ML23013A091: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML23013A091
| number = ML23013A091
| issue date = 01/13/2023
| issue date = 01/13/2023
| title = Fourth 10-Year Interval, Second Period Owners Activity Report Number 3R23
| title = Fourth 10-Year Interval, Second Period Owner’S Activity Report Number 3R23
| author name = Cox M
| author name = Cox M
| author affiliation = Arizona Public Service Co
| author affiliation = Arizona Public Service Co
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:10 CFR 50.55a Palo Verde Nuclear Generating Station P.O. Box 52034 Phoenix, AZ 85072 102-08561-MSC/CJS                                                             Mail Station 7636 January 13, 2023                                                             Tel: (623) 393-5753 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
{{#Wiki_filter:10 CFR 50.55a A member of the STARS Alliance LLC Callaway
* Diablo Canyon
* Palo Verde
* Wolf Creek 102-08561-MSC/CJS January 13, 2023 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001  


==Subject:==
==Subject:==
Palo Verde Nuclear Generating Station Unit 3 Docket No. STN 50-530 Fourth 10-Year Interval, Second Period Owners Activity Report Number 3R23 Pursuant to Title 10 of the Code of Federal Regulations 50.55a and in accordance with the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Case N-532-5, Repair/Replacement Activity Documentation Requirements and Inservice Inspection Summary Report Preparation and Submission Section XI, Division 1, Arizona Public Service Company hereby submits the Owners Activity Report (Form OAR-1) for Unit 3 refueling outage 23 (3R23). The outage ended on November 10, 2022.
Palo Verde Nuclear Generating Station Unit 3 Docket No. STN 50-530 Fourth 10-Year Interval, Second Period Owners Activity Report Number 3R23 Pursuant to Title 10 of the Code of Federal Regulations 50.55a and in accordance with the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Case N-532-5, Repair/Replacement Activity Documentation Requirements and Inservice Inspection Summary Report Preparation and Submission Section XI, Division 1, Arizona Public Service Company hereby submits the Owners Activity Report (Form OAR-1) for Unit 3 refueling outage 23 (3R23). The outage ended on November 10, 2022.
No commitments are being made to the NRC by this letter. Should you need further information regarding this submittal, please contact me at (623) 393-5753.
No commitments are being made to the NRC by this letter. Should you need further information regarding this submittal, please contact me at (623) 393-5753.
Sincerely, Cox, Matthew                              Digitally signed by Cox, Matthew S(Z05628)
Sincerely, Matthew S. Cox Department Leader, Nuclear Regulatory Affairs MSC/CJS/cr  
S(Z05628)                                Date: 2023.01.13 08:00:41 -07'00' Matthew S. Cox Department Leader, Nuclear Regulatory Affairs MSC/CJS/cr


==Enclosure:==
==Enclosure:==
Unit 3 Twenty-Third Refueling Outage Owners Activity Report, Report 3R23 cc:   S. A. Morris           NRC Region IV Regional Administrator D. J. Galvin           NRC NRR Project Manager for PVNGS L. N. Merker           NRC Senior Resident Inspector for PVNGS A member of the STARS Alliance LLC Callaway
Unit 3 Twenty-Third Refueling Outage Owners Activity Report, Report 3R23 cc:
* Diablo Canyon
S. A. Morris NRC Region IV Regional Administrator D. J. Galvin NRC NRR Project Manager for PVNGS L. N. Merker NRC Senior Resident Inspector for PVNGS Palo Verde Nuclear Generating Station P.O. Box 52034 Phoenix, AZ 85072 Mail Station 7636 Tel: (623) 393-5753 Cox, Matthew S(Z05628)
* Palo Verde
Digitally signed by Cox, Matthew S(Z05628)
* Wolf Creek
Date: 2023.01.13 08:00:41 -07'00'


ENCLOSURE Unit 3 Twenty-Third Refueling Outage Owners Activity Report Report 3R23
ENCLOSURE Unit 3 Twenty-Third Refueling Outage Owners Activity Report Report 3R23  


FORM OAR-1 OWNERS ACTIVITY REPORT 3R23 Report Number: ________________________________________________________________________________________________
PV-E0796 Ver. 2 FORM OAR-1 OWNERS ACTIVITY REPORT Report Number: ________________________________________________________________________________________________
Palo Verde Generating Station, 5801 S. Wintersburg Road, Tonopah, Arizona 85354-7529 Plant: ___________________________________________________________________________________________________________
Plant: ___________________________________________________________________________________________________________
3 Unit No.: ___________                     Commercial service date: ___________________Jan 8, 1988                                                  23 Refueling Outage No.: ___________________
Unit No.: ___________
Commercial service date: ___________________
Refueling Outage No.: ___________________
(if applicable)
(if applicable)
IWB, IWC, IWD, IWF = 4th /                      IWE = 3rd / IWL = 3rd / S.P.T. = 4th Current inspection interval ______________________________________________________________________________________
Current inspection interval ______________________________________________________________________________________
(1st, 2nd, 3rd, 4th, other)
(1st, 2nd, 3rd, 4th, other)
IWB, IWC, IWD, IWF = 2nd /                      IWE = 2nd / IWL = 1st / S.P.T. = 2nd Current inspection period _______________________________________________________________________________________
Current inspection period _______________________________________________________________________________________
(1st, 2nd, 3rd) 2013 Edition (IWE=2007 Ed., '08 Ad.)
(1st, 2nd, 3rd)
Edition and Addenda of Section XI applicable to the inspection plans ____________________________________________
Edition and Addenda of Section XI applicable to the inspection plans ____________________________________________
ISI=4/09/21 R1, IWE=10/3/18 R0, IWL=6/21/22 R0, SPT=6/21/18 R0 Date and revision of inspection plans ___________________________________________________________________________
Date and revision of inspection plans ___________________________________________________________________________
Edition and Addenda of Section XI applicable to repair/replacement activities, 2013 Edition if different than the inspection plans ____________________________________________________________________________
Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans ____________________________________________________________________________
Code Cases used for inspection and evaluation:
Code Cases used for inspection and evaluation:
N-532-5, N-722-1, N-716-1, N-845 (if applicable)
(if applicable)
CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of U3R23
CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of
_______________               conform to the requirements of Section XI.
_______________ conform to the requirements of Section XI.
(refueling outage number)
(refueling outage number)
Folley, Roy                                  Digitally signed by Folley, Roy C(Z07131)
Signed _________________________________________________________
C(Z07131)                                    Date: 2023.01.05 06:42:44
Date: _____________________________________
                                                          -07'00' Signed _________________________________________________________                                                 Date: _____________________________________
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by _____________________________ of _______________________________ have inspected the items described in this Owners Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by _____________________________
* Hartford, Connecticut of _______________________________                       have inspected the items described in this Owners Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
                                                                                      7KH+DUWIRUG6WHDP%RLOHU,QVSHFWLRQDQG,QVXUDQFH&RPSDQ\
Digitally signed by Hogstrom,                          Hogstrom, Robert (YH2450)
Robert (YH2450) Date:              -07'00' 2023.01.06 14:33:13
__________________________________________                                                                    1%&,15
Commissions ____________________________________________________
Commissions ____________________________________________________
(Inspectors Signature)                                                                       National Board, State, Province, and Endorsements
(Inspectors Signature)
                      
National Board, State, Province, and Endorsements Date: _____________________________________
Date: _____________________________________
3R23 Palo Verde Generating Station, 5801 S. Wintersburg Road, Tonopah, Arizona 85354-7529 3
PV-E0796 Ver. 2
Jan 8, 1988 23 IWB, IWC, IWD, IWF = 4th
/
IWE = 3rd
/
IWL = 3rd
/
S.P.T. = 4th IWB, IWC, IWD, IWF = 2nd
/
IWE = 2nd
/
IWL = 1st
/
S.P.T. = 2nd 2013 Edition (IWE=2007 Ed., '08 Ad.)
ISI=4/09/21 R1, IWE=10/3/18 R0, IWL=6/21/22 R0, SPT=6/21/18 R0 2013 Edition N-532-5, N-722-1, N-716-1, N-845 U3R23 Folley, Roy C(Z07131)
Digitally signed by Folley, Roy C(Z07131)
Date: 2023.01.05 06:42:44
-07'00' Hartford, Connecticut
7KH+DUWIRUG6WHDP%RLOHU,QVSHFWLRQDQG,QVXUDQFH&RPSDQ\\
1%&,15

: Hogstrom, Robert (YH2450)
Digitally signed by Hogstrom, Robert (YH2450)
Date: 2023.01.06 14:33:13
-07'00'


Table 1 Items with Flaws or Relevant Conditions That Required Evaluation for Continued Service Examination Category and           Item Description           Evaluation Description Item Number None                           None                           None
Table 1 Items with Flaws or Relevant Conditions That Required Evaluation for Continued Service Examination Category and Item Number Item Description Evaluation Description None None None  


Table 2 Abstract of Repair/Replacement Activities Required for Continued Service Code                                                                 Date    Repair/Replacement Component ID               Description of Work Class                                                              Complete     Plan Number PRESSURIZER SAFETY RELIEF VALVE 1    3JRCEPSV0200                                              11/07/2022     5356750-0 Replace the pressurizer safety relief valve with a reconditioned spare PRESSURIZER SAFETY RELIEF VALVE 1    3JRCEPSV0201                                              11/07/2022     5356751-0 Replace the pressurizer safety relief valve with a reconditioned spare PRESSURIZER SAFETY RELIEF VALVE 1    3JRCEPSV0202                                              11/07/2022     5356752-0 Replace the pressurizer safety relief valve with a reconditioned spare PRESSURIZER SAFETY RELIEF VALVE.
Table 2 Abstract of Repair/Replacement Activities Required for Continued Service 1
1    3JRCEPSV0203                                              11/07/2022     5356753-0 Replace the pressurizer safety relief valve with a reconditioned spare B TRAIN SDC RELIEF VALVE TO RDT 1    3JSIBPSV0169    Remove and test PSV by performing ST. 10/25/2022    5357319-0 ASME code parts will be replaced as needed based on surveillance test results PRESSURIZER 1     3MRCEX02                                                 11/7/2022     5423854-0 Replace pressurizer heater as needed.
Code Class Component ID Description of Work Date Complete Repair/Replacement Plan Number 1
3JRCEPSV0200 PRESSURIZER SAFETY RELIEF VALVE 11/07/2022 5356750-0 Replace the pressurizer safety relief valve with a reconditioned spare 1
3JRCEPSV0201 PRESSURIZER SAFETY RELIEF VALVE 11/07/2022 5356751-0 Replace the pressurizer safety relief valve with a reconditioned spare 1
3JRCEPSV0202 PRESSURIZER SAFETY RELIEF VALVE 11/07/2022 5356752-0 Replace the pressurizer safety relief valve with a reconditioned spare 1
3JRCEPSV0203 PRESSURIZER SAFETY RELIEF VALVE.
11/07/2022 5356753-0 Replace the pressurizer safety relief valve with a reconditioned spare 1
3JSIBPSV0169 B TRAIN SDC RELIEF VALVE TO RDT 10/25/2022 5357319-0 Remove and test PSV by performing ST.
ASME code parts will be replaced as needed based on surveillance test results 1
3MRCEX02 PRESSURIZER 11/7/2022 5423854-0 Replace pressurizer heater as needed.
New heaters will be welded into place.
New heaters will be welded into place.
SIT 1B TO SAFETY VALVE 3JSIEPSV0241 2      3PSIEL230                                              7/29/2022     5398500-10 Replace piping as required based on snoop or pressure testing.
2 3PSIEL230 SIT 1B TO SAFETY VALVE 3JSIEPSV0241 7/29/2022 5398500-10 Replace piping as required based on snoop or pressure testing.
ECWS HT EXCH B 3      3MEWBE01        Perform base metal weld repairs on EW    10/29/2022     5356621-1 "B" heat exchanger and associated nozzles based on inspection results.
3 3MEWBE01 ECWS HT EXCH B 10/29/2022 5356621-1 Perform base metal weld repairs on EW "B" heat exchanger and associated nozzles based on inspection results.}}
1}}

Latest revision as of 11:33, 27 November 2024

Fourth 10-Year Interval, Second Period Owner’S Activity Report Number 3R23
ML23013A091
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 01/13/2023
From: Cox M
Arizona Public Service Co
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
102-08561-MSC/CJS
Download: ML23013A091 (1)


Text

10 CFR 50.55a A member of the STARS Alliance LLC Callaway

  • Diablo Canyon
  • Palo Verde
  • Wolf Creek 102-08561-MSC/CJS January 13, 2023 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Subject:

Palo Verde Nuclear Generating Station Unit 3 Docket No. STN 50-530 Fourth 10-Year Interval, Second Period Owners Activity Report Number 3R23 Pursuant to Title 10 of the Code of Federal Regulations 50.55a and in accordance with the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Case N-532-5, Repair/Replacement Activity Documentation Requirements and Inservice Inspection Summary Report Preparation and Submission Section XI, Division 1, Arizona Public Service Company hereby submits the Owners Activity Report (Form OAR-1) for Unit 3 refueling outage 23 (3R23). The outage ended on November 10, 2022.

No commitments are being made to the NRC by this letter. Should you need further information regarding this submittal, please contact me at (623) 393-5753.

Sincerely, Matthew S. Cox Department Leader, Nuclear Regulatory Affairs MSC/CJS/cr

Enclosure:

Unit 3 Twenty-Third Refueling Outage Owners Activity Report, Report 3R23 cc:

S. A. Morris NRC Region IV Regional Administrator D. J. Galvin NRC NRR Project Manager for PVNGS L. N. Merker NRC Senior Resident Inspector for PVNGS Palo Verde Nuclear Generating Station P.O. Box 52034 Phoenix, AZ 85072 Mail Station 7636 Tel: (623) 393-5753 Cox, Matthew S(Z05628)

Digitally signed by Cox, Matthew S(Z05628)

Date: 2023.01.13 08:00:41 -07'00'

ENCLOSURE Unit 3 Twenty-Third Refueling Outage Owners Activity Report Report 3R23

PV-E0796 Ver. 2 FORM OAR-1 OWNERS ACTIVITY REPORT Report Number: ________________________________________________________________________________________________

Plant: ___________________________________________________________________________________________________________

Unit No.: ___________

Commercial service date: ___________________

Refueling Outage No.: ___________________

(if applicable)

Current inspection interval ______________________________________________________________________________________

(1st, 2nd, 3rd, 4th, other)

Current inspection period _______________________________________________________________________________________

(1st, 2nd, 3rd)

Edition and Addenda of Section XI applicable to the inspection plans ____________________________________________

Date and revision of inspection plans ___________________________________________________________________________

Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans ____________________________________________________________________________

Code Cases used for inspection and evaluation:

(if applicable)

CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of

_______________ conform to the requirements of Section XI.

(refueling outage number)

Signed _________________________________________________________

Date: _____________________________________

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by _____________________________ of _______________________________ have inspected the items described in this Owners Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Commissions ____________________________________________________

(Inspectors Signature)

National Board, State, Province, and Endorsements Date: _____________________________________

3R23 Palo Verde Generating Station, 5801 S. Wintersburg Road, Tonopah, Arizona 85354-7529 3

Jan 8, 1988 23 IWB, IWC, IWD, IWF = 4th

/

IWE = 3rd

/

IWL = 3rd

/

S.P.T. = 4th IWB, IWC, IWD, IWF = 2nd

/

IWE = 2nd

/

IWL = 1st

/

S.P.T. = 2nd 2013 Edition (IWE=2007 Ed., '08 Ad.)

ISI=4/09/21 R1, IWE=10/3/18 R0, IWL=6/21/22 R0, SPT=6/21/18 R0 2013 Edition N-532-5, N-722-1, N-716-1, N-845 U3R23 Folley, Roy C(Z07131)

Digitally signed by Folley, Roy C(Z07131)

Date: 2023.01.05 06:42:44

-07'00' Hartford, Connecticut

7KH+DUWIRUG6WHDP%RLOHU,QVSHFWLRQDQG,QVXUDQFH&RPSDQ\\

1%&,15



Hogstrom, Robert (YH2450)

Digitally signed by Hogstrom, Robert (YH2450)

Date: 2023.01.06 14:33:13

-07'00'

Table 1 Items with Flaws or Relevant Conditions That Required Evaluation for Continued Service Examination Category and Item Number Item Description Evaluation Description None None None

Table 2 Abstract of Repair/Replacement Activities Required for Continued Service 1

Code Class Component ID Description of Work Date Complete Repair/Replacement Plan Number 1

3JRCEPSV0200 PRESSURIZER SAFETY RELIEF VALVE 11/07/2022 5356750-0 Replace the pressurizer safety relief valve with a reconditioned spare 1

3JRCEPSV0201 PRESSURIZER SAFETY RELIEF VALVE 11/07/2022 5356751-0 Replace the pressurizer safety relief valve with a reconditioned spare 1

3JRCEPSV0202 PRESSURIZER SAFETY RELIEF VALVE 11/07/2022 5356752-0 Replace the pressurizer safety relief valve with a reconditioned spare 1

3JRCEPSV0203 PRESSURIZER SAFETY RELIEF VALVE.

11/07/2022 5356753-0 Replace the pressurizer safety relief valve with a reconditioned spare 1

3JSIBPSV0169 B TRAIN SDC RELIEF VALVE TO RDT 10/25/2022 5357319-0 Remove and test PSV by performing ST.

ASME code parts will be replaced as needed based on surveillance test results 1

3MRCEX02 PRESSURIZER 11/7/2022 5423854-0 Replace pressurizer heater as needed.

New heaters will be welded into place.

2 3PSIEL230 SIT 1B TO SAFETY VALVE 3JSIEPSV0241 7/29/2022 5398500-10 Replace piping as required based on snoop or pressure testing.

3 3MEWBE01 ECWS HT EXCH B 10/29/2022 5356621-1 Perform base metal weld repairs on EW "B" heat exchanger and associated nozzles based on inspection results.