Monthly Operating Rept for June 1986
ML20209F034
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 06/30/1986
From: Hutchison L, Powers C
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NUDOCS 8609120023
Download: ML20209F034 (4)


Text

. . _. -. . .. . _ . _

AVERAGE DAILY UNTT POWER LEVEL i

DOCKET NO. 00' 9l UNIT WNP-2 DATE Juiv I 1986 COMPLETED BY LB Hutchison TELEPHONE (509)377-2486 MONTH JUNF igg DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER M (MWe-Net) ,

(MWe-Net) 1 0 17 560 2 0 la 771 0

3 to 763 0

4 811 20 0

5 72 21 a 0 0 22 7 0 0 23 8 0 0 24 9 0 0 25 10 53 0 28 11 0 27 0 67 12 0 2s 340 13 0 29-14 389 294 30 323 15 31 to 33 INSTRUCTIONS On this fonn, list the awrap daily unit power lowl in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

These figures will be used to plot 1 graph for each reporting month. Note that when maximum dependable capacity is used for the not electrical rating of the unit, there may be occasions when the daily averap power level exceeds the 100% line (or the restricted power level line). In such cases, the aver 25e daily unit power output sheet should be footnoted to explam the apparent anomaly.

l 9609120023 860630 1

PDR ADOCK 05000397 gh21,l/

R PDR

DOCKET NO. 50-397 LNIT tWE WNP-2 .

DATE July 1, 1986 LNIT SIUTIXTdNS / REDUCTIONS COMPLETED BY L.B. Hutchison REPORT PERIOD ~ JUNE 1986 TELEPIDE (509)377-2486 mcnth, yHr NO. DATE TVPE 100RS REASON. METil0D LER IUt0ER SYSlEN COMPONENT CAUSE & COINECTIVE ACTION TO HlEVENT RECUIVIENCE 86-04 6/10/86 S 48.9 8 1 -

HA MECFUN GENERATOR WAS REMOVED FR0f1 GRID TO PERFORM OVERSPEED TESTS ON TURBINE 86-05 6/15/86 S 23.1 B 1 -

CC VALVEX-X GENERATOR WAS REMOVED FROM GRID TO ADJUST / TEST MAIN STEAM RELIEF VALVES AND RECIRC FLOW CONTROL VALVE 86-06 6/21/86 F 49 A 1 CF VALVEX-F PLANT WAS SHUTDOWN MANUALLY DUE TO LEAKAGE OF REACTOR COOLANT THROUGH AN RHR SYSTEM ISOLATION VALVE 86-07 6/21/86 S 167.78 B 9 - - -

UNIT ENTERED SCHEDULED MAINTENANCE OUTAGE FOR REPAIR OF VARIOUS EQUIPMENT l l l SUltfARY l PLANT RETURNED TO SERVICE FROM REFUELING OUTAGE ON 6/10/86.

l TYPE RFJ\ SON METil0D SYSTEM & COMP 0 TENT F-Forced A-Equip Failure . F-Admin 1-Manual Exhibit F & H  !

S-Sched D-Maint or Test . G-Oper Error 2-Manual Scram Instructions for C-Refueling Il-Other 3-Auto Scram Preparation of l D-He0ulatory Restriction 4-Continued Data Entry Sheet  !

E-Operator Training

  • 5-Reduced Load Licensee Event Report '

& License Examination 9-Other (LER) File (NUREG-0161)

M

e .* b t

OPERATING DAFA REPORT WNP-2 01-Jul-96

1. DOCKET: 50-397
2. REPORTING PERIOD: Jun-96 OUTAGE + DN-LINE HOURS 720
3. UTILITY CONTACT: LEONARD HUTCHISON (509) 377-2406
4. LICENSED THERMAL POWER (MWt): 3323
5. NAMEPLATE RATING (GROSS MWe) 1200.1
6. DESIGN ELECTRICAL RATING (MET MWe): 1100
7. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe): 1140 C. MAXIMUM DEPENDABLE CAPACITY (NET MWe): 1095
9. IF CHANGES OCCUR ABOVE SINCE LAST REPORT, GIVJ REASONS:

- ----- - _ - - _ - _ -__E0E_--____-------____----- ---_

10. POWER TO WHICH RESTRICTED, IF ANY (NET MWe): ___ __
11. REASONS FOR RESTRICTIONS, IF ANY: ____ - _________. _

MONTH YEAR CUMULATIVE

12. REPORT PERIOD HOURS 720 4343 13543.2
13. HOURS REACTOR CRITICAL 378.2 2157.6 9473.7
14. RX RESERVE SHTDWN HRS O.O 340.4 340.4
15. HRS GENERATOR ON LINE 209.6 1947.7 8974.2
16. UNIT RESERVE SHUTDOWN HOURS O.0 381.7 381.7
17. GROSS THERMAL ENERGY (MWH) 362400 4239930 21904210
10. GROSS ELECTRICAL ENERGY (MWH) 113990 1389770 7213020
19. NET ELECTRICAL ENERGY (MWH) 107412 1331390 6918163
20. UNIT SERVICE FACTOR 29.1% 44.8% 66.3%
21. UNIT AVAILABILITY FACTOR 29.1% 53.6% 69.1%
22. UNIT CAPACITY FACTOR (MDC NET) 13.6% 28.0% 46.7%
23. UNIT CAPACITY FACTOR (DER NET) 13.6% 27.9% 46.4%
24. UNIT FORCED OUTAGE RATE 18.9% 3.2% B.7%
25. FORCED DUTAGE HCURS 49.0 65.2 950.2
26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE,DATE, DURATION):

NONE


_ - - - - - - - - - - - - = ----- ------= --- ------ -- -

27. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE: __________

~

Cs WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968

  • Richland, Washington 99352 Docket No. 50-397 July 7, 1986 Director Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Sir:

Subject:

NUCLEAR PLANT NO. 2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for June 1986 as required by our Technical Specifications 6.9.1.6.

Very truly yours, Al C.k. Powers (M/D927M)

WNP-2 Plant Manager CMP /lc Enclosure cc: Mr. John B. Martin - NRC, Region V NRC Site Representative Ms. Dottie Sherman - ANI, Farmington CT Mr. J. T. Wheelock - INP0