ML20247P812: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:_ _ _ _ _ _ _ - _ _ _            -_ _-__ _____ ___ ______ __ ____________---_-_____                    _ _ _ - -- _ _ ___ . ____ __- __ ____ _ -______ _____ _ _
{{#Wiki_filter:_ _ _ _ _ _ _ - _ _ _
v j .    /"N                                                                                                                                                                   Duke Power Company j,5           ;                                                                                                                                                        A Deh, Earry Cmpzy
v j
      *U                               '                                                                                                                                    McGuire Nudear Station
/"N Duke Power Company j,5 A Deh, Earry Cmpzy
                      " ' " ' '
*U McGuire Nudear Station MG0lVP 12700 Hager: Ferry Rd.
* MG0lVP 12700 Hager: Ferry Rd.
Humersville, NC 28078-9340 l
Humersville, NC 28078-9340 l                 .
Vice besident, McGuirr 604) 875-4800 OFHCE Nudcar Generation Department 60f) 87S-4809 fax May 20, 1998 U.-S.
Vice besident, McGuirr                                                                                                                             604) 875-4800 OFHCE Nudcar Generation Department                                                                                                                         60f) 87S-4809 fax May 20, 1998 U.-S. Nuclear Regulatory Commission                                                                                                                                                       '
Nuclear Regulatory Commission Document Control Desk Washington, D.C.
Document Control Desk Washington, D.C.                                                                   20555
20555


==Subject:==
==Subject:==
McGuire Nuclear Station Docket Noc. 50-369, 370 Generic Letter 95-07, " Pressure Locking and Thermal Binding of Safety-Related Power-Operated Gate Valves" On August 17, 1995, the NRC issued Generic Letter 95-07,
McGuire Nuclear Station Docket Noc. 50-369, 370 Generic Letter 95-07, " Pressure Locking and Thermal Binding of Safety-Related Power-Operated Gate Valves" On August 17, 1995, the NRC issued Generic Letter 95-07,
                  " Pressure Locking and Thermal Binding of Safety-Related Power-Operated Gate Valves," to request that licensees take actions to ensure that safety-related power-operated gate valves that are susceptible to pressure locking or thermal binding are capable of performing their safety functions.
" Pressure Locking and Thermal Binding of Safety-Related Power-Operated Gate Valves," to request that licensees take actions to ensure that safety-related power-operated gate valves that are susceptible to pressure locking or thermal binding are capable of performing their safety functions.
McGuire plans to replace valves 1NI0009A and 1NI0010B during the Unit 1, Cycle 13 outage.                                                           This replacement will eliminate the pressure locking concern. McGuire previously committed to modify these valves during the Unit 1, Cycle 12 outage.
McGuire plans to replace valves 1NI0009A and 1NI0010B during the Unit 1, Cycle 13 outage.
Questions should be directed to Kay Crane, McGuire                                                                                                                                   p Regulatory Compliance at (704) 875-4306.
This replacement will eliminate the pressure locking concern. McGuire previously committed to modify these valves during the Unit 1, Cycle 12 outage.
Very truly yours,                                                                                                                                                                   -
Questions should be directed to Kay Crane, McGuire p
A&th                                                                                                                                                                             hvb H. B. Barron, Vice President McGuire Nuclear Station l
Regulatory Compliance at (704) 875-4306.
Very truly yours, A&th hvb H.
B. Barron, Vice President McGuire Nuclear Station l
1 1
1 1
9905290119 990520 .
9905290119 990520.
PDR                 ADOCK 05000369lc P                                                                               PDR y
PDR ADOCK 05000369lc P
PDR y


e U. S. Nuclear Regulatory Commission Document Control Desk                                                                       j May 20, 1998 Page 2 i
e U.
cc: F. Rinaldi, Project Manager U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Washington, D.C. 20555 Mr. Luis A. Reyes U. S. Nuclear Regulatory Commission, Region II Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, GA 30303 Mr. Scott Shaeffer Senior Resident Inspector McGuire Nuclear Station l
S. Nuclear Regulatory Commission Document Control Desk j
May 20, 1998 Page 2 i
cc:
F.
Rinaldi, Project Manager U.
S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Washington, D.C.
20555 Mr. Luis A.
Reyes U.
S. Nuclear Regulatory Commission, Region II Atlanta Federal Center 61 Forsyth St.,
SW, Suite 23T85 Atlanta, GA 30303 Mr. Scott Shaeffer Senior Resident Inspector McGuire Nuclear Station l
l
l
                                                                                                        \
\\
i l
i l
l
l
{I}}
{I}}

Latest revision as of 19:16, 1 December 2024

Informs That Plant Plans to Replace Valves 1NI0009A & 1NI0010B During Unit 1,Cycle 13 Outage.Replacement Will Eliminate Pressure Locking Concern
ML20247P812
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 05/20/1998
From: Barron H
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-95-07, GL-95-7, NUDOCS 9805280118
Download: ML20247P812 (2)


Text

_ _ _ _ _ _ _ - _ _ _

v j

/"N Duke Power Company j,5 A Deh, Earry Cmpzy

  • U McGuire Nudear Station MG0lVP 12700 Hager: Ferry Rd.

Humersville, NC 28078-9340 l

Vice besident, McGuirr 604) 875-4800 OFHCE Nudcar Generation Department 60f) 87S-4809 fax May 20, 1998 U.-S.

Nuclear Regulatory Commission Document Control Desk Washington, D.C.

20555

Subject:

McGuire Nuclear Station Docket Noc. 50-369, 370 Generic Letter 95-07, " Pressure Locking and Thermal Binding of Safety-Related Power-Operated Gate Valves" On August 17, 1995, the NRC issued Generic Letter 95-07,

" Pressure Locking and Thermal Binding of Safety-Related Power-Operated Gate Valves," to request that licensees take actions to ensure that safety-related power-operated gate valves that are susceptible to pressure locking or thermal binding are capable of performing their safety functions.

McGuire plans to replace valves 1NI0009A and 1NI0010B during the Unit 1, Cycle 13 outage.

This replacement will eliminate the pressure locking concern. McGuire previously committed to modify these valves during the Unit 1, Cycle 12 outage.

Questions should be directed to Kay Crane, McGuire p

Regulatory Compliance at (704) 875-4306.

Very truly yours, A&th hvb H.

B. Barron, Vice President McGuire Nuclear Station l

1 1

9905290119 990520.

PDR ADOCK 05000369lc P

PDR y

e U.

S. Nuclear Regulatory Commission Document Control Desk j

May 20, 1998 Page 2 i

cc:

F.

Rinaldi, Project Manager U.

S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Washington, D.C.

20555 Mr. Luis A.

Reyes U.

S. Nuclear Regulatory Commission, Region II Atlanta Federal Center 61 Forsyth St.,

SW, Suite 23T85 Atlanta, GA 30303 Mr. Scott Shaeffer Senior Resident Inspector McGuire Nuclear Station l

l

\\

i l

l

{I