ML20235B377: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 19: Line 19:
=Text=
=Text=
{{#Wiki_filter:_
{{#Wiki_filter:_
              )'
)'
  << . ,,i,.
<< . ,,i,.
[
[
                                              JJN 261987
JJN 261987
\'       In Reply Refer To:
\\'
          Dockets:   50-445/57-09
In Reply Refer To:
                      50-446/87-07
Dockets:
          TU Electric
50-445/57-09
          ATIN: Mr. W. G. Counsil                                         ,
50-446/87-07
                  Executive Vice President
TU Electric
          400 North Olive Street, L.B. 81
ATIN:
        . Dallas,' Texas   :73201
Mr. W. G. Counsil
          Gentieluen:
,
"         This refers to the inspection conducted by Mr. I. Barnes and other
Executive Vice President
          inspectors in the Comanche Peak-Project Division during the period
400 North Olive Street, L.B.
          May 1 through June 4, 1987, of activities authorised by NRC
81
          Construction Permits CPPR-126 and CPPR-127 for the-Comanche. Peak
. Dallas,' Texas
          SteAn Electric Station, Units 1 and 2, and to th~e respective
:73201
          discussions of our findings with members of your staff during the
Gentieluen:
          inspection period and'with Mr. L. D. Nace and other members of your
"
          ataff_at the conclusion of the inspection.
This refers to the inspection conducted by Mr. I. Barnes and other
          The enclosed copy of our inspection report identifies areas examined
inspectors in the Comanche Peak-Project Division during the period
          during the inspection. Within these areas, the inspection consisted
May 1 through June 4, 1987, of activities authorised by NRC
          of selective examination of procedures and representative records,
Construction Permits CPPR-126 and CPPR-127 for the-Comanche. Peak
          ' interviews with personnel, and observations by the inspectors,
SteAn Electric Station, Units 1 and 2, and to th~e respective
          Within the scope of the inspection, no violations or deviations were
discussions of our findings with members of your staff during the
          identified.
inspection period and'with Mr. L. D. Nace and other members of your
          We have also examined actions you have taken with regard to
ataff_at the conclusion of the inspection.
          previously identified inspection findings. The status of these itens
The enclosed copy of our inspection report identifies areas examined
          is identified in paragraphs 3 and 4 of the enclosed report.
during the inspection.
          Should you have any questions concerning this inspection, we will be
Within these areas, the inspection consisted
p         pleased to discuss them with you.
of selective examination of procedures and representative records,
                                                  Sincerely,
' interviews with personnel, and observations by the inspectors,
                                                  ORIGIliAL CGrED ET n. F. W TNCE
Within the scope of the inspection, no violations or deviations were
            B707090038 870626                     R. F. Warnick, Assistant Director
identified.
            PDR ADOCK 05000445
We have also examined actions you have taken with regard to
            G               PDR                    for Inspection Programs
previously identified inspection findings.
                                                    Comanche Peak Project Division
The status of these itens
          OFC:       OSP:CP     OSP:C     OSP:C             OSP:CP         NO { B*tb O'5*
is identified in paragraphs 3 and 4 of the enclosed report.
          NAME:     IBarnes     CHale     LE e     ' w     RWarnick       (#l'zuwe rcWeeml
Should you have any questions concerning this inspection, we will be
          DATE:        24        6/,2y87   6   /'87         6 / R/,/ 87     rep 9rt dr # M
p
                      6/ a/87                                                s. _.h
pleased to discuss them with you.
                                                                              IHCvry9t h gp W
Sincerely,
                                                          # 'i                               ,
ORIGIliAL CGrED ET n. F. W TNCE
B707090038 870626
PDR
ADOCK 05000445
R.
F. Warnick, Assistant Director
PDR
G
for Inspection Programs
Comanche Peak Project Division
OFC:
OSP:CP
OSP:C
OSP:C
OSP:CP
NO { B*tb O'5*
NAME:
IBarnes
CHale
LE
e
' w
RWarnick
(#l'zuwe rcWeeml
6/ a/87
6/,2y87
6
/'87
6 / R/,/ 87
rep 9rt dr # M
24
DATE:
s. _.h
IHCvry9t h gp W
#
'i
,


            -
-
  o.     .,
o.
        TU Electric                                 2
.,
                                                          4
TU Electric
                                                            l
2
          Enclosure:
4
          Inspection Report 50-445/<37-09; 50-446/87-07
l
          cc w/ enclosure:
Enclosure:
        TU Electric                                       :
Inspection Report 50-445/<37-09; 50-446/87-07
                                                          I
cc w/ enclosure:
          ATTN: G. S. Kesley, Managet,
TU Electric
                  Nuclear Licensing                       !
:
          Skyway Tower
I
                                                        1
ATTN:
          400 North Olive Street
G.
          Lock Box 81                                     {
S. Kesley, Managet,
          Dallas, Texas     75201
Nuclear Licensing
                                                          i
Skyway Tower
          Juanita Ellis                                     ,
1
          President - CASE                                 {
400 North Olive Street
          1426 South Polk Street                         i
Lock Box 81
          Dallas, Texas     75224
{
          Re.nea Hicks
Dallas, Texas
          Assistant Attorney General
75201
          Environmental Protection Division
i
          P.O. Box 12$4B
Juanita Ellis
          Aust3 n, 'i'exas   78711-2S48
President - CASE
        - Administrative Judge Peter Bloch
{
          U. S. Nuclear Regulatory Commission             i
1426 South Polk Street
          Washington, D.C. 20555
i
          Elizabeth B. Jonnson                           ,
Dallas, Texas
                                                          '
75224
Re.nea Hicks
Assistant Attorney General
Environmental Protection Division
P.O. Box 12$4B
Aust3 n, 'i'exas
78711-2S48
- Administrative Judge Peter Bloch
U.
S. Nuclear Regulatory Commission
i
Washington, D.C.
20555
Elizabeth B. Jonnson
,
'
Administrative Judge
,
l
04< Ridge National Laboratory
i
PcD. Box X, Building 3500
,
,
          Administrative Judge
Oak Ridge, Tennessee
l        04< Ridge National Laboratory
37830
i        PcD. Box X, Building 3500                      ,
Dr. Kenneth A. McCollom
          Oak Ridge, Tennessee 37830
1107 West Knapp
          Dr. Kenneth A. McCollom
Etillwater, Oklahoma
          1107 West Knapp
74075
          Etillwater, Oklahoma       74075
Dr. Walter H,
          Dr. Walter H,   Jordan
Jordan
          881 West Outer Drive
881 West Outer Drive
          Oak Ridge, Tennessee       37830
Oak Ridge, Tennessee
37830
Anthony Roisman, Esq.
;
;
          Anthony Roisman, Esq.
Suite 600
          Suite 600
1401 New York Avenue NW
          1401 New York Avenue NW
Washington, D.C.
          Washington, D.C.       20005
20005
          Texas Radiation CC       'ol Program Director
Texas Radiation CC
          Texas Departm6 tit of Health
'ol Program Director
        - Burs &u of Radiation Control
Texas Departm6 tit of Health
          1140 West 49th
- Burs &u of Radiation Control
      ,
1140 West 49th
          Austin, Texas     78756                         i
i
      ,
Austin, Texas
  ,m,                         -
78756
,
,
,m,
m..
-
-
,
x-------
--


      .__
.__
  .a     .,
.a
      bec to DM3 (IE01)
.,
      bec distrib.
bec to DM3 (IE01)
      *CPRT                     RPB
bec distrib.
      * SRI-OPS                 * MIS System
*CPRT
      * SRI-CONS'               *RSIS Operator
RPB
          C, Grimes, OSP         RIV File
* SRI-OPS
          H. Schierling, 03P     L. Chandler, OGC
* MIS System
          J. Lyoas, OSE         "D. Weisc, RM/ALF
* SRI-CONS'
*RSIS Operator
C,
Grimes, OSP
RIV File
H. Schierling, 03P
L. Chandler, OGC
J. Lyoas, OSE
"D. Weisc, RM/ALF
I
I
          CPPD-LA, OSP
CPPD-LA, OSP
      *w/766
*w/766
}
}
                            -
\\
\
-
                              ,
,
l
l
                                                  l
l
                                                  h
h
.
.
L
L
t-           = _ _ .
t-
.
=
.
}}
}}

Latest revision as of 06:18, 3 December 2024

Forwards Insp Repts 50-445/87-09 & 50-446/87-07 on 870501-0604.No Violations Noted.Status of Corrective Actions in Response to Previously Identified Insp Findings Identified in Paragraphs 3 & 4 of Rept
ML20235B377
Person / Time
Site: Comanche Peak  
Issue date: 06/26/1987
From: Warnick R
NRC OFFICE OF SPECIAL PROJECTS
To: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20235B381 List:
References
NUDOCS 8707090038
Download: ML20235B377 (3)


See also: IR 05000445/1987009

Text

_

)'

<< . ,,i,.

[

JJN 261987

\\'

In Reply Refer To:

Dockets:

50-445/57-09

50-446/87-07

TU Electric

ATIN:

Mr. W. G. Counsil

,

Executive Vice President

400 North Olive Street, L.B.

81

. Dallas,' Texas

73201

Gentieluen:

"

This refers to the inspection conducted by Mr. I. Barnes and other

inspectors in the Comanche Peak-Project Division during the period

May 1 through June 4, 1987, of activities authorised by NRC

Construction Permits CPPR-126 and CPPR-127 for the-Comanche. Peak

SteAn Electric Station, Units 1 and 2, and to th~e respective

discussions of our findings with members of your staff during the

inspection period and'with Mr. L. D. Nace and other members of your

ataff_at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection.

Within these areas, the inspection consisted

of selective examination of procedures and representative records,

' interviews with personnel, and observations by the inspectors,

Within the scope of the inspection, no violations or deviations were

identified.

We have also examined actions you have taken with regard to

previously identified inspection findings.

The status of these itens

is identified in paragraphs 3 and 4 of the enclosed report.

Should you have any questions concerning this inspection, we will be

p

pleased to discuss them with you.

Sincerely,

ORIGIliAL CGrED ET n. F. W TNCE

B707090038 870626

PDR

ADOCK 05000445

R.

F. Warnick, Assistant Director

PDR

G

for Inspection Programs

Comanche Peak Project Division

OFC:

OSP:CP

OSP:C

OSP:C

OSP:CP

NO { B*tb O'5*

NAME:

IBarnes

CHale

LE

e

' w

RWarnick

(#l'zuwe rcWeeml

6/ a/87

6/,2y87

6

/'87

6 / R/,/ 87

rep 9rt dr # M

24

DATE:

s. _.h

IHCvry9t h gp W

'i

,

-

o.

.,

TU Electric

2

4

l

Enclosure:

Inspection Report 50-445/<37-09; 50-446/87-07

cc w/ enclosure:

TU Electric

I

ATTN:

G.

S. Kesley, Managet,

Nuclear Licensing

Skyway Tower

1

400 North Olive Street

Lock Box 81

{

Dallas, Texas

75201

i

Juanita Ellis

President - CASE

{

1426 South Polk Street

i

Dallas, Texas

75224

Re.nea Hicks

Assistant Attorney General

Environmental Protection Division

P.O. Box 12$4B

Aust3 n, 'i'exas

78711-2S48

- Administrative Judge Peter Bloch

U.

S. Nuclear Regulatory Commission

i

Washington, D.C.

20555

Elizabeth B. Jonnson

,

'

Administrative Judge

,

l

04< Ridge National Laboratory

i

PcD. Box X, Building 3500

,

Oak Ridge, Tennessee

37830

Dr. Kenneth A. McCollom

1107 West Knapp

Etillwater, Oklahoma

74075

Dr. Walter H,

Jordan

881 West Outer Drive

Oak Ridge, Tennessee

37830

Anthony Roisman, Esq.

Suite 600

1401 New York Avenue NW

Washington, D.C.

20005

Texas Radiation CC

'ol Program Director

Texas Departm6 tit of Health

- Burs &u of Radiation Control

1140 West 49th

i

Austin, Texas

78756

,

,

,m,

m..

-

-

,

x-------

--

.__

.a

.,

bec to DM3 (IE01)

bec distrib.

  • CPRT

RPB

  • SRI-OPS
  • MIS System
  • SRI-CONS'
  • RSIS Operator

C,

Grimes, OSP

RIV File

H. Schierling, 03P

L. Chandler, OGC

J. Lyoas, OSE

"D. Weisc, RM/ALF

I

CPPD-LA, OSP

  • w/766

}

\\

-

,

l

l

h

.

L

t-

.

=

.