ML14190B013: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(5 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 07/09/2014
| issue date = 07/09/2014
| title = June 24, 2014, Summary of Annual Assessment Meeting Regarding Seabrook Station
| title = June 24, 2014, Summary of Annual Assessment Meeting Regarding Seabrook Station
| author name = Dentel G T
| author name = Dentel G
| author affiliation = NRC/RGN-I/DRP/PB3
| author affiliation = NRC/RGN-I/DRP/PB3
| addressee name =  
| addressee name =  
Line 13: Line 13:
| page count = 2
| page count = 2
}}
}}
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSYLVANIA 19406-2713 July 9, 2014 MEETING
==SUMMARY==
LICENSEE:      NextEra Energy, Seabrook, LLC FACILITY:      Seabrook Station, Unit 1
==SUBJECT:==
Summary of Annual Assessment Meeting regarding Seabrook Station On June 24, 2014, at 5:30 p.m., the U. S. Nuclear Regulatory Commission (NRC) conducted an open house at Best Western Inn and Conference Center in Hampton, NH. The NRC conducted the open house to discuss its assessment of the safety performance at Seabrook Station. The open house was followed by a public meeting from 6:30 - 8:30 pm.
A notice of the open house and public meeting was issued on June 5, 2014, and was posted on the NRCs external (public) web page. The meeting notice can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) with Accession No. ML14156A255. ADAMS is accessible from the NRC Web page at: http://www.nrc.gov/reading-rm/adams.html.
The NRC presented poster boards and was available to discuss its assessment of the safety performance of Seabrook for the period of January 1 through December 31, 2013, as documented in our letter dated March 4, 2014, ADAMS Accession No. ML14062A021.
The NRC poster boards presented included background on the Reactor Oversight Process (ROP) and the License Renewal Process. Additional information relative to the NRCs Annual Assessment Process and the safety performance of Seabrook can be found on the NRCs website at: www.nrc.gov/nrr/oversight/assess/index.html.
Members of the media and public, along with State and local officials, attended the open-house and the subsequent public meeting, and were offered the opportunity to question the NRC.
Statements and question were received regarding Seabrooks performance as well as issues related to the Alkali Silica Reaction (ASR) found in reinforced concrete structures at Seabrook, and the long-term storage of spent nuclear fuel.
                                                      /RA/
Glenn T. Dentel, Chief Projects Branch 3 Division of Reactor Projects
ML14062A021. The NRC poster boards presented included background on the Reactor Oversight Process (ROP) and the License Renewal Process. Additional information relative to the NRCs Annual Assessment Process and the safety performance of Seabrook can be found on the NRCs website at: www.nrc.gov/nrr/oversight/assess/index.html.
Members of the media and public, along with State and local officials, attended the open-house and the subsequent public meeting, and were offered the opportunity to question the NRC.
Statements and question were received regarding Seabrooks performance as well as issues related to the Alkali Silica Reaction (ASR) found in reinforced concrete structures at Seabrook, and the long-term storage of spent nuclear fuel.
                                                                  /RA/
Glenn T. Dentel, Chief Projects Branch 3 Division of Reactor Projects Distribution:
G. Dentel, DRP                          P. Cataldo, DRP, SRI R. Barkley, DRP                        C. Newport, DRP, RI M. Draxton, DRP                        A. Cass, DRP, AA DOC NAME: G:\DRP\BRANCH3\COMMUNICATIONS\PUBLIC MEETINGS\2014 ANNUAL ASSESSMENT MEETING\
SB\MEETING
==SUMMARY==
\SEABROOK MEETING
==SUMMARY==
2014.DOCX ADAMS Accession No.: ML14190B013 Non-Sensitive                    Publicly Available SUNSI Review Sensitive                        Non-Publicly Available OFFICE        RI/DRP                    RI/DRP NAME          RSB/ RSB                  GTD/ GTD DATE          07/ 09 /14                07/09/14}}

Latest revision as of 19:08, 5 February 2020

June 24, 2014, Summary of Annual Assessment Meeting Regarding Seabrook Station
ML14190B013
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 07/09/2014
From: Glenn Dentel
Reactor Projects Branch 3
To:
DENTEL, GT
References
Download: ML14190B013 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSYLVANIA 19406-2713 July 9, 2014 MEETING

SUMMARY

LICENSEE: NextEra Energy, Seabrook, LLC FACILITY: Seabrook Station, Unit 1

SUBJECT:

Summary of Annual Assessment Meeting regarding Seabrook Station On June 24, 2014, at 5:30 p.m., the U. S. Nuclear Regulatory Commission (NRC) conducted an open house at Best Western Inn and Conference Center in Hampton, NH. The NRC conducted the open house to discuss its assessment of the safety performance at Seabrook Station. The open house was followed by a public meeting from 6:30 - 8:30 pm.

A notice of the open house and public meeting was issued on June 5, 2014, and was posted on the NRCs external (public) web page. The meeting notice can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) with Accession No. ML14156A255. ADAMS is accessible from the NRC Web page at: http://www.nrc.gov/reading-rm/adams.html.

The NRC presented poster boards and was available to discuss its assessment of the safety performance of Seabrook for the period of January 1 through December 31, 2013, as documented in our letter dated March 4, 2014, ADAMS Accession No. ML14062A021.

The NRC poster boards presented included background on the Reactor Oversight Process (ROP) and the License Renewal Process. Additional information relative to the NRCs Annual Assessment Process and the safety performance of Seabrook can be found on the NRCs website at: www.nrc.gov/nrr/oversight/assess/index.html.

Members of the media and public, along with State and local officials, attended the open-house and the subsequent public meeting, and were offered the opportunity to question the NRC.

Statements and question were received regarding Seabrooks performance as well as issues related to the Alkali Silica Reaction (ASR) found in reinforced concrete structures at Seabrook, and the long-term storage of spent nuclear fuel.

/RA/

Glenn T. Dentel, Chief Projects Branch 3 Division of Reactor Projects

ML14062A021. The NRC poster boards presented included background on the Reactor Oversight Process (ROP) and the License Renewal Process. Additional information relative to the NRCs Annual Assessment Process and the safety performance of Seabrook can be found on the NRCs website at: www.nrc.gov/nrr/oversight/assess/index.html.

Members of the media and public, along with State and local officials, attended the open-house and the subsequent public meeting, and were offered the opportunity to question the NRC.

Statements and question were received regarding Seabrooks performance as well as issues related to the Alkali Silica Reaction (ASR) found in reinforced concrete structures at Seabrook, and the long-term storage of spent nuclear fuel.

/RA/

Glenn T. Dentel, Chief Projects Branch 3 Division of Reactor Projects Distribution:

G. Dentel, DRP P. Cataldo, DRP, SRI R. Barkley, DRP C. Newport, DRP, RI M. Draxton, DRP A. Cass, DRP, AA DOC NAME: G:\DRP\BRANCH3\COMMUNICATIONS\PUBLIC MEETINGS\2014 ANNUAL ASSESSMENT MEETING\