ENS 57618: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 25: | Line 25: | ||
The following additional information was obtained from the licensee in accordance with Headquarters Operations Officers Report Guidance: | The following additional information was obtained from the licensee in accordance with Headquarters Operations Officers Report Guidance: | ||
At the time of the event, condensate flushing evolutions were ongoing. It should be noted that prior to the reactor scram, a single feedwater pump tripped which would lower reactor water level. | At the time of the event, condensate flushing evolutions were ongoing. It should be noted that prior to the reactor scram, a single feedwater pump tripped which would lower reactor water level. | ||
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2025/ | | URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2025/20250321en.html#en57618 | ||
}}{{unit info | }}{{unit info | ||
| Unit = 1 | | Unit = 1 | ||
Latest revision as of 06:20, 21 March 2025
| Where | |
|---|---|
| Monticello Minnesota (NRC Region 3) | |
| Reporting | |
| 10 CFR 50.72(b)(2)(iv)(B), RPS Actuation 10 CFR 50.72(b)(3)(iv)(A), System Actuation | |
| Time - Person (Reporting Time:+-0.4 h-0.0167 days <br />-0.00238 weeks <br />-5.4792e-4 months <br />) | |
| Opened: | Tom Johnson 16:12 Mar 19, 2025 |
| NRC Officer: | Ernest West |
| Last Updated: | Mar 19, 2025 |
| 57618 - NRC Website
| |