{{#Wiki_filter:ENCLOSURE 3
{{#Wiki_filter:ENCLOSURE 3
                                        NOTICE OF VIOLATION
                                                  NOTICE OF VIOLATION
Exelon Generation Company, LLC                                       Docket No. 50-333
 
James A. FitzPatrick Nuclear Power Plant                             License No. DPR-59 EA-20-138
Exelon                                           Generation                                           Company,           LLC                                                           Docket                                 No.           50-333
During an NRC review in response to a contested violation conducted from June 3, 2021,
James A. FitzPatrick Nuclear Power Plant                                                                       License No. DPR-59 EA-20-138
through September 3, 2021, violations of NRC requirements were identified. In accordance with
 
the NRC Enforcement Policy, the violations are listed below:
During                                           an                                           NRC review in response to a contested violation conducted                                                         from June 3,                                                                                                             2021,
Title 10 CFR Part 50, Appendix B, Criterion V, Instructions, Procedures, and Drawings, states,
through                                                                                         September 3,                                             2021,                                                                                                   violations                       of                                 NRC requirements were identified.                                                         In                                 accordance                     with
the                                                       NRC                                                                                     Enforcement                                                       Policy, the                                                       violations                                             are listed below:
 
Title 10 CFR Part 50, Appendix B, Criterion V, Instructions, Procedures, and Drawings   ,             states,
in part, that activities affecting quality shall be prescribed by documented instructions,
in part, that activities affecting quality shall be prescribed by documented instructions,
procedures, or drawings, of a type appropriate to the circumstances and shall be accomplished
procedures, or drawings, of a type appropriate to the circumstances and shall be accomplished
in accordance with these instructions, procedures, or drawings.
in accordance with these instructions, procedures, or drawings.
Title 10 CFR Part 50, Appendix B, Criterion XV, Nonconforming Materials, Parts, or
Title 10 CFR Part 50, Appendix B, Criterion XV, Nonconforming Materials, Parts, or
Components, states, in part, that measures shall be established to control materials, parts, or
Components, states, in part, that measures shall be established to control materials, parts, or
components which do not conform to requirements in order to prevent their inadvertent use or
components which do not conform to requirements in order to prevent their inadvertent use or
installation. These measures shall include, as appropriate, procedures for identification,
installation. These measures shall include, as appropriate, procedures for identification,
documentation, segregation, disposition, and notification to affected organizations.
documentation, segregation, disposition, and notification to affected organizations.
Exelon Procedure SM-AA-102, Warehouse Operations, Revision 23, prescribes activities
 
affecting quality and measures to control nonconforming components. Procedure SM-AA-102,
Exelon Procedure SM-AA             -102, Warehouse Operations, Revision 23, prescribes                                                           activities
Attachment 1, step 1.10.6, states Items that are on hold at one site can be released to another
affecting quality and measures to control nonconforming             components.Procedure SM                                 -AA-102,
Attachment 1, step 1.10.6, states                                             I  tems that are on hold at one site can be released to another
site while on hold only if an action item is created at the receiving site to track resolution of the
site while on hold only if an action item is created at the receiving site to track resolution of the
item before the transfer occurs, and the item is added to the receiving sites hold tag log. A hold
item before                       the transfer occurs, and the item is added to the receiving sites hold tag log. A hold
tag shall be attached to the item upon receipt of the transfer at the receiving site.
tag shall be attached to the item upon receipt of the transfer at the receiving site.
FitzPatrick Technical Specification (TS 3.5.1) requires, in part, that the HPCI system be
FitzPatrick Technical Specification (TS 3.5.1) requires, in part, that the HPCI system be
operable in Modes 1, 2 and 3 with reactor steam dome pressure >150 psig. If the HPCI system
operable in Modes 1, 2 and 3 with reactor steam dome pressure >150 psig.                                               If the HPCI system
is determined to be inoperable, it shall be returned to an operable status within 14 days. If not
is determined to be inoperable, it shall be returned to an operable status within 14 days.                         If not
restored to an operable status, the unit shall be shut down and in Mode 3 within 12 hours.
restored to an operable status, the unit shall be shut down and in Mode 3 within 12 hours.
Contrary to the above, from December 16, 2017, to April 10, 2020, activities affecting quality
Contrary to the above, from December 16, 2017, to April 10, 2020, activities affecting quality
were not accomplished in accordance with procedures for controlling a nonconforming
were not accomplished in accordance with procedures for control ling a nonconforming
component and a nonconforming component was not controlled in accordance with documented
component                                                                                                                         and a nonconforming component was not controlled in accordance with documented
procedures. Specifically, Exelon failed to initiate an action item at FitzPatrick to track resolution
procedures. Specifically, Exelon failed to initiate an action item at FitzPatrick to track resolution
of a nonconforming Pressure Control Valve (PCV) before its transfer occurred, did not add it to
of a nonconforming Pressure Control Valve ( PCV) before its transfer occurred,                                             did not add it to
the receiving sites hold tag log, and did not attach a hold tag upon receipt. As a result, on
the receiving sites hold tag log, and did not attach a hold tag upon receipt. As a result, on
December 16, 2017, Exelon did not identify that the PCVs diaphragm required replacement and
December 16, 2017, Exelon did not identify that the PCVs diaphragm required replacement and
installed the nonconforming PCV in the High Pressure Coolant Injection (HPCI) system.
installed the nonconforming PCV in the High Pressure Coolant Injection (HPCI) system.
Line 55: Line 62:
longer than its TS allowed outage time, and the unit was not shut down and placed in Mode 3
longer than its TS allowed outage time, and the unit was not shut down and placed in Mode 3
within 12 hours in accordance with requirements.
within 12 hours in accordance with requirements.
These violations are categorized collectively as a problem and are associated with a White
These violations are categorized collectively as a problem and are associated with a White
Significance Determination Process finding.
Significance Determination Process finding.


Notice of Violation                               2
Notice of Violation                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     2
 
 
No response to this Notice of Violation is required since the NRC previously received adequate
No response to this Notice of Violation is required since the NRC previously received adequate
responses as documented in a letter dated February 26, 2021 (ML21057A190). If you wish to
responses as documented in a letter dated February 26, 2021 (ML21057A190).                         If you wish to
provide additional information for the NRC to consider, you should notify the Region I Regional
provide additional information for the                                                       NRC to consider, you                                           should notify the Region I Regional
Administrator verbally within 10 days of receipt of this Notice of Violation, followed by a written
Administrator                           verbally within 10 days of receipt of this Notice of Violation, followed by a written
response submitted within 30 days of the date of the notification to the U.S. Nuclear Regulatory
response submitted                                                                   within 30 days of the date of the                                                                                                                                                                                                                 notification to the U.S. Nuclear Regulatory
Commission, ATTN: Document Control Desk, Washington, DC 20555-0001 with a copy to the
Commission, ATTN: Document Control Desk, Washington, DC 20555-0001 with a copy to the
Regional Administrator, Region I, and a copy to the NRC Resident Inspector at the facility that is
Regional Administrator, Region I, and a copy to the NRC Resident Inspector at the facility that is
the subject of this Notice. This reply should be clearly marked as a "Reply to a Notice of
the subject of this Notice.                       This reply should be clearly marked as a "Reply to a Notice of
Violation; EA-20-138". If you do not notify the Region I Regional Administrator within 10 days of
Violation; EA                         -20-138".                                                                       If you do not notify the Region I Regional Administrator within 10 days of
receipt, this Notice of Violation will be considered final.
receipt, this Notice of Violation will be considered final.
Your response, if made, will be made available electronically for public inspection in the NRC
Your response, if made, will be made available electronically for public inspection in the NRC
Public Document Room or from the NRCs document system (ADAMS), accessible from the
Public Document Room or from the NRCs document system (ADAMS), accessible from the
NRC Web site at http://www.nrc.gov/reading-rm/adams.html, to the extent possible, it should not
NRC Web site at http://www.nrc.gov/reading-rm/adams.html                                                                                                                                                 , to the extent possible, it should not
include any personal privacy, proprietary, or safeguards information so that it can be made
include any personal privacy, proprietary, or safeguards information so that i  t can be made
available to the public without redaction. If personal privacy or proprietary information is
available to the public without redaction.                                                                   If personal privacy or proprietary information is
necessary to provide an acceptable response, then please provide a bracketed copy of your
necessary to provide an acceptable response, then please provide a bracketed copy of your
response that identifies the information that should be protected and a redacted copy of your
response that identifies the information that should be pr otected and a redacted copy of your
response that deletes such information. If you request withholding of such material, you must
response that deletes such information.                                                         If you request withholding of such material, you must
specifically identify the portions of your response that you seek to have withheld and provide in
specifically identify the portions of your response that you seek to have withheld and provide in
detail the bases for your claim of withholding (e.g., explain why the disclosure of information will
detail the bases for your claim of withholding (e.g., explain why the disclosure of information will
create an unwarranted invasion of personal privacy or provide the information required by
create an unwarranted invasion of personal privacy or provide the information required by
10 CFR 2.390(b) to support a request for withholding confidential commercial or financial
10 CFR 2.390(b) to support a request for withholding confidential commercial or financial
information). If safeguards information is necessary to provide an acceptable response, please
information). If safeguards information is necessary to provide an acceptable response, please
provide the level of protection described in 10 CFR 73.21.
provide the level of protection described in 10 CFR 73.21.
In accordance with 10 CFR 19.11, the licensee may be required to post this Notice within two
In accordance with 10 CFR 19.11, the licensee may be required to post this Notice within two
working days of receipt.
working                                           days of receipt.
 
Dated this 3rd day of September 2021.
Dated this 3rd day of September 2021.
}}
}}

Latest revision as of 21:44, 19 November 2024

Enclosure 3 - James A. FitzPatrick Nuclear Power Plant-Response to Contested Violation and Final White Finding and Revised Notice of Violation-Inspection Report 0500333/2021090
ML21244A500
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 09/03/2021
From: David Lew
NRC Region 1
To:
Exelon Generation Co
References
EA-20-138 IR 2021090
Download: ML21244A500 (2)


See also: IR 05000333/2021090

Text

ENCLOSURE 3

NOTICE OF VIOLATION

Exelon Generation Company, LLC Docket No. 50-333

James A. FitzPatrick Nuclear Power Plant License No. DPR-59 EA-20-138

During an NRC review in response to a contested violation conducted from June 3, 2021,

through September 3, 2021, violations of NRC requirements were identified. In accordance with

the NRC Enforcement Policy, the violations are listed below:

Title 10 CFR Part 50, Appendix B, Criterion V, Instructions, Procedures, and Drawings , states,

in part, that activities affecting quality shall be prescribed by documented instructions,

procedures, or drawings, of a type appropriate to the circumstances and shall be accomplished

in accordance with these instructions, procedures, or drawings.

Title 10 CFR Part 50, Appendix B, Criterion XV, Nonconforming Materials, Parts, or

Components, states, in part, that measures shall be established to control materials, parts, or

components which do not conform to requirements in order to prevent their inadvertent use or

installation. These measures shall include, as appropriate, procedures for identification,

documentation, segregation, disposition, and notification to affected organizations.

Exelon Procedure SM-AA -102, Warehouse Operations, Revision 23, prescribes activities

affecting quality and measures to control nonconforming components.Procedure SM -AA-102,

Attachment 1, step 1.10.6, states I tems that are on hold at one site can be released to another

site while on hold only if an action item is created at the receiving site to track resolution of the

item before the transfer occurs, and the item is added to the receiving sites hold tag log. A hold

tag shall be attached to the item upon receipt of the transfer at the receiving site.

FitzPatrick Technical Specification (TS 3.5.1) requires, in part, that the HPCI system be

operable in Modes 1, 2 and 3 with reactor steam dome pressure >150 psig. If the HPCI system

is determined to be inoperable, it shall be returned to an operable status within 14 days. If not

restored to an operable status, the unit shall be shut down and in Mode 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

Contrary to the above, from December 16, 2017, to April 10, 2020, activities affecting quality

were not accomplished in accordance with procedures for control ling a nonconforming

component and a nonconforming component was not controlled in accordance with documented

procedures. Specifically, Exelon failed to initiate an action item at FitzPatrick to track resolution

of a nonconforming Pressure Control Valve ( PCV) before its transfer occurred, did not add it to

the receiving sites hold tag log, and did not attach a hold tag upon receipt. As a result, on

December 16, 2017, Exelon did not identify that the PCVs diaphragm required replacement and

installed the nonconforming PCV in the High Pressure Coolant Injection (HPCI) system.

Consequently, the HPCI system was rendered inoperable prior to April 10, 2020, for a period

longer than its TS allowed outage time, and the unit was not shut down and placed in Mode 3

within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> in accordance with requirements.

These violations are categorized collectively as a problem and are associated with a White

Significance Determination Process finding.

Notice of Violation 2

No response to this Notice of Violation is required since the NRC previously received adequate

responses as documented in a letter dated February 26, 2021 (ML21057A190). If you wish to

provide additional information for the NRC to consider, you should notify the Region I Regional

Administrator verbally within 10 days of receipt of this Notice of Violation, followed by a written

response submitted within 30 days of the date of the notification to the U.S. Nuclear Regulatory

Commission, ATTN: Document Control Desk, Washington, DC 20555-0001 with a copy to the

Regional Administrator, Region I, and a copy to the NRC Resident Inspector at the facility that is

the subject of this Notice. This reply should be clearly marked as a "Reply to a Notice of

Violation; EA -20-138". If you do not notify the Region I Regional Administrator within 10 days of

receipt, this Notice of Violation will be considered final.

Your response, if made, will be made available electronically for public inspection in the NRC

Public Document Room or from the NRCs document system (ADAMS), accessible from the

NRC Web site at http://www.nrc.gov/reading-rm/adams.html , to the extent possible, it should not

include any personal privacy, proprietary, or safeguards information so that i t can be made

available to the public without redaction. If personal privacy or proprietary information is

necessary to provide an acceptable response, then please provide a bracketed copy of your

response that identifies the information that should be pr otected and a redacted copy of your

response that deletes such information. If you request withholding of such material, you must

specifically identify the portions of your response that you seek to have withheld and provide in

detail the bases for your claim of withholding (e.g., explain why the disclosure of information will

create an unwarranted invasion of personal privacy or provide the information required by

10 CFR 2.390(b) to support a request for withholding confidential commercial or financial

information). If safeguards information is necessary to provide an acceptable response, please

provide the level of protection described in 10 CFR 73.21.

In accordance with 10 CFR 19.11, the licensee may be required to post this Notice within two

working days of receipt.

Dated this 3rd day of September 2021.