The third group of requested documents consists of those items that the inspection team will  
The third group of requested documents consists of those items that the inspection team will  
review, or need access to, during the inspection. Please have this information available by the  
review, or need access to, during the inspection. Please have this information available by the  
first day of the onsite inspection, June 24, 2024.April 10, 2024
first day of the onsite inspection, June 24, 2024.
E. Pigott 2
April 10, 2024
 
E. Pigott
2
The fourth group of information is necessary to aid the inspection team in tracking issues  
The fourth group of information is necessary to aid the inspection team in tracking issues  
identified as a result of the inspection. It is requested that this information be provided to the  
identified as a result of the inspection. It is requested that this information be provided to the  
Line 88: Line 91:


  ML24100A874
  ML24100A874
                          X    Non-Sensitive                  X   Publicly Available
X
  X  SUNSI Review
SUNSI Review
                              Sensitive                          Non-Publicly Available
X
 
Non-Sensitive
OFFICE  RII/DRS          RII/DRS
NAME    P. Braaten      D. Bacon
DATE    4/10/2024        4/10/2024
                               
Inspection Report:        05000369/2024403; 05000370/2024403
 
 
Inspection Dates:          June 24 - 28, 2024
 
 
Inspection Procedure:      IP 71130.10, Cybersecurity, Revision 0 (Effective: 01/01/2022)
 
 
Reference:                  Guidance Document for Development of the Request for
                            Information (RFI) and Notification Letter for Full-Implementation of
                            the Cyber Security Inspection, Rev. 2 (Issued: 11/22/2021)
 
 
NRC Inspectors:Philipp Braaten, Lead                        William Monk
                            404-997-4651                                    404-997-4579
                            Philipp.Braaten@nrc.gov                  William.Monk@nrc.gov


NRC Contractors:      Balla Barro                                        James Hartman
Sensitive
                            Balla.Barro@nrc.gov                  James.Hartman@nrc.gov
X
Publicly Available


I.   Information Requested for In-Office Preparation
Non-Publicly Available
OFFICE
RII/DRS
RII/DRS
NAME
P. Braaten
D. Bacon
DATE
4/10/2024
4/10/2024


The initial request for information (i.e., first RFI) concentrates on providing the inspection team
Enclosure
with the general information necessary to select appropriate components and CSP elements to
Inspection Report:
develop a site-specific inspection plan. The first RFI is used to identify the list of critical
05000369/2024403; 05000370/2024403
systems and critical digital assets (CSs/CDAs) plus operational and management (O&M)
Inspection Dates:
security control portions of the CSP to be chosen as the sample set required to be inspected
June 24 - 28, 2024
by the cybersecurity IP. The first RFIs requested information is specified below in Table
Inspection Procedure:
RFI #1. The Table RFI #1 information is requested to be provided to the regional office by May
IP 71130.10, Cybersecurity, Revision 0 (Effective: 01/01/2022)
10, 2024, or sooner, to facilitate the selection of the specific items that will be reviewed during
Reference:
Guidance Document for Development of the Request for
Information (RFI) and Notification Letter for Full-Implementation of
the Cyber Security Inspection, Rev. 2 (Issued: 11/22/2021)
NRC Inspectors:
Philipp Braaten, Lead
William Monk
404-997-4651
404-997-4579
Philipp.Braaten@nrc.gov                  William.Monk@nrc.gov
NRC Contractors:
Balla Barro
James Hartman
Balla.Barro@nrc.gov
James.Hartman@nrc.gov
I.
Information Requested for In-Office Preparation
The initial request for information (i.e., first RFI) concentrates on providing the inspection team  
with the general information necessary to select appropriate components and CSP elements to  
develop a site-specific inspection plan. The first RFI is used to identify the list of critical  
systems and critical digital assets (CSs/CDAs) plus operational and management (O&M)  
security control portions of the CSP to be chosen as the sample set required to be inspected  
by the cybersecurity IP. The first RFIs requested information is specified below in Table  
RFI #1. The Table RFI #1 information is requested to be provided to the regional office by May  
10, 2024, or sooner, to facilitate the selection of the specific items that will be reviewed during  
the onsite inspection weeks.
the onsite inspection weeks.
 
The inspection team will examine the returned documentation from the first RFI and  
The inspection team will examine the returned documentation from the first RFI and
identify/select specific systems and equipment (e.g., CSs/CDAs) to provide a more focused  
identify/select specific systems and equipment (e.g., CSs/CDAs) to provide a more focused
follow-up request to develop the second RFI. The inspection team will submit the specific  
follow-up request to develop the second RFI. The inspection team will submit the specific
systems and equipment list to your staff by May 17, 2024, which will identify the specific  
systems and equipment list to your staff by May 17, 2024, which will identify the specific
systems and equipment that will be utilized to evaluate the CSs/CDAs, defensive architecture,  
systems and equipment that will be utilized to evaluate the CSs/CDAs, defensive architecture,
and the areas of the licensees CSP selected for the cybersecurity inspection. We request that  
and the areas of the licensees CSP selected for the cybersecurity inspection. We request that
the additional information provided from the second RFI be made available to the regional  
the additional information provided from the second RFI be made available to the regional
office prior to the inspection by June 14, 2024. All requests for information shall follow the  
office prior to the inspection by June 14, 2024. All requests for information shall follow the
guidance document U.S. NRC - Guidance Document for Development of the Request for  
guidance document U.S. NRC - Guidance Document for Development of the Request for
Information (RFI) and Notification Letter for Full Implementation of the Cyber Security  
Information (RFI) and Notification Letter for Full Implementation of the Cyber Security
Inspection, referenced above.
Inspection, referenced above.
 
The required Table RFI #1 information shall be provided electronically to the lead inspector by  
The required Table RFI #1 information shall be provided electronically to the lead inspector by
May 10, 2024. The preferred file format for all lists is a searchable Excel spreadsheet file. The  
May 10, 2024. The preferred file format for all lists is a searchable Excel spreadsheet file. The
information should be indexed and hyper-linked to facilitate ease of use. If you have any  
information should be indexed and hyper-linked to facilitate ease of use. If you have any
questions regarding this information, please call the inspection team leader as soon as  
questions regarding this information, please call the inspection team leader as soon as
possible.
possible.


                                                                                      Enclosure
2
                                      Table RFI #1
Table RFI #1
 
Paragraph Number/Title:
Paragraph Number/Title:                                                         IP Ref
IP Ref
 
1
    A list of all Identified Critical Systems and Critical Digital Assets, -
A list of all Identified Critical Systems and Critical Digital Assets, -  
  1  highlight/note any additions, deletions, reclassifications due to new       Overall
highlight/note any additions, deletions, reclassifications due to new  
    guidance from white papers, changes to NEI 10-04, 13-10, etc. since
guidance from white papers, changes to NEI 10-04, 13-10, etc. since  
    the last cybersecurity inspection.
the last cybersecurity inspection.
 
Overall
  2 A list of EP and Security onsite and offsite digital communication         Overall
2
    systems.
A list of EP and Security onsite and offsite digital communication  
 
systems.  
  3 Network Topology Diagrams to include information and data flow for         Overall
Overall
    critical systems in levels 2, 3, and 4 (If available).
3
 
Network Topology Diagrams to include information and data flow for  
4 Ongoing Monitoring and Assessment program documentation.                     03.01(a)
critical systems in levels 2, 3, and 4 (If available).
 
Overall
  5  The most recent effectiveness analysis of the Cybersecurity Program.       03.01(b)
4
 
Ongoing Monitoring and Assessment program documentation.
    Cybersecurity Incident Response program documentation, including
03.01(a)
    incident detection, response, and recovery documentation as well as       03.02(a)
5
  6  contingency plan development, implementation, and including any               and
The most recent effectiveness analysis of the Cybersecurity Program.
    program documentation that requires testing of security boundary           03.04(b)
03.01(b)
    device functionality.
6
 
Cybersecurity Incident Response program documentation, including  
  7  Password/Authenticator program documentation.                               03.02(c)
incident detection, response, and recovery documentation as well as  
 
contingency plan development, implementation, and including any  
    Design change/ modification program documentation and a list of all
program documentation that requires testing of security boundary  
  8  design changes completed since the last cybersecurity inspection,           03.03(a)
device functionality.
    including either a summary of the design change or the 50.59
03.02(a)
    documentation for the change.
and
 
03.04(b)
  9 Supply Chain Management program documentation including a list of         03.03(a), (b)
7
    security impact analysis for new acquisitions.                            and (c)
Password/Authenticator program documentation.  
 
03.02(c)
    Configuration Management program documentation including a list of         03.03(a)
8
10  security impact analysis performed due to configuration changes since       and (b)
Design change/ modification program documentation and a list of all  
    the last cybersecurity inspection.
design changes completed since the last cybersecurity inspection,  
 
including either a summary of the design change or the 50.59  
11   Cyber Security Plan and any 50.54(p) analysis to support changes to         03.04(a)
documentation for the change.  
    the plan since the last inspection.
03.03(a)
 
9
12   Cybersecurity Performance Metrics tracked (if applicable).                 03.06(b)
Supply Chain Management program documentation including a list of  
 
security impact analysis for new acquisitions.
13  Provide a list of all cybersecurity procedures and policies with their     Overall
03.03(a), (b)  
    descriptive name and associated number.
and (c)        
 
10
14   Performance testing report (if applicable).                                 03.06(a)
Configuration Management program documentation including a list of  
 
security impact analysis performed due to configuration changes since  
    Any cybersecurity event reports submitted in accordance with 10 CFR
the last cybersecurity inspection.  
15  73.77 since the last cybersecurity inspection and any copies of any         03.04(a)
03.03(a)
    recordable cybersecurity events since the last inspection
and (b)
 
11
Cyber Security Plan and any 50.54(p) analysis to support changes to  
the plan since the last inspection.
03.04(a)
12
Cybersecurity Performance Metrics tracked (if applicable).
03.06(b)
13
Provide a list of all cybersecurity procedures and policies with their  
descriptive name and associated number.
Overall
14
Performance testing report (if applicable).
03.06(a)
15
Any cybersecurity event reports submitted in accordance with 10 CFR  
73.77 since the last cybersecurity inspection and any copies of any  
recordable cybersecurity events since the last inspection
03.04(a)


                                            2
3
Based on this information, the inspection team will identify and select specific systems and
Based on this information, the inspection team will identify and select specific systems and  
equipment (e.g., CSs/CDAs) from the information requested by Table RFI #1 and submit a list
equipment (e.g., CSs/CDAs) from the information requested by Table RFI #1 and submit a list  
of specific systems and equipment to your staff by May 17, 2024, for the second RFI
of specific systems and equipment to your staff by May 17, 2024, for the second RFI  
(i.e., RFI #2).
(i.e., RFI #2).
 
II.
II.     Additional Information Requested to be Available Prior to Inspection
Additional Information Requested to be Available Prior to Inspection
 
As stated in Section I above, the inspection team will examine the returned documentation  
As stated in Section I above, the inspection team will examine the returned documentation
requested from Table RFI #1 and submit the list of specific systems and equipment to your  
requested from Table RFI #1 and submit the list of specific systems and equipment to your
staff by May 17, 2024, for the second RFI (i.e., RFI #2). The second RFI will request additional  
staff by May 17, 2024, for the second RFI (i.e., RFI #2). The second RFI will request additional
information required to evaluate the CSs/CDAs, defensive architecture, and the areas of the  
information required to evaluate the CSs/CDAs, defensive architecture, and the areas of the
licensees CSP selected for the cybersecurity inspection. The additional information requested  
licensees CSP selected for the cybersecurity inspection. The additional information requested
for the specific systems and equipment is identified in Table RFI #2.  All requested information  
for the specific systems and equipment is identified in Table RFI #2.  All requested information
shall follow the guidance document referenced above.
shall follow the guidance document referenced above.
 
The Table RFI 2 information shall be provided to the lead inspector by June 14, 2024. The  
The Table RFI 2 information shall be provided to the lead inspector by June 14, 2024. The
preferred file format for all lists is a searchable Excel spreadsheet. The information should be  
preferred file format for all lists is a searchable Excel spreadsheet. The information should be
indexed and hyper-linked to facilitate ease of use. If you have any questions regarding this  
indexed and hyper-linked to facilitate ease of use. If you have any questions regarding this
information, please call the inspection team leader as soon as possible.
information, please call the inspection team leader as soon as possible.
Table RFI #2
Paragraph Number/Title:
Items
For the system(s) chosen for inspection provide:
1
Ongoing Monitoring and Assessment activity performed on the
selected system(s).
03.01(a)
2
All Security Control Assessments for the selected design changes
and system(s). *
03.01(a)
3
All vulnerability screenings/assessments associated with, or scans
performed on the selected system(s) since the last cybersecurity
inspection. *
All vulnerability screenings and assessments completed prior to
putting new equipment into service as part of the select design
changes.
03.01(c)
4
Documentation (including configuration files and rules sets) for
Network-based Intrusion Detection/Protection Systems (NIDS/NIPS),
Host-based Intrusion Detection Systems (HIDS), and Security
Information and Event Management (SIEM) systems for system(s)
chosen for inspection (i.e. the devices that are credit for protection
for the selected systems). *
03.02(b)


                                    Table RFI #2
4
 
5
Paragraph Number/Title:                                                        Items
Documentation (including configuration files and rule sets) for intra-
 
security level firewalls and boundary devices used to protect the  
      For the system(s) chosen for inspection provide:
selected system(s).
 
03.02(c)
  1  Ongoing Monitoring and Assessment activity performed on the            03.01(a)
6
      selected system(s).
Copies of all periodic reviews of the access authorization list for the  
 
selected systems since the last cybersecurity inspection.
  2  All Security Control Assessments for the selected design changes        03.01(a)
03.02(d)
      and system(s). *
7
 
Baseline configuration data sheets for the selected CDAs and for  
      All vulnerability screenings/assessments associated with, or scans
selected design changes. *
      performed on the selected system(s) since the last cybersecurity
03.03(a)
  3  inspection. *                                                          03.01(c)
8
      All vulnerability screenings and assessments completed prior to
Security impact analysis for the selected design changes.
      putting new equipment into service as part of the select design
03.03(b)
      changes.
9
 
Copies of the purchase order documentation for selected design  
      Documentation (including configuration files and rules sets) for
changes.
      Network-based Intrusion Detection/Protection Systems (NIDS/NIPS),
03.03(c)
  4 Host-based Intrusion Detection Systems (HIDS), and Security            03.02(b)
10
      Information and Event Management (SIEM) systems for system(s)
Copies of any reports/assessment for cybersecurity drills performed  
      chosen for inspection (i.e. the devices that are credit for protection
since the last inspection.
      for the selected systems). *
03.02(a)
 
03.04(b)
 
11
 
Copy of the individual recovery plan(s) for the selected system(s)  
 
including documentation of the results the last time the backups  
 
were executed.
 
03.02(a)
 
03.04(b)
                                              3
12
      Documentation (including configuration files and rule sets) for intra-
List of Corrective actions taken as a result of cybersecurity  
    5  security level firewalls and boundary devices used to protect the       03.02(c)
incidents/issues to include previous NRC violations and Licensee  
      selected system(s).
Identified Violations since the last cybersecurity inspection.  
 
03.05
    6 Copies of all periodic reviews of the access authorization list for the 03.02(d)
13
      selected systems since the last cybersecurity inspection.
Vulnerability Management program screening and assessment  
 
policies and procedures
    7 Baseline configuration data sheets for the selected CDAs and for       03.03(a)
03.01(c)
      selected design changes. *
14
 
The most recent Cybersecurity Quality Assurance audit and/or self-
    8 Security impact analysis for the selected design changes.               03.03(b)
assessment and a list of Corrective Actions generated as a result
 
*Some selected systems may have a large number of CDAs. For these systems reach out to the  
    9  Copies of the purchase order documentation for selected design         03.03(c)
team leader for a specific selection of CDAs when responding to this request.
      changes.
III.
 
Information Requested to be Available on First Day of Inspection
      Copies of any reports/assessment for cybersecurity drills performed     03.02(a)
For the specific systems and equipment identified in Section II above, provide the following RFI  
  10  since the last inspection.                                              03.04(b)
(i.e., Table Week Onsite) to the team by June 24, 2024, the first day of the inspection. All  
 
 
      Copy of the individual recovery plan(s) for the selected system(s)      03.02(a)
  11  including documentation of the results the last time the backups       03.04(b)
      were executed.
 
      List of Corrective actions taken as a result of cybersecurity
  12  incidents/issues to include previous NRC violations and Licensee         03.05
      Identified Violations since the last cybersecurity inspection.
 
  13   Vulnerability Management program screening and assessment               03.01(c)
      policies and procedures
 
  14  The most recent Cybersecurity Quality Assurance audit and/or self-
      assessment and a list of Corrective Actions generated as a result
 
 
*Some selected systems may have a large number of CDAs. For these systems reach out to the
      team leader for a specific selection of CDAs when responding to this request.
 
 
 
III.     Information Requested to be Available on First Day of Inspection
 
For the specific systems and equipment identified in Section II above, provide the following RFI
(i.e., Table Week Onsite) to the team by June 24, 2024, the first day of the inspection. All
requested information shall follow the guidance document referenced above.
requested information shall follow the guidance document referenced above.
 
The preferred file format for all lists is a searchable Excel spreadsheet file. The information  
The preferred file format for all lists is a searchable Excel spreadsheet file. The information
should be indexed and hyper-linked to facilitate ease of use. If you have any questions  
should be indexed and hyper-linked to facilitate ease of use. If you have any questions
regarding this information, please call the inspection team leader as soon as possible.
regarding this information, please call the inspection team leader as soon as possible.


 
5
 
Table Week Onsite
 
Paragraph Number/Title:
 
Items
 
1
 
Updated copies of corrective actions taken as a result of  
                                              4
cybersecurity incidents/issues, to include previous NRC violations  
                                  Table Week Onsite
and Licensee Identified Violations since the last cybersecurity  
 
inspection, as well as vulnerability-related corrective actions.  
Paragraph Number/Title:                                                       Items
03.05
 
      Updated copies of corrective actions taken as a result of
  1  cybersecurity incidents/issues, to include previous NRC violations     03.05
      and Licensee Identified Violations since the last cybersecurity
      inspection, as well as vulnerability-related corrective actions.
 
 
 
 
   IV.      Information Requested to Be Provided Throughout the Inspection
   IV.      Information Requested to Be Provided Throughout the Inspection
 
(1) Copies of any corrective action documents generated as a result of the inspection  
      (1) Copies of any corrective action documents generated as a result of the inspection
teams questions or queries during the inspection.
      teams questions or queries during the inspection.
(2) Copies of the list of questions submitted by the inspection team members and the  
 
status/resolution of the information requested (provided daily during the inspection to  
      (2) Copies of the list of questions submitted by the inspection team members and the
each inspection team member).
      status/resolution of the information requested (provided daily during the inspection to
If you have any questions regarding the information requested, please contact the inspection  
      each inspection team member).
 
 
If you have any questions regarding the information requested, please contact the inspection
team leader.
team leader.
                                              5
}}
}}

Latest revision as of 18:43, 24 November 2024

Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000369/2024403; and 05000370/2024403
ML24100A874
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 04/10/2024
From: Daniel Bacon
Division of Reactor Safety II
To: Pigott E
Duke Energy Carolinas
References
IR 2024403
Download: ML24100A874 (8)


See also: IR 05000369/2024403

Text

Edward Pigott

Site Vice President

Duke Energy Carolinas, LLC

McGuire Nuclear Station

12700 Hagers Ferry Road

Huntersville, NC 28078-8935

SUBJECT: MCGUIRE NUCLEAR STATION - INFORMATION REQUEST FOR THE

CYBERSECURITY BASELINE INSPECTION, NOTIFICATION TO PERFORM

INSPECTION 05000369/2024403; 05000370/2024403

Dear Edward Pigott:

On June 24, 2024, the U.S. Nuclear Regulatory Commission (NRC) will begin a baseline

inspection in accordance with Inspection Procedure (IP) 71130.10 Cybersecurity, Revision 0 at

your McGuire Nuclear Station. The inspection will be performed to evaluate and verify your

ability to provide assurance that your digital computer and communication systems and

networks associated with safety, security, or emergency preparedness (SSEP) functions are

adequately protected against cyber-attacks in accordance with Title 10 of the Code of Federal

Regulations (10 CFR) 73.54 and the U.S. Nuclear Regulatory Commission (NRC) approved

cyber security plan (CSP). The onsite portion of the inspection will take place during the week of

June 24, 2024.

Experience has shown that baseline inspections are extremely resource intensive, both for the

NRC inspectors and the licensee staff. To minimize the inspection impact on the site and to

ensure a productive inspection for both parties, we have enclosed a request for documents

needed for the inspection. These documents have been divided into four groups.

The first group specifies information necessary to assist the inspection team in choosing the

focus areas (i.e., sample set) to be inspected by the cybersecurity IP. This information should

be made available electronically no later than May 10, 2024. The inspection team will review

this information and, by May 17, 2024, will request the specific items that should be provided for

review. This second group of additional requested documents will assist the inspection team in

the evaluation of the critical systems and critical digital assets (CSs/CDAs), defensive

architecture, and the areas of the licensees CSP selected for the cybersecurity inspection. We

request that the information provided from the second RFI be made available to the regional

office prior to the inspection by June 14, 2024.

The third group of requested documents consists of those items that the inspection team will

review, or need access to, during the inspection. Please have this information available by the

first day of the onsite inspection, June 24, 2024.

April 10, 2024

E. Pigott

2

The fourth group of information is necessary to aid the inspection team in tracking issues

identified as a result of the inspection. It is requested that this information be provided to the

lead inspector as the information is generated during the inspection. It is important that all these

documents are up to date and complete in order to minimize the number of additional

documents requested during the preparation and/or the onsite portions of the inspection.

The lead inspector for this inspection is Philipp Braaten. We understand that our regulatory

contact for this inspection is Jeff Thomas of your organization. If there are any questions about

the inspection or the material requested, please contact the lead inspector at (404) 997-4651 or

via e-mail at Philipp.braaten@nrc.gov.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, control number 3150-

0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a

request for information or an information collection requirement unless the requesting document

displays a currently valid Office of Management and Budget control number.

In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding,

of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available

electronically for public inspection in the NRCs Public Document Room or from the Publicly

Available Records (PARS) component of the NRC's Agencywide Documents Access and

Management System (ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

Daniel Bacon, Branch Chief

Engineering Branch 2

Division of Reactor Safety

Docket Nos. 05000369 and 05000370

License Nos. NPF-9 and NPF-17

Enclosure:

McGuire Nuclear Station Cybersecurity Inspection Document Request

cc w/encl: Distribution via LISTSERV

Signed by Bacon, Daniel

on 04/10/24

ML24100A874

X

SUNSI Review

X

Non-Sensitive

Sensitive

X

Publicly Available

Non-Publicly Available

OFFICE

RII/DRS

RII/DRS

NAME

P. Braaten

D. Bacon

DATE

4/10/2024

4/10/2024

Enclosure

Inspection Report: 05000369/2024403; 05000370/2024403

Inspection Dates:

June 24 - 28, 2024

Inspection Procedure:

IP 71130.10, Cybersecurity, Revision 0 (Effective: 01/01/2022)

Reference:

Guidance Document for Development of the Request for

Information (RFI) and Notification Letter for Full-Implementation of

the Cyber Security Inspection, Rev. 2 (Issued: 11/22/2021)

NRC Inspectors:

Philipp Braaten, Lead

William Monk

404-997-4651

404-997-4579

Philipp.Braaten@nrc.gov William.Monk@nrc.gov

NRC Contractors:

Balla Barro

James Hartman

Balla.Barro@nrc.gov

James.Hartman@nrc.gov

I.

Information Requested for In-Office Preparation

The initial request for information (i.e., first RFI) concentrates on providing the inspection team

with the general information necessary to select appropriate components and CSP elements to

develop a site-specific inspection plan. The first RFI is used to identify the list of critical

systems and critical digital assets (CSs/CDAs) plus operational and management (O&M)

security control portions of the CSP to be chosen as the sample set required to be inspected

by the cybersecurity IP. The first RFIs requested information is specified below in Table

RFI #1. The Table RFI #1 information is requested to be provided to the regional office by May

10, 2024, or sooner, to facilitate the selection of the specific items that will be reviewed during

the onsite inspection weeks.

The inspection team will examine the returned documentation from the first RFI and

identify/select specific systems and equipment (e.g., CSs/CDAs) to provide a more focused

follow-up request to develop the second RFI. The inspection team will submit the specific

systems and equipment list to your staff by May 17, 2024, which will identify the specific

systems and equipment that will be utilized to evaluate the CSs/CDAs, defensive architecture,

and the areas of the licensees CSP selected for the cybersecurity inspection. We request that

the additional information provided from the second RFI be made available to the regional

office prior to the inspection by June 14, 2024. All requests for information shall follow the

guidance document U.S. NRC - Guidance Document for Development of the Request for

Information (RFI) and Notification Letter for Full Implementation of the Cyber Security

Inspection, referenced above.

The required Table RFI #1 information shall be provided electronically to the lead inspector by

May 10, 2024. The preferred file format for all lists is a searchable Excel spreadsheet file. The

information should be indexed and hyper-linked to facilitate ease of use. If you have any

questions regarding this information, please call the inspection team leader as soon as

possible.

2

Table RFI #1

Paragraph Number/Title:

IP Ref

1

A list of all Identified Critical Systems and Critical Digital Assets, -

highlight/note any additions, deletions, reclassifications due to new

guidance from white papers, changes to NEI 10-04, 13-10, etc. since

the last cybersecurity inspection.

Overall

2

A list of EP and Security onsite and offsite digital communication

systems.

Overall

3

Network Topology Diagrams to include information and data flow for

critical systems in levels 2, 3, and 4 (If available).

Overall

4

Ongoing Monitoring and Assessment program documentation.

03.01(a)

5

The most recent effectiveness analysis of the Cybersecurity Program.

03.01(b)

6

Cybersecurity Incident Response program documentation, including

incident detection, response, and recovery documentation as well as

contingency plan development, implementation, and including any

program documentation that requires testing of security boundary

device functionality.

03.02(a)

and

03.04(b)

7

Password/Authenticator program documentation.

03.02(c)

8

Design change/ modification program documentation and a list of all

design changes completed since the last cybersecurity inspection,

including either a summary of the design change or the 50.59

documentation for the change.

03.03(a)

9

Supply Chain Management program documentation including a list of

security impact analysis for new acquisitions.

03.03(a), (b)

and (c)

10

Configuration Management program documentation including a list of

security impact analysis performed due to configuration changes since

the last cybersecurity inspection.

03.03(a)

and (b)

11

Cyber Security Plan and any 50.54(p) analysis to support changes to

the plan since the last inspection.

03.04(a)

12

Cybersecurity Performance Metrics tracked (if applicable).

03.06(b)

13

Provide a list of all cybersecurity procedures and policies with their

descriptive name and associated number.

Overall

14

Performance testing report (if applicable).

03.06(a)

15

Any cybersecurity event reports submitted in accordance with 10 CFR

73.77 since the last cybersecurity inspection and any copies of any

recordable cybersecurity events since the last inspection

03.04(a)

3

Based on this information, the inspection team will identify and select specific systems and

equipment (e.g., CSs/CDAs) from the information requested by Table RFI #1 and submit a list

of specific systems and equipment to your staff by May 17, 2024, for the second RFI

(i.e., RFI #2).

II.

Additional Information Requested to be Available Prior to Inspection

As stated in Section I above, the inspection team will examine the returned documentation

requested from Table RFI #1 and submit the list of specific systems and equipment to your

staff by May 17, 2024, for the second RFI (i.e., RFI #2). The second RFI will request additional

information required to evaluate the CSs/CDAs, defensive architecture, and the areas of the

licensees CSP selected for the cybersecurity inspection. The additional information requested

for the specific systems and equipment is identified in Table RFI #2. All requested information

shall follow the guidance document referenced above.

The Table RFI 2 information shall be provided to the lead inspector by June 14, 2024. The

preferred file format for all lists is a searchable Excel spreadsheet. The information should be

indexed and hyper-linked to facilitate ease of use. If you have any questions regarding this

information, please call the inspection team leader as soon as possible.

Table RFI #2

Paragraph Number/Title:

Items

For the system(s) chosen for inspection provide:

1

Ongoing Monitoring and Assessment activity performed on the

selected system(s).

03.01(a)

2

All Security Control Assessments for the selected design changes

and system(s). *

03.01(a)

3

All vulnerability screenings/assessments associated with, or scans

performed on the selected system(s) since the last cybersecurity

inspection. *

All vulnerability screenings and assessments completed prior to

putting new equipment into service as part of the select design

changes.

03.01(c)

4

Documentation (including configuration files and rules sets) for

Network-based Intrusion Detection/Protection Systems (NIDS/NIPS),

Host-based Intrusion Detection Systems (HIDS), and Security

Information and Event Management (SIEM) systems for system(s)

chosen for inspection (i.e. the devices that are credit for protection

for the selected systems). *

03.02(b)

4

5

Documentation (including configuration files and rule sets) for intra-

security level firewalls and boundary devices used to protect the

selected system(s).

03.02(c)

6

Copies of all periodic reviews of the access authorization list for the

selected systems since the last cybersecurity inspection.

03.02(d)

7

Baseline configuration data sheets for the selected CDAs and for

selected design changes. *

03.03(a)

8

Security impact analysis for the selected design changes.

03.03(b)

9

Copies of the purchase order documentation for selected design

changes.

03.03(c)

10

Copies of any reports/assessment for cybersecurity drills performed

since the last inspection.

03.02(a)

03.04(b)

11

Copy of the individual recovery plan(s) for the selected system(s)

including documentation of the results the last time the backups

were executed.

03.02(a)

03.04(b)

12

List of Corrective actions taken as a result of cybersecurity

incidents/issues to include previous NRC violations and Licensee

Identified Violations since the last cybersecurity inspection.

03.05

13

Vulnerability Management program screening and assessment

policies and procedures

03.01(c)

14

The most recent Cybersecurity Quality Assurance audit and/or self-

assessment and a list of Corrective Actions generated as a result

  • Some selected systems may have a large number of CDAs. For these systems reach out to the

team leader for a specific selection of CDAs when responding to this request.

III.

Information Requested to be Available on First Day of Inspection

For the specific systems and equipment identified in Section II above, provide the following RFI

(i.e., Table Week Onsite) to the team by June 24, 2024, the first day of the inspection. All

requested information shall follow the guidance document referenced above.

The preferred file format for all lists is a searchable Excel spreadsheet file. The information

should be indexed and hyper-linked to facilitate ease of use. If you have any questions

regarding this information, please call the inspection team leader as soon as possible.

5

Table Week Onsite

Paragraph Number/Title:

Items

1

Updated copies of corrective actions taken as a result of

cybersecurity incidents/issues, to include previous NRC violations

and Licensee Identified Violations since the last cybersecurity

inspection, as well as vulnerability-related corrective actions.

03.05

IV. Information Requested to Be Provided Throughout the Inspection

(1) Copies of any corrective action documents generated as a result of the inspection

teams questions or queries during the inspection.

(2) Copies of the list of questions submitted by the inspection team members and the

status/resolution of the information requested (provided daily during the inspection to

each inspection team member).

If you have any questions regarding the information requested, please contact the inspection

team leader.