ML22073A123: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (One intermediate revision by the same user not shown) | |||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:8 spray piping headers (3A and 3B) at penetrations P-19A and P-19B to a minimum plant elevation of 65 feet inside containment. FPL shall notify the NRC in writing within 60 days following completion of the refueling outage during which the piping replacement is completed. The notification will confirm the elevation of the air-to-borated-water interface inside the piping and confirm that the installation of the stainless steel piping exceeds this elevation. | {{#Wiki_filter:8 Subsequent Renewed License No. DPR-31 spray piping headers (3A and 3B) at penetrations P-19A and P-19B to a minimum plant elevation of 65 feet inside containment. FPL shall notify the NRC in writing within 60 days following completion of the refueling outage during which the piping replacement is completed. The notification will confirm the elevation of the air-to-borated-water interface inside the piping and confirm that the installation of the stainless steel piping exceeds this elevation. | ||
: 4. This subsequent renewed license is effective as of the date of issuance, and shall expire at midnight July 19, 2032. | : 4. | ||
FOR THE NUCLEAR REGULATORY COMMISSION | This subsequent renewed license is effective as of the date of issuance, and shall expire at midnight July 19, 2032. | ||
FOR THE NUCLEAR REGULATORY COMMISSION | |||
/RA/ | |||
Ho K. Nieh, Director Office of Nuclear Reactor Regulation Attachments: | Ho K. Nieh, Director Office of Nuclear Reactor Regulation Attachments: | ||
Appendix A - Technical Specifications for Unit 3 Appendix B - Environmental Protection Plan Date of Issuance: December 4, 2019 | Appendix A - Technical Specifications for Unit 3 Appendix B - Environmental Protection Plan Date of Issuance: December 4, 2019}} | ||
Latest revision as of 17:46, 27 November 2024
| ML22073A123 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 03/25/2022 |
| From: | Vaughn Thomas NRC/NRR/DNRL/NLRP |
| To: | Coffey B Florida Power & Light Co |
| Thomas V | |
| Shared Package | |
| ML22073A121 | List: |
| References | |
| Download: ML22073A123 (1) | |
Text
8 Subsequent Renewed License No. DPR-31 spray piping headers (3A and 3B) at penetrations P-19A and P-19B to a minimum plant elevation of 65 feet inside containment. FPL shall notify the NRC in writing within 60 days following completion of the refueling outage during which the piping replacement is completed. The notification will confirm the elevation of the air-to-borated-water interface inside the piping and confirm that the installation of the stainless steel piping exceeds this elevation.
- 4.
This subsequent renewed license is effective as of the date of issuance, and shall expire at midnight July 19, 2032.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
Ho K. Nieh, Director Office of Nuclear Reactor Regulation Attachments:
Appendix A - Technical Specifications for Unit 3 Appendix B - Environmental Protection Plan Date of Issuance: December 4, 2019