7 3 .,~l                                                                                 RELATED CORRESP0aur_NCE.
3.,~l RELATED CORRESP0aur_NCE.
DUKE POWER GOMPANY LE ^L ""''^" " " "
7 DUKE POWER GOMPANY l
LE
^L ""''^" " " "
ST'J*"C'n'o"~.s.
ST'J*"C'n'o"~.s.
l gn=J,;^=g.a,..                                 P. O. Box 33180                         og.n uepr go a,sou,v.ga,                         GIIARLOTTE. N. G. 2a242                                           ao* =-2570 s"         =,~i",'*"'"'                                         July 16,1144 g jg g
o n epr gn=J,;^=g.a,..
        '"'" sh"Eln . sa.
P. O. Box 33180
        "21"; i L*ta". sn.
: g. u go a,sou,v.ga, GIIARLOTTE. N. G. 2a242 ao* =-2570 s"
KONALD L.OlSSON James L. Kelley,. Chairman~
=,~i",'*"'"'
Atomic Safety and' Licensing Board U. S. Nuclear Regulatory' Commission                                                                   !
July 16,1144 g jg g
Washington, D. C. 20555                                                                                 l 1
'"'" h"Eln. sa.
Dr. Paul W. Purdom 235 Co'lumbia Driva Decatur, Georgia 30030 Dr. Richard F. Foster Post Office Box 4263                                                               .i Sunriver, Oregon 97702 Re: Duke Power Company, et al.
s "21"; i L*ta". sn.
KONALD L.OlSSON James L. Kelley,. Chairman
~
Atomic Safety and' Licensing Board U. S. Nuclear Regulatory' Commission Washington, D. C. 20555 l
1 Dr. Paul W. Purdom 235 Co'lumbia Driva Decatur, Georgia 30030 Dr. Richard F. Foster Post Office Box 4263
.i Sunriver, Oregon 97702 Re: Duke Power Company, et al.
Catawba Nuclear Station, Units 1 and 2 Docket Nos. 50-413pnd 50-414 OG.
Catawba Nuclear Station, Units 1 and 2 Docket Nos. 50-413pnd 50-414 OG.
Gentlemen:
Gentlemen:
I am transmitting to the Board a copy of Applicants' {{letter dated|date=July 6, 1984|text=July 6, 1984 letter}} to the NRC Staff which describes the Catawba 18 diesel engine inspections. In keeping with a commitment made in Applicants' June 29 report to the NRC Staff (transmitted to you by my letter of July 11) the July 6 letter also provides the NRC Staff with Applicants' plans for return to service testing of the Catawba IA diesel.
I am transmitting to the Board a copy of Applicants' {{letter dated|date=July 6, 1984|text=July 6, 1984 letter}} to the NRC Staff which describes the Catawba 18 diesel engine inspections.
In keeping with a commitment made in Applicants' June 29 report to the NRC Staff (transmitted to you by my letter of July 11) the July 6 letter also provides the NRC Staff with Applicants' plans for return to service testing of the Catawba IA diesel.
The parties have already been served with a copy of the July 6 letter.
The parties have already been served with a copy of the July 6 letter.
Sincerely yours, Albert V.           rr, Jr.
Sincerely yours, Albert V.
rr, Jr.
c: All Parties (w/o attach.)
c: All Parties (w/o attach.)
8407180304 840716                                   -
8407180304 840716 PDR ADOCK 05000 G
PDR ADOCK 05000 G


1 .
1 DuxE POWER GoNaPANY P.O. BOX 33180 RAL B. TUCKER CHARLOTIT, N.C. 28242 memen (704) o73-453:
l i
DuxE POWER GoNaPANY                                                                         '
P.O. BOX 33180 RAL B. TUCKER CHARLOTIT, N.C. 28242 memen (704) o73-453:
July 6,1984 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Ms. E. G. Adensam, Chief Licens' tng Brarich No. 4 Re: Catawba Nuclear Station Docket Nos. 50-413 and 50-414
July 6,1984 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Ms. E. G. Adensam, Chief Licens' tng Brarich No. 4 Re: Catawba Nuclear Station Docket Nos. 50-413 and 50-414


==Dear Mr. Denton:==
==Dear Mr. Denton:==
of the Catawba 1B diesel engine and the return to servic lA engine following reassembly after inspection. The Duke Power Company pla for these two items appear below:
A.
Catawba 18 Diesel Engine Inspections Our letter of April 5,1984 forwarded a report entitled " Catawba Nuclear Station Extended Operation Tests and Inspections of Diesel Generators."
Section 6 of this report noted that the extent of inspections to be carried out of the Catawba 18 diesel would be based upon the results of the Catawba lA diesel inspections and other TDI emergency diesels.
The Catawba ~1A diesel inspections are now complete.
i The Catawba lA diesel inspection results as well as the Owners Group inspection requirements for the second i
for.the Catawba 1B diesel has been developed from this re 18 inspection plan matrix is shown in a revised Table 5-1 to the above The Catawba mentioned report and is included as an enclosure to this letter.
3
'to the revised Table 5-1, sample size of components to be inspected onReferring the Catawba 18 diesel will be the same as the Catawba lA diesel except as noted by parentheses.
Where parentheses are included inspection.for the Catawba 1B diesel appears in the paren, theses. ' sample size of B.
Catawba Diesel 1A Return to Service Testina
-In accordance with a commitment made in " Catawba Nuclear Station Engine 1A Component Revalidation Inspection. Final Report " of June 29, 1984, the following is the Duke Power Company plan for return to service
'I testing of the Catawba lA diesel.
l l
e
____r
..+


of the Catawba 1B diesel engine and the return to servic lA these for    enginetwofollowing items appear reassemblybelow:      after inspection. The Duke Power Company plan A.      Catawba 18 Diesel Engine Inspections Our letter of April 5,1984 forwarded a report entitled " Catawba Nuclear Station Extended Operation Tests and Inspections of Diesel Generators."
?. -
Section 6 of this report noted that the extent of inspections to be carried out of the Catawba 18 diesel would be based upon the results of the Catawba i
Mr. Harold R. Denton, Director July 6, 1984 Page 2 1.
lA diesel inspections and other TDI emergency diesels.
Run-In Operation:
diesel inspections are now complete.                                                      The Catawba ~1A The Catawba lA diesel inspection i
This will be in acco$ dance with TDI Instruction Manual, Chapter 6, Part C (page 6-C-18). The runs are mainly for seating new rings in the cylinder liner and consist of running the engine at various speeds and loads, inspections of the engine following various run.s, hot crankshaft. web deflection checks, and cold compression checks.
results as well as the Owners Group inspection requirements for the second for .the Catawba 1B diesel has been developed                                                          The Catawba from this re
In additio', during these runs, control systems, vital engine parameters, n
;                              18 inspection plan matrix is shown in a revised Table 5-1 to the above 3                            mentioned report and is included as an enclosure to this letter.
and auxiliary services will be monitored to assure proper operation.
                            'to the revised Table 5-1, sample size of components to be inspected onReferring thenoted as  Catawba          18 diesel will be the same as the Catawba lA diesel except by parentheses.            Where parentheses are included inspection.for the Catawba 1B diesel appears in the paren, theses. ' sample size of                                            .
2.
B.
Modified Load Tests:
Catawba Diesel 1A Return to Service Testina                                                      "
Ten modified load tests will be run at a load of at least 3500 kW.
!                          -In accordance with a commitment made in " Catawba Nuclear Station Engine 1A Component Revalidation Inspection. Final Report " of June 29,                                                              'I testingthe 1984,          following of the  Catawba  is the      Duke Power Company plan for return to service lA diesel.
:                                                                                                                                                                    l l
l e
                                    ._.--.      -      , , _ _        -,  _    _    ____r _ _ . _ _ . . . , _ _ _ _  _ . , . ,      .  ..+          -
 
              ?. -
Mr. Harold R. Denton, Director July 6, 1984                                                 '
Page 2
: 1. Run-In Operation:
This will be in acco$ dance with TDI Instruction Manual, Chapter 6, Part C (page 6-C-18). The runs are mainly for seating new rings
;                              in the cylinder liner and consist of running the engine at various speeds and loads, inspections of the engine following various run.s, hot crankshaft. web deflection checks, and cold compression checks.
In additio',n during these runs, control systems, vital engine parameters, and auxiliary services will be monitored to assure proper operation.
: 2. Modified Load Tests:
Ten   modified load tests will be run at a load of at least 3500 kW.
Pertinent parameters that will be adhered to are as follow:
Pertinent parameters that will be adhered to are as follow:
a.
A test will be of one hour minimum duration followed by. ct a.
A test will be of one hour minimum duration followed by. ct least one and a half hours with the engine secured prior to the next modified load test, b.
least one and a half hours with the engine secured prior to the next modified load test, b.
All test starts will be performed. with a pre-lube of the engine.
All test starts will be performed. with a pre-lube of the engine.
c.
During a test, the load will be increased to a minimum of 3500 KV c.
During a test, the load will be increased to a minimum of 3500 KV in a period less than five minutes.
in a period less than five minutes.
d.
d.
Vital engine parameters will be monitored on a fifteen minute basis during the one hour run at power to assure proper operation.
Vital engine parameters will be monitored on a fifteen minute basis during the one hour run at power to assure proper operation.
: 3. 24-Hour Run:
3.
24-Hour Run:
A twenty-four hour run test will be conducted.
A twenty-four hour run test will be conducted.
of twenty-two hours at 7000 KW and two hours at 7700 kW.This test will consist parameters that will be adhered to are as follow:               Pertinent a.
of twenty-two hours at 7000 KW and two hours at 7700 kW.This test will consist Pertinent parameters that will be adhered to are as follow:
The engine been          test starts will be performed after the engine has pre-lubed.
The engine test starts will be performed after the engine has a.
been pre-lubed.
b.
b.
During the minutes        test, all load changes will be accomplis,hed in five or less.
During the test, all load changes will be accomplis,hed in five minutes or less.
c.
Vital engine parameters will be monitored on a one-hour basis to c.
Vital engine parameters will be monitored on a one-hour basis to assure proper operation.
assure proper operation.
: 4. Fast Start Test:
4.
Two fast start tests will be conducted.         Pertinent parameters that will be adhered to are as follow:
Fast Start Test:
S
Two fast start tests will be conducted.
will be adhered to are as follow:
Pertinent parameters that S


f               *  *                "
f
                                                                            'N                                                                 .
'N
                    ..                         ll~
,..ll~
Mr. Harold R. Denton, Director 1 July 5,1984 Page 3
Mr. Harold R. Denton, Director 1 July 5,1984 Page 3
                                                                                                          -s..,_     ~
-s..,_
l                                                                                             2 s             ,
l 2
? '
~
                'i                           Js" y'             .^
s
?
'i Js Diesd1 engine will come upato speed and voltage within eleven y'
.^
a.
a.
Diesd1 engine will come upato speed and voltage within eleven
segonds.
                            ,                                            segonds.
'l ;
                                      'l ;
b.
: b.         Diesel engine wiil be loaded with ' accelerated blackout loads in the period of eleven seconds to thirty seconds. Peak load will be about 4100 KW. This is the highest load obtainable with the loed sequencer under ESF or blackout conditions.
Diesel engine wiil be loaded with ' accelerated blackout loads in the period of eleven seconds to thirty seconds. Peak load will be about 4100 KW. This is the highest load obtainable with the loed sequencer under ESF or blackout conditions.
: c.        After lhe engfne has achieved 410b KW, each test will last for gg                                                     a period of one hour followed by a shutdown of at least one and a half hours. The one hour duration at load is set so that
After lhe engfne has achieved 410b KW, each test will last for c.
                                                          \x            auxiliary cooling devices will not have to be cut in for some of the respective loads which would place an undue burden on thk plant for the performance of these tests.
gg a period of one hour followed by a shutdown of at least one and a half hours. The one hour duration at load is set so that
        ~
\\
: d.       0ne of these tests will be conducted under pre-lube conditions.
auxiliary cooling devices will not have to be cut in for some of the respective loads which would place an undue burden on x
thk plant for the performance of these tests.
~
d.
0ne of these tests will be conducted under pre-lube conditions.
The other of these tests will be performed with the engine in ready standby sutus without pre-lube.
The other of these tests will be performed with the engine in ready standby sutus without pre-lube.
: e. ' Vital engine parameters will be monitored on a 15-minute basis, 1
: e. ' Vital engine parameters will be monitored on a 15-minute basis, Further, visacorder tracings of diesel generator voltage and 1
Further, visacorder tracings of diesel generator voltage and frequency will be made during starting and loading transients.
frequency will be made during starting and loading transients.
            ~
'. Trip Device Verification:
Trip Device Verification:                                               b s                                                                                                         x There are ten trips which cause the engine to shut down under normal W                                                        operation and tnree trips which cause shutdown under emergency operation.
b 5
To verify propdr opert. tion of these trip devices, shutdown from the tests outlined *In B-2 through 8-4 above will be accomplished by sequentially
~
                                  ;                  s
s x
                                                          -introducing thesh trips for each of the thirteen tests.
There are ten trips which cause the engine to shut down under normal operation and tnree trips which cause shutdown under emergency operation.
N                           .
W To verify propdr opert. tion of these trip devices, shutdown from the tests outlined *In B-2 through 8-4 above will be accomplished by sequentially
: 6.       Load Rejection:
-introducing thesh trips for each of the thirteen tests.
                                      ,e~                         ,
s N
                ,                                          To assure that on a load refec;the diesel generator does not go over five hundred RPM tion of ~1000 KW, visacorder tracings of frequency will s
6.
be made during the trio frca'7000 KW outlined -in B-3 above.                               *
Load Rejection:
                                                                                ..                  'M               ,
,e~
Criteria used to judge the tests outlinsd above as to what is a successful test,
To assure that on a load refec;the diesel generator does not go over five hundred RPM tion of ~1000 KW, visacorder tracings of frequency will be made during the trio frca 7000 KW outlined -in B-3 above.
_ %                            as opposed to a failed test, will be according to the foll.; wing plan:
s
~'\ .                                   o s
'M Criteria used to judge the tests outlinsd above as to what is a successful test, as opposed to a failed test, will be according to the foll.; wing plan:
              , N; , .~ The operation runs %u: tlined in'1-1 above are for break-in and grooming.
~'\\.
t                              As such, there are not any pass /{ ail criteria applied to them. In addition to break-in, this rpn will be to as ure that the diesel generator is ready for tests B-2. through '8-6.'
The operation runs %u: tlined in'1-1 above are for break-in and grooming.
, N;,.~
o s
As such, there are not any pass /{ ail criteria applied to them. In addition t
to break-in, this rpn will be to as ure that the diesel generator is ready for tests B-2. through '8-6.
1
1
(    sh .'        M'                    ,
                                                                                                      ,                  j '; 3        \
o
(*                        Tests? outlined in II-2 throtgh B-6Wil'1'he conducted in accordance with the pars / fail criteria of NRC Regulatory, Guide 1.108.
x s                    x a                i*
                                #                                    '                                  g
                                                        \p s
(
(
y '"
sh.'
\t                                                                                ,
M' j '; 3
                                                                                                          ~
\\
gi             J
Tests? outlined in II-2 throtgh B-6Wil'1'he conducted in accordance with the o
    's .
,(*
7
pars / fail criteria of NRC Regulatory, Guide 1.108.
                                                                              \           "
a x s x
i*
g s
\\p
(
\\t y '"
gi J
~
's.
\\
y ?_ '
y ?_ '
: v.           y' s                       ;-                        , x, Q                           ,
7 v.
_            %              3                   ,
y
s
' s
, x, Q
3 s


a                                                                                                         ,,
a Mr. Harold R. Denton, Director July 6,1984 Page 4 of the Catawba Unit i diesels.We trust the above information is keeping yo service.
Mr. Harold R. Denton, Director July 6,1984 Page 4 of the Catawba Unit i diesels.We trust the above information is keeping you service.                           Please call me if I can be of any further Very truly yours, 44 k r Hal B. Tucker NAR/php cc:
Please call me if I can be of any further Very truly yours, 44 k r Hal B. Tucker NAR/php Mr. James P. O'Reilly, Regional Administrator cc:
Mr. James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission Region   II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 NRC Resident Inspector Catawba Nuclear Station Robert Guild, Esq.
U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 NRC Resident Inspector Catawba Nuclear Station Robert Guild, Esq.
Attorney-at-Law P.O. Box 12097 Charleston, South Carolina 29412 Palmetto Alliance 21351 Devine Street Columbia, South Carolina 29205 Mr. Jesse L. Riley Carolina Environmental Study Group 854 Henley Place Charlotte, North Carolina 28207 bec:       .D/G ~ Task Force                                                                 .
Attorney-at-Law P.O. Box 12097 Charleston, South Carolina 29412 Palmetto Alliance 21351 Devine Street Columbia, South Carolina 29205 Mr. Jesse L. Riley Carolina Environmental Study Group 854 Henley Place Charlotte, North Carolina 28207 bec:
J. M.'McGarry A.'V. Carr                                                   ,
.D/G ~ Task Force J. M.'McGarry A.'V. Carr C. Newton J. M. Hart C. L. Ray C. L. Hartzell M. S. Tully N. A. Rutherford R. C. Futrell
C. Newton J. M. Hart C. L. Ray C. L. Hartzell M. S. Tully N. A. Rutherford
~
                                  ~
L. T. Parker R. O. Sharpe SREC NC MPA-1 NCEMC Group File: CN-801.01
R. C. Futrell L. T. Parker R. O. Sharpe SREC NC MPA-1 NCEMC Group File: CN-801.01


x                             -
x
_ p a, .r 4.
_ p a,.r 4.
                                      ~
Latam i*uit J Diesch Inspection Plan &trix s
s                  ,-
~
Latam i*uit J Diesch Inspection Plan &trix j
/
                                          .      s                        -
Saz:ple Size, Pehent of Frgine Parts Inspected j
                                                                            /         .
s Part Nmn
Saz:ple Size, Pehent of Frgine Parts Inspected Part Nmn
' e
                                            'e
'e p,g,y Surf. Vol.
                                                                                'e '                                                                                                                                                                          p,g,y Part 2., Claus Lizen. Visual 10E                                 Surf. Vol.
Part 2., Claus Lizen. Visual 10E IDE Inbe Oil Pressure lhgulatin Valve v --**- -'-t-kterial Rutiness Eag Ev ktes 00 420 t,,-
IDE v --**- -'-t- -                                                                                kterial Rutiness Eag Ev ktes Inbe Oil Pressure lhgulatin Valve 00 420             t,,-                          -
Jacket Wter SWp? e, Ftres, Casket f
Jacket Wter SWp?fe, Ftres, Casket                                 00-700A           3 r         100                       L                                                                                         X                   9 Jacket %tdr Staafpipa@lts                           /             00-7003 B               -
00-700A 3
            ~ Jacket Eter Stanipipe Supp)tm ' -
r 100 L
00-700C             B             '-
X 9
100 X                   9 Jacket Eterstan! pipe Svirrheb/ '.                               00-700E             B               -
Jacket %tdr Staafpipa@lts
Jacket Eter Stan3 pipe Boltin;&u rial.100-700F                                                                   s,
/
* l                 -                    -                    -                        -
00-7003 B
B               -
~ Jacket Eter Stanipipe Supp)tm ' -
100' ~ -              '                                                                                          X                  9 Nin Beariq Cap Base Assenbly                     %                                                      ~
00-700C B
02-305A           A               -                                                                                                                              -                  -
100 X
min Bearing Studs ami Ets                                                                                           50(0) 50(0)                                 -                    -
9 Jacket Eterstan! pipe Svirrheb/ '.
02-305C                                                                                                                                                           -
00-700E B
min Bearirg caps                -        *              ,
Jacket Eter Stan3 pipe Boltin;&u ial.100-700F s,
A _10(0) 30(0)                                     -                    -
* l r
          , Inbe Oil Internal Beaders e
B X
                                                                ,          ' 02-305D               A                   -'                                                                                                  -                    -                  -
9 Nin Beariq Cap Base Assenbly 02-305A A
                                                                        % .f-307A                                                50(0 5C(0)                                                       -
100' ~
lube Oil 'Ibbing an! Fittings-IntdLiO2 '97P A             -
~
100 "} '                          '
min Bearing Studs ami Ets 50(0) 50(0) 02-305C A _10(0) 30(0) min Bearirg caps
A              -
, Inbe Oil Internal Beaders
100                  -
' 02-305D A
lobe Oil Line Supports-Inte:nal- ', . i 02-@f,'D                                       B Crarkshaft'     -i 100       #,
e 50(0 5C(0) 100 "} '
                                                                              '02-310A           A 100 NI %.                                                                                                                                   -                  -        I Crakshaft Bearitz Shell                                                                                                              38(0)                     -
%.f-307A A
Crmkshaft huat Bearing Ring 02-3103 [ A                   50(0) $0(0)                                                 -
lube Oil 'Ibbing an! Fittings-IntdLiO2 '97P A
3,4 3                                       -                      -
lobe Oil Line Supports-Inte:nal- ',. i 02-@f,'D B
Crankcase assenbly                                                02-3100 ~ A 100-                                       "            -
100 Crarkshaft'
Cam Iceing Caps tal Dowels                                       02-311A            A        *  -
-i 100 Crakshaft Bearitz Shell
7C0                .~                         -
'02-310A A 100 NI %.
4 02-3113             B             -                    '
38(0) 02-3103 [ A 50(0) $0(0) 3,4 Crmkshaft huat Bearing Ring 3
Crms. case Wuntirs Faz6ere                                         02-311D X
02-3100 ~ A 100-Crankcase assenbly 02-311A A
B                                                                                                                                                                9 C'lialer   Block 7                                                                                                       ;'S-f                                                                                                                   -
4 Cam Iceing Caps tal Dowels 7C0
Cylinder liner ''                       N 02--31 %           A 40(25)                       -
.~
20(25)                                               -
02-3113 B
X(0)                 9 Cylinfer Block Jacket Eter knifold 02-315C           A 100                     100               2-                         -
Crms. case Wuntirs Faz6ere 02-311D B
Cylinder Head Studs                                            ,02-315D              E            -
X 9
100' 20(0) , 20(0)                                   -                    -
C'lialer Block 7
u ? n2-315E                   B           -
;'S-f Cylinder liner ''
25
02--31 %
                                                                                                                                                                                                -s                     -                    -                  -
A 40(25) 20(25)
Cpl. Block Jr@t Wtr. &nifold Nts ' 02-315F                                                                                             :                    -
X(0) 9 N
3(0)                   -
02-315C A 100 100 2-Cylinfer Block Jacket Eter knifold 20(0), 20(0)
CylindedBloc.k Scals and Cackets-02-315G B
,02-315D E
B          -
Cylinder Head Studs 100' u ? n2-315E B
loog.
-s Cpl. Block Jr@t Wtr. &nifold Nts ' 02-315F B
A.                         -                      -                      -            --
25 3(0)
Jacket kater Inlet knifold Asse::bly ~'02-316A                                       B            -
CylindedBloc.k Scals and Cackets-loo A.
X(0)                     9 Jacket Eter Inlet. Uanifold Coupliat                                                                           100                  -                      -                    -
02-315G B
02-316B             B                                                                                                                     -                    -
g.
Jacket Wter Discharge maifold ''
Jacket kater Inlet knifold Asse::bly ~'02-316A 100 X(0) 9 B
100 %                             " -                              -
Jacket Eter Inlet. Uanifold Coupliat 02-316B B
                                                                    ' 02-317A                    E          -
Jacket Wter Discharge maifold
' 02-317A E
100 %
Jacket Eter Disch. &nifnld Coupling 02-317B B
10 0 '
10 0 '
Jacket Eter Disch. &nifnld Coupling                              02-317B              B          -
Jocket Eter Disch. Enifald Supporth 02-317C 100 B
100                  -
F1pheel 100
Jocket Eter Disch. Enifald Supporth 02-317C                                                                                                               --                      -
%f 02-33'M A
F1pheel                                                                               B                                                                                                                                          -
Flywheel Bolting
                                                %f 100                -                      -                    -
\\
Flywheel Bolting                  "                            02-33'M             A           - '                -
Front Cear Case Bolting C2-33W A
                                                  \                                                                                           -                      -                    -
100 X(0) 9 s
C2-33W s            A           -
02-335B
X(0)                   9 100 Front Cear Case Bolting                  ''                                                                                        -                      -
'C' Connecting Rods ani Bushings 100 02-340A A 100(0) 100 100 Connecting Rod Bearing Shells v
02-335B             'C'           -
25l0) 25(0)-
100 Connecting Rods ani Bushings                                                                                                       -                      -                      -
Piston 02-340B A 100 100 100 100 Piston Rings 02-341A A 100(0)100 100(0) 02-341B A
v          02-340A                                                                                                                                   -
25(0) 100(0)
Connecting Rod Bearing Shells                                                        A 100(0) 100                             100                         -
Piston Pin Asser:bly 5,10 I'i(0)
Piston 02-340B              A 100                                                                                    25l0)                     25(0)-               -
< Intake Tappets 02:341C A
100           100                   100                         -
25(0)100 11 7'
Piston Rings                                                   02-341A             A 100(0)100                                                                                               ,                            -                    -
15(0) 25(0)
02-341B 100(0)                       -                    -                        -
N 1 Tappets 02-34 %
Piston Pin Asser:bly                                                                A          25(0) 100(0)                       -
A 25 A
5,10
02-345B A
      < Intake Tappets                                                   02:341C             A         25(0)100 I'i(0)                      -                  -
h1 Pmp hse AsnAly 13 02-345C B
11 7'             15(0) 02-34 %              A                                                                                                                  25(0)
Cashaft Assembly, canshaft l'earig 02-350A A Nv 100 X(0) 9 r.-
N 1 Tappets                 .
02-3503 F s
02-345B 25 A                     ,,                  ,        -                        '              '
Onrhaft Supports, 'Boltiyg'ani Cear 100
h1 Pmp hse AsnAly                                                                     A          -
. -e
13               -            ''        -                    -
~ -
                                                    ',                  02-345C             B                                                                                                                                       -
0215f5 ' A ' k-i
Cashaft Assembly,                                                                                         ,'        -              -                      -                    - *                      -
' Crcakshalt Cear
canshaft l'earig s                      '                        02-350A             A Nv 100 r.-                                                                                                                            X(0)                   9 Onrhaft Supports, 'Boltiyg'ani Cear 02-3503 F                        -
'100(0)/'i -
100            . -e                       -                    -
7 10@)
                                                                                                                                                                                                            ~ -
10X0) i 02-3554 '
i
"A.
    ' Crcakshalt Cear                                                  0215f5 ' A ' k-                                                                           -
N+
7 i
Idfer Cear Asserbly
Idfer Cear Asserbly            /                '                02-3554 '
/
                                                                . s (135Ld' A ' { - 100 "A. N+            '100(0)/'i 100          - '
100 Air Start Valve
                                                                                                                                                                  -                10@)
. s (135Ld' A ' { -
10X0)
Air Start Valve                                                                                                                      -                     -                    -
Cylinier Head                                        .
                                                                    <02-3 W " A                                                                                                                           100(0) 100 [ 10t Q -                                            _-
                                                      '' i . 0@cA- C 100 100 '
Intake and hh:nst Valves                                                                                                      100 100                        -                        -
Cylinder Bead Bolticg aaf Gidets . - 101-360B                  Ob360J, $ B
                                                                                        /sB        25(0)100                            -                      -
25(0)                      -
X 2,9
!  _ V21ve Spriegs                                                                                    -                  -              -                                                                                                              -
l    Subcowr Assecbly                        ' "
                                                          #'          02-3630 - B                      -
100               -
9 I-X(0)                      -
i Feel Injection Pu:n                                        <    02-3% _,B ''                     -
100            100 ,                      -' -
                                                                                                                                                                                                                                        =
1 hi Injectio2 Tips                                            10'-3bh                  B        -
100
100
* t'                     -
<02-3 W "
                                                                - S2-365U                'B.                                                      '10C(0)                         -
A 100 [ 10t Q -
100(0)               X                                          -
100(0)
                                ''                                                                       ,.              -             -                                                '                                                             9
Cylinier Head
                                                                                        '                                                                   ~                     -            !          e X(0)
'' i. 0@cA-C 100 100 '
                                                            ,~                    *
100 100 Intake and hh:nst Valves
                                                                                                .g                           ,
. - 101-360B / s B 25(0)100 X
                                                                                                                                          ; .;+                                                             -
Cylinder Bead Bolticg aaf Gidets Ob360J, $ B 25(0) 2,9
9 A
_ V21ve Spriegs 9
g          k a                   %                        e         ''
02-3630 - B 100 X(0) l Subcowr Assecbly I
s
Feel Injection Pu:n
                                                  ,sf
< 02-3% _,B ''
* lauie >-1.
i 100 100,
          . .*    .                                  Catz.ta Unit 1 Diesels Inspection Plan Matrix Sacple Size, Percent of Engine Parts Inspected Part Nase                                                                                                                                                                                                   Page 2 Surf. Vol.
t'
Part No. Class Dimen. Visual )DE10E                                                                     Material Hardness hg Dr Notes h1 Injection Ming 02-365C       B                 -
=
100 h 1 Injection % bizs Supports                                                                                 100                       -                    -                    -
1 10'-3bh B
02-365D       B                 -
hi Injectio2 Tips 100
'10C(0) 100(0)
X 9
- S2-365U
'B.
~
e X(0) 9
.g
;.;+
,~
A g
k a
e s
,sf
 
lauie >-1.
Catz.ta Unit 1 Diesels Inspection Plan Matrix Sacple Size, Percent of Engine Parts Inspected Page 2 Part Nase Surf. Vol.
Part No. Class Dimen. Visual )DE10E h1 Injection Ming Material Hardness hg Dr Notes 02-365C B
h 1 Injection % bizs Supports 100 100 02-365D B
100 8
100 8
h1 Puup Linkage and control Shaft                                                                                   -                  -                    -                  -
h1 Puup Linkage and control Shaft 02-371A A
02-371A       A                 -                  -
h1 Puup, Linkge, Bearings and Shaft 100(0) 100(0)
h1 Puup, Linkge, Bearings and Shaft                                                                                 -                    -
Intake Manifolds 02-371B A
100(0)             100(0)
100 Exhaust Manifold 02-375 B
Intake Manifolds                           02-371B       A                 -
100 02-380A B
100                     -                  -
Exhaust Ihnifald Bolting 100 100 i
Exhaust Manifold                           02-375         B               -
100(0) 100(0) 02-380B B
100                     -                  -
9 9'
02-380A       B               -                                                                                                                        -                  -
8 Cylixxier Block Cover, Caskets an! Bolts 02-3853 C
Exhaust Ihnifald Bolting                                                                   100               100                       -                                                                                  i 02-380B                                                                                                      100(0)             100(0)
Crankcase Cover Gaskets and Bolting 02-386B C
Cylixxier Block Cover, Caskets an! Bolts B                9                  9'                  -                  -                    -                    -
100 X(0) 9 Intake & Intermediate Rocker Arm Asably. 02-390A B
8    !
Exhasst Rocker Arm Assenbly 100 100(0) 100(0) 100(0) 02-390B B
02-3853       C               -                  -
Intake and N = nt Pushreds; 100 100(0) 100(0) 100(0)
Crankcase Cover Gaskets and Bolting 02-386B                                                                         -                  -                    -                  -
Connector hhrod
C               -
, 02-390C B
100                       -                                                                                X(0)                 9 Intake & Intermediate Rocker Arm Asably. 02-390A           B               -
100 100 02-39(D B
Exhasst Rocker Arm Assenbly                                                               100               100(0)                   -
' Rocker Arm Bushirgs 100 100 02-390E B
02-390B        B                                                                                              100(0)             100(0)               -
Rocker Arm Folting 100 02-390G B
Intake and N = nt Pushreds;                                               -
Overspeed Trip Covernor 100 100 02-410A A
100               100(0)                     -
100(0) 100(0)
                                                    , 02-390C          B              -                                                                              100(0)             100(0)               -                  -
Overspeed Trip & Accessory Drive 02-410B A
Connector hhrod                                                                         100               100                       -                      -
X(0) 9 Overspeed Trip Couplings 100(0)100(0) 100(0) 100(0) 02-4100 A
          ' Rocker Arm Bushirgs                        02-39(D       B               -
Overspeed Trip Vent Valves 100 02-410D A
100 100                       -                      -
Speed Rgulatizg Governor Drive 02-411A A
02-390E       B               -
X(0) 9 Govemor Drive Couplings 100(0)100(0) 100(0) 100(0) 02-411B A
Rocker Arm Folting                                                                       100                     -                  -                    -                  -
Governor Linkage 100 100 02-413 A
Overspeed Trip Covernor                     02-390G      B              -
h1 Pucp Linkage-Auto Slutdom Cylinder 02-413B 100 Speed Raulating Governor B
100 100                       -
100 02-41 %
02-410A       A               -                  -
A Govemor Booster Servonotor 02-415B B
100(0)             100(0)                 -                -
X(0) 9 Covernor Heat Excharger Assenbly 02-415C A
Overspeed Trip & Accessory Drive                                                                                 -                  -                    -
X 9
02-410B       A             -
lobe Oil Puup 02-420 A
X(0)               9 Overspeed Trip Couplings                                                                 100(0)100(0)                               -
X(0) 9
100(0)
" Jacket Water Puap 02-42 %
Overspeed Trip Vent Valves                 02-4100      A              -
A 100(0)
100                      -                  -
X(0) 9 Intercooler Piping-Coupling, Bolt, Cskt.
100(0)                -                  -
100(0) 100(0) 02-4363 A
02-410D       A               -
-W:bo Cooling Water Pipe ani Fittings 02-437A B
Speed Rgulatizg Governor Drive                                                                 -                  -                  -                    -                  -
100 l
02-411A       A               -                                                                                                                      X(0)               9 Govemor Drive Couplings                                                                 100(0)100(0)                                 -
hrbo Cooling Water Pipe Supports 100 02-437B A
100(0) 02-411B      A            .-                                                                                                  100(0)                 -                  -
Start Air Manifold Pipe, Abits & Fttng. 02-441A 100 A
Governor Linkage                                                                       100                     -                  -
Start Air Manifold Vivs, Stmers, Fitrs. 02-441B 100 A
100 02-413       A             -
Start Air Manifold Pipe Supports 02-441C A
100                      -
Iti)
h1 Pucp Linkage-Auto Slutdom Cylinder 02-413B             B            -
X(0) 9 Starting Air Distributor Assenbly 02-442A A 100(0)100(0)
Speed Raulating Governor                                                               100                     -                  -
Start Air Distributor 7bg., Ftg., Cskts. 02-442B 100 100(0)
;                                                      02-41 %       A             -                  -
A Fuel Oil Booster Punp 6
Govemor Booster Servonotor                 02-415B B             -                  -                                                                                                    X(0)               9 Covernor Heat Excharger Assenbly             02-415C lobe Oil Puup                                              A             -                  -                  -                  -
02-445 A
X                 9
bl Oil Piping and wbing 02450B A
        " Jacket Water Puap 02-420       A             -                  -                  -                  -                      -
100 X(0) 9 h1 Dil Piping Supports 02-450D A
X(0) 9 02-42 %       A             -
M 1 Oil Filters 100 h1 Oil Strainers 02-45%
X(0)               9 Intercooler Piping-Coupling, Bolt, Cskt. 02-4363                                      100(0)                  -                  -
B 1
A            -                                                                              100(0)             100(0)                 -                -
02-455B B
        -W:bo Cooling Water Pipe ani Fittings                                                   100                    -                  -                      -                  -
X(0) 9 h1011 Filter Mounting Harduare 02-455C A
02-437A       B           -
X(0) 9 Externa 11nbe oil Lines 100 02-46%
100 hrbo Cooling Water Pipe Supports             02-437B l                                                                  A             -
A Extemal lube Oil Line Supports 100 02-465B A
100                    -
External Inbe Oil Valves 100 02-465C A
;      Start Air Manifold Pipe, Abits & Fttng. 02-441A           A             -
Arbocharger Inbe Oil Piping 02-467A B
Start Air Manifold Vivs, Stmers, Fitrs. 02-441B                                       100                     -                  -                      -
Wrbocharger Inbe Oil Piping Supports 100 X
A           -                  -                                                                                                  -                  -
9 02-467B B
Start Air Manifold Pipe Supports           02-441C A           -
Arbochstger Bracket 100 02-47 %
Iti)                                                                                                     X(0)               9 Starting Air Distributor Assenbly           02-442A Start Air Distributor 7bg., Ftg., Cskts. 02-442B           A 100(0)100(0)                                     -                  -                    -
B Wrbocharger Air Butterfly Valve 100 02-475B A
Fuel Oil Booster Punp                                     A            -
hrbocharger Bracket Bolting 100(0) 100(0) 100(0)
100                    -                  -
Control hel Cabinet 02-475D B
100(0)                -
8(0)
6
Control Air Accuuulator 02-500A A
!                                                    02-445       A           -
8(0) 12 Control Air System Valves 02-500F A
bl Oil Piping and wbing                     02450B h1 Dil Piping Supports                                    A           -
X 9
100                     -                  -                                                              X(0)               9 02-450D       A                                                                                                               -                  -
02-5000 A
M 1 Oil Filters                                                       -
X 9
100                     -                  -                      -
X 9
02-45%         B                                                                                                               -
                                                                                                                                                                                                      -                  1 h1 Oil Strainers                                                      -                  -                -                  -                      -
02-455B       B         -
X(0) h1011 Filter Mounting Harduare                                                           -                  -                  -                      -                                                        9 02-455C       A           -
100 X(0)
Externa 11nbe oil Lines                                                                                     -                  -                      -                                                        9 02-46%       A         -
100 Extemal lube Oil Line Supports                                                                               -                  -                    -
02-465B       A         -
100 External Inbe Oil Valves                                                                                     -
02-465C       A         -                                                                                                  -                    -
Arbocharger Inbe Oil Piping                                                               -                -                  -                      -
02-467A       B         -
100 X
Wrbocharger Inbe Oil Piping Supports                                                                         -                  -                    -
9 Arbochstger Bracket                          02-467B       B         -                                                                                                    -                  -
100                   -                  -                      -
02-47 %       B         -
100 Wrbocharger Air Butterfly Valve                                                                             -                  -                    -                              '
02-475B       A         -                                                                                                    -                  -
hrbocharger Bracket Bolting                                                         100(0)                 -                  -
02-475D        B        -                                                                              100(0)             100(0)               -
Control hel Cabinet                                                                       8(0)              -                  -
8(0) 02-500A       A         -                  -
12 Control Air Accuuulator                                                                                    -                  -
Control Air System Valves                   02-500F       A       -                    -                -
X                 9 02-5000       A         -                    -                -
X                 9 X                 9 l
l l
l l
l


                      , , , ,              Table 5-1.           Cat.* M 1 Dierals Inspection Plan htrh
Table 5-1.
                  .                                            S .mple Siza, Percsnt of Engina Parts Inspscted                                                     Page 3 Part 11ase                                                                               Surf. Vol.
Cat.* M 1 Dierals Inspection Plan htrh S.mple Siza, Percsnt of Engina Parts Inspscted Page 3 Part 11ase Surf. Vol.
Part Ib. Class Dinen. Visual NDE                         NDE heerial Esrdness Etg 27 Notes Catrol Air System Pressure switches 02-5031     B           -          -            -
Part Ib. Class Dinen. Visual NDE NDE heerial Esrdness Etg 27 Notes Catrol Air System Pressure switches 02-5031 B
cmtrol Systen Belays                       02-500T     A             -          -            -
cmtrol Systen Belays 02-500T A
I         9 Cetrol System Solanoid Valves                                                                                     -                -
I 9
I 02-500t     A             -          -            -          -        -
Cetrol System Solanoid Valves 02-500t A
9 cmtrol Air Systes Pipirg, Tbbirg, Ptngs 02-500M       B             -
I 9
I     ~9 100               -
cmtrol Air Systes Pipirg, Tbbirg, Ptngs 02-500M B
Cmtrol Panel Wiring                       02-500N
I
                                                    ,                    A           -          -            -
~9 100 Cmtrol Panel Wiring o02-540A B
Inbe Oil Smp Tank                       o02-540A I
02-500N A
B            -
Inbe Oil Smp Tank I
100                 -                                                        9 Iube 011 Sep Tank Bolting                 02-540B     B           -
9 100 Iube 011 Sep Tank Bolting 02-540B B
Inbe Oil Sep Tank muotirg Harthere                                       100                -          -        -                -        -
100 Inbe Oil Sep Tank muotirg Harthere 02-540C B
02-540C     B           -
100 Fourziation Bolts and Anclors 02-550 B
100               -          -
Insen - *fon h r = ples 02 4 300 3
Fourziation Bolts and Anclors               02-550       B           -
I(0) 9 Ergine & A-41t=7 2dula Wiring Confuit 02488&
Insen - *fon h r = ples                     02 4 300     3           -          -
I 9
I(0)       9 Ergine & A-41t=7 2dula Wiring Confuit 02488&           A            -
A 100 Ergine and L=illig 2dule Wiring
I         9 100             -
. 02488B A
Ergine and L=illig 2dule Wiring         . 02488B       A                       -            -
Engine and k=itia7 2dnIn Wiring Boxes 02-688C A
Engine and k=itia7 2dnIn Wiring Boxes 02-688C           A         -            -
I 9
I         9 Ergine Alarm Sensors         -
Ergine Alarm Sensors 02490 A
02490       A           -          -            -
I 9
I         9 off Engina Safety Alarm Sensors-evitebes 02-691A       B         -            -            -
off Engina Safety Alarm Sensors-evitebes 02-691A I
I        9 Ergine Stutdoza Ibbica and Fittings       02495&       B         -
9 B
I        9 100               -        -
Ergine Stutdoza Ibbica and Fittings 02495&
Ibgine Stutdout Yalves, Ecgs. & Orifice 024 958         A         -            -          -
B I
Ergine Shutdann liip Switches               02495C I
9 100 Ibgine Stutdout Yalves, Ecgs. & Orifice 024 958 A
lbel 011 Duplex Strainer                               A          -          -            -        -          -
Ergine Shutdann liip Switches 02495C A
9 02-825D     A         -          -            -        -
I 9
I         9 lbrbochar;;er Ihrust Bearirg Inbe Systra 02<I2           C I           9 hatatic Valve 100              -        -          -                -
lbel 011 Duplex Strainer 02-825D A
C 135-40 B             -          -
I 9
Intake Air Filter -                         @ l06       B       -            -
lbrbochar;;er Ihrust Bearirg Inbe Systra 02<I2 I
I           9 Intake Air Silm er                         CN-107 I
9 C
B       -            -            -        -
100 hatatic Valve C 135-40 B Intake Air Filter -
9 Befora and After Inbe Oil Pmp               @ l09       A         -            -
@ l06 B
I           9 lb11 Flor Zube Oil Filter                   CH-110     A         -
I 9
I           9 Inbe Oil Heat Webmar                         @ lli       B       -          -
Intake Air Silm er CN-107 B
I           9 Cenerator Shaft armi Bearings                 G-119A I
I 9
A       -            -            -        -
Befora and After Inbe Oil Pmp
9 Jacket Water Heat heb==r                     @ l20       B       -            -            -
@ l09 A
I           9 011 Prelube Filter                           CN-122 I
I 9
A        -            -                                                                        9 Iube Oil Keeptarm Strainer                                                                   -          -        -                -
lb11 Flor Zube Oil Filter CH-110 A
I CN-131       A       -            -                                                                        9 Intercooler                                   F-068 I
I 9
1hrbocharger                                              A      -
Inbe Oil Heat Webmar
100         100         -          -
@ lli B
9 HP-022/3 A 100                 100           -        -
I 9
Inbe Oil 1%11 Pressure Strainer               SE-025       A       -            -
Cenerator Shaft armi Bearings G-119A A
I           9 1
I 9
                                                                                                                                                                                          .i e
Jacket Water Heat heb==r
@ l20 B
I 9
011 Prelube Filter CN-122 A
I 9
Iube Oil Keeptarm Strainer CN-131 A
I 9
Intercooler F-068 A
I 9
100 100 1hrbocharger HP-022/3 A 100 100 Inbe Oil 1%11 Pressure Strainer SE-025 A
I 9
. i e
0 l
0 l
t l
t l
l l
e e
e e
I
I


4 _.
4 _.
I l
l Notes to Table 5-1 1.
l Notes to Table 5-1 1.
Intake and exhaust valve springs have proper olor code.
Intake and exhaust valve springs have proper olor code.
2.
2.
Ultrasonic wall thickness measurement of fire deck area an
Ultrasonic wall thickness measurement of fire deck area an
                            . area.
. area.
3.
3.
A torsiograph will be developed of the crankshaft.
A torsiograph will be developed of the crankshaft.
Line 465: Line 476:
Eddy current test to determine if there are cracks.
Eddy current test to determine if there are cracks.
9.
9.
Engineering validation (Eng Ev) of diesel 'lA part including visual
Engineering validation (Eng Ev) of diesel 'lA part including visual inspection to determine that part is per bill of materials and review of unscheduled maintenance reports associated with part.
                ,        inspection to determine that part is per bill of materials and review of i
i engineering validation consists of reviewing unscheduled maintenanceFor dies reports.
unscheduled maintenance reports associated with part.
10.
engineering reports.              validation consists of reviewing unscheduled maintenanceFor dies 10.
Piston skirts will be replaced on the 1B diesel.
Piston skirts will be replaced on the 1B diesel.                                                   '
Surface NDE and hardness weneperformed in receipt inspection.
weneperformed in receipt inspection.                             Surface NDE and hardness
11.
!                11.
New piston rings will be installed on the new skirts.
New piston rings will be installed on the new skirts.
: 12. All bolting will be replaced.
: 12. All bolting will be replaced.
13.
13.
Catawba 18 frequency of inspections same as CatawFa lA except parentheses.                                                                                           as Where Catawba 18 appears          in parentheses the parentheses,are included, frequency of inspection for             -
Catawba 18 frequency of inspections same as CatawFa lA except as parentheses.
t 9
Where parentheses are included, frequency of inspection for Catawba 18 appears in the parentheses, t
1 l
9 1
l
l l
                                                                                                                .}}
.}}

Latest revision as of 10:29, 13 December 2024

Forwards Applicant to NRC Describing Diesel Engine 1B Insp.Ltr Also Provides NRC W/Applicant Plans for Return to Svc Testing of Diesel Engine.Related Correspondence
ML20093F242
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 07/16/1984
From: Carr A
DUKE POWER CO.
To: Foster R, Joseph Kelly, Purdom P
Atomic Safety and Licensing Board Panel
References
OL, NUDOCS 8407180304
Download: ML20093F242 (9)


Text

_ _ _ _ _ _ _ _

3.,~l RELATED CORRESP0aur_NCE.

7 DUKE POWER GOMPANY l

LE

^L ""^" " " "

ST'J*"C'n'o"~.s.

o n epr gn=J,;^=g.a,..

P. O. Box 33180

g. u go a,sou,v.ga, GIIARLOTTE. N. G. 2a242 ao* =-2570 s"

=,~i",'*"'"'

July 16,1144 g jg g

'"'" h"Eln. sa.

s "21"; i L*ta". sn.

KONALD L.OlSSON James L. Kelley,. Chairman

~

Atomic Safety and' Licensing Board U. S. Nuclear Regulatory' Commission Washington, D. C. 20555 l

1 Dr. Paul W. Purdom 235 Co'lumbia Driva Decatur, Georgia 30030 Dr. Richard F. Foster Post Office Box 4263

.i Sunriver, Oregon 97702 Re: Duke Power Company, et al.

Catawba Nuclear Station, Units 1 and 2 Docket Nos. 50-413pnd 50-414 OG.

Gentlemen:

I am transmitting to the Board a copy of Applicants' July 6, 1984 letter to the NRC Staff which describes the Catawba 18 diesel engine inspections.

In keeping with a commitment made in Applicants' June 29 report to the NRC Staff (transmitted to you by my letter of July 11) the July 6 letter also provides the NRC Staff with Applicants' plans for return to service testing of the Catawba IA diesel.

The parties have already been served with a copy of the July 6 letter.

Sincerely yours, Albert V.

rr, Jr.

c: All Parties (w/o attach.)

8407180304 840716 PDR ADOCK 05000 G

1 DuxE POWER GoNaPANY P.O. BOX 33180 RAL B. TUCKER CHARLOTIT, N.C. 28242 memen (704) o73-453:

July 6,1984 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Ms. E. G. Adensam, Chief Licens' tng Brarich No. 4 Re: Catawba Nuclear Station Docket Nos. 50-413 and 50-414

Dear Mr. Denton:

of the Catawba 1B diesel engine and the return to servic lA engine following reassembly after inspection. The Duke Power Company pla for these two items appear below:

A.

Catawba 18 Diesel Engine Inspections Our letter of April 5,1984 forwarded a report entitled " Catawba Nuclear Station Extended Operation Tests and Inspections of Diesel Generators."

Section 6 of this report noted that the extent of inspections to be carried out of the Catawba 18 diesel would be based upon the results of the Catawba lA diesel inspections and other TDI emergency diesels.

The Catawba ~1A diesel inspections are now complete.

i The Catawba lA diesel inspection results as well as the Owners Group inspection requirements for the second i

for.the Catawba 1B diesel has been developed from this re 18 inspection plan matrix is shown in a revised Table 5-1 to the above The Catawba mentioned report and is included as an enclosure to this letter.

3

'to the revised Table 5-1, sample size of components to be inspected onReferring the Catawba 18 diesel will be the same as the Catawba lA diesel except as noted by parentheses.

Where parentheses are included inspection.for the Catawba 1B diesel appears in the paren, theses. ' sample size of B.

Catawba Diesel 1A Return to Service Testina

-In accordance with a commitment made in " Catawba Nuclear Station Engine 1A Component Revalidation Inspection. Final Report " of June 29, 1984, the following is the Duke Power Company plan for return to service

'I testing of the Catawba lA diesel.

l l

e

____r

..+

?. -

Mr. Harold R. Denton, Director July 6, 1984 Page 2 1.

Run-In Operation:

This will be in acco$ dance with TDI Instruction Manual, Chapter 6, Part C (page 6-C-18). The runs are mainly for seating new rings in the cylinder liner and consist of running the engine at various speeds and loads, inspections of the engine following various run.s, hot crankshaft. web deflection checks, and cold compression checks.

In additio', during these runs, control systems, vital engine parameters, n

and auxiliary services will be monitored to assure proper operation.

2.

Modified Load Tests:

Ten modified load tests will be run at a load of at least 3500 kW.

Pertinent parameters that will be adhered to are as follow:

A test will be of one hour minimum duration followed by. ct a.

least one and a half hours with the engine secured prior to the next modified load test, b.

All test starts will be performed. with a pre-lube of the engine.

During a test, the load will be increased to a minimum of 3500 KV c.

in a period less than five minutes.

d.

Vital engine parameters will be monitored on a fifteen minute basis during the one hour run at power to assure proper operation.

3.

24-Hour Run:

A twenty-four hour run test will be conducted.

of twenty-two hours at 7000 KW and two hours at 7700 kW.This test will consist Pertinent parameters that will be adhered to are as follow:

The engine test starts will be performed after the engine has a.

been pre-lubed.

b.

During the test, all load changes will be accomplis,hed in five minutes or less.

Vital engine parameters will be monitored on a one-hour basis to c.

assure proper operation.

4.

Fast Start Test:

Two fast start tests will be conducted.

will be adhered to are as follow:

Pertinent parameters that S

f

'N

,..ll~

Mr. Harold R. Denton, Director 1 July 5,1984 Page 3

-s..,_

l 2

~

s

?

'i Js Diesd1 engine will come upato speed and voltage within eleven y'

.^

a.

segonds.

'l ;

b.

Diesel engine wiil be loaded with ' accelerated blackout loads in the period of eleven seconds to thirty seconds. Peak load will be about 4100 KW. This is the highest load obtainable with the loed sequencer under ESF or blackout conditions.

After lhe engfne has achieved 410b KW, each test will last for c.

gg a period of one hour followed by a shutdown of at least one and a half hours. The one hour duration at load is set so that

\\

auxiliary cooling devices will not have to be cut in for some of the respective loads which would place an undue burden on x

thk plant for the performance of these tests.

~

d.

0ne of these tests will be conducted under pre-lube conditions.

The other of these tests will be performed with the engine in ready standby sutus without pre-lube.

e. ' Vital engine parameters will be monitored on a 15-minute basis, Further, visacorder tracings of diesel generator voltage and 1

frequency will be made during starting and loading transients.

'. Trip Device Verification:

b 5

~

s x

There are ten trips which cause the engine to shut down under normal operation and tnree trips which cause shutdown under emergency operation.

W To verify propdr opert. tion of these trip devices, shutdown from the tests outlined *In B-2 through 8-4 above will be accomplished by sequentially

-introducing thesh trips for each of the thirteen tests.

s N

6.

Load Rejection:

,e~

To assure that on a load refec;the diesel generator does not go over five hundred RPM tion of ~1000 KW, visacorder tracings of frequency will be made during the trio frca 7000 KW outlined -in B-3 above.

s

'M Criteria used to judge the tests outlinsd above as to what is a successful test, as opposed to a failed test, will be according to the foll.; wing plan:

~'\\.

The operation runs %u: tlined in'1-1 above are for break-in and grooming.

, N;,.~

o s

As such, there are not any pass /{ ail criteria applied to them. In addition t

to break-in, this rpn will be to as ure that the diesel generator is ready for tests B-2. through '8-6.

1

(

sh.'

M' j '; 3

\\

Tests? outlined in II-2 throtgh B-6Wil'1'he conducted in accordance with the o

,(*

pars / fail criteria of NRC Regulatory, Guide 1.108.

a x s x

i*

g s

\\p

(

\\t y '"

gi J

~

's.

\\

y ?_ '

7 v.

y

' s

, x, Q

3 s

a Mr. Harold R. Denton, Director July 6,1984 Page 4 of the Catawba Unit i diesels.We trust the above information is keeping yo service.

Please call me if I can be of any further Very truly yours, 44 k r Hal B. Tucker NAR/php Mr. James P. O'Reilly, Regional Administrator cc:

U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 NRC Resident Inspector Catawba Nuclear Station Robert Guild, Esq.

Attorney-at-Law P.O. Box 12097 Charleston, South Carolina 29412 Palmetto Alliance 21351 Devine Street Columbia, South Carolina 29205 Mr. Jesse L. Riley Carolina Environmental Study Group 854 Henley Place Charlotte, North Carolina 28207 bec:

.D/G ~ Task Force J. M.'McGarry A.'V. Carr C. Newton J. M. Hart C. L. Ray C. L. Hartzell M. S. Tully N. A. Rutherford R. C. Futrell

~

L. T. Parker R. O. Sharpe SREC NC MPA-1 NCEMC Group File: CN-801.01

x

_ p a,.r 4.

Latam i*uit J Diesch Inspection Plan &trix s

~

/

Saz:ple Size, Pehent of Frgine Parts Inspected j

s Part Nmn

' e

'e p,g,y Surf. Vol.

Part 2., Claus Lizen. Visual 10E IDE Inbe Oil Pressure lhgulatin Valve v --**- -'-t-kterial Rutiness Eag Ev ktes 00 420 t,,-

Jacket Wter SWp? e, Ftres, Casket f

00-700A 3

r 100 L

X 9

Jacket %tdr Staafpipa@lts

/

00-7003 B

~ Jacket Eter Stanipipe Supp)tm ' -

00-700C B

100 X

9 Jacket Eterstan! pipe Svirrheb/ '.

00-700E B

Jacket Eter Stan3 pipe Boltin;&u ial.100-700F s,

  • l r

B X

9 Nin Beariq Cap Base Assenbly 02-305A A

100' ~

~

min Bearing Studs ami Ets 50(0) 50(0) 02-305C A _10(0) 30(0) min Bearirg caps

, Inbe Oil Internal Beaders

' 02-305D A

e 50(0 5C(0) 100 "} '

%.f-307A A

lube Oil 'Ibbing an! Fittings-IntdLiO2 '97P A

lobe Oil Line Supports-Inte:nal- ',. i 02-@f,'D B

100 Crarkshaft'

-i 100 Crakshaft Bearitz Shell

'02-310A A 100 NI %.

38(0) 02-3103 [ A 50(0) $0(0) 3,4 Crmkshaft huat Bearing Ring 3

02-3100 ~ A 100-Crankcase assenbly 02-311A A

4 Cam Iceing Caps tal Dowels 7C0

.~

02-3113 B

Crms. case Wuntirs Faz6ere 02-311D B

X 9

C'lialer Block 7

'S-f Cylinder liner

02--31 %

A 40(25) 20(25)

X(0) 9 N

02-315C A 100 100 2-Cylinfer Block Jacket Eter knifold 20(0), 20(0)

,02-315D E

Cylinder Head Studs 100' u ? n2-315E B

-s Cpl. Block Jr@t Wtr. &nifold Nts ' 02-315F B

25 3(0)

CylindedBloc.k Scals and Cackets-loo A.

02-315G B

g.

Jacket kater Inlet knifold Asse::bly ~'02-316A 100 X(0) 9 B

Jacket Eter Inlet. Uanifold Coupliat 02-316B B

Jacket Wter Discharge maifold

' 02-317A E

100 %

Jacket Eter Disch. &nifnld Coupling 02-317B B

10 0 '

Jocket Eter Disch. Enifald Supporth 02-317C 100 B

F1pheel 100

%f 02-33'M A

Flywheel Bolting

\\

Front Cear Case Bolting C2-33W A

100 X(0) 9 s

02-335B

'C' Connecting Rods ani Bushings 100 02-340A A 100(0) 100 100 Connecting Rod Bearing Shells v

25l0) 25(0)-

Piston 02-340B A 100 100 100 100 Piston Rings 02-341A A 100(0)100 100(0) 02-341B A

25(0) 100(0)

Piston Pin Asser:bly 5,10 I'i(0)

< Intake Tappets 02:341C A

25(0)100 11 7'

15(0) 25(0)

N 1 Tappets 02-34 %

A 25 A

02-345B A

h1 Pmp hse AsnAly 13 02-345C B

Cashaft Assembly, canshaft l'earig 02-350A A Nv 100 X(0) 9 r.-

02-3503 F s

Onrhaft Supports, 'Boltiyg'ani Cear 100

. -e

~ -

0215f5 ' A ' k-i

' Crcakshalt Cear

'100(0)/'i -

7 10@)

10X0) i 02-3554 '

"A.

N+

Idfer Cear Asserbly

/

100 Air Start Valve

. s (135Ld' A ' { -

100

<02-3 W "

A 100 [ 10t Q -

100(0)

Cylinier Head

i. 0@cA-C 100 100 '

100 100 Intake and hh:nst Valves

. - 101-360B / s B 25(0)100 X

Cylinder Bead Bolticg aaf Gidets Ob360J, $ B 25(0) 2,9

_ V21ve Spriegs 9

02-3630 - B 100 X(0) l Subcowr Assecbly I

Feel Injection Pu:n

< 02-3% _,B

i 100 100,

t'

=

1 10'-3bh B

hi Injectio2 Tips 100

'10C(0) 100(0)

X 9

- S2-365U

'B.

~

e X(0) 9

.g

.;+

,~

A g

k a

e s

,sf

lauie >-1.

Catz.ta Unit 1 Diesels Inspection Plan Matrix Sacple Size, Percent of Engine Parts Inspected Page 2 Part Nase Surf. Vol.

Part No. Class Dimen. Visual )DE10E h1 Injection Ming Material Hardness hg Dr Notes 02-365C B

h 1 Injection % bizs Supports 100 100 02-365D B

100 8

h1 Puup Linkage and control Shaft 02-371A A

h1 Puup, Linkge, Bearings and Shaft 100(0) 100(0)

Intake Manifolds 02-371B A

100 Exhaust Manifold 02-375 B

100 02-380A B

Exhaust Ihnifald Bolting 100 100 i

100(0) 100(0) 02-380B B

9 9'

8 Cylixxier Block Cover, Caskets an! Bolts 02-3853 C

Crankcase Cover Gaskets and Bolting 02-386B C

100 X(0) 9 Intake & Intermediate Rocker Arm Asably. 02-390A B

Exhasst Rocker Arm Assenbly 100 100(0) 100(0) 100(0) 02-390B B

Intake and N = nt Pushreds; 100 100(0) 100(0) 100(0)

Connector hhrod

, 02-390C B

100 100 02-39(D B

' Rocker Arm Bushirgs 100 100 02-390E B

Rocker Arm Folting 100 02-390G B

Overspeed Trip Covernor 100 100 02-410A A

100(0) 100(0)

Overspeed Trip & Accessory Drive 02-410B A

X(0) 9 Overspeed Trip Couplings 100(0)100(0) 100(0) 100(0) 02-4100 A

Overspeed Trip Vent Valves 100 02-410D A

Speed Rgulatizg Governor Drive 02-411A A

X(0) 9 Govemor Drive Couplings 100(0)100(0) 100(0) 100(0) 02-411B A

Governor Linkage 100 100 02-413 A

h1 Pucp Linkage-Auto Slutdom Cylinder 02-413B 100 Speed Raulating Governor B

100 02-41 %

A Govemor Booster Servonotor 02-415B B

X(0) 9 Covernor Heat Excharger Assenbly 02-415C A

X 9

lobe Oil Puup 02-420 A

X(0) 9

" Jacket Water Puap 02-42 %

A 100(0)

X(0) 9 Intercooler Piping-Coupling, Bolt, Cskt.

100(0) 100(0) 02-4363 A

-W:bo Cooling Water Pipe ani Fittings 02-437A B

100 l

hrbo Cooling Water Pipe Supports 100 02-437B A

Start Air Manifold Pipe, Abits & Fttng. 02-441A 100 A

Start Air Manifold Vivs, Stmers, Fitrs. 02-441B 100 A

Start Air Manifold Pipe Supports 02-441C A

Iti)

X(0) 9 Starting Air Distributor Assenbly 02-442A A 100(0)100(0)

Start Air Distributor 7bg., Ftg., Cskts. 02-442B 100 100(0)

A Fuel Oil Booster Punp 6

02-445 A

bl Oil Piping and wbing 02450B A

100 X(0) 9 h1 Dil Piping Supports 02-450D A

M 1 Oil Filters 100 h1 Oil Strainers 02-45%

B 1

02-455B B

X(0) 9 h1011 Filter Mounting Harduare 02-455C A

X(0) 9 Externa 11nbe oil Lines 100 02-46%

A Extemal lube Oil Line Supports 100 02-465B A

External Inbe Oil Valves 100 02-465C A

Arbocharger Inbe Oil Piping 02-467A B

Wrbocharger Inbe Oil Piping Supports 100 X

9 02-467B B

Arbochstger Bracket 100 02-47 %

B Wrbocharger Air Butterfly Valve 100 02-475B A

hrbocharger Bracket Bolting 100(0) 100(0) 100(0)

Control hel Cabinet 02-475D B

8(0)

Control Air Accuuulator 02-500A A

8(0) 12 Control Air System Valves 02-500F A

X 9

02-5000 A

X 9

X 9

l l

l

Table 5-1.

Cat.* M 1 Dierals Inspection Plan htrh S.mple Siza, Percsnt of Engina Parts Inspscted Page 3 Part 11ase Surf. Vol.

Part Ib. Class Dinen. Visual NDE NDE heerial Esrdness Etg 27 Notes Catrol Air System Pressure switches 02-5031 B

cmtrol Systen Belays 02-500T A

I 9

Cetrol System Solanoid Valves 02-500t A

I 9

cmtrol Air Systes Pipirg, Tbbirg, Ptngs 02-500M B

I

~9 100 Cmtrol Panel Wiring o02-540A B

02-500N A

Inbe Oil Smp Tank I

9 100 Iube 011 Sep Tank Bolting 02-540B B

100 Inbe Oil Sep Tank muotirg Harthere 02-540C B

100 Fourziation Bolts and Anclors02-550 B

Insen - *fon h r = ples 02 4 300 3

I(0) 9 Ergine & A-41t=7 2dula Wiring Confuit 02488&

I 9

A 100 Ergine and L=illig 2dule Wiring

. 02488B A

Engine and k=itia7 2dnIn Wiring Boxes 02-688C A

I 9

Ergine Alarm Sensors 02490 A

I 9

off Engina Safety Alarm Sensors-evitebes 02-691A I

9 B

Ergine Stutdoza Ibbica and Fittings 02495&

B I

9 100 Ibgine Stutdout Yalves, Ecgs. & Orifice 024 958 A

Ergine Shutdann liip Switches 02495C A

I 9

lbel 011 Duplex Strainer 02-825D A

I 9

lbrbochar;;er Ihrust Bearirg Inbe Systra 02<I2 I

9 C

100 hatatic Valve C 135-40 B Intake Air Filter -

@ l06 B

I 9

Intake Air Silm er CN-107 B

I 9

Befora and After Inbe Oil Pmp

@ l09 A

I 9

lb11 Flor Zube Oil Filter CH-110 A

I 9

Inbe Oil Heat Webmar

@ lli B

I 9

Cenerator Shaft armi Bearings G-119A A

I 9

Jacket Water Heat heb==r

@ l20 B

I 9

011 Prelube Filter CN-122 A

I 9

Iube Oil Keeptarm Strainer CN-131 A

I 9

Intercooler F-068 A

I 9

100 100 1hrbocharger HP-022/3 A 100 100 Inbe Oil 1%11 Pressure Strainer SE-025 A

I 9

. i e

0 l

t l

e e

I

4 _.

l Notes to Table 5-1 1.

Intake and exhaust valve springs have proper olor code.

2.

Ultrasonic wall thickness measurement of fire deck area an

. area.

3.

A torsiograph will be developed of the crankshaft.

4.

the diesel both hot and cold. Crankshaft web deflec'tio'n 5.

Measure torque on belleville spring loaded bolts.

6.

Hardness of the spools will be measured only if excessive wear is measured on one or more of the spools.

7.

of the camshaft bearings will be performed.If inspection of cam 8.

Eddy current test to determine if there are cracks.

9.

Engineering validation (Eng Ev) of diesel 'lA part including visual inspection to determine that part is per bill of materials and review of unscheduled maintenance reports associated with part.

i engineering validation consists of reviewing unscheduled maintenanceFor dies reports.

10.

Piston skirts will be replaced on the 1B diesel.

Surface NDE and hardness weneperformed in receipt inspection.

11.

New piston rings will be installed on the new skirts.

12. All bolting will be replaced.

13.

Catawba 18 frequency of inspections same as CatawFa lA except as parentheses.

Where parentheses are included, frequency of inspection for Catawba 18 appears in the parentheses, t

9 1

l l

.