{{#Wiki_filter:Lcg # TXX-4929 File # 10110 908.1 TEXAS UTILITIES GENERATING COMPANT SKYW AY TOWER . 400 NORTH OLIVE NTREET. L.B. N I . DALLAS. TEX AN 78301 July 22, 1986 EMUUi??E.7.*.h f
{{#Wiki_filter:Lcg # TXX-4929 File # 10110 908.1 TEXAS UTILITIES GENERATING COMPANT SKYW AY TOWER. 400 NORTH OLIVE NTREET. L.B. N I. DALLAS. TEX AN 78301 July 22, 1986 f
:U fQgy NA.LGf'I Mr. Eric H. Johnson, Director Division of Reactor Safety and Projects l''f    4 2 8I986 il U. S. Nuclear Regulatory Commission                                           h                      i i
fQgy EMUUi??E.7.*.h
                                                                                                                    /
:U NA.LGf l''f
611 Ryan Plaza Drive, Suite 1000                                                                     L/
'I il Mr. Eric H. Johnson, Director h
4 2 8I986 Division of Reactor Safety and Projects i
/
i U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 L/
Arlington, TX 76012
Arlington, TX 76012


==SUBJECT:==
==SUBJECT:==
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS.     50-445 AND 50-446 ELECTRICAL PENETRATION ASSEMBLIES SDAR: CP-86-10 (INTERIM REPORT)
DOCKET NOS.
50-445 AND 50-446 ELECTRICAL PENETRATION ASSEMBLIES SDAR: CP-86-10 (INTERIM REPORT)


==Dear Mr. Johnson:==
==Dear Mr. Johnson:==
 
On April 24, 1986, we notified you of a reportable item involving the electrical penetration assemblies (EPA's) supplied by Bunker Ramo (see TXX-4774). This is a follow-up interim report on a reportable item under the provisions of 10CFR50.55(e).
On April 24, 1986, we notified you of a reportable item involving the electrical penetration assemblies (EPA's) supplied by Bunker Ramo (see TXX-4774). This is a follow-up interim report on a reportable item under the                                     ,
An interim report logged TXX-4853, dated June 11, 1986, stated that a project Task Team was investigating the circumstances resulting in the EPA deficiencies. The conclusions of the Task Team are scheduled to be completed in August, 1986. A specific construction schedule will be provided upon receipt of the hardware.
provisions of 10CFR50.55(e).
We are continuing our evaluation and anticipate submitting our next report by September 26, 1986.
An interim report logged TXX-4853, dated June 11, 1986, stated that a project Task Team was investigating the circumstances resulting in the EPA deficiencies. The conclusions of the Task Team are scheduled to be completed in August, 1986. A specific construction schedule will be provided upon receipt of the hardware. We are continuing our evaluation and anticipate submitting our next report by September 26, 1986.
Very truly yours,
Very truly yours,
[               Had[
[
W. G.       nsi By:     ..      -
Had[
                                                                                                        /
W. G.
G. S. Keeley
nsi By:
;                                                                                Manager, Nec a Licensing JCH/arh c - NRC Region IV (0 + 1 copy)
/
Director, Inspection & Enforcement (15 copies) l               U. S. Nuclear Regulatory Commission Washington, D.C. 20555 0608040041 860722 PDR   ADOCK 05000445 l                   S                     PDR
G. S. Keeley Manager, Nec a Licensing JCH/arh c - NRC Region IV (0 + 1 copy)
  }(,-93l O                     a nuvusw:v or rexas amunes ru:crnw anursur                                 3G.-).]
Director, Inspection & Enforcement (15 copies) l U. S. Nuclear Regulatory Commission Washington, D.C.
                                                                                                                  /[o}}
20555 0608040041 860722 PDR ADOCK 05000445 l
S PDR
}(,-93l O 3G.-).]
a nuvusw:v or rexas amunes ru:crnw anursur
/[o}}

Latest revision as of 01:57, 8 December 2024

Interim Deficiency Rept CP-86-10 Re Defects Noted in Electrical Penetration Assemblies Supplied by Bunker Ramo. Initially Reported on 860424.Investigation & Evaluation in Progress.Next Rept Will Be Submitted by 860926
ML20203G748
Person / Time
Site: Comanche Peak  
Issue date: 07/22/1986
From: Counsil W, Keeley G
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
CP-86-10, TXX-4929, NUDOCS 8608040041
Download: ML20203G748 (1)


Text

Lcg # TXX-4929 File # 10110 908.1 TEXAS UTILITIES GENERATING COMPANT SKYW AY TOWER. 400 NORTH OLIVE NTREET. L.B. N I. DALLAS. TEX AN 78301 July 22, 1986 f

fQgy EMUUi??E.7.*.h

U NA.LGf lf

'I il Mr. Eric H. Johnson, Director h

4 2 8I986 Division of Reactor Safety and Projects i

/

i U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 L/

Arlington, TX 76012

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS.

50-445 AND 50-446 ELECTRICAL PENETRATION ASSEMBLIES SDAR: CP-86-10 (INTERIM REPORT)

Dear Mr. Johnson:

On April 24, 1986, we notified you of a reportable item involving the electrical penetration assemblies (EPA's) supplied by Bunker Ramo (see TXX-4774). This is a follow-up interim report on a reportable item under the provisions of 10CFR50.55(e).

An interim report logged TXX-4853, dated June 11, 1986, stated that a project Task Team was investigating the circumstances resulting in the EPA deficiencies. The conclusions of the Task Team are scheduled to be completed in August, 1986. A specific construction schedule will be provided upon receipt of the hardware.

We are continuing our evaluation and anticipate submitting our next report by September 26, 1986.

Very truly yours,

[

Had[

W. G.

nsi By:

/

G. S. Keeley Manager, Nec a Licensing JCH/arh c - NRC Region IV (0 + 1 copy)

Director, Inspection & Enforcement (15 copies) l U. S. Nuclear Regulatory Commission Washington, D.C.

20555 0608040041 860722 PDR ADOCK 05000445 l

S PDR

}(,-93l O 3G.-).]

a nuvusw:v or rexas amunes ru:crnw anursur

/[o