TXX-4929, Interim Deficiency Rept CP-86-10 Re Defects Noted in Electrical Penetration Assemblies Supplied by Bunker Ramo. Initially Reported on 860424.Investigation & Evaluation in Progress.Next Rept Will Be Submitted by 860926: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Lcg # TXX-4929 File # 10110 908.1 TEXAS UTILITIES GENERATING COMPANT SKYW AY TOWER . 400 NORTH OLIVE NTREET. L.B. N I . DALLAS. TEX AN 78301 July 22, 1986 EMUUi??E.7.*.h | {{#Wiki_filter:Lcg # TXX-4929 File # 10110 908.1 TEXAS UTILITIES GENERATING COMPANT SKYW AY TOWER. 400 NORTH OLIVE NTREET. L.B. N I. DALLAS. TEX AN 78301 July 22, 1986 f | ||
:U | fQgy EMUUi??E.7.*.h | ||
:U NA.LGf l''f | |||
611 Ryan Plaza Drive, Suite 1000 | 'I il Mr. Eric H. Johnson, Director h | ||
4 2 8I986 Division of Reactor Safety and Projects i | |||
/ | |||
i U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 L/ | |||
Arlington, TX 76012 | Arlington, TX 76012 | ||
==SUBJECT:== | ==SUBJECT:== | ||
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES) | COMANCHE PEAK STEAM ELECTRIC STATION (CPSES) | ||
DOCKET NOS. | DOCKET NOS. | ||
50-445 AND 50-446 ELECTRICAL PENETRATION ASSEMBLIES SDAR: CP-86-10 (INTERIM REPORT) | |||
==Dear Mr. Johnson:== | ==Dear Mr. Johnson:== | ||
On April 24, 1986, we notified you of a reportable item involving the electrical penetration assemblies (EPA's) supplied by Bunker Ramo (see TXX-4774). This is a follow-up interim report on a reportable item under the provisions of 10CFR50.55(e). | |||
On April 24, 1986, we notified you of a reportable item involving the electrical penetration assemblies (EPA's) supplied by Bunker Ramo (see TXX-4774). This is a follow-up interim report on a reportable item under the | An interim report logged TXX-4853, dated June 11, 1986, stated that a project Task Team was investigating the circumstances resulting in the EPA deficiencies. The conclusions of the Task Team are scheduled to be completed in August, 1986. A specific construction schedule will be provided upon receipt of the hardware. | ||
provisions of 10CFR50.55(e). | We are continuing our evaluation and anticipate submitting our next report by September 26, 1986. | ||
An interim report logged TXX-4853, dated June 11, 1986, stated that a project Task Team was investigating the circumstances resulting in the EPA deficiencies. The conclusions of the Task Team are scheduled to be completed in August, 1986. A specific construction schedule will be provided upon receipt of the hardware. We are continuing our evaluation and anticipate submitting our next report by September 26, 1986. | |||
Very truly yours, | Very truly yours, | ||
[ | [ | ||
W. G. | Had[ | ||
W. G. | |||
G. S. Keeley | nsi By: | ||
/ | |||
Director, Inspection & Enforcement (15 copies) l | G. S. Keeley Manager, Nec a Licensing JCH/arh c - NRC Region IV (0 + 1 copy) | ||
Director, Inspection & Enforcement (15 copies) l U. S. Nuclear Regulatory Commission Washington, D.C. | |||
20555 0608040041 860722 PDR ADOCK 05000445 l | |||
S PDR | |||
}(,-93l O 3G.-).] | |||
a nuvusw:v or rexas amunes ru:crnw anursur | |||
/[o}} | |||
Latest revision as of 01:57, 8 December 2024
| ML20203G748 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 07/22/1986 |
| From: | Counsil W, Keeley G TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Johnson E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| CP-86-10, TXX-4929, NUDOCS 8608040041 | |
| Download: ML20203G748 (1) | |
Text
Lcg # TXX-4929 File # 10110 908.1 TEXAS UTILITIES GENERATING COMPANT SKYW AY TOWER. 400 NORTH OLIVE NTREET. L.B. N I. DALLAS. TEX AN 78301 July 22, 1986 f
fQgy EMUUi??E.7.*.h
- U NA.LGf lf
'I il Mr. Eric H. Johnson, Director h
4 2 8I986 Division of Reactor Safety and Projects i
/
i U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 L/
Arlington, TX 76012
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS.
50-445 AND 50-446 ELECTRICAL PENETRATION ASSEMBLIES SDAR: CP-86-10 (INTERIM REPORT)
Dear Mr. Johnson:
On April 24, 1986, we notified you of a reportable item involving the electrical penetration assemblies (EPA's) supplied by Bunker Ramo (see TXX-4774). This is a follow-up interim report on a reportable item under the provisions of 10CFR50.55(e).
An interim report logged TXX-4853, dated June 11, 1986, stated that a project Task Team was investigating the circumstances resulting in the EPA deficiencies. The conclusions of the Task Team are scheduled to be completed in August, 1986. A specific construction schedule will be provided upon receipt of the hardware.
We are continuing our evaluation and anticipate submitting our next report by September 26, 1986.
Very truly yours,
[
Had[
W. G.
nsi By:
/
G. S. Keeley Manager, Nec a Licensing JCH/arh c - NRC Region IV (0 + 1 copy)
Director, Inspection & Enforcement (15 copies) l U. S. Nuclear Regulatory Commission Washington, D.C.
20555 0608040041 860722 PDR ADOCK 05000445 l
S PDR
}(,-93l O 3G.-).]
a nuvusw:v or rexas amunes ru:crnw anursur
/[o