| Issue date: | 04/14/1989 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Campbell G ARKANSAS POWER & LIGHT CO. |
| Shared Package | |
| ML20245C093 | List: |
| References | |
| NUDOCS 8904270001 | |
| Download: ML20245C092 (2) | |
See also: IR 05000313/1989012
Text
_
.
_
- - _ .
_.
g,
,'
~P_
(
.
' ' '
-In Reply Refer Toi
~
? Dockets: 50-313/89-12-
50-368/89-12
Arkansas Power & Light Company
ATTN:
Mr. Gene-Campbell.
,'
Vice President, Nuclear
Operations
P.O. Box 551
' Little Rock, Arkansas 72203
Gentlemen:
This' refers to the inspection conducted by Mr. Nemen M. Terc of this office and
other accompanying personnel during the period March 14-16, 1989, of activities
1 authorized by NRC Operating Licenses DPR-51 and NPF-6 for Arkansas Nuclear
One, Units 1 and 2, and to the discussion of our findings with you and
members of your staff at the. conclusion of the inspection.
Areas examined during the inspection included the implementation of the
' emergency plan and procedures during the annual emergency response exercise.
_
Within these areas, the inspection consisted of selective examination of
procedures and' representative records, interviews with personnel, and
observations by the NRC inspection team. 'The inspection findings are documented
-in the enclosed. inspection report.
- Within.the scope of the inspection, no violations or deviations were
identified.
The' enclosed report identifies four exercise weaknesses in your emergency
preparedness program.
Exercise weaknesses, according to 10 CFR Part 50,
Appendix _E.IV_.F.5, are inspection findings that need to be corrected by the
. licensee. You are requested to provide this office with a description of your
corrective actions-and your schedule for completing these actions within
.30. days af ter receipt of this letter.
We'also. examined actions you have taken with regard to previously identified
inspection fi dings. The status of these items is identified in paragraph 2 of
n
the enclosed report.
b
\\[c;nmt
C:Sg
C:RPB
D
S
D:DRP
1er
'RJEv vett
BMurraj
B
ch
L Callan
Y/t) /89
4 /gV89 -
Q
/89
f/i$/89
/[4/89
1
I
8904270003 9904j4
p
ADOCK 05000313[7
jfj{
-
G
PNU
-_
._.
_ _ _ _ _ - - _ _ _ _ _ _ _ _ - . _ - - _ _ _ _ _ - -
s,
D
.
--
'
Arkansas Power. & Light Company
-2-
1
Should you have any questions concerning this-inspection, we will be pleased to
discuss them with you.
'
i
Sincerely,
'
,
L. J. Callan, Director
Division of Reactor Projects
,
f
Enclosure:
Appendix - NRC Inspection Report
50-313/89-12
50-368/89-12
cc w/ enclosure:
Arkansas Nuclear One
ATTN:
J. M. Levine, Executive
,
Director, Nuclear Operations
P.O. Box 608
Russellville, Arkansas 72801
Arkansas Radiation Control Program Director
Chief, Technological Hazards Branch
FEMA Region 6
Federal Center
800 North Loop 288
Denton, Texas 76201-3698
bec to DMB (IE35)
bec distrib. by RIV:
"RRI
- R.
D. Martin, RA
- RPB-DRSS
- Section' Chief (DRP/A)
Lisa Shea, RM/ALF
"RIV File
- DRP
- MIS System
- RSTS Operator
- Project Engineer, DRP/A
- DRS
- B.
Beach
- C. Harbuck, NRR Project Manager (MS:
13-D-18)
- C. Posiusny, NRR Project Manager (MS:
13-D-18)
- R. Hall
- B. Murray
- J. Everett
"N. Terc
- w/766
l
U--_____________-_____________-___.
___ _-_