ML20059E098: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:, .
{{#Wiki_filter:rno/oce vtc6s)!
      ,
,
        . . .
, .
              ..
. . .
                                                                            rno/oce vtc6s)!    ,
..
      .
,
                                                AUG' 2 81990                                 ,
.
          Docket No. 50-483
AUG' 2 81990
        Union Electric Company
,
        ATTN: Mr. Donald F. Schnell
Docket No. 50-483
                  Senior Vice President - Nuclear                                             i
Union Electric Company
          Post Office Box 149 - Mail Code 400                                                 J
ATTN: Mr. Donald F. Schnell
        St. Louis, MO 63166
Senior Vice President - Nuclear
        Ovotlemen:                                                                             '
i
        This refers to the routine safety inspection conducted by Messrs;
Post Office Box 149 - Mail Code 400
        B. L. Bartlett, C. H. Brown, and C. J. Phillips of-this office from July 1
J
        -through August 15, 1990,'of activities at Callaway Plant, Unit 1, authorized
St. Louis, MO 63166
        by NRC Operating License No. NPF-30, and to the discussion of our findings
Ovotlemen:
        with Mr. J. D. Blosser and others of your' staff at the conclusion of the
'
        inspection.
This refers to the routine safety inspection conducted by Messrs;
        The enclosed copy of our inspection report identifies areas examined during:         i
B. L. Bartlett, C. H. Brown, and C. J. Phillips of-this office from July 1
        the inspection. Within these.' areas, the' inspection consisted of a selective
-through August 15, 1990,'of activities at Callaway Plant, Unit 1, authorized
        examination of procedures and representative records,. observations, and
by NRC Operating License No. NPF-30, and to the discussion of our findings
        interviews with personnel.
with Mr. J. D. Blosser and others of your' staff at the conclusion of the
                                                                      .
inspection.
                                                                                              t
The enclosed copy of our inspection report identifies areas examined during:
        During this inspection, certain of your activities . appeared to be in. violation ~   (
i
        of NRC requirements as identified in the enclosed copy of our inspection .           l
the inspection. Within these.' areas, the' inspection consisted of a selective
        report. The inspection showed that the violations met the test of 10 CFR 2,.       ''
examination of procedures and representative records,. observations, and
        Appendix C, Section V.G.1; accordingly, no Notice of Violation was issued.           ,i
interviews with personnel.
                                                                                              !
.
        No reply to the violations is required and we have no further questions               {
t
        regarding these matters at this time,
During this inspection, certain of your activities . appeared to be in. violation ~
                                                                                              i
(
        In accordance with 10 CFR 2.790 of the Commission's-regulations, a copy of
of NRC requirements as identified in the enclosed copy of our inspection .
        this letter and the-. enclosed inspection report.will be placed in the PRC           1
l
        Public Document Room.                                                                 '
report. The inspection showed that the violations met the test of 10 CFR 2,.
                                                                                              i
''
        We will gladly discuss any questions you have'concerning thi'. inspection.         'i
Appendix C, Section V.G.1; accordingly, no Notice of Violation was issued.
                                                                                              l
,
                                                  Sincerely,
!
                                                          {C     f<     -
No reply to the violations is required and we have no further questions
                                                  Richard C. Knop, Chie ,                     j
{
                                                  Reactor Projects Branch 3                 j
regarding these matters at this time,
        Enclosure: Inspection Report                                                         l
i
            No. 50 483/90013(DRP)
In accordance with 10 CFR 2.790 of the Commission's-regulations, a copy of
        See Attached Distrihtion           46                                                 i
this letter and the-. enclosed inspection report.will be placed in the PRC
        RH'               H/             RIII '                                               !
1
          a     /       Pe ' se
Public Document Room.
                            ?     $       f5It &                                         I
'
                                                                                    /$.
i
      9009100023 90082e                                                                       '
We will gladly discuss any questions you have'concerning thi'. inspection.
      $DR ADOCK 0500           3
'i
                                                                                /
l
L                                                                                             i
Sincerely,
{C f< -
Richard C. Knop, Chie ,
j
Reactor Projects Branch 3
j
Enclosure:
Inspection Report
l
No. 50 483/90013(DRP)
See Attached Distrihtion
46
i
RH'
H/
RIII '
!
a
/
Pe ' se
?
$
f5It &
I
/$.
9009100023 90082e
'
$DR
ADOCK 0500
3
/
L
i


      o                                                       ;
o
              .
;
  .. ,- ,
.
                "                                             ;
..
    ,
,- ,
      .
;
                      ~
"
        l.; ion ~ Electric Company-           2 AUG 2 81990
,
                                                              >
.
        Distribution
l.; ion ~ Electric Company-
l.       cc w/ enclosure:
2
        G. ~ L. Randolph, General Manager,
AUG 2 81990
            Nuclear Operations
~
1       J. V. Laux, Manaaer,
>
            Quality Assurance
Distribution
        Tom P. Sharkey, Supervising Engineer,
l.
          . Site Licensing                                   '
cc w/ enclosure:
        DCD/DCB(RIDS)
G. ~ L. Randolph, General Manager,
        Licensing Fee Management Branch
Nuclear Operations
        Resident Inspector, RIII.                           '
1
                                                              .
J. V. Laux, Manaaer,
        Region IV
Quality Assurance
        Resident Inspector, Wolf Creek
Tom P. Sharkey, Supervising Engineer,
        K. Drey
. Site Licensing
        Chris R. Rogers, P. E.                               >
'
            Vtility Division, Missouri
DCD/DCB(RIDS)
          -Public Service Commission
Licensing Fee Management Branch
        CFA, Inc.
Resident Inspector, RIII.
        Gerald Charnoff, Esq.
.'
        Thomas Baxter, Esq.
Region IV
        R. A. Kucera, Deputy Director
Resident Inspector, Wolf Creek
            Department of Natural Resources                   -
K. Drey
Chris R. Rogers, P. E.
>
Vtility Division, Missouri
-Public Service Commission
CFA, Inc.
Gerald Charnoff, Esq.
Thomas Baxter, Esq.
R. A. Kucera, Deputy Director
Department of Natural Resources
l
l
        T. Marsh, NRR
T. Marsh, NRR
                                                              i
-
                                                            l.
i
                                                              t
l.
                                                              :
t
                                                              -i
:
                                                                l
-i
                                                              .i
.
}}
}}

Latest revision as of 02:43, 17 December 2024

Forwards Safety Insp Rept 50-483/90-13 on 900701-0815. Violations Noted Met Requirements of 10CFR2,App C,Section V.G.1 & No Notice of Violation Issued
ML20059E098
Person / Time
Site: Callaway 
Issue date: 08/28/1990
From: Knop R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Schnell D
UNION ELECTRIC CO.
Shared Package
ML20059E101 List:
References
NUDOCS 9009100023
Download: ML20059E098 (2)


See also: IR 05000483/1990013

Text

rno/oce vtc6s)!

,

, .

. . .

..

,

.

AUG' 2 81990

,

Docket No. 50-483

Union Electric Company

ATTN: Mr. Donald F. Schnell

Senior Vice President - Nuclear

i

Post Office Box 149 - Mail Code 400

J

St. Louis, MO 63166

Ovotlemen:

'

This refers to the routine safety inspection conducted by Messrs;

B. L. Bartlett, C. H. Brown, and C. J. Phillips of-this office from July 1

-through August 15, 1990,'of activities at Callaway Plant, Unit 1, authorized

by NRC Operating License No. NPF-30, and to the discussion of our findings

with Mr. J. D. Blosser and others of your' staff at the conclusion of the

inspection.

The enclosed copy of our inspection report identifies areas examined during:

i

the inspection. Within these.' areas, the' inspection consisted of a selective

examination of procedures and representative records,. observations, and

interviews with personnel.

.

t

During this inspection, certain of your activities . appeared to be in. violation ~

(

of NRC requirements as identified in the enclosed copy of our inspection .

l

report. The inspection showed that the violations met the test of 10 CFR 2,.

Appendix C,Section V.G.1; accordingly, no Notice of Violation was issued.

,

!

No reply to the violations is required and we have no further questions

{

regarding these matters at this time,

i

In accordance with 10 CFR 2.790 of the Commission's-regulations, a copy of

this letter and the-. enclosed inspection report.will be placed in the PRC

1

Public Document Room.

'

i

We will gladly discuss any questions you have'concerning thi'. inspection.

'i

l

Sincerely,

{C f< -

Richard C. Knop, Chie ,

j

Reactor Projects Branch 3

j

Enclosure:

Inspection Report

l

No. 50 483/90013(DRP)

See Attached Distrihtion

46

i

RH'

H/

RIII '

!

a

/

Pe ' se

?

$

f5It &

I

/$.

9009100023 90082e

'

$DR

ADOCK 0500

3

/

L

i

o

.

..

,- ,

"

,

.

l.; ion ~ Electric Company-

2

AUG 2 81990

~

>

Distribution

l.

cc w/ enclosure:

G. ~ L. Randolph, General Manager,

Nuclear Operations

1

J. V. Laux, Manaaer,

Quality Assurance

Tom P. Sharkey, Supervising Engineer,

. Site Licensing

'

DCD/DCB(RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII.

.'

Region IV

Resident Inspector, Wolf Creek

K. Drey

Chris R. Rogers, P. E.

>

Vtility Division, Missouri

-Public Service Commission

CFA, Inc.

Gerald Charnoff, Esq.

Thomas Baxter, Esq.

R. A. Kucera, Deputy Director

Department of Natural Resources

l

T. Marsh, NRR

-

i

l.

t

-i

.