ML17033B024: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
StriderTol Bot change
 
(6 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML17033B024
| number = ML17033B024
| issue date = 02/02/2017
| issue date = 02/02/2017
| title = Nine Mile Point, Units 1 and 2 - Qualifications P. Allister Burt General Superintendent - Nuclear Generation Niagara Mohawk Power Corporation
| title = Qualifications P. Allister Burt General Superintendent - Nuclear Generation Niagara Mohawk Power Corporation
| author name =  
| author name =  
| author affiliation = Niagara Mohawk Power Corp
| author affiliation = Niagara Mohawk Power Corp
Line 13: Line 13:
| page count = 4
| page count = 4
}}
}}
=Text=
{{#Wiki_filter:QUALIFICATIONS P. ALLISTER BURT GENERAL SUPERINTENDENT - NUCLEAR GENERATION NIAGARAMOHAWKPOWER CORPORATION My name is P. Allister Burt.
My business address is Niagara 2
Mohawk Power Corporation, Nine Mile Point Nuclear Station, Post Office Box 32, Lycoming, New York. I am presently General Superintendent of 4
Nuclear Generation far the Niagara Mohawk Power Corporation.
In this capacity, I am in charge of the overall operation of both the Nine Mile 6
Point and James A. FitzPatrick Nuclear Power Plants.
Previous to this 7
assignment, I was Station Superintendent of the Nine Mile Point Nuclear 8
Station.
9 I attended the University of Buffalo from 1939 to 1947, receiving a 10 13 14 15 18 certificate in engineering.
Since then, I have taken courses in Nuclear Technology, Basic Radiological Health and Industrial Management.
Until 1949, I held various positions at Niagara Mohawk's C. R.
Huntley Generating Station, including the position of Assistant Results Superintendent.
From 1949 to 1963 I was Station Superintendent for Niagara Mohawk's Dunkirk Steam Station, a 624 Mw steam plant.
During this time, I was responsible for the start-up of all four units at the Station.
From 1963 to 1967, I was assigned to the Project Engineering Department of Niagara Mohawk, where I participated in the design of the Nine Mile Point Nuclear Plant, assembled personnel for the plant, and
sg 4
~
Page Two P. Allister Burt 20 planned and organized the training program for start-up and operation.
23 During 1965 and 1966 I received eight months of on-the-job training at Big Rock Point and ZVZSR.
'rom 1967 to 1972, I was Superintendent of the Nine Mile Point 24 Nuclear Plant.
I had the primary responsibility..for bringing that plant 25 from the construction phase to'full power operation, and now have identical 26 responsibility for the James A. FitzPatrick Nuclear Plant.
In addition, I I
27 participated in the design review for the FitzPatrick Plant, as I am now 28 doing fo'r Nine Mile Point Unit 2.
29 I am a Licensed Professional Engineer in the State of New York.
80 I hold a Reactor Operators License from the Atomic Energy Commission.
4}}

Latest revision as of 16:12, 9 January 2025

Qualifications P. Allister Burt General Superintendent - Nuclear Generation Niagara Mohawk Power Corporation
ML17033B024
Person / Time
Site: Nine Mile Point  
Issue date: 02/02/2017
From:
Niagara Mohawk Power Corp
To:
US Atomic Energy Commission (AEC)
References
Download: ML17033B024 (4)


Text

QUALIFICATIONS P. ALLISTER BURT GENERAL SUPERINTENDENT - NUCLEAR GENERATION NIAGARAMOHAWKPOWER CORPORATION My name is P. Allister Burt.

My business address is Niagara 2

Mohawk Power Corporation, Nine Mile Point Nuclear Station, Post Office Box 32, Lycoming, New York. I am presently General Superintendent of 4

Nuclear Generation far the Niagara Mohawk Power Corporation.

In this capacity, I am in charge of the overall operation of both the Nine Mile 6

Point and James A. FitzPatrick Nuclear Power Plants.

Previous to this 7

assignment, I was Station Superintendent of the Nine Mile Point Nuclear 8

Station.

9 I attended the University of Buffalo from 1939 to 1947, receiving a 10 13 14 15 18 certificate in engineering.

Since then, I have taken courses in Nuclear Technology, Basic Radiological Health and Industrial Management.

Until 1949, I held various positions at Niagara Mohawk's C. R.

Huntley Generating Station, including the position of Assistant Results Superintendent.

From 1949 to 1963 I was Station Superintendent for Niagara Mohawk's Dunkirk Steam Station, a 624 Mw steam plant.

During this time, I was responsible for the start-up of all four units at the Station.

From 1963 to 1967, I was assigned to the Project Engineering Department of Niagara Mohawk, where I participated in the design of the Nine Mile Point Nuclear Plant, assembled personnel for the plant, and

sg 4

~

Page Two P. Allister Burt 20 planned and organized the training program for start-up and operation.

23 During 1965 and 1966 I received eight months of on-the-job training at Big Rock Point and ZVZSR.

'rom 1967 to 1972, I was Superintendent of the Nine Mile Point 24 Nuclear Plant.

I had the primary responsibility..for bringing that plant 25 from the construction phase to'full power operation, and now have identical 26 responsibility for the James A. FitzPatrick Nuclear Plant.

In addition, I I

27 participated in the design review for the FitzPatrick Plant, as I am now 28 doing fo'r Nine Mile Point Unit 2.

29 I am a Licensed Professional Engineer in the State of New York.

80 I hold a Reactor Operators License from the Atomic Energy Commission.

4