ML17033B024: Difference between revisions
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) StriderTol Bot change |
||
| (6 intermediate revisions by the same user not shown) | |||
| Line 2: | Line 2: | ||
| number = ML17033B024 | | number = ML17033B024 | ||
| issue date = 02/02/2017 | | issue date = 02/02/2017 | ||
| title = | | title = Qualifications P. Allister Burt General Superintendent - Nuclear Generation Niagara Mohawk Power Corporation | ||
| author name = | | author name = | ||
| author affiliation = Niagara Mohawk Power Corp | | author affiliation = Niagara Mohawk Power Corp | ||
| Line 13: | Line 13: | ||
| page count = 4 | | page count = 4 | ||
}} | }} | ||
=Text= | |||
{{#Wiki_filter:QUALIFICATIONS P. ALLISTER BURT GENERAL SUPERINTENDENT - NUCLEAR GENERATION NIAGARAMOHAWKPOWER CORPORATION My name is P. Allister Burt. | |||
My business address is Niagara 2 | |||
Mohawk Power Corporation, Nine Mile Point Nuclear Station, Post Office Box 32, Lycoming, New York. I am presently General Superintendent of 4 | |||
Nuclear Generation far the Niagara Mohawk Power Corporation. | |||
In this capacity, I am in charge of the overall operation of both the Nine Mile 6 | |||
Point and James A. FitzPatrick Nuclear Power Plants. | |||
Previous to this 7 | |||
assignment, I was Station Superintendent of the Nine Mile Point Nuclear 8 | |||
Station. | |||
9 I attended the University of Buffalo from 1939 to 1947, receiving a 10 13 14 15 18 certificate in engineering. | |||
Since then, I have taken courses in Nuclear Technology, Basic Radiological Health and Industrial Management. | |||
Until 1949, I held various positions at Niagara Mohawk's C. R. | |||
Huntley Generating Station, including the position of Assistant Results Superintendent. | |||
From 1949 to 1963 I was Station Superintendent for Niagara Mohawk's Dunkirk Steam Station, a 624 Mw steam plant. | |||
During this time, I was responsible for the start-up of all four units at the Station. | |||
From 1963 to 1967, I was assigned to the Project Engineering Department of Niagara Mohawk, where I participated in the design of the Nine Mile Point Nuclear Plant, assembled personnel for the plant, and | |||
sg 4 | |||
~ | |||
Page Two P. Allister Burt 20 planned and organized the training program for start-up and operation. | |||
23 During 1965 and 1966 I received eight months of on-the-job training at Big Rock Point and ZVZSR. | |||
'rom 1967 to 1972, I was Superintendent of the Nine Mile Point 24 Nuclear Plant. | |||
I had the primary responsibility..for bringing that plant 25 from the construction phase to'full power operation, and now have identical 26 responsibility for the James A. FitzPatrick Nuclear Plant. | |||
In addition, I I | |||
27 participated in the design review for the FitzPatrick Plant, as I am now 28 doing fo'r Nine Mile Point Unit 2. | |||
29 I am a Licensed Professional Engineer in the State of New York. | |||
80 I hold a Reactor Operators License from the Atomic Energy Commission. | |||
4}} | |||
Latest revision as of 16:12, 9 January 2025
| ML17033B024 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 02/02/2017 |
| From: | Niagara Mohawk Power Corp |
| To: | US Atomic Energy Commission (AEC) |
| References | |
| Download: ML17033B024 (4) | |
Text
QUALIFICATIONS P. ALLISTER BURT GENERAL SUPERINTENDENT - NUCLEAR GENERATION NIAGARAMOHAWKPOWER CORPORATION My name is P. Allister Burt.
My business address is Niagara 2
Mohawk Power Corporation, Nine Mile Point Nuclear Station, Post Office Box 32, Lycoming, New York. I am presently General Superintendent of 4
Nuclear Generation far the Niagara Mohawk Power Corporation.
In this capacity, I am in charge of the overall operation of both the Nine Mile 6
Point and James A. FitzPatrick Nuclear Power Plants.
Previous to this 7
assignment, I was Station Superintendent of the Nine Mile Point Nuclear 8
Station.
9 I attended the University of Buffalo from 1939 to 1947, receiving a 10 13 14 15 18 certificate in engineering.
Since then, I have taken courses in Nuclear Technology, Basic Radiological Health and Industrial Management.
Until 1949, I held various positions at Niagara Mohawk's C. R.
Huntley Generating Station, including the position of Assistant Results Superintendent.
From 1949 to 1963 I was Station Superintendent for Niagara Mohawk's Dunkirk Steam Station, a 624 Mw steam plant.
During this time, I was responsible for the start-up of all four units at the Station.
From 1963 to 1967, I was assigned to the Project Engineering Department of Niagara Mohawk, where I participated in the design of the Nine Mile Point Nuclear Plant, assembled personnel for the plant, and
sg 4
~
Page Two P. Allister Burt 20 planned and organized the training program for start-up and operation.
23 During 1965 and 1966 I received eight months of on-the-job training at Big Rock Point and ZVZSR.
'rom 1967 to 1972, I was Superintendent of the Nine Mile Point 24 Nuclear Plant.
I had the primary responsibility..for bringing that plant 25 from the construction phase to'full power operation, and now have identical 26 responsibility for the James A. FitzPatrick Nuclear Plant.
In addition, I I
27 participated in the design review for the FitzPatrick Plant, as I am now 28 doing fo'r Nine Mile Point Unit 2.
29 I am a Licensed Professional Engineer in the State of New York.
80 I hold a Reactor Operators License from the Atomic Energy Commission.
4