ENS 48139: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 9: | Line 9: | ||
| unit = 2 | | unit = 2 | ||
| utype = GE-5 | | utype = GE-5 | ||
| cfr = 10 CFR 50.73(a)(1) | | cfr = , 10 CFR 50.73(a)(1), | ||
| emergency class = Non Emergency | | emergency class = Non Emergency | ||
| notification date = 07/26/2012 17:52 | | notification date = 07/26/2012 17:52 |
Latest revision as of 01:42, 24 February 2020
Where | |
---|---|
Columbia Generating Station Washington (NRC Region 4) | |
Reporting | |
10 CFR 50.73(a)(1), Submit an LER, Invalid Actuation | |
Time - Person (Reporting Time:+1349.28 h56.22 days <br />8.031 weeks <br />1.848 months <br />) | |
Opened: | Mot Hedges 17:52 Jul 26, 2012 |
NRC Officer: | Mark Abramovitz |
Last Updated: | Jul 26, 2012 |
48139 - NRC Website
| |