{{#Wiki_filter:June 1974 U.S. ATOMIC ENERGY COMMISSION
                                  REGULAT6ORY
                                  DIRECTORATE OF REGULATORY STANDARDS
                                                                                                                                GU IDE
                                                                    REGULATORY GUIDE 5.33 STATISTICAL EVALUATION OF MATERIAL UNACCOUNTED FOR


==A. INTRODUCTION==
==A. INTRODUCTION==
Paragraph 70.51(e) of 10 CFR Part 70 requires certain AEC licensees authorized to possess special nuclear material to calculate material unaccounted for (MUF) quantities and their associated statistical limits of error (LEMUF) as part of their material control and accounting procedures for use in assuring that special nuclear material in their possession is accounted fo Paragraph 70.53(bXl) requires that a report be made to the Commission if any single MUF exceeds its associated LEMUF and certain specified quantities and that the report include a statement of the probable reasons for the MUF and actions taken or planned. This guide identifies methods acceptable to the Regulatory staff for evaluating the statistical significance1 of observed MUF value
Receipts - Removals = Inventory Paragraph 70.51(e) of 10 CFR Part 70 requires                                         If there was material on hand at the beginning of the certain AEC licensees authorized to possess special                                   time interval for which a balance is being taken, a nuclear material to calculate material unaccounted for                                 beginning inventory component would have to be added (MUF) quantities and their associated statistical limits of                           to the equation to give:
  error (LEMUF) as part of their material control and accounting procedures for use in assuring that special                                 Beginning Inventory + Receipts - Removals nuclear material in their possession is accounted for.                                                                              = Ending Inventory (1)
  Paragraph 70.53(bXl) requires that a report be made to the Commission if any single MUF exceeds its associated                                   Because of uncertainties] in measurements or un LEMUF and certain specified quantities and that the                                   known removals such as losses or thefts, this equation report include a statement of the probable reasons for                                 seldom balances in practice, indicating some observed the MUF and actions taken or planned. This guide                                       material unaccounted for (MUF). Equation (1) can be identifies methods acceptable to the Regulatory staff for                             recast as:
  evaluating the statistical significance 1 of observed MUF
  values.                                                                              (Beginning Inventory + Receipts)
                                                                                                          (Removals + Ending Inventory) = MUF (2)


==B. DISCUSSION==
==B. DISCUSSION==
While there may be mechanisms of process control involving identification of process anomalies that can provide an indication of possible missing material, the only positive means for assuring that the material is not missing is to measure all of the material and establish a measured material balance. Records are maintained of the measured quantities received into a plant and the measured quantities removed from a plant. The difference between these quantities should be on inventory in the plant. A measured physical inventory will either confirm that this quantity is preuent or indicate that some material is missing. Assuming that there is no inventory at the beginning of the time interval, the balance can be expressed by the equation: IAs defined in Regulatory Guide 5.3, "Statistical Terminology and Notation for Special Nuclear Materials Control and Accountability," February 2, 1973.June 1974IDEReceipts -Removals = Inventory If there was material on hand at the beginning of the time interval for which a balance is being taken, a beginning inventory component would have to be added to the equation to give: Beginning Inventory + Receipts -Removals = Ending Inventory (1) Because of uncertainties] in measurements or unknown removals such as losses or thefts, this equation seldom balances in practice, indicating some observed material unaccounted for (MUF). Equation (1) can be recast as: (Beginning Inventory + Receipts) (Removals + Ending Inventory) = MUF (2) If equation (1) balances, the MUF of equation (2) is zero. When equation (1) does not balance, the MUF of equation (2) represents some finite quantity of SN The significance of this quantity could represent only the uncertainties of the measurements, or it could include an unknown loss or theft. The first step in determining the significance of the MUF is to determine what value might be attributable to uncertainties of the measurement syste Each of the measured quantities in the material balance will have some uncertainty associated with i Combination of these individual uncertainties by appropriate statistical methodology will result in limits in terms of SNM quantities by which equation (1) could be expected to be out of balance due only to the measurement system uncertainties,. i.e., the MUF in equation (2) that could be expected. Since measurement uncertainties may be either positive or negative, aUSAEC REGULATORY GUIDES Copie of published guides may be obtained by request indicating the divisions desired to the US. Atomic Energy Commission. Washington. D.C. 2064 Regulatory Guides we Issued to dewibe and make available to the public Attention: Director of Regulatory Standards. Comments and suggestions for methods acceptable to the AEC Reguletory staff of Implementing Specific perts of Improvements In thes guides are encouraged and should be sent to the Secraetry the Commission's regulations, to delineate techniques oed by the staff in of the Commission, US. Atomic Energy Commission, Washington, D.C. 20545, eluatilng specific problems or postulated accklents, or to provide guidance to Attention: Chief, Public Proceedings Staf applicants. Regulatory Guides are not substitutes for regulations and complaence with them is not required. Methods and solutions different from those set out in The gudes are issued in the following ten broad divisions: the guides will be acceptable If they provide a basls for the findings requisite to . the iwssunoe or comntionet of a permit or lienswe by the Comnission. I. Power Reactors 6. Products 2. Research and Test Retors 7. Transportation 3. Fuels end Meteriab Facilities 8. Occupational Health Published guides will be revised periodically. es appropriate, to accommodate 4. Environmental and Siting 9. Antitrust Review' comments and to reflect new information or experience. ". Merials end Plant Protection 10. GeneralU.S. ATOMIC ENERGY COMMISSION REGULAT6ORY GU DIRECTORATE OF REGULATORY STANDARDS REGULATORY GUIDE 5.33 STATISTICAL EVALUATION OF MATERIAL UNACCOUNTED FOR confidence interval' is established within which the MUF could be expected due only to measurement uncertainty. This confidence interval is defined by the "limits of error of the material unaccounted for" (LEMUF). It is the magnitude of this LEMUF value that determines, at a 95% confidence level, how well the total material balance can confirm that all SNM is present or detect whether some is missing. When the MUF quantity is equal to or smaller than the LEMUF, the indication is that MUF could have occurred by chance due to measurement variation. If the MUF is greater than the LEMUF in either a positive or negative direction, the indication is that the MUF could not have occurred by chance due to measurement variation but that some other mechanism has had an effect. This could be a loss or theft of material (positive MUF) or an error in the system causing an unaccounted for gain (negative MUF). If MUF is due solely to random variations in the measurement system, MUF values taken over time from a series of balances. around the same process or plapt should tend toward zero. If this is not the case, and MUF values tend to show a consistent difference from zero, factors other than random measurement variations are indicated. Consistently positive MUF values would indicate that there may be some biased measurements, consistent measurement or recording mistakes, unknown or unrecorded inventory, or some continual small losses or thefts of material. Consistently negative MUF values would indicate that there may be some biased measurements or consistent measurement or recording mistake MUF values that are not consistent with measurement system variations, i.e., are in excess of such variations within stated statistical probabilities, are considered statistically significant. The purpose of this guide is to provide guidance in assessing the significance of MUF values but not in the investigation of MUF values that are found to be statistically significan
If equation (1) balances, the MUF of equation (2) is While there may be mechanisms of process control                                 zero. When equation (1) does not balance, the MUF of involving identification of process anomalies that can                               equation (2) represents some finite quantity of SNM.
 
provide an indication of possible missing material, the                               The significance of this quantity could represent only only positive means for assuring that the material is not                             the uncertainties of the measurements, or it could missing is to measure all of the material and establish a                               include an unknown loss or theft. The first step in measured material balance. Records are maintained of                                   determining the significance of the MUF is to determine the measured quantities received into a plant and the                                  what value might be attributable to uncertainties of the measured quantities removed from a plant. The differ                                  measurement system.
 
ence between these quantities should be on inventory in the plant. A measured physical inventory will either                                     Each of the measured quantities in the material confirm that this quantity is preuent or indicate that                               balance will have some uncertainty associated with it.
 
some material is missing. Assuming that there is no                                 Combination of these individual uncertainties by appro inventory at the beginning of the time interval, the                                 priate statistical methodology will result in limits in balance can be expressed by the equation:                                             terms of SNM quantities by which equation (1) could be expected to be out of balance due only to the IAs defined in Regulatory Guide 5.3, "Statistical Terminology                          measurement system uncertainties,. i.e., the MUF in and Notation for Special Nuclear Materials Control and                              equation (2) that could be expected. Since measurement Accountability," February 2, 1973.                                                  uncertainties may be either positive or negative, a USAEC REGULATORY GUIDES                                     Copie of published guides may be obtained by request indicating the divisions desired to the US. Atomic Energy Commission. Washington. D.C. 20645.
 
Regulatory Guides we Issued to dewibe and make available to the public             Attention: Director of Regulatory Standards. Comments and suggestions for methods acceptable to the AEC Reguletory staff of Implementing Specific perts of   Improvements In thes guides are encouraged and should be sent to the Secraetry the Commission's regulations, to delineate techniques         oed by the staff in   of the Commission, US. Atomic Energy Commission, Washington, D.C. 20545, eluatilng specific problems or postulated accklents, or to provide guidance to   Attention: Chief, Public Proceedings Staff.
 
applicants. Regulatory Guides arenot substitutes for regulations and complaence with them is not required. Methods and solutions different from those set out in     The gudes are issued in the following ten broad divisions:
the guides will be acceptable If they provide a basls for the findings requisite to .
the iwssunoe or comntionetof a permit or lienswe by the Comnission.                   I. Power Reactors                        
 
===6. Products===
                                                                                      2. Research and Test Retors              
 
===7. Transportation===
                                                                                      3. Fuels end Meteriab Facilities           8. Occupational Health Published guides will be revised periodically. es appropriate, to accommodate         4. Environmental and Siting               9. Antitrust Review'
comments and to reflect new information or experienc
 
====e. Merials end====
                                                                                                    ". Plant Protection         1
 
===0. General===
 
confidence interval' is established within which the MUF could be expected due only to measurement                           The evaluation of either short-term or long-term MUF
                                                                        should consist of testing whether the MUF quantity uncertainty. This confidence interval is defined by the             observed over a single material balance period or a
  "limits of error of the material unaccounted for"
                                                                        cumulative period exceeds the LEMUF for that period.
 
(LEMUF). It is the magnitude of this LEMUF value that               Specifically, the test criterion should be whether MUF +/-
  determines, at a 95% confidence level, how well the total LEMUF contains zero, i.e.,
  material balance can confirm that all SNM is present or detect whether some is missing. When the MUF quantity is equal to or smaller than the LEMUF, the indication is                               0 e (MUF +/- LEMUF)                    (3)
  that MUF could have occurred by chance due to measurement variation. If the MUF is greater than the               Thus, an appropriate decision rule is that if observed LEMUF in either a positive or negative direction, the               MUF is greater than LEMUF, i.e.:
  indication is that the MUF could not have occurred by chance due to measurement variation but that some                                           MUF > LEMUF                      (4)
  other mechanism has had an effect. This could be a loss or theft of material (positive MUF) or an error in the               then MUF should be declared significant and investi system causing an unaccounted for gain (negative MUF).             gated. This 95% confidence interval test is equivalent to a two-sided hypothesisI
                                                                      MUF is zero at a 5% level test    with a null hypothesis that of significance.
 
If MUF is due solely to random variations in the measurement system, MUF values taken over time from a series of balances. around the same process or plapt                 Regulatory Guide 5.18, "Limit of Error Concepts and should tend toward zero. If this is not the case, and               Principles of Calculation in Nuclear Materials Control,"
  MUF values tend to show a consistent difference from               describes acceptable methods for calculation of limits of zero, factors other than random measurement variations             error.
 
are indicated. Consistently positive MUF values would indicate that there may be some biased measurements,                   An example of how single, isolated observed MUF
  consistent measurement or recording mistakes, unknown               values should be evaluated is presented by John L.
 
or unrecorded inventory, or some continual small losses             Jaech, Statistical Methods in Nuclear Material Control, or thefts of material. Consistently negative MUF values             TID-26298, December 1973, Section 7.1, specifically would indicate that there may be some biased measure                answers 7.A and 7.B of Section 7.1.3. However, the ments or consistent measurement or recording mistakes.              following specifications should be applied:
      MUF values that are not consistent with measurement system variations, i.e., are in excess of such variations                   1. The value of M. should be set to zero.
 
within stated statistical probabilities, are considered                     2. The limit of error is ccfa.
 
statistically significant. The purpose of this guide is to                 3. Absolute signs should be placed around x, the provide guidance in assessing the significance of MUF               observed MUF, in order to indicate a two-sided test of values but not in the investigation of MUF values that               significance.
 
are found to be statistically significant.                                  4. A significance level of 5% should be assigned.
 
5 If the method of Section 7.1.3, question 7.B, is used, a confidence coefficient of 95% should be chosen.


==C. REGULATORY POSITION==
==C. REGULATORY POSITION==
The concepts, principles, and methods discussed and referenced below are generally acceptable to the Regulatory staff for evaluating the significance of MUF values resulting from measured material balances as specified in paragraph 70.51(e) of 10 CFR Part 70. Individual MUF values (short-term MUF) that are statistically significant (i.e., those that exceed the LEMUF values specified in paragraph 70.51(eX5) and that exceed the minimum quantities specified in paragraph 70.51(eX5)) are required to be investigated and reported to the AEC. In addition, combinations or sequences of MUF values (long-term MUF) which show trends significantly different from zero should be investigated to determine and correct the cause lAs defined in Regulatory Guide 5.3, "Statistical Terminology and Notation for Special Nuclear Materials Control and Accountability," February 2, 1973.The evaluation of either short-term or long-term MUF should consist of testing whether the MUF quantity observed over a single material balance period or a cumulative period exceeds the LEMUF for that perio Specifically, the test criterion should be whether MUF +/- LEMUF contains zero, i.e.,0 e (MUF +/- LEMUF)Thus, an appropriate decision rule is that if observed MUF is greater than LEMUF, i.e.:MUF > LEMUF(4)then MUF should be declared significant and investigated. This 95% confidence interval test is equivalent to a two-sided hypothesisI test with a null hypothesis that MUF is zero at a 5% level of significanc Regulatory Guide 5.18, "Limit of Error Concepts and Principles of Calculation in Nuclear Materials Control," describes acceptable methods for calculation of limits of erro An example of how single, isolated observed MUF values should be evaluated is presented by John Jaech, Statistical Methods in Nuclear Material Control, TID-26298, December 1973, Section 7.1, specifically answers 7.A and 7.B of Section 7.1.3. However, the following specifications should be applied: 1. The value of M. should be set to zer . The limit of error is ccf . Absolute signs should be placed around x, the observed MUF, in order to indicate a two-sided test of significanc . A significance level of 5% should be assigne If the method of Section 7.1.3, question 7.B, is used, a confidence coefficient of 95% should be chose An example of how combinations and sequences of MUF values should be evaluated is given in Section 7.2 of the above reference, specifically answer 7.E of Section 7.2.2 with the following conditions specified: 1. Any related Mo shouldbe zer . Any test of significance should be two-side . Control charts in answer 7.F would be more appropriate as the correlation between successive MUF values increase . A 5% level of significance should be chose . The term denoted as a systematic-error variance in equation (7.9) and throughout TID-26298 is clearly defined on an applications basis in that reference. It should be noted in current practice that it may be determined by a mean square error or the variance of the estimated bias. Caution must be used in selecting which is appropriate for the process in question.5.33-2(3)}}
The concepts, principles, and methods discussed and                 An example of how combinations and sequences of referenced below are generally acceptable to the Regula              MUF values should be evaluated is given in Section 7.2 tory staff for evaluating the significance of MUF values             of the above reference, specifically answer 7.E of resulting from measured material balances as specified in           Section 7.2.2 with the following conditions specified:
paragraph 70.51(e) of 10 CFR Part 7
 
===0. Individual MUF===
values (short-term MUF) that are statistically significant                 1. Any related Mo shouldbe zero.
 
(i.e., those that exceed the LEMUF values specified in                     2. Any test of significance should be two-sided.
 
paragraph 70.51(eX5) and that exceed the minimum                           3. Control charts in answer 7.F would be more quantities specified in paragraph 70.51(eX5)) are                   appropriate as the correlation between successive MUF
required to be investigated and reported to the AEC. In             values increases.
 
addition, combinations or sequences of MUF values                           4. A 5% level of significance should be chosen.
 
(long-term MUF) which show trends significantly differ                      5. The term denoted as a systematic-error variance ent from zero should be investigated to determine and                in equation (7.9) and throughout TID-26298 is clearly correct the causes.                                                  defined on an applications basis in that reference. It should be noted in current practice that it may be lAs defined in Regulatory Guide 5.3, "Statistical Terminology        determined by a mean square error or the variance of the and Notation for Special Nuclear Materials Control and            estimated bias. Caution must be used in selecting which Accountability," February 2, 1973.                                is appropriate for the process in question.
 
5.33-2}}


{{RG-Nav}}
{{RG-Nav}}

Latest revision as of 06:23, 24 November 2019

Statistical Evaluation of Material Unaccounted for
ML003739948
Person / Time
Issue date: 06/30/1974
From:
Office of Nuclear Regulatory Research
To:
References
RG-5.33
Download: ML003739948 (2)


June 1974 U.S. ATOMIC ENERGY COMMISSION

REGULAT6ORY

DIRECTORATE OF REGULATORY STANDARDS

GU IDE

REGULATORY GUIDE 5.33 STATISTICAL EVALUATION OF MATERIAL UNACCOUNTED FOR

A. INTRODUCTION

Receipts - Removals = Inventory Paragraph 70.51(e) of 10 CFR Part 70 requires If there was material on hand at the beginning of the certain AEC licensees authorized to possess special time interval for which a balance is being taken, a nuclear material to calculate material unaccounted for beginning inventory component would have to be added (MUF) quantities and their associated statistical limits of to the equation to give:

error (LEMUF) as part of their material control and accounting procedures for use in assuring that special Beginning Inventory + Receipts - Removals nuclear material in their possession is accounted for. = Ending Inventory (1)

Paragraph 70.53(bXl) requires that a report be made to the Commission if any single MUF exceeds its associated Because of uncertainties] in measurements or un LEMUF and certain specified quantities and that the known removals such as losses or thefts, this equation report include a statement of the probable reasons for seldom balances in practice, indicating some observed the MUF and actions taken or planned. This guide material unaccounted for (MUF). Equation (1) can be identifies methods acceptable to the Regulatory staff for recast as:

evaluating the statistical significance 1 of observed MUF

values. (Beginning Inventory + Receipts)

(Removals + Ending Inventory) = MUF (2)

B. DISCUSSION

If equation (1) balances, the MUF of equation (2) is While there may be mechanisms of process control zero. When equation (1) does not balance, the MUF of involving identification of process anomalies that can equation (2) represents some finite quantity of SNM.

provide an indication of possible missing material, the The significance of this quantity could represent only only positive means for assuring that the material is not the uncertainties of the measurements, or it could missing is to measure all of the material and establish a include an unknown loss or theft. The first step in measured material balance. Records are maintained of determining the significance of the MUF is to determine the measured quantities received into a plant and the what value might be attributable to uncertainties of the measured quantities removed from a plant. The differ measurement system.

ence between these quantities should be on inventory in the plant. A measured physical inventory will either Each of the measured quantities in the material confirm that this quantity is preuent or indicate that balance will have some uncertainty associated with it.

some material is missing. Assuming that there is no Combination of these individual uncertainties by appro inventory at the beginning of the time interval, the priate statistical methodology will result in limits in balance can be expressed by the equation: terms of SNM quantities by which equation (1) could be expected to be out of balance due only to the IAs defined in Regulatory Guide 5.3, "Statistical Terminology measurement system uncertainties,. i.e., the MUF in and Notation for Special Nuclear Materials Control and equation (2) that could be expected. Since measurement Accountability," February 2, 1973. uncertainties may be either positive or negative, a USAEC REGULATORY GUIDES Copie of published guides may be obtained by request indicating the divisions desired to the US. Atomic Energy Commission. Washington. D.C. 20645.

Regulatory Guides we Issued to dewibe and make available to the public Attention: Director of Regulatory Standards. Comments and suggestions for methods acceptable to the AEC Reguletory staff of Implementing Specific perts of Improvements In thes guides are encouraged and should be sent to the Secraetry the Commission's regulations, to delineate techniques oed by the staff in of the Commission, US. Atomic Energy Commission, Washington, D.C. 20545, eluatilng specific problems or postulated accklents, or to provide guidance to Attention: Chief, Public Proceedings Staff.

applicants. Regulatory Guides arenot substitutes for regulations and complaence with them is not required. Methods and solutions different from those set out in The gudes are issued in the following ten broad divisions:

the guides will be acceptable If they provide a basls for the findings requisite to .

the iwssunoe or comntionetof a permit or lienswe by the Comnission. I. Power Reactors

6. Products

2. Research and Test Retors

7. Transportation

3. Fuels end Meteriab Facilities 8. Occupational Health Published guides will be revised periodically. es appropriate, to accommodate 4. Environmental and Siting 9. Antitrust Review'

comments and to reflect new information or experienc

e. Merials end

". Plant Protection 1

0. General

confidence interval' is established within which the MUF could be expected due only to measurement The evaluation of either short-term or long-term MUF

should consist of testing whether the MUF quantity uncertainty. This confidence interval is defined by the observed over a single material balance period or a

"limits of error of the material unaccounted for"

cumulative period exceeds the LEMUF for that period.

(LEMUF). It is the magnitude of this LEMUF value that Specifically, the test criterion should be whether MUF +/-

determines, at a 95% confidence level, how well the total LEMUF contains zero, i.e.,

material balance can confirm that all SNM is present or detect whether some is missing. When the MUF quantity is equal to or smaller than the LEMUF, the indication is 0 e (MUF +/- LEMUF) (3)

that MUF could have occurred by chance due to measurement variation. If the MUF is greater than the Thus, an appropriate decision rule is that if observed LEMUF in either a positive or negative direction, the MUF is greater than LEMUF, i.e.:

indication is that the MUF could not have occurred by chance due to measurement variation but that some MUF > LEMUF (4)

other mechanism has had an effect. This could be a loss or theft of material (positive MUF) or an error in the then MUF should be declared significant and investi system causing an unaccounted for gain (negative MUF). gated. This 95% confidence interval test is equivalent to a two-sided hypothesisI

MUF is zero at a 5% level test with a null hypothesis that of significance.

If MUF is due solely to random variations in the measurement system, MUF values taken over time from a series of balances. around the same process or plapt Regulatory Guide 5.18, "Limit of Error Concepts and should tend toward zero. If this is not the case, and Principles of Calculation in Nuclear Materials Control,"

MUF values tend to show a consistent difference from describes acceptable methods for calculation of limits of zero, factors other than random measurement variations error.

are indicated. Consistently positive MUF values would indicate that there may be some biased measurements, An example of how single, isolated observed MUF

consistent measurement or recording mistakes, unknown values should be evaluated is presented by John L.

or unrecorded inventory, or some continual small losses Jaech, Statistical Methods in Nuclear Material Control, or thefts of material. Consistently negative MUF values TID-26298, December 1973, Section 7.1, specifically would indicate that there may be some biased measure answers 7.A and 7.B of Section 7.1.3. However, the ments or consistent measurement or recording mistakes. following specifications should be applied:

MUF values that are not consistent with measurement system variations, i.e., are in excess of such variations 1. The value of M. should be set to zero.

within stated statistical probabilities, are considered 2. The limit of error is ccfa.

statistically significant. The purpose of this guide is to 3. Absolute signs should be placed around x, the provide guidance in assessing the significance of MUF observed MUF, in order to indicate a two-sided test of values but not in the investigation of MUF values that significance.

are found to be statistically significant. 4. A significance level of 5% should be assigned.

5 If the method of Section 7.1.3, question 7.B, is used, a confidence coefficient of 95% should be chosen.

C. REGULATORY POSITION

The concepts, principles, and methods discussed and An example of how combinations and sequences of referenced below are generally acceptable to the Regula MUF values should be evaluated is given in Section 7.2 tory staff for evaluating the significance of MUF values of the above reference, specifically answer 7.E of resulting from measured material balances as specified in Section 7.2.2 with the following conditions specified:

paragraph 70.51(e) of 10 CFR Part 7

0. Individual MUF

values (short-term MUF) that are statistically significant 1. Any related Mo shouldbe zero.

(i.e., those that exceed the LEMUF values specified in 2. Any test of significance should be two-sided.

paragraph 70.51(eX5) and that exceed the minimum 3. Control charts in answer 7.F would be more quantities specified in paragraph 70.51(eX5)) are appropriate as the correlation between successive MUF

required to be investigated and reported to the AEC. In values increases.

addition, combinations or sequences of MUF values 4. A 5% level of significance should be chosen.

(long-term MUF) which show trends significantly differ 5. The term denoted as a systematic-error variance ent from zero should be investigated to determine and in equation (7.9) and throughout TID-26298 is clearly correct the causes. defined on an applications basis in that reference. It should be noted in current practice that it may be lAs defined in Regulatory Guide 5.3, "Statistical Terminology determined by a mean square error or the variance of the and Notation for Special Nuclear Materials Control and estimated bias. Caution must be used in selecting which Accountability," February 2, 1973. is appropriate for the process in question.

5.33-2