{{#Wiki_filter:ES-301 | {{#Wiki_filter:ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: | ||
: a. Initiate standby liquid control with a failure of RWCU to isolate. | Quad Cities Date of Examination: | ||
3/16/2020 Exam Level: RO SRO-I SRO-U Operating Test Number: | |||
ILT 18-1 Control Room Systems:* 8 for RO, 7 for SRO-I, and 2 or 3 for SRO-U System/JPM Title Type Code* | |||
Safety Function | |||
: a. Initiate standby liquid control with a failure of RWCU to isolate. | |||
[Standby Liquid Control System; 211000 A4.06 3.9/3.9] | [Standby Liquid Control System; 211000 A4.06 3.9/3.9] | ||
: b. Pressurize the main steam lines | A, D, S 1 | ||
: b. Pressurize the main steam lines | |||
[Main and Reheat Steam; 239001 A4.01 4.2/4.0] | [Main and Reheat Steam; 239001 A4.01 4.2/4.0] | ||
: c. HPCI startup for injection with loss of CCST suction path | D, L, S 3 | ||
: c. HPCI startup for injection with loss of CCST suction path | |||
[High Pressure Coolant Injection System; 206000 A2.06 3.3/3.5] | [High Pressure Coolant Injection System; 206000 A2.06 3.3/3.5] | ||
: d. Place RHR/LPCI in torus cooling mode | A, L, N, S 2 | ||
: d. Place RHR/LPCI in torus cooling mode | |||
[RHR/LPCI Torus/Suppression Pool Cooling Mode; 219000 A1.08 3.7/3.6] | [RHR/LPCI Torus/Suppression Pool Cooling Mode; 219000 A1.08 3.7/3.6] | ||
: e. Shutdown the RCIC system | D, S 5 | ||
: e. Shutdown the RCIC system | |||
[Reactor Core Isolation Cooling System; 217000 A4.03 3.4/3.3] | [Reactor Core Isolation Cooling System; 217000 A4.03 3.4/3.3] | ||
: f. N/A | D, S 4 | ||
: g. Perform a reactor protection system functional test with a failure to | : f. N/A N/A N/A | ||
: g. Perform a reactor protection system functional test with a failure to trip | |||
[Reactor Protection System; 212000 A4.02 3.6/3.7] | [Reactor Protection System; 212000 A4.02 3.6/3.7] | ||
: h. Startup SBGT with failure of MCC 19-4 | A, D, S 7 | ||
: h. Startup SBGT with failure of MCC 19-4 | |||
[Standby Gas Treatment System; 261000 A2.07 2.7/2.8] | [Standby Gas Treatment System; 261000 A2.07 2.7/2.8] | ||
A, EN, N, S 9 | |||
In-Plant Systems:* 3 for RO, 3 for SRO-I, and 3 or 2 for SRO-U | In-Plant Systems:* 3 for RO, 3 for SRO-I, and 3 or 2 for SRO-U | ||
: i. Place the 1/2 RBCCW pump in operation on Unit 1. | : i. Place the 1/2 RBCCW pump in operation on Unit 1. | ||
[Component Cooling Water System; 400000 2.1.30 4.4/4.0] | [Component Cooling Water System; 400000 2.1.30 4.4/4.0] | ||
: j. Inject water into the RPV using the condensate system crosstie | N, R 8 | ||
: j. Inject water into the RPV using the condensate system crosstie | |||
[Reactor Low Water Level; 295031 EA1.11 4.1/4.1] | [Reactor Low Water Level; 295031 EA1.11 4.1/4.1] | ||
: k. Locally startup and emergency diesel generator with failure of the | D, E, R 2 | ||
: k. Locally startup and emergency diesel generator with failure of the vent fan. | |||
[Emergency Generators (Diesel/Jet); 264000 A3.03 3.4/3.4] | [Emergency Generators (Diesel/Jet); 264000 A3.03 3.4/3.4] | ||
A, D, R 6 | |||
ES-301 | ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions, all five SRO-U systems must serve different safety functions, and in-plant systems and functions may overlap those tested in the control room. | ||
* Type Codes Criteria for R /SRO-I/SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power/Shutdown (N)ew or (M)odified from bank including 1(A) | |||
* Type Codes | (P)revious 2 exams (R)CA (S)imulator 4-6/4-6 /2-3 9/ 8/ 4 1/ 1/ 1 1/ 1/ 1 (control room system) 1/ 1/ 1 2/ 2/ 1 3/ 3/ 2 (randomly selected) 1/ 1/ 1}} | ||
(L)ow-Power/Shutdown | |||
Latest revision as of 03:22, 11 December 2024
| ML20153A831 | |
| Person / Time | |
|---|---|
| Site: | Quad Cities |
| Issue date: | 04/10/2020 |
| From: | NRC/RGN-III |
| To: | Exelon Generation Co |
| Roach G | |
| Shared Package | |
| ML19121A185 | List: |
| References | |
| Download: ML20153A831 (2) | |
Text
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility:
Quad Cities Date of Examination:
3/16/2020 Exam Level: RO SRO-I SRO-U Operating Test Number:
ILT 18-1 Control Room Systems:* 8 for RO, 7 for SRO-I, and 2 or 3 for SRO-U System/JPM Title Type Code*
Safety Function
- a. Initiate standby liquid control with a failure of RWCU to isolate.
[Standby Liquid Control System; 211000 A4.06 3.9/3.9]
A, D, S 1
- b. Pressurize the main steam lines
[Main and Reheat Steam; 239001 A4.01 4.2/4.0]
D, L, S 3
- c. HPCI startup for injection with loss of CCST suction path
[High Pressure Coolant Injection System; 206000 A2.06 3.3/3.5]
A, L, N, S 2
- d. Place RHR/LPCI in torus cooling mode
[RHR/LPCI Torus/Suppression Pool Cooling Mode; 219000 A1.08 3.7/3.6]
D, S 5
- e. Shutdown the RCIC system
[Reactor Core Isolation Cooling System; 217000 A4.03 3.4/3.3]
D, S 4
- f. N/A N/A N/A
- g. Perform a reactor protection system functional test with a failure to trip
[Reactor Protection System; 212000 A4.02 3.6/3.7]
A, D, S 7
[Standby Gas Treatment System; 261000 A2.07 2.7/2.8]
A, EN, N, S 9
In-Plant Systems:* 3 for RO, 3 for SRO-I, and 3 or 2 for SRO-U
- i. Place the 1/2 RBCCW pump in operation on Unit 1.
[Component Cooling Water System; 400000 2.1.30 4.4/4.0]
N, R 8
- j. Inject water into the RPV using the condensate system crosstie
[Reactor Low Water Level; 295031 EA1.11 4.1/4.1]
D, E, R 2
- k. Locally startup and emergency diesel generator with failure of the vent fan.
[Emergency Generators (Diesel/Jet); 264000 A3.03 3.4/3.4]
A, D, R 6
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions, all five SRO-U systems must serve different safety functions, and in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for R /SRO-I/SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power/Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 4-6/4-6 /2-3 9/ 8/ 4 1/ 1/ 1 1/ 1/ 1 (control room system) 1/ 1/ 1 2/ 2/ 1 3/ 3/ 2 (randomly selected) 1/ 1/ 1