ-20-14-T-0012 Under Delivery Order No. NRC-HQ-50-14-E-0001
| author name = Williams M B
| author name = Williams M
| author affiliation = NRC/ADM/AMD
| author affiliation = NRC/ADM/AMD
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:X ". ORDER FOR SUPPLIES OR SERVICES PAGE OF PAGESIMP&TAN " Mark all packages and papers with contract and/or order numbers.
{{#Wiki_filter:X     ".                                 ORDER FOR SUPPLIES OR SERVICES                                                                                                 PAGE OF PAGES IMP&TAN " Mark all packages and papers with contract and/or order numbers.                                                                                                           1                  30
1 301. DATE OP 6RDER 2. CONTRACT NO. (If any) 6 SHIP TO:*NRC-HQ-50-!4-E-0001 09/22/2014  
: 1. DATE OP 6RDER             2. CONTRACT NO. (If any)                                                                                                       6 SHIP TO:
: a. NAME OF CONSIGNEE
                    *NRC-HQ-50-!4-E-0001 09/22/2014                                                                                                 a. NAME OF CONSIGNEE
: 3. ORDER NO. 4. REQUISITION/REFERENCE NO.NRC-HQ-20-14-T-0012 NRR-14-0287 SARA LYONS5. ISSUING OFFICE (Address correspondence to) b. STREET ADDRESSUS NRC -HQ 1155 ROCKVILLE PIKEACQUISITION MANAGEMENT DIVISION MAIL STOP OWFN 1OC15MAIL STOP 3WFN-05-C64MP WASHINGTON DC 20555-0001 c CITY d. STATE e. ZIP CODEROCKVILLE MD 208527. TO: f. SHIP VIAa. NAME OF CONTRACTOR S W R I 8. TYPE OF ORDERb. COMPANY NAME -a. PURCHASE X-' b. DELIVERYc. STREET ADDRESS REFERENCE YOUR:6220 CULEBRA RD Except for billing instructions on thereverse, this delivery order is subjectto instructions contained on this sideonly of this form and is issuedPlease furnish the following on the terms subject to the terms and conditions and conditions specified on both sides of of the above-numbered contract.
: 3. ORDER NO.                                                 4. REQUISITION/REFERENCE NO.
: d. CITY e. STATE f. ZIP CODE this order and on the attached sheet, if any,SAN ANTONIO TX 782385166 including delivery as indicated.
NRR-14-0287                                  SARA LYONS NRC-HQ-20-14-T-0012
: 9. ACCOUNTING AND APPROPRIATION DATA 10. REQUISITIONING OFFICESee Schedule OFF OF NUCLEAR REACTOR REGULATION
: 5. ISSUING OFFICE (Address correspondence to)                                                               b. STREET ADDRESS US NRC - HQ                                                                                               1155 ROCKVILLE PIKE ACQUISITION MANAGEMENT DIVISION                                                                           MAIL STOP OWFN 1OC15 MAIL STOP 3WFN-05-C64MP WASHINGTON               DC   20555-0001 c CITY                                                               d. STATE     e. ZIP CODE ROCKVILLE                                                            MD         20852
: 11. BUSINESS CLASSIFICATION (Check appropriate box(es))  
: 7. TO:                                                                                                     f. SHIP VIA
: 12. F.O.B. POINTa. SMALL b OTHER THAN SMALL I ' c. DISADVANTAGED  
: a. NAME OF CONTRACTOR S W R I                                                                                                                                           8. TYPE OF ORDER
: d. WOMEN-OWNED  
: b. COMPANY NAME                                                                                               -a. PURCHASE                                             X-' b. DELIVERY
: j. e. HUBZonef. SERVICE-DISABLED  
: c. STREET ADDRESS                                                                                             REFERENCE YOUR:
: g. WOMEN-OWNED SMALL BUSINESS (WOSB) h EDWOSBVETERAN-OWNED ELIGIBLE UNDER THE WOSB PROGRAM13. PLACE OF 14. GOVERNMENT BIL NO. 15. DELIVER TO F.O.B. POINT 16. DISCOUNT TERMSON OR BEFORE (Date)a. INSPECTION  
6220       CULEBRA RD                                                                                                                                                   Except for billing instructions on the reverse, this delivery order is subject to instructions contained on this side only of this form and is issued Please furnish the following on the terms                   subject to the terms and conditions and conditions specified on both sides of                   of the above-numbered contract.
: b. ACCEPTANCE Destination Destination 3017. SCHEDULE (See reverse for Rejections)
: d. CITY                                                                 e. STATE   f. ZIP CODE             this order and on the attached sheet, if any, SAN ANTONIO                                                               TX       782385166               including delivery as indicated.
QUANTITY UNIT QUANTITYITEM NO. SUPPLIES OR SERVICES ORDERED UNIT PRICE AMOUNT ACCEPTED(a) (b) (c) (d) (e) (f) (g)The Contractor shall provide services inaccordance with the Statement of Workentitled "Review of the Calvert CliffsUnits 1 and 2 License Amendment Request(LAR) Pertaining to Risk-Informed (RI)Technical Specification Task Force (TSTF)Continued  
: 9. ACCOUNTING AND APPROPRIATION DATA                                                                       10. REQUISITIONING OFFICE See Schedule                                                                                               OFF OF NUCLEAR REACTOR REGULATION
...18. SHIPPING POINT 19. GROSS SHIPPING WEIGHT 20. INVOICE NO. 17(h)TOTAL(Cont.pages)21. MAIL INVOICE TO: a. NAME $76,716.00 44US NUCLEAR REGULATORY COMMISSION SEE BILLINGINSTRUCTIONS
: 11. BUSINESS CLASSIFICATION           (Check appropriatebox(es))                                                                                                             12. F.O.B. POINT
: b. STREET ADDRESS ONE WHITE FLINT NORTHONREVERSE (orP. Box) 11555 ROCKVILLE PIKE 17(i)GRANDMAILSTOP 03-EI7A TOTALc.. e $76, 716.0 ooi .CITY dSTE e. ZIP CODE $7 "160ROCKVILLE MD 20852-2738
: a. SMALL                 b OTHER THAN SMALL               I ' c. DISADVANTAGED               d. WOMEN-OWNED                 j. e. HUBZone
: 22. UNITED STATES OF 09 / 22 / 201 4 23. NAME (Typed)AMERICA BY (Signature)
: f. SERVICE-DISABLED               g. WOMEN-OWNED SMALL BUSINESS (WOSB)                         h EDWOSB VETERAN-OWNED                 ELIGIBLE UNDER THE WOSB PROGRAM
L MONIQUE B. WILLIAMS1--,+-rLA,  
: 13. PLACE OF                                   14. GOVERNMENT BIL NO.                         15. DELIVER TO F.O.B. POINT                     16. DISCOUNT TERMS ON OR BEFORE (Date)
, t. .TITLE: CONTRACTING/ORDERING OFFICERAUTHORIZED FOR LOCAL REPRODUCTION PREVIOUS EDITION NOT USABLEOPTIONAL FORM 347 (R-. U2012)Presrbed by GSA/FAR 48 CPR 53213(f)SUNSI REVIEW COMPLETIN."PI A13-Anfle"900 DEC 2 3 2014hDOW2 ORDER FOR SUPPLIES OR SERVICES PAGE NOof SCHEDULE  
: a. INSPECTION                             b. ACCEPTANCE Destination                               Destination                                                                                                                                         30
-CONTINUATION 2IMPORTANT:
: 17. SCHEDULE (See reverse for Rejections)
Mark all packages and papers with contract and/or order numbers.DATE OF ORDER CONTRACT NO. ORDER NO.09/22/2014 INRC-HQ-50-14-E-0001 NRC-HQ-20-14-T-0012 ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT AMOUNT QUANTITYORDERED PRICE ACCEPTED(a) (b) (c) I(d) (e) (f) (g)Initiative 5b, "Risk-Informed Method forControl of Surveillance Frequencies, TSTF-425."
QUANTITY                       UNIT                                                       QUANTITY ITEM NO.                                     SUPPLIES OR SERVICES                                       ORDERED UNIT                   PRICE                     AMOUNT                           ACCEPTED (a)                                                 (b)                                                   (c)       (d)               (e)                         (f)                               (g)
NRC Contracting Officers Representative:
The Contractor shall provide services in accordance with the Statement of Work entitled            "Review of the Calvert Cliffs Units 1 and 2 License Amendment Request (LAR) Pertaining to Risk-Informed (RI)
Sara Lyons 301-415-2861 Period of Performance:
Technical Specification Task Force (TSTF)
09/22/2014 to02/28/2015 Accounting Info:2014-X0200-FEEBASED-20-20D007-11-4-149-1128-252ALabor/Fee The obligated amount of award: $76,716.00.
Continued ...
The total for this award is shown in box17(i).0000176,716.00 TOTAL CARRIED FORWARD TO 1ST PAGE (ITEM 17(H)) K> $76,716.00 AUTHORIZED FOR LOCAL REPODUCTION OPTIONAL FORM 348 (R-e 42006)PREVIOUS EDITION NOT USABLEs#.P~bed by GS (48 CFR I 53.213(f)
: 18. SHIPPING POINT                                             19. GROSS SHIPPING WEIGHT                   20. INVOICE NO.                                                               17(h)
CONTRACTOR ACCEPTANCE OF TASK ORDER NRC-HQ-20-14-T-0012 Acceptance of Task Order No: NRC-HQ-20-14-T-0012 should be made by having an official, authorized to bind your organization, execute two copies of this document in the space providedand return one copy to the Contracting Officer.
TOTAL (Cont.
You should retain the other copy for yourrecords.Accepted Task Order No. N C-HQ-20-14-T-0012:
pages)
Name R. B. KalmbachExecutive
: 21. MAIL INVOICE TO:                                                                                                              *
: Director, Contracts Title09/18/2014 Date3 SECTION B -Supplies or Services/Prices NRCB010 BRIEF PROJECT TITLE AND WORK DESCRIPTION (a) The title of this project is "Review of the Calvert Cliffs Units 1 and 2 License Amendment Request (LAR) Pertaining to Risk-informed (RI) Technical Specification Task Force (TSTF)Initiative 5b, "Risk-Informed Method for Control of Surveillance Frequencies,"
: a. NAME                                                                                                                                       $76,716.00                                     44 US NUCLEAR REGULATORY                         COMMISSION SEE BILLING INSTRUCTIONS b. STREET ADDRESS                     ONE WHITE FLINT NORTH ONREVERSE      (orP. Box)                       11555 ROCKVILLE PIKE                                                                                                                                     17(i)
TSTF-425."
GRAND MAILSTOP 03-EI7A                                                                                                                                         TOTAL c..
(b) Summary work description:
i .CITY                                                                                       dSTE e
The objective of this task order is to obtain technical assistance from the Southwest Research Institute's (SwRI) Center for Nuclear Waste Regulatory Analyses(CNWRA) to assist the staff in determining the acceptability of the Calvert Cliffs, Units 1 and 2,License Amendment Request.PRICE/COST SCHEDULEPERIOD OF ?ERFORMANCGE'-Septetmber 22;,2014 201.5.L--'ININO.  
: e. ZIP CODE                   $7 716.0
,OF :`-ESTIMA :-W IXEDi. PEE TOTALSRIPLIESISERMICES'i  
                                                                                                                                                                $76,              oo "160 ROCKVILLE                                                                                  MD         20852-2738
ýCO.STI ~CPIFF.00001 Review of Technical Reports forLicense Amendment RequestPertaining to Risk-Informed (RI)Technical Specification Task Force(TSTF) Initiative 5b, "Risk-Informed Method for Control ofSurveillance Frequencies,"
: 22. UNITED STATES OF                             09 / 22 / 201 4                                                           23. NAME       (Typed)
TSTF-425.Total _ _ _$76,716.00 NRCBO40A CONSIDERATION AND OBLIGATION-COST-PLUS-FIXED-FEE ALTERNATE I(a) The total estimated cost to the Government for full performance of this contract is$76,716.00 of which the sum of represents the estimated reimbursable costs, and ofwhich 10 [epresents the W(b) There shall be no adjustment in the amount of the Contractor's fixed fee.(c) The amount currently obligated b the Gov rnment with respect to this contract is$76,716.00, of which the sum of represents the estimated reimbursable costs,and of which repres he ixed-fee.
AMERICA BY (Signature)                 L                                                                                   MONIQUE           B. WILLIAMS 1--,+-rLA,   ,               t.       .                               TITLE: CONTRACTING/ORDERING OFFICER AUTHORIZED FOR LOCAL REPRODUCTION                                                                                                                                             OPTIONAL FORM 347 (R-. U2012)
(d) This is an incrementally-funded contract and FAR 52.232-22
PREVIOUS EDITION NOT USABLE                                                                                                                                                      Presrbed by GSA/FAR48 CPR 53213(f)
-"Limitation of Funds". applies.(e) In accordance with FAR 52.216-8
SUNSI REVIEW COMPLET 3 - Anfle"900                                                                                                         DEC 2 3 2014 IN."PI A1                                                                                                                                                            hDOW2
-Fixed Fee, it is the policy of the NRC to withholdpayment of fee after payment of of the fee has been paid in order to protect theGovernment's interest.
 
The amou of fixed-fee withheld from the contractor will not exceedpercent of the total fee or qwhichever is less. Accordingly, the maximum amount offixed-fee that may be held in reserve is4 SECTION C -Description/Specifications Statement of WorkProject Title: Review of the Calvert Cliffs Units 1 and 2 License Amendment Request (LAR)Pertaining to Risk-Informed (RI) Technical Specification Task Force (TSTF)Initiative 5b, "Risk-Informed Method for Control of Surveillance Frequencies,"
ORDER FOR SUPPLIES OR SERVICES                                               PAGE NO of                                    SCHEDULE - CONTINUATION                                           2 IMPORTANT: Mark all packages and papers with contract and/or order numbers.
TSTF-425Cost Center: 1128Contract No.: NRC-HQ-50-14-E-0001 Task Assignment Control Numbers:
DATE OF ORDER       CONTRACT NO.                                                               ORDER NO.
MF4227, non-fee recoverable work, for Task IMF4065 for Unit 1MF4066 for Unit 2Budget & Reporting No.: 11-4-149NRC Requisition Office: NRRNRC COR: Sara Lyons, Sara.Lyonsanrc..qov, (301) 415-2861Alternate NRC COR: Bernard L. Grenier, Bernard.Grenier(Dnrc.,qov, (301) 415-2726Fee Recoverable:
09/22/2014 INRC-HQ-50-14-E-0001                                                                 NRC-HQ-20-14-T-0012 ITEM NO.                         SUPPLIES/SERVICES                       QUANTITY UNIT UNIT             AMOUNT                     QUANTITY ORDERED      PRICE                                       ACCEPTED (a)                                     (b)                             (c)   I(d)   (e)               (f)                         (g)
Yes; all costs must be allocated to each specific TAC number in theactual amount which was spent on Task 1 or on each individual unit.Contractor:
Initiative       5b, "Risk-Informed Method for Control of Surveillance Frequencies, TSTF-425."
CNWRAType of Contract/Order:
NRC Contracting Officers                     Representative:
Cost Plus Fixed FeePeriod of Performance:
Sara Lyons 301-415-2861 Period of Performance:                   09/22/2014 to 02/28/2015 Accounting Info:
9/22/2014  
2014-X0200-FEEBASED-20-20D007-11-4-149-1128-252A 00001        Labor/Fee                                                                                       76,716.00 The obligated amount of award: $76,716.00.
-02/28/2015
The total       for this award is shown in box 17(i).
: 1. BACKGROUND In 1992, the NRC issued the improved Standard Technical Specifications (STS) to clarify thecontent and form of requirements necessary to ensure safe operation of nuclear powerplants in accordance with Section 50.36 of Title 10 of the Code of Federal Regulations (10CFR 50.36). As the STS mature, necessary improvements are identified.
TOTAL CARRIED FORWARD TO 1ST PAGE (ITEM 17(H))                 K>                           $76,716.00 AUTHORIZED FOR LOCALREPODUCTION                                                                                          OPTIONAL FORM 348 (R-e 42006)
One processused to initiate changes to the STS involves the industry-sponsored Technical Specifications Task Force (TSTF) submitting a proposed change or Traveler to the NRC for review,approval, and subsequent incorporation into the next revision of the STS. The NRC reviewsthe proposed change, with the end product being a model application, a model safetyevaluation, and a review plan which licensees may use in subsequent LARs. Licensees applying to incorporate these proposed changes into their Technical Specifications mustprovide a plant specific justification acceptable to the staff in their LAR.5 In 2007, the NRC issued the final safety evaluation (SE) for the Nuclear Energy Institute (NEI) Topical Report (TR) 04-10, Revision 1, "Risk-Informed Technical Specification Initiative 5b, Risk-Informed Method for Control of Surveillance Frequencies."
PREVIOUS EDITION NOTUSABLE                                                                                                                              s#.
This STSchange provides a risk-informed methodology to identify, assess, implement, and monitorproposed changes to frequencies of surveillance requirements (SRs) of technical specifications (TSs). The initiative is intended to maintain and improve safety throughincorporation of risk assessment and management techniques in the TSs, while reducingunnecessary burden.The Office of Nuclear Reactor Regulation (NRR) is currently reviewing several risk-informed LARs and expects additional risk-informed LARs in fiscal years 2015 and 2016. CalvertCliffs has submitted a RI-TSTF Initiative 5b LAR which is applicable to both units. The PRALicensing Branch (APLA) is responsible for reviewing the Probabilistic Risk Assessment (PRA) portion of the LARs to make an independent assessment regarding PRA technical adequacy and the acceptability of the proposed amendment.
P~bed by GS FR* (48 CFRI53.213(f)
Due to heavy workload inAPLA, contractor assistance is required to support APLA so as to complete the technical review and develop the safety evaluation report (SER) for these LARs in a timely manner.The metric which has been established for staff review and issuance of the SER is one yearfrom receipt of the LAR in ADAMS. The Calvert Cliffs was accepted in ADAMS on May 1,2014. The APLA SE date to the Division of Operating Reactor Licensing is January 2, 2015.1. SCOPE OF WORKThe scope of the work includes review of the Calvert Cliffs, Units 1 and 2, RI-TSTF Initiative 5b/TSTF-425 LAR for PRA quality and technical adequacy and preparation of the technical evaluation report (TER).Objective The objective of this task order is to obtain technical assistance from the Southwest Research Institute's (SwRI) Center for Nuclear Waste Regulatory Analyses (CNWRA) toassist the staff in determining the acceptability of the Calvert Cliffs, Units 1 and 2, LAR.2. SPECIFIC TASKS (WORK REQUIREMENTS AND SCHEDULE)
 
Tasks Completion Schedule1. Gain familiarity with NRC processes specific to this Task Order.a. Prepare for a kick-off meeting by reviewing applicable One week after theDocuments and Standards (see Section 5). Travel to trip; the trip is toNRC HQ to participate in a kick-off meeting to discuss occur within twoall aspects of the scope of the work, expectations, and weeks after award ofother subjects pertinent to this type of work. Prepare a the task order.trip report.b. Travel to NRC HQ to participate in a review process One week after theassessment meeting to discuss the process, questions trip; the trip is toand potential improvements after completion of the first occur within twodetailed TSTF-425 review. Prepare a trip report. weeks of completing Task 2, below.6  
CONTRACTOR ACCEPTANCE OF TASK ORDER NRC-HQ-20-14-T-0012 Acceptance of Task Order No: NRC-HQ-20-14-T-0012 should be made by having an official, authorized to bind your organization, execute two copies of this document in the space provided and return one copy to the Contracting Officer. You should retain the other copy for your records.
Accepted Task Order No. N C-HQ-20-14-T-0012:
Name R. B. Kalmbach Executive Director, Contracts Title 09/18/2014 Date 3
 
SECTION B - Supplies or Services/Prices NRCB010 BRIEF PROJECT TITLE AND WORK DESCRIPTION (a) The title of this project is "Review of the Calvert Cliffs Units 1 and 2 License Amendment Request (LAR) Pertaining to Risk-informed (RI) Technical Specification Task Force (TSTF)
Initiative 5b, "Risk-Informed Method for Control of Surveillance Frequencies," TSTF-425."
(b) Summary work description: The objective of this task order is to obtain technical assistance from the Southwest Research Institute's (SwRI) Center for Nuclear Waste Regulatory Analyses (CNWRA) to assist the staff in determining the acceptability of the Calvert Cliffs, Units 1 and 2, License Amendment Request.
PRICE/COST SCHEDULE PERIOD OF ?ERFORMANCGE'-Septetmber 22;,2014 .ýý-*Februar.28, 201.5
.L--'ININO. 'a-N*--D.ESCRIPTc!ON    ,OF :`-ESTIMA             *-  :-W     IXEDi.PEE TOTAL SRIPLIESISERMICES'i               ýCO.STI             ~CPIFF.
00001         Review of Technical Reports for License Amendment Request Pertaining to Risk-Informed (RI)
Technical Specification Task Force (TSTF) Initiative 5b, "Risk-Informed Method for Control of Surveillance Frequencies," TSTF-425.
Total         _     _     _$76,716.00 NRCBO40A CONSIDERATION AND OBLIGATION-COST-PLUS-FIXED-FEE ALTERNATE I (a) The total estimated cost to the Government for full performance of this contract is
$76,716.00 of which the sum of                   represents the estimated reimbursable costs, and of which 10             [epresents the W (b) There shall be no adjustment in the amount of the Contractor's fixed fee.
(c) The amount currently obligated b the Gov rnment with respect to this contract is
$76,716.00, of which the sum of                       represents the estimated reimbursable costs, and of which                     repres     he ixed-fee.
(d) This is an incrementally-funded contract and FAR 52.232 "Limitation of Funds". applies.
(e) In accordance with FAR 52.216 Fixed Fee, it is the policy of the NRC to withhold payment of fee after payment of *ercent of the fee has been paid in order to protect the Government's interest. The amou of fixed-fee withheld from the contractor will not exceed percent of the total fee or qwhichever               is less. Accordingly, the maximum amount of fixed-fee that may be held in reserve is 4
 
SECTION C - Description/Specifications Statement of Work Project
 
==Title:==
Review of the Calvert Cliffs Units 1 and 2 License Amendment Request (LAR)
Pertaining to Risk-Informed (RI) Technical Specification Task Force (TSTF)
Initiative 5b, "Risk-Informed Method for Control of Surveillance Frequencies,"
TSTF-425 Cost Center:     1128 Contract No.: NRC-HQ-50-14-E-0001 Task Assignment Control Numbers: MF4227, non-fee recoverable work, for Task I MF4065 for Unit 1 MF4066 for Unit 2 Budget & Reporting No.: 11-4-149 NRC Requisition Office: NRR NRC COR:                 Sara Lyons, Sara.Lyonsanrc..qov, (301) 415-2861 Alternate NRC COR:       Bernard L. Grenier, Bernard.Grenier(Dnrc.,qov, (301) 415-2726 Fee Recoverable:         Yes; all costs must be allocated to each specific TAC number in the actual amount which was spent on Task 1 or on each individual unit.
Contractor: CNWRA Type of Contract/Order: Cost Plus Fixed Fee Period of Performance: 9/22/2014 - 02/28/2015
: 1. BACKGROUND In 1992, the NRC issued the improved Standard Technical Specifications (STS) to clarify the content and form of requirements necessary to ensure safe operation of nuclear power plants in accordance with Section 50.36 of Title 10 of the Code of Federal Regulations (10 CFR 50.36). As the STS mature, necessary improvements are identified. One process used to initiate changes to the STS involves the industry-sponsored Technical Specifications Task Force (TSTF) submitting a proposed change or Traveler to the NRC for review, approval, and subsequent incorporation into the next revision of the STS. The NRC reviews the proposed change, with the end product being a model application, a model safety evaluation, and a review plan which licensees may use in subsequent LARs. Licensees applying to incorporate these proposed changes into their Technical Specifications must provide a plant specific justification acceptable to the staff in their LAR.
5
 
In 2007, the NRC issued the final safety evaluation (SE) for the Nuclear Energy Institute (NEI) Topical Report (TR) 04-10, Revision 1, "Risk-Informed Technical Specification Initiative 5b, Risk-Informed Method for Control of Surveillance Frequencies." This STS change provides a risk-informed methodology to identify, assess, implement, and monitor proposed changes to frequencies of surveillance requirements (SRs) of technical specifications (TSs). The initiative is intended to maintain and improve safety through incorporation of risk assessment and management techniques in the TSs, while reducing unnecessary burden.
The Office of Nuclear Reactor Regulation (NRR) is currently reviewing several risk-informed LARs and expects additional risk-informed LARs in fiscal years 2015 and 2016. Calvert Cliffs has submitted a RI-TSTF Initiative 5b LAR which is applicable to both units. The PRA Licensing Branch (APLA) is responsible for reviewing the Probabilistic Risk Assessment (PRA) portion of the LARs to make an independent assessment regarding PRA technical adequacy and the acceptability of the proposed amendment. Due to heavy workload in APLA, contractor assistance is required to support APLA so as to complete the technical review and develop the safety evaluation report (SER) for these LARs in a timely manner.
The metric which has been established for staff review and issuance of the SER is one year from receipt of the LAR in ADAMS. The Calvert Cliffs was accepted in ADAMS on May 1, 2014. The APLA SE date to the Division of Operating Reactor Licensing is January 2, 2015.
: 1. SCOPE OF WORK The scope of the work includes review of the Calvert Cliffs, Units 1 and 2, RI-TSTF Initiative 5b/TSTF-425 LAR for PRA quality and technical adequacy and preparation of the technical evaluation report (TER).
Objective The objective of this task order is to obtain technical assistance from the Southwest Research Institute's (SwRI) Center for Nuclear Waste Regulatory Analyses (CNWRA) to assist the staff in determining the acceptability of the Calvert Cliffs, Units 1 and 2, LAR.
: 2. SPECIFIC TASKS (WORK REQUIREMENTS AND SCHEDULE)
Tasks                                                                       Completion Schedule
: 1. Gain familiarity with NRC processes specific to this Task Order.
: a. Prepare for a kick-off meeting by reviewing applicable             One week after the Documents and Standards (see Section 5). Travel to                 trip; the trip is to NRC HQ to participate in a kick-off meeting to discuss             occur within two all aspects of the scope of the work, expectations, and           weeks after award of other subjects pertinent to this type of work. Prepare a the task order.
trip report.
: b. Travel to NRC HQ to participate in a review process                 One week after the assessment meeting to discuss the process, questions trip; the trip is to and potential improvements after completion of the first           occur within two detailed TSTF-425 review. Prepare a trip report.                 weeks of completing Task 2, below.
6
: 3. SPECIFIC TASKS (WORK REQUIREMENTS AND SCHEDULE)
: 3. SPECIFIC TASKS (WORK REQUIREMENTS AND SCHEDULE)
TasksCompletion Schedule2. Based on the applicable documents and standards found inSection 4, perform the following tasks:a. Review the layout, scope, and content of the LAR andidentify the NRC approved revision of TSTF-425referenced by the licensee in the LAR. Prepare atechnical letter report.b. Identify any deviations from the approved TSTF-425 scope:(1) Compare the TSTF-425 LAR with the Safety Evaluation Report (SER) issued for the appropriate revision ofNEI 04-10, "Risk-Informed Technical Specification Initiative 5B, Risk-Informed Method for Control ofSurveillance Frequencies,"
Tasks                                                                  Completion Schedule
and itemize any deviations.
: 2. Based on the applicable documents and standards found in Section 4, perform the following tasks:
: a. Review the layout, scope, and content of the LAR and            One week after identify the NRC approved revision of TSTF-425                completion of referenced by the licensee in the LAR. Prepare a              Subtask l.a.
technical letter report.
: b. Identify any deviations from the approved TSTF-425 scope:       Two weeks after completion of (1) Compare the TSTF-425 LAR with the Safety Evaluation       Subtask 2.a.
Report (SER) issued for the appropriate revision of NEI 04-10, "Risk-Informed Technical Specification Initiative 5B, Risk-Informed Method for Control of Surveillance Frequencies," and itemize any deviations.
(2) Where possible, summarize the reason for the deviation (as identified by the licensee) along with the deviation.
(2) Where possible, summarize the reason for the deviation (as identified by the licensee) along with the deviation.
: c. TSTF-425 identifies the specific STS Surveillance Frequencies (SFs) to be relocated.
: c. TSTF-425 identifies the specific STS Surveillance               One week after Frequencies (SFs) to be relocated. Identify any plant-         completion of specific frequencies proposed to be relocated which are        Subtask 2.b.
Identify any plant-specific frequencies proposed to be relocated which arenot contained within the STS scope.1 Determine if eachrelocated frequency is solely time-based, and not basedon events, equipment conditions, or other parameters.
not contained within the STS scope.1 Determine if each relocated frequency is solely time-based, and not based on events, equipment conditions, or other parameters.
TSTF-425, Section 2.0 describes the exceptions torelocating surveillance frequencies.
TSTF-425, Section 2.0 describes the exceptions to relocating surveillance frequencies. Prepare a technical letter report.
Prepare a technical letter report.d. Review the Technical Adequacy of the Internal EventsProbabilistic Risk Assessment (PRA) Model.(1) Confirm that the licensee has completed a peer reviewof their model in accordance with Regulatory Guide(RG) 1.200.One week aftercompletion ofSubtask l.a.Two weeks aftercompletion ofSubtask 2.a.One week aftercompletion ofSubtask 2.b.Three weeks aftercompletion ofSubtask 1.a; seeassumptions andunderstandings
: d. Review the Technical Adequacy of the Internal Events            Three weeks after Probabilistic Risk Assessment (PRA) Model.                     completion of Subtask 1.a; see (1) Confirm that the licensee has completed a peer review      assumptions and of their model in accordance with Regulatory Guide       understandings (RG) 1.200.                                               section, below.
: section, below.(2) Review all facts and observations (F&Os), including any identified as "documentation issue only."Evaluate the disposition of the F&O for the TSTF-425program and determine if proposed sensitivity analysesare reasonable.
(2) Review all facts and observations (F&Os), including any identified as "documentation issue only."
Identify the need for additional orclarifying information (RAIs2) which are not necessarily limited to F&Os, but addresses the PRA technical 1 SFs which are identical with the TSTF-425 scope, or which are not relocated in the plant-specific implementation of TSTF-425, do not require review.2 See Section 10 for guidance in the preparation of RAIs.7  
Evaluate the disposition of the F&O for the TSTF-425 program and determine if proposed sensitivity analyses are reasonable. Identify the need for additional or clarifying information (RAIs 2 ) which are not necessarily limited to F&Os, but addresses the PRA technical 1 SFs which are identical with the TSTF-425 scope, or which are not relocated in the plant-specific implementation of TSTF-425, do not require review.
: 3. SPECIFIC TASKS (WORK REQUIREMENTS AND SCHEDULE)  
2 See Section 10 for guidance in the preparation of RAIs.
(CONTINUED) adequacy of the Internal Events PRA model. Anexample may be an RAI related to peer review(s).
7
Another example may be assessing the acceptability of a capability category I supporting requirement forthe TSTF-425 program.
: 3. SPECIFIC TASKS (WORK REQUIREMENTS AND SCHEDULE) (CONTINUED) adequacy of the Internal Events PRA model. An example may be an RAI related to peer review(s).
Prepare a technical letterreport.e. Given that the licensee is permitted to use PRA or othermethods to address seismic, fire, other external eventsand shutdown events for making SF changes, identifythe method by which the licensee is addressing otherhazard groups. Identify if the method requires a peer-reviewed PRA model for a detailed analysis or if onlyqualitative and bounding analyses will be considered.
Another example may be assessing the acceptability of a capability category I supporting requirement for the TSTF-425 program. Prepare a technical letter report.
Identify if the method considers the current as-built, as-operated plant. Confirm that the method identified isconsistent with the NRC approved revision of TSTF-425referenced by the licensee in the LAR. Identify anydeviations from this guidance and provide a technical determination of the significance based on available information.
: e. Given that the licensee is permitted to use PRA or other    One week after methods to address seismic, fire, other external events    completion of and shutdown events for making SF changes, identify        Subtask 2.d.
Identify the need for additional or clarifying information.
the method by which the licensee is addressing other hazard groups. Identify if the method requires a peer-reviewed PRA model for a detailed analysis or if only qualitative and bounding analyses will be considered.
Prepare a technical letter report.f. Confirm that the new program in TS Administrative Controls is identical to the program in TSTF-425, exceptthe plant specific numbering of the TS program andreferenced surveillance requirements.
Identify if the method considers the current as-built, as-operated plant. Confirm that the method identified is consistent with the NRC approved revision of TSTF-425 referenced by the licensee in the LAR. Identify any deviations from this guidance and provide a technical determination of the significance based on available information. Identify the need for additional or clarifying information. Prepare a technical letter report.
Identify anydeviations, and the need for additional or clarifying information.
: f. Confirm that the new program in TS Administrative           One week after Controls is identical to the program in TSTF-425, except    completion of the plant specific numbering of the TS program and          Subtask 2.e.
Prepare a technical letter report.g. Identify any open items in the TER and corresponding draft RAIs.(1) Draft TER and RAIs. Review the TSTF-425 ModelSER and use it as the basis for developing the TER.(2) Incorporate NRC comments and prepare the finaldraft TER and RAIs.3. Using the same steps as in Task 2, review the licenseesupplement including the RAI responses (depending onthe content of the supplement) and determine if theresponse adequately addresses the RAI. If the RAIresponse adequately addresses the RAI, update the TER.If the response does not adequately address the RAI,develop an additional RAI. Prepare a technical letter report.One week aftercompletion ofSubtask 2.d.One week aftercompletion ofSubtask 2.e.One week aftercompletion ofSubtask 2.f.Two weeks afterreceipt of NRCcomments.
referenced surveillance requirements. Identify any deviations, and the need for additional or clarifying information. Prepare a technical letter report.
Two weeks fromreceipt of the RAIresponses.
: g. Identify any open items in the TER and corresponding draft RAIs.
8  
(1) Draft TER and RAIs. Review the TSTF-425 Model          One week after SER and use it as the basis for developing the TER. completion of Subtask 2.f.
(2) Incorporate NRC comments and prepare the final          Two weeks after draft TER and RAIs.                                     receipt of NRC comments.
: 3. Using the same steps as in Task 2, review the licensee              Two weeks from supplement including the RAI responses (depending on                receipt of the RAI the content of the supplement) and determine if the                  responses.
response adequately addresses the RAI. If the RAI response adequately addresses the RAI, update the TER.
If the response does not adequately address the RAI, develop an additional RAI. Prepare a technical letter report.
8
: 3. SPECIFIC TASKS (WORK REQUIREMENTS AND SCHEDULE)
: 3. SPECIFIC TASKS (WORK REQUIREMENTS AND SCHEDULE)
: 4. After receipt of the last RAI responses(s),
: 4. After receipt of the last RAI responses(s), update the TER.
update the TER.If the response does not adequately address the RAI, listthe item as an open item in the TER.a. Draft TER. Two weeks afterreceipt of the lastRAI response(s).
If the response does not adequately address the RAI, list the item as an open item in the TER.
: b. Incorporate NRC comments and prepare the final TER. Two weeks afterreceipt of NRCcomments.
: a. Draft TER.                                                         Two weeks after receipt of the last RAI response(s).
: b. Incorporate NRC comments and prepare the final TER.               Two weeks after receipt of NRC comments.
: 3. APPLICABLE DOCUMENTS AND STANDARDS Technical References
: 3. APPLICABLE DOCUMENTS AND STANDARDS Technical References
* Technical Specification Task Force, letter and enclosure to U.S. Nuclear Regulatory Commission, Transmittal of TSTF-425, Revision 3, "Relocate Surveillance Frequencies to Licensee Control-RITSTF Initiative 5b," dated March 18, 2009 (ADAMS Accession No.ML090850642).
* Technical Specification Task Force, letter and enclosure to U.S. Nuclear Regulatory Commission, Transmittal of TSTF-425, Revision 3, "Relocate Surveillance Frequencies to Licensee Control-RITSTF Initiative 5b," dated March 18, 2009 (ADAMS Accession No. ML090850642).
o Nuclear Energy Institute, NEI 04-10, Revision 1, "Risk-Inforned Technical Specifications Initiative 5b, Risk-informed Method for Control of Surveillance Frequencies,"
o Nuclear Energy Institute, NEI 04-10, Revision 1, "Risk-Inforned Technical Specifications Initiative 5b, Risk-informed Method for Control of Surveillance Frequencies," April 2007 (ADAMS Accession No. ML071360456).
April 2007(ADAMS Accession No. ML071360456).
* Letter from H. Hieh (NRC) to T. Pietrangelo (NEI), "Final Safety Evaluation for Nuclear Energy Institute (NEI) Industry Guidance Document NEI 04-10, Revision 0, Risk-Informed Technical Specifications Initiative 5B, Risk-Informed Method for Control of Surveillance Frequencies," dated September 28, 2006, Accession No.ML062700012.
* Letter from H. Hieh (NRC) to T. Pietrangelo (NEI), "Final Safety Evaluation for NuclearEnergy Institute (NEI) Industry Guidance Document NEI 04-10, Revision 0, Risk-Informed Technical Specifications Initiative 5B, Risk-Informed Method for Control ofSurveillance Frequencies,"
0 Nieh, H. K., U.S. Nuclear Regulatory Commission, letter to Biff Bradley, Nuclear Energy Institute, "Final Safety Evaluation for Nuclear Energy Institute (NEI) Topical Report (TR) 04-10, Revision 1, 'Risk-Informed Technical Specifications Initiative 5B, Risk-Informed Method for Control of Surveillance Frequencies'," dated September 19, 2007 (ADAMS Accession No. ML072570267).
dated September 28, 2006, Accession No.ML062700012.
a U.S. Nuclear Regulatory Commission, Regulatory Guide 1.174, Revision 2, "An Approach for Using Probabilistic Risk Assessment in Risk-Informed Decisions on PlantSpecific Changes to the Licensing Basis," May 2011 (ADAMS Accession No. ML100910006).
0 Nieh, H. K., U.S. Nuclear Regulatory Commission, letter to Biff Bradley, Nuclear EnergyInstitute, "Final Safety Evaluation for Nuclear Energy Institute (NEI) Topical Report (TR)04-10, Revision 1, 'Risk-Informed Technical Specifications Initiative 5B, Risk-Informed Method for Control of Surveillance Frequencies',"
* U.S. Nuclear Regulatory Commission, Regulatory Guide 1.177, Revision 1, "An Approach for Plant-Specific, Risk-Informed Decisionmaking: Technical Specifications,"
dated September 19, 2007 (ADAMSAccession No. ML072570267).
May 2011 (ADAMS Accession No. ML100910008).
a U.S. Nuclear Regulatory Commission, Regulatory Guide 1.174, Revision 2, "AnApproach for Using Probabilistic Risk Assessment in Risk-Informed Decisions onPlantSpecific Changes to the Licensing Basis," May 2011 (ADAMS Accession No. ML100910006).
* U.S. Nuclear Regulatory Commission, Regulatory Guide 1.200, Revision 2, "An Approach for Determining the Technical Adequacy of Probabilistic Risk Assessment Results for Risk-Informed Activities," March 2009 (ADAMS Accession No. ML090410014 and ML090410018).
* U.S. Nuclear Regulatory Commission, Regulatory Guide 1.177, Revision 1, "AnApproach for Plant-Specific, Risk-Informed Decisionmaking:
9
Technical Specifications,"
May 2011 (ADAMS Accession No. ML 100910008).
* U.S. Nuclear Regulatory Commission, Regulatory Guide 1.200, Revision 2, "AnApproach for Determining the Technical Adequacy of Probabilistic Risk Assessment Results for Risk-Informed Activities,"
March 2009 (ADAMS Accession No. ML090410014 and ML090410018).
9  
: 4. APPLICABLE DOCUMENTS AND STANDARDS (CONTINUED)
: 4. APPLICABLE DOCUMENTS AND STANDARDS (CONTINUED)
* U.S. Nuclear Regulatory Commission, NUREG-0800, Standard Review Plan, Section16.1, Revision 1, "Risk-lnformed Decision Making: Technical Specifications,"
* U.S. Nuclear Regulatory Commission, NUREG-0800, Standard Review Plan, Section 16.1, Revision 1, "Risk-lnformed Decision Making: Technical Specifications," March 2007 (ADAMS Accession No. ML070380228).
March2007 (ADAMS Accession No. ML070380228).
  " U.S. Nuclear Regulatory Commission, NUREG-0800, Standard Review Plan, Section 19.1, Revision 3, "Determining the Technical Adequacy of Probabilistic Risk Assessment Results for Risk-Informed Activities," September 2012 (ADAMS Accession No. ML12193A107).
" U.S. Nuclear Regulatory Commission, NUREG-0800, Standard Review Plan, Section19.1, Revision 3, "Determining the Technical Adequacy of Probabilistic Risk Assessment Results for Risk-Informed Activities,"
: 4. DELIVERABLES AND DELIVERY SCHEDULE Technical Reporting Requirements
September 2012 (ADAMS Accession No.ML1 2193A1 07).4. DELIVERABLES AND DELIVERY SCHEDULETechnical Reporting Requirements
: 1. At the completion of Task 1 .a, submit a trip report that contains a brief summary of the discussions and any highlights or challenges of the upcoming work.
: 1. At the completion of Task 1 .a, submit a trip report that contains a brief summary of thediscussions and any highlights or challenges of the upcoming work.2. At the completion of Task 1.b, submit a trip report that contains a brief summary of thediscussions.
: 2. At the completion of Task 1.b, submit a trip report that contains a brief summary of the discussions.
: 3. At the completion of Subtask 2.a., submit a technical letter report that contains asummary of the work performed to include the NRC approved revision of TSTF-425referenced by the licensee in the LAR.4. At the completion of Subtask 2.b., submit a technical letter report that contains asummary of the work performed to include any deviations from the approved TSTF-425scope, and a summary of the reason for the deviation (as identified by the licensee),
: 3. At the completion of Subtask 2.a., submit a technical letter report that contains a summary of the work performed to include the NRC approved revision of TSTF-425 referenced by the licensee in the LAR.
: 4. At the completion of Subtask 2.b., submit a technical letter report that contains a summary of the work performed to include any deviations from the approved TSTF-425 scope, and a summary of the reason for the deviation (as identified by the licensee),
where possible.
where possible.
: 5. At the completion of Subtask 2.c, submit a technical letter report that contains asummary of the work performed to include identification of any plant-specific frequencies proposed to be relocated which are not contained within the STS scope.6. At the completion of Subtask 2.d, submit a technical letter report that contains a listof the RAIs and the regulatory basis for the RAI and include a discussion on PRAtechnical adequacy for the resolution of each F&O and for the PRA model as awhole upon completing the evaluation of each F&O.7. At the completion of Task 2.e, submit a technical letter report that contains asummary of the work performed to include a summary of the methods used toaddress external events and shutdown events, if the method considers thecurrent as-built, as-operated plant, and any deviations from the approved revisionof TSTF-425 referenced by the licensee in the LAR.8. At the completion of Task 2.f, submit a technical letter report that contains asummary of the work performed to include a summary of and deviations of the10 new program in TS Administrative Controls from the approved revision of TSTF-425 referenced by the licensee in the LAR.5. DELIVERABLES AND DELIVERY SCHEDULE9. At the completion of Task 2.g.(1) and 2.g.(2),
: 5. At the completion of Subtask 2.c, submit a technical letter report that contains a summary of the work performed to include identification of any plant-specific frequencies proposed to be relocated which are not contained within the STS scope.
submit a TER and RAIs, draft and final, asappropriate, that are developed in accordance with the format, outline, and contentprovided by the NRC COR.10. At the completion of Task 3, submit a TER and RAIs (if needed),
: 6. At the completion of Subtask 2.d, submit a technical letter report that contains a list of the RAIs and the regulatory basis for the RAI and include a discussion on PRA technical adequacy for the resolution of each F&O and for the PRA model as a whole upon completing the evaluation of each F&O.
draft and final, asappropriate, that are developed in accordance with the format, outline, and contentprovided by the NRC COR.11. At the completion of Task 4.a and 4.b, submit an updated TER, draft and final,respectively.
: 7. At the completion of Task 2.e, submit a technical letter report that contains a summary of the work performed to include a summary of the methods used to address external events and shutdown events, if the method considers the current as-built, as-operated plant, and any deviations from the approved revision of TSTF-425 referenced by the licensee in the LAR.
: 8. At the completion of Task 2.f, submit a technical letter report that contains a summary of the work performed to include a summary of and deviations of the 10
 
new program in TS Administrative Controls from the approved revision of TSTF-425 referenced by the licensee in the LAR.
: 5. DELIVERABLES AND DELIVERY SCHEDULE
: 9. At the completion of Task 2.g.(1) and 2.g.(2), submit a TER and RAIs, draft and final, as appropriate, that are developed in accordance with the format, outline, and content provided by the NRC COR.
: 10. At the completion of Task 3, submit a TER and RAIs (if needed), draft and final, as appropriate, that are developed in accordance with the format, outline, and content provided by the NRC COR.
: 11. At the completion of Task 4.a and 4.b, submit an updated TER, draft and final, respectively.
Monthly Letter Status Reporting (MLSR) Requirements MLSRs will be prepared in accordance with the base EWC contract.
Monthly Letter Status Reporting (MLSR) Requirements MLSRs will be prepared in accordance with the base EWC contract.
The MLSRs must contain a License Fee Recovery Reporting Section which lists the TACnumbers for each plant and the associated costs against those TAC numbers for thereporting period.6. REQUIRED LABOR CATEGORIES (Except for Information Techhnoloqy' Services)
The MLSRs must contain a License Fee Recovery Reporting Section which lists the TAC numbers for each plant and the associated costs against those TAC numbers for the reporting period.
One Principal Investigator (PI)/ Senior Risk Analyst who possesses experience and workingknowledge in the areas of (1) Use of PRA at U.S. nuclear power plants; and (2) U.S. nuclearpower plant systems and operations.
: 6. REQUIRED LABOR CATEGORIES (Except for Information Techhnoloqy' Services)
Two staff-level Nuclear Engineers or Risk Analysts who possesses in-depth knowledge ofU.S. nuclear power plant systems and operations.
One Principal Investigator (PI)/ Senior Risk Analyst who possesses experience and working knowledge in the areas of (1) Use of PRA at U.S. nuclear power plants; and (2) U.S. nuclear power plant systems and operations.
Two staff-level Nuclear Engineers or Risk Analysts who possesses in-depth knowledge of U.S. nuclear power plant systems and operations.
: 5. GOVERNMENT-FURNISHED PROPERTY/MATERIALS The ADAMS Accession No. for the Calvert Cliffs TSTF-425 LAR is ML14125A015.
: 5. GOVERNMENT-FURNISHED PROPERTY/MATERIALS The ADAMS Accession No. for the Calvert Cliffs TSTF-425 LAR is ML14125A015.
NOTE: Some of these documents contain proprietary information and must be safeguarded against unauthorized disclosure.
NOTE: Some of these documents contain proprietary information and must be safeguarded against unauthorized disclosure. After completion of work, the documents should either be destroyed or returned to NRC. Ifthey are destroyed, please confirm this in an E-mail to the COR and include the date and manner in which the documents were destroyed.
After completion of work, the documents shouldeither be destroyed or returned to NRC. If they aredestroyed, please confirm this in an E-mail to the COR andinclude the date and manner in which the documents weredestroyed.
The NRC COR will provide those NRC documents related to licensing activities (for example, any Non-Publicly available SERs, audit reports, and related documents) that are readily available. The NRC COR will provide access to training material pertinent to the LAR reviews or other NRC documents and docketed correspondence on related issues.
The NRC COR will provide those NRC documents related to licensing activities (forexample, any Non-Publicly available SERs, audit reports, and related documents) that arereadily available.
The CNWRA staff shall identify any additional NRC documentation that is needed and the COR will determine whether these will be provided by the NRC or obtained directly by the CNWRA from ADAMS, NRC public document room or the NRC website at www.nrc.qov.
The NRC COR will provide access to training material pertinent to theLAR reviews or other NRC documents and docketed correspondence on related issues.The CNWRA staff shall identify any additional NRC documentation that is needed and theCOR will determine whether these will be provided by the NRC or obtained directly by theCNWRA from ADAMS, NRC public document room or the NRC website at www.nrc.qov.
11
11 A6. PLACE OF PERFORMANCE This work will be performed at the contractor's site, with the exception of trips to the plantsite and Government site as needed.7. SPECIAL CONSIDERATIONS Assumptions and Understanding The level of effort for each Task was determined based on previous NRC experience fromreviewing LARs of similar scope. However, it is expected that the actual number of hourswill vary depending on the quality and scope of the specific TSTF-425 LAR to be reviewed.
 
: 8. SPECIAL CONSIDERATIONS Assumptions and Understanding The level of effort assumption for Task 1 .a, for each traveler, is based on forty hours ofpreparation, four hours to travel to the meeting site, 16 hours for the meeting and four hoursfor return travel and documentation.
A
It is assumed that there will be three travelers.
: 6. PLACE OF PERFORMANCE This work will be performed at the contractor's site, with the exception of trips to the plant site and Government site as needed.
Thelevel of effort assumption for task 1 .b, for each traveler, is based on four hours to travel tothe meeting site, 16 hours for the meeting and four hours for return travel anddocumentation.
: 7. SPECIAL CONSIDERATIONS Assumptions and Understanding The level of effort for each Task was determined based on previous NRC experience from reviewing LARs of similar scope. However, it is expected that the actual number of hours will vary depending on the quality and scope of the specific TSTF-425 LAR to be reviewed.
It is understood that Subtask 2.d. can be done in parallel with Subtasks 2.b. and 2.c.The level of effort assumption for Task 3 assumes two rounds of RAIs. Each round of RAIsis assumed to take 16 hours to review, including drafting any necessary follow-up RAIs andupdating the draft TER.It is understood that the level of effort for each Task contains sufficient effort to conducttelephone conference calls with the NRC staff. Such phone calls, for example, might bearranged by the NRC COR with the Licensing Project Manager and other NRC staff todiscuss the RAls and to reach an understanding with the licensee.
: 8. SPECIAL CONSIDERATIONS Assumptions and Understanding The level of effort assumption for Task 1.a, for each traveler, is based on forty hours of preparation, four hours to travel to the meeting site, 16 hours for the meeting and four hours for return travel and documentation. It is assumed that there will be three travelers. The level of effort assumption for task 1.b, for each traveler, is based on four hours to travel to the meeting site, 16 hours for the meeting and four hours for return travel and documentation.
Comments might beprovided to the contractor such that the RAls may have to be resubmitted by the contractor.
It is understood that Subtask 2.d. can be done in parallel with Subtasks 2.b. and 2.c.
Guidance for Preparing Requests for Additional Information (RAls)Additional information necessary to resolve open or unresolved items identified during thereview of the information associated with the LAR needs to be requested in a manner that isunambiguous, has an adequate basis, and is necessary for the safety review. RAls shouldbe developed using the following guidance:
The level of effort assumption for Task 3 assumes two rounds of RAIs. Each round of RAIs is assumed to take 16 hours to review, including drafting any necessary follow-up RAIs and updating the draft TER.
: 1. An RAI should include the appropriate basis for requesting the information.
It is understood that the level of effort for each Task contains sufficient effort to conduct telephone conference calls with the NRC staff. Such phone calls, for example, might be arranged by the NRC COR with the Licensing Project Manager and other NRC staff to discuss the RAls and to reach an understanding with the licensee. Comments might be provided to the contractor such that the RAls may have to be resubmitted by the contractor.
The basisshould explain why the information is needed, including how it will be used to help makea reasonable assurance finding.12  
Guidance for Preparing Requests for Additional Information (RAls)
&2. Judgmental language should be avoided.a. Questions should not make adequacy determinations.
Additional information necessary to resolve open or unresolved items identified during the review of the information associated with the LAR needs to be requested in a manner that is unambiguous, has an adequate basis, and is necessary for the safety review. RAls should be developed using the following guidance:
: b. Words like "unacceptable" or "deficient" and "deviation" should be avoided.  
: 1. An RAI should include the appropriate basis for requesting the information. The basis should explain why the information is needed, including how it will be used to help make a reasonable assurance finding.
: Likewise, avoid using phrases like "the staff will require" since it is premature to requireanything when asking questions.
12
: 2. Judgmental language should be avoided.
: a. Questions should not make adequacy determinations.
: b. Words like "unacceptable" or "deficient" and "deviation" should be avoided. Likewise, avoid using phrases like "the staff will require"since it is premature to require anything when asking questions.
: 3. Questions should be focused, not open-ended.
: 3. Questions should be focused, not open-ended.
: a. The RAI should be in the form of a question or an imperative to provide whatis needed to complete the review. When the reviewer needs specificinformation or the underlying issue may not be apparent, the RAI shouldclearly identify the information requested and/or the underlying issue.b. "If ... then" questions (questions that could lead to follow-on questions) shouldprovide both parts of the question.
: a. The RAI should be in the form of a question or an imperative to provide what is needed to complete the review. When the reviewer needs specific information or the underlying issue may not be apparent, the RAI should clearly identify the information requested and/or the underlying issue.
: b. "If... then" questions (questions that could lead to follow-on questions) should provide both parts of the question.
Guidance for Preparinq Requests for Additional Information (RAls) (Continued)
Guidance for Preparinq Requests for Additional Information (RAls) (Continued)
: 4. For follow-up RAIs, reference the original RAI, the date of the letter in which the licenseeresponded to the RAI, and the ADAMS Accession Number of the letter.To ensure that the response appropriately addresses the RAI, the licensee maysubmit a draft response (which the NRC dockets in the Agency-Wide Documents Access and Management System (ADAMS))
: 4. For follow-up RAIs, reference the original RAI, the date of the letter in which the licensee responded to the RAI, and the ADAMS Accession Number of the letter.
and may request a follow-up teleconference and/or meeting.9. TRAVELTwo three-person, two-day trips to the NRC headquarters office in Rockville, MD.10. SECURITYThis work will be UNCLASSIFIED; it will only contain proprietary information.
To ensure that the response appropriately addresses the RAI, the licensee may submit a draft response (which the NRC dockets in the Agency-Wide Documents Access and Management System (ADAMS)) and may request a follow-up teleconference and/or meeting.
13 SECTION D -Packaging and MarkingNRCDO20 BRANDINGThe Contractor is required to use the statement below in any publications, presentations,
: 9. TRAVEL Two three-person, two-day trips to the NRC headquarters office in Rockville, MD.
: articles, products, or materials funded under this contract/order, to the extent practical, in orderto provide NRC with recognition for its involvement in and contribution to the project.
: 10. SECURITY This work will be UNCLASSIFIED; it will only contain proprietary information.
If the workperformed is funded entirely with NRC funds, then the contractor must acknowledge thatinformation in its documentation/presentation.
13
Work Supported by the U.S. Nuclear Regulatory Commission (NRC), Office of Nuclear ReactorRegulation, under Contract/order number NRC-HQ-50-14-E-0001/NRC-HQ-20-14-T-0012.
 
(End of Clause)NRCD010 PACKAGING AND MARKING(a) The Contractor shall package material for shipment to the NRC in such a manner that willensure acceptance by common carrier and safe delivery at destination.
SECTION D - Packaging and Marking NRCDO20 BRANDING The Contractor is required to use the statement below in any publications, presentations, articles, products, or materials funded under this contract/order, to the extent practical, in order to provide NRC with recognition for its involvement in and contribution to the project. If the work performed is funded entirely with NRC funds, then the contractor must acknowledge that information in its documentation/presentation.
Containers andclosures shall comply with the Surface Transportation Board, Uniform Freight Classification Rules, or regulations of other carriers as applicable to the mode of transportation.
Work Supported by the U.S. Nuclear Regulatory Commission (NRC), Office of Nuclear Reactor Regulation, under Contract/order number NRC-HQ-50-14-E-0001/NRC-HQ-20-14-T-0012.
(b) On the front of the package, the Contractor shall clearly identify the contract number underwhich the product is being provided.
(End of Clause)
(c) Additional packaging andlor marking requirements are as follows:
NRCD010 PACKAGING AND MARKING (a) The Contractor shall package material for shipment to the NRC in such a manner that will ensure acceptance by common carrier and safe delivery at destination. Containers and closures shall comply with the Surface Transportation Board, Uniform Freight Classification Rules, or regulations of other carriers as applicable to the mode of transportation.
None.(End of Clause)14 SECTION E -Inspection and Acceptance 2052.215-71 PROJECT OFFICER AUTHORITY (OCT 1999)(a) The contracting officer's authorized representative hereinafter referred to as the projectofficer for this contract is:Name: Sara LyonsAddress:
(b) On the front of the package, the Contractor shall clearly identify the contract number under which the product is being provided.
Mail Stop: OWFN/10 C15Washington, DC 20555Telephone Number: 301-415-2861 Sara.lyons(n rc.qovAlternate COR:Name: Bernard GrenierMail Stop: OWFN 13 E-10(301)-415-2726 Bemard.orenier(anrc.,ov (b) Performance of the work under this contract is subject to the technical direction of the NRCproject officer.
(c) Additional packaging andlor marking requirements are as follows: None.
The term technical direction is defined to include the following:
(End of Clause) 14
(1) Technical direction to the contractor which shifts work emphasis between areas of work ortasks, authorizes travel which was unanticipated in the Schedule (i.e., travel not contemplated inthe Statement of Work or changes to specific travel identified in the Statement of Work), fills indetails, or otherwise serves to accomplish the contractual statement of work.(2) Provide advice and guidance to the contractor in the preparation of drawings, specifications, or technical portions of the work description.
 
(3) Review and, where required by the contract, approve technical  
SECTION E - Inspection and Acceptance 2052.215-71 PROJECT OFFICER AUTHORITY (OCT 1999)
: reports, drawings, specifications, and technical information to be delivered by the contractor to the Government under the contract.
(a) The contracting officer's authorized representative hereinafter referred to as the project officer for this contract is:
(c) Technical direction must be within the general statement of work stated in the contract.
Name: Sara Lyons Address: Mail Stop: OWFN/10 C15 Washington, DC 20555 Telephone Number: 301-415-2861 Sara.lyons(n rc.qov Alternate COR:
Theproject officer does not have the authority to and may not issue any technical direction which:(1) Constitutes an assignment of work outside the general scope of the contract.
Name: Bernard Grenier Mail Stop: OWFN 13 E-10 (301)-415-2726 Bemard.orenier(anrc.,ov (b) Performance of the work under this contract is subject to the technical direction of the NRC project officer. The term technical direction is defined to include the following:
(1) Technical direction to the contractor which shifts work emphasis between areas of work or tasks, authorizes travel which was unanticipated in the Schedule (i.e., travel not contemplated in the Statement of Work or changes to specific travel identified in the Statement of Work), fills in details, or otherwise serves to accomplish the contractual statement of work.
(2) Provide advice and guidance to the contractor in the preparation of drawings, specifications, or technical portions of the work description.
(3) Review and, where required by the contract, approve technical reports, drawings, specifications, and technical information to be delivered by the contractor to the Government under the contract.
(c) Technical direction must be within the general statement of work stated in the contract. The project officer does not have the authority to and may not issue any technical direction which:
(1) Constitutes an assignment of work outside the general scope of the contract.
(2) Constitutes a change as defined in the "Changes" clause of this contract.
(2) Constitutes a change as defined in the "Changes" clause of this contract.
(3) In any way causes an increase or decrease in the total estimated contract cost, the fixed fee,if any, or the time required for contract performance.
(3) In any way causes an increase or decrease in the total estimated contract cost, the fixed fee, if any, or the time required for contract performance.
(4) Changes any of the expressed terms, conditions, or specifications of the contract.
(4) Changes any of the expressed terms, conditions, or specifications of the contract.
(5) Terminates the contract, settles any claim or dispute arising under the contract, or issuesany unilateral directive whatever.
(5) Terminates the contract, settles any claim or dispute arising under the contract, or issues any unilateral directive whatever.
(d) All technical directions must be issued in writing by the project officer or must be confirmed by the project officer in writing within ten (10) working days after verbal issuance.
(d) All technical directions must be issued in writing by the project officer or must be confirmed by the project officer in writing within ten (10) working days after verbal issuance. A copy of the 15
A copy of the15 written direction must be furnished to the contracting officer.
 
A copy of NRC Form 445, Requestfor Approval of Official Foreign Travel, which has received final approval from the NRC must befurnished to the contracting officer.(e) The contractor shall proceed promptly with the performance of technical directions dulyissued by the project officer in the manner prescribed by this clause and within the projectofficer's authority under the provisions of this clause.(f) If, in the opinion of the contractor, any instruction or direction issued by the project officer iswithin one of the categories defined in paragraph (c) of this section, the contractor may notproceed but shall notify the contracting officer in writing within five (5) working days after thereceipt of any instruction or direction and shall request that contracting officer to modify thecontract accordingly.
written direction must be furnished to the contracting officer. A copy of NRC Form 445, Request for Approval of Official Foreign Travel, which has received final approval from the NRC must be furnished to the contracting officer.
Upon receiving the notification from the contractor, the contracting officershall issue an appropriate contract modification or advise the contractor in writing that, in thecontracting officers  
(e) The contractor shall proceed promptly with the performance of technical directions duly issued by the project officer in the manner prescribed by this clause and within the project officer's authority under the provisions of this clause.
: opinion, the technical direction is within the scope of this article and doesnot constitute a change under the "Changes" clause.(g) Any unauthorized commitment or direction issued by the project officer may result in anunnecessary delay in the contractors performance and may even result in the contractor expending funds for unallowable costs under the contract.
(f) If, in the opinion of the contractor, any instruction or direction issued by the project officer is within one of the categories defined in paragraph (c) of this section, the contractor may not proceed but shall notify the contracting officer in writing within five (5) working days after the receipt of any instruction or direction and shall request that contracting officer to modify the contract accordingly. Upon receiving the notification from the contractor, the contracting officer shall issue an appropriate contract modification or advise the contractor in writing that, in the contracting officers opinion, the technical direction is within the scope of this article and does not constitute a change under the "Changes" clause.
(h) A failure of the parties to agree upon the nature of the instruction or direction or upon thecontract action to be taken with respect to the instruction or direction is subject to 52.233-1
(g) Any unauthorized commitment or direction issued by the project officer may result in an unnecessary delay in the contractors performance and may even result in the contractor expending funds for unallowable costs under the contract.
-Disputes.
(h) A failure of the parties to agree upon the nature of the instruction or direction or upon the contract action to be taken with respect to the instruction or direction is subject to 52.233 Disputes.
(i) In addition to providing technical direction as defined in paragraph (b) of the section, theproject officer shall:(1) Monitor the contractors technical  
(i) In addition to providing technical direction as defined in paragraph (b) of the section, the project officer shall:
: progress, including surveillance and assessment ofperformance, and recommend to the contracting officer changes in requirements.
(1) Monitor the contractors technical progress, including surveillance and assessment of performance, and recommend to the contracting officer changes in requirements.
(2) Assist the contractor in the resolution of technical problems encountered duringperformance.
(2) Assist the contractor in the resolution of technical problems encountered during performance.
(3) Review all costs requested for reimbursement by the contractor and submit to thecontracting officer recommendations for approval, disapproval, or suspension of payment forsupplies and services required under this contract.
(3) Review all costs requested for reimbursement by the contractor and submit to the contracting officer recommendations for approval, disapproval, or suspension of payment for supplies and services required under this contract.
(End of Clause)16 SECTION F -Deliveries or Performance NRCF032 TASK/DELIVERY ORDER PERIOD OF PERFORMANCE (SEP 2013)This order shall commence on September 22, 2014 and will expire on February 28, 2015.(End of Clause)NRCF010 PLACE OF DELIVERY-REPORTS The items to be furnished hereunder shall be delivered, with all charges paid by the Contractor, to:a. Name: Sara Lyons (1 Electronic Copy)Contracting Officer's Representative (COR)Address:
(End of Clause) 16
Sara. Lyons@nrc.gov
 
: b. Name: Hugo Alcantara (1 Electronic Copy)Contract Specialist (CS)Address:
SECTION F - Deliveries or Performance NRCF032 TASK/DELIVERY ORDER PERIOD OF PERFORMANCE (SEP 2013)
Hugo.Alcantara@nrc.gov (End of Clause)SECTION G -Contract Administration DataNRCG030 ELECTRONIC PAYMENT (SEP 2014)The Debt Collection Improvement Act of 1996 requires that all payments except IRS tax refundsbe made by Electronic Funds Transfer.
This order shall commence on September 22, 2014 and will expire on February 28, 2015.
Payment shall be made in accordance with FAR52.232-33, entitled "Payment by Electronic Funds-Central Contractor Registration".
(End of Clause)
To receive payment, the contractor shall prepare invoices in accordance with NRC's BillingInstructions.
NRCF010 PLACE OF DELIVERY-REPORTS The items to be furnished hereunder shall be delivered, with all charges paid by the Contractor, to:
Claims shall be submitted on the payee's letterhead,  
: a. Name: Sara Lyons (1 Electronic Copy)
: invoice, or on theGovernment's Standard Form 1034, "Public Voucher for Purchases and Services Other thanPersonal,"
Contracting Officer's Representative (COR)
and Standard Form 1035, "Public Voucher for Purchases Other than Personal  
Address: Sara. Lyons@nrc.gov
-Continuation Sheet." The preferred method of submitting invoices is electronically to:
: b. Name: Hugo Alcantara (1 Electronic Copy)
(End of Clause)17 SECTION H -Special Contract Requirements 2052.215-70 KEY PERSONNEL (JAN 1993)(a) The following individuals are considered to be essential to the successful performance of thework hereunder:
Contract Specialist (CS)
Name TitleLane Howard Program ManagerRobert Fosdick Principal Investigator Robert Schmidt Consultant The contractor agrees that personnel may not be removed from the contract work or replacedwithout compliance with paragraphs (b) and (c) of this section.(b) If one or more of the key personnel, for whatever reason, becomes, or is expected tobecome, unavailable for work under this contract for a continuous period exceeding 30 workdays, or is expected to devote substantially less effort to the work than indicated in the proposalor initially anticipated, the contractor shall immediately notify the contracting officer and shall,subject to the concurrence of the contracting  
Address: Hugo.Alcantara@nrc.gov (End of Clause)
: officer, promptly replace the personnel withpersonnel of at least substantially equal ability and qualifications.
SECTION G - Contract Administration Data NRCG030 ELECTRONIC PAYMENT (SEP 2014)
(c) Each request for approval of substitutions must be in writing and contain a detailedexplanation of the circumstances necessitating the proposed substitutions.
The Debt Collection Improvement Act of 1996 requires that all payments except IRS tax refunds be made by Electronic Funds Transfer. Payment shall be made in accordance with FAR 52.232-33, entitled "Payment by Electronic Funds-Central Contractor Registration".
The request mustalso contain a complete resume for the proposed substitute and other information requested orneeded by the contracting officer to evaluate the proposed substitution.
To receive payment, the contractor shall prepare invoices in accordance with NRC's Billing Instructions. Claims shall be submitted on the payee's letterhead, invoice, or on the Government's Standard Form 1034, "Public Voucher for Purchases and Services Other than Personal," and Standard Form 1035, "Public Voucher for Purchases Other than Personal -
The contracting officerand the project officer shall evaluate the contractor's request and the contracting officer shallpromptly notify the contractor of his or her decision in writing.(d) If the contracting officer determines that suitable and timely replacement of key personnel who have been reassigned, terminated, or have otherwise become unavailable for the contractwork is not reasonably forthcoming, or that the resultant reduction of productive effort would beso substantial as to impair the successful completion of the contract or the service order, thecontract may be terminated by the contracting officer for default or for the convenience of theGovernment, as appropriate.
Continuation Sheet." The preferred method of submitting invoices is electronically to:
If the contracting officer finds the contractor at fault for thecondition, the contract price or fixed fee may be equitably adjusted downward to compensate the Government for any resultant delay, loss, or damage.(End of Clause)18 2052.215-78 TRAVEL APPROVALS AND REIMBURSEMENT (OCT 1999) -ALTERNATE I(OCT 1999)(a) Total expenditure for travel may not exceed $5,379.00 without the prior approval of thecontracting officer.(b) All foreign travel must be approved in advance by the NRC on NRC Form 445, Request forApproval of Official Foreign Travel, and must be in compliance with FAR 52.247-63 Preference for U.S. Flag Air Carriers.
NRCPayments*,nrc..ov.
The contractor shall submit NRC Form 445 to the NRC no later than30 days prior to the commencement of travel.(c) The contractor will be reimbursed only for travel costs incurred that are directly related to thiscontract and are allowable subject to the limitations prescribed in FAR 31.205-46.
(End of Clause) 17
(d) It is the responsibility of the contractor to notify the contracting officer in accordance with theFAR Limitations of Cost clause of this contract when, at any time, the contractor learns thattravel expenses will cause the contractor to exceed the travel ceiling amount identified inparagraph (a) of this clause.(e) Reasonable travel costs for research and related activities performed at State and nonprofit institutions, in accordance with Section 12 of Pub. L. 100-679, must be charged in accordance with the contractor's institutional policy to the degree that the limitations of Office ofManagement and Budget (OMB) guidance are not exceeded.
 
Applicable guidance documents include OMB Circular A-87, Cost Principles for State and Local Governments; OMB Circular A-122, Cost Principles for Nonprofit Organizations; and OMB Circular A-21, Cost Principles forEducational Institutions.
SECTION H - Special Contract Requirements 2052.215-70 KEY PERSONNEL (JAN 1993)
(End of Clause)NRCH480 USE OF AUTOMATED CLEARING HOUSE (ACH) ELECTRONIC PAYMENTIREMITTANCE ADDRESSThe Debt Collection Improvement Act of 1996 requires that all Federal payments except IRS taxrefunds be made by Electronic Funds Transfer.
(a) The following individuals are considered to be essential to the successful performance of the work hereunder:
It is the policy of the Nuclear Regulatory Commission to pay government vendors by the Automated Clearing House (ACH) electronic funds transfer payment system. Item 15C of the Standard Form 33 may be disregarded.
Name                           Title Lane Howard                   Program Manager Robert Fosdick                 Principal Investigator Robert Schmidt                 Consultant The contractor agrees that personnel may not be removed from the contract work or replaced without compliance with paragraphs (b) and (c) of this section.
(End of Clause)19 NRCH470 GREEN PURCHASING (SEP 2013)(a) In furtherance of the sustainable acquisition goals included in Executive Order 13514,"Federal Leadership in Environmental, Energy, and Economic Performance,"
(b) If one or more of the key personnel, for whatever reason, becomes, or is expected to become, unavailable for work under this contract for a continuous period exceeding 30 work days, or is expected to devote substantially less effort to the work than indicated in the proposal or initially anticipated, the contractor shall immediately notify the contracting officer and shall, subject to the concurrence of the contracting officer, promptly replace the personnel with personnel of at least substantially equal ability and qualifications.
products andservices acquired under this contract/order shall be energy-efficient (Energy Star or FederalEnergy Management Program (FEMP) designated),
(c) Each request for approval of substitutions must be in writing and contain a detailed explanation of the circumstances necessitating the proposed substitutions. The request must also contain a complete resume for the proposed substitute and other information requested or needed by the contracting officer to evaluate the proposed substitution. The contracting officer and the project officer shall evaluate the contractor's request and the contracting officer shall promptly notify the contractor of his or her decision in writing.
water-efficient,  
(d) If the contracting officer determines that suitable and timely replacement of key personnel who have been reassigned, terminated, or have otherwise become unavailable for the contract work is not reasonably forthcoming, or that the resultant reduction of productive effort would be so substantial as to impair the successful completion of the contract or the service order, the contract may be terminated by the contracting officer for default or for the convenience of the Government, as appropriate. If the contracting officer finds the contractor at fault for the condition, the contract price or fixed fee may be equitably adjusted downward to compensate the Government for any resultant delay, loss, or damage.
: biobased, environmentally preferable (e.g., Electronic Product Environmental Assessment Tool (EPEAT) certified),
(End of Clause) 18
non-ozone depleting, recycled  
 
: content, and non-toxic or less toxic alternatives, to the maximumextent practicable in meeting NRC contractual requirements.
2052.215-78 TRAVEL APPROVALS AND REIMBURSEMENT (OCT 1999) - ALTERNATE I (OCT 1999)
(b) See NRC's Green Purchasing Plan (GPP) at:http://pbadupws.nrc..qov/docs/ML1219//ML12191A130.pdf and the General ServiceAdministration's (GSA) Green Procurement Compilation at:hftp :/Awww.qsa.qov/portal/content/l 98257.(c) The contractor shall flow down this clause into all subcontracts and other agreements thatrelate to performance of this contract/order.
(a) Total expenditure for travel may not exceed $5,379.00 without the prior approval of the contracting officer.
(End of Clause)NRCH410 WHISTLEBLOWER PROTECTION FOR NRC CONTRACTOR ANDSUBCONTRACTOR EMPLOYEES (a) The U.S. Nuclear Regulatory Commission (NRC) contractor and its subcontractor aresubject to the Whistleblower Employee Protection public law provisions as codified at 42 U.S.C.5851. NRC contractor(s) and subcontractor(s) shall comply with the requirements of thisWhistleblower Employee Protection law, and the implementing regulations of the NRC and theDepartment of Labor (DOL). See, for example, DOL Procedures on Handling Complaints at 29C.F.R. Part 24 concerning the employer obligations, prohibited acts, DOL procedures and therequirement for prominent posting of notice of Employee Rights at Appendix A to Part 24entitled:  
(b) All foreign travel must be approved in advance by the NRC on NRC Form 445, Request for Approval of Official Foreign Travel, and must be in compliance with FAR 52.247-63 Preference for U.S. Flag Air Carriers. The contractor shall submit NRC Form 445 to the NRC no later than 30 days prior to the commencement of travel.
"Your Rights Under the Energy Reorganization Act".(b) Under this Whistleblower Employee Protection law, as implemented by regulations, NRCcontractor and subcontractor employees are protected from discharge,  
(c) The contractor will be reimbursed only for travel costs incurred that are directly related to this contract and are allowable subject to the limitations prescribed in FAR 31.205-46.
: reprisal, threats,intimidation,  
(d) It is the responsibility of the contractor to notify the contracting officer in accordance with the FAR Limitations of Cost clause of this contract when, at any time, the contractor learns that travel expenses will cause the contractor to exceed the travel ceiling amount identified in paragraph (a) of this clause.
: coercion, blacklisting or other employment discrimination practices with respect tocompensation, terms, conditions or privileges of their employment because the contractor orsubcontractor employee(s) has provided notice to the employer, refused to engage in unlawfulpractices, assisted in proceedings or testified on activities concerning alleged violations of theAtomic Energy Act of 1954 (as amended) and the Energy Reorganization Act of 1974 (asamended).
(e) Reasonable travel costs for research and related activities performed at State and nonprofit institutions, in accordance with Section 12 of Pub. L. 100-679, must be charged in accordance with the contractor's institutional policy to the degree that the limitations of Office of Management and Budget (OMB) guidance are not exceeded. Applicable guidance documents include OMB Circular A-87, Cost Principles for State and Local Governments; OMB Circular A-122, Cost Principles for Nonprofit Organizations; and OMB Circular A-21, Cost Principles for Educational Institutions.
(End of Clause)
NRCH480 USE OF AUTOMATED CLEARING HOUSE (ACH) ELECTRONIC PAYMENTIREMITTANCE ADDRESS The Debt Collection Improvement Act of 1996 requires that all Federal payments except IRS tax refunds be made by Electronic Funds Transfer. It is the policy of the Nuclear Regulatory Commission to pay government vendors by the Automated Clearing House (ACH) electronic funds transfer payment system. Item 15C of the Standard Form 33 may be disregarded.
(End of Clause) 19
 
NRCH470 GREEN PURCHASING (SEP 2013)
(a) In furtherance of the sustainable acquisition goals included in Executive Order 13514, "Federal Leadership in Environmental, Energy, and Economic Performance," products and services acquired under this contract/order shall be energy-efficient (Energy Star or Federal Energy Management Program (FEMP) designated), water-efficient, biobased, environmentally preferable (e.g., Electronic Product Environmental Assessment Tool (EPEAT) certified), non-ozone depleting, recycled content, and non-toxic or less toxic alternatives, to the maximum extent practicable in meeting NRC contractual requirements.
(b) See NRC's Green Purchasing Plan (GPP) at:
http://pbadupws.nrc..qov/docs/ML1219//ML12191A130.pdf and the General Service Administration's (GSA) Green Procurement Compilation at:
hftp :/Awww.qsa.qov/portal/content/l 98257.
(c) The contractor shall flow down this clause into all subcontracts and other agreements that relate to performance of this contract/order.
(End of Clause)
NRCH410 WHISTLEBLOWER PROTECTION FOR NRC CONTRACTOR AND SUBCONTRACTOR EMPLOYEES (a) The U.S. Nuclear Regulatory Commission (NRC) contractor and its subcontractor are subject to the Whistleblower Employee Protection public law provisions as codified at 42 U.S.C.
5851. NRC contractor(s) and subcontractor(s) shall comply with the requirements of this Whistleblower Employee Protection law, and the implementing regulations of the NRC and the Department of Labor (DOL). See, for example, DOL Procedures on Handling Complaints at 29 C.F.R. Part 24 concerning the employer obligations, prohibited acts, DOL procedures and the requirement for prominent posting of notice of Employee Rights at Appendix A to Part 24 entitled: "Your Rights Under the Energy Reorganization Act".
(b) Under this Whistleblower Employee Protection law, as implemented by regulations, NRC contractor and subcontractor employees are protected from discharge, reprisal, threats, intimidation, coercion, blacklisting or other employment discrimination practices with respect to compensation, terms, conditions or privileges of their employment because the contractor or subcontractor employee(s) has provided notice to the employer, refused to engage in unlawful practices, assisted in proceedings or testified on activities concerning alleged violations of the Atomic Energy Act of 1954 (as amended) and the Energy Reorganization Act of 1974 (as amended).
(c) The contractor shall insert this or the substance of this clause in any subcontracts involving work performed under this contract.
(c) The contractor shall insert this or the substance of this clause in any subcontracts involving work performed under this contract.
(End of Clause)20 NRCH400 SECURITY REQUIREMENTS RELATING TO THE PRODUCTION OF REPORT(S)
(End of Clause) 20
OR THE PUBLICATION OF RESULTS UNDER CONTRACTS, AGREEMENTS, ANDGRANTSReview and Approval of Reports(a) Reporting Requirements.
 
The contractor/grantee shall comply with the terms and conditions of the contract/grant regarding the contents of the draft and final report, summaries, data, andrelated documents, to include correcting,  
NRCH400 SECURITY REQUIREMENTS RELATING TO THE PRODUCTION OF REPORT(S)
: deleting, editing,  
OR THE PUBLICATION OF RESULTS UNDER CONTRACTS, AGREEMENTS, AND GRANTS Review and Approval of Reports (a) Reporting Requirements. The contractor/grantee shall comply with the terms and conditions of the contract/grant regarding the contents of the draft and final report, summaries, data, and related documents, to include correcting, deleting, editing, revising, modifying, formatting, and supplementing any of the information contained therein, at no additional cost to the NRC.
: revising, modifying, formatting, andsupplementing any of the information contained  
Performance under the contract/grant will not be deemed accepted or completed until it complies with the NRC's directions. The reports, summaries, data, and related documents will be considered draft until approved by the NRC. The contractor/grantee agrees that the direction, determinations, and decisions on approval or disapproval of reports, summaries, data, and related documents created under this contract/grant remain solely within the discretion of the NRC.
: therein, at no additional cost to the NRC.Performance under the contract/grant will not be deemed accepted or completed until itcomplies with the NRC's directions.
(b) Publication of Results. Prior to any dissemination, display, publication, or release of articles, reports, summaries, data, or related documents developed under the contract/grant, the contractor/grantee shall submit them to the NRC for review and approval. The contractor/
The reports, summaries, data, and related documents willbe considered draft until approved by the NRC. The contractor/grantee agrees that the direction, determinations, and decisions on approval or disapproval of reports, summaries, data, andrelated documents created under this contract/grant remain solely within the discretion of theNRC.(b) Publication of Results.
grantee shall not release, disseminate, display or publish articles, reports, summaries, data, and related documents, or the contents therein, that have not been reviewed and approved by the NRC for release, display, dissemination or publication. The contractor/grantee agrees to conspicuously place any disclaimers, markings or notices, directed by the NRC, on any articles, reports, summaries, data, and related documents that the contractor/grantee intends to release, display, disseminate or publish to other persons, the public, or any other entities. The contractor/grantee agrees, and grants, a royalty-free, nonexclusive, irrevocable worldwide license to the government, to use, reproduce, modify, distribute, prepare derivative works, release, display or disclose the articles, reports, summaries, data, and related documents developed under the contract/grant, for any governmental purpose and to have or authorize others to do so.
Prior to any dissemination,  
(c) Identification/Marking of Sensitive Unclassified Non-Safeguards Information (SUNSI) and Safeguards Information (SGI). The decision, determination, or direction by the NRC that information possessed, formulated or produced by the contractor/grantee constitutes SUNSI or SGI is solely within the authority and discretion of the NRC. In performing the contract/grant, the contractor/grantee shall clearly mark SUNSI and SGI, to include for example, QUO-Allegation Information or OUO-Security Related Information on any reports, documents, designs, data, materials, and written information, as directed by the NRC. In addition to marking the information as directed by the NRC, the contractor shall use the applicable NRC cover sheet (e.g., NRC Form 461 Safeguards Information) in maintaining these records and documents. The contractor/grantee shall ensure that SUNSI and SGI is handled, maintained and protected from unauthorized disclosure, consistent with NRC policies and directions. The contractor/grantee shall comply with the requirements to mark, maintain, and protect all information, including documents, summaries, reports, data, designs, and materials in accordance with the provisions of Section 147 of the Atomic Energy Act of 1954 as amended, its implementing regulations (10 CFR 73.21), Sensitive Unclassified Non-Safeguards and Safeguards Information policies, and NRC Management Directives and Handbooks 12.5, 12.6 and 12.7.
: display, publication, or release of articles,
(d) Remedies. In addition to any civil, criminal, and contractual remedies available under the applicable laws and regulations, failure to comply with the above provisions, and/or NRC directions, may result in suspension, withholding, or offsetting of any payments invoiced or 21
: reports, summaries, data, or related documents developed under the contract/grant, thecontractor/grantee shall submit them to the NRC for review and approval.
 
The contractor/
0 claimed by the contractor/grantee.
grantee shall not release, disseminate, display or publish articles,  
(e) Flowdown. If the contractor/grantee intends to enter into any subcontracts or other agreements to perform this contract/grant, the contractor/grantee shall include all of the above provisions in any subcontracts or agreements.
: reports, summaries, data, andrelated documents, or the contents  
(End of Clause) 22
: therein, that have not been reviewed and approved by theNRC for release,  
 
: display, dissemination or publication.
a 4 SECTION J - List of Documents, Exhibits and Other Attachments BILLING INSTRUCTIONS FOR COST-REIMBURSEMENT TYPE CONTRACTS (MAY 2013)
The contractor/grantee agrees toconspicuously place any disclaimers, markings or notices, directed by the NRC, on any articles,
General: During performance and through final payment of this contract, the contractor is responsible for the accuracy and completeness of data within the System for Award Management (SAM) database and for any liability resulting from the Government's reliance on inaccurate or incomplete SAM data.
: reports, summaries, data, and related documents that the contractor/grantee intends to release,display, disseminate or publish to other persons, the public, or any other entities.
The contractor shall prepare invoices/vouchers for reimbursement of costs in the manner and format described herein. FAILURE TO SUBMIT INVOICES/VOUCHERS IN ACCORDANCE WITH THESE INSTRUCTIONS MAY RESULT IN REJECTION OF THE INVOICENOUCHER AS IMPROPER.
Thecontractor/grantee agrees, and grants, a royalty-free, nonexclusive, irrevocable worldwide license to the government, to use, reproduce, modify, distribute, prepare derivative works,release, display or disclose the articles,  
Standard Forms: Reimbursement requests shall be submitted on the payee's letterhead, invoice/voucher, or on the Govemment's Standard Form 1034, "Public Voucher for Purchases and Services Other than Personal," and Standard Form 1035, "Public Voucher for Purchases Other than Personal-Continuation Sheet."
: reports, summaries, data, and related documents developed under the contract/grant, for any governmental purpose and to have or authorize others to do so.(c) Identification/Marking of Sensitive Unclassified Non-Safeguards Information (SUNSI) andSafeguards Information (SGI). The decision, determination, or direction by the NRC thatinformation possessed, formulated or produced by the contractor/grantee constitutes SUNSI orSGI is solely within the authority and discretion of the NRC. In performing the contract/grant, thecontractor/grantee shall clearly mark SUNSI and SGI, to include for example, QUO-Allegation Information or OUO-Security Related Information on any reports, documents,  
Electronic InvoiceNoucher Submissions: The preferred method of submitting invoices/vouchers is electronically to the U.S. Nuclear Regulatory Commission, via email to:
: designs, data,materials, and written information, as directed by the NRC. In addition to marking theinformation as directed by the NRC, the contractor shall use the applicable NRC cover sheet(e.g., NRC Form 461 Safeguards Information) in maintaining these records and documents.
NRCPayments(*nrc._oov.
Thecontractor/grantee shall ensure that SUNSI and SGI is handled, maintained and protected fromunauthorized disclosure, consistent with NRC policies and directions.
Hard-Copy InvoiceNoucher Submissions: If you submit a hard-copy of the invoice/voucher, a signed original and supporting documentation shall be submitted to the following address:
The contractor/grantee shall comply with the requirements to mark, maintain, and protect all information, including documents, summaries,  
NRC Payments U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mailstop 03-E17A Rockville, MD 20852-2738 Purchase of Capital Property: ($50,000 or more with life of one yearor longer)
: reports, data, designs, and materials in accordance with the provisions of Section 147 of the Atomic Energy Act of 1954 as amended, its implementing regulations (10CFR 73.21), Sensitive Unclassified Non-Safeguards and Safeguards Information  
Contractors must report to the Contracting Officer, electronically, any capital property acquired with contract funds having an initial cost of $50,000 or more, in accordance with procedures set forth in NRC Management Directive (MD) 13.1, IV, C -"Reporting Requirements" (revised 2/16/2011).
: policies, andNRC Management Directives and Handbooks 12.5, 12.6 and 12.7.(d) Remedies.
Agency Payment Office: Payment will continue to be made by the office designated in the contract in Block 12 of the Standard Form 26, or Block 25 of the Standard Form 33, whichever is applicable.
In addition to any civil, criminal, and contractual remedies available under theapplicable laws and regulations, failure to comply with the above provisions, and/or NRCdirections, may result in suspension, withholding, or offsetting of any payments invoiced or21 0claimed by the contractor/grantee.
Frequency: The contractor shall submit requests for reimbursement once each month, unless otherwise authorized by the Contracting Officer.
(e) Flowdown.
Format: InvoicesNouchers shall be submitted in the format depicted on the attached sample form entitled "InvoiceNoucher for Purchases and Services Other Than Personal". Alternate formats are permissible only if they address all requirements of the Billing Instructions. The 23
If the contractor/grantee intends to enter into any subcontracts or otheragreements to perform this contract/grant, the contractor/grantee shall include all of the aboveprovisions in any subcontracts or agreements.
 
(End of Clause)22 a 4SECTION J -List of Documents, Exhibits and Other Attachments BILLING INSTRUCTIONS FORCOST-REIMBURSEMENT TYPE CONTRACTS (MAY 2013)General:
instructions for preparation and itemization of the invoice/voucher are included with the sample form.
During performance and through final payment of this contract, the contractor isresponsible for the accuracy and completeness of data within the System for AwardManagement (SAM) database and for any liability resulting from the Government's reliance oninaccurate or incomplete SAM data.The contractor shall prepare invoices/vouchers for reimbursement of costs in the manner andformat described herein. FAILURE TO SUBMIT INVOICES/VOUCHERS IN ACCORDANCE WITH THESE INSTRUCTIONS MAY RESULT IN REJECTION OF THE INVOICENOUCHER AS IMPROPER.
Task Order Contracts: The contractor must submit a separate invoice/voucher for each individual task order with detailed cost information. This includes all applicable cost elements and other items discussed in paragraphs (a) through (s) of the attached instructions. In addition, the invoice/voucher must specify the contract number, and the NRC-assigned task/delivery order number.
Standard Forms: Reimbursement requests shall be submitted on the payee's letterhead, invoice/voucher, or on the Govemment's Standard Form 1034, "Public Voucher for Purchases and Services Other than Personal,"
Billing of Costs after Expiration of Contract: If costs are incurred during the contract period and invoiced after the contract has expired, you must cite the period during which these costs were incurred. To be considered a proper expiration invoice/voucher, the contractor shall clearly mark it "EXPIRATION INVOICE" or "EXPIRATION VOUCHER".
and Standard Form 1035, "Public Voucher for Purchases Other than Personal-Continuation Sheet."Electronic InvoiceNoucher Submissions:
The preferred method of submitting invoices/vouchers is electronically to the U.S. Nuclear Regulatory Commission, via email to:
Hard-Copy InvoiceNoucher Submissions:
If you submit a hard-copy of the invoice/voucher, a signed original and supporting documentation shall be submitted to the following address:NRC PaymentsU.S. Nuclear Regulatory Commission One White Flint North11555 Rockville PikeMailstop 03-E17ARockville, MD 20852-2738 Purchase of Capital Property:  
($50,000 or more with life of one year or longer)Contractors must report to the Contracting  
: Officer, electronically, any capital property acquiredwith contract funds having an initial cost of $50,000 or more, in accordance with procedures setforth in NRC Management Directive (MD) 13.1, IV, C -"Reporting Requirements" (revised2/16/2011).
Agency Payment Office: Payment will continue to be made by the office designated in thecontract in Block 12 of the Standard Form 26, or Block 25 of the Standard Form 33, whichever is applicable.
Frequency:
The contractor shall submit requests for reimbursement once each month, unlessotherwise authorized by the Contracting Officer.Format: InvoicesNouchers shall be submitted in the format depicted on the attached sampleform entitled "InvoiceNoucher for Purchases and Services Other Than Personal".
Alternate formats are permissible only if they address all requirements of the Billing Instructions.
The23 instructions for preparation and itemization of the invoice/voucher are included with the sampleform.Task Order Contracts:
The contractor must submit a separate invoice/voucher for eachindividual task order with detailed cost information.
This includes all applicable cost elementsand other items discussed in paragraphs (a) through (s) of the attached instructions.
Inaddition, the invoice/voucher must specify the contract number, and the NRC-assigned task/delivery order number.Billing of Costs after Expiration of Contract:
If costs are incurred during the contract periodand invoiced after the contract has expired, you must cite the period during which these costswere incurred.
To be considered a proper expiration invoice/voucher, the contractor shallclearly mark it "EXPIRATION INVOICE" or "EXPIRATION VOUCHER".
Final invoices/vouchers shall be marked "FINAL INVOICE" or "FINAL VOUCHER".
Final invoices/vouchers shall be marked "FINAL INVOICE" or "FINAL VOUCHER".
Currency:
Currency: InvoicesNouchers must be expressed in U.S. Dollars.
InvoicesNouchers must be expressed in U.S. Dollars.Supersession:
Supersession: These instructions supersede previous Billing Instructions for Cost-Reimbursement Type Contracts (July 2011).
These instructions supersede previous Billing Instructions for Cost-Reimbursement Type Contracts (July 2011).24 qINVOICEIVOUCHER FOR PURCHASES AND SERVICES OTHER THAN PERSONAL(SAMPLE FORMAT -COVER SHEET)1. Official Agency Billing OfficeNRC PaymentsU.S. Nuclear Regulatory Commission One White Flint North11555 Rockville PikeMailstop 03-E17ARockville, MD 20852-2738
24
 
q INVOICEIVOUCHER FOR PURCHASES AND SERVICES OTHER THAN PERSONAL (SAMPLE FORMAT - COVER SHEET)
: 1. Official Agency Billing Office NRC Payments U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mailstop 03-E17A Rockville, MD 20852-2738
: 2. InvoiceNoucher Information
: 2. InvoiceNoucher Information
: a. Payee's DUNS Number or DUNS+4. The Payee shall include the Payee's Data Universal Number (DUNS) or DUNS+4 number that identifies the Payee's name and address.
: a. Payee's DUNS Number or DUNS+4. The Payee shall include the Payee's Data Universal Number (DUNS) or DUNS+4 number that identifies the Payee's name and address. The DUNS+4 number is the DUNS number plus a 4-character suffix that may be assigned at the discretion of the Payee to identify alternative Electronic Funds Transfer (EFT) accounts for the same parent concern.
TheDUNS+4 number is the DUNS number plus a 4-character suffix that may be assigned at thediscretion of the Payee to identify alternative Electronic Funds Transfer (EFT) accounts for thesame parent concern.b. Taxpayer Identification Number. The Payee shall include the Payee's taxpayer identification number (TIN) used by the Internal Revenue Service (IRS) in the administration of tax laws.(See IRS Web site:httD://www.irs.gov/Businesses/Small-Businesses-&-Self-EmDloved/Employer-ID-Numbers-(EINsV).c. Payee's Name and Address.
: b. Taxpayer Identification Number. The Payee shall include the Payee's taxpayer identification number (TIN) used by the Internal Revenue Service (IRS) in the administration of tax laws.
Show the name of the Payee as it appears in the contract andits correct address.
(See IRS Web site:
If the Payee assigns the proceeds of this contract as provided for in theassignment of claims terms of this contract, the Payee shall require as a condition of any suchassignment, that the assignee shall register separately in the System for Award Management (SAM) database at http://sam.gov and shall be paid by EFT in accordance with the terms of thiscontract.
httD://www.irs.gov/Businesses/Small-Businesses-&-Self-EmDloved/Employer-ID-Numbers-(EINsV).
See Federal Acquisition Regulation (FAR) 52.232-33(g)
: c. Payee's Name and Address. Show the name of the Payee as it appears in the contract and its correct address. If the Payee assigns the proceeds of this contract as provided for in the assignment of claims terms of this contract, the Payee shall require as a condition of any such assignment, that the assignee shall register separately in the System for Award Management (SAM) database at http://sam.gov and shall be paid by EFT in accordance with the terms of this contract. See Federal Acquisition Regulation (FAR) 52.232-33(g) Payment by Electronic Funds Transfer - Central Contractor Registration (October 2003).
Payment by Electronic FundsTransfer
: d. Contract Number. Insert the NRC contract number (including Enterprise-wide Contract (EWC)), GSA Federal Supply Schedule (FSS), Governmentwide Agency Contract (GWAC) number, or Multiple Agency Contract (MAC) number, as applicable.
-Central Contractor Registration (October 2003).d. Contract Number. Insert the NRC contract number (including Enterprise-wide Contract(EWC)), GSA Federal Supply Schedule (FSS), Governmentwide Agency Contract (GWAC)number, or Multiple Agency Contract (MAC) number, as applicable.
: e. Task Order Number. Insert the task/delivery order number (If Applicable). Do not include more than one task order per invoice or the invoice may be rejected as improper.
: e. Task Order Number. Insert the task/delivery order number (If Applicable).
: f. InvoiceNoucher. The appropriate sequential number of the invoice/voucher, beginning with 001 should be designated. Contractors may also include an individual internal accounting number, if desired, in addition to the 3-digit sequential number.
Do not includemore than one task order per invoice or the invoice may be rejected as improper.
: g. Date of InvoiceNoucher. Insert the date the invoice/voucher is prepared.
: f. InvoiceNoucher.
: h. Billingq Period. Insert the beginning and ending dates (day, month, year) of the period during which costs were incurred and for which reimbursement is requested.
The appropriate sequential number of the invoice/voucher, beginning with001 should be designated.
: i. Description of Deliverables. Provide a brief description of supplies or services, quantity, unit cost, and total cost.
Contractors may also include an individual internal accounting number, if desired, in addition to the 3-digit sequential number.g. Date of InvoiceNoucher.
25
Insert the date the invoice/voucher is prepared.
 
: h. Billingq Period. Insert the beginning and ending dates (day, month, year) of the period duringwhich costs were incurred and for which reimbursement is requested.
-A
: i. Description of Deliverables.
: j. Work Completed. Provide a general summary description of the services performed or products submitted for the invoice period and specify the section or Contract Line Item Number (CLIN) or SubCLIN in the contract pertaining to the required deliverable(s).
Provide a brief description of supplies or services,  
: k. Shipping. Insert weight and zone of shipment, if shipped by parcel post.
: quantity, unitcost, and total cost.25  
I. Charges for freight or express shipments. Attach prepaid bill if shipped by freight or express.
-Aj. Work Completed.
: m. Instructions. Include instructions to consignee to notify the Contracting Officer of receipt of shipment.
Provide a general summary description of the services performed orproducts submitted for the invoice period and specify the section or Contract Line Item Number(CLIN) or SubCLIN in the contract pertaining to the required deliverable(s).
: n. For Indefinite Delivery contracts, the final invoice/voucher shall be marked "FINAL INVOICE" or "FINAL VOUCHER".
: k. Shipping.
: o. Direct Costs. Insert the amount billed for the following cost elements, adjustments, suspensions, and total amounts, for both the current billing period and for the cumulative period (from contract inception to end date of this billing period).
Insert weight and zone of shipment, if shipped by parcel post.I. Charges for freight or express shipments.
(1) Direct Labor. This consists of salaries and wages paid (or accrued) for direct performance of the contract itemized as follows:
Attach prepaid bill if shipped by freight or express.m. Instructions.
Labor         Hours                         Cumulative Category       Billed       Rate     Total   Hours Billed (2) Fringe Benefits. This represents fringe benefits applicable to direct labor and billed as a direct cost. Where a rate is used indicate the rate. Fringe benefits included in direct labor or in other indirect cost pools should not be identified here.
Include instructions to consignee to notify the Contracting Officer of receipt ofshipment.
(3) Contractor-acquired property ($50,000 or more). List each item costing $50,000 or more and having a life expectancy of more than one year. List only those items of equipment for which reimbursement is requested. For each such item, list the following (as applicable): (a) an item description, (b) manufacturer, (c) model number, (d) serial number, (e) acquisition cost, (f) date of purchase, and (g) a copy of the purchasing document.
: n. For Indefinite Delivery contracts, the final invoice/voucher shall be marked "FINAL INVOICE"or "FINAL VOUCHER".
(4) Contractor-acquired property (under $50,000), Materials, and Supplies. These are equipment other than that described in (3) above, plus consumable materials and supplies. List by category. List items valued at $1,000 or more separately. Provide the item number for each piece of equipment valued at $1,000 or more.
: o. Direct Costs. Insert the amount billed for the following cost elements, adjustments, suspensions, and total amounts, for both the current billing period and for the cumulative period(from contract inception to end date of this billing period).(1) Direct Labor. This consists of salaries and wages paid (or accrued) for directperformance of the contract itemized as follows:Labor Hours Cumulative Category Billed Rate Total Hours Billed(2) Fringe Benefits.
(5) Premium Pay. This enumeration in excess of the basic hourly rate. (Requires written approval of the Contracting Officer.)
This represents fringe benefits applicable to direct labor and billedas a direct cost. Where a rate is used indicate the rate. Fringe benefits included indirect labor or in other indirect cost pools should not be identified here.(3) Contractor-acquired property  
(6) Consultant Fee. The supporting information must include the name, hourly or daily rate of the consultant, and reference the NRC approval (if not specifically approved in the original contract).
($50,000 or more). List each item costing $50,000 ormore and having a life expectancy of more than one year. List only those items ofequipment for which reimbursement is requested.
(7) Travel. Total costs associated with each trip must be shown in the following format:
For each such item, list the following (as applicable):  
Start Date       Destination         Costs From To           From To             $
(a) an item description, (b) manufacturer, (c) model number, (d) serialnumber, (e) acquisition cost, (f) date of purchase, and (g) a copy of the purchasing document.
26
(4) Contractor-acquired property (under $50,000),
 
Materials, and Supplies.
I (Must include separatedetailedcosts for airfare, per diem, and other transportation expenses. All costs must be adequately supportedby copies of receipts or other documentation.)
These areequipment other than that described in (3) above, plus consumable materials andsupplies.
(8) Subcontracts. Include separate detailed breakdown of all costs paid to approved subcontractors during the billing period.
List by category.
(9) Other Costs. List all other direct costs by cost element and dollar amount separately.
List items valued at $1,000 or more separately.
: p. Indirect Costs (Overhead and General and Administrative Expense). Cite the formula (rate and base) in effect in accordance with the terms of the contract, during the time the costs were incurred and for which reimbursement is requested.
Provide theitem number for each piece of equipment valued at $1,000 or more.(5) Premium Pay. This enumeration in excess of the basic hourly rate. (Requires written approval of the Contracting Officer.)
: q. Fixed-Fee. If the contract provides for a fixed-fee, it must be reimbursed as indicated in the contract. Cite the formula or method of computation. Include this information as it applies to individual task orders as well.
(6) Consultant Fee. The supporting information must include the name, hourly or dailyrate of the consultant, and reference the NRC approval (if not specifically approved inthe original contract).
(1) The NRC will withhold payment of 15% of the negotiated contract fixed-fee amount, not to exceed $100,000.
(7) Travel. Total costs associated with each trip must be shown in the following format:Start Date Destination CostsFrom To From To $26 I(Must include separate detailed costs for airfare, per diem, and other transportation expenses.
(2) If the fee withholding amount has reached $100,000, the contractor may resume billing the NRC for the balance of its fee under subsequent invoices for work completed.
All costs must be adequately supported by copies of receipts or otherdocumentation.)
(3) Any fee amounts withheld by the NRC will be paid to the contractor during contract closeout in increments, following the submission/settlement of indirect rate proposals in accordance with FAR 52.216-8, "Fixed Fee" (JUN 2011).
(8) Subcontracts.
: r. Total Amount Billed. Insert columns for total amounts for the current and cumulative periods.
Include separate detailed breakdown of all costs paid to approvedsubcontractors during the billing period.(9) Other Costs. List all other direct costs by cost element and dollar amount separately.
: s. Adiustments. Insert columns for any adjustments, including outstanding suspensions for deficient or defective products or nonconforming services, for the current and cumulative periods.
: p. Indirect Costs (Overhead and General and Administrative Expense).
: t. Grand Totals.
Cite the formula (rateand base) in effect in accordance with the terms of the contract, during the time the costs wereincurred and for which reimbursement is requested.
27
: q. Fixed-Fee.
If the contract provides for a fixed-fee, it must be reimbursed as indicated in thecontract.
Cite the formula or method of computation.
Include this information as it applies toindividual task orders as well.(1) The NRC will withhold payment of 15% of the negotiated contract fixed-fee amount,not to exceed $100,000.
(2) If the fee withholding amount has reached $100,000, the contractor may resumebilling the NRC for the balance of its fee under subsequent invoices for workcompleted.
(3) Any fee amounts withheld by the NRC will be paid to the contractor during contractcloseout in increments, following the submission/settlement of indirect rate proposals in accordance with FAR 52.216-8, "Fixed Fee" (JUN 2011).r. Total Amount Billed. Insert columns for total amounts for the current and cumulative periods.s. Adiustments.
Insert columns for any adjustments, including outstanding suspensions fordeficient or defective products or nonconforming  
: services, for the current and cumulative periods.t. Grand Totals.27  
: 3. Sample InvoiceNoucher Information Sample InvoiceNoucher Information (Supporting Documentation must be attached)
: 3. Sample InvoiceNoucher Information Sample InvoiceNoucher Information (Supporting Documentation must be attached)
This invoice/voucher represents reimbursable costs for the billing period from-through.___
This invoice/voucher represents reimbursable costs for the billing period from-through.___
Amount BilledCurrent Period Cumulative (a) Direct Costs(1) Direct labor $ $(2) Fringe benefits  
Amount Billed Current Period     Cumulative (a)                                                 Direct Costs (1)     Direct labor                                   $                   $
(% of direct labor) $ $_(3) Government property  
(2)     Fringe benefits (% of direct labor)           $                   $_
($50,000 or more) $ $(4) Government  
(3)     Government property ($50,000 or more)         $                   $
: property, Materials, andSupplies (under $50,000 per item) $. $(5) Premium pay (NRC approved overtime)  
(4)     Government property, Materials, and Supplies (under $50,000 per item)             $.                 $
$ $_(6) Consultants Fee $ $(7) Travel $ $(8) Subcontracts  
(5)     Premium pay (NRC approved overtime)           $                   $_
$_ $(9) Other costs $ $_Total Direct Costs: $ $(b) Indirect Costs (provide the rate information applicable to your firm)(10) Overhead
(6)     Consultants Fee                               $                   $
_ % of-(Indicate Base) $ $_(11) General and Administrative (G&A) _ %of (Indicate Base) $ $Total Indirect Costs: $ $(c) Fixed-Fee:
(7)     Travel                                         $                   $
(12) Fixed-Fee Calculations:
(8)     Subcontracts                                   $_                 $
: i. Total negotiated contract fixed-fee percent and amount $ii. 85% allowable fee amount $iii. Cumulative fee billed on prior invoices  
(9)     Other costs                                   $                   $_
$iv. Fee due this invoice (not to exceed 85% of fee earned based uponnegotiated contract fee percentage)  
Total Direct Costs:           $                   $
$Note: The fee balance withheld by NRC may not exceed $100,000.
(b)     Indirect Costs (provide the rate information applicable to your firm)
Total Fixed-Fee:  
(10)   Overhead   _   % of
$ I(d)(e)Total Amount BilledAdjustments
              -     (Indicate Base)                           $                   $_
(+/-)$$$$28 (f) Grand Total $ $.(The invoice/voucher format provided above must include information similar to that includedbelow in the following to ensure accuracy and completeness.)
(11)   General and Administrative (G&A) _       %
of             (Indicate Base)                       $                   $
Total Indirect Costs:         $                   $
(c)     Fixed-Fee:
(12)   Fixed-Fee Calculations:
: i.       Total negotiated contract fixed-fee percent   and amount $
ii.     85% allowable fee amount $
iii. Cumulative fee billed on prior invoices $
iv.     Fee due this invoice (notto exceed 85% of fee earnedbased upon negotiated contract fee percentage)$
Note: The fee balance withheld by NRC may not exceed $100,000.
Total Fixed-Fee:             $                   I (d)   Total Amount Billed                                                        $
(e)   Adjustments (+/-)                                                           $
28
 
(f)   Grand Total                                         $                       $.
(The invoice/voucher format provided above must include information similar to that included below in the following to ensure accuracy and completeness.)
SAMPLE SUPPORTING INFORMATION The budget information provided below is for format purposes only and is illustrative.
SAMPLE SUPPORTING INFORMATION The budget information provided below is for format purposes only and is illustrative.
Cost Elements:
Cost Elements:
: 1) Direct Labor- $2,400Labor Hours Cumulative Category Billed Rate Total Hours BilledSenior Engineer I 100 $14.00 $1,400 975Engineer 50 $10.00 $ 500 465Computer Analyst 100 $5.00 $ 500 320$2,400 1,760 hrs.2) Fringe Benefits  
: 1)     Direct Labor- $2,400 Labor                                Hours                                 Cumulative Category                             Billed     Rate       Total           Hours Billed Senior Engineer I                     100       $14.00 $1,400                     975 Engineer                              50       $10.00 $ 500                     465 Computer Analyst                     100       $5.00     $ 500                 320
-$480Fringe @ 20% of Direct SalariesLabor FringeCategory Salaries AmountSenior Engineer I $1,400 $280Engineer
                                                                  $2,400               1,760 hrs.
$ 500 $100Computer Analyst $ 500 $100$2,400 $4803) Govemment-furnished and contractor-acquired Property  
: 2)     Fringe Benefits - $480 Fringe @ 20% of Direct Salaries Labor                                              Fringe Category                            Salaries      Amount Senior Engineer I                   $1,400         $280 Engineer                            $ 500         $100 Computer Analyst                     $ 500         $100
($50,000 or more) -$60,000Prototype Spectrometer  
                                            $2,400         $480
-item number 1000-01 = $60,0004) Govemment-furnished and contractor-acquired Property (under $50,000),
: 3)     Govemment-furnished and contractor-acquired Property ($50,000 or more) - $60,000 Prototype Spectrometer - item number 1000-01 = $60,000
Materials, andSupplies
: 4)     Govemment-furnished and contractor-acquired Property (under $50,000), Materials, and Supplies - $2,000 10 Radon tubes @ $110.00                     = $1,100 6 Pairs Electrostatic gloves @ $150.00     = $ 900
-$2,00010 Radon tubes @ $110.00 = $1,1006 Pairs Electrostatic gloves @ $150.00 = $ 900$2,0005) Premium Pay -$150Walter Murphy -10 hours @ $10.00 Per Hour (Reg. Pay) = $100 x 1.5 OT rate = $150(EX: Premium pay for this individual was approved and authorized under this contractby the NRC Contracting Officer by letter dated 6/1/2011.)
                                                      $2,000
: 6) Consultants' Fee -$100Dr. Carney -1 hour fully-burdened  
: 5)     Premium Pay - $150 Walter Murphy - 10 hours @ $10.00 Per Hour (Reg. Pay) = $100 x 1.5 OT rate = $150 (EX: Premium pay for this individual was approved and authorized under this contract by the NRC Contracting Officer by letter dated 6/1/2011.)
@ $100 = $10029
: 6)     Consultants' Fee - $100 Dr. Carney - 1 hour fully-burdened @ $100 = $100 29
: 7) Travel -$2,640(i) Airfare:  
: 7) Travel - $2,640 (i)     Airfare: (2 Roundtrip trips for 1 person @ $300 per r/t ticket)
(2 Roundtrip trips for 1 person @ $300 per r/t ticket)Start Date End Date Days From To Cost4/1/2011 4/7/2011 7 Philadelphia, PA Wash, D.C. $3007/1/2011 7/8/2011 8 Philadelphia, PA Wash, D.C. $300(ii) Per Diem: $136/day x 15 days = $2,0408) Subcontracting  
Start Date     End Date         Days   From                   To         Cost 4/1/2011       4/7/2011         7     Philadelphia, PA       Wash, D.C. $300 7/1/2011       7/8/2011         8     Philadelphia, PA       Wash, D.C. $300 (ii)   Per Diem: $136/day x 15 days = $2,040
-$30,000Company A = $10,000Company B = $20,000$30,000(EX: Subcontracts for Companies A & B were consented to by the Contracting Officerby letter dated 6/15/2011.)
: 8) Subcontracting - $30,000 Company A               = $10,000 Company B               = $20,000
: 9) Other Costs -$5,100Honorarium for speaker at American Nuclear Society conference  
                              $30,000 (EX: Subcontracts for Companies A & B were consented to by the Contracting Officer by letter dated 6/15/2011.)
= $5,000Nuclear Planet Journal subscription fee = $10010) Overhead Expense -S41,148Overhead
: 9) Other Costs - $5,100 Honorarium for speaker at American Nuclear Society conference = $5,000 NuclearPlanet Journal subscription fee = $100
@ 40% of Total Direct Costs11) General and Administrative (G&A) Expense -$22,784G&A @ 20% of Total Costs, excluding subcontracts and consultants
: 10) Overhead Expense - S41,148 Overhead @ 40% of Total Direct Costs
: 12) Fixed-Fee  
: 11) General and Administrative (G&A) Expense - $22,784 G&A @ 20% of Total Costs, excluding subcontracts and consultants
-$8,218Fixed-Fee applied to Total Costs @ 5%Fixed-Fee Calculations:
: 12) Fixed-Fee - $8,218 Fixed-Fee applied to Total Costs @ 5%
: i. Total contract fixed-fee  
Fixed-Fee Calculations:
$100,000ii. 85% allowable fee $85,000iii. Cumulative fee billed on prior invoices  
: i. Total contract fixed-fee $100,000 ii. 85% allowable fee $85,000 iii. Cumulative fee billed on prior invoices $85,000 iv. Fee due this invoice (not to exceed 85% of fee earned based upon negotiated contract fee percentage) $8,218 Total Amount Billed             $175,020 Adjustments (+1-)               - $8,218 Grand Total                     $166,802 30
$85,000iv. Fee due this invoice (not to exceed 85% of fee earned based uponnegotiated contract fee percentage)  
 
$8,218Total Amount Billed $175,020Adjustments
X     ".                                 ORDER FOR SUPPLIES OR SERVICES                                                                                                 PAGE OF PAGES IMP&TAN " Mark all packages and papers with contract and/or order numbers.                                                                                                           1                  30
(+1-) -$8,218Grand Total $166,80230 X ". ORDER FOR SUPPLIES OR SERVICES PAGE OF PAGESIMP&TAN " Mark all packages and papers with contract and/or order numbers.
: 1. DATE OP 6RDER             2. CONTRACT NO. (If any)                                                                                                       6 SHIP TO:
1 301. DATE OP 6RDER 2. CONTRACT NO. (If any) 6 SHIP TO:*NRC-HQ-50-!4-E-0001 09/22/2014  
                    *NRC-HQ-50-!4-E-0001 09/22/2014                                                                                                 a. NAME OF CONSIGNEE
: a. NAME OF CONSIGNEE
: 3. ORDER NO.                                                 4. REQUISITION/REFERENCE NO.
: 3. ORDER NO. 4. REQUISITION/REFERENCE NO.NRC-HQ-20-14-T-0012 NRR-14-0287 SARA LYONS5. ISSUING OFFICE (Address correspondence to) b. STREET ADDRESSUS NRC -HQ 1155 ROCKVILLE PIKEACQUISITION MANAGEMENT DIVISION MAIL STOP OWFN 1OC15MAIL STOP 3WFN-05-C64MP WASHINGTON DC 20555-0001 c CITY d. STATE e. ZIP CODEROCKVILLE MD 208527. TO: f. SHIP VIAa. NAME OF CONTRACTOR S W R I 8. TYPE OF ORDERb. COMPANY NAME -a. PURCHASE X-' b. DELIVERYc. STREET ADDRESS REFERENCE YOUR:6220 CULEBRA RD Except for billing instructions on thereverse, this delivery order is subjectto instructions contained on this sideonly of this form and is issuedPlease furnish the following on the terms subject to the terms and conditions and conditions specified on both sides of of the above-numbered contract.
NRR-14-0287                                  SARA LYONS NRC-HQ-20-14-T-0012
: d. CITY e. STATE f. ZIP CODE this order and on the attached sheet, if any,SAN ANTONIO TX 782385166 including delivery as indicated.
: 5. ISSUING OFFICE (Address correspondence to)                                                               b. STREET ADDRESS US NRC - HQ                                                                                               1155 ROCKVILLE PIKE ACQUISITION MANAGEMENT DIVISION                                                                           MAIL STOP OWFN 1OC15 MAIL STOP 3WFN-05-C64MP WASHINGTON               DC   20555-0001 c CITY                                                               d. STATE     e. ZIP CODE ROCKVILLE                                                            MD         20852
: 9. ACCOUNTING AND APPROPRIATION DATA 10. REQUISITIONING OFFICESee Schedule OFF OF NUCLEAR REACTOR REGULATION
: 7. TO:                                                                                                     f. SHIP VIA
: 11. BUSINESS CLASSIFICATION (Check appropriate box(es))  
: a. NAME OF CONTRACTOR S W R I                                                                                                                                           8. TYPE OF ORDER
: 12. F.O.B. POINTa. SMALL b OTHER THAN SMALL I ' c. DISADVANTAGED  
: b. COMPANY NAME                                                                                               -a. PURCHASE                                             X-' b. DELIVERY
: d. WOMEN-OWNED  
: c. STREET ADDRESS                                                                                             REFERENCE YOUR:
: j. e. HUBZonef. SERVICE-DISABLED  
6220       CULEBRA RD                                                                                                                                                   Except for billing instructions on the reverse, this delivery order is subject to instructions contained on this side only of this form and is issued Please furnish the following on the terms                   subject to the terms and conditions and conditions specified on both sides of                   of the above-numbered contract.
: g. WOMEN-OWNED SMALL BUSINESS (WOSB) h EDWOSBVETERAN-OWNED ELIGIBLE UNDER THE WOSB PROGRAM13. PLACE OF 14. GOVERNMENT BIL NO. 15. DELIVER TO F.O.B. POINT 16. DISCOUNT TERMSON OR BEFORE (Date)a. INSPECTION  
: d. CITY                                                                 e. STATE   f. ZIP CODE             this order and on the attached sheet, if any, SAN ANTONIO                                                               TX       782385166               including delivery as indicated.
: b. ACCEPTANCE Destination Destination 3017. SCHEDULE (See reverse for Rejections)
: 9. ACCOUNTING AND APPROPRIATION DATA                                                                       10. REQUISITIONING OFFICE See Schedule                                                                                               OFF OF NUCLEAR REACTOR REGULATION
QUANTITY UNIT QUANTITYITEM NO. SUPPLIES OR SERVICES ORDERED UNIT PRICE AMOUNT ACCEPTED(a) (b) (c) (d) (e) (f) (g)The Contractor shall provide services inaccordance with the Statement of Workentitled "Review of the Calvert CliffsUnits 1 and 2 License Amendment Request(LAR) Pertaining to Risk-Informed (RI)Technical Specification Task Force (TSTF)Continued  
: 11. BUSINESS CLASSIFICATION           (Check appropriatebox(es))                                                                                                             12. F.O.B. POINT
...18. SHIPPING POINT 19. GROSS SHIPPING WEIGHT 20. INVOICE NO. 17(h)TOTAL(Cont.pages)21. MAIL INVOICE TO: a. NAME $76,716.00 44US NUCLEAR REGULATORY COMMISSION SEE BILLINGINSTRUCTIONS
: a. SMALL                 b OTHER THAN SMALL               I ' c. DISADVANTAGED               d. WOMEN-OWNED                 j. e. HUBZone
: b. STREET ADDRESS ONE WHITE FLINT NORTHONREVERSE (orP. Box) 11555 ROCKVILLE PIKE 17(i)GRANDMAILSTOP 03-EI7A TOTALc.. e $76, 716.0 ooi .CITY dSTE e. ZIP CODE $7 "160ROCKVILLE MD 20852-2738
: f. SERVICE-DISABLED               g. WOMEN-OWNED SMALL BUSINESS (WOSB)                         h EDWOSB VETERAN-OWNED                 ELIGIBLE UNDER THE WOSB PROGRAM
: 22. UNITED STATES OF 09 / 22 / 201 4 23. NAME (Typed)AMERICA BY (Signature)
: 13. PLACE OF                                   14. GOVERNMENT BIL NO.                         15. DELIVER TO F.O.B. POINT                     16. DISCOUNT TERMS ON OR BEFORE (Date)
L MONIQUE B. WILLIAMS1--,+-rLA,  
: a. INSPECTION                             b. ACCEPTANCE Destination                               Destination                                                                                                                                         30
, t. .TITLE: CONTRACTING/ORDERING OFFICERAUTHORIZED FOR LOCAL REPRODUCTION PREVIOUS EDITION NOT USABLEOPTIONAL FORM 347 (R-. U2012)Presrbed by GSA/FAR 48 CPR 53213(f)SUNSI REVIEW COMPLETIN."PI A13-Anfle"900 DEC 2 3 2014hDOW2 ORDER FOR SUPPLIES OR SERVICES PAGE NOof SCHEDULE  
: 17. SCHEDULE (See reverse for Rejections)
-CONTINUATION 2IMPORTANT:
QUANTITY                       UNIT                                                       QUANTITY ITEM NO.                                     SUPPLIES OR SERVICES                                       ORDERED UNIT                   PRICE                     AMOUNT                           ACCEPTED (a)                                                 (b)                                                   (c)       (d)               (e)                         (f)                               (g)
Mark all packages and papers with contract and/or order numbers.DATE OF ORDER CONTRACT NO. ORDER NO.09/22/2014 INRC-HQ-50-14-E-0001 NRC-HQ-20-14-T-0012 ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT AMOUNT QUANTITYORDERED PRICE ACCEPTED(a) (b) (c) I(d) (e) (f) (g)Initiative 5b, "Risk-Informed Method forControl of Surveillance Frequencies, TSTF-425."
The Contractor shall provide services in accordance with the Statement of Work entitled            "Review of the Calvert Cliffs Units 1 and 2 License Amendment Request (LAR) Pertaining to Risk-Informed (RI)
NRC Contracting Officers Representative:
Technical Specification Task Force (TSTF)
Sara Lyons 301-415-2861 Period of Performance:
Continued ...
09/22/2014 to02/28/2015 Accounting Info:2014-X0200-FEEBASED-20-20D007-11-4-149-1128-252ALabor/Fee The obligated amount of award: $76,716.00.
: 18. SHIPPING POINT                                             19. GROSS SHIPPING WEIGHT                   20. INVOICE NO.                                                               17(h)
The total for this award is shown in box17(i).0000176,716.00 TOTAL CARRIED FORWARD TO 1ST PAGE (ITEM 17(H)) K> $76,716.00 AUTHORIZED FOR LOCAL REPODUCTION OPTIONAL FORM 348 (R-e 42006)PREVIOUS EDITION NOT USABLEs#.P~bed by GS (48 CFR I 53.213(f)
TOTAL (Cont.
CONTRACTOR ACCEPTANCE OF TASK ORDER NRC-HQ-20-14-T-0012 Acceptance of Task Order No: NRC-HQ-20-14-T-0012 should be made by having an official, authorized to bind your organization, execute two copies of this document in the space providedand return one copy to the Contracting Officer.
pages)
You should retain the other copy for yourrecords.Accepted Task Order No. N C-HQ-20-14-T-0012:
: 21. MAIL INVOICE TO:                                                                                                              *
Name R. B. KalmbachExecutive
: a. NAME                                                                                                                                       $76,716.00                                     44 US NUCLEAR REGULATORY                         COMMISSION SEE BILLING INSTRUCTIONS b. STREET ADDRESS                     ONE WHITE FLINT NORTH ONREVERSE      (orP. Box)                       11555 ROCKVILLE PIKE                                                                                                                                     17(i)
: Director, Contracts Title09/18/2014 Date3 SECTION B -Supplies or Services/Prices NRCB010 BRIEF PROJECT TITLE AND WORK DESCRIPTION (a) The title of this project is "Review of the Calvert Cliffs Units 1 and 2 License Amendment Request (LAR) Pertaining to Risk-informed (RI) Technical Specification Task Force (TSTF)Initiative 5b, "Risk-Informed Method for Control of Surveillance Frequencies,"
GRAND MAILSTOP 03-EI7A                                                                                                                                         TOTAL c..
TSTF-425."
i .CITY                                                                                       dSTE e
(b) Summary work description:
: e. ZIP CODE                   $7 716.0
The objective of this task order is to obtain technical assistance from the Southwest Research Institute's (SwRI) Center for Nuclear Waste Regulatory Analyses(CNWRA) to assist the staff in determining the acceptability of the Calvert Cliffs, Units 1 and 2,License Amendment Request.PRICE/COST SCHEDULEPERIOD OF ?ERFORMANCGE'-Septetmber 22;,2014 201.5.L--'ININO.  
                                                                                                                                                                $76,              oo "160 ROCKVILLE                                                                                  MD         20852-2738
,OF :`-ESTIMA :-W IXEDi. PEE TOTALSRIPLIESISERMICES'i  
: 22. UNITED STATES OF                             09 / 22 / 201 4                                                           23. NAME       (Typed)
ýCO.STI ~CPIFF.00001 Review of Technical Reports forLicense Amendment RequestPertaining to Risk-Informed (RI)Technical Specification Task Force(TSTF) Initiative 5b, "Risk-Informed Method for Control ofSurveillance Frequencies,"
AMERICA BY (Signature)                 L                                                                                   MONIQUE           B. WILLIAMS 1--,+-rLA,   ,               t.       .                               TITLE: CONTRACTING/ORDERING OFFICER AUTHORIZED FOR LOCAL REPRODUCTION                                                                                                                                             OPTIONAL FORM 347 (R-. U2012)
TSTF-425.Total _ _ _$76,716.00 NRCBO40A CONSIDERATION AND OBLIGATION-COST-PLUS-FIXED-FEE ALTERNATE I(a) The total estimated cost to the Government for full performance of this contract is$76,716.00 of which the sum of represents the estimated reimbursable costs, and ofwhich 10 [epresents the W(b) There shall be no adjustment in the amount of the Contractor's fixed fee.(c) The amount currently obligated b the Gov rnment with respect to this contract is$76,716.00, of which the sum of represents the estimated reimbursable costs,and of which repres he ixed-fee.
PREVIOUS EDITION NOT USABLE                                                                                                                                                      Presrbed by GSA/FAR48 CPR 53213(f)
(d) This is an incrementally-funded contract and FAR 52.232-22
SUNSI REVIEW COMPLET 3 - Anfle"900                                                                                                         DEC 2 3 2014 IN."PI A1                                                                                                                                                            hDOW2
-"Limitation of Funds". applies.(e) In accordance with FAR 52.216-8
 
-Fixed Fee, it is the policy of the NRC to withholdpayment of fee after payment of of the fee has been paid in order to protect theGovernment's interest.
ORDER FOR SUPPLIES OR SERVICES                                               PAGE NO of                                    SCHEDULE - CONTINUATION                                           2 IMPORTANT: Mark all packages and papers with contract and/or order numbers.
The amou of fixed-fee withheld from the contractor will not exceedpercent of the total fee or qwhichever is less. Accordingly, the maximum amount offixed-fee that may be held in reserve is4 SECTION C -Description/Specifications Statement of WorkProject Title: Review of the Calvert Cliffs Units 1 and 2 License Amendment Request (LAR)Pertaining to Risk-Informed (RI) Technical Specification Task Force (TSTF)Initiative 5b, "Risk-Informed Method for Control of Surveillance Frequencies,"
DATE OF ORDER       CONTRACT NO.                                                               ORDER NO.
TSTF-425Cost Center: 1128Contract No.: NRC-HQ-50-14-E-0001 Task Assignment Control Numbers:
09/22/2014 INRC-HQ-50-14-E-0001                                                                 NRC-HQ-20-14-T-0012 ITEM NO.                         SUPPLIES/SERVICES                       QUANTITY UNIT UNIT             AMOUNT                     QUANTITY ORDERED      PRICE                                       ACCEPTED (a)                                     (b)                             (c)   I(d)   (e)               (f)                         (g)
MF4227, non-fee recoverable work, for Task IMF4065 for Unit 1MF4066 for Unit 2Budget & Reporting No.: 11-4-149NRC Requisition Office: NRRNRC COR: Sara Lyons, Sara.Lyonsanrc..qov, (301) 415-2861Alternate NRC COR: Bernard L. Grenier, Bernard.Grenier(Dnrc.,qov, (301) 415-2726Fee Recoverable:
Initiative       5b, "Risk-Informed Method for Control of Surveillance Frequencies, TSTF-425."
Yes; all costs must be allocated to each specific TAC number in theactual amount which was spent on Task 1 or on each individual unit.Contractor:
NRC Contracting Officers                     Representative:
CNWRAType of Contract/Order:
Sara Lyons 301-415-2861 Period of Performance:                   09/22/2014 to 02/28/2015 Accounting Info:
Cost Plus Fixed FeePeriod of Performance:
2014-X0200-FEEBASED-20-20D007-11-4-149-1128-252A 00001        Labor/Fee                                                                                       76,716.00 The obligated amount of award: $76,716.00.
9/22/2014  
The total       for this award is shown in box 17(i).
-02/28/2015
TOTAL CARRIED FORWARD TO 1ST PAGE (ITEM 17(H))                 K>                           $76,716.00 AUTHORIZED FOR LOCALREPODUCTION                                                                                          OPTIONAL FORM 348 (R-e 42006)
: 1. BACKGROUND In 1992, the NRC issued the improved Standard Technical Specifications (STS) to clarify thecontent and form of requirements necessary to ensure safe operation of nuclear powerplants in accordance with Section 50.36 of Title 10 of the Code of Federal Regulations (10CFR 50.36). As the STS mature, necessary improvements are identified.
PREVIOUS EDITION NOTUSABLE                                                                                                                              s#.
One processused to initiate changes to the STS involves the industry-sponsored Technical Specifications Task Force (TSTF) submitting a proposed change or Traveler to the NRC for review,approval, and subsequent incorporation into the next revision of the STS. The NRC reviewsthe proposed change, with the end product being a model application, a model safetyevaluation, and a review plan which licensees may use in subsequent LARs. Licensees applying to incorporate these proposed changes into their Technical Specifications mustprovide a plant specific justification acceptable to the staff in their LAR.5 In 2007, the NRC issued the final safety evaluation (SE) for the Nuclear Energy Institute (NEI) Topical Report (TR) 04-10, Revision 1, "Risk-Informed Technical Specification Initiative 5b, Risk-Informed Method for Control of Surveillance Frequencies."
P~bed by GS FR* (48 CFRI53.213(f)
This STSchange provides a risk-informed methodology to identify, assess, implement, and monitorproposed changes to frequencies of surveillance requirements (SRs) of technical specifications (TSs). The initiative is intended to maintain and improve safety throughincorporation of risk assessment and management techniques in the TSs, while reducingunnecessary burden.The Office of Nuclear Reactor Regulation (NRR) is currently reviewing several risk-informed LARs and expects additional risk-informed LARs in fiscal years 2015 and 2016. CalvertCliffs has submitted a RI-TSTF Initiative 5b LAR which is applicable to both units. The PRALicensing Branch (APLA) is responsible for reviewing the Probabilistic Risk Assessment (PRA) portion of the LARs to make an independent assessment regarding PRA technical adequacy and the acceptability of the proposed amendment.
 
Due to heavy workload inAPLA, contractor assistance is required to support APLA so as to complete the technical review and develop the safety evaluation report (SER) for these LARs in a timely manner.The metric which has been established for staff review and issuance of the SER is one yearfrom receipt of the LAR in ADAMS. The Calvert Cliffs was accepted in ADAMS on May 1,2014. The APLA SE date to the Division of Operating Reactor Licensing is January 2, 2015.1. SCOPE OF WORKThe scope of the work includes review of the Calvert Cliffs, Units 1 and 2, RI-TSTF Initiative 5b/TSTF-425 LAR for PRA quality and technical adequacy and preparation of the technical evaluation report (TER).Objective The objective of this task order is to obtain technical assistance from the Southwest Research Institute's (SwRI) Center for Nuclear Waste Regulatory Analyses (CNWRA) toassist the staff in determining the acceptability of the Calvert Cliffs, Units 1 and 2, LAR.2. SPECIFIC TASKS (WORK REQUIREMENTS AND SCHEDULE)
CONTRACTOR ACCEPTANCE OF TASK ORDER NRC-HQ-20-14-T-0012 Acceptance of Task Order No: NRC-HQ-20-14-T-0012 should be made by having an official, authorized to bind your organization, execute two copies of this document in the space provided and return one copy to the Contracting Officer. You should retain the other copy for your records.
Tasks Completion Schedule1. Gain familiarity with NRC processes specific to this Task Order.a. Prepare for a kick-off meeting by reviewing applicable One week after theDocuments and Standards (see Section 5). Travel to trip; the trip is toNRC HQ to participate in a kick-off meeting to discuss occur within twoall aspects of the scope of the work, expectations, and weeks after award ofother subjects pertinent to this type of work. Prepare a the task order.trip report.b. Travel to NRC HQ to participate in a review process One week after theassessment meeting to discuss the process, questions trip; the trip is toand potential improvements after completion of the first occur within twodetailed TSTF-425 review. Prepare a trip report. weeks of completing Task 2, below.6  
Accepted Task Order No. N C-HQ-20-14-T-0012:
Name R. B. Kalmbach Executive Director, Contracts Title 09/18/2014 Date 3
 
SECTION B - Supplies or Services/Prices NRCB010 BRIEF PROJECT TITLE AND WORK DESCRIPTION (a) The title of this project is "Review of the Calvert Cliffs Units 1 and 2 License Amendment Request (LAR) Pertaining to Risk-informed (RI) Technical Specification Task Force (TSTF)
Initiative 5b, "Risk-Informed Method for Control of Surveillance Frequencies," TSTF-425."
(b) Summary work description: The objective of this task order is to obtain technical assistance from the Southwest Research Institute's (SwRI) Center for Nuclear Waste Regulatory Analyses (CNWRA) to assist the staff in determining the acceptability of the Calvert Cliffs, Units 1 and 2, License Amendment Request.
PRICE/COST SCHEDULE PERIOD OF ?ERFORMANCGE'-Septetmber 22;,2014 .ýý-*Februar.28, 201.5
.L--'ININO. 'a-N*--D.ESCRIPTc!ON    ,OF :`-ESTIMA             *-  :-W     IXEDi.PEE TOTAL SRIPLIESISERMICES'i               ýCO.STI             ~CPIFF.
00001         Review of Technical Reports for License Amendment Request Pertaining to Risk-Informed (RI)
Technical Specification Task Force (TSTF) Initiative 5b, "Risk-Informed Method for Control of Surveillance Frequencies," TSTF-425.
Total         _     _     _$76,716.00 NRCBO40A CONSIDERATION AND OBLIGATION-COST-PLUS-FIXED-FEE ALTERNATE I (a) The total estimated cost to the Government for full performance of this contract is
$76,716.00 of which the sum of                   represents the estimated reimbursable costs, and of which 10             [epresents the W (b) There shall be no adjustment in the amount of the Contractor's fixed fee.
(c) The amount currently obligated b the Gov rnment with respect to this contract is
$76,716.00, of which the sum of                       represents the estimated reimbursable costs, and of which                     repres     he ixed-fee.
(d) This is an incrementally-funded contract and FAR 52.232 "Limitation of Funds". applies.
(e) In accordance with FAR 52.216 Fixed Fee, it is the policy of the NRC to withhold payment of fee after payment of *ercent of the fee has been paid in order to protect the Government's interest. The amou of fixed-fee withheld from the contractor will not exceed percent of the total fee or qwhichever               is less. Accordingly, the maximum amount of fixed-fee that may be held in reserve is 4
 
SECTION C - Description/Specifications Statement of Work Project
 
==Title:==
Review of the Calvert Cliffs Units 1 and 2 License Amendment Request (LAR)
Pertaining to Risk-Informed (RI) Technical Specification Task Force (TSTF)
Initiative 5b, "Risk-Informed Method for Control of Surveillance Frequencies,"
TSTF-425 Cost Center:     1128 Contract No.: NRC-HQ-50-14-E-0001 Task Assignment Control Numbers: MF4227, non-fee recoverable work, for Task I MF4065 for Unit 1 MF4066 for Unit 2 Budget & Reporting No.: 11-4-149 NRC Requisition Office: NRR NRC COR:                 Sara Lyons, Sara.Lyonsanrc..qov, (301) 415-2861 Alternate NRC COR:       Bernard L. Grenier, Bernard.Grenier(Dnrc.,qov, (301) 415-2726 Fee Recoverable:         Yes; all costs must be allocated to each specific TAC number in the actual amount which was spent on Task 1 or on each individual unit.
Contractor: CNWRA Type of Contract/Order: Cost Plus Fixed Fee Period of Performance: 9/22/2014 - 02/28/2015
: 1. BACKGROUND In 1992, the NRC issued the improved Standard Technical Specifications (STS) to clarify the content and form of requirements necessary to ensure safe operation of nuclear power plants in accordance with Section 50.36 of Title 10 of the Code of Federal Regulations (10 CFR 50.36). As the STS mature, necessary improvements are identified. One process used to initiate changes to the STS involves the industry-sponsored Technical Specifications Task Force (TSTF) submitting a proposed change or Traveler to the NRC for review, approval, and subsequent incorporation into the next revision of the STS. The NRC reviews the proposed change, with the end product being a model application, a model safety evaluation, and a review plan which licensees may use in subsequent LARs. Licensees applying to incorporate these proposed changes into their Technical Specifications must provide a plant specific justification acceptable to the staff in their LAR.
5
 
In 2007, the NRC issued the final safety evaluation (SE) for the Nuclear Energy Institute (NEI) Topical Report (TR) 04-10, Revision 1, "Risk-Informed Technical Specification Initiative 5b, Risk-Informed Method for Control of Surveillance Frequencies." This STS change provides a risk-informed methodology to identify, assess, implement, and monitor proposed changes to frequencies of surveillance requirements (SRs) of technical specifications (TSs). The initiative is intended to maintain and improve safety through incorporation of risk assessment and management techniques in the TSs, while reducing unnecessary burden.
The Office of Nuclear Reactor Regulation (NRR) is currently reviewing several risk-informed LARs and expects additional risk-informed LARs in fiscal years 2015 and 2016. Calvert Cliffs has submitted a RI-TSTF Initiative 5b LAR which is applicable to both units. The PRA Licensing Branch (APLA) is responsible for reviewing the Probabilistic Risk Assessment (PRA) portion of the LARs to make an independent assessment regarding PRA technical adequacy and the acceptability of the proposed amendment. Due to heavy workload in APLA, contractor assistance is required to support APLA so as to complete the technical review and develop the safety evaluation report (SER) for these LARs in a timely manner.
The metric which has been established for staff review and issuance of the SER is one year from receipt of the LAR in ADAMS. The Calvert Cliffs was accepted in ADAMS on May 1, 2014. The APLA SE date to the Division of Operating Reactor Licensing is January 2, 2015.
: 1. SCOPE OF WORK The scope of the work includes review of the Calvert Cliffs, Units 1 and 2, RI-TSTF Initiative 5b/TSTF-425 LAR for PRA quality and technical adequacy and preparation of the technical evaluation report (TER).
Objective The objective of this task order is to obtain technical assistance from the Southwest Research Institute's (SwRI) Center for Nuclear Waste Regulatory Analyses (CNWRA) to assist the staff in determining the acceptability of the Calvert Cliffs, Units 1 and 2, LAR.
: 2. SPECIFIC TASKS (WORK REQUIREMENTS AND SCHEDULE)
Tasks                                                                       Completion Schedule
: 1. Gain familiarity with NRC processes specific to this Task Order.
: a. Prepare for a kick-off meeting by reviewing applicable             One week after the Documents and Standards (see Section 5). Travel to                 trip; the trip is to NRC HQ to participate in a kick-off meeting to discuss             occur within two all aspects of the scope of the work, expectations, and           weeks after award of other subjects pertinent to this type of work. Prepare a the task order.
trip report.
: b. Travel to NRC HQ to participate in a review process                 One week after the assessment meeting to discuss the process, questions trip; the trip is to and potential improvements after completion of the first           occur within two detailed TSTF-425 review. Prepare a trip report.                 weeks of completing Task 2, below.
6
: 3. SPECIFIC TASKS (WORK REQUIREMENTS AND SCHEDULE)
: 3. SPECIFIC TASKS (WORK REQUIREMENTS AND SCHEDULE)
TasksCompletion Schedule2. Based on the applicable documents and standards found inSection 4, perform the following tasks:a. Review the layout, scope, and content of the LAR andidentify the NRC approved revision of TSTF-425referenced by the licensee in the LAR. Prepare atechnical letter report.b. Identify any deviations from the approved TSTF-425 scope:(1) Compare the TSTF-425 LAR with the Safety Evaluation Report (SER) issued for the appropriate revision ofNEI 04-10, "Risk-Informed Technical Specification Initiative 5B, Risk-Informed Method for Control ofSurveillance Frequencies,"
Tasks                                                                  Completion Schedule
and itemize any deviations.
: 2. Based on the applicable documents and standards found in Section 4, perform the following tasks:
: a. Review the layout, scope, and content of the LAR and            One week after identify the NRC approved revision of TSTF-425                completion of referenced by the licensee in the LAR. Prepare a              Subtask l.a.
technical letter report.
: b. Identify any deviations from the approved TSTF-425 scope:       Two weeks after completion of (1) Compare the TSTF-425 LAR with the Safety Evaluation       Subtask 2.a.
Report (SER) issued for the appropriate revision of NEI 04-10, "Risk-Informed Technical Specification Initiative 5B, Risk-Informed Method for Control of Surveillance Frequencies," and itemize any deviations.
(2) Where possible, summarize the reason for the deviation (as identified by the licensee) along with the deviation.
(2) Where possible, summarize the reason for the deviation (as identified by the licensee) along with the deviation.
: c. TSTF-425 identifies the specific STS Surveillance Frequencies (SFs) to be relocated.
: c. TSTF-425 identifies the specific STS Surveillance               One week after Frequencies (SFs) to be relocated. Identify any plant-         completion of specific frequencies proposed to be relocated which are        Subtask 2.b.
Identify any plant-specific frequencies proposed to be relocated which arenot contained within the STS scope.1 Determine if eachrelocated frequency is solely time-based, and not basedon events, equipment conditions, or other parameters.
not contained within the STS scope.1 Determine if each relocated frequency is solely time-based, and not based on events, equipment conditions, or other parameters.
TSTF-425, Section 2.0 describes the exceptions torelocating surveillance frequencies.
TSTF-425, Section 2.0 describes the exceptions to relocating surveillance frequencies. Prepare a technical letter report.
Prepare a technical letter report.d. Review the Technical Adequacy of the Internal EventsProbabilistic Risk Assessment (PRA) Model.(1) Confirm that the licensee has completed a peer reviewof their model in accordance with Regulatory Guide(RG) 1.200.One week aftercompletion ofSubtask l.a.Two weeks aftercompletion ofSubtask 2.a.One week aftercompletion ofSubtask 2.b.Three weeks aftercompletion ofSubtask 1.a; seeassumptions andunderstandings
: d. Review the Technical Adequacy of the Internal Events            Three weeks after Probabilistic Risk Assessment (PRA) Model.                     completion of Subtask 1.a; see (1) Confirm that the licensee has completed a peer review      assumptions and of their model in accordance with Regulatory Guide       understandings (RG) 1.200.                                               section, below.
: section, below.(2) Review all facts and observations (F&Os), including any identified as "documentation issue only."Evaluate the disposition of the F&O for the TSTF-425program and determine if proposed sensitivity analysesare reasonable.
(2) Review all facts and observations (F&Os), including any identified as "documentation issue only."
Identify the need for additional orclarifying information (RAIs2) which are not necessarily limited to F&Os, but addresses the PRA technical 1 SFs which are identical with the TSTF-425 scope, or which are not relocated in the plant-specific implementation of TSTF-425, do not require review.2 See Section 10 for guidance in the preparation of RAIs.7  
Evaluate the disposition of the F&O for the TSTF-425 program and determine if proposed sensitivity analyses are reasonable. Identify the need for additional or clarifying information (RAIs 2 ) which are not necessarily limited to F&Os, but addresses the PRA technical 1 SFs which are identical with the TSTF-425 scope, or which are not relocated in the plant-specific implementation of TSTF-425, do not require review.
: 3. SPECIFIC TASKS (WORK REQUIREMENTS AND SCHEDULE)  
2 See Section 10 for guidance in the preparation of RAIs.
(CONTINUED) adequacy of the Internal Events PRA model. Anexample may be an RAI related to peer review(s).
7
Another example may be assessing the acceptability of a capability category I supporting requirement forthe TSTF-425 program.
: 3. SPECIFIC TASKS (WORK REQUIREMENTS AND SCHEDULE) (CONTINUED) adequacy of the Internal Events PRA model. An example may be an RAI related to peer review(s).
Prepare a technical letterreport.e. Given that the licensee is permitted to use PRA or othermethods to address seismic, fire, other external eventsand shutdown events for making SF changes, identifythe method by which the licensee is addressing otherhazard groups. Identify if the method requires a peer-reviewed PRA model for a detailed analysis or if onlyqualitative and bounding analyses will be considered.
Another example may be assessing the acceptability of a capability category I supporting requirement for the TSTF-425 program. Prepare a technical letter report.
Identify if the method considers the current as-built, as-operated plant. Confirm that the method identified isconsistent with the NRC approved revision of TSTF-425referenced by the licensee in the LAR. Identify anydeviations from this guidance and provide a technical determination of the significance based on available information.
: e. Given that the licensee is permitted to use PRA or other    One week after methods to address seismic, fire, other external events    completion of and shutdown events for making SF changes, identify        Subtask 2.d.
Identify the need for additional or clarifying information.
the method by which the licensee is addressing other hazard groups. Identify if the method requires a peer-reviewed PRA model for a detailed analysis or if only qualitative and bounding analyses will be considered.
Prepare a technical letter report.f. Confirm that the new program in TS Administrative Controls is identical to the program in TSTF-425, exceptthe plant specific numbering of the TS program andreferenced surveillance requirements.
Identify if the method considers the current as-built, as-operated plant. Confirm that the method identified is consistent with the NRC approved revision of TSTF-425 referenced by the licensee in the LAR. Identify any deviations from this guidance and provide a technical determination of the significance based on available information. Identify the need for additional or clarifying information. Prepare a technical letter report.
Identify anydeviations, and the need for additional or clarifying information.
: f. Confirm that the new program in TS Administrative           One week after Controls is identical to the program in TSTF-425, except    completion of the plant specific numbering of the TS program and          Subtask 2.e.
Prepare a technical letter report.g. Identify any open items in the TER and corresponding draft RAIs.(1) Draft TER and RAIs. Review the TSTF-425 ModelSER and use it as the basis for developing the TER.(2) Incorporate NRC comments and prepare the finaldraft TER and RAIs.3. Using the same steps as in Task 2, review the licenseesupplement including the RAI responses (depending onthe content of the supplement) and determine if theresponse adequately addresses the RAI. If the RAIresponse adequately addresses the RAI, update the TER.If the response does not adequately address the RAI,develop an additional RAI. Prepare a technical letter report.One week aftercompletion ofSubtask 2.d.One week aftercompletion ofSubtask 2.e.One week aftercompletion ofSubtask 2.f.Two weeks afterreceipt of NRCcomments.
referenced surveillance requirements. Identify any deviations, and the need for additional or clarifying information. Prepare a technical letter report.
Two weeks fromreceipt of the RAIresponses.
: g. Identify any open items in the TER and corresponding draft RAIs.
8  
(1) Draft TER and RAIs. Review the TSTF-425 Model          One week after SER and use it as the basis for developing the TER. completion of Subtask 2.f.
(2) Incorporate NRC comments and prepare the final          Two weeks after draft TER and RAIs.                                     receipt of NRC comments.
: 3. Using the same steps as in Task 2, review the licensee              Two weeks from supplement including the RAI responses (depending on                receipt of the RAI the content of the supplement) and determine if the                  responses.
response adequately addresses the RAI. If the RAI response adequately addresses the RAI, update the TER.
If the response does not adequately address the RAI, develop an additional RAI. Prepare a technical letter report.
8
: 3. SPECIFIC TASKS (WORK REQUIREMENTS AND SCHEDULE)
: 3. SPECIFIC TASKS (WORK REQUIREMENTS AND SCHEDULE)
: 4. After receipt of the last RAI responses(s),
: 4. After receipt of the last RAI responses(s), update the TER.
update the TER.If the response does not adequately address the RAI, listthe item as an open item in the TER.a. Draft TER. Two weeks afterreceipt of the lastRAI response(s).
If the response does not adequately address the RAI, list the item as an open item in the TER.
: b. Incorporate NRC comments and prepare the final TER. Two weeks afterreceipt of NRCcomments.
: a. Draft TER.                                                         Two weeks after receipt of the last RAI response(s).
: b. Incorporate NRC comments and prepare the final TER.               Two weeks after receipt of NRC comments.
: 3. APPLICABLE DOCUMENTS AND STANDARDS Technical References
: 3. APPLICABLE DOCUMENTS AND STANDARDS Technical References
* Technical Specification Task Force, letter and enclosure to U.S. Nuclear Regulatory Commission, Transmittal of TSTF-425, Revision 3, "Relocate Surveillance Frequencies to Licensee Control-RITSTF Initiative 5b," dated March 18, 2009 (ADAMS Accession No.ML090850642).
* Technical Specification Task Force, letter and enclosure to U.S. Nuclear Regulatory Commission, Transmittal of TSTF-425, Revision 3, "Relocate Surveillance Frequencies to Licensee Control-RITSTF Initiative 5b," dated March 18, 2009 (ADAMS Accession No. ML090850642).
o Nuclear Energy Institute, NEI 04-10, Revision 1, "Risk-Inforned Technical Specifications Initiative 5b, Risk-informed Method for Control of Surveillance Frequencies,"
o Nuclear Energy Institute, NEI 04-10, Revision 1, "Risk-Inforned Technical Specifications Initiative 5b, Risk-informed Method for Control of Surveillance Frequencies," April 2007 (ADAMS Accession No. ML071360456).
April 2007(ADAMS Accession No. ML071360456).
* Letter from H. Hieh (NRC) to T. Pietrangelo (NEI), "Final Safety Evaluation for Nuclear Energy Institute (NEI) Industry Guidance Document NEI 04-10, Revision 0, Risk-Informed Technical Specifications Initiative 5B, Risk-Informed Method for Control of Surveillance Frequencies," dated September 28, 2006, Accession No.ML062700012.
* Letter from H. Hieh (NRC) to T. Pietrangelo (NEI), "Final Safety Evaluation for NuclearEnergy Institute (NEI) Industry Guidance Document NEI 04-10, Revision 0, Risk-Informed Technical Specifications Initiative 5B, Risk-Informed Method for Control ofSurveillance Frequencies,"
0 Nieh, H. K., U.S. Nuclear Regulatory Commission, letter to Biff Bradley, Nuclear Energy Institute, "Final Safety Evaluation for Nuclear Energy Institute (NEI) Topical Report (TR) 04-10, Revision 1, 'Risk-Informed Technical Specifications Initiative 5B, Risk-Informed Method for Control of Surveillance Frequencies'," dated September 19, 2007 (ADAMS Accession No. ML072570267).
dated September 28, 2006, Accession No.ML062700012.
a U.S. Nuclear Regulatory Commission, Regulatory Guide 1.174, Revision 2, "An Approach for Using Probabilistic Risk Assessment in Risk-Informed Decisions on PlantSpecific Changes to the Licensing Basis," May 2011 (ADAMS Accession No. ML100910006).
0 Nieh, H. K., U.S. Nuclear Regulatory Commission, letter to Biff Bradley, Nuclear EnergyInstitute, "Final Safety Evaluation for Nuclear Energy Institute (NEI) Topical Report (TR)04-10, Revision 1, 'Risk-Informed Technical Specifications Initiative 5B, Risk-Informed Method for Control of Surveillance Frequencies',"
* U.S. Nuclear Regulatory Commission, Regulatory Guide 1.177, Revision 1, "An Approach for Plant-Specific, Risk-Informed Decisionmaking: Technical Specifications,"
dated September 19, 2007 (ADAMSAccession No. ML072570267).
May 2011 (ADAMS Accession No. ML100910008).
a U.S. Nuclear Regulatory Commission, Regulatory Guide 1.174, Revision 2, "AnApproach for Using Probabilistic Risk Assessment in Risk-Informed Decisions onPlantSpecific Changes to the Licensing Basis," May 2011 (ADAMS Accession No. ML100910006).
* U.S. Nuclear Regulatory Commission, Regulatory Guide 1.200, Revision 2, "An Approach for Determining the Technical Adequacy of Probabilistic Risk Assessment Results for Risk-Informed Activities," March 2009 (ADAMS Accession No. ML090410014 and ML090410018).
* U.S. Nuclear Regulatory Commission, Regulatory Guide 1.177, Revision 1, "AnApproach for Plant-Specific, Risk-Informed Decisionmaking:
9
Technical Specifications,"
May 2011 (ADAMS Accession No. ML 100910008).
* U.S. Nuclear Regulatory Commission, Regulatory Guide 1.200, Revision 2, "AnApproach for Determining the Technical Adequacy of Probabilistic Risk Assessment Results for Risk-Informed Activities,"
March 2009 (ADAMS Accession No. ML090410014 and ML090410018).
9  
: 4. APPLICABLE DOCUMENTS AND STANDARDS (CONTINUED)
: 4. APPLICABLE DOCUMENTS AND STANDARDS (CONTINUED)
* U.S. Nuclear Regulatory Commission, NUREG-0800, Standard Review Plan, Section16.1, Revision 1, "Risk-lnformed Decision Making: Technical Specifications,"
* U.S. Nuclear Regulatory Commission, NUREG-0800, Standard Review Plan, Section 16.1, Revision 1, "Risk-lnformed Decision Making: Technical Specifications," March 2007 (ADAMS Accession No. ML070380228).
March2007 (ADAMS Accession No. ML070380228).
  " U.S. Nuclear Regulatory Commission, NUREG-0800, Standard Review Plan, Section 19.1, Revision 3, "Determining the Technical Adequacy of Probabilistic Risk Assessment Results for Risk-Informed Activities," September 2012 (ADAMS Accession No. ML12193A107).
" U.S. Nuclear Regulatory Commission, NUREG-0800, Standard Review Plan, Section19.1, Revision 3, "Determining the Technical Adequacy of Probabilistic Risk Assessment Results for Risk-Informed Activities,"
: 4. DELIVERABLES AND DELIVERY SCHEDULE Technical Reporting Requirements
September 2012 (ADAMS Accession No.ML1 2193A1 07).4. DELIVERABLES AND DELIVERY SCHEDULETechnical Reporting Requirements
: 1. At the completion of Task 1 .a, submit a trip report that contains a brief summary of the discussions and any highlights or challenges of the upcoming work.
: 1. At the completion of Task 1 .a, submit a trip report that contains a brief summary of thediscussions and any highlights or challenges of the upcoming work.2. At the completion of Task 1.b, submit a trip report that contains a brief summary of thediscussions.
: 2. At the completion of Task 1.b, submit a trip report that contains a brief summary of the discussions.
: 3. At the completion of Subtask 2.a., submit a technical letter report that contains asummary of the work performed to include the NRC approved revision of TSTF-425referenced by the licensee in the LAR.4. At the completion of Subtask 2.b., submit a technical letter report that contains asummary of the work performed to include any deviations from the approved TSTF-425scope, and a summary of the reason for the deviation (as identified by the licensee),
: 3. At the completion of Subtask 2.a., submit a technical letter report that contains a summary of the work performed to include the NRC approved revision of TSTF-425 referenced by the licensee in the LAR.
: 4. At the completion of Subtask 2.b., submit a technical letter report that contains a summary of the work performed to include any deviations from the approved TSTF-425 scope, and a summary of the reason for the deviation (as identified by the licensee),
where possible.
where possible.
: 5. At the completion of Subtask 2.c, submit a technical letter report that contains asummary of the work performed to include identification of any plant-specific frequencies proposed to be relocated which are not contained within the STS scope.6. At the completion of Subtask 2.d, submit a technical letter report that contains a listof the RAIs and the regulatory basis for the RAI and include a discussion on PRAtechnical adequacy for the resolution of each F&O and for the PRA model as awhole upon completing the evaluation of each F&O.7. At the completion of Task 2.e, submit a technical letter report that contains asummary of the work performed to include a summary of the methods used toaddress external events and shutdown events, if the method considers thecurrent as-built, as-operated plant, and any deviations from the approved revisionof TSTF-425 referenced by the licensee in the LAR.8. At the completion of Task 2.f, submit a technical letter report that contains asummary of the work performed to include a summary of and deviations of the10 new program in TS Administrative Controls from the approved revision of TSTF-425 referenced by the licensee in the LAR.5. DELIVERABLES AND DELIVERY SCHEDULE9. At the completion of Task 2.g.(1) and 2.g.(2),
: 5. At the completion of Subtask 2.c, submit a technical letter report that contains a summary of the work performed to include identification of any plant-specific frequencies proposed to be relocated which are not contained within the STS scope.
submit a TER and RAIs, draft and final, asappropriate, that are developed in accordance with the format, outline, and contentprovided by the NRC COR.10. At the completion of Task 3, submit a TER and RAIs (if needed),
: 6. At the completion of Subtask 2.d, submit a technical letter report that contains a list of the RAIs and the regulatory basis for the RAI and include a discussion on PRA technical adequacy for the resolution of each F&O and for the PRA model as a whole upon completing the evaluation of each F&O.
draft and final, asappropriate, that are developed in accordance with the format, outline, and contentprovided by the NRC COR.11. At the completion of Task 4.a and 4.b, submit an updated TER, draft and final,respectively.
: 7. At the completion of Task 2.e, submit a technical letter report that contains a summary of the work performed to include a summary of the methods used to address external events and shutdown events, if the method considers the current as-built, as-operated plant, and any deviations from the approved revision of TSTF-425 referenced by the licensee in the LAR.
: 8. At the completion of Task 2.f, submit a technical letter report that contains a summary of the work performed to include a summary of and deviations of the 10
 
new program in TS Administrative Controls from the approved revision of TSTF-425 referenced by the licensee in the LAR.
: 5. DELIVERABLES AND DELIVERY SCHEDULE
: 9. At the completion of Task 2.g.(1) and 2.g.(2), submit a TER and RAIs, draft and final, as appropriate, that are developed in accordance with the format, outline, and content provided by the NRC COR.
: 10. At the completion of Task 3, submit a TER and RAIs (if needed), draft and final, as appropriate, that are developed in accordance with the format, outline, and content provided by the NRC COR.
: 11. At the completion of Task 4.a and 4.b, submit an updated TER, draft and final, respectively.
Monthly Letter Status Reporting (MLSR) Requirements MLSRs will be prepared in accordance with the base EWC contract.
Monthly Letter Status Reporting (MLSR) Requirements MLSRs will be prepared in accordance with the base EWC contract.
The MLSRs must contain a License Fee Recovery Reporting Section which lists the TACnumbers for each plant and the associated costs against those TAC numbers for thereporting period.6. REQUIRED LABOR CATEGORIES (Except for Information Techhnoloqy' Services)
The MLSRs must contain a License Fee Recovery Reporting Section which lists the TAC numbers for each plant and the associated costs against those TAC numbers for the reporting period.
One Principal Investigator (PI)/ Senior Risk Analyst who possesses experience and workingknowledge in the areas of (1) Use of PRA at U.S. nuclear power plants; and (2) U.S. nuclearpower plant systems and operations.
: 6. REQUIRED LABOR CATEGORIES (Except for Information Techhnoloqy' Services)
Two staff-level Nuclear Engineers or Risk Analysts who possesses in-depth knowledge ofU.S. nuclear power plant systems and operations.
One Principal Investigator (PI)/ Senior Risk Analyst who possesses experience and working knowledge in the areas of (1) Use of PRA at U.S. nuclear power plants; and (2) U.S. nuclear power plant systems and operations.
Two staff-level Nuclear Engineers or Risk Analysts who possesses in-depth knowledge of U.S. nuclear power plant systems and operations.
: 5. GOVERNMENT-FURNISHED PROPERTY/MATERIALS The ADAMS Accession No. for the Calvert Cliffs TSTF-425 LAR is ML14125A015.
: 5. GOVERNMENT-FURNISHED PROPERTY/MATERIALS The ADAMS Accession No. for the Calvert Cliffs TSTF-425 LAR is ML14125A015.
NOTE: Some of these documents contain proprietary information and must be safeguarded against unauthorized disclosure.
NOTE: Some of these documents contain proprietary information and must be safeguarded against unauthorized disclosure. After completion of work, the documents should either be destroyed or returned to NRC. Ifthey are destroyed, please confirm this in an E-mail to the COR and include the date and manner in which the documents were destroyed.
After completion of work, the documents shouldeither be destroyed or returned to NRC. If they aredestroyed, please confirm this in an E-mail to the COR andinclude the date and manner in which the documents weredestroyed.
The NRC COR will provide those NRC documents related to licensing activities (for example, any Non-Publicly available SERs, audit reports, and related documents) that are readily available. The NRC COR will provide access to training material pertinent to the LAR reviews or other NRC documents and docketed correspondence on related issues.
The NRC COR will provide those NRC documents related to licensing activities (forexample, any Non-Publicly available SERs, audit reports, and related documents) that arereadily available.
The CNWRA staff shall identify any additional NRC documentation that is needed and the COR will determine whether these will be provided by the NRC or obtained directly by the CNWRA from ADAMS, NRC public document room or the NRC website at www.nrc.qov.
The NRC COR will provide access to training material pertinent to theLAR reviews or other NRC documents and docketed correspondence on related issues.The CNWRA staff shall identify any additional NRC documentation that is needed and theCOR will determine whether these will be provided by the NRC or obtained directly by theCNWRA from ADAMS, NRC public document room or the NRC website at www.nrc.qov.
11
11 A6. PLACE OF PERFORMANCE This work will be performed at the contractor's site, with the exception of trips to the plantsite and Government site as needed.7. SPECIAL CONSIDERATIONS Assumptions and Understanding The level of effort for each Task was determined based on previous NRC experience fromreviewing LARs of similar scope. However, it is expected that the actual number of hourswill vary depending on the quality and scope of the specific TSTF-425 LAR to be reviewed.
 
: 8. SPECIAL CONSIDERATIONS Assumptions and Understanding The level of effort assumption for Task 1 .a, for each traveler, is based on forty hours ofpreparation, four hours to travel to the meeting site, 16 hours for the meeting and four hoursfor return travel and documentation.
A
It is assumed that there will be three travelers.
: 6. PLACE OF PERFORMANCE This work will be performed at the contractor's site, with the exception of trips to the plant site and Government site as needed.
Thelevel of effort assumption for task 1 .b, for each traveler, is based on four hours to travel tothe meeting site, 16 hours for the meeting and four hours for return travel anddocumentation.
: 7. SPECIAL CONSIDERATIONS Assumptions and Understanding The level of effort for each Task was determined based on previous NRC experience from reviewing LARs of similar scope. However, it is expected that the actual number of hours will vary depending on the quality and scope of the specific TSTF-425 LAR to be reviewed.
It is understood that Subtask 2.d. can be done in parallel with Subtasks 2.b. and 2.c.The level of effort assumption for Task 3 assumes two rounds of RAIs. Each round of RAIsis assumed to take 16 hours to review, including drafting any necessary follow-up RAIs andupdating the draft TER.It is understood that the level of effort for each Task contains sufficient effort to conducttelephone conference calls with the NRC staff. Such phone calls, for example, might bearranged by the NRC COR with the Licensing Project Manager and other NRC staff todiscuss the RAls and to reach an understanding with the licensee.
: 8. SPECIAL CONSIDERATIONS Assumptions and Understanding The level of effort assumption for Task 1.a, for each traveler, is based on forty hours of preparation, four hours to travel to the meeting site, 16 hours for the meeting and four hours for return travel and documentation. It is assumed that there will be three travelers. The level of effort assumption for task 1.b, for each traveler, is based on four hours to travel to the meeting site, 16 hours for the meeting and four hours for return travel and documentation.
Comments might beprovided to the contractor such that the RAls may have to be resubmitted by the contractor.
It is understood that Subtask 2.d. can be done in parallel with Subtasks 2.b. and 2.c.
Guidance for Preparing Requests for Additional Information (RAls)Additional information necessary to resolve open or unresolved items identified during thereview of the information associated with the LAR needs to be requested in a manner that isunambiguous, has an adequate basis, and is necessary for the safety review. RAls shouldbe developed using the following guidance:
The level of effort assumption for Task 3 assumes two rounds of RAIs. Each round of RAIs is assumed to take 16 hours to review, including drafting any necessary follow-up RAIs and updating the draft TER.
: 1. An RAI should include the appropriate basis for requesting the information.
It is understood that the level of effort for each Task contains sufficient effort to conduct telephone conference calls with the NRC staff. Such phone calls, for example, might be arranged by the NRC COR with the Licensing Project Manager and other NRC staff to discuss the RAls and to reach an understanding with the licensee. Comments might be provided to the contractor such that the RAls may have to be resubmitted by the contractor.
The basisshould explain why the information is needed, including how it will be used to help makea reasonable assurance finding.12  
Guidance for Preparing Requests for Additional Information (RAls)
&2. Judgmental language should be avoided.a. Questions should not make adequacy determinations.
Additional information necessary to resolve open or unresolved items identified during the review of the information associated with the LAR needs to be requested in a manner that is unambiguous, has an adequate basis, and is necessary for the safety review. RAls should be developed using the following guidance:
: b. Words like "unacceptable" or "deficient" and "deviation" should be avoided.  
: 1. An RAI should include the appropriate basis for requesting the information. The basis should explain why the information is needed, including how it will be used to help make a reasonable assurance finding.
: Likewise, avoid using phrases like "the staff will require" since it is premature to requireanything when asking questions.
12
: 2. Judgmental language should be avoided.
: a. Questions should not make adequacy determinations.
: b. Words like "unacceptable" or "deficient" and "deviation" should be avoided. Likewise, avoid using phrases like "the staff will require"since it is premature to require anything when asking questions.
: 3. Questions should be focused, not open-ended.
: 3. Questions should be focused, not open-ended.
: a. The RAI should be in the form of a question or an imperative to provide whatis needed to complete the review. When the reviewer needs specificinformation or the underlying issue may not be apparent, the RAI shouldclearly identify the information requested and/or the underlying issue.b. "If ... then" questions (questions that could lead to follow-on questions) shouldprovide both parts of the question.
: a. The RAI should be in the form of a question or an imperative to provide what is needed to complete the review. When the reviewer needs specific information or the underlying issue may not be apparent, the RAI should clearly identify the information requested and/or the underlying issue.
: b. "If... then" questions (questions that could lead to follow-on questions) should provide both parts of the question.
Guidance for Preparinq Requests for Additional Information (RAls) (Continued)
Guidance for Preparinq Requests for Additional Information (RAls) (Continued)
: 4. For follow-up RAIs, reference the original RAI, the date of the letter in which the licenseeresponded to the RAI, and the ADAMS Accession Number of the letter.To ensure that the response appropriately addresses the RAI, the licensee maysubmit a draft response (which the NRC dockets in the Agency-Wide Documents Access and Management System (ADAMS))
: 4. For follow-up RAIs, reference the original RAI, the date of the letter in which the licensee responded to the RAI, and the ADAMS Accession Number of the letter.
and may request a follow-up teleconference and/or meeting.9. TRAVELTwo three-person, two-day trips to the NRC headquarters office in Rockville, MD.10. SECURITYThis work will be UNCLASSIFIED; it will only contain proprietary information.
To ensure that the response appropriately addresses the RAI, the licensee may submit a draft response (which the NRC dockets in the Agency-Wide Documents Access and Management System (ADAMS)) and may request a follow-up teleconference and/or meeting.
13 SECTION D -Packaging and MarkingNRCDO20 BRANDINGThe Contractor is required to use the statement below in any publications, presentations,
: 9. TRAVEL Two three-person, two-day trips to the NRC headquarters office in Rockville, MD.
: articles, products, or materials funded under this contract/order, to the extent practical, in orderto provide NRC with recognition for its involvement in and contribution to the project.
: 10. SECURITY This work will be UNCLASSIFIED; it will only contain proprietary information.
If the workperformed is funded entirely with NRC funds, then the contractor must acknowledge thatinformation in its documentation/presentation.
13
Work Supported by the U.S. Nuclear Regulatory Commission (NRC), Office of Nuclear ReactorRegulation, under Contract/order number NRC-HQ-50-14-E-0001/NRC-HQ-20-14-T-0012.
 
(End of Clause)NRCD010 PACKAGING AND MARKING(a) The Contractor shall package material for shipment to the NRC in such a manner that willensure acceptance by common carrier and safe delivery at destination.
SECTION D - Packaging and Marking NRCDO20 BRANDING The Contractor is required to use the statement below in any publications, presentations, articles, products, or materials funded under this contract/order, to the extent practical, in order to provide NRC with recognition for its involvement in and contribution to the project. If the work performed is funded entirely with NRC funds, then the contractor must acknowledge that information in its documentation/presentation.
Containers andclosures shall comply with the Surface Transportation Board, Uniform Freight Classification Rules, or regulations of other carriers as applicable to the mode of transportation.
Work Supported by the U.S. Nuclear Regulatory Commission (NRC), Office of Nuclear Reactor Regulation, under Contract/order number NRC-HQ-50-14-E-0001/NRC-HQ-20-14-T-0012.
(b) On the front of the package, the Contractor shall clearly identify the contract number underwhich the product is being provided.
(End of Clause)
(c) Additional packaging andlor marking requirements are as follows:
NRCD010 PACKAGING AND MARKING (a) The Contractor shall package material for shipment to the NRC in such a manner that will ensure acceptance by common carrier and safe delivery at destination. Containers and closures shall comply with the Surface Transportation Board, Uniform Freight Classification Rules, or regulations of other carriers as applicable to the mode of transportation.
None.(End of Clause)14 SECTION E -Inspection and Acceptance 2052.215-71 PROJECT OFFICER AUTHORITY (OCT 1999)(a) The contracting officer's authorized representative hereinafter referred to as the projectofficer for this contract is:Name: Sara LyonsAddress:
(b) On the front of the package, the Contractor shall clearly identify the contract number under which the product is being provided.
Mail Stop: OWFN/10 C15Washington, DC 20555Telephone Number: 301-415-2861 Sara.lyons(n rc.qovAlternate COR:Name: Bernard GrenierMail Stop: OWFN 13 E-10(301)-415-2726 Bemard.orenier(anrc.,ov (b) Performance of the work under this contract is subject to the technical direction of the NRCproject officer.
(c) Additional packaging andlor marking requirements are as follows: None.
The term technical direction is defined to include the following:
(End of Clause) 14
(1) Technical direction to the contractor which shifts work emphasis between areas of work ortasks, authorizes travel which was unanticipated in the Schedule (i.e., travel not contemplated inthe Statement of Work or changes to specific travel identified in the Statement of Work), fills indetails, or otherwise serves to accomplish the contractual statement of work.(2) Provide advice and guidance to the contractor in the preparation of drawings, specifications, or technical portions of the work description.
 
(3) Review and, where required by the contract, approve technical  
SECTION E - Inspection and Acceptance 2052.215-71 PROJECT OFFICER AUTHORITY (OCT 1999)
: reports, drawings, specifications, and technical information to be delivered by the contractor to the Government under the contract.
(a) The contracting officer's authorized representative hereinafter referred to as the project officer for this contract is:
(c) Technical direction must be within the general statement of work stated in the contract.
Name: Sara Lyons Address: Mail Stop: OWFN/10 C15 Washington, DC 20555 Telephone Number: 301-415-2861 Sara.lyons(n rc.qov Alternate COR:
Theproject officer does not have the authority to and may not issue any technical direction which:(1) Constitutes an assignment of work outside the general scope of the contract.
Name: Bernard Grenier Mail Stop: OWFN 13 E-10 (301)-415-2726 Bemard.orenier(anrc.,ov (b) Performance of the work under this contract is subject to the technical direction of the NRC project officer. The term technical direction is defined to include the following:
(1) Technical direction to the contractor which shifts work emphasis between areas of work or tasks, authorizes travel which was unanticipated in the Schedule (i.e., travel not contemplated in the Statement of Work or changes to specific travel identified in the Statement of Work), fills in details, or otherwise serves to accomplish the contractual statement of work.
(2) Provide advice and guidance to the contractor in the preparation of drawings, specifications, or technical portions of the work description.
(3) Review and, where required by the contract, approve technical reports, drawings, specifications, and technical information to be delivered by the contractor to the Government under the contract.
(c) Technical direction must be within the general statement of work stated in the contract. The project officer does not have the authority to and may not issue any technical direction which:
(1) Constitutes an assignment of work outside the general scope of the contract.
(2) Constitutes a change as defined in the "Changes" clause of this contract.
(2) Constitutes a change as defined in the "Changes" clause of this contract.
(3) In any way causes an increase or decrease in the total estimated contract cost, the fixed fee,if any, or the time required for contract performance.
(3) In any way causes an increase or decrease in the total estimated contract cost, the fixed fee, if any, or the time required for contract performance.
(4) Changes any of the expressed terms, conditions, or specifications of the contract.
(4) Changes any of the expressed terms, conditions, or specifications of the contract.
(5) Terminates the contract, settles any claim or dispute arising under the contract, or issuesany unilateral directive whatever.
(5) Terminates the contract, settles any claim or dispute arising under the contract, or issues any unilateral directive whatever.
(d) All technical directions must be issued in writing by the project officer or must be confirmed by the project officer in writing within ten (10) working days after verbal issuance.
(d) All technical directions must be issued in writing by the project officer or must be confirmed by the project officer in writing within ten (10) working days after verbal issuance. A copy of the 15
A copy of the15 written direction must be furnished to the contracting officer.
 
A copy of NRC Form 445, Requestfor Approval of Official Foreign Travel, which has received final approval from the NRC must befurnished to the contracting officer.(e) The contractor shall proceed promptly with the performance of technical directions dulyissued by the project officer in the manner prescribed by this clause and within the projectofficer's authority under the provisions of this clause.(f) If, in the opinion of the contractor, any instruction or direction issued by the project officer iswithin one of the categories defined in paragraph (c) of this section, the contractor may notproceed but shall notify the contracting officer in writing within five (5) working days after thereceipt of any instruction or direction and shall request that contracting officer to modify thecontract accordingly.
written direction must be furnished to the contracting officer. A copy of NRC Form 445, Request for Approval of Official Foreign Travel, which has received final approval from the NRC must be furnished to the contracting officer.
Upon receiving the notification from the contractor, the contracting officershall issue an appropriate contract modification or advise the contractor in writing that, in thecontracting officers  
(e) The contractor shall proceed promptly with the performance of technical directions duly issued by the project officer in the manner prescribed by this clause and within the project officer's authority under the provisions of this clause.
: opinion, the technical direction is within the scope of this article and doesnot constitute a change under the "Changes" clause.(g) Any unauthorized commitment or direction issued by the project officer may result in anunnecessary delay in the contractors performance and may even result in the contractor expending funds for unallowable costs under the contract.
(f) If, in the opinion of the contractor, any instruction or direction issued by the project officer is within one of the categories defined in paragraph (c) of this section, the contractor may not proceed but shall notify the contracting officer in writing within five (5) working days after the receipt of any instruction or direction and shall request that contracting officer to modify the contract accordingly. Upon receiving the notification from the contractor, the contracting officer shall issue an appropriate contract modification or advise the contractor in writing that, in the contracting officers opinion, the technical direction is within the scope of this article and does not constitute a change under the "Changes" clause.
(h) A failure of the parties to agree upon the nature of the instruction or direction or upon thecontract action to be taken with respect to the instruction or direction is subject to 52.233-1
(g) Any unauthorized commitment or direction issued by the project officer may result in an unnecessary delay in the contractors performance and may even result in the contractor expending funds for unallowable costs under the contract.
-Disputes.
(h) A failure of the parties to agree upon the nature of the instruction or direction or upon the contract action to be taken with respect to the instruction or direction is subject to 52.233 Disputes.
(i) In addition to providing technical direction as defined in paragraph (b) of the section, theproject officer shall:(1) Monitor the contractors technical  
(i) In addition to providing technical direction as defined in paragraph (b) of the section, the project officer shall:
: progress, including surveillance and assessment ofperformance, and recommend to the contracting officer changes in requirements.
(1) Monitor the contractors technical progress, including surveillance and assessment of performance, and recommend to the contracting officer changes in requirements.
(2) Assist the contractor in the resolution of technical problems encountered duringperformance.
(2) Assist the contractor in the resolution of technical problems encountered during performance.
(3) Review all costs requested for reimbursement by the contractor and submit to thecontracting officer recommendations for approval, disapproval, or suspension of payment forsupplies and services required under this contract.
(3) Review all costs requested for reimbursement by the contractor and submit to the contracting officer recommendations for approval, disapproval, or suspension of payment for supplies and services required under this contract.
(End of Clause)16 SECTION F -Deliveries or Performance NRCF032 TASK/DELIVERY ORDER PERIOD OF PERFORMANCE (SEP 2013)This order shall commence on September 22, 2014 and will expire on February 28, 2015.(End of Clause)NRCF010 PLACE OF DELIVERY-REPORTS The items to be furnished hereunder shall be delivered, with all charges paid by the Contractor, to:a. Name: Sara Lyons (1 Electronic Copy)Contracting Officer's Representative (COR)Address:
(End of Clause) 16
Sara. Lyons@nrc.gov
 
: b. Name: Hugo Alcantara (1 Electronic Copy)Contract Specialist (CS)Address:
SECTION F - Deliveries or Performance NRCF032 TASK/DELIVERY ORDER PERIOD OF PERFORMANCE (SEP 2013)
Hugo.Alcantara@nrc.gov (End of Clause)SECTION G -Contract Administration DataNRCG030 ELECTRONIC PAYMENT (SEP 2014)The Debt Collection Improvement Act of 1996 requires that all payments except IRS tax refundsbe made by Electronic Funds Transfer.
This order shall commence on September 22, 2014 and will expire on February 28, 2015.
Payment shall be made in accordance with FAR52.232-33, entitled "Payment by Electronic Funds-Central Contractor Registration".
(End of Clause)
To receive payment, the contractor shall prepare invoices in accordance with NRC's BillingInstructions.
NRCF010 PLACE OF DELIVERY-REPORTS The items to be furnished hereunder shall be delivered, with all charges paid by the Contractor, to:
Claims shall be submitted on the payee's letterhead,  
: a. Name: Sara Lyons (1 Electronic Copy)
: invoice, or on theGovernment's Standard Form 1034, "Public Voucher for Purchases and Services Other thanPersonal,"
Contracting Officer's Representative (COR)
and Standard Form 1035, "Public Voucher for Purchases Other than Personal  
Address: Sara. Lyons@nrc.gov
-Continuation Sheet." The preferred method of submitting invoices is electronically to:
: b. Name: Hugo Alcantara (1 Electronic Copy)
(End of Clause)17 SECTION H -Special Contract Requirements 2052.215-70 KEY PERSONNEL (JAN 1993)(a) The following individuals are considered to be essential to the successful performance of thework hereunder:
Contract Specialist (CS)
Name TitleLane Howard Program ManagerRobert Fosdick Principal Investigator Robert Schmidt Consultant The contractor agrees that personnel may not be removed from the contract work or replacedwithout compliance with paragraphs (b) and (c) of this section.(b) If one or more of the key personnel, for whatever reason, becomes, or is expected tobecome, unavailable for work under this contract for a continuous period exceeding 30 workdays, or is expected to devote substantially less effort to the work than indicated in the proposalor initially anticipated, the contractor shall immediately notify the contracting officer and shall,subject to the concurrence of the contracting  
Address: Hugo.Alcantara@nrc.gov (End of Clause)
: officer, promptly replace the personnel withpersonnel of at least substantially equal ability and qualifications.
SECTION G - Contract Administration Data NRCG030 ELECTRONIC PAYMENT (SEP 2014)
(c) Each request for approval of substitutions must be in writing and contain a detailedexplanation of the circumstances necessitating the proposed substitutions.
The Debt Collection Improvement Act of 1996 requires that all payments except IRS tax refunds be made by Electronic Funds Transfer. Payment shall be made in accordance with FAR 52.232-33, entitled "Payment by Electronic Funds-Central Contractor Registration".
The request mustalso contain a complete resume for the proposed substitute and other information requested orneeded by the contracting officer to evaluate the proposed substitution.
To receive payment, the contractor shall prepare invoices in accordance with NRC's Billing Instructions. Claims shall be submitted on the payee's letterhead, invoice, or on the Government's Standard Form 1034, "Public Voucher for Purchases and Services Other than Personal," and Standard Form 1035, "Public Voucher for Purchases Other than Personal -
The contracting officerand the project officer shall evaluate the contractor's request and the contracting officer shallpromptly notify the contractor of his or her decision in writing.(d) If the contracting officer determines that suitable and timely replacement of key personnel who have been reassigned, terminated, or have otherwise become unavailable for the contractwork is not reasonably forthcoming, or that the resultant reduction of productive effort would beso substantial as to impair the successful completion of the contract or the service order, thecontract may be terminated by the contracting officer for default or for the convenience of theGovernment, as appropriate.
Continuation Sheet." The preferred method of submitting invoices is electronically to:
If the contracting officer finds the contractor at fault for thecondition, the contract price or fixed fee may be equitably adjusted downward to compensate the Government for any resultant delay, loss, or damage.(End of Clause)18 2052.215-78 TRAVEL APPROVALS AND REIMBURSEMENT (OCT 1999) -ALTERNATE I(OCT 1999)(a) Total expenditure for travel may not exceed $5,379.00 without the prior approval of thecontracting officer.(b) All foreign travel must be approved in advance by the NRC on NRC Form 445, Request forApproval of Official Foreign Travel, and must be in compliance with FAR 52.247-63 Preference for U.S. Flag Air Carriers.
NRCPayments*,nrc..ov.
The contractor shall submit NRC Form 445 to the NRC no later than30 days prior to the commencement of travel.(c) The contractor will be reimbursed only for travel costs incurred that are directly related to thiscontract and are allowable subject to the limitations prescribed in FAR 31.205-46.
(End of Clause) 17
(d) It is the responsibility of the contractor to notify the contracting officer in accordance with theFAR Limitations of Cost clause of this contract when, at any time, the contractor learns thattravel expenses will cause the contractor to exceed the travel ceiling amount identified inparagraph (a) of this clause.(e) Reasonable travel costs for research and related activities performed at State and nonprofit institutions, in accordance with Section 12 of Pub. L. 100-679, must be charged in accordance with the contractor's institutional policy to the degree that the limitations of Office ofManagement and Budget (OMB) guidance are not exceeded.
 
Applicable guidance documents include OMB Circular A-87, Cost Principles for State and Local Governments; OMB Circular A-122, Cost Principles for Nonprofit Organizations; and OMB Circular A-21, Cost Principles forEducational Institutions.
SECTION H - Special Contract Requirements 2052.215-70 KEY PERSONNEL (JAN 1993)
(End of Clause)NRCH480 USE OF AUTOMATED CLEARING HOUSE (ACH) ELECTRONIC PAYMENTIREMITTANCE ADDRESSThe Debt Collection Improvement Act of 1996 requires that all Federal payments except IRS taxrefunds be made by Electronic Funds Transfer.
(a) The following individuals are considered to be essential to the successful performance of the work hereunder:
It is the policy of the Nuclear Regulatory Commission to pay government vendors by the Automated Clearing House (ACH) electronic funds transfer payment system. Item 15C of the Standard Form 33 may be disregarded.
Name                           Title Lane Howard                   Program Manager Robert Fosdick                 Principal Investigator Robert Schmidt                 Consultant The contractor agrees that personnel may not be removed from the contract work or replaced without compliance with paragraphs (b) and (c) of this section.
(End of Clause)19 NRCH470 GREEN PURCHASING (SEP 2013)(a) In furtherance of the sustainable acquisition goals included in Executive Order 13514,"Federal Leadership in Environmental, Energy, and Economic Performance,"
(b) If one or more of the key personnel, for whatever reason, becomes, or is expected to become, unavailable for work under this contract for a continuous period exceeding 30 work days, or is expected to devote substantially less effort to the work than indicated in the proposal or initially anticipated, the contractor shall immediately notify the contracting officer and shall, subject to the concurrence of the contracting officer, promptly replace the personnel with personnel of at least substantially equal ability and qualifications.
products andservices acquired under this contract/order shall be energy-efficient (Energy Star or FederalEnergy Management Program (FEMP) designated),
(c) Each request for approval of substitutions must be in writing and contain a detailed explanation of the circumstances necessitating the proposed substitutions. The request must also contain a complete resume for the proposed substitute and other information requested or needed by the contracting officer to evaluate the proposed substitution. The contracting officer and the project officer shall evaluate the contractor's request and the contracting officer shall promptly notify the contractor of his or her decision in writing.
water-efficient,  
(d) If the contracting officer determines that suitable and timely replacement of key personnel who have been reassigned, terminated, or have otherwise become unavailable for the contract work is not reasonably forthcoming, or that the resultant reduction of productive effort would be so substantial as to impair the successful completion of the contract or the service order, the contract may be terminated by the contracting officer for default or for the convenience of the Government, as appropriate. If the contracting officer finds the contractor at fault for the condition, the contract price or fixed fee may be equitably adjusted downward to compensate the Government for any resultant delay, loss, or damage.
: biobased, environmentally preferable (e.g., Electronic Product Environmental Assessment Tool (EPEAT) certified),
(End of Clause) 18
non-ozone depleting, recycled  
 
: content, and non-toxic or less toxic alternatives, to the maximumextent practicable in meeting NRC contractual requirements.
2052.215-78 TRAVEL APPROVALS AND REIMBURSEMENT (OCT 1999) - ALTERNATE I (OCT 1999)
(b) See NRC's Green Purchasing Plan (GPP) at:http://pbadupws.nrc..qov/docs/ML1219//ML12191A130.pdf and the General ServiceAdministration's (GSA) Green Procurement Compilation at:hftp :/Awww.qsa.qov/portal/content/l 98257.(c) The contractor shall flow down this clause into all subcontracts and other agreements thatrelate to performance of this contract/order.
(a) Total expenditure for travel may not exceed $5,379.00 without the prior approval of the contracting officer.
(End of Clause)NRCH410 WHISTLEBLOWER PROTECTION FOR NRC CONTRACTOR ANDSUBCONTRACTOR EMPLOYEES (a) The U.S. Nuclear Regulatory Commission (NRC) contractor and its subcontractor aresubject to the Whistleblower Employee Protection public law provisions as codified at 42 U.S.C.5851. NRC contractor(s) and subcontractor(s) shall comply with the requirements of thisWhistleblower Employee Protection law, and the implementing regulations of the NRC and theDepartment of Labor (DOL). See, for example, DOL Procedures on Handling Complaints at 29C.F.R. Part 24 concerning the employer obligations, prohibited acts, DOL procedures and therequirement for prominent posting of notice of Employee Rights at Appendix A to Part 24entitled:  
(b) All foreign travel must be approved in advance by the NRC on NRC Form 445, Request for Approval of Official Foreign Travel, and must be in compliance with FAR 52.247-63 Preference for U.S. Flag Air Carriers. The contractor shall submit NRC Form 445 to the NRC no later than 30 days prior to the commencement of travel.
"Your Rights Under the Energy Reorganization Act".(b) Under this Whistleblower Employee Protection law, as implemented by regulations, NRCcontractor and subcontractor employees are protected from discharge,  
(c) The contractor will be reimbursed only for travel costs incurred that are directly related to this contract and are allowable subject to the limitations prescribed in FAR 31.205-46.
: reprisal, threats,intimidation,  
(d) It is the responsibility of the contractor to notify the contracting officer in accordance with the FAR Limitations of Cost clause of this contract when, at any time, the contractor learns that travel expenses will cause the contractor to exceed the travel ceiling amount identified in paragraph (a) of this clause.
: coercion, blacklisting or other employment discrimination practices with respect tocompensation, terms, conditions or privileges of their employment because the contractor orsubcontractor employee(s) has provided notice to the employer, refused to engage in unlawfulpractices, assisted in proceedings or testified on activities concerning alleged violations of theAtomic Energy Act of 1954 (as amended) and the Energy Reorganization Act of 1974 (asamended).
(e) Reasonable travel costs for research and related activities performed at State and nonprofit institutions, in accordance with Section 12 of Pub. L. 100-679, must be charged in accordance with the contractor's institutional policy to the degree that the limitations of Office of Management and Budget (OMB) guidance are not exceeded. Applicable guidance documents include OMB Circular A-87, Cost Principles for State and Local Governments; OMB Circular A-122, Cost Principles for Nonprofit Organizations; and OMB Circular A-21, Cost Principles for Educational Institutions.
(End of Clause)
NRCH480 USE OF AUTOMATED CLEARING HOUSE (ACH) ELECTRONIC PAYMENTIREMITTANCE ADDRESS The Debt Collection Improvement Act of 1996 requires that all Federal payments except IRS tax refunds be made by Electronic Funds Transfer. It is the policy of the Nuclear Regulatory Commission to pay government vendors by the Automated Clearing House (ACH) electronic funds transfer payment system. Item 15C of the Standard Form 33 may be disregarded.
(End of Clause) 19
 
NRCH470 GREEN PURCHASING (SEP 2013)
(a) In furtherance of the sustainable acquisition goals included in Executive Order 13514, "Federal Leadership in Environmental, Energy, and Economic Performance," products and services acquired under this contract/order shall be energy-efficient (Energy Star or Federal Energy Management Program (FEMP) designated), water-efficient, biobased, environmentally preferable (e.g., Electronic Product Environmental Assessment Tool (EPEAT) certified), non-ozone depleting, recycled content, and non-toxic or less toxic alternatives, to the maximum extent practicable in meeting NRC contractual requirements.
(b) See NRC's Green Purchasing Plan (GPP) at:
http://pbadupws.nrc..qov/docs/ML1219//ML12191A130.pdf and the General Service Administration's (GSA) Green Procurement Compilation at:
hftp :/Awww.qsa.qov/portal/content/l 98257.
(c) The contractor shall flow down this clause into all subcontracts and other agreements that relate to performance of this contract/order.
(End of Clause)
NRCH410 WHISTLEBLOWER PROTECTION FOR NRC CONTRACTOR AND SUBCONTRACTOR EMPLOYEES (a) The U.S. Nuclear Regulatory Commission (NRC) contractor and its subcontractor are subject to the Whistleblower Employee Protection public law provisions as codified at 42 U.S.C.
5851. NRC contractor(s) and subcontractor(s) shall comply with the requirements of this Whistleblower Employee Protection law, and the implementing regulations of the NRC and the Department of Labor (DOL). See, for example, DOL Procedures on Handling Complaints at 29 C.F.R. Part 24 concerning the employer obligations, prohibited acts, DOL procedures and the requirement for prominent posting of notice of Employee Rights at Appendix A to Part 24 entitled: "Your Rights Under the Energy Reorganization Act".
(b) Under this Whistleblower Employee Protection law, as implemented by regulations, NRC contractor and subcontractor employees are protected from discharge, reprisal, threats, intimidation, coercion, blacklisting or other employment discrimination practices with respect to compensation, terms, conditions or privileges of their employment because the contractor or subcontractor employee(s) has provided notice to the employer, refused to engage in unlawful practices, assisted in proceedings or testified on activities concerning alleged violations of the Atomic Energy Act of 1954 (as amended) and the Energy Reorganization Act of 1974 (as amended).
(c) The contractor shall insert this or the substance of this clause in any subcontracts involving work performed under this contract.
(c) The contractor shall insert this or the substance of this clause in any subcontracts involving work performed under this contract.
(End of Clause)20 NRCH400 SECURITY REQUIREMENTS RELATING TO THE PRODUCTION OF REPORT(S)
(End of Clause) 20
OR THE PUBLICATION OF RESULTS UNDER CONTRACTS, AGREEMENTS, ANDGRANTSReview and Approval of Reports(a) Reporting Requirements.
 
The contractor/grantee shall comply with the terms and conditions of the contract/grant regarding the contents of the draft and final report, summaries, data, andrelated documents, to include correcting,  
NRCH400 SECURITY REQUIREMENTS RELATING TO THE PRODUCTION OF REPORT(S)
: deleting, editing,  
OR THE PUBLICATION OF RESULTS UNDER CONTRACTS, AGREEMENTS, AND GRANTS Review and Approval of Reports (a) Reporting Requirements. The contractor/grantee shall comply with the terms and conditions of the contract/grant regarding the contents of the draft and final report, summaries, data, and related documents, to include correcting, deleting, editing, revising, modifying, formatting, and supplementing any of the information contained therein, at no additional cost to the NRC.
: revising, modifying, formatting, andsupplementing any of the information contained  
Performance under the contract/grant will not be deemed accepted or completed until it complies with the NRC's directions. The reports, summaries, data, and related documents will be considered draft until approved by the NRC. The contractor/grantee agrees that the direction, determinations, and decisions on approval or disapproval of reports, summaries, data, and related documents created under this contract/grant remain solely within the discretion of the NRC.
: therein, at no additional cost to the NRC.Performance under the contract/grant will not be deemed accepted or completed until itcomplies with the NRC's directions.
(b) Publication of Results. Prior to any dissemination, display, publication, or release of articles, reports, summaries, data, or related documents developed under the contract/grant, the contractor/grantee shall submit them to the NRC for review and approval. The contractor/
The reports, summaries, data, and related documents willbe considered draft until approved by the NRC. The contractor/grantee agrees that the direction, determinations, and decisions on approval or disapproval of reports, summaries, data, andrelated documents created under this contract/grant remain solely within the discretion of theNRC.(b) Publication of Results.
grantee shall not release, disseminate, display or publish articles, reports, summaries, data, and related documents, or the contents therein, that have not been reviewed and approved by the NRC for release, display, dissemination or publication. The contractor/grantee agrees to conspicuously place any disclaimers, markings or notices, directed by the NRC, on any articles, reports, summaries, data, and related documents that the contractor/grantee intends to release, display, disseminate or publish to other persons, the public, or any other entities. The contractor/grantee agrees, and grants, a royalty-free, nonexclusive, irrevocable worldwide license to the government, to use, reproduce, modify, distribute, prepare derivative works, release, display or disclose the articles, reports, summaries, data, and related documents developed under the contract/grant, for any governmental purpose and to have or authorize others to do so.
Prior to any dissemination,  
(c) Identification/Marking of Sensitive Unclassified Non-Safeguards Information (SUNSI) and Safeguards Information (SGI). The decision, determination, or direction by the NRC that information possessed, formulated or produced by the contractor/grantee constitutes SUNSI or SGI is solely within the authority and discretion of the NRC. In performing the contract/grant, the contractor/grantee shall clearly mark SUNSI and SGI, to include for example, QUO-Allegation Information or OUO-Security Related Information on any reports, documents, designs, data, materials, and written information, as directed by the NRC. In addition to marking the information as directed by the NRC, the contractor shall use the applicable NRC cover sheet (e.g., NRC Form 461 Safeguards Information) in maintaining these records and documents. The contractor/grantee shall ensure that SUNSI and SGI is handled, maintained and protected from unauthorized disclosure, consistent with NRC policies and directions. The contractor/grantee shall comply with the requirements to mark, maintain, and protect all information, including documents, summaries, reports, data, designs, and materials in accordance with the provisions of Section 147 of the Atomic Energy Act of 1954 as amended, its implementing regulations (10 CFR 73.21), Sensitive Unclassified Non-Safeguards and Safeguards Information policies, and NRC Management Directives and Handbooks 12.5, 12.6 and 12.7.
: display, publication, or release of articles,
(d) Remedies. In addition to any civil, criminal, and contractual remedies available under the applicable laws and regulations, failure to comply with the above provisions, and/or NRC directions, may result in suspension, withholding, or offsetting of any payments invoiced or 21
: reports, summaries, data, or related documents developed under the contract/grant, thecontractor/grantee shall submit them to the NRC for review and approval.
 
The contractor/
0 claimed by the contractor/grantee.
grantee shall not release, disseminate, display or publish articles,  
(e) Flowdown. If the contractor/grantee intends to enter into any subcontracts or other agreements to perform this contract/grant, the contractor/grantee shall include all of the above provisions in any subcontracts or agreements.
: reports, summaries, data, andrelated documents, or the contents  
(End of Clause) 22
: therein, that have not been reviewed and approved by theNRC for release,  
 
: display, dissemination or publication.
a 4 SECTION J - List of Documents, Exhibits and Other Attachments BILLING INSTRUCTIONS FOR COST-REIMBURSEMENT TYPE CONTRACTS (MAY 2013)
The contractor/grantee agrees toconspicuously place any disclaimers, markings or notices, directed by the NRC, on any articles,
General: During performance and through final payment of this contract, the contractor is responsible for the accuracy and completeness of data within the System for Award Management (SAM) database and for any liability resulting from the Government's reliance on inaccurate or incomplete SAM data.
: reports, summaries, data, and related documents that the contractor/grantee intends to release,display, disseminate or publish to other persons, the public, or any other entities.
The contractor shall prepare invoices/vouchers for reimbursement of costs in the manner and format described herein. FAILURE TO SUBMIT INVOICES/VOUCHERS IN ACCORDANCE WITH THESE INSTRUCTIONS MAY RESULT IN REJECTION OF THE INVOICENOUCHER AS IMPROPER.
Thecontractor/grantee agrees, and grants, a royalty-free, nonexclusive, irrevocable worldwide license to the government, to use, reproduce, modify, distribute, prepare derivative works,release, display or disclose the articles,  
Standard Forms: Reimbursement requests shall be submitted on the payee's letterhead, invoice/voucher, or on the Govemment's Standard Form 1034, "Public Voucher for Purchases and Services Other than Personal," and Standard Form 1035, "Public Voucher for Purchases Other than Personal-Continuation Sheet."
: reports, summaries, data, and related documents developed under the contract/grant, for any governmental purpose and to have or authorize others to do so.(c) Identification/Marking of Sensitive Unclassified Non-Safeguards Information (SUNSI) andSafeguards Information (SGI). The decision, determination, or direction by the NRC thatinformation possessed, formulated or produced by the contractor/grantee constitutes SUNSI orSGI is solely within the authority and discretion of the NRC. In performing the contract/grant, thecontractor/grantee shall clearly mark SUNSI and SGI, to include for example, QUO-Allegation Information or OUO-Security Related Information on any reports, documents,  
Electronic InvoiceNoucher Submissions: The preferred method of submitting invoices/vouchers is electronically to the U.S. Nuclear Regulatory Commission, via email to:
: designs, data,materials, and written information, as directed by the NRC. In addition to marking theinformation as directed by the NRC, the contractor shall use the applicable NRC cover sheet(e.g., NRC Form 461 Safeguards Information) in maintaining these records and documents.
NRCPayments(*nrc._oov.
Thecontractor/grantee shall ensure that SUNSI and SGI is handled, maintained and protected fromunauthorized disclosure, consistent with NRC policies and directions.
Hard-Copy InvoiceNoucher Submissions: If you submit a hard-copy of the invoice/voucher, a signed original and supporting documentation shall be submitted to the following address:
The contractor/grantee shall comply with the requirements to mark, maintain, and protect all information, including documents, summaries,  
NRC Payments U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mailstop 03-E17A Rockville, MD 20852-2738 Purchase of Capital Property: ($50,000 or more with life of one yearor longer)
: reports, data, designs, and materials in accordance with the provisions of Section 147 of the Atomic Energy Act of 1954 as amended, its implementing regulations (10CFR 73.21), Sensitive Unclassified Non-Safeguards and Safeguards Information  
Contractors must report to the Contracting Officer, electronically, any capital property acquired with contract funds having an initial cost of $50,000 or more, in accordance with procedures set forth in NRC Management Directive (MD) 13.1, IV, C -"Reporting Requirements" (revised 2/16/2011).
: policies, andNRC Management Directives and Handbooks 12.5, 12.6 and 12.7.(d) Remedies.
Agency Payment Office: Payment will continue to be made by the office designated in the contract in Block 12 of the Standard Form 26, or Block 25 of the Standard Form 33, whichever is applicable.
In addition to any civil, criminal, and contractual remedies available under theapplicable laws and regulations, failure to comply with the above provisions, and/or NRCdirections, may result in suspension, withholding, or offsetting of any payments invoiced or21 0claimed by the contractor/grantee.
Frequency: The contractor shall submit requests for reimbursement once each month, unless otherwise authorized by the Contracting Officer.
(e) Flowdown.
Format: InvoicesNouchers shall be submitted in the format depicted on the attached sample form entitled "InvoiceNoucher for Purchases and Services Other Than Personal". Alternate formats are permissible only if they address all requirements of the Billing Instructions. The 23
If the contractor/grantee intends to enter into any subcontracts or otheragreements to perform this contract/grant, the contractor/grantee shall include all of the aboveprovisions in any subcontracts or agreements.
 
(End of Clause)22 a 4SECTION J -List of Documents, Exhibits and Other Attachments BILLING INSTRUCTIONS FORCOST-REIMBURSEMENT TYPE CONTRACTS (MAY 2013)General:
instructions for preparation and itemization of the invoice/voucher are included with the sample form.
During performance and through final payment of this contract, the contractor isresponsible for the accuracy and completeness of data within the System for AwardManagement (SAM) database and for any liability resulting from the Government's reliance oninaccurate or incomplete SAM data.The contractor shall prepare invoices/vouchers for reimbursement of costs in the manner andformat described herein. FAILURE TO SUBMIT INVOICES/VOUCHERS IN ACCORDANCE WITH THESE INSTRUCTIONS MAY RESULT IN REJECTION OF THE INVOICENOUCHER AS IMPROPER.
Task Order Contracts: The contractor must submit a separate invoice/voucher for each individual task order with detailed cost information. This includes all applicable cost elements and other items discussed in paragraphs (a) through (s) of the attached instructions. In addition, the invoice/voucher must specify the contract number, and the NRC-assigned task/delivery order number.
Standard Forms: Reimbursement requests shall be submitted on the payee's letterhead, invoice/voucher, or on the Govemment's Standard Form 1034, "Public Voucher for Purchases and Services Other than Personal,"
Billing of Costs after Expiration of Contract: If costs are incurred during the contract period and invoiced after the contract has expired, you must cite the period during which these costs were incurred. To be considered a proper expiration invoice/voucher, the contractor shall clearly mark it "EXPIRATION INVOICE" or "EXPIRATION VOUCHER".
and Standard Form 1035, "Public Voucher for Purchases Other than Personal-Continuation Sheet."Electronic InvoiceNoucher Submissions:
The preferred method of submitting invoices/vouchers is electronically to the U.S. Nuclear Regulatory Commission, via email to:
Hard-Copy InvoiceNoucher Submissions:
If you submit a hard-copy of the invoice/voucher, a signed original and supporting documentation shall be submitted to the following address:NRC PaymentsU.S. Nuclear Regulatory Commission One White Flint North11555 Rockville PikeMailstop 03-E17ARockville, MD 20852-2738 Purchase of Capital Property:  
($50,000 or more with life of one year or longer)Contractors must report to the Contracting  
: Officer, electronically, any capital property acquiredwith contract funds having an initial cost of $50,000 or more, in accordance with procedures setforth in NRC Management Directive (MD) 13.1, IV, C -"Reporting Requirements" (revised2/16/2011).
Agency Payment Office: Payment will continue to be made by the office designated in thecontract in Block 12 of the Standard Form 26, or Block 25 of the Standard Form 33, whichever is applicable.
Frequency:
The contractor shall submit requests for reimbursement once each month, unlessotherwise authorized by the Contracting Officer.Format: InvoicesNouchers shall be submitted in the format depicted on the attached sampleform entitled "InvoiceNoucher for Purchases and Services Other Than Personal".
Alternate formats are permissible only if they address all requirements of the Billing Instructions.
The23 instructions for preparation and itemization of the invoice/voucher are included with the sampleform.Task Order Contracts:
The contractor must submit a separate invoice/voucher for eachindividual task order with detailed cost information.
This includes all applicable cost elementsand other items discussed in paragraphs (a) through (s) of the attached instructions.
Inaddition, the invoice/voucher must specify the contract number, and the NRC-assigned task/delivery order number.Billing of Costs after Expiration of Contract:
If costs are incurred during the contract periodand invoiced after the contract has expired, you must cite the period during which these costswere incurred.
To be considered a proper expiration invoice/voucher, the contractor shallclearly mark it "EXPIRATION INVOICE" or "EXPIRATION VOUCHER".
Final invoices/vouchers shall be marked "FINAL INVOICE" or "FINAL VOUCHER".
Final invoices/vouchers shall be marked "FINAL INVOICE" or "FINAL VOUCHER".
Currency:
Currency: InvoicesNouchers must be expressed in U.S. Dollars.
InvoicesNouchers must be expressed in U.S. Dollars.Supersession:
Supersession: These instructions supersede previous Billing Instructions for Cost-Reimbursement Type Contracts (July 2011).
These instructions supersede previous Billing Instructions for Cost-Reimbursement Type Contracts (July 2011).24 qINVOICEIVOUCHER FOR PURCHASES AND SERVICES OTHER THAN PERSONAL(SAMPLE FORMAT -COVER SHEET)1. Official Agency Billing OfficeNRC PaymentsU.S. Nuclear Regulatory Commission One White Flint North11555 Rockville PikeMailstop 03-E17ARockville, MD 20852-2738
24
 
q INVOICEIVOUCHER FOR PURCHASES AND SERVICES OTHER THAN PERSONAL (SAMPLE FORMAT - COVER SHEET)
: 1. Official Agency Billing Office NRC Payments U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mailstop 03-E17A Rockville, MD 20852-2738
: 2. InvoiceNoucher Information
: 2. InvoiceNoucher Information
: a. Payee's DUNS Number or DUNS+4. The Payee shall include the Payee's Data Universal Number (DUNS) or DUNS+4 number that identifies the Payee's name and address.
: a. Payee's DUNS Number or DUNS+4. The Payee shall include the Payee's Data Universal Number (DUNS) or DUNS+4 number that identifies the Payee's name and address. The DUNS+4 number is the DUNS number plus a 4-character suffix that may be assigned at the discretion of the Payee to identify alternative Electronic Funds Transfer (EFT) accounts for the same parent concern.
TheDUNS+4 number is the DUNS number plus a 4-character suffix that may be assigned at thediscretion of the Payee to identify alternative Electronic Funds Transfer (EFT) accounts for thesame parent concern.b. Taxpayer Identification Number. The Payee shall include the Payee's taxpayer identification number (TIN) used by the Internal Revenue Service (IRS) in the administration of tax laws.(See IRS Web site:httD://www.irs.gov/Businesses/Small-Businesses-&-Self-EmDloved/Employer-ID-Numbers-(EINsV).c. Payee's Name and Address.
: b. Taxpayer Identification Number. The Payee shall include the Payee's taxpayer identification number (TIN) used by the Internal Revenue Service (IRS) in the administration of tax laws.
Show the name of the Payee as it appears in the contract andits correct address.
(See IRS Web site:
If the Payee assigns the proceeds of this contract as provided for in theassignment of claims terms of this contract, the Payee shall require as a condition of any suchassignment, that the assignee shall register separately in the System for Award Management (SAM) database at http://sam.gov and shall be paid by EFT in accordance with the terms of thiscontract.
httD://www.irs.gov/Businesses/Small-Businesses-&-Self-EmDloved/Employer-ID-Numbers-(EINsV).
See Federal Acquisition Regulation (FAR) 52.232-33(g)
: c. Payee's Name and Address. Show the name of the Payee as it appears in the contract and its correct address. If the Payee assigns the proceeds of this contract as provided for in the assignment of claims terms of this contract, the Payee shall require as a condition of any such assignment, that the assignee shall register separately in the System for Award Management (SAM) database at http://sam.gov and shall be paid by EFT in accordance with the terms of this contract. See Federal Acquisition Regulation (FAR) 52.232-33(g) Payment by Electronic Funds Transfer - Central Contractor Registration (October 2003).
Payment by Electronic FundsTransfer
: d. Contract Number. Insert the NRC contract number (including Enterprise-wide Contract (EWC)), GSA Federal Supply Schedule (FSS), Governmentwide Agency Contract (GWAC) number, or Multiple Agency Contract (MAC) number, as applicable.
-Central Contractor Registration (October 2003).d. Contract Number. Insert the NRC contract number (including Enterprise-wide Contract(EWC)), GSA Federal Supply Schedule (FSS), Governmentwide Agency Contract (GWAC)number, or Multiple Agency Contract (MAC) number, as applicable.
: e. Task Order Number. Insert the task/delivery order number (If Applicable). Do not include more than one task order per invoice or the invoice may be rejected as improper.
: e. Task Order Number. Insert the task/delivery order number (If Applicable).
: f. InvoiceNoucher. The appropriate sequential number of the invoice/voucher, beginning with 001 should be designated. Contractors may also include an individual internal accounting number, if desired, in addition to the 3-digit sequential number.
Do not includemore than one task order per invoice or the invoice may be rejected as improper.
: g. Date of InvoiceNoucher. Insert the date the invoice/voucher is prepared.
: f. InvoiceNoucher.
: h. Billingq Period. Insert the beginning and ending dates (day, month, year) of the period during which costs were incurred and for which reimbursement is requested.
The appropriate sequential number of the invoice/voucher, beginning with001 should be designated.
: i. Description of Deliverables. Provide a brief description of supplies or services, quantity, unit cost, and total cost.
Contractors may also include an individual internal accounting number, if desired, in addition to the 3-digit sequential number.g. Date of InvoiceNoucher.
25
Insert the date the invoice/voucher is prepared.
 
: h. Billingq Period. Insert the beginning and ending dates (day, month, year) of the period duringwhich costs were incurred and for which reimbursement is requested.
-A
: i. Description of Deliverables.
: j. Work Completed. Provide a general summary description of the services performed or products submitted for the invoice period and specify the section or Contract Line Item Number (CLIN) or SubCLIN in the contract pertaining to the required deliverable(s).
Provide a brief description of supplies or services,  
: k. Shipping. Insert weight and zone of shipment, if shipped by parcel post.
: quantity, unitcost, and total cost.25  
I. Charges for freight or express shipments. Attach prepaid bill if shipped by freight or express.
-Aj. Work Completed.
: m. Instructions. Include instructions to consignee to notify the Contracting Officer of receipt of shipment.
Provide a general summary description of the services performed orproducts submitted for the invoice period and specify the section or Contract Line Item Number(CLIN) or SubCLIN in the contract pertaining to the required deliverable(s).
: n. For Indefinite Delivery contracts, the final invoice/voucher shall be marked "FINAL INVOICE" or "FINAL VOUCHER".
: k. Shipping.
: o. Direct Costs. Insert the amount billed for the following cost elements, adjustments, suspensions, and total amounts, for both the current billing period and for the cumulative period (from contract inception to end date of this billing period).
Insert weight and zone of shipment, if shipped by parcel post.I. Charges for freight or express shipments.
(1) Direct Labor. This consists of salaries and wages paid (or accrued) for direct performance of the contract itemized as follows:
Attach prepaid bill if shipped by freight or express.m. Instructions.
Labor         Hours                         Cumulative Category       Billed       Rate     Total   Hours Billed (2) Fringe Benefits. This represents fringe benefits applicable to direct labor and billed as a direct cost. Where a rate is used indicate the rate. Fringe benefits included in direct labor or in other indirect cost pools should not be identified here.
Include instructions to consignee to notify the Contracting Officer of receipt ofshipment.
(3) Contractor-acquired property ($50,000 or more). List each item costing $50,000 or more and having a life expectancy of more than one year. List only those items of equipment for which reimbursement is requested. For each such item, list the following (as applicable): (a) an item description, (b) manufacturer, (c) model number, (d) serial number, (e) acquisition cost, (f) date of purchase, and (g) a copy of the purchasing document.
: n. For Indefinite Delivery contracts, the final invoice/voucher shall be marked "FINAL INVOICE"or "FINAL VOUCHER".
(4) Contractor-acquired property (under $50,000), Materials, and Supplies. These are equipment other than that described in (3) above, plus consumable materials and supplies. List by category. List items valued at $1,000 or more separately. Provide the item number for each piece of equipment valued at $1,000 or more.
: o. Direct Costs. Insert the amount billed for the following cost elements, adjustments, suspensions, and total amounts, for both the current billing period and for the cumulative period(from contract inception to end date of this billing period).(1) Direct Labor. This consists of salaries and wages paid (or accrued) for directperformance of the contract itemized as follows:Labor Hours Cumulative Category Billed Rate Total Hours Billed(2) Fringe Benefits.
(5) Premium Pay. This enumeration in excess of the basic hourly rate. (Requires written approval of the Contracting Officer.)
This represents fringe benefits applicable to direct labor and billedas a direct cost. Where a rate is used indicate the rate. Fringe benefits included indirect labor or in other indirect cost pools should not be identified here.(3) Contractor-acquired property  
(6) Consultant Fee. The supporting information must include the name, hourly or daily rate of the consultant, and reference the NRC approval (if not specifically approved in the original contract).
($50,000 or more). List each item costing $50,000 ormore and having a life expectancy of more than one year. List only those items ofequipment for which reimbursement is requested.
(7) Travel. Total costs associated with each trip must be shown in the following format:
For each such item, list the following (as applicable):  
Start Date       Destination         Costs From To           From To             $
(a) an item description, (b) manufacturer, (c) model number, (d) serialnumber, (e) acquisition cost, (f) date of purchase, and (g) a copy of the purchasing document.
26
(4) Contractor-acquired property (under $50,000),
 
Materials, and Supplies.
I (Must include separatedetailedcosts for airfare, per diem, and other transportation expenses. All costs must be adequately supportedby copies of receipts or other documentation.)
These areequipment other than that described in (3) above, plus consumable materials andsupplies.
(8) Subcontracts. Include separate detailed breakdown of all costs paid to approved subcontractors during the billing period.
List by category.
(9) Other Costs. List all other direct costs by cost element and dollar amount separately.
List items valued at $1,000 or more separately.
: p. Indirect Costs (Overhead and General and Administrative Expense). Cite the formula (rate and base) in effect in accordance with the terms of the contract, during the time the costs were incurred and for which reimbursement is requested.
Provide theitem number for each piece of equipment valued at $1,000 or more.(5) Premium Pay. This enumeration in excess of the basic hourly rate. (Requires written approval of the Contracting Officer.)
: q. Fixed-Fee. If the contract provides for a fixed-fee, it must be reimbursed as indicated in the contract. Cite the formula or method of computation. Include this information as it applies to individual task orders as well.
(6) Consultant Fee. The supporting information must include the name, hourly or dailyrate of the consultant, and reference the NRC approval (if not specifically approved inthe original contract).
(1) The NRC will withhold payment of 15% of the negotiated contract fixed-fee amount, not to exceed $100,000.
(7) Travel. Total costs associated with each trip must be shown in the following format:Start Date Destination CostsFrom To From To $26 I(Must include separate detailed costs for airfare, per diem, and other transportation expenses.
(2) If the fee withholding amount has reached $100,000, the contractor may resume billing the NRC for the balance of its fee under subsequent invoices for work completed.
All costs must be adequately supported by copies of receipts or otherdocumentation.)
(3) Any fee amounts withheld by the NRC will be paid to the contractor during contract closeout in increments, following the submission/settlement of indirect rate proposals in accordance with FAR 52.216-8, "Fixed Fee" (JUN 2011).
(8) Subcontracts.
: r. Total Amount Billed. Insert columns for total amounts for the current and cumulative periods.
Include separate detailed breakdown of all costs paid to approvedsubcontractors during the billing period.(9) Other Costs. List all other direct costs by cost element and dollar amount separately.
: s. Adiustments. Insert columns for any adjustments, including outstanding suspensions for deficient or defective products or nonconforming services, for the current and cumulative periods.
: p. Indirect Costs (Overhead and General and Administrative Expense).
: t. Grand Totals.
Cite the formula (rateand base) in effect in accordance with the terms of the contract, during the time the costs wereincurred and for which reimbursement is requested.
27
: q. Fixed-Fee.
If the contract provides for a fixed-fee, it must be reimbursed as indicated in thecontract.
Cite the formula or method of computation.
Include this information as it applies toindividual task orders as well.(1) The NRC will withhold payment of 15% of the negotiated contract fixed-fee amount,not to exceed $100,000.
(2) If the fee withholding amount has reached $100,000, the contractor may resumebilling the NRC for the balance of its fee under subsequent invoices for workcompleted.
(3) Any fee amounts withheld by the NRC will be paid to the contractor during contractcloseout in increments, following the submission/settlement of indirect rate proposals in accordance with FAR 52.216-8, "Fixed Fee" (JUN 2011).r. Total Amount Billed. Insert columns for total amounts for the current and cumulative periods.s. Adiustments.
Insert columns for any adjustments, including outstanding suspensions fordeficient or defective products or nonconforming  
: services, for the current and cumulative periods.t. Grand Totals.27  
: 3. Sample InvoiceNoucher Information Sample InvoiceNoucher Information (Supporting Documentation must be attached)
: 3. Sample InvoiceNoucher Information Sample InvoiceNoucher Information (Supporting Documentation must be attached)
This invoice/voucher represents reimbursable costs for the billing period from-through.___
This invoice/voucher represents reimbursable costs for the billing period from-through.___
Amount BilledCurrent Period Cumulative (a) Direct Costs(1) Direct labor $ $(2) Fringe benefits  
Amount Billed Current Period     Cumulative (a)                                                 Direct Costs (1)     Direct labor                                   $                   $
(% of direct labor) $ $_(3) Government property  
(2)     Fringe benefits (% of direct labor)           $                   $_
($50,000 or more) $ $(4) Government  
(3)     Government property ($50,000 or more)         $                   $
: property, Materials, andSupplies (under $50,000 per item) $. $(5) Premium pay (NRC approved overtime)  
(4)     Government property, Materials, and Supplies (under $50,000 per item)             $.                 $
$ $_(6) Consultants Fee $ $(7) Travel $ $(8) Subcontracts  
(5)     Premium pay (NRC approved overtime)           $                   $_
$_ $(9) Other costs $ $_Total Direct Costs: $ $(b) Indirect Costs (provide the rate information applicable to your firm)(10) Overhead
(6)     Consultants Fee                               $                   $
_ % of-(Indicate Base) $ $_(11) General and Administrative (G&A) _ %of (Indicate Base) $ $Total Indirect Costs: $ $(c) Fixed-Fee:
(7)     Travel                                         $                   $
(12) Fixed-Fee Calculations:
(8)     Subcontracts                                   $_                 $
: i. Total negotiated contract fixed-fee percent and amount $ii. 85% allowable fee amount $iii. Cumulative fee billed on prior invoices  
(9)     Other costs                                   $                   $_
$iv. Fee due this invoice (not to exceed 85% of fee earned based uponnegotiated contract fee percentage)  
Total Direct Costs:           $                   $
$Note: The fee balance withheld by NRC may not exceed $100,000.
(b)     Indirect Costs (provide the rate information applicable to your firm)
Total Fixed-Fee:  
(10)   Overhead   _   % of
$ I(d)(e)Total Amount BilledAdjustments
              -     (Indicate Base)                           $                   $_
(+/-)$$$$28 (f) Grand Total $ $.(The invoice/voucher format provided above must include information similar to that includedbelow in the following to ensure accuracy and completeness.)
(11)   General and Administrative (G&A) _       %
of             (Indicate Base)                       $                   $
Total Indirect Costs:         $                   $
(c)     Fixed-Fee:
(12)   Fixed-Fee Calculations:
: i.       Total negotiated contract fixed-fee percent   and amount $
ii.     85% allowable fee amount $
iii. Cumulative fee billed on prior invoices $
iv.     Fee due this invoice (notto exceed 85% of fee earnedbased upon negotiated contract fee percentage)$
Note: The fee balance withheld by NRC may not exceed $100,000.
Total Fixed-Fee:             $                   I (d)   Total Amount Billed                                                        $
(e)   Adjustments (+/-)                                                           $
28
 
(f)   Grand Total                                         $                       $.
(The invoice/voucher format provided above must include information similar to that included below in the following to ensure accuracy and completeness.)
SAMPLE SUPPORTING INFORMATION The budget information provided below is for format purposes only and is illustrative.
SAMPLE SUPPORTING INFORMATION The budget information provided below is for format purposes only and is illustrative.
Cost Elements:
Cost Elements:
: 1) Direct Labor- $2,400Labor Hours Cumulative Category Billed Rate Total Hours BilledSenior Engineer I 100 $14.00 $1,400 975Engineer 50 $10.00 $ 500 465Computer Analyst 100 $5.00 $ 500 320$2,400 1,760 hrs.2) Fringe Benefits  
: 1)     Direct Labor- $2,400 Labor                                Hours                                 Cumulative Category                             Billed     Rate       Total           Hours Billed Senior Engineer I                     100       $14.00 $1,400                     975 Engineer                              50       $10.00 $ 500                     465 Computer Analyst                     100       $5.00     $ 500                 320
-$480Fringe @ 20% of Direct SalariesLabor FringeCategory Salaries AmountSenior Engineer I $1,400 $280Engineer
                                                                  $2,400               1,760 hrs.
$ 500 $100Computer Analyst $ 500 $100$2,400 $4803) Govemment-furnished and contractor-acquired Property  
: 2)     Fringe Benefits - $480 Fringe @ 20% of Direct Salaries Labor                                              Fringe Category                            Salaries      Amount Senior Engineer I                   $1,400         $280 Engineer                            $ 500         $100 Computer Analyst                     $ 500         $100
($50,000 or more) -$60,000Prototype Spectrometer  
                                            $2,400         $480
-item number 1000-01 = $60,0004) Govemment-furnished and contractor-acquired Property (under $50,000),
: 3)     Govemment-furnished and contractor-acquired Property ($50,000 or more) - $60,000 Prototype Spectrometer - item number 1000-01 = $60,000
Materials, andSupplies
: 4)     Govemment-furnished and contractor-acquired Property (under $50,000), Materials, and Supplies - $2,000 10 Radon tubes @ $110.00                     = $1,100 6 Pairs Electrostatic gloves @ $150.00     = $ 900
-$2,00010 Radon tubes @ $110.00 = $1,1006 Pairs Electrostatic gloves @ $150.00 = $ 900$2,0005) Premium Pay -$150Walter Murphy -10 hours @ $10.00 Per Hour (Reg. Pay) = $100 x 1.5 OT rate = $150(EX: Premium pay for this individual was approved and authorized under this contractby the NRC Contracting Officer by letter dated 6/1/2011.)
                                                      $2,000
: 6) Consultants' Fee -$100Dr. Carney -1 hour fully-burdened  
: 5)     Premium Pay - $150 Walter Murphy - 10 hours @ $10.00 Per Hour (Reg. Pay) = $100 x 1.5 OT rate = $150 (EX: Premium pay for this individual was approved and authorized under this contract by the NRC Contracting Officer by letter dated 6/1/2011.)
@ $100 = $10029
: 6)     Consultants' Fee - $100 Dr. Carney - 1 hour fully-burdened @ $100 = $100 29
: 7) Travel -$2,640(i) Airfare:  
: 7) Travel - $2,640 (i)     Airfare: (2 Roundtrip trips for 1 person @ $300 per r/t ticket)
(2 Roundtrip trips for 1 person @ $300 per r/t ticket)Start Date End Date Days From To Cost4/1/2011 4/7/2011 7 Philadelphia, PA Wash, D.C. $3007/1/2011 7/8/2011 8 Philadelphia, PA Wash, D.C. $300(ii) Per Diem: $136/day x 15 days = $2,0408) Subcontracting  
Start Date     End Date         Days   From                   To         Cost 4/1/2011       4/7/2011         7     Philadelphia, PA       Wash, D.C. $300 7/1/2011       7/8/2011         8     Philadelphia, PA       Wash, D.C. $300 (ii)   Per Diem: $136/day x 15 days = $2,040
-$30,000Company A = $10,000Company B = $20,000$30,000(EX: Subcontracts for Companies A & B were consented to by the Contracting Officerby letter dated 6/15/2011.)
: 8) Subcontracting - $30,000 Company A               = $10,000 Company B               = $20,000
: 9) Other Costs -$5,100Honorarium for speaker at American Nuclear Society conference  
                              $30,000 (EX: Subcontracts for Companies A & B were consented to by the Contracting Officer by letter dated 6/15/2011.)
= $5,000Nuclear Planet Journal subscription fee = $10010) Overhead Expense -S41,148Overhead
: 9) Other Costs - $5,100 Honorarium for speaker at American Nuclear Society conference = $5,000 NuclearPlanet Journal subscription fee = $100
@ 40% of Total Direct Costs11) General and Administrative (G&A) Expense -$22,784G&A @ 20% of Total Costs, excluding subcontracts and consultants
: 10) Overhead Expense - S41,148 Overhead @ 40% of Total Direct Costs
: 12) Fixed-Fee  
: 11) General and Administrative (G&A) Expense - $22,784 G&A @ 20% of Total Costs, excluding subcontracts and consultants
-$8,218Fixed-Fee applied to Total Costs @ 5%Fixed-Fee Calculations:
: 12) Fixed-Fee - $8,218 Fixed-Fee applied to Total Costs @ 5%
: i. Total contract fixed-fee  
Fixed-Fee Calculations:
$100,000ii. 85% allowable fee $85,000iii. Cumulative fee billed on prior invoices  
: i. Total contract fixed-fee $100,000 ii. 85% allowable fee $85,000 iii. Cumulative fee billed on prior invoices $85,000 iv. Fee due this invoice (not to exceed 85% of fee earned based upon negotiated contract fee percentage) $8,218 Total Amount Billed             $175,020 Adjustments (+1-)               - $8,218 Grand Total                     $166,802 30}}
$85,000iv. Fee due this invoice (not to exceed 85% of fee earned based uponnegotiated contract fee percentage)  
$8,218Total Amount Billed $175,020Adjustments
(+1-) -$8,218Grand Total $166,80230}}

Latest revision as of 16:37, 5 February 2020

Task Order No. NRC-HQ-20-14-T-0012 Under Delivery Order No. NRC-HQ-50-14-E-0001
ML14360A007
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 12/23/2014
From: Mike Williams
Acquisition Management Division
To:
Southwest Research Institute
References
NRC-HQ-50-14-E-0001
Download: ML14360A007 (30)


Text

X ". ORDER FOR SUPPLIES OR SERVICES PAGE OF PAGES IMP&TAN " Mark all packages and papers with contract and/or order numbers. 1 30

1. DATE OP 6RDER 2. CONTRACT NO. (If any) 6 SHIP TO:
  • NRC-HQ-50-!4-E-0001 09/22/2014 a. NAME OF CONSIGNEE
3. ORDER NO. 4. REQUISITION/REFERENCE NO.

NRR-14-0287 SARA LYONS NRC-HQ-20-14-T-0012

5. ISSUING OFFICE (Address correspondence to) b. STREET ADDRESS US NRC - HQ 1155 ROCKVILLE PIKE ACQUISITION MANAGEMENT DIVISION MAIL STOP OWFN 1OC15 MAIL STOP 3WFN-05-C64MP WASHINGTON DC 20555-0001 c CITY d. STATE e. ZIP CODE ROCKVILLE MD 20852
7. TO: f. SHIP VIA
a. NAME OF CONTRACTOR S W R I 8. TYPE OF ORDER
b. COMPANY NAME -a. PURCHASE X-' b. DELIVERY
c. STREET ADDRESS REFERENCE YOUR:

6220 CULEBRA RD Except for billing instructions on the reverse, this delivery order is subject to instructions contained on this side only of this form and is issued Please furnish the following on the terms subject to the terms and conditions and conditions specified on both sides of of the above-numbered contract.

d. CITY e. STATE f. ZIP CODE this order and on the attached sheet, if any, SAN ANTONIO TX 782385166 including delivery as indicated.
9. ACCOUNTING AND APPROPRIATION DATA 10. REQUISITIONING OFFICE See Schedule OFF OF NUCLEAR REACTOR REGULATION
11. BUSINESS CLASSIFICATION (Check appropriatebox(es)) 12. F.O.B. POINT
a. SMALL b OTHER THAN SMALL I ' c. DISADVANTAGED d. WOMEN-OWNED j. e. HUBZone
f. SERVICE-DISABLED g. WOMEN-OWNED SMALL BUSINESS (WOSB) h EDWOSB VETERAN-OWNED ELIGIBLE UNDER THE WOSB PROGRAM
13. PLACE OF 14. GOVERNMENT BIL NO. 15. DELIVER TO F.O.B. POINT 16. DISCOUNT TERMS ON OR BEFORE (Date)
a. INSPECTION b. ACCEPTANCE Destination Destination 30
17. SCHEDULE (See reverse for Rejections)

QUANTITY UNIT QUANTITY ITEM NO. SUPPLIES OR SERVICES ORDERED UNIT PRICE AMOUNT ACCEPTED (a) (b) (c) (d) (e) (f) (g)

The Contractor shall provide services in accordance with the Statement of Work entitled "Review of the Calvert Cliffs Units 1 and 2 License Amendment Request (LAR) Pertaining to Risk-Informed (RI)

Technical Specification Task Force (TSTF)

Continued ...

18. SHIPPING POINT 19. GROSS SHIPPING WEIGHT 20. INVOICE NO. 17(h)

TOTAL (Cont.

pages)

21. MAIL INVOICE TO: *
a. NAME $76,716.00 44 US NUCLEAR REGULATORY COMMISSION SEE BILLING INSTRUCTIONS b. STREET ADDRESS ONE WHITE FLINT NORTH ONREVERSE (orP. Box) 11555 ROCKVILLE PIKE 17(i)

GRAND MAILSTOP 03-EI7A TOTAL c..

i .CITY dSTE e

e. ZIP CODE $7 716.0

$76, oo "160 ROCKVILLE MD 20852-2738

22. UNITED STATES OF 09 / 22 / 201 4 23. NAME (Typed)

AMERICA BY (Signature) L MONIQUE B. WILLIAMS 1--,+-rLA, , t. . TITLE: CONTRACTING/ORDERING OFFICER AUTHORIZED FOR LOCAL REPRODUCTION OPTIONAL FORM 347 (R-. U2012)

PREVIOUS EDITION NOT USABLE Presrbed by GSA/FAR48 CPR 53213(f)

SUNSI REVIEW COMPLET 3 - Anfle"900 DEC 2 3 2014 IN."PI A1 hDOW2

ORDER FOR SUPPLIES OR SERVICES PAGE NO of SCHEDULE - CONTINUATION 2 IMPORTANT: Mark all packages and papers with contract and/or order numbers.

DATE OF ORDER CONTRACT NO. ORDER NO.

09/22/2014 INRC-HQ-50-14-E-0001 NRC-HQ-20-14-T-0012 ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT AMOUNT QUANTITY ORDERED PRICE ACCEPTED (a) (b) (c) I(d) (e) (f) (g)

Initiative 5b, "Risk-Informed Method for Control of Surveillance Frequencies, TSTF-425."

NRC Contracting Officers Representative:

Sara Lyons 301-415-2861 Period of Performance: 09/22/2014 to 02/28/2015 Accounting Info:

2014-X0200-FEEBASED-20-20D007-11-4-149-1128-252A 00001 Labor/Fee 76,716.00 The obligated amount of award: $76,716.00.

The total for this award is shown in box 17(i).

TOTAL CARRIED FORWARD TO 1ST PAGE (ITEM 17(H)) K> $76,716.00 AUTHORIZED FOR LOCALREPODUCTION OPTIONAL FORM 348 (R-e 42006)

PREVIOUS EDITION NOTUSABLE s#.

P~bed by GS FR* (48 CFRI53.213(f)

CONTRACTOR ACCEPTANCE OF TASK ORDER NRC-HQ-20-14-T-0012 Acceptance of Task Order No: NRC-HQ-20-14-T-0012 should be made by having an official, authorized to bind your organization, execute two copies of this document in the space provided and return one copy to the Contracting Officer. You should retain the other copy for your records.

Accepted Task Order No. N C-HQ-20-14-T-0012:

Name R. B. Kalmbach Executive Director, Contracts Title 09/18/2014 Date 3

SECTION B - Supplies or Services/Prices NRCB010 BRIEF PROJECT TITLE AND WORK DESCRIPTION (a) The title of this project is "Review of the Calvert Cliffs Units 1 and 2 License Amendment Request (LAR) Pertaining to Risk-informed (RI) Technical Specification Task Force (TSTF)

Initiative 5b, "Risk-Informed Method for Control of Surveillance Frequencies," TSTF-425."

(b) Summary work description: The objective of this task order is to obtain technical assistance from the Southwest Research Institute's (SwRI) Center for Nuclear Waste Regulatory Analyses (CNWRA) to assist the staff in determining the acceptability of the Calvert Cliffs, Units 1 and 2, License Amendment Request.

PRICE/COST SCHEDULE PERIOD OF ?ERFORMANCGE'-Septetmber 22;,2014 .ýý-*Februar.28, 201.5

.L--'ININO. 'a-N*--D.ESCRIPTc!ON ,OF :`-ESTIMA *-  :-W IXEDi.PEE TOTAL SRIPLIESISERMICES'i ýCO.STI ~CPIFF.

00001 Review of Technical Reports for License Amendment Request Pertaining to Risk-Informed (RI)

Technical Specification Task Force (TSTF) Initiative 5b, "Risk-Informed Method for Control of Surveillance Frequencies," TSTF-425.

Total _ _ _$76,716.00 NRCBO40A CONSIDERATION AND OBLIGATION-COST-PLUS-FIXED-FEE ALTERNATE I (a) The total estimated cost to the Government for full performance of this contract is

$76,716.00 of which the sum of represents the estimated reimbursable costs, and of which 10 [epresents the W (b) There shall be no adjustment in the amount of the Contractor's fixed fee.

(c) The amount currently obligated b the Gov rnment with respect to this contract is

$76,716.00, of which the sum of represents the estimated reimbursable costs, and of which repres he ixed-fee.

(d) This is an incrementally-funded contract and FAR 52.232 "Limitation of Funds". applies.

(e) In accordance with FAR 52.216 Fixed Fee, it is the policy of the NRC to withhold payment of fee after payment of *ercent of the fee has been paid in order to protect the Government's interest. The amou of fixed-fee withheld from the contractor will not exceed percent of the total fee or qwhichever is less. Accordingly, the maximum amount of fixed-fee that may be held in reserve is 4

SECTION C - Description/Specifications Statement of Work Project

Title:

Review of the Calvert Cliffs Units 1 and 2 License Amendment Request (LAR)

Pertaining to Risk-Informed (RI) Technical Specification Task Force (TSTF)

Initiative 5b, "Risk-Informed Method for Control of Surveillance Frequencies,"

TSTF-425 Cost Center: 1128 Contract No.: NRC-HQ-50-14-E-0001 Task Assignment Control Numbers: MF4227, non-fee recoverable work, for Task I MF4065 for Unit 1 MF4066 for Unit 2 Budget & Reporting No.: 11-4-149 NRC Requisition Office: NRR NRC COR: Sara Lyons, Sara.Lyonsanrc..qov, (301) 415-2861 Alternate NRC COR: Bernard L. Grenier, Bernard.Grenier(Dnrc.,qov, (301) 415-2726 Fee Recoverable: Yes; all costs must be allocated to each specific TAC number in the actual amount which was spent on Task 1 or on each individual unit.

Contractor: CNWRA Type of Contract/Order: Cost Plus Fixed Fee Period of Performance: 9/22/2014 - 02/28/2015

1. BACKGROUND In 1992, the NRC issued the improved Standard Technical Specifications (STS) to clarify the content and form of requirements necessary to ensure safe operation of nuclear power plants in accordance with Section 50.36 of Title 10 of the Code of Federal Regulations (10 CFR 50.36). As the STS mature, necessary improvements are identified. One process used to initiate changes to the STS involves the industry-sponsored Technical Specifications Task Force (TSTF) submitting a proposed change or Traveler to the NRC for review, approval, and subsequent incorporation into the next revision of the STS. The NRC reviews the proposed change, with the end product being a model application, a model safety evaluation, and a review plan which licensees may use in subsequent LARs. Licensees applying to incorporate these proposed changes into their Technical Specifications must provide a plant specific justification acceptable to the staff in their LAR.

5

In 2007, the NRC issued the final safety evaluation (SE) for the Nuclear Energy Institute (NEI) Topical Report (TR) 04-10, Revision 1, "Risk-Informed Technical Specification Initiative 5b, Risk-Informed Method for Control of Surveillance Frequencies." This STS change provides a risk-informed methodology to identify, assess, implement, and monitor proposed changes to frequencies of surveillance requirements (SRs) of technical specifications (TSs). The initiative is intended to maintain and improve safety through incorporation of risk assessment and management techniques in the TSs, while reducing unnecessary burden.

The Office of Nuclear Reactor Regulation (NRR) is currently reviewing several risk-informed LARs and expects additional risk-informed LARs in fiscal years 2015 and 2016. Calvert Cliffs has submitted a RI-TSTF Initiative 5b LAR which is applicable to both units. The PRA Licensing Branch (APLA) is responsible for reviewing the Probabilistic Risk Assessment (PRA) portion of the LARs to make an independent assessment regarding PRA technical adequacy and the acceptability of the proposed amendment. Due to heavy workload in APLA, contractor assistance is required to support APLA so as to complete the technical review and develop the safety evaluation report (SER) for these LARs in a timely manner.

The metric which has been established for staff review and issuance of the SER is one year from receipt of the LAR in ADAMS. The Calvert Cliffs was accepted in ADAMS on May 1, 2014. The APLA SE date to the Division of Operating Reactor Licensing is January 2, 2015.

1. SCOPE OF WORK The scope of the work includes review of the Calvert Cliffs, Units 1 and 2, RI-TSTF Initiative 5b/TSTF-425 LAR for PRA quality and technical adequacy and preparation of the technical evaluation report (TER).

Objective The objective of this task order is to obtain technical assistance from the Southwest Research Institute's (SwRI) Center for Nuclear Waste Regulatory Analyses (CNWRA) to assist the staff in determining the acceptability of the Calvert Cliffs, Units 1 and 2, LAR.

2. SPECIFIC TASKS (WORK REQUIREMENTS AND SCHEDULE)

Tasks Completion Schedule

1. Gain familiarity with NRC processes specific to this Task Order.
a. Prepare for a kick-off meeting by reviewing applicable One week after the Documents and Standards (see Section 5). Travel to trip; the trip is to NRC HQ to participate in a kick-off meeting to discuss occur within two all aspects of the scope of the work, expectations, and weeks after award of other subjects pertinent to this type of work. Prepare a the task order.

trip report.

b. Travel to NRC HQ to participate in a review process One week after the assessment meeting to discuss the process, questions trip; the trip is to and potential improvements after completion of the first occur within two detailed TSTF-425 review. Prepare a trip report. weeks of completing Task 2, below.

6

3. SPECIFIC TASKS (WORK REQUIREMENTS AND SCHEDULE)

Tasks Completion Schedule

2. Based on the applicable documents and standards found in Section 4, perform the following tasks:
a. Review the layout, scope, and content of the LAR and One week after identify the NRC approved revision of TSTF-425 completion of referenced by the licensee in the LAR. Prepare a Subtask l.a.

technical letter report.

b. Identify any deviations from the approved TSTF-425 scope: Two weeks after completion of (1) Compare the TSTF-425 LAR with the Safety Evaluation Subtask 2.a.

Report (SER) issued for the appropriate revision of NEI 04-10, "Risk-Informed Technical Specification Initiative 5B, Risk-Informed Method for Control of Surveillance Frequencies," and itemize any deviations.

(2) Where possible, summarize the reason for the deviation (as identified by the licensee) along with the deviation.

c. TSTF-425 identifies the specific STS Surveillance One week after Frequencies (SFs) to be relocated. Identify any plant- completion of specific frequencies proposed to be relocated which are Subtask 2.b.

not contained within the STS scope.1 Determine if each relocated frequency is solely time-based, and not based on events, equipment conditions, or other parameters.

TSTF-425, Section 2.0 describes the exceptions to relocating surveillance frequencies. Prepare a technical letter report.

d. Review the Technical Adequacy of the Internal Events Three weeks after Probabilistic Risk Assessment (PRA) Model. completion of Subtask 1.a; see (1) Confirm that the licensee has completed a peer review assumptions and of their model in accordance with Regulatory Guide understandings (RG) 1.200. section, below.

(2) Review all facts and observations (F&Os), including any identified as "documentation issue only."

Evaluate the disposition of the F&O for the TSTF-425 program and determine if proposed sensitivity analyses are reasonable. Identify the need for additional or clarifying information (RAIs 2 ) which are not necessarily limited to F&Os, but addresses the PRA technical 1 SFs which are identical with the TSTF-425 scope, or which are not relocated in the plant-specific implementation of TSTF-425, do not require review.

2 See Section 10 for guidance in the preparation of RAIs.

7

3. SPECIFIC TASKS (WORK REQUIREMENTS AND SCHEDULE) (CONTINUED) adequacy of the Internal Events PRA model. An example may be an RAI related to peer review(s).

Another example may be assessing the acceptability of a capability category I supporting requirement for the TSTF-425 program. Prepare a technical letter report.

e. Given that the licensee is permitted to use PRA or other One week after methods to address seismic, fire, other external events completion of and shutdown events for making SF changes, identify Subtask 2.d.

the method by which the licensee is addressing other hazard groups. Identify if the method requires a peer-reviewed PRA model for a detailed analysis or if only qualitative and bounding analyses will be considered.

Identify if the method considers the current as-built, as-operated plant. Confirm that the method identified is consistent with the NRC approved revision of TSTF-425 referenced by the licensee in the LAR. Identify any deviations from this guidance and provide a technical determination of the significance based on available information. Identify the need for additional or clarifying information. Prepare a technical letter report.

f. Confirm that the new program in TS Administrative One week after Controls is identical to the program in TSTF-425, except completion of the plant specific numbering of the TS program and Subtask 2.e.

referenced surveillance requirements. Identify any deviations, and the need for additional or clarifying information. Prepare a technical letter report.

g. Identify any open items in the TER and corresponding draft RAIs.

(1) Draft TER and RAIs. Review the TSTF-425 Model One week after SER and use it as the basis for developing the TER. completion of Subtask 2.f.

(2) Incorporate NRC comments and prepare the final Two weeks after draft TER and RAIs. receipt of NRC comments.

3. Using the same steps as in Task 2, review the licensee Two weeks from supplement including the RAI responses (depending on receipt of the RAI the content of the supplement) and determine if the responses.

response adequately addresses the RAI. If the RAI response adequately addresses the RAI, update the TER.

If the response does not adequately address the RAI, develop an additional RAI. Prepare a technical letter report.

8

3. SPECIFIC TASKS (WORK REQUIREMENTS AND SCHEDULE)
4. After receipt of the last RAI responses(s), update the TER.

If the response does not adequately address the RAI, list the item as an open item in the TER.

a. Draft TER. Two weeks after receipt of the last RAI response(s).
b. Incorporate NRC comments and prepare the final TER. Two weeks after receipt of NRC comments.
3. APPLICABLE DOCUMENTS AND STANDARDS Technical References
  • Technical Specification Task Force, letter and enclosure to U.S. Nuclear Regulatory Commission, Transmittal of TSTF-425, Revision 3, "Relocate Surveillance Frequencies to Licensee Control-RITSTF Initiative 5b," dated March 18, 2009 (ADAMS Accession No. ML090850642).

o Nuclear Energy Institute, NEI 04-10, Revision 1, "Risk-Inforned Technical Specifications Initiative 5b, Risk-informed Method for Control of Surveillance Frequencies," April 2007 (ADAMS Accession No. ML071360456).

  • Letter from H. Hieh (NRC) to T. Pietrangelo (NEI), "Final Safety Evaluation for Nuclear Energy Institute (NEI) Industry Guidance Document NEI 04-10, Revision 0, Risk-Informed Technical Specifications Initiative 5B, Risk-Informed Method for Control of Surveillance Frequencies," dated September 28, 2006, Accession No.ML062700012.

0 Nieh, H. K., U.S. Nuclear Regulatory Commission, letter to Biff Bradley, Nuclear Energy Institute, "Final Safety Evaluation for Nuclear Energy Institute (NEI) Topical Report (TR) 04-10, Revision 1, 'Risk-Informed Technical Specifications Initiative 5B, Risk-Informed Method for Control of Surveillance Frequencies'," dated September 19, 2007 (ADAMS Accession No. ML072570267).

a U.S. Nuclear Regulatory Commission, Regulatory Guide 1.174, Revision 2, "An Approach for Using Probabilistic Risk Assessment in Risk-Informed Decisions on PlantSpecific Changes to the Licensing Basis," May 2011 (ADAMS Accession No. ML100910006).

  • U.S. Nuclear Regulatory Commission, Regulatory Guide 1.177, Revision 1, "An Approach for Plant-Specific, Risk-Informed Decisionmaking: Technical Specifications,"

May 2011 (ADAMS Accession No. ML100910008).

9

4. APPLICABLE DOCUMENTS AND STANDARDS (CONTINUED)
  • U.S. Nuclear Regulatory Commission, NUREG-0800, Standard Review Plan, Section 16.1, Revision 1, "Risk-lnformed Decision Making: Technical Specifications," March 2007 (ADAMS Accession No. ML070380228).

" U.S. Nuclear Regulatory Commission, NUREG-0800, Standard Review Plan, Section 19.1, Revision 3, "Determining the Technical Adequacy of Probabilistic Risk Assessment Results for Risk-Informed Activities," September 2012 (ADAMS Accession No. ML12193A107).

4. DELIVERABLES AND DELIVERY SCHEDULE Technical Reporting Requirements
1. At the completion of Task 1 .a, submit a trip report that contains a brief summary of the discussions and any highlights or challenges of the upcoming work.
2. At the completion of Task 1.b, submit a trip report that contains a brief summary of the discussions.
3. At the completion of Subtask 2.a., submit a technical letter report that contains a summary of the work performed to include the NRC approved revision of TSTF-425 referenced by the licensee in the LAR.
4. At the completion of Subtask 2.b., submit a technical letter report that contains a summary of the work performed to include any deviations from the approved TSTF-425 scope, and a summary of the reason for the deviation (as identified by the licensee),

where possible.

5. At the completion of Subtask 2.c, submit a technical letter report that contains a summary of the work performed to include identification of any plant-specific frequencies proposed to be relocated which are not contained within the STS scope.
6. At the completion of Subtask 2.d, submit a technical letter report that contains a list of the RAIs and the regulatory basis for the RAI and include a discussion on PRA technical adequacy for the resolution of each F&O and for the PRA model as a whole upon completing the evaluation of each F&O.
7. At the completion of Task 2.e, submit a technical letter report that contains a summary of the work performed to include a summary of the methods used to address external events and shutdown events, if the method considers the current as-built, as-operated plant, and any deviations from the approved revision of TSTF-425 referenced by the licensee in the LAR.
8. At the completion of Task 2.f, submit a technical letter report that contains a summary of the work performed to include a summary of and deviations of the 10

new program in TS Administrative Controls from the approved revision of TSTF-425 referenced by the licensee in the LAR.

5. DELIVERABLES AND DELIVERY SCHEDULE
9. At the completion of Task 2.g.(1) and 2.g.(2), submit a TER and RAIs, draft and final, as appropriate, that are developed in accordance with the format, outline, and content provided by the NRC COR.
10. At the completion of Task 3, submit a TER and RAIs (if needed), draft and final, as appropriate, that are developed in accordance with the format, outline, and content provided by the NRC COR.
11. At the completion of Task 4.a and 4.b, submit an updated TER, draft and final, respectively.

Monthly Letter Status Reporting (MLSR) Requirements MLSRs will be prepared in accordance with the base EWC contract.

The MLSRs must contain a License Fee Recovery Reporting Section which lists the TAC numbers for each plant and the associated costs against those TAC numbers for the reporting period.

6. REQUIRED LABOR CATEGORIES (Except for Information Techhnoloqy' Services)

One Principal Investigator (PI)/ Senior Risk Analyst who possesses experience and working knowledge in the areas of (1) Use of PRA at U.S. nuclear power plants; and (2) U.S. nuclear power plant systems and operations.

Two staff-level Nuclear Engineers or Risk Analysts who possesses in-depth knowledge of U.S. nuclear power plant systems and operations.

5. GOVERNMENT-FURNISHED PROPERTY/MATERIALS The ADAMS Accession No. for the Calvert Cliffs TSTF-425 LAR is ML14125A015.

NOTE: Some of these documents contain proprietary information and must be safeguarded against unauthorized disclosure. After completion of work, the documents should either be destroyed or returned to NRC. Ifthey are destroyed, please confirm this in an E-mail to the COR and include the date and manner in which the documents were destroyed.

The NRC COR will provide those NRC documents related to licensing activities (for example, any Non-Publicly available SERs, audit reports, and related documents) that are readily available. The NRC COR will provide access to training material pertinent to the LAR reviews or other NRC documents and docketed correspondence on related issues.

The CNWRA staff shall identify any additional NRC documentation that is needed and the COR will determine whether these will be provided by the NRC or obtained directly by the CNWRA from ADAMS, NRC public document room or the NRC website at www.nrc.qov.

11

A

6. PLACE OF PERFORMANCE This work will be performed at the contractor's site, with the exception of trips to the plant site and Government site as needed.
7. SPECIAL CONSIDERATIONS Assumptions and Understanding The level of effort for each Task was determined based on previous NRC experience from reviewing LARs of similar scope. However, it is expected that the actual number of hours will vary depending on the quality and scope of the specific TSTF-425 LAR to be reviewed.
8. SPECIAL CONSIDERATIONS Assumptions and Understanding The level of effort assumption for Task 1.a, for each traveler, is based on forty hours of preparation, four hours to travel to the meeting site, 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> for the meeting and four hours for return travel and documentation. It is assumed that there will be three travelers. The level of effort assumption for task 1.b, for each traveler, is based on four hours to travel to the meeting site, 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> for the meeting and four hours for return travel and documentation.

It is understood that Subtask 2.d. can be done in parallel with Subtasks 2.b. and 2.c.

The level of effort assumption for Task 3 assumes two rounds of RAIs. Each round of RAIs is assumed to take 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> to review, including drafting any necessary follow-up RAIs and updating the draft TER.

It is understood that the level of effort for each Task contains sufficient effort to conduct telephone conference calls with the NRC staff. Such phone calls, for example, might be arranged by the NRC COR with the Licensing Project Manager and other NRC staff to discuss the RAls and to reach an understanding with the licensee. Comments might be provided to the contractor such that the RAls may have to be resubmitted by the contractor.

Guidance for Preparing Requests for Additional Information (RAls)

Additional information necessary to resolve open or unresolved items identified during the review of the information associated with the LAR needs to be requested in a manner that is unambiguous, has an adequate basis, and is necessary for the safety review. RAls should be developed using the following guidance:

1. An RAI should include the appropriate basis for requesting the information. The basis should explain why the information is needed, including how it will be used to help make a reasonable assurance finding.

12

2. Judgmental language should be avoided.
a. Questions should not make adequacy determinations.
b. Words like "unacceptable" or "deficient" and "deviation" should be avoided. Likewise, avoid using phrases like "the staff will require"since it is premature to require anything when asking questions.
3. Questions should be focused, not open-ended.
a. The RAI should be in the form of a question or an imperative to provide what is needed to complete the review. When the reviewer needs specific information or the underlying issue may not be apparent, the RAI should clearly identify the information requested and/or the underlying issue.
b. "If... then" questions (questions that could lead to follow-on questions) should provide both parts of the question.

Guidance for Preparinq Requests for Additional Information (RAls) (Continued)

4. For follow-up RAIs, reference the original RAI, the date of the letter in which the licensee responded to the RAI, and the ADAMS Accession Number of the letter.

To ensure that the response appropriately addresses the RAI, the licensee may submit a draft response (which the NRC dockets in the Agency-Wide Documents Access and Management System (ADAMS)) and may request a follow-up teleconference and/or meeting.

9. TRAVEL Two three-person, two-day trips to the NRC headquarters office in Rockville, MD.
10. SECURITY This work will be UNCLASSIFIED; it will only contain proprietary information.

13

SECTION D - Packaging and Marking NRCDO20 BRANDING The Contractor is required to use the statement below in any publications, presentations, articles, products, or materials funded under this contract/order, to the extent practical, in order to provide NRC with recognition for its involvement in and contribution to the project. If the work performed is funded entirely with NRC funds, then the contractor must acknowledge that information in its documentation/presentation.

Work Supported by the U.S. Nuclear Regulatory Commission (NRC), Office of Nuclear Reactor Regulation, under Contract/order number NRC-HQ-50-14-E-0001/NRC-HQ-20-14-T-0012.

(End of Clause)

NRCD010 PACKAGING AND MARKING (a) The Contractor shall package material for shipment to the NRC in such a manner that will ensure acceptance by common carrier and safe delivery at destination. Containers and closures shall comply with the Surface Transportation Board, Uniform Freight Classification Rules, or regulations of other carriers as applicable to the mode of transportation.

(b) On the front of the package, the Contractor shall clearly identify the contract number under which the product is being provided.

(c) Additional packaging andlor marking requirements are as follows: None.

(End of Clause) 14

SECTION E - Inspection and Acceptance 2052.215-71 PROJECT OFFICER AUTHORITY (OCT 1999)

(a) The contracting officer's authorized representative hereinafter referred to as the project officer for this contract is:

Name: Sara Lyons Address: Mail Stop: OWFN/10 C15 Washington, DC 20555 Telephone Number: 301-415-2861 Sara.lyons(n rc.qov Alternate COR:

Name: Bernard Grenier Mail Stop: OWFN 13 E-10 (301)-415-2726 Bemard.orenier(anrc.,ov (b) Performance of the work under this contract is subject to the technical direction of the NRC project officer. The term technical direction is defined to include the following:

(1) Technical direction to the contractor which shifts work emphasis between areas of work or tasks, authorizes travel which was unanticipated in the Schedule (i.e., travel not contemplated in the Statement of Work or changes to specific travel identified in the Statement of Work), fills in details, or otherwise serves to accomplish the contractual statement of work.

(2) Provide advice and guidance to the contractor in the preparation of drawings, specifications, or technical portions of the work description.

(3) Review and, where required by the contract, approve technical reports, drawings, specifications, and technical information to be delivered by the contractor to the Government under the contract.

(c) Technical direction must be within the general statement of work stated in the contract. The project officer does not have the authority to and may not issue any technical direction which:

(1) Constitutes an assignment of work outside the general scope of the contract.

(2) Constitutes a change as defined in the "Changes" clause of this contract.

(3) In any way causes an increase or decrease in the total estimated contract cost, the fixed fee, if any, or the time required for contract performance.

(4) Changes any of the expressed terms, conditions, or specifications of the contract.

(5) Terminates the contract, settles any claim or dispute arising under the contract, or issues any unilateral directive whatever.

(d) All technical directions must be issued in writing by the project officer or must be confirmed by the project officer in writing within ten (10) working days after verbal issuance. A copy of the 15

written direction must be furnished to the contracting officer. A copy of NRC Form 445, Request for Approval of Official Foreign Travel, which has received final approval from the NRC must be furnished to the contracting officer.

(e) The contractor shall proceed promptly with the performance of technical directions duly issued by the project officer in the manner prescribed by this clause and within the project officer's authority under the provisions of this clause.

(f) If, in the opinion of the contractor, any instruction or direction issued by the project officer is within one of the categories defined in paragraph (c) of this section, the contractor may not proceed but shall notify the contracting officer in writing within five (5) working days after the receipt of any instruction or direction and shall request that contracting officer to modify the contract accordingly. Upon receiving the notification from the contractor, the contracting officer shall issue an appropriate contract modification or advise the contractor in writing that, in the contracting officers opinion, the technical direction is within the scope of this article and does not constitute a change under the "Changes" clause.

(g) Any unauthorized commitment or direction issued by the project officer may result in an unnecessary delay in the contractors performance and may even result in the contractor expending funds for unallowable costs under the contract.

(h) A failure of the parties to agree upon the nature of the instruction or direction or upon the contract action to be taken with respect to the instruction or direction is subject to 52.233 Disputes.

(i) In addition to providing technical direction as defined in paragraph (b) of the section, the project officer shall:

(1) Monitor the contractors technical progress, including surveillance and assessment of performance, and recommend to the contracting officer changes in requirements.

(2) Assist the contractor in the resolution of technical problems encountered during performance.

(3) Review all costs requested for reimbursement by the contractor and submit to the contracting officer recommendations for approval, disapproval, or suspension of payment for supplies and services required under this contract.

(End of Clause) 16

SECTION F - Deliveries or Performance NRCF032 TASK/DELIVERY ORDER PERIOD OF PERFORMANCE (SEP 2013)

This order shall commence on September 22, 2014 and will expire on February 28, 2015.

(End of Clause)

NRCF010 PLACE OF DELIVERY-REPORTS The items to be furnished hereunder shall be delivered, with all charges paid by the Contractor, to:

a. Name: Sara Lyons (1 Electronic Copy)

Contracting Officer's Representative (COR)

Address: Sara. Lyons@nrc.gov

b. Name: Hugo Alcantara (1 Electronic Copy)

Contract Specialist (CS)

Address: Hugo.Alcantara@nrc.gov (End of Clause)

SECTION G - Contract Administration Data NRCG030 ELECTRONIC PAYMENT (SEP 2014)

The Debt Collection Improvement Act of 1996 requires that all payments except IRS tax refunds be made by Electronic Funds Transfer. Payment shall be made in accordance with FAR 52.232-33, entitled "Payment by Electronic Funds-Central Contractor Registration".

To receive payment, the contractor shall prepare invoices in accordance with NRC's Billing Instructions. Claims shall be submitted on the payee's letterhead, invoice, or on the Government's Standard Form 1034, "Public Voucher for Purchases and Services Other than Personal," and Standard Form 1035, "Public Voucher for Purchases Other than Personal -

Continuation Sheet." The preferred method of submitting invoices is electronically to:

NRCPayments*,nrc..ov.

(End of Clause) 17

SECTION H - Special Contract Requirements 2052.215-70 KEY PERSONNEL (JAN 1993)

(a) The following individuals are considered to be essential to the successful performance of the work hereunder:

Name Title Lane Howard Program Manager Robert Fosdick Principal Investigator Robert Schmidt Consultant The contractor agrees that personnel may not be removed from the contract work or replaced without compliance with paragraphs (b) and (c) of this section.

(b) If one or more of the key personnel, for whatever reason, becomes, or is expected to become, unavailable for work under this contract for a continuous period exceeding 30 work days, or is expected to devote substantially less effort to the work than indicated in the proposal or initially anticipated, the contractor shall immediately notify the contracting officer and shall, subject to the concurrence of the contracting officer, promptly replace the personnel with personnel of at least substantially equal ability and qualifications.

(c) Each request for approval of substitutions must be in writing and contain a detailed explanation of the circumstances necessitating the proposed substitutions. The request must also contain a complete resume for the proposed substitute and other information requested or needed by the contracting officer to evaluate the proposed substitution. The contracting officer and the project officer shall evaluate the contractor's request and the contracting officer shall promptly notify the contractor of his or her decision in writing.

(d) If the contracting officer determines that suitable and timely replacement of key personnel who have been reassigned, terminated, or have otherwise become unavailable for the contract work is not reasonably forthcoming, or that the resultant reduction of productive effort would be so substantial as to impair the successful completion of the contract or the service order, the contract may be terminated by the contracting officer for default or for the convenience of the Government, as appropriate. If the contracting officer finds the contractor at fault for the condition, the contract price or fixed fee may be equitably adjusted downward to compensate the Government for any resultant delay, loss, or damage.

(End of Clause) 18

2052.215-78 TRAVEL APPROVALS AND REIMBURSEMENT (OCT 1999) - ALTERNATE I (OCT 1999)

(a) Total expenditure for travel may not exceed $5,379.00 without the prior approval of the contracting officer.

(b) All foreign travel must be approved in advance by the NRC on NRC Form 445, Request for Approval of Official Foreign Travel, and must be in compliance with FAR 52.247-63 Preference for U.S. Flag Air Carriers. The contractor shall submit NRC Form 445 to the NRC no later than 30 days prior to the commencement of travel.

(c) The contractor will be reimbursed only for travel costs incurred that are directly related to this contract and are allowable subject to the limitations prescribed in FAR 31.205-46.

(d) It is the responsibility of the contractor to notify the contracting officer in accordance with the FAR Limitations of Cost clause of this contract when, at any time, the contractor learns that travel expenses will cause the contractor to exceed the travel ceiling amount identified in paragraph (a) of this clause.

(e) Reasonable travel costs for research and related activities performed at State and nonprofit institutions, in accordance with Section 12 of Pub. L. 100-679, must be charged in accordance with the contractor's institutional policy to the degree that the limitations of Office of Management and Budget (OMB) guidance are not exceeded. Applicable guidance documents include OMB Circular A-87, Cost Principles for State and Local Governments; OMB Circular A-122, Cost Principles for Nonprofit Organizations; and OMB Circular A-21, Cost Principles for Educational Institutions.

(End of Clause)

NRCH480 USE OF AUTOMATED CLEARING HOUSE (ACH) ELECTRONIC PAYMENTIREMITTANCE ADDRESS The Debt Collection Improvement Act of 1996 requires that all Federal payments except IRS tax refunds be made by Electronic Funds Transfer. It is the policy of the Nuclear Regulatory Commission to pay government vendors by the Automated Clearing House (ACH) electronic funds transfer payment system. Item 15C of the Standard Form 33 may be disregarded.

(End of Clause) 19

NRCH470 GREEN PURCHASING (SEP 2013)

(a) In furtherance of the sustainable acquisition goals included in Executive Order 13514, "Federal Leadership in Environmental, Energy, and Economic Performance," products and services acquired under this contract/order shall be energy-efficient (Energy Star or Federal Energy Management Program (FEMP) designated), water-efficient, biobased, environmentally preferable (e.g., Electronic Product Environmental Assessment Tool (EPEAT) certified), non-ozone depleting, recycled content, and non-toxic or less toxic alternatives, to the maximum extent practicable in meeting NRC contractual requirements.

(b) See NRC's Green Purchasing Plan (GPP) at:

http://pbadupws.nrc..qov/docs/ML1219//ML12191A130.pdf and the General Service Administration's (GSA) Green Procurement Compilation at:

hftp :/Awww.qsa.qov/portal/content/l 98257.

(c) The contractor shall flow down this clause into all subcontracts and other agreements that relate to performance of this contract/order.

(End of Clause)

NRCH410 WHISTLEBLOWER PROTECTION FOR NRC CONTRACTOR AND SUBCONTRACTOR EMPLOYEES (a) The U.S. Nuclear Regulatory Commission (NRC) contractor and its subcontractor are subject to the Whistleblower Employee Protection public law provisions as codified at 42 U.S.C.

5851. NRC contractor(s) and subcontractor(s) shall comply with the requirements of this Whistleblower Employee Protection law, and the implementing regulations of the NRC and the Department of Labor (DOL). See, for example, DOL Procedures on Handling Complaints at 29 C.F.R. Part 24 concerning the employer obligations, prohibited acts, DOL procedures and the requirement for prominent posting of notice of Employee Rights at Appendix A to Part 24 entitled: "Your Rights Under the Energy Reorganization Act".

(b) Under this Whistleblower Employee Protection law, as implemented by regulations, NRC contractor and subcontractor employees are protected from discharge, reprisal, threats, intimidation, coercion, blacklisting or other employment discrimination practices with respect to compensation, terms, conditions or privileges of their employment because the contractor or subcontractor employee(s) has provided notice to the employer, refused to engage in unlawful practices, assisted in proceedings or testified on activities concerning alleged violations of the Atomic Energy Act of 1954 (as amended) and the Energy Reorganization Act of 1974 (as amended).

(c) The contractor shall insert this or the substance of this clause in any subcontracts involving work performed under this contract.

(End of Clause) 20

NRCH400 SECURITY REQUIREMENTS RELATING TO THE PRODUCTION OF REPORT(S)

OR THE PUBLICATION OF RESULTS UNDER CONTRACTS, AGREEMENTS, AND GRANTS Review and Approval of Reports (a) Reporting Requirements. The contractor/grantee shall comply with the terms and conditions of the contract/grant regarding the contents of the draft and final report, summaries, data, and related documents, to include correcting, deleting, editing, revising, modifying, formatting, and supplementing any of the information contained therein, at no additional cost to the NRC.

Performance under the contract/grant will not be deemed accepted or completed until it complies with the NRC's directions. The reports, summaries, data, and related documents will be considered draft until approved by the NRC. The contractor/grantee agrees that the direction, determinations, and decisions on approval or disapproval of reports, summaries, data, and related documents created under this contract/grant remain solely within the discretion of the NRC.

(b) Publication of Results. Prior to any dissemination, display, publication, or release of articles, reports, summaries, data, or related documents developed under the contract/grant, the contractor/grantee shall submit them to the NRC for review and approval. The contractor/

grantee shall not release, disseminate, display or publish articles, reports, summaries, data, and related documents, or the contents therein, that have not been reviewed and approved by the NRC for release, display, dissemination or publication. The contractor/grantee agrees to conspicuously place any disclaimers, markings or notices, directed by the NRC, on any articles, reports, summaries, data, and related documents that the contractor/grantee intends to release, display, disseminate or publish to other persons, the public, or any other entities. The contractor/grantee agrees, and grants, a royalty-free, nonexclusive, irrevocable worldwide license to the government, to use, reproduce, modify, distribute, prepare derivative works, release, display or disclose the articles, reports, summaries, data, and related documents developed under the contract/grant, for any governmental purpose and to have or authorize others to do so.

(c) Identification/Marking of Sensitive Unclassified Non-Safeguards Information (SUNSI) and Safeguards Information (SGI). The decision, determination, or direction by the NRC that information possessed, formulated or produced by the contractor/grantee constitutes SUNSI or SGI is solely within the authority and discretion of the NRC. In performing the contract/grant, the contractor/grantee shall clearly mark SUNSI and SGI, to include for example, QUO-Allegation Information or OUO-Security Related Information on any reports, documents, designs, data, materials, and written information, as directed by the NRC. In addition to marking the information as directed by the NRC, the contractor shall use the applicable NRC cover sheet (e.g., NRC Form 461 Safeguards Information) in maintaining these records and documents. The contractor/grantee shall ensure that SUNSI and SGI is handled, maintained and protected from unauthorized disclosure, consistent with NRC policies and directions. The contractor/grantee shall comply with the requirements to mark, maintain, and protect all information, including documents, summaries, reports, data, designs, and materials in accordance with the provisions of Section 147 of the Atomic Energy Act of 1954 as amended, its implementing regulations (10 CFR 73.21), Sensitive Unclassified Non-Safeguards and Safeguards Information policies, and NRC Management Directives and Handbooks 12.5, 12.6 and 12.7.

(d) Remedies. In addition to any civil, criminal, and contractual remedies available under the applicable laws and regulations, failure to comply with the above provisions, and/or NRC directions, may result in suspension, withholding, or offsetting of any payments invoiced or 21

0 claimed by the contractor/grantee.

(e) Flowdown. If the contractor/grantee intends to enter into any subcontracts or other agreements to perform this contract/grant, the contractor/grantee shall include all of the above provisions in any subcontracts or agreements.

(End of Clause) 22

a 4 SECTION J - List of Documents, Exhibits and Other Attachments BILLING INSTRUCTIONS FOR COST-REIMBURSEMENT TYPE CONTRACTS (MAY 2013)

General: During performance and through final payment of this contract, the contractor is responsible for the accuracy and completeness of data within the System for Award Management (SAM) database and for any liability resulting from the Government's reliance on inaccurate or incomplete SAM data.

The contractor shall prepare invoices/vouchers for reimbursement of costs in the manner and format described herein. FAILURE TO SUBMIT INVOICES/VOUCHERS IN ACCORDANCE WITH THESE INSTRUCTIONS MAY RESULT IN REJECTION OF THE INVOICENOUCHER AS IMPROPER.

Standard Forms: Reimbursement requests shall be submitted on the payee's letterhead, invoice/voucher, or on the Govemment's Standard Form 1034, "Public Voucher for Purchases and Services Other than Personal," and Standard Form 1035, "Public Voucher for Purchases Other than Personal-Continuation Sheet."

Electronic InvoiceNoucher Submissions: The preferred method of submitting invoices/vouchers is electronically to the U.S. Nuclear Regulatory Commission, via email to:

NRCPayments(*nrc._oov.

Hard-Copy InvoiceNoucher Submissions: If you submit a hard-copy of the invoice/voucher, a signed original and supporting documentation shall be submitted to the following address:

NRC Payments U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mailstop 03-E17A Rockville, MD 20852-2738 Purchase of Capital Property: ($50,000 or more with life of one yearor longer)

Contractors must report to the Contracting Officer, electronically, any capital property acquired with contract funds having an initial cost of $50,000 or more, in accordance with procedures set forth in NRC Management Directive (MD) 13.1, IV, C -"Reporting Requirements" (revised 2/16/2011).

Agency Payment Office: Payment will continue to be made by the office designated in the contract in Block 12 of the Standard Form 26, or Block 25 of the Standard Form 33, whichever is applicable.

Frequency: The contractor shall submit requests for reimbursement once each month, unless otherwise authorized by the Contracting Officer.

Format: InvoicesNouchers shall be submitted in the format depicted on the attached sample form entitled "InvoiceNoucher for Purchases and Services Other Than Personal". Alternate formats are permissible only if they address all requirements of the Billing Instructions. The 23

instructions for preparation and itemization of the invoice/voucher are included with the sample form.

Task Order Contracts: The contractor must submit a separate invoice/voucher for each individual task order with detailed cost information. This includes all applicable cost elements and other items discussed in paragraphs (a) through (s) of the attached instructions. In addition, the invoice/voucher must specify the contract number, and the NRC-assigned task/delivery order number.

Billing of Costs after Expiration of Contract: If costs are incurred during the contract period and invoiced after the contract has expired, you must cite the period during which these costs were incurred. To be considered a proper expiration invoice/voucher, the contractor shall clearly mark it "EXPIRATION INVOICE" or "EXPIRATION VOUCHER".

Final invoices/vouchers shall be marked "FINAL INVOICE" or "FINAL VOUCHER".

Currency: InvoicesNouchers must be expressed in U.S. Dollars.

Supersession: These instructions supersede previous Billing Instructions for Cost-Reimbursement Type Contracts (July 2011).

24

q INVOICEIVOUCHER FOR PURCHASES AND SERVICES OTHER THAN PERSONAL (SAMPLE FORMAT - COVER SHEET)

1. Official Agency Billing Office NRC Payments U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mailstop 03-E17A Rockville, MD 20852-2738
2. InvoiceNoucher Information
a. Payee's DUNS Number or DUNS+4. The Payee shall include the Payee's Data Universal Number (DUNS) or DUNS+4 number that identifies the Payee's name and address. The DUNS+4 number is the DUNS number plus a 4-character suffix that may be assigned at the discretion of the Payee to identify alternative Electronic Funds Transfer (EFT) accounts for the same parent concern.
b. Taxpayer Identification Number. The Payee shall include the Payee's taxpayer identification number (TIN) used by the Internal Revenue Service (IRS) in the administration of tax laws.

(See IRS Web site:

httD://www.irs.gov/Businesses/Small-Businesses-&-Self-EmDloved/Employer-ID-Numbers-(EINsV).

c. Payee's Name and Address. Show the name of the Payee as it appears in the contract and its correct address. If the Payee assigns the proceeds of this contract as provided for in the assignment of claims terms of this contract, the Payee shall require as a condition of any such assignment, that the assignee shall register separately in the System for Award Management (SAM) database at http://sam.gov and shall be paid by EFT in accordance with the terms of this contract. See Federal Acquisition Regulation (FAR) 52.232-33(g) Payment by Electronic Funds Transfer - Central Contractor Registration (October 2003).
d. Contract Number. Insert the NRC contract number (including Enterprise-wide Contract (EWC)), GSA Federal Supply Schedule (FSS), Governmentwide Agency Contract (GWAC) number, or Multiple Agency Contract (MAC) number, as applicable.
e. Task Order Number. Insert the task/delivery order number (If Applicable). Do not include more than one task order per invoice or the invoice may be rejected as improper.
f. InvoiceNoucher. The appropriate sequential number of the invoice/voucher, beginning with 001 should be designated. Contractors may also include an individual internal accounting number, if desired, in addition to the 3-digit sequential number.
g. Date of InvoiceNoucher. Insert the date the invoice/voucher is prepared.
h. Billingq Period. Insert the beginning and ending dates (day, month, year) of the period during which costs were incurred and for which reimbursement is requested.
i. Description of Deliverables. Provide a brief description of supplies or services, quantity, unit cost, and total cost.

25

-A

j. Work Completed. Provide a general summary description of the services performed or products submitted for the invoice period and specify the section or Contract Line Item Number (CLIN) or SubCLIN in the contract pertaining to the required deliverable(s).
k. Shipping. Insert weight and zone of shipment, if shipped by parcel post.

I. Charges for freight or express shipments. Attach prepaid bill if shipped by freight or express.

m. Instructions. Include instructions to consignee to notify the Contracting Officer of receipt of shipment.
n. For Indefinite Delivery contracts, the final invoice/voucher shall be marked "FINAL INVOICE" or "FINAL VOUCHER".
o. Direct Costs. Insert the amount billed for the following cost elements, adjustments, suspensions, and total amounts, for both the current billing period and for the cumulative period (from contract inception to end date of this billing period).

(1) Direct Labor. This consists of salaries and wages paid (or accrued) for direct performance of the contract itemized as follows:

Labor Hours Cumulative Category Billed Rate Total Hours Billed (2) Fringe Benefits. This represents fringe benefits applicable to direct labor and billed as a direct cost. Where a rate is used indicate the rate. Fringe benefits included in direct labor or in other indirect cost pools should not be identified here.

(3) Contractor-acquired property ($50,000 or more). List each item costing $50,000 or more and having a life expectancy of more than one year. List only those items of equipment for which reimbursement is requested. For each such item, list the following (as applicable): (a) an item description, (b) manufacturer, (c) model number, (d) serial number, (e) acquisition cost, (f) date of purchase, and (g) a copy of the purchasing document.

(4) Contractor-acquired property (under $50,000), Materials, and Supplies. These are equipment other than that described in (3) above, plus consumable materials and supplies. List by category. List items valued at $1,000 or more separately. Provide the item number for each piece of equipment valued at $1,000 or more.

(5) Premium Pay. This enumeration in excess of the basic hourly rate. (Requires written approval of the Contracting Officer.)

(6) Consultant Fee. The supporting information must include the name, hourly or daily rate of the consultant, and reference the NRC approval (if not specifically approved in the original contract).

(7) Travel. Total costs associated with each trip must be shown in the following format:

Start Date Destination Costs From To From To $

26

I (Must include separatedetailedcosts for airfare, per diem, and other transportation expenses. All costs must be adequately supportedby copies of receipts or other documentation.)

(8) Subcontracts. Include separate detailed breakdown of all costs paid to approved subcontractors during the billing period.

(9) Other Costs. List all other direct costs by cost element and dollar amount separately.

p. Indirect Costs (Overhead and General and Administrative Expense). Cite the formula (rate and base) in effect in accordance with the terms of the contract, during the time the costs were incurred and for which reimbursement is requested.
q. Fixed-Fee. If the contract provides for a fixed-fee, it must be reimbursed as indicated in the contract. Cite the formula or method of computation. Include this information as it applies to individual task orders as well.

(1) The NRC will withhold payment of 15% of the negotiated contract fixed-fee amount, not to exceed $100,000.

(2) If the fee withholding amount has reached $100,000, the contractor may resume billing the NRC for the balance of its fee under subsequent invoices for work completed.

(3) Any fee amounts withheld by the NRC will be paid to the contractor during contract closeout in increments, following the submission/settlement of indirect rate proposals in accordance with FAR 52.216-8, "Fixed Fee" (JUN 2011).

r. Total Amount Billed. Insert columns for total amounts for the current and cumulative periods.
s. Adiustments. Insert columns for any adjustments, including outstanding suspensions for deficient or defective products or nonconforming services, for the current and cumulative periods.
t. Grand Totals.

27

3. Sample InvoiceNoucher Information Sample InvoiceNoucher Information (Supporting Documentation must be attached)

This invoice/voucher represents reimbursable costs for the billing period from-through.___

Amount Billed Current Period Cumulative (a) Direct Costs (1) Direct labor $ $

(2) Fringe benefits (% of direct labor) $ $_

(3) Government property ($50,000 or more) $ $

(4) Government property, Materials, and Supplies (under $50,000 per item) $. $

(5) Premium pay (NRC approved overtime) $ $_

(6) Consultants Fee $ $

(7) Travel $ $

(8) Subcontracts $_ $

(9) Other costs $ $_

Total Direct Costs: $ $

(b) Indirect Costs (provide the rate information applicable to your firm)

(10) Overhead _  % of

- (Indicate Base) $ $_

(11) General and Administrative (G&A) _  %

of (Indicate Base) $ $

Total Indirect Costs: $ $

(c) Fixed-Fee:

(12) Fixed-Fee Calculations:

i. Total negotiated contract fixed-fee percent and amount $

ii. 85% allowable fee amount $

iii. Cumulative fee billed on prior invoices $

iv. Fee due this invoice (notto exceed 85% of fee earnedbased upon negotiated contract fee percentage)$

Note: The fee balance withheld by NRC may not exceed $100,000.

Total Fixed-Fee: $ I (d) Total Amount Billed $

(e) Adjustments (+/-) $

28

(f) Grand Total $ $.

(The invoice/voucher format provided above must include information similar to that included below in the following to ensure accuracy and completeness.)

SAMPLE SUPPORTING INFORMATION The budget information provided below is for format purposes only and is illustrative.

Cost Elements:

1) Direct Labor- $2,400 Labor Hours Cumulative Category Billed Rate Total Hours Billed Senior Engineer I 100 $14.00 $1,400 975 Engineer 50 $10.00 $ 500 465 Computer Analyst 100 $5.00 $ 500 320

$2,400 1,760 hrs.

2) Fringe Benefits - $480 Fringe @ 20% of Direct Salaries Labor Fringe Category Salaries Amount Senior Engineer I $1,400 $280 Engineer $ 500 $100 Computer Analyst $ 500 $100

$2,400 $480

3) Govemment-furnished and contractor-acquired Property ($50,000 or more) - $60,000 Prototype Spectrometer - item number 1000-01 = $60,000
4) Govemment-furnished and contractor-acquired Property (under $50,000), Materials, and Supplies - $2,000 10 Radon tubes @ $110.00 = $1,100 6 Pairs Electrostatic gloves @ $150.00 = $ 900

$2,000

5) Premium Pay - $150 Walter Murphy - 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> @ $10.00 Per Hour (Reg. Pay) = $100 x 1.5 OT rate = $150 (EX: Premium pay for this individual was approved and authorized under this contract by the NRC Contracting Officer by letter dated 6/1/2011.)
6) Consultants' Fee - $100 Dr. Carney - 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> fully-burdened @ $100 = $100 29
7) Travel - $2,640 (i) Airfare: (2 Roundtrip trips for 1 person @ $300 per r/t ticket)

Start Date End Date Days From To Cost 4/1/2011 4/7/2011 7 Philadelphia, PA Wash, D.C. $300 7/1/2011 7/8/2011 8 Philadelphia, PA Wash, D.C. $300 (ii) Per Diem: $136/day x 15 days = $2,040

8) Subcontracting - $30,000 Company A = $10,000 Company B = $20,000

$30,000 (EX: Subcontracts for Companies A & B were consented to by the Contracting Officer by letter dated 6/15/2011.)

9) Other Costs - $5,100 Honorarium for speaker at American Nuclear Society conference = $5,000 NuclearPlanet Journal subscription fee = $100
10) Overhead Expense - S41,148 Overhead @ 40% of Total Direct Costs
11) General and Administrative (G&A) Expense - $22,784 G&A @ 20% of Total Costs, excluding subcontracts and consultants
12) Fixed-Fee - $8,218 Fixed-Fee applied to Total Costs @ 5%

Fixed-Fee Calculations:

i. Total contract fixed-fee $100,000 ii. 85% allowable fee $85,000 iii. Cumulative fee billed on prior invoices $85,000 iv. Fee due this invoice (not to exceed 85% of fee earned based upon negotiated contract fee percentage) $8,218 Total Amount Billed $175,020 Adjustments (+1-) - $8,218 Grand Total $166,802 30

X ". ORDER FOR SUPPLIES OR SERVICES PAGE OF PAGES IMP&TAN " Mark all packages and papers with contract and/or order numbers. 1 30

1. DATE OP 6RDER 2. CONTRACT NO. (If any) 6 SHIP TO:
  • NRC-HQ-50-!4-E-0001 09/22/2014 a. NAME OF CONSIGNEE
3. ORDER NO. 4. REQUISITION/REFERENCE NO.

NRR-14-0287 SARA LYONS NRC-HQ-20-14-T-0012

5. ISSUING OFFICE (Address correspondence to) b. STREET ADDRESS US NRC - HQ 1155 ROCKVILLE PIKE ACQUISITION MANAGEMENT DIVISION MAIL STOP OWFN 1OC15 MAIL STOP 3WFN-05-C64MP WASHINGTON DC 20555-0001 c CITY d. STATE e. ZIP CODE ROCKVILLE MD 20852
7. TO: f. SHIP VIA
a. NAME OF CONTRACTOR S W R I 8. TYPE OF ORDER
b. COMPANY NAME -a. PURCHASE X-' b. DELIVERY
c. STREET ADDRESS REFERENCE YOUR:

6220 CULEBRA RD Except for billing instructions on the reverse, this delivery order is subject to instructions contained on this side only of this form and is issued Please furnish the following on the terms subject to the terms and conditions and conditions specified on both sides of of the above-numbered contract.

d. CITY e. STATE f. ZIP CODE this order and on the attached sheet, if any, SAN ANTONIO TX 782385166 including delivery as indicated.
9. ACCOUNTING AND APPROPRIATION DATA 10. REQUISITIONING OFFICE See Schedule OFF OF NUCLEAR REACTOR REGULATION
11. BUSINESS CLASSIFICATION (Check appropriatebox(es)) 12. F.O.B. POINT
a. SMALL b OTHER THAN SMALL I ' c. DISADVANTAGED d. WOMEN-OWNED j. e. HUBZone
f. SERVICE-DISABLED g. WOMEN-OWNED SMALL BUSINESS (WOSB) h EDWOSB VETERAN-OWNED ELIGIBLE UNDER THE WOSB PROGRAM
13. PLACE OF 14. GOVERNMENT BIL NO. 15. DELIVER TO F.O.B. POINT 16. DISCOUNT TERMS ON OR BEFORE (Date)
a. INSPECTION b. ACCEPTANCE Destination Destination 30
17. SCHEDULE (See reverse for Rejections)

QUANTITY UNIT QUANTITY ITEM NO. SUPPLIES OR SERVICES ORDERED UNIT PRICE AMOUNT ACCEPTED (a) (b) (c) (d) (e) (f) (g)

The Contractor shall provide services in accordance with the Statement of Work entitled "Review of the Calvert Cliffs Units 1 and 2 License Amendment Request (LAR) Pertaining to Risk-Informed (RI)

Technical Specification Task Force (TSTF)

Continued ...

18. SHIPPING POINT 19. GROSS SHIPPING WEIGHT 20. INVOICE NO. 17(h)

TOTAL (Cont.

pages)

21. MAIL INVOICE TO: *
a. NAME $76,716.00 44 US NUCLEAR REGULATORY COMMISSION SEE BILLING INSTRUCTIONS b. STREET ADDRESS ONE WHITE FLINT NORTH ONREVERSE (orP. Box) 11555 ROCKVILLE PIKE 17(i)

GRAND MAILSTOP 03-EI7A TOTAL c..

i .CITY dSTE e

e. ZIP CODE $7 716.0

$76, oo "160 ROCKVILLE MD 20852-2738

22. UNITED STATES OF 09 / 22 / 201 4 23. NAME (Typed)

AMERICA BY (Signature) L MONIQUE B. WILLIAMS 1--,+-rLA, , t. . TITLE: CONTRACTING/ORDERING OFFICER AUTHORIZED FOR LOCAL REPRODUCTION OPTIONAL FORM 347 (R-. U2012)

PREVIOUS EDITION NOT USABLE Presrbed by GSA/FAR48 CPR 53213(f)

SUNSI REVIEW COMPLET 3 - Anfle"900 DEC 2 3 2014 IN."PI A1 hDOW2

ORDER FOR SUPPLIES OR SERVICES PAGE NO of SCHEDULE - CONTINUATION 2 IMPORTANT: Mark all packages and papers with contract and/or order numbers.

DATE OF ORDER CONTRACT NO. ORDER NO.

09/22/2014 INRC-HQ-50-14-E-0001 NRC-HQ-20-14-T-0012 ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT AMOUNT QUANTITY ORDERED PRICE ACCEPTED (a) (b) (c) I(d) (e) (f) (g)

Initiative 5b, "Risk-Informed Method for Control of Surveillance Frequencies, TSTF-425."

NRC Contracting Officers Representative:

Sara Lyons 301-415-2861 Period of Performance: 09/22/2014 to 02/28/2015 Accounting Info:

2014-X0200-FEEBASED-20-20D007-11-4-149-1128-252A 00001 Labor/Fee 76,716.00 The obligated amount of award: $76,716.00.

The total for this award is shown in box 17(i).

TOTAL CARRIED FORWARD TO 1ST PAGE (ITEM 17(H)) K> $76,716.00 AUTHORIZED FOR LOCALREPODUCTION OPTIONAL FORM 348 (R-e 42006)

PREVIOUS EDITION NOTUSABLE s#.

P~bed by GS FR* (48 CFRI53.213(f)

CONTRACTOR ACCEPTANCE OF TASK ORDER NRC-HQ-20-14-T-0012 Acceptance of Task Order No: NRC-HQ-20-14-T-0012 should be made by having an official, authorized to bind your organization, execute two copies of this document in the space provided and return one copy to the Contracting Officer. You should retain the other copy for your records.

Accepted Task Order No. N C-HQ-20-14-T-0012:

Name R. B. Kalmbach Executive Director, Contracts Title 09/18/2014 Date 3

SECTION B - Supplies or Services/Prices NRCB010 BRIEF PROJECT TITLE AND WORK DESCRIPTION (a) The title of this project is "Review of the Calvert Cliffs Units 1 and 2 License Amendment Request (LAR) Pertaining to Risk-informed (RI) Technical Specification Task Force (TSTF)

Initiative 5b, "Risk-Informed Method for Control of Surveillance Frequencies," TSTF-425."

(b) Summary work description: The objective of this task order is to obtain technical assistance from the Southwest Research Institute's (SwRI) Center for Nuclear Waste Regulatory Analyses (CNWRA) to assist the staff in determining the acceptability of the Calvert Cliffs, Units 1 and 2, License Amendment Request.

PRICE/COST SCHEDULE PERIOD OF ?ERFORMANCGE'-Septetmber 22;,2014 .ýý-*Februar.28, 201.5

.L--'ININO. 'a-N*--D.ESCRIPTc!ON ,OF :`-ESTIMA *-  :-W IXEDi.PEE TOTAL SRIPLIESISERMICES'i ýCO.STI ~CPIFF.

00001 Review of Technical Reports for License Amendment Request Pertaining to Risk-Informed (RI)

Technical Specification Task Force (TSTF) Initiative 5b, "Risk-Informed Method for Control of Surveillance Frequencies," TSTF-425.

Total _ _ _$76,716.00 NRCBO40A CONSIDERATION AND OBLIGATION-COST-PLUS-FIXED-FEE ALTERNATE I (a) The total estimated cost to the Government for full performance of this contract is

$76,716.00 of which the sum of represents the estimated reimbursable costs, and of which 10 [epresents the W (b) There shall be no adjustment in the amount of the Contractor's fixed fee.

(c) The amount currently obligated b the Gov rnment with respect to this contract is

$76,716.00, of which the sum of represents the estimated reimbursable costs, and of which repres he ixed-fee.

(d) This is an incrementally-funded contract and FAR 52.232 "Limitation of Funds". applies.

(e) In accordance with FAR 52.216 Fixed Fee, it is the policy of the NRC to withhold payment of fee after payment of *ercent of the fee has been paid in order to protect the Government's interest. The amou of fixed-fee withheld from the contractor will not exceed percent of the total fee or qwhichever is less. Accordingly, the maximum amount of fixed-fee that may be held in reserve is 4

SECTION C - Description/Specifications Statement of Work Project

Title:

Review of the Calvert Cliffs Units 1 and 2 License Amendment Request (LAR)

Pertaining to Risk-Informed (RI) Technical Specification Task Force (TSTF)

Initiative 5b, "Risk-Informed Method for Control of Surveillance Frequencies,"

TSTF-425 Cost Center: 1128 Contract No.: NRC-HQ-50-14-E-0001 Task Assignment Control Numbers: MF4227, non-fee recoverable work, for Task I MF4065 for Unit 1 MF4066 for Unit 2 Budget & Reporting No.: 11-4-149 NRC Requisition Office: NRR NRC COR: Sara Lyons, Sara.Lyonsanrc..qov, (301) 415-2861 Alternate NRC COR: Bernard L. Grenier, Bernard.Grenier(Dnrc.,qov, (301) 415-2726 Fee Recoverable: Yes; all costs must be allocated to each specific TAC number in the actual amount which was spent on Task 1 or on each individual unit.

Contractor: CNWRA Type of Contract/Order: Cost Plus Fixed Fee Period of Performance: 9/22/2014 - 02/28/2015

1. BACKGROUND In 1992, the NRC issued the improved Standard Technical Specifications (STS) to clarify the content and form of requirements necessary to ensure safe operation of nuclear power plants in accordance with Section 50.36 of Title 10 of the Code of Federal Regulations (10 CFR 50.36). As the STS mature, necessary improvements are identified. One process used to initiate changes to the STS involves the industry-sponsored Technical Specifications Task Force (TSTF) submitting a proposed change or Traveler to the NRC for review, approval, and subsequent incorporation into the next revision of the STS. The NRC reviews the proposed change, with the end product being a model application, a model safety evaluation, and a review plan which licensees may use in subsequent LARs. Licensees applying to incorporate these proposed changes into their Technical Specifications must provide a plant specific justification acceptable to the staff in their LAR.

5

In 2007, the NRC issued the final safety evaluation (SE) for the Nuclear Energy Institute (NEI) Topical Report (TR) 04-10, Revision 1, "Risk-Informed Technical Specification Initiative 5b, Risk-Informed Method for Control of Surveillance Frequencies." This STS change provides a risk-informed methodology to identify, assess, implement, and monitor proposed changes to frequencies of surveillance requirements (SRs) of technical specifications (TSs). The initiative is intended to maintain and improve safety through incorporation of risk assessment and management techniques in the TSs, while reducing unnecessary burden.

The Office of Nuclear Reactor Regulation (NRR) is currently reviewing several risk-informed LARs and expects additional risk-informed LARs in fiscal years 2015 and 2016. Calvert Cliffs has submitted a RI-TSTF Initiative 5b LAR which is applicable to both units. The PRA Licensing Branch (APLA) is responsible for reviewing the Probabilistic Risk Assessment (PRA) portion of the LARs to make an independent assessment regarding PRA technical adequacy and the acceptability of the proposed amendment. Due to heavy workload in APLA, contractor assistance is required to support APLA so as to complete the technical review and develop the safety evaluation report (SER) for these LARs in a timely manner.

The metric which has been established for staff review and issuance of the SER is one year from receipt of the LAR in ADAMS. The Calvert Cliffs was accepted in ADAMS on May 1, 2014. The APLA SE date to the Division of Operating Reactor Licensing is January 2, 2015.

1. SCOPE OF WORK The scope of the work includes review of the Calvert Cliffs, Units 1 and 2, RI-TSTF Initiative 5b/TSTF-425 LAR for PRA quality and technical adequacy and preparation of the technical evaluation report (TER).

Objective The objective of this task order is to obtain technical assistance from the Southwest Research Institute's (SwRI) Center for Nuclear Waste Regulatory Analyses (CNWRA) to assist the staff in determining the acceptability of the Calvert Cliffs, Units 1 and 2, LAR.

2. SPECIFIC TASKS (WORK REQUIREMENTS AND SCHEDULE)

Tasks Completion Schedule

1. Gain familiarity with NRC processes specific to this Task Order.
a. Prepare for a kick-off meeting by reviewing applicable One week after the Documents and Standards (see Section 5). Travel to trip; the trip is to NRC HQ to participate in a kick-off meeting to discuss occur within two all aspects of the scope of the work, expectations, and weeks after award of other subjects pertinent to this type of work. Prepare a the task order.

trip report.

b. Travel to NRC HQ to participate in a review process One week after the assessment meeting to discuss the process, questions trip; the trip is to and potential improvements after completion of the first occur within two detailed TSTF-425 review. Prepare a trip report. weeks of completing Task 2, below.

6

3. SPECIFIC TASKS (WORK REQUIREMENTS AND SCHEDULE)

Tasks Completion Schedule

2. Based on the applicable documents and standards found in Section 4, perform the following tasks:
a. Review the layout, scope, and content of the LAR and One week after identify the NRC approved revision of TSTF-425 completion of referenced by the licensee in the LAR. Prepare a Subtask l.a.

technical letter report.

b. Identify any deviations from the approved TSTF-425 scope: Two weeks after completion of (1) Compare the TSTF-425 LAR with the Safety Evaluation Subtask 2.a.

Report (SER) issued for the appropriate revision of NEI 04-10, "Risk-Informed Technical Specification Initiative 5B, Risk-Informed Method for Control of Surveillance Frequencies," and itemize any deviations.

(2) Where possible, summarize the reason for the deviation (as identified by the licensee) along with the deviation.

c. TSTF-425 identifies the specific STS Surveillance One week after Frequencies (SFs) to be relocated. Identify any plant- completion of specific frequencies proposed to be relocated which are Subtask 2.b.

not contained within the STS scope.1 Determine if each relocated frequency is solely time-based, and not based on events, equipment conditions, or other parameters.

TSTF-425, Section 2.0 describes the exceptions to relocating surveillance frequencies. Prepare a technical letter report.

d. Review the Technical Adequacy of the Internal Events Three weeks after Probabilistic Risk Assessment (PRA) Model. completion of Subtask 1.a; see (1) Confirm that the licensee has completed a peer review assumptions and of their model in accordance with Regulatory Guide understandings (RG) 1.200. section, below.

(2) Review all facts and observations (F&Os), including any identified as "documentation issue only."

Evaluate the disposition of the F&O for the TSTF-425 program and determine if proposed sensitivity analyses are reasonable. Identify the need for additional or clarifying information (RAIs 2 ) which are not necessarily limited to F&Os, but addresses the PRA technical 1 SFs which are identical with the TSTF-425 scope, or which are not relocated in the plant-specific implementation of TSTF-425, do not require review.

2 See Section 10 for guidance in the preparation of RAIs.

7

3. SPECIFIC TASKS (WORK REQUIREMENTS AND SCHEDULE) (CONTINUED) adequacy of the Internal Events PRA model. An example may be an RAI related to peer review(s).

Another example may be assessing the acceptability of a capability category I supporting requirement for the TSTF-425 program. Prepare a technical letter report.

e. Given that the licensee is permitted to use PRA or other One week after methods to address seismic, fire, other external events completion of and shutdown events for making SF changes, identify Subtask 2.d.

the method by which the licensee is addressing other hazard groups. Identify if the method requires a peer-reviewed PRA model for a detailed analysis or if only qualitative and bounding analyses will be considered.

Identify if the method considers the current as-built, as-operated plant. Confirm that the method identified is consistent with the NRC approved revision of TSTF-425 referenced by the licensee in the LAR. Identify any deviations from this guidance and provide a technical determination of the significance based on available information. Identify the need for additional or clarifying information. Prepare a technical letter report.

f. Confirm that the new program in TS Administrative One week after Controls is identical to the program in TSTF-425, except completion of the plant specific numbering of the TS program and Subtask 2.e.

referenced surveillance requirements. Identify any deviations, and the need for additional or clarifying information. Prepare a technical letter report.

g. Identify any open items in the TER and corresponding draft RAIs.

(1) Draft TER and RAIs. Review the TSTF-425 Model One week after SER and use it as the basis for developing the TER. completion of Subtask 2.f.

(2) Incorporate NRC comments and prepare the final Two weeks after draft TER and RAIs. receipt of NRC comments.

3. Using the same steps as in Task 2, review the licensee Two weeks from supplement including the RAI responses (depending on receipt of the RAI the content of the supplement) and determine if the responses.

response adequately addresses the RAI. If the RAI response adequately addresses the RAI, update the TER.

If the response does not adequately address the RAI, develop an additional RAI. Prepare a technical letter report.

8

3. SPECIFIC TASKS (WORK REQUIREMENTS AND SCHEDULE)
4. After receipt of the last RAI responses(s), update the TER.

If the response does not adequately address the RAI, list the item as an open item in the TER.

a. Draft TER. Two weeks after receipt of the last RAI response(s).
b. Incorporate NRC comments and prepare the final TER. Two weeks after receipt of NRC comments.
3. APPLICABLE DOCUMENTS AND STANDARDS Technical References
  • Technical Specification Task Force, letter and enclosure to U.S. Nuclear Regulatory Commission, Transmittal of TSTF-425, Revision 3, "Relocate Surveillance Frequencies to Licensee Control-RITSTF Initiative 5b," dated March 18, 2009 (ADAMS Accession No. ML090850642).

o Nuclear Energy Institute, NEI 04-10, Revision 1, "Risk-Inforned Technical Specifications Initiative 5b, Risk-informed Method for Control of Surveillance Frequencies," April 2007 (ADAMS Accession No. ML071360456).

  • Letter from H. Hieh (NRC) to T. Pietrangelo (NEI), "Final Safety Evaluation for Nuclear Energy Institute (NEI) Industry Guidance Document NEI 04-10, Revision 0, Risk-Informed Technical Specifications Initiative 5B, Risk-Informed Method for Control of Surveillance Frequencies," dated September 28, 2006, Accession No.ML062700012.

0 Nieh, H. K., U.S. Nuclear Regulatory Commission, letter to Biff Bradley, Nuclear Energy Institute, "Final Safety Evaluation for Nuclear Energy Institute (NEI) Topical Report (TR) 04-10, Revision 1, 'Risk-Informed Technical Specifications Initiative 5B, Risk-Informed Method for Control of Surveillance Frequencies'," dated September 19, 2007 (ADAMS Accession No. ML072570267).

a U.S. Nuclear Regulatory Commission, Regulatory Guide 1.174, Revision 2, "An Approach for Using Probabilistic Risk Assessment in Risk-Informed Decisions on PlantSpecific Changes to the Licensing Basis," May 2011 (ADAMS Accession No. ML100910006).

  • U.S. Nuclear Regulatory Commission, Regulatory Guide 1.177, Revision 1, "An Approach for Plant-Specific, Risk-Informed Decisionmaking: Technical Specifications,"

May 2011 (ADAMS Accession No. ML100910008).

9

4. APPLICABLE DOCUMENTS AND STANDARDS (CONTINUED)
  • U.S. Nuclear Regulatory Commission, NUREG-0800, Standard Review Plan, Section 16.1, Revision 1, "Risk-lnformed Decision Making: Technical Specifications," March 2007 (ADAMS Accession No. ML070380228).

" U.S. Nuclear Regulatory Commission, NUREG-0800, Standard Review Plan, Section 19.1, Revision 3, "Determining the Technical Adequacy of Probabilistic Risk Assessment Results for Risk-Informed Activities," September 2012 (ADAMS Accession No. ML12193A107).

4. DELIVERABLES AND DELIVERY SCHEDULE Technical Reporting Requirements
1. At the completion of Task 1 .a, submit a trip report that contains a brief summary of the discussions and any highlights or challenges of the upcoming work.
2. At the completion of Task 1.b, submit a trip report that contains a brief summary of the discussions.
3. At the completion of Subtask 2.a., submit a technical letter report that contains a summary of the work performed to include the NRC approved revision of TSTF-425 referenced by the licensee in the LAR.
4. At the completion of Subtask 2.b., submit a technical letter report that contains a summary of the work performed to include any deviations from the approved TSTF-425 scope, and a summary of the reason for the deviation (as identified by the licensee),

where possible.

5. At the completion of Subtask 2.c, submit a technical letter report that contains a summary of the work performed to include identification of any plant-specific frequencies proposed to be relocated which are not contained within the STS scope.
6. At the completion of Subtask 2.d, submit a technical letter report that contains a list of the RAIs and the regulatory basis for the RAI and include a discussion on PRA technical adequacy for the resolution of each F&O and for the PRA model as a whole upon completing the evaluation of each F&O.
7. At the completion of Task 2.e, submit a technical letter report that contains a summary of the work performed to include a summary of the methods used to address external events and shutdown events, if the method considers the current as-built, as-operated plant, and any deviations from the approved revision of TSTF-425 referenced by the licensee in the LAR.
8. At the completion of Task 2.f, submit a technical letter report that contains a summary of the work performed to include a summary of and deviations of the 10

new program in TS Administrative Controls from the approved revision of TSTF-425 referenced by the licensee in the LAR.

5. DELIVERABLES AND DELIVERY SCHEDULE
9. At the completion of Task 2.g.(1) and 2.g.(2), submit a TER and RAIs, draft and final, as appropriate, that are developed in accordance with the format, outline, and content provided by the NRC COR.
10. At the completion of Task 3, submit a TER and RAIs (if needed), draft and final, as appropriate, that are developed in accordance with the format, outline, and content provided by the NRC COR.
11. At the completion of Task 4.a and 4.b, submit an updated TER, draft and final, respectively.

Monthly Letter Status Reporting (MLSR) Requirements MLSRs will be prepared in accordance with the base EWC contract.

The MLSRs must contain a License Fee Recovery Reporting Section which lists the TAC numbers for each plant and the associated costs against those TAC numbers for the reporting period.

6. REQUIRED LABOR CATEGORIES (Except for Information Techhnoloqy' Services)

One Principal Investigator (PI)/ Senior Risk Analyst who possesses experience and working knowledge in the areas of (1) Use of PRA at U.S. nuclear power plants; and (2) U.S. nuclear power plant systems and operations.

Two staff-level Nuclear Engineers or Risk Analysts who possesses in-depth knowledge of U.S. nuclear power plant systems and operations.

5. GOVERNMENT-FURNISHED PROPERTY/MATERIALS The ADAMS Accession No. for the Calvert Cliffs TSTF-425 LAR is ML14125A015.

NOTE: Some of these documents contain proprietary information and must be safeguarded against unauthorized disclosure. After completion of work, the documents should either be destroyed or returned to NRC. Ifthey are destroyed, please confirm this in an E-mail to the COR and include the date and manner in which the documents were destroyed.

The NRC COR will provide those NRC documents related to licensing activities (for example, any Non-Publicly available SERs, audit reports, and related documents) that are readily available. The NRC COR will provide access to training material pertinent to the LAR reviews or other NRC documents and docketed correspondence on related issues.

The CNWRA staff shall identify any additional NRC documentation that is needed and the COR will determine whether these will be provided by the NRC or obtained directly by the CNWRA from ADAMS, NRC public document room or the NRC website at www.nrc.qov.

11

A

6. PLACE OF PERFORMANCE This work will be performed at the contractor's site, with the exception of trips to the plant site and Government site as needed.
7. SPECIAL CONSIDERATIONS Assumptions and Understanding The level of effort for each Task was determined based on previous NRC experience from reviewing LARs of similar scope. However, it is expected that the actual number of hours will vary depending on the quality and scope of the specific TSTF-425 LAR to be reviewed.
8. SPECIAL CONSIDERATIONS Assumptions and Understanding The level of effort assumption for Task 1.a, for each traveler, is based on forty hours of preparation, four hours to travel to the meeting site, 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> for the meeting and four hours for return travel and documentation. It is assumed that there will be three travelers. The level of effort assumption for task 1.b, for each traveler, is based on four hours to travel to the meeting site, 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> for the meeting and four hours for return travel and documentation.

It is understood that Subtask 2.d. can be done in parallel with Subtasks 2.b. and 2.c.

The level of effort assumption for Task 3 assumes two rounds of RAIs. Each round of RAIs is assumed to take 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> to review, including drafting any necessary follow-up RAIs and updating the draft TER.

It is understood that the level of effort for each Task contains sufficient effort to conduct telephone conference calls with the NRC staff. Such phone calls, for example, might be arranged by the NRC COR with the Licensing Project Manager and other NRC staff to discuss the RAls and to reach an understanding with the licensee. Comments might be provided to the contractor such that the RAls may have to be resubmitted by the contractor.

Guidance for Preparing Requests for Additional Information (RAls)

Additional information necessary to resolve open or unresolved items identified during the review of the information associated with the LAR needs to be requested in a manner that is unambiguous, has an adequate basis, and is necessary for the safety review. RAls should be developed using the following guidance:

1. An RAI should include the appropriate basis for requesting the information. The basis should explain why the information is needed, including how it will be used to help make a reasonable assurance finding.

12

2. Judgmental language should be avoided.
a. Questions should not make adequacy determinations.
b. Words like "unacceptable" or "deficient" and "deviation" should be avoided. Likewise, avoid using phrases like "the staff will require"since it is premature to require anything when asking questions.
3. Questions should be focused, not open-ended.
a. The RAI should be in the form of a question or an imperative to provide what is needed to complete the review. When the reviewer needs specific information or the underlying issue may not be apparent, the RAI should clearly identify the information requested and/or the underlying issue.
b. "If... then" questions (questions that could lead to follow-on questions) should provide both parts of the question.

Guidance for Preparinq Requests for Additional Information (RAls) (Continued)

4. For follow-up RAIs, reference the original RAI, the date of the letter in which the licensee responded to the RAI, and the ADAMS Accession Number of the letter.

To ensure that the response appropriately addresses the RAI, the licensee may submit a draft response (which the NRC dockets in the Agency-Wide Documents Access and Management System (ADAMS)) and may request a follow-up teleconference and/or meeting.

9. TRAVEL Two three-person, two-day trips to the NRC headquarters office in Rockville, MD.
10. SECURITY This work will be UNCLASSIFIED; it will only contain proprietary information.

13

SECTION D - Packaging and Marking NRCDO20 BRANDING The Contractor is required to use the statement below in any publications, presentations, articles, products, or materials funded under this contract/order, to the extent practical, in order to provide NRC with recognition for its involvement in and contribution to the project. If the work performed is funded entirely with NRC funds, then the contractor must acknowledge that information in its documentation/presentation.

Work Supported by the U.S. Nuclear Regulatory Commission (NRC), Office of Nuclear Reactor Regulation, under Contract/order number NRC-HQ-50-14-E-0001/NRC-HQ-20-14-T-0012.

(End of Clause)

NRCD010 PACKAGING AND MARKING (a) The Contractor shall package material for shipment to the NRC in such a manner that will ensure acceptance by common carrier and safe delivery at destination. Containers and closures shall comply with the Surface Transportation Board, Uniform Freight Classification Rules, or regulations of other carriers as applicable to the mode of transportation.

(b) On the front of the package, the Contractor shall clearly identify the contract number under which the product is being provided.

(c) Additional packaging andlor marking requirements are as follows: None.

(End of Clause) 14

SECTION E - Inspection and Acceptance 2052.215-71 PROJECT OFFICER AUTHORITY (OCT 1999)

(a) The contracting officer's authorized representative hereinafter referred to as the project officer for this contract is:

Name: Sara Lyons Address: Mail Stop: OWFN/10 C15 Washington, DC 20555 Telephone Number: 301-415-2861 Sara.lyons(n rc.qov Alternate COR:

Name: Bernard Grenier Mail Stop: OWFN 13 E-10 (301)-415-2726 Bemard.orenier(anrc.,ov (b) Performance of the work under this contract is subject to the technical direction of the NRC project officer. The term technical direction is defined to include the following:

(1) Technical direction to the contractor which shifts work emphasis between areas of work or tasks, authorizes travel which was unanticipated in the Schedule (i.e., travel not contemplated in the Statement of Work or changes to specific travel identified in the Statement of Work), fills in details, or otherwise serves to accomplish the contractual statement of work.

(2) Provide advice and guidance to the contractor in the preparation of drawings, specifications, or technical portions of the work description.

(3) Review and, where required by the contract, approve technical reports, drawings, specifications, and technical information to be delivered by the contractor to the Government under the contract.

(c) Technical direction must be within the general statement of work stated in the contract. The project officer does not have the authority to and may not issue any technical direction which:

(1) Constitutes an assignment of work outside the general scope of the contract.

(2) Constitutes a change as defined in the "Changes" clause of this contract.

(3) In any way causes an increase or decrease in the total estimated contract cost, the fixed fee, if any, or the time required for contract performance.

(4) Changes any of the expressed terms, conditions, or specifications of the contract.

(5) Terminates the contract, settles any claim or dispute arising under the contract, or issues any unilateral directive whatever.

(d) All technical directions must be issued in writing by the project officer or must be confirmed by the project officer in writing within ten (10) working days after verbal issuance. A copy of the 15

written direction must be furnished to the contracting officer. A copy of NRC Form 445, Request for Approval of Official Foreign Travel, which has received final approval from the NRC must be furnished to the contracting officer.

(e) The contractor shall proceed promptly with the performance of technical directions duly issued by the project officer in the manner prescribed by this clause and within the project officer's authority under the provisions of this clause.

(f) If, in the opinion of the contractor, any instruction or direction issued by the project officer is within one of the categories defined in paragraph (c) of this section, the contractor may not proceed but shall notify the contracting officer in writing within five (5) working days after the receipt of any instruction or direction and shall request that contracting officer to modify the contract accordingly. Upon receiving the notification from the contractor, the contracting officer shall issue an appropriate contract modification or advise the contractor in writing that, in the contracting officers opinion, the technical direction is within the scope of this article and does not constitute a change under the "Changes" clause.

(g) Any unauthorized commitment or direction issued by the project officer may result in an unnecessary delay in the contractors performance and may even result in the contractor expending funds for unallowable costs under the contract.

(h) A failure of the parties to agree upon the nature of the instruction or direction or upon the contract action to be taken with respect to the instruction or direction is subject to 52.233 Disputes.

(i) In addition to providing technical direction as defined in paragraph (b) of the section, the project officer shall:

(1) Monitor the contractors technical progress, including surveillance and assessment of performance, and recommend to the contracting officer changes in requirements.

(2) Assist the contractor in the resolution of technical problems encountered during performance.

(3) Review all costs requested for reimbursement by the contractor and submit to the contracting officer recommendations for approval, disapproval, or suspension of payment for supplies and services required under this contract.

(End of Clause) 16

SECTION F - Deliveries or Performance NRCF032 TASK/DELIVERY ORDER PERIOD OF PERFORMANCE (SEP 2013)

This order shall commence on September 22, 2014 and will expire on February 28, 2015.

(End of Clause)

NRCF010 PLACE OF DELIVERY-REPORTS The items to be furnished hereunder shall be delivered, with all charges paid by the Contractor, to:

a. Name: Sara Lyons (1 Electronic Copy)

Contracting Officer's Representative (COR)

Address: Sara. Lyons@nrc.gov

b. Name: Hugo Alcantara (1 Electronic Copy)

Contract Specialist (CS)

Address: Hugo.Alcantara@nrc.gov (End of Clause)

SECTION G - Contract Administration Data NRCG030 ELECTRONIC PAYMENT (SEP 2014)

The Debt Collection Improvement Act of 1996 requires that all payments except IRS tax refunds be made by Electronic Funds Transfer. Payment shall be made in accordance with FAR 52.232-33, entitled "Payment by Electronic Funds-Central Contractor Registration".

To receive payment, the contractor shall prepare invoices in accordance with NRC's Billing Instructions. Claims shall be submitted on the payee's letterhead, invoice, or on the Government's Standard Form 1034, "Public Voucher for Purchases and Services Other than Personal," and Standard Form 1035, "Public Voucher for Purchases Other than Personal -

Continuation Sheet." The preferred method of submitting invoices is electronically to:

NRCPayments*,nrc..ov.

(End of Clause) 17

SECTION H - Special Contract Requirements 2052.215-70 KEY PERSONNEL (JAN 1993)

(a) The following individuals are considered to be essential to the successful performance of the work hereunder:

Name Title Lane Howard Program Manager Robert Fosdick Principal Investigator Robert Schmidt Consultant The contractor agrees that personnel may not be removed from the contract work or replaced without compliance with paragraphs (b) and (c) of this section.

(b) If one or more of the key personnel, for whatever reason, becomes, or is expected to become, unavailable for work under this contract for a continuous period exceeding 30 work days, or is expected to devote substantially less effort to the work than indicated in the proposal or initially anticipated, the contractor shall immediately notify the contracting officer and shall, subject to the concurrence of the contracting officer, promptly replace the personnel with personnel of at least substantially equal ability and qualifications.

(c) Each request for approval of substitutions must be in writing and contain a detailed explanation of the circumstances necessitating the proposed substitutions. The request must also contain a complete resume for the proposed substitute and other information requested or needed by the contracting officer to evaluate the proposed substitution. The contracting officer and the project officer shall evaluate the contractor's request and the contracting officer shall promptly notify the contractor of his or her decision in writing.

(d) If the contracting officer determines that suitable and timely replacement of key personnel who have been reassigned, terminated, or have otherwise become unavailable for the contract work is not reasonably forthcoming, or that the resultant reduction of productive effort would be so substantial as to impair the successful completion of the contract or the service order, the contract may be terminated by the contracting officer for default or for the convenience of the Government, as appropriate. If the contracting officer finds the contractor at fault for the condition, the contract price or fixed fee may be equitably adjusted downward to compensate the Government for any resultant delay, loss, or damage.

(End of Clause) 18

2052.215-78 TRAVEL APPROVALS AND REIMBURSEMENT (OCT 1999) - ALTERNATE I (OCT 1999)

(a) Total expenditure for travel may not exceed $5,379.00 without the prior approval of the contracting officer.

(b) All foreign travel must be approved in advance by the NRC on NRC Form 445, Request for Approval of Official Foreign Travel, and must be in compliance with FAR 52.247-63 Preference for U.S. Flag Air Carriers. The contractor shall submit NRC Form 445 to the NRC no later than 30 days prior to the commencement of travel.

(c) The contractor will be reimbursed only for travel costs incurred that are directly related to this contract and are allowable subject to the limitations prescribed in FAR 31.205-46.

(d) It is the responsibility of the contractor to notify the contracting officer in accordance with the FAR Limitations of Cost clause of this contract when, at any time, the contractor learns that travel expenses will cause the contractor to exceed the travel ceiling amount identified in paragraph (a) of this clause.

(e) Reasonable travel costs for research and related activities performed at State and nonprofit institutions, in accordance with Section 12 of Pub. L. 100-679, must be charged in accordance with the contractor's institutional policy to the degree that the limitations of Office of Management and Budget (OMB) guidance are not exceeded. Applicable guidance documents include OMB Circular A-87, Cost Principles for State and Local Governments; OMB Circular A-122, Cost Principles for Nonprofit Organizations; and OMB Circular A-21, Cost Principles for Educational Institutions.

(End of Clause)

NRCH480 USE OF AUTOMATED CLEARING HOUSE (ACH) ELECTRONIC PAYMENTIREMITTANCE ADDRESS The Debt Collection Improvement Act of 1996 requires that all Federal payments except IRS tax refunds be made by Electronic Funds Transfer. It is the policy of the Nuclear Regulatory Commission to pay government vendors by the Automated Clearing House (ACH) electronic funds transfer payment system. Item 15C of the Standard Form 33 may be disregarded.

(End of Clause) 19

NRCH470 GREEN PURCHASING (SEP 2013)

(a) In furtherance of the sustainable acquisition goals included in Executive Order 13514, "Federal Leadership in Environmental, Energy, and Economic Performance," products and services acquired under this contract/order shall be energy-efficient (Energy Star or Federal Energy Management Program (FEMP) designated), water-efficient, biobased, environmentally preferable (e.g., Electronic Product Environmental Assessment Tool (EPEAT) certified), non-ozone depleting, recycled content, and non-toxic or less toxic alternatives, to the maximum extent practicable in meeting NRC contractual requirements.

(b) See NRC's Green Purchasing Plan (GPP) at:

http://pbadupws.nrc..qov/docs/ML1219//ML12191A130.pdf and the General Service Administration's (GSA) Green Procurement Compilation at:

hftp :/Awww.qsa.qov/portal/content/l 98257.

(c) The contractor shall flow down this clause into all subcontracts and other agreements that relate to performance of this contract/order.

(End of Clause)

NRCH410 WHISTLEBLOWER PROTECTION FOR NRC CONTRACTOR AND SUBCONTRACTOR EMPLOYEES (a) The U.S. Nuclear Regulatory Commission (NRC) contractor and its subcontractor are subject to the Whistleblower Employee Protection public law provisions as codified at 42 U.S.C.

5851. NRC contractor(s) and subcontractor(s) shall comply with the requirements of this Whistleblower Employee Protection law, and the implementing regulations of the NRC and the Department of Labor (DOL). See, for example, DOL Procedures on Handling Complaints at 29 C.F.R. Part 24 concerning the employer obligations, prohibited acts, DOL procedures and the requirement for prominent posting of notice of Employee Rights at Appendix A to Part 24 entitled: "Your Rights Under the Energy Reorganization Act".

(b) Under this Whistleblower Employee Protection law, as implemented by regulations, NRC contractor and subcontractor employees are protected from discharge, reprisal, threats, intimidation, coercion, blacklisting or other employment discrimination practices with respect to compensation, terms, conditions or privileges of their employment because the contractor or subcontractor employee(s) has provided notice to the employer, refused to engage in unlawful practices, assisted in proceedings or testified on activities concerning alleged violations of the Atomic Energy Act of 1954 (as amended) and the Energy Reorganization Act of 1974 (as amended).

(c) The contractor shall insert this or the substance of this clause in any subcontracts involving work performed under this contract.

(End of Clause) 20

NRCH400 SECURITY REQUIREMENTS RELATING TO THE PRODUCTION OF REPORT(S)

OR THE PUBLICATION OF RESULTS UNDER CONTRACTS, AGREEMENTS, AND GRANTS Review and Approval of Reports (a) Reporting Requirements. The contractor/grantee shall comply with the terms and conditions of the contract/grant regarding the contents of the draft and final report, summaries, data, and related documents, to include correcting, deleting, editing, revising, modifying, formatting, and supplementing any of the information contained therein, at no additional cost to the NRC.

Performance under the contract/grant will not be deemed accepted or completed until it complies with the NRC's directions. The reports, summaries, data, and related documents will be considered draft until approved by the NRC. The contractor/grantee agrees that the direction, determinations, and decisions on approval or disapproval of reports, summaries, data, and related documents created under this contract/grant remain solely within the discretion of the NRC.

(b) Publication of Results. Prior to any dissemination, display, publication, or release of articles, reports, summaries, data, or related documents developed under the contract/grant, the contractor/grantee shall submit them to the NRC for review and approval. The contractor/

grantee shall not release, disseminate, display or publish articles, reports, summaries, data, and related documents, or the contents therein, that have not been reviewed and approved by the NRC for release, display, dissemination or publication. The contractor/grantee agrees to conspicuously place any disclaimers, markings or notices, directed by the NRC, on any articles, reports, summaries, data, and related documents that the contractor/grantee intends to release, display, disseminate or publish to other persons, the public, or any other entities. The contractor/grantee agrees, and grants, a royalty-free, nonexclusive, irrevocable worldwide license to the government, to use, reproduce, modify, distribute, prepare derivative works, release, display or disclose the articles, reports, summaries, data, and related documents developed under the contract/grant, for any governmental purpose and to have or authorize others to do so.

(c) Identification/Marking of Sensitive Unclassified Non-Safeguards Information (SUNSI) and Safeguards Information (SGI). The decision, determination, or direction by the NRC that information possessed, formulated or produced by the contractor/grantee constitutes SUNSI or SGI is solely within the authority and discretion of the NRC. In performing the contract/grant, the contractor/grantee shall clearly mark SUNSI and SGI, to include for example, QUO-Allegation Information or OUO-Security Related Information on any reports, documents, designs, data, materials, and written information, as directed by the NRC. In addition to marking the information as directed by the NRC, the contractor shall use the applicable NRC cover sheet (e.g., NRC Form 461 Safeguards Information) in maintaining these records and documents. The contractor/grantee shall ensure that SUNSI and SGI is handled, maintained and protected from unauthorized disclosure, consistent with NRC policies and directions. The contractor/grantee shall comply with the requirements to mark, maintain, and protect all information, including documents, summaries, reports, data, designs, and materials in accordance with the provisions of Section 147 of the Atomic Energy Act of 1954 as amended, its implementing regulations (10 CFR 73.21), Sensitive Unclassified Non-Safeguards and Safeguards Information policies, and NRC Management Directives and Handbooks 12.5, 12.6 and 12.7.

(d) Remedies. In addition to any civil, criminal, and contractual remedies available under the applicable laws and regulations, failure to comply with the above provisions, and/or NRC directions, may result in suspension, withholding, or offsetting of any payments invoiced or 21

0 claimed by the contractor/grantee.

(e) Flowdown. If the contractor/grantee intends to enter into any subcontracts or other agreements to perform this contract/grant, the contractor/grantee shall include all of the above provisions in any subcontracts or agreements.

(End of Clause) 22

a 4 SECTION J - List of Documents, Exhibits and Other Attachments BILLING INSTRUCTIONS FOR COST-REIMBURSEMENT TYPE CONTRACTS (MAY 2013)

General: During performance and through final payment of this contract, the contractor is responsible for the accuracy and completeness of data within the System for Award Management (SAM) database and for any liability resulting from the Government's reliance on inaccurate or incomplete SAM data.

The contractor shall prepare invoices/vouchers for reimbursement of costs in the manner and format described herein. FAILURE TO SUBMIT INVOICES/VOUCHERS IN ACCORDANCE WITH THESE INSTRUCTIONS MAY RESULT IN REJECTION OF THE INVOICENOUCHER AS IMPROPER.

Standard Forms: Reimbursement requests shall be submitted on the payee's letterhead, invoice/voucher, or on the Govemment's Standard Form 1034, "Public Voucher for Purchases and Services Other than Personal," and Standard Form 1035, "Public Voucher for Purchases Other than Personal-Continuation Sheet."

Electronic InvoiceNoucher Submissions: The preferred method of submitting invoices/vouchers is electronically to the U.S. Nuclear Regulatory Commission, via email to:

NRCPayments(*nrc._oov.

Hard-Copy InvoiceNoucher Submissions: If you submit a hard-copy of the invoice/voucher, a signed original and supporting documentation shall be submitted to the following address:

NRC Payments U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mailstop 03-E17A Rockville, MD 20852-2738 Purchase of Capital Property: ($50,000 or more with life of one yearor longer)

Contractors must report to the Contracting Officer, electronically, any capital property acquired with contract funds having an initial cost of $50,000 or more, in accordance with procedures set forth in NRC Management Directive (MD) 13.1, IV, C -"Reporting Requirements" (revised 2/16/2011).

Agency Payment Office: Payment will continue to be made by the office designated in the contract in Block 12 of the Standard Form 26, or Block 25 of the Standard Form 33, whichever is applicable.

Frequency: The contractor shall submit requests for reimbursement once each month, unless otherwise authorized by the Contracting Officer.

Format: InvoicesNouchers shall be submitted in the format depicted on the attached sample form entitled "InvoiceNoucher for Purchases and Services Other Than Personal". Alternate formats are permissible only if they address all requirements of the Billing Instructions. The 23

instructions for preparation and itemization of the invoice/voucher are included with the sample form.

Task Order Contracts: The contractor must submit a separate invoice/voucher for each individual task order with detailed cost information. This includes all applicable cost elements and other items discussed in paragraphs (a) through (s) of the attached instructions. In addition, the invoice/voucher must specify the contract number, and the NRC-assigned task/delivery order number.

Billing of Costs after Expiration of Contract: If costs are incurred during the contract period and invoiced after the contract has expired, you must cite the period during which these costs were incurred. To be considered a proper expiration invoice/voucher, the contractor shall clearly mark it "EXPIRATION INVOICE" or "EXPIRATION VOUCHER".

Final invoices/vouchers shall be marked "FINAL INVOICE" or "FINAL VOUCHER".

Currency: InvoicesNouchers must be expressed in U.S. Dollars.

Supersession: These instructions supersede previous Billing Instructions for Cost-Reimbursement Type Contracts (July 2011).

24

q INVOICEIVOUCHER FOR PURCHASES AND SERVICES OTHER THAN PERSONAL (SAMPLE FORMAT - COVER SHEET)

1. Official Agency Billing Office NRC Payments U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mailstop 03-E17A Rockville, MD 20852-2738
2. InvoiceNoucher Information
a. Payee's DUNS Number or DUNS+4. The Payee shall include the Payee's Data Universal Number (DUNS) or DUNS+4 number that identifies the Payee's name and address. The DUNS+4 number is the DUNS number plus a 4-character suffix that may be assigned at the discretion of the Payee to identify alternative Electronic Funds Transfer (EFT) accounts for the same parent concern.
b. Taxpayer Identification Number. The Payee shall include the Payee's taxpayer identification number (TIN) used by the Internal Revenue Service (IRS) in the administration of tax laws.

(See IRS Web site:

httD://www.irs.gov/Businesses/Small-Businesses-&-Self-EmDloved/Employer-ID-Numbers-(EINsV).

c. Payee's Name and Address. Show the name of the Payee as it appears in the contract and its correct address. If the Payee assigns the proceeds of this contract as provided for in the assignment of claims terms of this contract, the Payee shall require as a condition of any such assignment, that the assignee shall register separately in the System for Award Management (SAM) database at http://sam.gov and shall be paid by EFT in accordance with the terms of this contract. See Federal Acquisition Regulation (FAR) 52.232-33(g) Payment by Electronic Funds Transfer - Central Contractor Registration (October 2003).
d. Contract Number. Insert the NRC contract number (including Enterprise-wide Contract (EWC)), GSA Federal Supply Schedule (FSS), Governmentwide Agency Contract (GWAC) number, or Multiple Agency Contract (MAC) number, as applicable.
e. Task Order Number. Insert the task/delivery order number (If Applicable). Do not include more than one task order per invoice or the invoice may be rejected as improper.
f. InvoiceNoucher. The appropriate sequential number of the invoice/voucher, beginning with 001 should be designated. Contractors may also include an individual internal accounting number, if desired, in addition to the 3-digit sequential number.
g. Date of InvoiceNoucher. Insert the date the invoice/voucher is prepared.
h. Billingq Period. Insert the beginning and ending dates (day, month, year) of the period during which costs were incurred and for which reimbursement is requested.
i. Description of Deliverables. Provide a brief description of supplies or services, quantity, unit cost, and total cost.

25

-A

j. Work Completed. Provide a general summary description of the services performed or products submitted for the invoice period and specify the section or Contract Line Item Number (CLIN) or SubCLIN in the contract pertaining to the required deliverable(s).
k. Shipping. Insert weight and zone of shipment, if shipped by parcel post.

I. Charges for freight or express shipments. Attach prepaid bill if shipped by freight or express.

m. Instructions. Include instructions to consignee to notify the Contracting Officer of receipt of shipment.
n. For Indefinite Delivery contracts, the final invoice/voucher shall be marked "FINAL INVOICE" or "FINAL VOUCHER".
o. Direct Costs. Insert the amount billed for the following cost elements, adjustments, suspensions, and total amounts, for both the current billing period and for the cumulative period (from contract inception to end date of this billing period).

(1) Direct Labor. This consists of salaries and wages paid (or accrued) for direct performance of the contract itemized as follows:

Labor Hours Cumulative Category Billed Rate Total Hours Billed (2) Fringe Benefits. This represents fringe benefits applicable to direct labor and billed as a direct cost. Where a rate is used indicate the rate. Fringe benefits included in direct labor or in other indirect cost pools should not be identified here.

(3) Contractor-acquired property ($50,000 or more). List each item costing $50,000 or more and having a life expectancy of more than one year. List only those items of equipment for which reimbursement is requested. For each such item, list the following (as applicable): (a) an item description, (b) manufacturer, (c) model number, (d) serial number, (e) acquisition cost, (f) date of purchase, and (g) a copy of the purchasing document.

(4) Contractor-acquired property (under $50,000), Materials, and Supplies. These are equipment other than that described in (3) above, plus consumable materials and supplies. List by category. List items valued at $1,000 or more separately. Provide the item number for each piece of equipment valued at $1,000 or more.

(5) Premium Pay. This enumeration in excess of the basic hourly rate. (Requires written approval of the Contracting Officer.)

(6) Consultant Fee. The supporting information must include the name, hourly or daily rate of the consultant, and reference the NRC approval (if not specifically approved in the original contract).

(7) Travel. Total costs associated with each trip must be shown in the following format:

Start Date Destination Costs From To From To $

26

I (Must include separatedetailedcosts for airfare, per diem, and other transportation expenses. All costs must be adequately supportedby copies of receipts or other documentation.)

(8) Subcontracts. Include separate detailed breakdown of all costs paid to approved subcontractors during the billing period.

(9) Other Costs. List all other direct costs by cost element and dollar amount separately.

p. Indirect Costs (Overhead and General and Administrative Expense). Cite the formula (rate and base) in effect in accordance with the terms of the contract, during the time the costs were incurred and for which reimbursement is requested.
q. Fixed-Fee. If the contract provides for a fixed-fee, it must be reimbursed as indicated in the contract. Cite the formula or method of computation. Include this information as it applies to individual task orders as well.

(1) The NRC will withhold payment of 15% of the negotiated contract fixed-fee amount, not to exceed $100,000.

(2) If the fee withholding amount has reached $100,000, the contractor may resume billing the NRC for the balance of its fee under subsequent invoices for work completed.

(3) Any fee amounts withheld by the NRC will be paid to the contractor during contract closeout in increments, following the submission/settlement of indirect rate proposals in accordance with FAR 52.216-8, "Fixed Fee" (JUN 2011).

r. Total Amount Billed. Insert columns for total amounts for the current and cumulative periods.
s. Adiustments. Insert columns for any adjustments, including outstanding suspensions for deficient or defective products or nonconforming services, for the current and cumulative periods.
t. Grand Totals.

27

3. Sample InvoiceNoucher Information Sample InvoiceNoucher Information (Supporting Documentation must be attached)

This invoice/voucher represents reimbursable costs for the billing period from-through.___

Amount Billed Current Period Cumulative (a) Direct Costs (1) Direct labor $ $

(2) Fringe benefits (% of direct labor) $ $_

(3) Government property ($50,000 or more) $ $

(4) Government property, Materials, and Supplies (under $50,000 per item) $. $

(5) Premium pay (NRC approved overtime) $ $_

(6) Consultants Fee $ $

(7) Travel $ $

(8) Subcontracts $_ $

(9) Other costs $ $_

Total Direct Costs: $ $

(b) Indirect Costs (provide the rate information applicable to your firm)

(10) Overhead _  % of

- (Indicate Base) $ $_

(11) General and Administrative (G&A) _  %

of (Indicate Base) $ $

Total Indirect Costs: $ $

(c) Fixed-Fee:

(12) Fixed-Fee Calculations:

i. Total negotiated contract fixed-fee percent and amount $

ii. 85% allowable fee amount $

iii. Cumulative fee billed on prior invoices $

iv. Fee due this invoice (notto exceed 85% of fee earnedbased upon negotiated contract fee percentage)$

Note: The fee balance withheld by NRC may not exceed $100,000.

Total Fixed-Fee: $ I (d) Total Amount Billed $

(e) Adjustments (+/-) $

28

(f) Grand Total $ $.

(The invoice/voucher format provided above must include information similar to that included below in the following to ensure accuracy and completeness.)

SAMPLE SUPPORTING INFORMATION The budget information provided below is for format purposes only and is illustrative.

Cost Elements:

1) Direct Labor- $2,400 Labor Hours Cumulative Category Billed Rate Total Hours Billed Senior Engineer I 100 $14.00 $1,400 975 Engineer 50 $10.00 $ 500 465 Computer Analyst 100 $5.00 $ 500 320

$2,400 1,760 hrs.

2) Fringe Benefits - $480 Fringe @ 20% of Direct Salaries Labor Fringe Category Salaries Amount Senior Engineer I $1,400 $280 Engineer $ 500 $100 Computer Analyst $ 500 $100

$2,400 $480

3) Govemment-furnished and contractor-acquired Property ($50,000 or more) - $60,000 Prototype Spectrometer - item number 1000-01 = $60,000
4) Govemment-furnished and contractor-acquired Property (under $50,000), Materials, and Supplies - $2,000 10 Radon tubes @ $110.00 = $1,100 6 Pairs Electrostatic gloves @ $150.00 = $ 900

$2,000

5) Premium Pay - $150 Walter Murphy - 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> @ $10.00 Per Hour (Reg. Pay) = $100 x 1.5 OT rate = $150 (EX: Premium pay for this individual was approved and authorized under this contract by the NRC Contracting Officer by letter dated 6/1/2011.)
6) Consultants' Fee - $100 Dr. Carney - 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> fully-burdened @ $100 = $100 29
7) Travel - $2,640 (i) Airfare: (2 Roundtrip trips for 1 person @ $300 per r/t ticket)

Start Date End Date Days From To Cost 4/1/2011 4/7/2011 7 Philadelphia, PA Wash, D.C. $300 7/1/2011 7/8/2011 8 Philadelphia, PA Wash, D.C. $300 (ii) Per Diem: $136/day x 15 days = $2,040

8) Subcontracting - $30,000 Company A = $10,000 Company B = $20,000

$30,000 (EX: Subcontracts for Companies A & B were consented to by the Contracting Officer by letter dated 6/15/2011.)

9) Other Costs - $5,100 Honorarium for speaker at American Nuclear Society conference = $5,000 NuclearPlanet Journal subscription fee = $100
10) Overhead Expense - S41,148 Overhead @ 40% of Total Direct Costs
11) General and Administrative (G&A) Expense - $22,784 G&A @ 20% of Total Costs, excluding subcontracts and consultants
12) Fixed-Fee - $8,218 Fixed-Fee applied to Total Costs @ 5%

Fixed-Fee Calculations:

i. Total contract fixed-fee $100,000 ii. 85% allowable fee $85,000 iii. Cumulative fee billed on prior invoices $85,000 iv. Fee due this invoice (not to exceed 85% of fee earned based upon negotiated contract fee percentage) $8,218 Total Amount Billed $175,020 Adjustments (+1-) - $8,218 Grand Total $166,802 30