ML20147E292: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:hS h'Y-DUKE POWER COMPANY GMNERAL OFFICES | ||
hS h'Y-DUKE POWER COMPANY | """''8"',^'!l 373 4 422 SOUTH CHURCH STREET CIIAlti.orrE. N. C. 28242 December 7,1978 l | ||
Mr. J. P. O'Reilly, Director l | |||
U. S. Nuclear Regulatory Comission 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 l | U. S. Nuclear Regulatory Comission 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 l | ||
Re: | |||
Catawba Nuclear Station IE:II:WPA Inspection Reports: | |||
50-413/78-12 and 50-414/78-11 Duke File: CN-1412-11.1 | |||
==Dear Mr. O'Reilly:== | ==Dear Mr. O'Reilly:== | ||
In response to Mr. Murphy's letter of December 1,1978 transmitting the subject IE Inspection Reports, Duke Power does not consider any of the information contained in those reports to be proprietary. | In response to Mr. Murphy's letter of December 1,1978 transmitting the subject IE Inspection Reports, Duke Power does not consider any of the information contained in those reports to be proprietary. | ||
Vary truly yours, d | Vary truly yours, d | ||
L. C. Dail Vice President Design Engineering JEB/jmi 7812210035' 1 | L. C. Dail Vice President Design Engineering JEB/jmi 7812210035' 1 | ||
_ _ _ _ - _ _ _ - _ _ _ _ _ _ _ _ _ - - _ -}} | |||
Latest revision as of 13:09, 11 December 2024
| ML20147E292 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 12/07/1978 |
| From: | Dail L DUKE POWER CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML20147E297 | List: |
| References | |
| NUDOCS 7812210035 | |
| Download: ML20147E292 (1) | |
Text
hS h'Y-DUKE POWER COMPANY GMNERAL OFFICES
"""8"',^'!l 373 4 422 SOUTH CHURCH STREET CIIAlti.orrE. N. C. 28242 December 7,1978 l
Mr. J. P. O'Reilly, Director l
U. S. Nuclear Regulatory Comission 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 l
Re:
Catawba Nuclear Station IE:II:WPA Inspection Reports:
50-413/78-12 and 50-414/78-11 Duke File: CN-1412-11.1
Dear Mr. O'Reilly:
In response to Mr. Murphy's letter of December 1,1978 transmitting the subject IE Inspection Reports, Duke Power does not consider any of the information contained in those reports to be proprietary.
Vary truly yours, d
L. C. Dail Vice President Design Engineering JEB/jmi 7812210035' 1
_ _ _ _ - _ _ _ - _ _ _ _ _ _ _ _ _ - - _ -