{{#Wiki_filter:.     .                                              _.                    -. .  ..    . _ .            _
{{#Wiki_filter:.
AVERAGE DAILY UNTT POWER LEVEL i
AVERAGE DAILY UNTT POWER LEVEL i
DOCKET NO. 00' 9l UNIT WNP-2 DATE Juiv I     1986 COMPLETED BY LB Hutchison TELEPHONE (509)377-2486 MONTH                     JUNF igg DAY AVERAGE DAILY POWER LEVEL                                 DAY AVERAGE DAILY POWER M (MWe-Net) ,
DOCKET NO. 00' 9l UNIT WNP-2 DATE Juiv I 1986 COMPLETED BY LB Hutchison TELEPHONE (509)377-2486 MONTH JUNF igg DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER M (MWe-Net)
(MWe-Net) 1                               0 17                         560 2                               0 la                         771 0
(MWe-Net) 1 0
3                                                         to 763 0
17 560 2
4                                                                                     811 20 0
0 la 771 0
5                                                                                       72 21 a                               0                                                      0 22 7                               0                                                       0 23 8                               0                                                       0 24 9                               0                                                       0 25 10                               53                                                        0 28 11                                 0 27                             0 67 12                                                                                         0 2s 340 13                                                                                         0 29-14                               389                                                   294 30 323 15 31 to                               33 INSTRUCTIONS On this fonn, list the awrap daily unit power lowl in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
3 763 to 0
4 20 811 0
5 72 21 0
a 0
22 7
0 0
23 8
0 0
24 9
0 0
25 53 10 0
28 11 0
27 0
67 12 2s 0
340 13 29-0 14 389 294 30 323 15 31 33 to INSTRUCTIONS On this fonn, list the awrap daily unit power lowl in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
These figures will be used to plot 1 graph for each reporting month. Note that when maximum dependable capacity is used for the not electrical rating of the unit, there may be occasions when the daily averap power level exceeds the 100% line (or the restricted power level line). In such cases, the aver 25e daily unit power output sheet should be footnoted to explam the apparent anomaly.
These figures will be used to plot 1 graph for each reporting month. Note that when maximum dependable capacity is used for the not electrical rating of the unit, there may be occasions when the daily averap power level exceeds the 100% line (or the restricted power level line). In such cases, the aver 25e daily unit power output sheet should be footnoted to explam the apparent anomaly.
l 9609120023 860630 1
l gh21,l/
PDR         ADOCK 05000397                                                                             gh21,l/
9609120023 860630 1
R                            PDR
PDR ADOCK 05000397 R
PDR


DOCKET NO.         50-397 LNIT tWE       WNP-2           .
DOCKET NO.
DATE       July 1, 1986 LNIT SIUTIXTdNS / REDUCTIONS                     COMPLETED BY     L.B. Hutchison REPORT PERIOD ~ JUNE             1986                                                                   TELEPIDE       (509)377-2486 mcnth,     yHr NO. DATE TVPE 100RS REASON. METil0D LER IUt0ER SYSlEN COMPONENT CAUSE & COINECTIVE ACTION TO HlEVENT RECUIVIENCE 86-04 6/10/86 S                 48.9       8       1         -
50-397 LNIT tWE WNP-2 DATE July 1, 1986 LNIT SIUTIXTdNS / REDUCTIONS COMPLETED BY L.B. Hutchison REPORT PERIOD ~ JUNE 1986 TELEPIDE (509)377-2486
HA       MECFUN     GENERATOR WAS REMOVED FR0f1 GRID TO PERFORM OVERSPEED TESTS ON TURBINE 86-05 6/15/86 S                 23.1       B       1         -
: mcnth, yHr NO.
CC       VALVEX-X GENERATOR WAS REMOVED FROM GRID TO ADJUST / TEST MAIN STEAM RELIEF VALVES AND RECIRC FLOW CONTROL VALVE 86-06 6/21/86 F                 49       A       1                   CF       VALVEX-F PLANT WAS SHUTDOWN MANUALLY DUE TO LEAKAGE OF REACTOR COOLANT THROUGH AN RHR SYSTEM ISOLATION VALVE 86-07 6/21/86 S                 167.78     B       9         -        -            -
DATE TVPE 100RS REASON. METil0D LER IUt0ER SYSlEN COMPONENT CAUSE & COINECTIVE ACTION TO HlEVENT RECUIVIENCE 86-04 6/10/86 S 48.9 8
UNIT ENTERED SCHEDULED MAINTENANCE OUTAGE FOR REPAIR OF VARIOUS EQUIPMENT l           l l SUltfARY l PLANT RETURNED TO SERVICE FROM REFUELING OUTAGE ON 6/10/86.
1 HA MECFUN GENERATOR WAS REMOVED FR0f1 GRID TO PERFORM OVERSPEED TESTS ON TURBINE 86-05 6/15/86 S 23.1 B
l TYPE                 RFJ\ SON                                     METil0D           SYSTEM & COMP 0 TENT F-Forced         A-Equip Failure               . F-Admin         1-Manual             Exhibit F & H                                               !
1 CC VALVEX-X GENERATOR WAS REMOVED FROM GRID TO ADJUST / TEST MAIN STEAM RELIEF VALVES AND RECIRC FLOW CONTROL VALVE 86-06 6/21/86 F 49 A
S-Sched       D-Maint or Test .                 G-Oper Error 2-Manual Scram       Instructions for C-Refueling                       Il-Other       3-Auto Scram         Preparation of                                             l D-He0ulatory Restriction                           4-Continued           Data Entry Sheet                                           !
1 CF VALVEX-F PLANT WAS SHUTDOWN MANUALLY DUE TO LEAKAGE OF REACTOR COOLANT THROUGH AN RHR SYSTEM ISOLATION VALVE 86-07 6/21/86 S 167.78 B
E-Operator Training
9 UNIT ENTERED SCHEDULED MAINTENANCE OUTAGE FOR REPAIR OF VARIOUS EQUIPMENT l
* 5-Reduced Load       Licensee Event Report                                         '
l l SUltfARY l PLANT RETURNED TO SERVICE FROM REFUELING OUTAGE ON 6/10/86.
                          & License Examination                   9-Other               (LER) File (NUREG-0161)
l TYPE RFJ\\ SON METil0D SYSTEM & COMP 0 TENT F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched D-Maint or Test.
G-Oper Error 2-Manual Scram Instructions for C-Refueling Il-Other 3-Auto Scram Preparation of l
D-He0ulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report
& License Examination 9-Other (LER) File (NUREG-0161)
M
M


.* b t
.* b e
OPERATING DAFA REPORT WNP-2 01-Jul-96
t OPERATING DAFA REPORT WNP-2 01-Jul-96 1.
: 1.     DOCKET: 50-397
DOCKET: 50-397 2.
: 2.     REPORTING PERIOD:                                                         Jun-96                                         OUTAGE + DN-LINE HOURS                                       720
REPORTING PERIOD:
: 3.       UTILITY CONTACT:                                                                                           LEONARD HUTCHISON (509) 377-2406
Jun-96 OUTAGE + DN-LINE HOURS 720 3.
: 4.     LICENSED THERMAL POWER (MWt):                                                                                                                                                       3323
UTILITY CONTACT:
: 5.       NAMEPLATE RATING (GROSS MWe)                                                                                                                                                   1200.1
LEONARD HUTCHISON (509) 377-2406 4.
: 6.       DESIGN ELECTRICAL RATING (MET MWe):                                                                                                                                                 1100
LICENSED THERMAL POWER (MWt):
: 7.     MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):                                                                                                                                           1140 C.       MAXIMUM DEPENDABLE CAPACITY (NET MWe):                                                                                                                                             1095
3323 5.
: 9.       IF CHANGES OCCUR ABOVE SINCE LAST REPORT, GIVJ REASONS:
NAMEPLATE RATING (GROSS MWe) 1200.1 6.
            -        -----                            - _ - - _ - _                                                    -__E0E_--____-------____-----                                           ---_
DESIGN ELECTRICAL RATING (MET MWe):
: 10. POWER TO WHICH RESTRICTED, IF ANY (NET MWe):                                                                                                                             ___                  __
1100 7.
: 11. REASONS FOR RESTRICTIONS, IF ANY:                                                                               ____                    -                    _________.                          _
MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):
MONTH             YEAR             CUMULATIVE
1140 C.
: 12. REPORT PERIOD HOURS                                                                                                                             720         4343               13543.2
MAXIMUM DEPENDABLE CAPACITY (NET MWe):
: 13. HOURS REACTOR CRITICAL                                                                                                                     378.2       2157.6                     9473.7
1095 9.
: 14. RX RESERVE SHTDWN HRS                                                                                                                           O.O         340.4                   340.4
IF CHANGES OCCUR ABOVE SINCE LAST REPORT, GIVJ REASONS:
: 15. HRS GENERATOR ON LINE                                                                                                                     209.6         1947.7                   8974.2
-__E0E_--____-------____-----
: 16. UNIT RESERVE SHUTDOWN HOURS                                                                                                                     O.0         381.7                   381.7
: 10. POWER TO WHICH RESTRICTED, IF ANY (NET MWe):
: 17. GROSS THERMAL ENERGY (MWH)                                                                                                             362400       4239930               21904210
: 11. REASONS FOR RESTRICTIONS, IF ANY:
: 10. GROSS ELECTRICAL ENERGY (MWH)                                                                                                             113990     1389770                   7213020
MONTH YEAR CUMULATIVE
: 19. NET ELECTRICAL ENERGY (MWH)                                                                                                             107412       1331390                 6918163
: 12. REPORT PERIOD HOURS 720 4343 13543.2
: 20. UNIT SERVICE FACTOR                                                                                                                         29.1%           44.8%                     66.3%
: 13. HOURS REACTOR CRITICAL 378.2 2157.6 9473.7
: 21. UNIT AVAILABILITY FACTOR                                                                                                                     29.1%           53.6%                     69.1%
: 14. RX RESERVE SHTDWN HRS O.O 340.4 340.4
: 22. UNIT CAPACITY FACTOR (MDC NET)                                                                                                               13.6%           28.0%                     46.7%
: 15. HRS GENERATOR ON LINE 209.6 1947.7 8974.2
: 23. UNIT CAPACITY FACTOR (DER NET)                                                                                                               13.6%           27.9%                     46.4%
: 16. UNIT RESERVE SHUTDOWN HOURS O.0 381.7 381.7
: 24. UNIT FORCED OUTAGE RATE                                                                                                                       18.9%           3.2%                     B.7%
: 17. GROSS THERMAL ENERGY (MWH) 362400 4239930 21904210
: 25. FORCED DUTAGE HCURS                                                                                                                         49.0             65.2                   950.2
: 10. GROSS ELECTRICAL ENERGY (MWH) 113990 1389770 7213020
: 19. NET ELECTRICAL ENERGY (MWH) 107412 1331390 6918163
: 20. UNIT SERVICE FACTOR 29.1%
44.8%
66.3%
: 21. UNIT AVAILABILITY FACTOR 29.1%
53.6%
69.1%
: 22. UNIT CAPACITY FACTOR (MDC NET) 13.6%
28.0%
46.7%
: 23. UNIT CAPACITY FACTOR (DER NET) 13.6%
27.9%
46.4%
: 24. UNIT FORCED OUTAGE RATE 18.9%
3.2%
B.7%
: 25. FORCED DUTAGE HCURS 49.0 65.2 950.2
: 26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE,DATE, DURATION):
: 26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE,DATE, DURATION):
NONE
NONE
            ------ _                    - - - - - - - - - - - - =                                             -----            ------=                 ---  ------                    --                -
- - - - - - - - - - - - =
: 27. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE:                                                                                                                             __________
------=
: 27. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE:


  ~
~
Cs WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968
Cs WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968
* 3000 George Washington Way
* 3000 George Washington Way
* Richland, Washington 99352 Docket No. 50-397 July 7, 1986 Director Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D. C.     20555
* Richland, Washington 99352 Docket No. 50-397 July 7, 1986 Director Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D. C.
20555


==Dear Sir:==
==Dear Sir:==
==Subject:==
==Subject:==
NUCLEAR PLANT NO. 2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for June 1986 as required by our Technical Specifications 6.9.1.6.
NUCLEAR PLANT NO. 2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for June 1986 as required by our Technical Specifications 6.9.1.6.
Very truly yours, Al C.k. Powers (M/D927M)
Very truly yours, Al C.k. Powers (M/D927M)
WNP-2 Plant Manager CMP /lc Enclosure cc: Mr. John B. Martin -       NRC, Region V NRC Site Representative Ms. Dottie Sherman - ANI, Farmington CT Mr. J. T. Wheelock -     INP0}}
WNP-2 Plant Manager CMP /lc Enclosure cc: Mr. John B. Martin -
NRC, Region V NRC Site Representative Ms. Dottie Sherman -
ANI, Farmington CT Mr. J. T. Wheelock -
INP0}}

Latest revision as of 18:04, 6 December 2024

Monthly Operating Rept for June 1986
ML20209F034
Person / Time
Site: Columbia 
Issue date: 06/30/1986
From: Hutchison L, Powers C
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NUDOCS 8609120023
Download: ML20209F034 (4)


Text

.

AVERAGE DAILY UNTT POWER LEVEL i

DOCKET NO. 00' 9l UNIT WNP-2 DATE Juiv I 1986 COMPLETED BY LB Hutchison TELEPHONE (509)377-2486 MONTH JUNF igg DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER M (MWe-Net)

(MWe-Net) 1 0

17 560 2

0 la 771 0

3 763 to 0

4 20 811 0

5 72 21 0

a 0

22 7

0 0

23 8

0 0

24 9

0 0

25 53 10 0

28 11 0

27 0

67 12 2s 0

340 13 29-0 14 389 294 30 323 15 31 33 to INSTRUCTIONS On this fonn, list the awrap daily unit power lowl in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

These figures will be used to plot 1 graph for each reporting month. Note that when maximum dependable capacity is used for the not electrical rating of the unit, there may be occasions when the daily averap power level exceeds the 100% line (or the restricted power level line). In such cases, the aver 25e daily unit power output sheet should be footnoted to explam the apparent anomaly.

l gh21,l/

9609120023 860630 1

PDR ADOCK 05000397 R

PDR

DOCKET NO.

50-397 LNIT tWE WNP-2 DATE July 1, 1986 LNIT SIUTIXTdNS / REDUCTIONS COMPLETED BY L.B. Hutchison REPORT PERIOD ~ JUNE 1986 TELEPIDE (509)377-2486

mcnth, yHr NO.

DATE TVPE 100RS REASON. METil0D LER IUt0ER SYSlEN COMPONENT CAUSE & COINECTIVE ACTION TO HlEVENT RECUIVIENCE 86-04 6/10/86 S 48.9 8

1 HA MECFUN GENERATOR WAS REMOVED FR0f1 GRID TO PERFORM OVERSPEED TESTS ON TURBINE 86-05 6/15/86 S 23.1 B

1 CC VALVEX-X GENERATOR WAS REMOVED FROM GRID TO ADJUST / TEST MAIN STEAM RELIEF VALVES AND RECIRC FLOW CONTROL VALVE 86-06 6/21/86 F 49 A

1 CF VALVEX-F PLANT WAS SHUTDOWN MANUALLY DUE TO LEAKAGE OF REACTOR COOLANT THROUGH AN RHR SYSTEM ISOLATION VALVE 86-07 6/21/86 S 167.78 B

9 UNIT ENTERED SCHEDULED MAINTENANCE OUTAGE FOR REPAIR OF VARIOUS EQUIPMENT l

l l SUltfARY l PLANT RETURNED TO SERVICE FROM REFUELING OUTAGE ON 6/10/86.

l TYPE RFJ\\ SON METil0D SYSTEM & COMP 0 TENT F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched D-Maint or Test.

G-Oper Error 2-Manual Scram Instructions for C-Refueling Il-Other 3-Auto Scram Preparation of l

D-He0ulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

& License Examination 9-Other (LER) File (NUREG-0161)

M

.* b e

t OPERATING DAFA REPORT WNP-2 01-Jul-96 1.

DOCKET: 50-397 2.

REPORTING PERIOD:

Jun-96 OUTAGE + DN-LINE HOURS 720 3.

UTILITY CONTACT:

LEONARD HUTCHISON (509) 377-2406 4.

LICENSED THERMAL POWER (MWt):

3323 5.

NAMEPLATE RATING (GROSS MWe) 1200.1 6.

DESIGN ELECTRICAL RATING (MET MWe):

1100 7.

MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):

1140 C.

MAXIMUM DEPENDABLE CAPACITY (NET MWe):

1095 9.

IF CHANGES OCCUR ABOVE SINCE LAST REPORT, GIVJ REASONS:

-__E0E_--____-------____-----

10. POWER TO WHICH RESTRICTED, IF ANY (NET MWe):
11. REASONS FOR RESTRICTIONS, IF ANY:

MONTH YEAR CUMULATIVE

12. REPORT PERIOD HOURS 720 4343 13543.2
13. HOURS REACTOR CRITICAL 378.2 2157.6 9473.7
14. RX RESERVE SHTDWN HRS O.O 340.4 340.4
15. HRS GENERATOR ON LINE 209.6 1947.7 8974.2
16. UNIT RESERVE SHUTDOWN HOURS O.0 381.7 381.7
17. GROSS THERMAL ENERGY (MWH) 362400 4239930 21904210
10. GROSS ELECTRICAL ENERGY (MWH) 113990 1389770 7213020
19. NET ELECTRICAL ENERGY (MWH) 107412 1331390 6918163
20. UNIT SERVICE FACTOR 29.1%

44.8%

66.3%

21. UNIT AVAILABILITY FACTOR 29.1%

53.6%

69.1%

22. UNIT CAPACITY FACTOR (MDC NET) 13.6%

28.0%

46.7%

23. UNIT CAPACITY FACTOR (DER NET) 13.6%

27.9%

46.4%

24. UNIT FORCED OUTAGE RATE 18.9%

3.2%

B.7%

25. FORCED DUTAGE HCURS 49.0 65.2 950.2
26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE,DATE, DURATION):

NONE

- - - - - - - - - - - - =


=

27. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE:

~

Cs WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968

  • Richland, Washington 99352 Docket No. 50-397 July 7, 1986 Director Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D. C.

20555

Dear Sir:

Subject:

NUCLEAR PLANT NO. 2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for June 1986 as required by our Technical Specifications 6.9.1.6.

Very truly yours, Al C.k. Powers (M/D927M)

WNP-2 Plant Manager CMP /lc Enclosure cc: Mr. John B. Martin -

NRC, Region V NRC Site Representative Ms. Dottie Sherman -

ANI, Farmington CT Mr. J. T. Wheelock -

INP0