ML20235B377
| ML20235B377 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 06/26/1987 |
| From: | Warnick R NRC OFFICE OF SPECIAL PROJECTS |
| To: | Counsil W TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| Shared Package | |
| ML20235B381 | List: |
| References | |
| NUDOCS 8707090038 | |
| Download: ML20235B377 (3) | |
See also: IR 05000445/1987009
Text
_
)'
<< . ,,i,.
[
JJN 261987
\\'
In Reply Refer To:
Dockets:
50-445/57-09
50-446/87-07
TU Electric
ATIN:
Mr. W. G. Counsil
,
Executive Vice President
400 North Olive Street, L.B.
81
. Dallas,' Texas
- 73201
Gentieluen:
"
This refers to the inspection conducted by Mr. I. Barnes and other
inspectors in the Comanche Peak-Project Division during the period
May 1 through June 4, 1987, of activities authorised by NRC
Construction Permits CPPR-126 and CPPR-127 for the-Comanche. Peak
SteAn Electric Station, Units 1 and 2, and to th~e respective
discussions of our findings with members of your staff during the
inspection period and'with Mr. L. D. Nace and other members of your
ataff_at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined
during the inspection.
Within these areas, the inspection consisted
of selective examination of procedures and representative records,
' interviews with personnel, and observations by the inspectors,
Within the scope of the inspection, no violations or deviations were
identified.
We have also examined actions you have taken with regard to
previously identified inspection findings.
The status of these itens
is identified in paragraphs 3 and 4 of the enclosed report.
Should you have any questions concerning this inspection, we will be
p
pleased to discuss them with you.
Sincerely,
ORIGIliAL CGrED ET n. F. W TNCE
B707090038 870626
ADOCK 05000445
R.
F. Warnick, Assistant Director
G
for Inspection Programs
Comanche Peak Project Division
OFC:
OSP:CP
OSP:C
OSP:C
OSP:CP
NO { B*tb O'5*
NAME:
IBarnes
CHale
LE
e
' w
RWarnick
(#l'zuwe rcWeeml
6/ a/87
6/,2y87
6
/'87
6 / R/,/ 87
rep 9rt dr # M
24
DATE:
s. _.h
IHCvry9t h gp W
'i
,
-
o.
.,
TU Electric
2
4
l
Enclosure:
Inspection Report 50-445/<37-09; 50-446/87-07
cc w/ enclosure:
TU Electric
I
ATTN:
G.
S. Kesley, Managet,
Nuclear Licensing
Skyway Tower
1
400 North Olive Street
Lock Box 81
{
Dallas, Texas
75201
i
Juanita Ellis
President - CASE
{
1426 South Polk Street
i
Dallas, Texas
75224
Re.nea Hicks
Assistant Attorney General
Environmental Protection Division
P.O. Box 12$4B
Aust3 n, 'i'exas
78711-2S48
- Administrative Judge Peter Bloch
U.
S. Nuclear Regulatory Commission
i
Washington, D.C.
20555
Elizabeth B. Jonnson
,
'
Administrative Judge
,
l
04< Ridge National Laboratory
i
PcD. Box X, Building 3500
,
Oak Ridge, Tennessee
37830
Dr. Kenneth A. McCollom
1107 West Knapp
Etillwater, Oklahoma
74075
Dr. Walter H,
Jordan
881 West Outer Drive
Oak Ridge, Tennessee
37830
Anthony Roisman, Esq.
Suite 600
1401 New York Avenue NW
Washington, D.C.
20005
'ol Program Director
Texas Departm6 tit of Health
- Burs &u of Radiation Control
1140 West 49th
i
78756
,
,
,m,
m..
-
-
,
x-------
--
.__
.a
.,
bec to DM3 (IE01)
bec distrib.
- CPRT
RPB
- SRI-OPS
- MIS System
- SRI-CONS'
- RSIS Operator
C,
Grimes, OSP
RIV File
H. Schierling, 03P
L. Chandler, OGC
J. Lyoas, OSE
"D. Weisc, RM/ALF
I
CPPD-LA, OSP
- w/766
}
\\
-
,
l
l
h
.
L
t-
.
=
.