ML23188A067: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (One intermediate revision by the same user not shown) | |||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:July 10, 2023 Mr. Barry N. Blair Site Vice President Energy Harbor Nuclear Corp. | {{#Wiki_filter:July 10, 2023 Mr. Barry N. Blair Site Vice President Energy Harbor Nuclear Corp. | ||
Beaver Valley Power Station Mail Stop P-BV-SSB P.O. Box 4, Route 168 Shippingport, PA 15077-0004 | Beaver Valley Power Station Mail Stop P-BV-SSB P.O. Box 4, Route 168 Shippingport, PA 15077-0004 | ||
==SUBJECT:== | ==SUBJECT:== | ||
BEAVER VALLEY POWER STATION, UNITS 1 AND 2 - PROJECT MANAGER ASSIGNMENT | BEAVER VALLEY POWER STATION, UNITS 1 AND 2 - PROJECT MANAGER ASSIGNMENT | ||
==Dear Mr. Blair:== | ==Dear Mr. Blair:== | ||
This letter is to inform you that effective July 7, 2023, Dr. V. Sreenivas will be assigned as the U.S. Nuclear Regulatory Commissions Licensing Project Manager for Beaver Valley Power Station, Units 1 and 2. Dr. V. Sreenivas may be reached at 301-415-2597 or by e-mail at V.Sreenivas@nrc.gov. | This letter is to inform you that effective July 7, 2023, Dr. V. Sreenivas will be assigned as the U.S. Nuclear Regulatory Commissions Licensing Project Manager for Beaver Valley Power Station, Units 1 and 2. Dr. V. Sreenivas may be reached at 301-415-2597 or by e-mail at V.Sreenivas@nrc.gov. | ||
Sincerely, | Sincerely, | ||
/RA/ | |||
Hipólito J. González, Chief Plant Licensing Branch LPL1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-334 and 50-412 cc: Listserv | Hipólito J. González, Chief Plant Licensing Branch LPL1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-334 and 50-412 cc: Listserv | ||
ML23188A067 OFFICE NRR/DORL/LPL1/PM | ML23188A067 OFFICE NRR/DORL/LPL1/PM NRR/DORL/LPL1/LA NRR/DORL/LPL1/BC NAME VSreenivas KZeleznock HGonzalez DATE 07/06/2023 07/07/2023 7/10/2023}} | ||
Latest revision as of 02:47, 27 November 2024
| ML23188A067 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 07/10/2023 |
| From: | Hipolito Gonzalez Plant Licensing Branch 1 |
| To: | Blair B Energy Harbor Nuclear Corp |
| Goetz S | |
| References | |
| Download: ML23188A067 (1) | |
Text
July 10, 2023 Mr. Barry N. Blair Site Vice President Energy Harbor Nuclear Corp.
Beaver Valley Power Station Mail Stop P-BV-SSB P.O. Box 4, Route 168 Shippingport, PA 15077-0004
SUBJECT:
BEAVER VALLEY POWER STATION, UNITS 1 AND 2 - PROJECT MANAGER ASSIGNMENT
Dear Mr. Blair:
This letter is to inform you that effective July 7, 2023, Dr. V. Sreenivas will be assigned as the U.S. Nuclear Regulatory Commissions Licensing Project Manager for Beaver Valley Power Station, Units 1 and 2. Dr. V. Sreenivas may be reached at 301-415-2597 or by e-mail at V.Sreenivas@nrc.gov.
Sincerely,
/RA/
Hipólito J. González, Chief Plant Licensing Branch LPL1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-334 and 50-412 cc: Listserv
ML23188A067 OFFICE NRR/DORL/LPL1/PM NRR/DORL/LPL1/LA NRR/DORL/LPL1/BC NAME VSreenivas KZeleznock HGonzalez DATE 07/06/2023 07/07/2023 7/10/2023