Forwards Insp Repts 50-445/87-09 & 50-446/87-07 on 870501-0604.No Violations Noted.Status of Corrective Actions in Response to Previously Identified Insp Findings Identified in Paragraphs 3 & 4 of Rept
ML20235B377
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 06/26/1987
From: Warnick R
NRC OFFICE OF SPECIAL PROJECTS
To: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20235B381 List:
References
NUDOCS 8707090038
Download: ML20235B377 (3)


See also: IR 05000445/1987009

Text

_

)'

<< . ,,i,.

[

JJN 261987

\' In Reply Refer To:

Dockets: 50-445/57-09

50-446/87-07

TU Electric

ATIN: Mr. W. G. Counsil ,

Executive Vice President

400 North Olive Street, L.B. 81

. Dallas,' Texas :73201

Gentieluen:

" This refers to the inspection conducted by Mr. I. Barnes and other

inspectors in the Comanche Peak-Project Division during the period

May 1 through June 4, 1987, of activities authorised by NRC

Construction Permits CPPR-126 and CPPR-127 for the-Comanche. Peak

SteAn Electric Station, Units 1 and 2, and to th~e respective

discussions of our findings with members of your staff during the

inspection period and'with Mr. L. D. Nace and other members of your

ataff_at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted

of selective examination of procedures and representative records,

' interviews with personnel, and observations by the inspectors,

Within the scope of the inspection, no violations or deviations were

identified.

We have also examined actions you have taken with regard to

previously identified inspection findings. The status of these itens

is identified in paragraphs 3 and 4 of the enclosed report.

Should you have any questions concerning this inspection, we will be

p pleased to discuss them with you.

Sincerely,

ORIGIliAL CGrED ET n. F. W TNCE

B707090038 870626 R. F. Warnick, Assistant Director

PDR ADOCK 05000445

G PDR for Inspection Programs

Comanche Peak Project Division

OFC: OSP:CP OSP:C OSP:C OSP:CP NO { B*tb O'5*

NAME: IBarnes CHale LE e ' w RWarnick (#l'zuwe rcWeeml

DATE: 24 6/,2y87 6 /'87 6 / R/,/ 87 rep 9rt dr # M

6/ a/87 s. _.h

IHCvry9t h gp W

  1. 'i ,

-

o. .,

TU Electric 2

4

l

Enclosure:

Inspection Report 50-445/<37-09; 50-446/87-07

cc w/ enclosure:

TU Electric  :

I

ATTN: G. S. Kesley, Managet,

Nuclear Licensing  !

Skyway Tower

1

400 North Olive Street

Lock Box 81 {

Dallas, Texas 75201

i

Juanita Ellis ,

President - CASE {

1426 South Polk Street i

Dallas, Texas 75224

Re.nea Hicks

Assistant Attorney General

Environmental Protection Division

P.O. Box 12$4B

Aust3 n, 'i'exas 78711-2S48

- Administrative Judge Peter Bloch

U. S. Nuclear Regulatory Commission i

Washington, D.C. 20555

Elizabeth B. Jonnson ,

'

,

Administrative Judge

l 04< Ridge National Laboratory

i PcD. Box X, Building 3500 ,

Oak Ridge, Tennessee 37830

Dr. Kenneth A. McCollom

1107 West Knapp

Etillwater, Oklahoma 74075

Dr. Walter H, Jordan

881 West Outer Drive

Oak Ridge, Tennessee 37830

Anthony Roisman, Esq.

Suite 600

1401 New York Avenue NW

Washington, D.C. 20005

Texas Radiation CC 'ol Program Director

Texas Departm6 tit of Health

- Burs &u of Radiation Control

1140 West 49th

,

Austin, Texas 78756 i

,

,m, -

.__

.a .,

bec to DM3 (IE01)

bec distrib.

  • CPRT RPB
  • SRI-OPS * MIS System
  • SRI-CONS' *RSIS Operator

C, Grimes, OSP RIV File

H. Schierling, 03P L. Chandler, OGC

J. Lyoas, OSE "D. Weisc, RM/ALF

I

CPPD-LA, OSP

  • w/766

}

-

\

,

l

l

h

.

L

t- = _ _ .