ML12221A370: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 14: Line 14:
| page count = 46
| page count = 46
}}
}}
=Text=
{{#Wiki_filter:Official Transcript of Proceedings NUCLEAR REGULATORY COMMISSION
==Title:==
Augmented Inspection Team Exit Meeting with Southern California Edison Company DVD 1/4 Docket Number:  (n/a)
Location:            San Juan Capistrano, California Date:          Monday, June 18, 2012 Work Order No.:      NRC-1798                                Pages 1-46 NEAL R. GROSS AND CO., INC.
Court Reporters and Transcribers 1323 Rhode Island Avenue, N.W.
Washington, D.C. 20005 (202) 234-4433
1 1                  UNITED STATES OF AMERICA 2                NUCLEAR REGULATORY COMMISSION 3                              + + + + +
4  AUGMENTED INSPECTION TEAM EXIT MEETING WITH SOUTHERN 5                  CALIFORNIA EDISON COMPANY 6                              + + + + +
7                                MONDAY 8                          JUNE 18, 2012 9                              + + + + +
10                SAN JUAN CAPISTRANO, CALIFORNIA 11                                DVD 1/4 12                              + + + + +
13                The meeting convened in the Community Hall 14 at the San Juan Capistrano Community Center at 25925 15 Camino Del Avion, San Juan Capistrano, California, at 16 6:00 p.m., Richard Daniel, presiding.
17 NRC STAFF PRESENT:
18 RICHARD DANIEL, Facilitator 19 THOMAS BLOUNT 20 ELMO COLLINS 21 GEORGE CRAVER 22 EMMETT MURPHY 23 JOHN REYNOSO 24 JOEL RIVERA-ORTIZ 25 GREGORY WARNICK NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433        WASHINGTON, D.C. 20005-3701  www.nealrgross.com
2 1 PRESENT: (CONTINUED) 2 GREGORY WERNER 3
4 ALSO PRESENT:
5 PETER DIETRICH, Southern California Edison Co.
6 DOUGLAS BAUDER, Southern California Edison Co.
7 THOMAS PALMISANO, Southern California Edison Co.
8 9
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433    WASHINGTON, D.C. 20005-3701  www.nealrgross.com
3 1                      P-R-O-C-E-E-D-I-N-G-S 2                                                            (10:10 a.m.)
3                  FACILITATOR        DANIEL:            (Joins    during 4 progress) with you tonight.                First gentleman to the 5 right -- we'll start to the right -- is regional director 6 for Region IV, the NRC, Elmo Collins.
7                  Immediately to his left is Tom Blount.                    He 8 is the acting director for division of reactor safety.
9                  The gentleman in the red shirt is Greg 10 Werner.        He is the branch chief in the AIP team lead.
11                  And finally the guy with the good haircut 12 there is Greg Warnick, senior resident inspector.
13                  Peter Dietrich, Southern California, soon 14 I'm going to allow you to introduce your own folks.
15                  MR. DIETRICH:          Yes.        Thank you.        Good 16 evening.        Pete Dietrich, the senior vice president and 17 chief nuclear officer for Southern California Edison, 18 and we are pleased to be here tonight to be able to talk 19 about the status of our steam generator situations with 20 concerned members of the public and other stakeholders.
21                  MR. BAUDER:        Good evening, Doug Bauder, 22 state vice president, San Onofre.
23                  MR. PALMISANO:          Good evening.        I'm Tom 24 Palmisano, vice president of engineering, projects and 25 site support.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433          WASHINGTON, D.C. 20005-3701          www.nealrgross.com
4 1                  FACILITATOR DANIEL:                Okay. So without 2 further ado, I'm going to turn this over to Mr. Elmo 3 Collins.      Elmo?
4                  MR. COLLINS:        Thank you Rick.        I hope the 5 microphone is working.
6                  FACILITATOR DANIEL:              Hang on a second.
7                  MR. COLLINS:          Does that sound better?                I 8 want to make sure that everyone --
9                  Is this better?          I hope everyone can see 10 me.      I might need a stool you know, maybe.                  Maybe a 11 pulpit, you know, like church, but not that, I'm not 12 going to do that tonight.              Thank you Rick.
13                  Southern        California          residents,          Mr.
14 Dietrich and other Edison employees, members of the 15 media, NRC representatives, good evening.                    I think I 16 would also like to introduce to you tonight another NRC 17 representative who is here.                This is Tom Hipschman.
18 He is a technical assistant for the NRC chairman -- Tom's 19 in the back there -- the NRC Chairman Dr. Gregory Jaczko.
20  So we are glad Tom could join us tonight for the meeting.
21  Thank you, Tom, for being here.
22                  I want to thank everyone for taking the time 23 to come out tonight to hear the Nuclear Regulatory 24 Commission      present      results      of    our  augmented      team 25 inspection.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433          WASHINGTON, D.C. 20005-3701          www.nealrgross.com
5 1                I can see we have a large crowd.              I trust 2 that represents the large amount of interest that you 3 have here in the results and what's going on at San 4 Onofre.
5                I expect that many of you had to travel to 6 get here and so I appreciate the time, the effort that 7 you made to come and listen to what you have to say to 8 you tonight.
9                We all know that both units at San Onofre 10 are shut down because of what has proved to be very 11 difficult      technical      issues        which  their      steam 12 generators.
13                And I'll just start tonight by saying, so 14 far      these issues    are    not    resolved    to  the      NRC's 15 satisfaction.      Understandably --
16                (Applause) 17                MR. COLLINS:          Understandably,      I    think 18 there is a lot of concern on your part, and I think that 19 concern is warranted.
20                For tonight's meeting we are here to present 21 the team's preliminary results to Edison, licensee, and 22 to you tonight, and we are going to talk to you about 23 those results, and NRC is glad to be here to share with 24 you what we know so far at the end of this stage of our 25 review.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433        WASHINGTON, D.C. 20005-3701      www.nealrgross.com
6 1                This is a different public meeting from what 2 we normally conduct.        As Rick indicated, this is an NRC 3 inspection exit meeting.            This marks the end of the 4 augmented team inspection which we started several 5 months ago and what you are going to hear tonight are 6 the preliminary inspection results.
7                There's no inspection report yet.                That's 8 to come, we are guessing, in about 30 days.              But tonight 9 you      will hear  what    the      inspection      team      found.
10 Additionally,      the    augmented        inspection      teams        are 11 directed to focus on fact finding and information 12 gathering.
13                We have not yet made any decisions about 14 the resumption of power operations at San Onofre.                      Nor 15 have we made decisions about whether violations occurred 16 as a result of that inspection.
17                Those will be indicated to you, there is 18 requiring additional follow-up -- as follow-up items 19 when the team gives its findings.                So I ask you tonight 20 to keep the issues that the team describes within that 21 context, remembering that the issues are not final 22 agency conclusions.
23                Rick talked about the comment and question 24 period we are going to have after we complete the 25 business part of the meeting.              I think, at the risk of NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433        WASHINGTON, D.C. 20005-3701          www.nealrgross.com
7 1 stating the obvious, I know there are a lot of questions 2 out there, and so we are going to be here to answer those 3 questions.
4                We'll tell you what we know and we'll tell 5 you when we don't know, and we'll tell you when we think 6 more work is needed, and I think the questions are going 7 to fall into all three of those categories.
8                I'll also just indicate for you, tonight's 9 meeting is what NRC views as the first in a series of 10 public meetings that we are going to have to conduct 11 associated with the follow-up on these technical issues.
12                We are going to be conducting additional 13 inspection. We are going to be getting submittals from 14 Edison in writing that we'll be following up on, so as 15 they work through the issues and the NRC inspects them, 16 we will continue to conduct public meetings with you.
17                We do believe additional work by Edison is 18 needed and we do believe additional NRC inspection is 19 needed, and that will have to happen before NRC is in 20 a position to make a decision about the acceptability 21 of a resumption of power operations at San Onofre.
22                I want to thank you again for being here, 23 and we hope the meeting is informative for you, and with 24 that, I think Tom Blount will introduce the Augmented 25 Inspection Team, and we'll get into our presentation.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433      WASHINGTON, D.C. 20005-3701  www.nealrgross.com
8 1                MR. BLOUNT:      Thank you, Elmo.          Is this all 2 right for everyone.        I kind of thought we'd go through 3 that. Sorry.      I would like to offer my thanks and 4 appreciation for everyone coming out this afternoon, 5 or this evening, as well.
6                Before we get into the inspection results 7 itself, I did want to take just a couple of minutes and 8 give you some appreciation or perspective regarding the 9 team and the team's background.
10                We recognize that this is an important and 11 pretty serious issue, and the agency as a whole engaged 12 in this inspection team and provided the resources 13 necessary to support that.
14                We had support from not only Region 4, but 15 from our four other offices as well, including Research 16 and our Nuclear Reactor Regulation.                    Region 2 also 17 supplies some support.
18                Some of the talent that we had on this team 19 included a steam generator tube integrity engineer, a 20 thermal hydraulics specialist, steam generator material 21 engineer,      quality    assurance      and      control  engineer, 22 design and evaluation engineer, all led by a Branch Chief 23 from Region 4, Greg Werner, who is going to give you 24 the AIT results here momentarily.
25                This team had over 130 years of total NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433        WASHINGTON, D.C. 20005-3701          www.nealrgross.com
9 1 experience that they brought to the table on this issue, 2 not only as the team was doing their work, but we also 3 had the rest of the agency engaged in supporting our 4 efforts.
5                So I just wanted you to be aware, we took 6 this very seriously and want to get the right resources 7 to apply to this issue and will continue to do so.
8                With that, then, I'd like to ask Greg 9 Warnick if he'd give us an overview of the event and 10 the steam generators themselves.
11                MR. WARNICK:        Sure, thank you very much.
12  Good evening. I'd just like to give a high level 13 overview of the steam generator tube leak event, the 14 licensee's response to that event, and what I personally 15 observed on January 31st, 2012.
16                The San Onofre plant is designed to rapidly 17 detect small amounts of radioactivity, small amounts 18 of leakage from the reactor system to the steam system 19 using sensitive radiation monitors that continuously 20 monitor and sample for radioactivity, samples of steam 21 that makes it way from the steam generator to the turbine 22 generators.
23                Procedures are in place that should, on 24 indication of steam generator tube leaks, actions are 25 prescribed to put the plant into a safe condition to NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433      WASHINGTON, D.C. 20005-3701    www.nealrgross.com
10 1 protect public health and safety.
2                  Finally, operators are trained on these 3 types of events such that they can quickly diagnose 4 problems, implement procedures and make the necessary 5 decisions to minimize any radioactive release to the 6 environment.
7                  On the afternoon of January 31st, I had just 8 returned to my office from performing a plant tour as 9 part of an inspection.              At that time, I heard a PA 10 announcement about a secondary plant system radiation 11 alarm.
12                  John and I, John is a Resident Inspector, 13 we were both in the office.                We went directly to the 14 control room when we heard that PA announcement.                      Our 15 offices are less than 100 yards from the Control Room, 16 so we were there within moments.
17                  Both John and I went there and observed 18 actions to ensure that -- to assess the conditions and 19 ensure that the appropriate actions were being taken.
20 Upon        arrival,  I    determined        that    the plant        had 21 appropriately responded to the tube leak by identifying 22 leakage from the Reactor Coolant System and alerting 23 the operators to the abnormal condition before any 24 licensed release limits had been exceeded.
25                  The operators responded in accordance with NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433          WASHINGTON, D.C. 20005-3701      www.nealrgross.com
11 1 their        procedures    to    accurately          diagnose  a    steam 2 generator        tube  leak.          They      accurately    assessed 3 conditions to determine that a rapid power reduction 4 and a plant shutdown was necessary.
5                  After the plant was shut down, the operators 6 promptly isolated the affected steam generator to 7 terminate the radiation release and continued on to cool 8 down and depressurize the plant.
9                  Because      of    the      plant    design,        the 10 established procedures and the skill and training of 11 the operators, SONGS Unit 3 was placed into a safe 12 condition and the radioactive release that did occur 13 was minimized.
14                  Our regional experts have independently 15 quantified the release and concluded that it was only 16 a very small percentage of the release limits allowed 17 by the plant license, such that the release associated 18 with this event did not represent a threat to workers 19 on site, to the public or to the environment.                Next slide 20                  (Question off-mic) 21                  MR. WARNICK:        Excuse me?
22                  PARTICIPANT:        What percentage?
23                  (Question off-mic) 24                  MR. WARNICK:        It's a very small percentage 25 and that will be a -- go ahead and bring that up during NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433          WASHINGTON, D.C. 20005-3701          www.nealrgross.com
12 1 the question and answer period and I'll be happy to 2 answer that.
3                  MEMBER OF AUDIENCE:            And what was it that 4 was released, what kind of radioactivity?
5                  (Question off-mic) 6                  FACILITATOR DANIEL:                Folks, hang on a 7 second.        We're going to have a question and answer 8 period of time, comments and everything.                          Let the 9 gentleman finish his presentation and we will take your 10 questions at the appropriate time, okay?                    Thank you.
11                  MR. WARNICK:        Okay, again to reiterate, I 12 work at the plant every day, went to the Control Room 13 and assessed conditions.              I'd like to now just talk 14 briefly about the steam generator function and some of 15 the structural components so that you will understand 16 some of the terms as we go through the balance of this 17 presentation.
18                  The function of -- or the purpose of a steam 19 generator is essentially to make steam out of water.
20  It does this by acting as a large heat exchanger that 21 transfers heat from the primary radioactive system to 22 the clean steam system where it boils water into steam.
23                  Hot  radioactive          water      enters  into      the 24 bottom of the tube area and travels up through the inside 25 of the tubes, around the U-bend, back down to the cold NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433          WASHINGTON, D.C. 20005-3701          www.nealrgross.com
13 1 side of the bowl area and returns to the reactor to be 2 reheated.
3                  The clean secondary water enters into the 4 steam generator, it flows down around the outside of 5 the tube bundle, it is then directed up around the 6 outside of the tubes of the tube bundle region, where 7 it is heated up, it boils into steam and that steam acts 8 as the top of the steam generator to go to the turbine 9 to make the electricity.
10                  Now I'll point out a few other structural 11 components, just, again, to aid in understanding of 12 terms we'll be using throughout the balance of this 13 meeting.
14                  A divider plate separates the hot and cold 15 bowl areas.        That divider plate also helps to direct 16 flow of the primary water up through the U-tubes.                    It 17 also acts as a support for the divider plate and the 18 steam generator internals.
19                  It is hard to see in this picture, but the 20 vertical section of the tube bundle is supported by tube 21 support plates.          Those tube support plates provide 22 structural support to that vertical section.
23                  In this picture, again, it's hard to see 24 but there are small holes throughout the tube support 25 plates.        There are several of them that go up through NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433          WASHINGTON, D.C. 20005-3701  www.nealrgross.com
14 1 that vertical section.            There are also flow channels 2 throughout the middle of the tube bundle region.
3                  The upper U-bend section of the tube bundle 4 is supported by a system of anti-vibration bars and 5 retainer bars.        The steam generators are 65 feet tall, 6 they are 14 feet in diameter and they have a little less 7 than 10,000 tubes throughout them to perform that 8 function of transferring heat to the water.
9                  It was one of these tubes in one of these 10 steam        generators, one of these 10,000 tubes that 11 developed a leak, and resulted in the event that I just 12 briefly highlighted, that happened on January 31st.
13 ***time test 103406 14                  FACILITATOR DANIEL:              Folks, we are going 15 to take a short break here.            Basically we have too many 16 people in the room, over capacity and we are going to 17 take a short break and move some folks out in the 18 courtyard on the side -- over on this side of the 19 building.
20                  So, there are speakers out there and I 21 promise you I will come out and take your questions.
22  So if you could slide out the door.                So you folks along 23 the back wall, if you move outside.
24                  (Pause for organization of audience) 25                  MR. COLLINS:          I    appreciate      everyone's NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433          WASHINGTON, D.C. 20005-3701          www.nealrgross.com
15 1 cooperation. I apologize that we have to take this pause 2 and it's a disruption to our meeting, but this is, we 3 have been informed, important for safety, and important 4 for adherence to the fire code.                So thank you so very 5 much for giving us this consideration.
6                (Pause while audience organized) 7                FACILITATOR DANIEL:            Gil Leone (phonetic),
8 could you come back so I can speak with you please?
9 Gil?
10                (Off mic discussion about facility director 11 and fire code) 12                FACILITATOR DANIEL:            For those folks that 13 are still standing there, okay, all right.              We are going 14 to continue. Sign down, please.            If you want to hold 15 up your sign, you can go outside and hold it up, but 16 not while you are seated.
17                (Off-mic remarks) 18                FACILITATOR DANIEL:              I understand, but I 19 asked at the beginning, I asked at the beginning, that 20 signs be held in the back, because we are afraid somebody 21 might get hit in the head.        We had that happen in another 22 meeting.
23                Okay, so -- ready?              All right. We are 24 going to hear from Mr. Greg Werner here.
25                MR. WERNER:          Good evening.        I am Greg NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433      WASHINGTON, D.C. 20005-3701        www.nealrgross.com
16 1 Werner, the Augmented Inspection Team leader.                        I am 2 going to go ahead and briefly discuss the decision to 3 conduct the augmented inspection.
4                  During the pressure testing of the 129 tubes 5 on the Unit 3 steam generator, eight of the tubes failed 6 to meet the strength requirements necessary for tube 7 integrity.
8                  Because the teams failed, this resulted in 9 conducting augmented inspection.                  Even before we made 10 a decision to perform the augmented inspection, two 11 Region 4 inspectors were already on site, accomplishing 12 the      Unit  2,  in-service        inspection      of  the      steam 13 generators.
14                  This was part of the normal NRC inspection 15 program.      We always complete an in-service inspection 16 that looks at 100 percent of the tubes after the first 17 outage for a replacement steam generator.
18                  After the tube leak on Unit 3, we also 19 brought in Emmett Murphy from headquarters to assist.
20 Emmett has over 30 years of steam generator experience.
21                  SONGS inspected 100 percent of all the steam 22 generator tubes on Unit 2 and 3, almost 40,000 tubes.
23  The NRC independently reviewed and analyzed the results 24 of the tube inspections and based upon our review of 25 the type of flaws on the Unit 3 tubes and the large number NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433        WASHINGTON, D.C. 20005-3701        www.nealrgross.com
17 1 of tubes with deep wear and over a long length of the 2 tube, the NRC had very good reasons to believe there 3 had been multiple failures of tubes on Unit 3.
4                    So even before the first tube failed, Region 5 4 was working to put together an inspection team and 6 inspection charter.            Because of this, we had inspectors 7 on site during the pressure testing.
8                    The Augmented Inspection Team was initially 9 on site for two weeks.            However, the team has continued 10 to review large quantities of documents, including the 11 cause        evaluations,      the    50.59      evaluations,      draft 12 operational          assessments,        thermal      hydraulic          and 13 vibration        computer    simulation        models,  as  well        as 14 numerous other documents.
15                    In  addition,        various        team    members, 16 including myself, have traveled back to SONGS to observe 17 expert        panels  on    the    cause      evaluation,      computer 18 simulation operational assessment.
19                    To date, the Augmented Inspection Team has 20 expanded well over 1500 hours associated with this 21 issue.        Next slide, slide 11.
22                    As    Tom      Blount        mentioned      earlier, 23 individuals with specialized expertise were brought in 24 from Region 4, Region 2, Office of New Reactors, the 25 offices of nuclear reactor regulation research at NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433          WASHINGTON, D.C. 20005-3701          www.nealrgross.com
18 1 headquarters in Rockville, Maryland.
2                  I'm going to discuss the key items or 3 objectives that the augmented team was tasked to look 4 at.        We developed an event time line to look at the 5 design,        construction,      shipping,          installation        and 6 operation of both unit steam generators, reviewed 7 information to determine the causes.                    We looked at the 8 operational activities on the units to see if there was 9 impacts        associated    with    those.          We  compared        the 10 differences in the design manufacturing between the two 11 units, reviewed quality assurance and quality control 12 associated with the design and manufacturing of both 13 units'        steam  generators.                We    also    reviewed 14 implementation        of    the    generic        communications          and 15 industry lessons learned, to see if they incorporated 16 lessons learned that we gathered over the last 30 or 17 so years of steam generator use, reviewed the steam 18 generator        simulation      models.          We    also  collected 19 information for the NRC risk assessment.                  We also looked 20 at other areas such as radiological controls that Greg 21 discussed.
22                  One of the key areas that we wanted to 23 understand was the differences between Units 2 and 3.
24 Why was there more wear on Unit 3 than Unit 2, because 25 essentially the designs were identical?
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433          WASHINGTON, D.C. 20005-3701          www.nealrgross.com
19 1                  It's important to note that for a number 2 of items we not only looked at what SONGS did, but we 3 also gathered information from Mitsubishi.                    We looked 4 at    what the residents collected during the rapid 5 shutdown of Unit 3.            We wanted to make sure that the 6 operators of the plant responded appropriately to the 7 event.
8                  The team looked at hundred and hundreds of 9 documents,        including      design,          manufacturing        and 10 operational information.              We did our own independent 11 comparison of the information between the units.                            We 12 compared        manufacturing        information        with      design 13 information to check to see if the steam generators are 14 built in accordance with the design.
15                  Where there were differences, we reviewed 16 the        justification      or      the        associated      change 17 authorizations.        Slide 12, please.
18                  Now I plan to discuss what the Augmented 19 Inspection Team found.                Throughout the US nuclear 20 industry, this is the first time that more than one steam 21 generator tube failed pressure testing.
22                  As I discussed earlier, because of the 23 failure of the Unit 3 tube leak, 100 percent of the tubes 24 were inspected with subsequent pressure testing of 129 25 of those tubes on Unit 3.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433          WASHINGTON, D.C. 20005-3701          www.nealrgross.com
20 1                  During this pressure testing on Unit 3, 2 eight tubes failed.            The pressure testing identified 3 the strength of the eight tubes was not adequate, and 4 structural integrity might not be maintained during an 5 accident.
6                  It is important that both SONGS and the NRC 7 understand what occurred and why.                    This is a serious 8 safety issue that must be resolved to prevent further 9 failures from occurring again.                This information will 10 be shared throughout the nuclear industry.
11                  SONGS    did      use      multiple      independent 12 consultants        and    steam        generator        manufacturers.
13 Personally I have never seen such a vast collection of 14 experts        working    together.            They    had    academia, 15 independent        consultants,        industry        experts        from 16 different utilities as well as the industry itself, and 17 they also had four different steam generator designer 18 and manufacturers looking at the issues.
19                  Next slide.      These next two items that I'll 20 be discussing are really the most important items that 21 the NRC identified during inspection activities. These 22 are      the  ones  that    everybody,        including    us,      were 23 interested in.
24                  Actions will have to be taken to address 25 these to prevent the vibration that leads to the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433          WASHINGTON, D.C. 20005-3701          www.nealrgross.com
21 1 tube-to-tube wear from occurring again.
2                  The team identified the primary cause of 3 the unexpected tube wear was higher than expected flow 4 velocities in the steam generators.
5                  Early in our inspections, we independently 6 developed a simplified mathematical thermohydraulic 7 computer simulation model of the steam generators in 8 Units 2 and 3.
9                  Using this, we determined that the computer 10 simulation used by Mitsubishi during the design of the 11 steam generators had underpredicted velocities of steam 12 and of water inside the steam generators by factors of 13 three to four times.
14                  San Onofre also had three other steam 15 generator vendors conduct computer simulation.                          The 16 results        of their    computer        simulation    also    showed 17 significantly higher steam velocities and confirmed our 18 results.
19                  Now the next item that I am going to discuss 20 deals with the differences between Unit 2 and 3.                          We 21 looked at a number of different items.                However we only 22 identified one item that we could essentially determine 23 as the cause.
24                  The cause of the difference in the tube wear 25 between the Units 2 and 3 is associated with the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433          WASHINGTON, D.C. 20005-3701        www.nealrgross.com
22 1 manufacturing          differences          of        the    tubes        and 2 anti-vibration bars.
3                    For Unit 3, the anti-vibration bars do not 4 come in contact with the tubes as tightly as they do 5 on Unit 2, along with the higher steam and water flows 6 created        to the conditions necessary for the high 7 vibration.
8                    So essentially the tubes are not held in 9 place securely enough so it allows them to slide or 10 vibrate.        SONGS has continued to analyze and develop 11 additional        actions    to  fix    and      prevent  this      from 12 happening again.          Next slide.
13                    Now what I'd like to talk about is the item 14 or the items that the team identified that require 15 additional follow up. However on this 10, we only --
16 we believe that only two are related to the tube-to-tube 17 wear.        I am just going to very briefly discuss these 18 items.
19                    There's      a    post      trip      and    transient 20 procedure.        SONGS did not conduct a formal review of 21 the reactor trip because they considered a plant trip 22 when they shut down the unit.                So we are going to look 23 at the procedure as well as the operator actions to 24 assess if it was appropriate.
25                    We are going to evaluate and disposition, NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433          WASHINGTON, D.C. 20005-3701          www.nealrgross.com
23 1 look at the numerous Unit 3 loose part monitor alarms.
2  The NRC needs to review how these alarms were evaluated.
3  We do have concerns that the alarms were treated as 4 what we call nuisance alarms, versus being evaluated 5 in accordance with procedures.
6                The retainer bar design was not evaluated 7 for vibration impacts.        Although this sounds familiar, 8 this wear is not related to the tube-to-tube wear.                    We 9 are reviewing the design basis of the retainer bars.
10                We are also going to look at the evaluation 11 of and control of the Unit 3 divider plate repair.                This 12 by far was the most significant difference between the 13 two units and it has been discounted as a potential cause 14 for the tube-to-tube wear.
15                The bowl of the steam generator that directs 16 the reactor fluid into the tubes as well as the plate 17 that separates the hot and cold reactor coolant had to 18 be cut out, repaired, re-welded and re-tested.                Again, 19 we did not identify an issue related to the tube-to-tube 20 wear for this repair.
21                Unit      3    steam          generator    shipping 22 requirements were changed form what was required as 23 compared to Unit 2.          There's nitrogen pressure, dew 24 point, and oxygen contents were not controlled or 25 monitored. These items are supposed to be controlled NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433      WASHINGTON, D.C. 20005-3701        www.nealrgross.com
24 1 to minimize corrosion of the internals of the steam 2 generators.
3                Item number 6.        Lack of tube bundle support 4 for the steam generators during shipment.              The shipping 5 specification did not initially have a requirement for 6 a tube bundle support, or it have a requirement for tube 7 bundle support, but it was not used during shipment.
8  So again, we are going back to look at that to see how 9 that was dispositioned.
10                We are going to look at the shipping 11 accelerometer data for Unit 3.                  Steam generator 88, 12 which was one of the generators for Unit 3, had all 13 accelerometers register an excessive force, which could 14 indicate mishandling during the transportation of steam 15 generators. The NRC    was not able to determine if this 16 was properly reviewed.
17                We are looking at the 50.59 adequacy.                  The 18 NRC is continuing to review the adequacy to SONGS 50.59.
19  We did identify a concern with the potential for using 20 a different methodology than what was described in the 21 updated final safety analysis report.
22                SONGS changed their structural analysis 23 method as well as a tube-stress calculation, and we need 24 to do some additional reviews on that to determine if 25 they should have asked for an amendment.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433      WASHINGTON, D.C. 20005-3701        www.nealrgross.com
25 1                The next two follow-up items, number 9 and 2 10, are the ones that the NRC believes are related to 3 the unexpected tube wear.          As I discussed previously, 4 the manufacturing differences, Mitsubishi improved the 5 manufacturing process, which sounds like it should be 6 good.
7                However, they didn't go back and look and 8 see what that would do to the original design dimensions.
9  They didn't go back and compare, should they have 10 reviewed, revised, shrunk the design dimensions.                        So 11 this resulted in a less rigid tube bundle, which 12 contributed to the vibration issue.
13                And as I discussed before, item number 10, 14 the computer simulation model.              Again, the Mitsubishi 15 model underpredicted the behavior of the steam and water 16 in the steam generators.
17                Again,      as      described        earlier,        the 18 combination of those two, the higher than predicted 19 steam water flow and the less rigid tube bundle for Unit 20 3, they vibrated and caused the tube-to-tube wear.
21                The  NRC    will    be    conducting    additional 22 inspections to review each of these issues.                  We have 23 been and will be requesting additional information from 24 SONGS as part of our follow-up inspection activities.
25                This    completes        my      discussion    of      the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433      WASHINGTON, D.C. 20005-3701        www.nealrgross.com
26 1 augmented inspections activities.                  I'm going to let Tom 2 Blount, turn it back to him.                He's going to summarize 3 the key points associated with this inspection.                      Thank 4 you.
5                  MR. BLOUNT:      Thank you, Greg.        So what we'd 6 like        you  to  walk      away      from      this  inspection 7 understanding, is the NRC does understand what the 8 mechanistic causes of the tube degradation are.                          The 9 thermal        hydraulic    conditions        were    not  accurately 10 predicted during the design phase.
11                  However, additional actions, as Greg has 12 pointed out, additional actions are being evaluated and 13 developed by the licensee, and these additional actions 14 will need to be inspected by us to ensure that this 15 condition will not exist in the future.
16                  The NRC is not done.            We have not reached 17 any conclusion.        We have got more inspection to do.
18 We recognize that and we want you to understand that 19 we recognize that.        We'll take as much time as necessary 20 to ensure safety, the safety of these facilities, and 21 no decision to this point has been made.                    Okay?
22                  With that, I'd like to ask Pete Dietrich 23 if he'd like to provide his response.
24                  MR. DIETRICH: Thank you, Mr. Blount.                    I'm 25 Pete Dietrich, the Senior Vice President and Chief NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433          WASHINGTON, D.C. 20005-3701          www.nealrgross.com
27 1 Nuclear Officer for Southern California Edison.
2                In our comments tonight, we'd like to update 3 you on the actions Southern California Edison has taken 4 and will take as we work to completely understand the 5 conditions of our steam generators and the effect on 6 San Onofre.
7                I'll make some opening remarks and then Doug 8 Bauder, our site vice president, will provide some 9 comments about the current conditions of the units, the 10 planned response to the tube leak and our learnings, 11 because we are a learning organization.              We learn from 12 all things that occur in our facility.                But Doug will 13 discuss our learnings in the area of our response.
14                Then Tom Palmisano, the vice president of 15 engineering, will summarize our technical evaluation 16 and the conclusions that we have reached to date.                  Much 17 work has been done, yet we still have much work to do 18 to fully understand and address what we have learned.
19  And then I will provide some closing remarks.
20                Just to start with, Southern California 21 Edison's overriding interest is the health and safety 22 of the public and our employees.                Consequently, both 23 San Onofre units are shut down and will remain shut down 24 until repairs have been made and we and the Nuclear 25 Regulatory Commission are satisfied it is safe to NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433      WASHINGTON, D.C. 20005-3701        www.nealrgross.com
28 1 operate.
2                  We are disappointed that the situation has 3 occurred      and  we    recognize        the    impact    on      our 4 stakeholders,        including          customers      of    Southern 5 California Edison, San Diego Gas and Electric and the 6 City of Riverside.          We are also concerned about the 7 concerns that you have, members of the public and also 8 our neighbors.
9                  So Southern California Edison understands 10 the significance of the unexpected tube-to-tube wear, 11 and we agree with the facts presented tonight by the 12 Nuclear Regulatory Commission.
13                  We appreciate the NRC's insights into this 14 situation and we pledge to continue to work with the 15 NRC to assure any remaining or additional questions are 16 answered promptly.
17                  Early on, we recognized the seriousness of 18 the situation.        As a result of the complex technical 19 nature of the wear, we recognized that we needed to 20 assemble the very best team to augment our resources 21 and the resources of the steam generator designer and 22 manufacturer, Mitsubishi Heavy Industries.
23                  As a result, we have brought together 24 experts in thermal hydraulics and steam generator design 25 from around the world to help us gain an understanding NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433        WASHINGTON, D.C. 20005-3701        www.nealrgross.com
29 1 of the causes of this unexpected tube-to-tube wear and 2 potential corrective actions to address it.
3                The experts include such subject matter 4 experts from companies such as AREVA, Westinghouse and 5 B&W Canada. We have used this assembled team, as well 6 as other industry experts and consultants, to review 7 the progress of our work and challenge the thoroughness 8 and adequacy of our conclusions.              And we will continue 9 to do so.
10                With that, I'd like to turn it over to Doug 11 to discuss the current status of the units and our 12 response to the tube leak.
13                MR. BAUDER:      Thank you, Pete.        I would like 14 to cover the current status of the San Onofre units.
15  Unit 2 remains shut down since January the 9th when 16 we started our planned refueling outage, an outage that 17 included a reactor vessel head replacement and planned, 18 full-scope testing of our Unit 2 steam generator tubes.
19                On January 31st, the San Onofre operators 20 shut down Unit 3 in accordance with plant procedures 21 after detection of a very small tube leak on that unit.
22                Their    actions      demonstrated        the    right, 23 conservative decision-making and focus on protecting 24 the health and safety of plant personnel and the public.
25                I  observed      from      the      Control  Room      our NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433      WASHINGTON, D.C. 20005-3701          www.nealrgross.com
30 1 operators' response, and I was pleased with their calm, 2 deliberate approach to properly quantifying the leak 3 and the execution of our plant procedures to safely shut 4 down the plant.
5                In  fact,      in    my  discussions      with      the 6 operators after the event, they told me the plant 7 response lined up with their experience and training 8 on our simulator where they frequently train --
9                (Sound system interference) 10                MR. BAUDER:          I'm going to switch mics.
11 Everything okay over there?            That would be a no.
12                (Off-mic discussion) 13                MR. BAUDER:      Thank you.        So yes, to catch 14 us back up.      In my discussions with the operators 15 following the shut down on January 31st, they confirmed 16 with me the planned response matched what they were 17 trained for and evaluated for in our plant simulator.
18  And that evaluation is frequently done before our 19 operators for steam generator tube leaks.
20                As a learning operation -- organization, 21 we have reviewed our plant equipment, our procedures 22 and our operator training programs as a result of the 23 shut down on January 31st.
24                We  have    improved        our  leak  detection 25 capability. We have enhanced our operator training NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433      WASHINGTON, D.C. 20005-3701        www.nealrgross.com
31 1 programs and built the lessons learned from this event 2 into our plant simulator training activities.
3                We have also reviewed the post-shutdown 4 critique process and we have enhanced the procedures 5 that tied the post-shutdown critique process to any 6 plant trip.
7                Also, we have shared this information with 8 the industry.      As Pete indicated, we are a learning 9 operation. We are all about learning, building things 10 back into our processes and sharing them with the 11 industry.
12                In conclusion, our operators took prompt, 13 conservative actions to shut down Unit 3, placing the 14 very highest priority on protecting the health and 15 safety of the public.
16                At this point I would like to turn the 17 presentation over to Tom Palmisano to talk through 18 insights and perspectives on open items, as well as 19 Southern California Edison's technical work so far on 20 our steam generators.        Tom.
21                MR. PALMISANO:          Okay.      Thank you, Doug.
22 Can you hear me okay in the back?                Great. Thank you.
23  What I would like to do is provide an update on the 24 technical work to date on our investigations, and talk 25 about some of the upcoming actions that we have in place.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433      WASHINGTON, D.C. 20005-3701        www.nealrgross.com
32 1                  And as Pete Dietrich has said and the NRC 2 has said, we have more work to do.                    We realize that.
3  And we're being very deliberate and conservative in 4 our approach to our work.
5                  So first, Mr. Warnick did a good job of 6 giving you an overview of the steam generator's function 7 of the plant design and the steam generator design 8 itself.        I just want to point out a couple of things.
9                  Tom, if you highlight the steam generator.
10  Two key functions we're talking about tonight.                          One 11 is the transfer heat from the radioactive primary system 12 to the secondary side to boil water to make steam that 13 ultimately turns the turbine and generates electricity.
14                  The other key function, and particularly 15 from a safety standpoint, is the function of the steam 16 generator tubes to prevent radioactive primary water 17 from leaking to the secondary side.                  So, those are the 18 two key functions we are focused on in this discussion 19 and in our current work.              Next slide please.
20                  In this slide, a cutaway of the steam 21 generator, we have already explained, or the NRC has 22 already explained the flow path.                Just let me reiterate 23 it.
24                  The hot radioactive water comes in through 25 what's called the hot leg at the bottom, flows up through NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433          WASHINGTON, D.C. 20005-3701          www.nealrgross.com
33 1 the steam generator tubes, around the U-tube bend, the 2 top of the tubes, and down through the remaining straight 3 portion and out the cold leg.
4                  The heat from that water is transferred to 5 the secondary side to boil the water to make the steam 6 that      exits the  top    of    the    steam    generator.          Of 7 particular importance tonight is what's labeled the 8 U-bend section.        This is where the tube-to-tube wear 9 has occurred that caused the tube leak in one of the 10 tubes, and also caused the damage in the other tubes 11 that caused us to do the in situ pressure test and caused 12 the test failures.
13                  So it's the very top of the U-bend that we're 14 going to be talking about where the tube-to-tube wear 15 has occurred.      Thank you, Tom.          Next slide, please.
16                  So, let me kind of summarize the actions 17 to date at this point.          Following the Unit 3 shutdown 18 on January 31st, we performed a comprehensive and 19 rigorous inspection of all 19,454 steam generator tubes 20 in the two Unit 3 steam generators.                      Each steam 21 generator has 9,727 tubes, roughly 10,000 tubes per 22 steam generator.      So we did a comprehensive inspection 23 of all of them.
24                  We've reviewed these inspection results 25 with industry experts and identified the cause of the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433        WASHINGTON, D.C. 20005-3701        www.nealrgross.com
34 1 tube leak as unexpected tube-to-tube wear.                    This wear 2 caused one tube to leak and caused the other eight 3 tubes -- there were eight tubes that we talked about 4 -- to fail the in situ pressure testing.
5                  Further inspection showed wear on 326 of 6 the these 19,454 tubes.            So I'd like you to have that 7 perspective with those numbers.                  The wear is in a very 8 localized root area of that upper tube bundle we saw 9 on the previous slide, and based on the finding of this 10 unexpected tube-to-tube wear, we elected not to restart 11 Unit 2.        Unit 2 was in the process of completing a 12 refueling outage, had already had all of its tubes 13 inspected, and was in satisfactory condition to operate.
14  We elected not to restart Unit 2 at that time.
15                  We wanted to make sure, given the unusual 16 nature of this tube-to-tube wear in Unit 3, that we took 17 every opportunity to inspect and test Unit 2 to help 18 us understand what was going on with the Unit 3 steam 19 generator tubes.        We felt that was very important.
20                  Recognizing        the    significance      of      this 21 unexpected tube-to-tube wear, we assembled a team of 22 experts        to  assist    Southern      California    Edison        and 23 Mitsubishi, the steam generator manufacturer.
24                  You have heard this discussed by the NRC 25 and by Pete Dietrich, and in a minute, I'll talk more NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433          WASHINGTON, D.C. 20005-3701        www.nealrgross.com
35 1 about that panel.
2                  To date we have now completed extensive 3 tests and analysis.          We have done over 60,000 tests on 4 steam generator tubes in both Units 2 and Unit 3 and 5 have performed significant analysis of the test results 6 to understand the cause of the tube-to-tube wear.
7                  As has been pointed out by the NRC, it's 8 significant to note there are differences between the 9 two units.        Unit 3, which experienced the tube leak, 10 had 326 tubes damaged by this tube-to-tube wear.                Unit 11 2 had only two tubes which showed minor indications of 12 tube-to-tube wear, so small it was almost undetectable.
13  It was our rigorous re-testing that identified two 14 tubes that had minor indications.
15                  So Unit 2 is in much better condition than 16 Unit 3.        The comments that Mr. Werner had about the 17 differences in the manufacturing tolerances between the 18 units explains partially why Unit 2 is in much better 19 condition than Unit 3 is with respect to tube-to-tube 20 wear.
21                  Next slide.        The expert panel. This is 22 significant.        You know, in any outage, we start with 23 our own expertise.            We start with the manufacturer, 24 Mitsubishi Heavy Industries.
25                  And as we realized the significance and NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433          WASHINGTON, D.C. 20005-3701  www.nealrgross.com
36 1 usual nature of this tube-to-tube wear, we stopped and 2 we formed a group of experts to assist us both onsite 3 and off-site and in expert panels.
4                    We have brought in Areva, Westinghouse and 5 B&W Canada.        All of those firms design, manufacture and 6 test      steam  generators.          They      are competitors        to 7 Mitsubishi.
8                    (Off-mic question) 9                    MR. PALMISANO:        Babcock & Wilcox, Canada.
10  Yes.      B&W, Canada. We brought in MPR Associates, which 11 is a leading problem-solving firm, both in the nuclear 12 and non-nuclear industry, renowned for their ability 13 to deal with difficult, technical issues.
14                    We immobilized EPRI, the Electric Power 15 Research Institute.            This is the electric utilities 16 industry's research group where we do cutting-edge 17 research across the board in the electric utility 18 industry, including nuclear.                  This is where we share 19 technical information, and in the nuclear side, we 20 maintain some technical standards that we operate and 21 maintain        our  plants      to,      particularly    for      steam 22 generators.
23                    We also brought in other industry personnel 24 from sister utilities with similar steam generators with 25 good expertise to assist us, and as has been mentioned, NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433          WASHINGTON, D.C. 20005-3701        www.nealrgross.com
37 1 some recognized academics and consultants who do serious 2 research        in  thermal      hydraulic        analysis,  vibration 3 analysis, and steam generator testing.
4                    So, we have assembled a team, and I think 5 it has been alluded to, this is virtually an unparalleled 6 effort in the industry.            The sharing, the cooperation, 7 the critical nature of this work has been the best I 8 have seen, and I think Mr. Werner's comments have echoed 9 that.
10                    Now, the team was established not just to 11 assist us, but to also challenge our work.                    We wanted 12 to make sure that we put in place not just getting good, 13 solid        technical    assistance,        but      a good  critical 14 challenge.
15                    We used an expert panel board process.                The 16 team forms up on site every three to four weeks, and 17 we spend one to two days reviewing the result of our 18 work to date, making presentations, getting critical 19 comments and getting some redirection, if you will, on 20 things that they feel we should investigate more fully.
21                    They have turned out to be quite valuable 22 and we are continuing their use through our remaining 23 technical work and our restart decisions as we formulate 24 our final plans.
25                    Next slide.      So what have we determined in NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433          WASHINGTON, D.C. 20005-3701        www.nealrgross.com
38 1 terms of cause? The specific mechanism -- you have heard 2 the NRC discuss this, and I'll use the term -- it's called 3 fluid-elastic instability.
4                  Basically, that is causing some of these 5 tubes, these selected tubes, to vibrate excessively to 6 where they are contacting adjacent tubes.                  That is not 7 the way these steam generators are designed to operate.
8  It's      a vibration    mechanism        that      should    not      be 9 occurring.
10                  We see this.      This is causing the excessive 11 wear and it's in this limited area of the Unit 3 steam 12 generators.          It    is    caused,          this    fluid-elastic 13 instability or tube vibration, is caused by high steam 14 flow velocities -- and this has already been alluded 15 to -- very dry steam, in other words, very localized 16 areas where there is very dry steam, very little liquid 17 as the water is boiled to steam, and inadequate tube 18 support structure, that anti-vibration bar structure, 19 in the U-bend region around these tubes that are 20 experiencing wear.        The tube support structure is not 21 providing sufficient restraint.
22                  So  a  combination        --      high  stream      flow 23 velocities, very dry steam and the interaction with this 24 tube support structure in the Unit 3 steam generators.
25  Again, we do not see much evidence of this phenomenon NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433          WASHINGTON, D.C. 20005-3701          www.nealrgross.com
39 1 in Unit 2 because Unit 2 clearly has a tighter tube 2 support structure than Unit 3 does.
3                  Our findings correlate very well with the 4 NRC's comments on the thermal hydraulic analysis.
5 These conditions were not predicted clearly during the 6 design phase to be as severe as they are.                      We are in 7 agreement with the NRC's conclusions on that.                  And also, 8 the differences between Unit 3 and Unit 2, likely due 9 to        manufacturing        tolerance            differences          and 10 manufacturing process differences, seem to explain the 11 difference between Unit 2 and Unit 3, and we are in 12 agreement with the NRC's Augmented Inspection Team on 13 those.
14                  Now, we have a good understanding of the 15 cause        of the    tube    vibration          which  causes        the 16 tube-to-tube wear.          Our expert panel has reviewed this 17 several times.        They have challenged us and they are 18 in concurrence with our conclusion as far as what is 19 causing the tube-to-tube wear.
20                  Next slide, please.              So, the next steps.
21  And again, I'd like to emphasize something you have 22 heard Pete be very clear on and the NRC say, we are taking 23 as much time as necessary to ensure this is understood 24 and that this is properly corrected.                    So that has been 25 a theme from the start of this investigation.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433          WASHINGTON, D.C. 20005-3701          www.nealrgross.com
40 1                    So, we are following up with the Augmented 2 Inspection Team's additional request.                      Two of their 3 open items clearly are related to the cause.                    They have 4 legitimate needs for more information on the other open 5 items and our team is supplying that information as it 6 becomes available and working with the inspection team.
7                    We  are    designing      and    implementing        our 8 corrective actions to prevent this tube vibration from 9 occurring, based on our understanding of the mechanism.
10                    We are developing additional information 11 as stated in the Confirmatory Action Letter which we 12 committed to prior to restart that we know we need to 13 submit, and we are continuing to work to develop 14 intermediate and longer term solutions to this problem.
15                    As Pete said, we are disappointed in this 16 and we are working on longer term solutions.                    And those 17 longer term solutions will require extensive analysis, 18 mock-up and testing prior to being implemented.
19                    In summary, we have identified the cause 20 of    the    unexpected    tube-to-tube          wear. We    are      in 21 agreement with the comments as discussed by the NRC 22 tonight.
23                    We continue to take a rigorous, deliberate 24 and conservative approach to completing our remaining 25 actions, and we are taking as much time as necessary NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433          WASHINGTON, D.C. 20005-3701          www.nealrgross.com
41 1 to insure safety.
2                  With that, let me turn it back to Pete 3 Dietrich.
4                  MR. DIETRICH: Thank you.                  By bringing 5 together      experts  in    thermal      hydraulics      and      steam 6 generator design and --
7                  (Sound system interference) 8                  MR. DIETRICH:              tests      and    analysis 9 mentioned by Tom Palmisano, we have determined the cause 10 of the unexpected tube-to-tube wear.
11                  We are working on different options and 12 solutions for the future.            We have 13                  (No audio) 14                  MR. BLOUNT:          Thank        you,  Pete.            We 15 appreciate      those  comments.          Looking      at  our      path 16 forward, it's important to note that the NRC still has 17 much more information to review.                The cause evaluation 18 has been completed by SONGS and they are working on 19 additional actions to prevent the tube-to-tube wear from 20 occurring again.
21                  We currently do not know what the final 22 actions will be.        So for the NRC to speculate on what 23 is going to occur would not be appropriate.                    However, 24 I will tell you what we do know.
25                  We continue to review information as it NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433        WASHINGTON, D.C. 20005-3701          www.nealrgross.com
42 1 becomes available, and as the Augmented Inspection Team 2 continues to review information, we ask SONGS additional 3 questions, and we request additional information, as 4 you have heard.
5                Our inspection will continue until we are 6 satisfied we have sufficient or enough information to 7 make a determination.        Based on the Confirmatory Action 8 Letter, we will have to complete additional inspections 9 once SONGS informs us that they --
10                (No audio) 11                MR. DIETRICH:        letter before we will go out 12 and do those inspections.
13                Portions of our AIT team will be called upon 14 to go out and do follow-up inspections on the 10 items 15 that we discussed earlier that were identified as part 16 of this inspection.
17                The NRC does plan to have additional public 18 meetings to keep you informed of our activities.                    As 19 part of our plans, we will have meetings with SONGS 20 designed to present their readiness plan associated in 21 response to the Confirmatory Action Letter.
22                After we have completed our inspection, we 23 will have another meeting to discuss the results of that 24 inspection. In addition, there are some type of public 25 meeting and press conference that will be held by the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433      WASHINGTON, D.C. 20005-3701    www.nealrgross.com
43 1 senior management, NRC senior management, to discuss 2 any future NRC decision about the acceptability of 3 resumption of power operations.              That decision will be 4 based on discussions with both the Region 4 and NRC 5 headquarter senior management.
6                And finally, as part of our normal process, 7 and how the NRC does business, we look back at our 8 inspection program and we look to see, are there things 9 out of this event that we should have seen earlier?
10 Are there processes that we should have been engaged 11 in, to help us learn how to get better at what it is 12 that we do?    Is there something that we could have been 13 doing do better, or looking at, prior to this event 14 occurring, that would have precluded that event?                    That 15 is also to help our inspection efforts going forward.
16                So with that, I'd like to turn it over to 17 Elmo Collins for closing remarks.                  Elmo?
18                MR. COLLINS:        Well, thank you, Tom.              To 19 conclude the business portion of the meeting, I will 20 say thank you to the residents of California for being 21 here tonight and thank you for listening attentively.
22                I have been quite 23                (No audio) 24                MR. COLLINS:        how polite and how patient 25 you have been as we move through a lot of information NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433      WASHINGTON, D.C. 20005-3701        www.nealrgross.com
44 1 tonight.        So I thank you for that.
2                    I want to thank this Augmented Inspection 3 Team that we have talked about.                A lot of hours of work 4 has gone on of people with high expertise.                      And so I 5 am glad we were able to hear the results of their 6 inspection and I hope it was informative for you.
7                    I want to thank Edison, Mr. Dietrich, for 8 your presentation and response to the information you 9 shared with us.        And lastly, I probably would be remiss, 10 if we didn't all express our appreciation to the 11 representatives from the Orange County Sheriff's Office 12 who are here looking out after our safety.                  So give them 13 a round of applause.
14                    (Applause) 15                    MR. COLLINS:        I know --
16                    (No audio) 17                    FACILITATOR DANIEL:            Thank you Elmo. you, 18 Elmo.        Thank you Southern California Edison and NRC.
19  Thank you audience, ladies and gentlemen, for being 20 so attentive, as Elmo --
21                    (No audio) 22                    FACILITATOR DANIEL:            We are going to take 23 a --
24                    (No audio) 25                    FACILITATOR DANIEL:            We are going to start NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433          WASHINGTON, D.C. 20005-3701        www.nealrgross.com
45 1 back at 7:20 sharp with a question and comment period.
2  In the meantime, Mr. Collins is going to be doing a 3 media interview, I believe --
4                (No audio) 5                FACILITATOR DANIEL:            Enjoy the break.        We 6 will see you at 7:20.        Thank you.
7 (Whereupon, at 11:17 a.m., DVD 1 ended)
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433      WASHINGTON, D.C. 20005-3701        www.nealrgross.com}}

Latest revision as of 18:51, 5 December 2019

Transcript 1 of San Onofre AIT June 18 2012 Public Exit Meeting, Pp. 1-46
ML12221A370
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 06/18/2012
From:
NRC/RGN-IV/DRP
To:
References
NRC-1798
Download: ML12221A370 (46)


Text

Official Transcript of Proceedings NUCLEAR REGULATORY COMMISSION

Title:

Augmented Inspection Team Exit Meeting with Southern California Edison Company DVD 1/4 Docket Number: (n/a)

Location: San Juan Capistrano, California Date: Monday, June 18, 2012 Work Order No.: NRC-1798 Pages 1-46 NEAL R. GROSS AND CO., INC.

Court Reporters and Transcribers 1323 Rhode Island Avenue, N.W.

Washington, D.C. 20005 (202) 234-4433

1 1 UNITED STATES OF AMERICA 2 NUCLEAR REGULATORY COMMISSION 3 + + + + +

4 AUGMENTED INSPECTION TEAM EXIT MEETING WITH SOUTHERN 5 CALIFORNIA EDISON COMPANY 6 + + + + +

7 MONDAY 8 JUNE 18, 2012 9 + + + + +

10 SAN JUAN CAPISTRANO, CALIFORNIA 11 DVD 1/4 12 + + + + +

13 The meeting convened in the Community Hall 14 at the San Juan Capistrano Community Center at 25925 15 Camino Del Avion, San Juan Capistrano, California, at 16 6:00 p.m., Richard Daniel, presiding.

17 NRC STAFF PRESENT:

18 RICHARD DANIEL, Facilitator 19 THOMAS BLOUNT 20 ELMO COLLINS 21 GEORGE CRAVER 22 EMMETT MURPHY 23 JOHN REYNOSO 24 JOEL RIVERA-ORTIZ 25 GREGORY WARNICK NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

2 1 PRESENT: (CONTINUED) 2 GREGORY WERNER 3

4 ALSO PRESENT:

5 PETER DIETRICH, Southern California Edison Co.

6 DOUGLAS BAUDER, Southern California Edison Co.

7 THOMAS PALMISANO, Southern California Edison Co.

8 9

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

3 1 P-R-O-C-E-E-D-I-N-G-S 2 (10:10 a.m.)

3 FACILITATOR DANIEL: (Joins during 4 progress) with you tonight. First gentleman to the 5 right -- we'll start to the right -- is regional director 6 for Region IV, the NRC, Elmo Collins.

7 Immediately to his left is Tom Blount. He 8 is the acting director for division of reactor safety.

9 The gentleman in the red shirt is Greg 10 Werner. He is the branch chief in the AIP team lead.

11 And finally the guy with the good haircut 12 there is Greg Warnick, senior resident inspector.

13 Peter Dietrich, Southern California, soon 14 I'm going to allow you to introduce your own folks.

15 MR. DIETRICH: Yes. Thank you. Good 16 evening. Pete Dietrich, the senior vice president and 17 chief nuclear officer for Southern California Edison, 18 and we are pleased to be here tonight to be able to talk 19 about the status of our steam generator situations with 20 concerned members of the public and other stakeholders.

21 MR. BAUDER: Good evening, Doug Bauder, 22 state vice president, San Onofre.

23 MR. PALMISANO: Good evening. I'm Tom 24 Palmisano, vice president of engineering, projects and 25 site support.

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

4 1 FACILITATOR DANIEL: Okay. So without 2 further ado, I'm going to turn this over to Mr. Elmo 3 Collins. Elmo?

4 MR. COLLINS: Thank you Rick. I hope the 5 microphone is working.

6 FACILITATOR DANIEL: Hang on a second.

7 MR. COLLINS: Does that sound better? I 8 want to make sure that everyone --

9 Is this better? I hope everyone can see 10 me. I might need a stool you know, maybe. Maybe a 11 pulpit, you know, like church, but not that, I'm not 12 going to do that tonight. Thank you Rick.

13 Southern California residents, Mr.

14 Dietrich and other Edison employees, members of the 15 media, NRC representatives, good evening. I think I 16 would also like to introduce to you tonight another NRC 17 representative who is here. This is Tom Hipschman.

18 He is a technical assistant for the NRC chairman -- Tom's 19 in the back there -- the NRC Chairman Dr. Gregory Jaczko.

20 So we are glad Tom could join us tonight for the meeting.

21 Thank you, Tom, for being here.

22 I want to thank everyone for taking the time 23 to come out tonight to hear the Nuclear Regulatory 24 Commission present results of our augmented team 25 inspection.

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

5 1 I can see we have a large crowd. I trust 2 that represents the large amount of interest that you 3 have here in the results and what's going on at San 4 Onofre.

5 I expect that many of you had to travel to 6 get here and so I appreciate the time, the effort that 7 you made to come and listen to what you have to say to 8 you tonight.

9 We all know that both units at San Onofre 10 are shut down because of what has proved to be very 11 difficult technical issues which their steam 12 generators.

13 And I'll just start tonight by saying, so 14 far these issues are not resolved to the NRC's 15 satisfaction. Understandably --

16 (Applause) 17 MR. COLLINS: Understandably, I think 18 there is a lot of concern on your part, and I think that 19 concern is warranted.

20 For tonight's meeting we are here to present 21 the team's preliminary results to Edison, licensee, and 22 to you tonight, and we are going to talk to you about 23 those results, and NRC is glad to be here to share with 24 you what we know so far at the end of this stage of our 25 review.

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

6 1 This is a different public meeting from what 2 we normally conduct. As Rick indicated, this is an NRC 3 inspection exit meeting. This marks the end of the 4 augmented team inspection which we started several 5 months ago and what you are going to hear tonight are 6 the preliminary inspection results.

7 There's no inspection report yet. That's 8 to come, we are guessing, in about 30 days. But tonight 9 you will hear what the inspection team found.

10 Additionally, the augmented inspection teams are 11 directed to focus on fact finding and information 12 gathering.

13 We have not yet made any decisions about 14 the resumption of power operations at San Onofre. Nor 15 have we made decisions about whether violations occurred 16 as a result of that inspection.

17 Those will be indicated to you, there is 18 requiring additional follow-up -- as follow-up items 19 when the team gives its findings. So I ask you tonight 20 to keep the issues that the team describes within that 21 context, remembering that the issues are not final 22 agency conclusions.

23 Rick talked about the comment and question 24 period we are going to have after we complete the 25 business part of the meeting. I think, at the risk of NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

7 1 stating the obvious, I know there are a lot of questions 2 out there, and so we are going to be here to answer those 3 questions.

4 We'll tell you what we know and we'll tell 5 you when we don't know, and we'll tell you when we think 6 more work is needed, and I think the questions are going 7 to fall into all three of those categories.

8 I'll also just indicate for you, tonight's 9 meeting is what NRC views as the first in a series of 10 public meetings that we are going to have to conduct 11 associated with the follow-up on these technical issues.

12 We are going to be conducting additional 13 inspection. We are going to be getting submittals from 14 Edison in writing that we'll be following up on, so as 15 they work through the issues and the NRC inspects them, 16 we will continue to conduct public meetings with you.

17 We do believe additional work by Edison is 18 needed and we do believe additional NRC inspection is 19 needed, and that will have to happen before NRC is in 20 a position to make a decision about the acceptability 21 of a resumption of power operations at San Onofre.

22 I want to thank you again for being here, 23 and we hope the meeting is informative for you, and with 24 that, I think Tom Blount will introduce the Augmented 25 Inspection Team, and we'll get into our presentation.

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

8 1 MR. BLOUNT: Thank you, Elmo. Is this all 2 right for everyone. I kind of thought we'd go through 3 that. Sorry. I would like to offer my thanks and 4 appreciation for everyone coming out this afternoon, 5 or this evening, as well.

6 Before we get into the inspection results 7 itself, I did want to take just a couple of minutes and 8 give you some appreciation or perspective regarding the 9 team and the team's background.

10 We recognize that this is an important and 11 pretty serious issue, and the agency as a whole engaged 12 in this inspection team and provided the resources 13 necessary to support that.

14 We had support from not only Region 4, but 15 from our four other offices as well, including Research 16 and our Nuclear Reactor Regulation. Region 2 also 17 supplies some support.

18 Some of the talent that we had on this team 19 included a steam generator tube integrity engineer, a 20 thermal hydraulics specialist, steam generator material 21 engineer, quality assurance and control engineer, 22 design and evaluation engineer, all led by a Branch Chief 23 from Region 4, Greg Werner, who is going to give you 24 the AIT results here momentarily.

25 This team had over 130 years of total NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

9 1 experience that they brought to the table on this issue, 2 not only as the team was doing their work, but we also 3 had the rest of the agency engaged in supporting our 4 efforts.

5 So I just wanted you to be aware, we took 6 this very seriously and want to get the right resources 7 to apply to this issue and will continue to do so.

8 With that, then, I'd like to ask Greg 9 Warnick if he'd give us an overview of the event and 10 the steam generators themselves.

11 MR. WARNICK: Sure, thank you very much.

12 Good evening. I'd just like to give a high level 13 overview of the steam generator tube leak event, the 14 licensee's response to that event, and what I personally 15 observed on January 31st, 2012.

16 The San Onofre plant is designed to rapidly 17 detect small amounts of radioactivity, small amounts 18 of leakage from the reactor system to the steam system 19 using sensitive radiation monitors that continuously 20 monitor and sample for radioactivity, samples of steam 21 that makes it way from the steam generator to the turbine 22 generators.

23 Procedures are in place that should, on 24 indication of steam generator tube leaks, actions are 25 prescribed to put the plant into a safe condition to NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

10 1 protect public health and safety.

2 Finally, operators are trained on these 3 types of events such that they can quickly diagnose 4 problems, implement procedures and make the necessary 5 decisions to minimize any radioactive release to the 6 environment.

7 On the afternoon of January 31st, I had just 8 returned to my office from performing a plant tour as 9 part of an inspection. At that time, I heard a PA 10 announcement about a secondary plant system radiation 11 alarm.

12 John and I, John is a Resident Inspector, 13 we were both in the office. We went directly to the 14 control room when we heard that PA announcement. Our 15 offices are less than 100 yards from the Control Room, 16 so we were there within moments.

17 Both John and I went there and observed 18 actions to ensure that -- to assess the conditions and 19 ensure that the appropriate actions were being taken.

20 Upon arrival, I determined that the plant had 21 appropriately responded to the tube leak by identifying 22 leakage from the Reactor Coolant System and alerting 23 the operators to the abnormal condition before any 24 licensed release limits had been exceeded.

25 The operators responded in accordance with NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

11 1 their procedures to accurately diagnose a steam 2 generator tube leak. They accurately assessed 3 conditions to determine that a rapid power reduction 4 and a plant shutdown was necessary.

5 After the plant was shut down, the operators 6 promptly isolated the affected steam generator to 7 terminate the radiation release and continued on to cool 8 down and depressurize the plant.

9 Because of the plant design, the 10 established procedures and the skill and training of 11 the operators, SONGS Unit 3 was placed into a safe 12 condition and the radioactive release that did occur 13 was minimized.

14 Our regional experts have independently 15 quantified the release and concluded that it was only 16 a very small percentage of the release limits allowed 17 by the plant license, such that the release associated 18 with this event did not represent a threat to workers 19 on site, to the public or to the environment. Next slide 20 (Question off-mic) 21 MR. WARNICK: Excuse me?

22 PARTICIPANT: What percentage?

23 (Question off-mic) 24 MR. WARNICK: It's a very small percentage 25 and that will be a -- go ahead and bring that up during NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

12 1 the question and answer period and I'll be happy to 2 answer that.

3 MEMBER OF AUDIENCE: And what was it that 4 was released, what kind of radioactivity?

5 (Question off-mic) 6 FACILITATOR DANIEL: Folks, hang on a 7 second. We're going to have a question and answer 8 period of time, comments and everything. Let the 9 gentleman finish his presentation and we will take your 10 questions at the appropriate time, okay? Thank you.

11 MR. WARNICK: Okay, again to reiterate, I 12 work at the plant every day, went to the Control Room 13 and assessed conditions. I'd like to now just talk 14 briefly about the steam generator function and some of 15 the structural components so that you will understand 16 some of the terms as we go through the balance of this 17 presentation.

18 The function of -- or the purpose of a steam 19 generator is essentially to make steam out of water.

20 It does this by acting as a large heat exchanger that 21 transfers heat from the primary radioactive system to 22 the clean steam system where it boils water into steam.

23 Hot radioactive water enters into the 24 bottom of the tube area and travels up through the inside 25 of the tubes, around the U-bend, back down to the cold NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

13 1 side of the bowl area and returns to the reactor to be 2 reheated.

3 The clean secondary water enters into the 4 steam generator, it flows down around the outside of 5 the tube bundle, it is then directed up around the 6 outside of the tubes of the tube bundle region, where 7 it is heated up, it boils into steam and that steam acts 8 as the top of the steam generator to go to the turbine 9 to make the electricity.

10 Now I'll point out a few other structural 11 components, just, again, to aid in understanding of 12 terms we'll be using throughout the balance of this 13 meeting.

14 A divider plate separates the hot and cold 15 bowl areas. That divider plate also helps to direct 16 flow of the primary water up through the U-tubes. It 17 also acts as a support for the divider plate and the 18 steam generator internals.

19 It is hard to see in this picture, but the 20 vertical section of the tube bundle is supported by tube 21 support plates. Those tube support plates provide 22 structural support to that vertical section.

23 In this picture, again, it's hard to see 24 but there are small holes throughout the tube support 25 plates. There are several of them that go up through NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

14 1 that vertical section. There are also flow channels 2 throughout the middle of the tube bundle region.

3 The upper U-bend section of the tube bundle 4 is supported by a system of anti-vibration bars and 5 retainer bars. The steam generators are 65 feet tall, 6 they are 14 feet in diameter and they have a little less 7 than 10,000 tubes throughout them to perform that 8 function of transferring heat to the water.

9 It was one of these tubes in one of these 10 steam generators, one of these 10,000 tubes that 11 developed a leak, and resulted in the event that I just 12 briefly highlighted, that happened on January 31st.

13 ***time test 103406 14 FACILITATOR DANIEL: Folks, we are going 15 to take a short break here. Basically we have too many 16 people in the room, over capacity and we are going to 17 take a short break and move some folks out in the 18 courtyard on the side -- over on this side of the 19 building.

20 So, there are speakers out there and I 21 promise you I will come out and take your questions.

22 So if you could slide out the door. So you folks along 23 the back wall, if you move outside.

24 (Pause for organization of audience) 25 MR. COLLINS: I appreciate everyone's NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

15 1 cooperation. I apologize that we have to take this pause 2 and it's a disruption to our meeting, but this is, we 3 have been informed, important for safety, and important 4 for adherence to the fire code. So thank you so very 5 much for giving us this consideration.

6 (Pause while audience organized) 7 FACILITATOR DANIEL: Gil Leone (phonetic),

8 could you come back so I can speak with you please?

9 Gil?

10 (Off mic discussion about facility director 11 and fire code) 12 FACILITATOR DANIEL: For those folks that 13 are still standing there, okay, all right. We are going 14 to continue. Sign down, please. If you want to hold 15 up your sign, you can go outside and hold it up, but 16 not while you are seated.

17 (Off-mic remarks) 18 FACILITATOR DANIEL: I understand, but I 19 asked at the beginning, I asked at the beginning, that 20 signs be held in the back, because we are afraid somebody 21 might get hit in the head. We had that happen in another 22 meeting.

23 Okay, so -- ready? All right. We are 24 going to hear from Mr. Greg Werner here.

25 MR. WERNER: Good evening. I am Greg NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

16 1 Werner, the Augmented Inspection Team leader. I am 2 going to go ahead and briefly discuss the decision to 3 conduct the augmented inspection.

4 During the pressure testing of the 129 tubes 5 on the Unit 3 steam generator, eight of the tubes failed 6 to meet the strength requirements necessary for tube 7 integrity.

8 Because the teams failed, this resulted in 9 conducting augmented inspection. Even before we made 10 a decision to perform the augmented inspection, two 11 Region 4 inspectors were already on site, accomplishing 12 the Unit 2, in-service inspection of the steam 13 generators.

14 This was part of the normal NRC inspection 15 program. We always complete an in-service inspection 16 that looks at 100 percent of the tubes after the first 17 outage for a replacement steam generator.

18 After the tube leak on Unit 3, we also 19 brought in Emmett Murphy from headquarters to assist.

20 Emmett has over 30 years of steam generator experience.

21 SONGS inspected 100 percent of all the steam 22 generator tubes on Unit 2 and 3, almost 40,000 tubes.

23 The NRC independently reviewed and analyzed the results 24 of the tube inspections and based upon our review of 25 the type of flaws on the Unit 3 tubes and the large number NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

17 1 of tubes with deep wear and over a long length of the 2 tube, the NRC had very good reasons to believe there 3 had been multiple failures of tubes on Unit 3.

4 So even before the first tube failed, Region 5 4 was working to put together an inspection team and 6 inspection charter. Because of this, we had inspectors 7 on site during the pressure testing.

8 The Augmented Inspection Team was initially 9 on site for two weeks. However, the team has continued 10 to review large quantities of documents, including the 11 cause evaluations, the 50.59 evaluations, draft 12 operational assessments, thermal hydraulic and 13 vibration computer simulation models, as well as 14 numerous other documents.

15 In addition, various team members, 16 including myself, have traveled back to SONGS to observe 17 expert panels on the cause evaluation, computer 18 simulation operational assessment.

19 To date, the Augmented Inspection Team has 20 expanded well over 1500 hours0.0174 days <br />0.417 hours <br />0.00248 weeks <br />5.7075e-4 months <br /> associated with this 21 issue. Next slide, slide 11.

22 As Tom Blount mentioned earlier, 23 individuals with specialized expertise were brought in 24 from Region 4, Region 2, Office of New Reactors, the 25 offices of nuclear reactor regulation research at NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

18 1 headquarters in Rockville, Maryland.

2 I'm going to discuss the key items or 3 objectives that the augmented team was tasked to look 4 at. We developed an event time line to look at the 5 design, construction, shipping, installation and 6 operation of both unit steam generators, reviewed 7 information to determine the causes. We looked at the 8 operational activities on the units to see if there was 9 impacts associated with those. We compared the 10 differences in the design manufacturing between the two 11 units, reviewed quality assurance and quality control 12 associated with the design and manufacturing of both 13 units' steam generators. We also reviewed 14 implementation of the generic communications and 15 industry lessons learned, to see if they incorporated 16 lessons learned that we gathered over the last 30 or 17 so years of steam generator use, reviewed the steam 18 generator simulation models. We also collected 19 information for the NRC risk assessment. We also looked 20 at other areas such as radiological controls that Greg 21 discussed.

22 One of the key areas that we wanted to 23 understand was the differences between Units 2 and 3.

24 Why was there more wear on Unit 3 than Unit 2, because 25 essentially the designs were identical?

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

19 1 It's important to note that for a number 2 of items we not only looked at what SONGS did, but we 3 also gathered information from Mitsubishi. We looked 4 at what the residents collected during the rapid 5 shutdown of Unit 3. We wanted to make sure that the 6 operators of the plant responded appropriately to the 7 event.

8 The team looked at hundred and hundreds of 9 documents, including design, manufacturing and 10 operational information. We did our own independent 11 comparison of the information between the units. We 12 compared manufacturing information with design 13 information to check to see if the steam generators are 14 built in accordance with the design.

15 Where there were differences, we reviewed 16 the justification or the associated change 17 authorizations. Slide 12, please.

18 Now I plan to discuss what the Augmented 19 Inspection Team found. Throughout the US nuclear 20 industry, this is the first time that more than one steam 21 generator tube failed pressure testing.

22 As I discussed earlier, because of the 23 failure of the Unit 3 tube leak, 100 percent of the tubes 24 were inspected with subsequent pressure testing of 129 25 of those tubes on Unit 3.

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

20 1 During this pressure testing on Unit 3, 2 eight tubes failed. The pressure testing identified 3 the strength of the eight tubes was not adequate, and 4 structural integrity might not be maintained during an 5 accident.

6 It is important that both SONGS and the NRC 7 understand what occurred and why. This is a serious 8 safety issue that must be resolved to prevent further 9 failures from occurring again. This information will 10 be shared throughout the nuclear industry.

11 SONGS did use multiple independent 12 consultants and steam generator manufacturers.

13 Personally I have never seen such a vast collection of 14 experts working together. They had academia, 15 independent consultants, industry experts from 16 different utilities as well as the industry itself, and 17 they also had four different steam generator designer 18 and manufacturers looking at the issues.

19 Next slide. These next two items that I'll 20 be discussing are really the most important items that 21 the NRC identified during inspection activities. These 22 are the ones that everybody, including us, were 23 interested in.

24 Actions will have to be taken to address 25 these to prevent the vibration that leads to the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

21 1 tube-to-tube wear from occurring again.

2 The team identified the primary cause of 3 the unexpected tube wear was higher than expected flow 4 velocities in the steam generators.

5 Early in our inspections, we independently 6 developed a simplified mathematical thermohydraulic 7 computer simulation model of the steam generators in 8 Units 2 and 3.

9 Using this, we determined that the computer 10 simulation used by Mitsubishi during the design of the 11 steam generators had underpredicted velocities of steam 12 and of water inside the steam generators by factors of 13 three to four times.

14 San Onofre also had three other steam 15 generator vendors conduct computer simulation. The 16 results of their computer simulation also showed 17 significantly higher steam velocities and confirmed our 18 results.

19 Now the next item that I am going to discuss 20 deals with the differences between Unit 2 and 3. We 21 looked at a number of different items. However we only 22 identified one item that we could essentially determine 23 as the cause.

24 The cause of the difference in the tube wear 25 between the Units 2 and 3 is associated with the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

22 1 manufacturing differences of the tubes and 2 anti-vibration bars.

3 For Unit 3, the anti-vibration bars do not 4 come in contact with the tubes as tightly as they do 5 on Unit 2, along with the higher steam and water flows 6 created to the conditions necessary for the high 7 vibration.

8 So essentially the tubes are not held in 9 place securely enough so it allows them to slide or 10 vibrate. SONGS has continued to analyze and develop 11 additional actions to fix and prevent this from 12 happening again. Next slide.

13 Now what I'd like to talk about is the item 14 or the items that the team identified that require 15 additional follow up. However on this 10, we only --

16 we believe that only two are related to the tube-to-tube 17 wear. I am just going to very briefly discuss these 18 items.

19 There's a post trip and transient 20 procedure. SONGS did not conduct a formal review of 21 the reactor trip because they considered a plant trip 22 when they shut down the unit. So we are going to look 23 at the procedure as well as the operator actions to 24 assess if it was appropriate.

25 We are going to evaluate and disposition, NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

23 1 look at the numerous Unit 3 loose part monitor alarms.

2 The NRC needs to review how these alarms were evaluated.

3 We do have concerns that the alarms were treated as 4 what we call nuisance alarms, versus being evaluated 5 in accordance with procedures.

6 The retainer bar design was not evaluated 7 for vibration impacts. Although this sounds familiar, 8 this wear is not related to the tube-to-tube wear. We 9 are reviewing the design basis of the retainer bars.

10 We are also going to look at the evaluation 11 of and control of the Unit 3 divider plate repair. This 12 by far was the most significant difference between the 13 two units and it has been discounted as a potential cause 14 for the tube-to-tube wear.

15 The bowl of the steam generator that directs 16 the reactor fluid into the tubes as well as the plate 17 that separates the hot and cold reactor coolant had to 18 be cut out, repaired, re-welded and re-tested. Again, 19 we did not identify an issue related to the tube-to-tube 20 wear for this repair.

21 Unit 3 steam generator shipping 22 requirements were changed form what was required as 23 compared to Unit 2. There's nitrogen pressure, dew 24 point, and oxygen contents were not controlled or 25 monitored. These items are supposed to be controlled NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

24 1 to minimize corrosion of the internals of the steam 2 generators.

3 Item number 6. Lack of tube bundle support 4 for the steam generators during shipment. The shipping 5 specification did not initially have a requirement for 6 a tube bundle support, or it have a requirement for tube 7 bundle support, but it was not used during shipment.

8 So again, we are going back to look at that to see how 9 that was dispositioned.

10 We are going to look at the shipping 11 accelerometer data for Unit 3. Steam generator 88, 12 which was one of the generators for Unit 3, had all 13 accelerometers register an excessive force, which could 14 indicate mishandling during the transportation of steam 15 generators. The NRC was not able to determine if this 16 was properly reviewed.

17 We are looking at the 50.59 adequacy. The 18 NRC is continuing to review the adequacy to SONGS 50.59.

19 We did identify a concern with the potential for using 20 a different methodology than what was described in the 21 updated final safety analysis report.

22 SONGS changed their structural analysis 23 method as well as a tube-stress calculation, and we need 24 to do some additional reviews on that to determine if 25 they should have asked for an amendment.

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

25 1 The next two follow-up items, number 9 and 2 10, are the ones that the NRC believes are related to 3 the unexpected tube wear. As I discussed previously, 4 the manufacturing differences, Mitsubishi improved the 5 manufacturing process, which sounds like it should be 6 good.

7 However, they didn't go back and look and 8 see what that would do to the original design dimensions.

9 They didn't go back and compare, should they have 10 reviewed, revised, shrunk the design dimensions. So 11 this resulted in a less rigid tube bundle, which 12 contributed to the vibration issue.

13 And as I discussed before, item number 10, 14 the computer simulation model. Again, the Mitsubishi 15 model underpredicted the behavior of the steam and water 16 in the steam generators.

17 Again, as described earlier, the 18 combination of those two, the higher than predicted 19 steam water flow and the less rigid tube bundle for Unit 20 3, they vibrated and caused the tube-to-tube wear.

21 The NRC will be conducting additional 22 inspections to review each of these issues. We have 23 been and will be requesting additional information from 24 SONGS as part of our follow-up inspection activities.

25 This completes my discussion of the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

26 1 augmented inspections activities. I'm going to let Tom 2 Blount, turn it back to him. He's going to summarize 3 the key points associated with this inspection. Thank 4 you.

5 MR. BLOUNT: Thank you, Greg. So what we'd 6 like you to walk away from this inspection 7 understanding, is the NRC does understand what the 8 mechanistic causes of the tube degradation are. The 9 thermal hydraulic conditions were not accurately 10 predicted during the design phase.

11 However, additional actions, as Greg has 12 pointed out, additional actions are being evaluated and 13 developed by the licensee, and these additional actions 14 will need to be inspected by us to ensure that this 15 condition will not exist in the future.

16 The NRC is not done. We have not reached 17 any conclusion. We have got more inspection to do.

18 We recognize that and we want you to understand that 19 we recognize that. We'll take as much time as necessary 20 to ensure safety, the safety of these facilities, and 21 no decision to this point has been made. Okay?

22 With that, I'd like to ask Pete Dietrich 23 if he'd like to provide his response.

24 MR. DIETRICH: Thank you, Mr. Blount. I'm 25 Pete Dietrich, the Senior Vice President and Chief NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

27 1 Nuclear Officer for Southern California Edison.

2 In our comments tonight, we'd like to update 3 you on the actions Southern California Edison has taken 4 and will take as we work to completely understand the 5 conditions of our steam generators and the effect on 6 San Onofre.

7 I'll make some opening remarks and then Doug 8 Bauder, our site vice president, will provide some 9 comments about the current conditions of the units, the 10 planned response to the tube leak and our learnings, 11 because we are a learning organization. We learn from 12 all things that occur in our facility. But Doug will 13 discuss our learnings in the area of our response.

14 Then Tom Palmisano, the vice president of 15 engineering, will summarize our technical evaluation 16 and the conclusions that we have reached to date. Much 17 work has been done, yet we still have much work to do 18 to fully understand and address what we have learned.

19 And then I will provide some closing remarks.

20 Just to start with, Southern California 21 Edison's overriding interest is the health and safety 22 of the public and our employees. Consequently, both 23 San Onofre units are shut down and will remain shut down 24 until repairs have been made and we and the Nuclear 25 Regulatory Commission are satisfied it is safe to NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

28 1 operate.

2 We are disappointed that the situation has 3 occurred and we recognize the impact on our 4 stakeholders, including customers of Southern 5 California Edison, San Diego Gas and Electric and the 6 City of Riverside. We are also concerned about the 7 concerns that you have, members of the public and also 8 our neighbors.

9 So Southern California Edison understands 10 the significance of the unexpected tube-to-tube wear, 11 and we agree with the facts presented tonight by the 12 Nuclear Regulatory Commission.

13 We appreciate the NRC's insights into this 14 situation and we pledge to continue to work with the 15 NRC to assure any remaining or additional questions are 16 answered promptly.

17 Early on, we recognized the seriousness of 18 the situation. As a result of the complex technical 19 nature of the wear, we recognized that we needed to 20 assemble the very best team to augment our resources 21 and the resources of the steam generator designer and 22 manufacturer, Mitsubishi Heavy Industries.

23 As a result, we have brought together 24 experts in thermal hydraulics and steam generator design 25 from around the world to help us gain an understanding NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

29 1 of the causes of this unexpected tube-to-tube wear and 2 potential corrective actions to address it.

3 The experts include such subject matter 4 experts from companies such as AREVA, Westinghouse and 5 B&W Canada. We have used this assembled team, as well 6 as other industry experts and consultants, to review 7 the progress of our work and challenge the thoroughness 8 and adequacy of our conclusions. And we will continue 9 to do so.

10 With that, I'd like to turn it over to Doug 11 to discuss the current status of the units and our 12 response to the tube leak.

13 MR. BAUDER: Thank you, Pete. I would like 14 to cover the current status of the San Onofre units.

15 Unit 2 remains shut down since January the 9th when 16 we started our planned refueling outage, an outage that 17 included a reactor vessel head replacement and planned, 18 full-scope testing of our Unit 2 steam generator tubes.

19 On January 31st, the San Onofre operators 20 shut down Unit 3 in accordance with plant procedures 21 after detection of a very small tube leak on that unit.

22 Their actions demonstrated the right, 23 conservative decision-making and focus on protecting 24 the health and safety of plant personnel and the public.

25 I observed from the Control Room our NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

30 1 operators' response, and I was pleased with their calm, 2 deliberate approach to properly quantifying the leak 3 and the execution of our plant procedures to safely shut 4 down the plant.

5 In fact, in my discussions with the 6 operators after the event, they told me the plant 7 response lined up with their experience and training 8 on our simulator where they frequently train --

9 (Sound system interference) 10 MR. BAUDER: I'm going to switch mics.

11 Everything okay over there? That would be a no.

12 (Off-mic discussion) 13 MR. BAUDER: Thank you. So yes, to catch 14 us back up. In my discussions with the operators 15 following the shut down on January 31st, they confirmed 16 with me the planned response matched what they were 17 trained for and evaluated for in our plant simulator.

18 And that evaluation is frequently done before our 19 operators for steam generator tube leaks.

20 As a learning operation -- organization, 21 we have reviewed our plant equipment, our procedures 22 and our operator training programs as a result of the 23 shut down on January 31st.

24 We have improved our leak detection 25 capability. We have enhanced our operator training NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

31 1 programs and built the lessons learned from this event 2 into our plant simulator training activities.

3 We have also reviewed the post-shutdown 4 critique process and we have enhanced the procedures 5 that tied the post-shutdown critique process to any 6 plant trip.

7 Also, we have shared this information with 8 the industry. As Pete indicated, we are a learning 9 operation. We are all about learning, building things 10 back into our processes and sharing them with the 11 industry.

12 In conclusion, our operators took prompt, 13 conservative actions to shut down Unit 3, placing the 14 very highest priority on protecting the health and 15 safety of the public.

16 At this point I would like to turn the 17 presentation over to Tom Palmisano to talk through 18 insights and perspectives on open items, as well as 19 Southern California Edison's technical work so far on 20 our steam generators. Tom.

21 MR. PALMISANO: Okay. Thank you, Doug.

22 Can you hear me okay in the back? Great. Thank you.

23 What I would like to do is provide an update on the 24 technical work to date on our investigations, and talk 25 about some of the upcoming actions that we have in place.

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

32 1 And as Pete Dietrich has said and the NRC 2 has said, we have more work to do. We realize that.

3 And we're being very deliberate and conservative in 4 our approach to our work.

5 So first, Mr. Warnick did a good job of 6 giving you an overview of the steam generator's function 7 of the plant design and the steam generator design 8 itself. I just want to point out a couple of things.

9 Tom, if you highlight the steam generator.

10 Two key functions we're talking about tonight. One 11 is the transfer heat from the radioactive primary system 12 to the secondary side to boil water to make steam that 13 ultimately turns the turbine and generates electricity.

14 The other key function, and particularly 15 from a safety standpoint, is the function of the steam 16 generator tubes to prevent radioactive primary water 17 from leaking to the secondary side. So, those are the 18 two key functions we are focused on in this discussion 19 and in our current work. Next slide please.

20 In this slide, a cutaway of the steam 21 generator, we have already explained, or the NRC has 22 already explained the flow path. Just let me reiterate 23 it.

24 The hot radioactive water comes in through 25 what's called the hot leg at the bottom, flows up through NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

33 1 the steam generator tubes, around the U-tube bend, the 2 top of the tubes, and down through the remaining straight 3 portion and out the cold leg.

4 The heat from that water is transferred to 5 the secondary side to boil the water to make the steam 6 that exits the top of the steam generator. Of 7 particular importance tonight is what's labeled the 8 U-bend section. This is where the tube-to-tube wear 9 has occurred that caused the tube leak in one of the 10 tubes, and also caused the damage in the other tubes 11 that caused us to do the in situ pressure test and caused 12 the test failures.

13 So it's the very top of the U-bend that we're 14 going to be talking about where the tube-to-tube wear 15 has occurred. Thank you, Tom. Next slide, please.

16 So, let me kind of summarize the actions 17 to date at this point. Following the Unit 3 shutdown 18 on January 31st, we performed a comprehensive and 19 rigorous inspection of all 19,454 steam generator tubes 20 in the two Unit 3 steam generators. Each steam 21 generator has 9,727 tubes, roughly 10,000 tubes per 22 steam generator. So we did a comprehensive inspection 23 of all of them.

24 We've reviewed these inspection results 25 with industry experts and identified the cause of the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

34 1 tube leak as unexpected tube-to-tube wear. This wear 2 caused one tube to leak and caused the other eight 3 tubes -- there were eight tubes that we talked about 4 -- to fail the in situ pressure testing.

5 Further inspection showed wear on 326 of 6 the these 19,454 tubes. So I'd like you to have that 7 perspective with those numbers. The wear is in a very 8 localized root area of that upper tube bundle we saw 9 on the previous slide, and based on the finding of this 10 unexpected tube-to-tube wear, we elected not to restart 11 Unit 2. Unit 2 was in the process of completing a 12 refueling outage, had already had all of its tubes 13 inspected, and was in satisfactory condition to operate.

14 We elected not to restart Unit 2 at that time.

15 We wanted to make sure, given the unusual 16 nature of this tube-to-tube wear in Unit 3, that we took 17 every opportunity to inspect and test Unit 2 to help 18 us understand what was going on with the Unit 3 steam 19 generator tubes. We felt that was very important.

20 Recognizing the significance of this 21 unexpected tube-to-tube wear, we assembled a team of 22 experts to assist Southern California Edison and 23 Mitsubishi, the steam generator manufacturer.

24 You have heard this discussed by the NRC 25 and by Pete Dietrich, and in a minute, I'll talk more NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

35 1 about that panel.

2 To date we have now completed extensive 3 tests and analysis. We have done over 60,000 tests on 4 steam generator tubes in both Units 2 and Unit 3 and 5 have performed significant analysis of the test results 6 to understand the cause of the tube-to-tube wear.

7 As has been pointed out by the NRC, it's 8 significant to note there are differences between the 9 two units. Unit 3, which experienced the tube leak, 10 had 326 tubes damaged by this tube-to-tube wear. Unit 11 2 had only two tubes which showed minor indications of 12 tube-to-tube wear, so small it was almost undetectable.

13 It was our rigorous re-testing that identified two 14 tubes that had minor indications.

15 So Unit 2 is in much better condition than 16 Unit 3. The comments that Mr. Werner had about the 17 differences in the manufacturing tolerances between the 18 units explains partially why Unit 2 is in much better 19 condition than Unit 3 is with respect to tube-to-tube 20 wear.

21 Next slide. The expert panel. This is 22 significant. You know, in any outage, we start with 23 our own expertise. We start with the manufacturer, 24 Mitsubishi Heavy Industries.

25 And as we realized the significance and NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

36 1 usual nature of this tube-to-tube wear, we stopped and 2 we formed a group of experts to assist us both onsite 3 and off-site and in expert panels.

4 We have brought in Areva, Westinghouse and 5 B&W Canada. All of those firms design, manufacture and 6 test steam generators. They are competitors to 7 Mitsubishi.

8 (Off-mic question) 9 MR. PALMISANO: Babcock & Wilcox, Canada.

10 Yes. B&W, Canada. We brought in MPR Associates, which 11 is a leading problem-solving firm, both in the nuclear 12 and non-nuclear industry, renowned for their ability 13 to deal with difficult, technical issues.

14 We immobilized EPRI, the Electric Power 15 Research Institute. This is the electric utilities 16 industry's research group where we do cutting-edge 17 research across the board in the electric utility 18 industry, including nuclear. This is where we share 19 technical information, and in the nuclear side, we 20 maintain some technical standards that we operate and 21 maintain our plants to, particularly for steam 22 generators.

23 We also brought in other industry personnel 24 from sister utilities with similar steam generators with 25 good expertise to assist us, and as has been mentioned, NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

37 1 some recognized academics and consultants who do serious 2 research in thermal hydraulic analysis, vibration 3 analysis, and steam generator testing.

4 So, we have assembled a team, and I think 5 it has been alluded to, this is virtually an unparalleled 6 effort in the industry. The sharing, the cooperation, 7 the critical nature of this work has been the best I 8 have seen, and I think Mr. Werner's comments have echoed 9 that.

10 Now, the team was established not just to 11 assist us, but to also challenge our work. We wanted 12 to make sure that we put in place not just getting good, 13 solid technical assistance, but a good critical 14 challenge.

15 We used an expert panel board process. The 16 team forms up on site every three to four weeks, and 17 we spend one to two days reviewing the result of our 18 work to date, making presentations, getting critical 19 comments and getting some redirection, if you will, on 20 things that they feel we should investigate more fully.

21 They have turned out to be quite valuable 22 and we are continuing their use through our remaining 23 technical work and our restart decisions as we formulate 24 our final plans.

25 Next slide. So what have we determined in NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

38 1 terms of cause? The specific mechanism -- you have heard 2 the NRC discuss this, and I'll use the term -- it's called 3 fluid-elastic instability.

4 Basically, that is causing some of these 5 tubes, these selected tubes, to vibrate excessively to 6 where they are contacting adjacent tubes. That is not 7 the way these steam generators are designed to operate.

8 It's a vibration mechanism that should not be 9 occurring.

10 We see this. This is causing the excessive 11 wear and it's in this limited area of the Unit 3 steam 12 generators. It is caused, this fluid-elastic 13 instability or tube vibration, is caused by high steam 14 flow velocities -- and this has already been alluded 15 to -- very dry steam, in other words, very localized 16 areas where there is very dry steam, very little liquid 17 as the water is boiled to steam, and inadequate tube 18 support structure, that anti-vibration bar structure, 19 in the U-bend region around these tubes that are 20 experiencing wear. The tube support structure is not 21 providing sufficient restraint.

22 So a combination -- high stream flow 23 velocities, very dry steam and the interaction with this 24 tube support structure in the Unit 3 steam generators.

25 Again, we do not see much evidence of this phenomenon NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

39 1 in Unit 2 because Unit 2 clearly has a tighter tube 2 support structure than Unit 3 does.

3 Our findings correlate very well with the 4 NRC's comments on the thermal hydraulic analysis.

5 These conditions were not predicted clearly during the 6 design phase to be as severe as they are. We are in 7 agreement with the NRC's conclusions on that. And also, 8 the differences between Unit 3 and Unit 2, likely due 9 to manufacturing tolerance differences and 10 manufacturing process differences, seem to explain the 11 difference between Unit 2 and Unit 3, and we are in 12 agreement with the NRC's Augmented Inspection Team on 13 those.

14 Now, we have a good understanding of the 15 cause of the tube vibration which causes the 16 tube-to-tube wear. Our expert panel has reviewed this 17 several times. They have challenged us and they are 18 in concurrence with our conclusion as far as what is 19 causing the tube-to-tube wear.

20 Next slide, please. So, the next steps.

21 And again, I'd like to emphasize something you have 22 heard Pete be very clear on and the NRC say, we are taking 23 as much time as necessary to ensure this is understood 24 and that this is properly corrected. So that has been 25 a theme from the start of this investigation.

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

40 1 So, we are following up with the Augmented 2 Inspection Team's additional request. Two of their 3 open items clearly are related to the cause. They have 4 legitimate needs for more information on the other open 5 items and our team is supplying that information as it 6 becomes available and working with the inspection team.

7 We are designing and implementing our 8 corrective actions to prevent this tube vibration from 9 occurring, based on our understanding of the mechanism.

10 We are developing additional information 11 as stated in the Confirmatory Action Letter which we 12 committed to prior to restart that we know we need to 13 submit, and we are continuing to work to develop 14 intermediate and longer term solutions to this problem.

15 As Pete said, we are disappointed in this 16 and we are working on longer term solutions. And those 17 longer term solutions will require extensive analysis, 18 mock-up and testing prior to being implemented.

19 In summary, we have identified the cause 20 of the unexpected tube-to-tube wear. We are in 21 agreement with the comments as discussed by the NRC 22 tonight.

23 We continue to take a rigorous, deliberate 24 and conservative approach to completing our remaining 25 actions, and we are taking as much time as necessary NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

41 1 to insure safety.

2 With that, let me turn it back to Pete 3 Dietrich.

4 MR. DIETRICH: Thank you. By bringing 5 together experts in thermal hydraulics and steam 6 generator design and --

7 (Sound system interference) 8 MR. DIETRICH: tests and analysis 9 mentioned by Tom Palmisano, we have determined the cause 10 of the unexpected tube-to-tube wear.

11 We are working on different options and 12 solutions for the future. We have 13 (No audio) 14 MR. BLOUNT: Thank you, Pete. We 15 appreciate those comments. Looking at our path 16 forward, it's important to note that the NRC still has 17 much more information to review. The cause evaluation 18 has been completed by SONGS and they are working on 19 additional actions to prevent the tube-to-tube wear from 20 occurring again.

21 We currently do not know what the final 22 actions will be. So for the NRC to speculate on what 23 is going to occur would not be appropriate. However, 24 I will tell you what we do know.

25 We continue to review information as it NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

42 1 becomes available, and as the Augmented Inspection Team 2 continues to review information, we ask SONGS additional 3 questions, and we request additional information, as 4 you have heard.

5 Our inspection will continue until we are 6 satisfied we have sufficient or enough information to 7 make a determination. Based on the Confirmatory Action 8 Letter, we will have to complete additional inspections 9 once SONGS informs us that they --

10 (No audio) 11 MR. DIETRICH: letter before we will go out 12 and do those inspections.

13 Portions of our AIT team will be called upon 14 to go out and do follow-up inspections on the 10 items 15 that we discussed earlier that were identified as part 16 of this inspection.

17 The NRC does plan to have additional public 18 meetings to keep you informed of our activities. As 19 part of our plans, we will have meetings with SONGS 20 designed to present their readiness plan associated in 21 response to the Confirmatory Action Letter.

22 After we have completed our inspection, we 23 will have another meeting to discuss the results of that 24 inspection. In addition, there are some type of public 25 meeting and press conference that will be held by the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

43 1 senior management, NRC senior management, to discuss 2 any future NRC decision about the acceptability of 3 resumption of power operations. That decision will be 4 based on discussions with both the Region 4 and NRC 5 headquarter senior management.

6 And finally, as part of our normal process, 7 and how the NRC does business, we look back at our 8 inspection program and we look to see, are there things 9 out of this event that we should have seen earlier?

10 Are there processes that we should have been engaged 11 in, to help us learn how to get better at what it is 12 that we do? Is there something that we could have been 13 doing do better, or looking at, prior to this event 14 occurring, that would have precluded that event? That 15 is also to help our inspection efforts going forward.

16 So with that, I'd like to turn it over to 17 Elmo Collins for closing remarks. Elmo?

18 MR. COLLINS: Well, thank you, Tom. To 19 conclude the business portion of the meeting, I will 20 say thank you to the residents of California for being 21 here tonight and thank you for listening attentively.

22 I have been quite 23 (No audio) 24 MR. COLLINS: how polite and how patient 25 you have been as we move through a lot of information NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

44 1 tonight. So I thank you for that.

2 I want to thank this Augmented Inspection 3 Team that we have talked about. A lot of hours of work 4 has gone on of people with high expertise. And so I 5 am glad we were able to hear the results of their 6 inspection and I hope it was informative for you.

7 I want to thank Edison, Mr. Dietrich, for 8 your presentation and response to the information you 9 shared with us. And lastly, I probably would be remiss, 10 if we didn't all express our appreciation to the 11 representatives from the Orange County Sheriff's Office 12 who are here looking out after our safety. So give them 13 a round of applause.

14 (Applause) 15 MR. COLLINS: I know --

16 (No audio) 17 FACILITATOR DANIEL: Thank you Elmo. you, 18 Elmo. Thank you Southern California Edison and NRC.

19 Thank you audience, ladies and gentlemen, for being 20 so attentive, as Elmo --

21 (No audio) 22 FACILITATOR DANIEL: We are going to take 23 a --

24 (No audio) 25 FACILITATOR DANIEL: We are going to start NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

45 1 back at 7:20 sharp with a question and comment period.

2 In the meantime, Mr. Collins is going to be doing a 3 media interview, I believe --

4 (No audio) 5 FACILITATOR DANIEL: Enjoy the break. We 6 will see you at 7:20. Thank you.

7 (Whereupon, at 11:17 a.m., DVD 1 ended)