ML20245C092: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:_       .       _         - - _ .
{{#Wiki_filter:_
  _.
.
_
- - _ .
_.
g,
g,
      ,'~P_
,'
                .
~P_
        '''
(
              -In Reply Refer Toi
.
~
' ' '
            ? Dockets: 50-313/89-12-
-In Reply Refer Toi
                            50-368/89-12
~
              Arkansas Power & Light Company
? Dockets: 50-313/89-12-
      ,'
50-368/89-12
              ATTN: Mr. Gene-Campbell.
Arkansas Power & Light Company
                        Vice President, Nuclear
ATTN:
                          Operations
Mr. Gene-Campbell.
              P.O. Box 551
,'
              ' Little Rock, Arkansas 72203
Vice President, Nuclear
              Gentlemen:
Operations
              This' refers to the inspection conducted by Mr. Nemen M. Terc of this office and
P.O. Box 551
              other accompanying personnel during the period March 14-16, 1989, of activities
' Little Rock, Arkansas 72203
            1 authorized by NRC Operating Licenses DPR-51 and NPF-6 for Arkansas Nuclear
Gentlemen:
              One, Units 1 and 2, and to the discussion of our findings with you and
This' refers to the inspection conducted by Mr. Nemen M. Terc of this office and
              members of your staff at the. conclusion of the inspection.
other accompanying personnel during the period March 14-16, 1989, of activities
              Areas examined during the inspection included the implementation of the
1 authorized by NRC Operating Licenses DPR-51 and NPF-6 for Arkansas Nuclear
            ' emergency plan and procedures during the annual emergency response exercise.
One, Units 1 and 2, and to the discussion of our findings with you and
                          _
members of your staff at the. conclusion of the inspection.
              Within these areas, the inspection consisted of selective examination of
Areas examined during the inspection included the implementation of the
              procedures and' representative records, interviews with personnel, and
' emergency plan and procedures during the annual emergency response exercise.
              observations by the NRC inspection team. 'The inspection findings are documented
_
              -in the enclosed. inspection report.
Within these areas, the inspection consisted of selective examination of
            :Within.the scope of the inspection, no violations or deviations were
procedures and' representative records, interviews with personnel, and
              identified.
observations by the NRC inspection team. 'The inspection findings are documented
              The' enclosed report identifies four exercise weaknesses in your emergency
-in the enclosed. inspection report.
              preparedness program. Exercise weaknesses, according to 10 CFR Part 50,
:Within.the scope of the inspection, no violations or deviations were
              Appendix _E.IV_.F.5, are inspection findings that need to be corrected by the
identified.
              . licensee. You are requested to provide this office with a description of your
The' enclosed report identifies four exercise weaknesses in your emergency
              corrective actions-and your schedule for completing these actions within
preparedness program.
            .30. days af ter receipt of this letter.
Exercise weaknesses, according to 10 CFR Part 50,
              We'also. examined actions you have taken with regard to previously identified
Appendix _E.IV_.F.5, are inspection findings that need to be corrected by the
              inspection fi ndings. The status of these items is identified in paragraph 2 of
. licensee. You are requested to provide this office with a description of your
              the enclosed report.
corrective actions-and your schedule for completing these actions within
                                                                                b
.30. days af ter receipt of this letter.
                  \
We'also. examined actions you have taken with regard to previously identified
                    [c;nmt       C:Sg           C:RPB         D     S       D:DRP
inspection fi dings. The status of these items is identified in paragraph 2 of
                  1er           'RJEv vett     BMurraj       B     ch       L Callan
n
                Y/t) /89         4 /gV89 -           /89     f/i$/89         /[4/89
the enclosed report.
                                              Q
b
                                                                                                  1
\\[c;nmt
            8904270003 9904j4             p                                                   I
C:Sg
            PDR                                                                                 -
C:RPB
            G
D
                        ADOCK       05000313[7
S
                                    PNU                                                      jfj{
D:DRP
1er
'RJEv vett
BMurraj
B
ch
L Callan
Y/t) /89
4 /gV89 -
Q
/89
f/i$/89
/[4/89
1
I
8904270003 9904j4
p
PDR
ADOCK 05000313[7
jfj{
-
G
PNU


                                                                -_     ._.
-_
                                                                            _ _ _ _ _ - - _ _ _ _ _ _ _ _ - . _ - - _ _ _ _ _ - -
._.
          s, D
_ _ _ _ _ - - _ _ _ _ _ _ _ _ - . _ - - _ _ _ _ _ - -
                                                    --
s,
                .
D
          '
.
            Arkansas Power. & Light Company           -2-
--
                                                                                                                                  1
'
            Should you have any questions concerning this-inspection, we will be pleased to
Arkansas Power. & Light Company
            discuss them with you.
-2-
        '
1
                                                                                                                                  i
Should you have any questions concerning this-inspection, we will be pleased to
                                                          Sincerely,
discuss them with you.
  '
'
    ,
i
                                                          L. J. Callan, Director
Sincerely,
                                                          Division of Reactor Projects                                             ,
'
                                                                                                                                  f
,
            Enclosure:
L. J. Callan, Director
            Appendix - NRC Inspection Report
Division of Reactor Projects
                  50-313/89-12
,
                  50-368/89-12
f
            cc w/ enclosure:
Enclosure:
            Arkansas Nuclear One
Appendix - NRC Inspection Report
      ,
50-313/89-12
            ATTN:     J. M. Levine, Executive
50-368/89-12
                        Director, Nuclear Operations
cc w/ enclosure:
            P.O. Box 608
Arkansas Nuclear One
              Russellville, Arkansas 72801
ATTN:
            Arkansas Radiation Control Program Director
J. M. Levine, Executive
            Chief, Technological Hazards Branch
,
              FEMA Region 6
Director, Nuclear Operations
              Federal Center
P.O. Box 608
            800 North Loop 288
Russellville, Arkansas 72801
            Denton, Texas 76201-3698
Arkansas Radiation Control Program Director
            bec to DMB (IE35)
Chief, Technological Hazards Branch
            bec distrib. by RIV:
FEMA Region 6
              "RRI                                 *R. D. Martin, RA
Federal Center
              *RPB-DRSS                           *Section' Chief (DRP/A)
800 North Loop 288
              Lisa Shea, RM/ALF                   "RIV File
Denton, Texas 76201-3698
              *DRP                                 * MIS System
bec to DMB (IE35)
              *RSTS Operator                       * Project Engineer, DRP/A
bec distrib. by RIV:
              *DRS                                 *B. Beach
"RRI
              *C. Harbuck, NRR Project Manager (MS: 13-D-18)
*R.
              *C. Posiusny, NRR Project Manager (MS: 13-D-18)
D. Martin, RA
              *R. Hall                             *B. Murray
*RPB-DRSS
              *J. Everett                         "N. Terc
*Section' Chief (DRP/A)
            *w/766
Lisa Shea, RM/ALF
"RIV File
*DRP
* MIS System
*RSTS Operator
* Project Engineer, DRP/A
*DRS
*B.
Beach
*C. Harbuck, NRR Project Manager (MS:
13-D-18)
*C. Posiusny, NRR Project Manager (MS:
13-D-18)
*R. Hall
*B. Murray
*J. Everett
"N. Terc
*w/766
l
l
U--_____________-_____________-___.       ___ _-_
U--_____________-_____________-___.
___ _-_
}}
}}

Latest revision as of 03:14, 2 December 2024

Forwards Insp Repts 50-313/89-12 & 50-368/89-12 on 890314-16.No Violations or Deviations Noted.Four Exercise Weaknesses in Emergency Preparedness Program Identified
ML20245C092
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 04/14/1989
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Campbell G
ARKANSAS POWER & LIGHT CO.
Shared Package
ML20245C093 List:
References
NUDOCS 8904270001
Download: ML20245C092 (2)


See also: IR 05000313/1989012

Text

_

.

_

- - _ .

_.

g,

,'

~P_

(

.

' ' '

-In Reply Refer Toi

~

? Dockets: 50-313/89-12-

50-368/89-12

Arkansas Power & Light Company

ATTN:

Mr. Gene-Campbell.

,'

Vice President, Nuclear

Operations

P.O. Box 551

' Little Rock, Arkansas 72203

Gentlemen:

This' refers to the inspection conducted by Mr. Nemen M. Terc of this office and

other accompanying personnel during the period March 14-16, 1989, of activities

1 authorized by NRC Operating Licenses DPR-51 and NPF-6 for Arkansas Nuclear

One, Units 1 and 2, and to the discussion of our findings with you and

members of your staff at the. conclusion of the inspection.

Areas examined during the inspection included the implementation of the

' emergency plan and procedures during the annual emergency response exercise.

_

Within these areas, the inspection consisted of selective examination of

procedures and' representative records, interviews with personnel, and

observations by the NRC inspection team. 'The inspection findings are documented

-in the enclosed. inspection report.

Within.the scope of the inspection, no violations or deviations were

identified.

The' enclosed report identifies four exercise weaknesses in your emergency

preparedness program.

Exercise weaknesses, according to 10 CFR Part 50,

Appendix _E.IV_.F.5, are inspection findings that need to be corrected by the

. licensee. You are requested to provide this office with a description of your

corrective actions-and your schedule for completing these actions within

.30. days af ter receipt of this letter.

We'also. examined actions you have taken with regard to previously identified

inspection fi dings. The status of these items is identified in paragraph 2 of

n

the enclosed report.

b

\\[c;nmt

C:Sg

C:RPB

D

S

D:DRP

1er

'RJEv vett

BMurraj

B

ch

L Callan

Y/t) /89

4 /gV89 -

Q

/89

f/i$/89

/[4/89

1

I

8904270003 9904j4

p

PDR

ADOCK 05000313[7

jfj{

-

G

PNU

-_

._.

_ _ _ _ _ - - _ _ _ _ _ _ _ _ - . _ - - _ _ _ _ _ - -

s,

D

.

--

'

Arkansas Power. & Light Company

-2-

1

Should you have any questions concerning this-inspection, we will be pleased to

discuss them with you.

'

i

Sincerely,

'

,

L. J. Callan, Director

Division of Reactor Projects

,

f

Enclosure:

Appendix - NRC Inspection Report

50-313/89-12

50-368/89-12

cc w/ enclosure:

Arkansas Nuclear One

ATTN:

J. M. Levine, Executive

,

Director, Nuclear Operations

P.O. Box 608

Russellville, Arkansas 72801

Arkansas Radiation Control Program Director

Chief, Technological Hazards Branch

FEMA Region 6

Federal Center

800 North Loop 288

Denton, Texas 76201-3698

bec to DMB (IE35)

bec distrib. by RIV:

"RRI

  • R.

D. Martin, RA

  • RPB-DRSS
  • Section' Chief (DRP/A)

Lisa Shea, RM/ALF

"RIV File

  • DRP
  • MIS System
  • RSTS Operator
  • Project Engineer, DRP/A
  • DRS
  • B.

Beach

  • C. Harbuck, NRR Project Manager (MS:

13-D-18)

  • C. Posiusny, NRR Project Manager (MS:

13-D-18)

  • R. Hall
  • B. Murray
  • J. Everett

"N. Terc

  • w/766

l

U--_____________-_____________-___.

___ _-_