Forwards Insp Repts 50-313/89-12 & 50-368/89-12 on 890314-16.No Violations or Deviations Noted.Four Exercise Weaknesses in Emergency Preparedness Program Identified
ML20245C092
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 04/14/1989
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Campbell G
ARKANSAS POWER & LIGHT CO.
Shared Package
ML20245C093 List:
References
NUDOCS 8904270001
Download: ML20245C092 (2)


See also: IR 05000313/1989012

Text

_

.

_

- - _ .

_.

g,

,'

~P_

(

.

' ' '

-In Reply Refer Toi

~

? Dockets: 50-313/89-12-

50-368/89-12

Arkansas Power & Light Company

ATTN:

Mr. Gene-Campbell.

,'

Vice President, Nuclear

Operations

P.O. Box 551

' Little Rock, Arkansas 72203

Gentlemen:

This' refers to the inspection conducted by Mr. Nemen M. Terc of this office and

other accompanying personnel during the period March 14-16, 1989, of activities

1 authorized by NRC Operating Licenses DPR-51 and NPF-6 for Arkansas Nuclear

One, Units 1 and 2, and to the discussion of our findings with you and

members of your staff at the. conclusion of the inspection.

Areas examined during the inspection included the implementation of the

' emergency plan and procedures during the annual emergency response exercise.

_

Within these areas, the inspection consisted of selective examination of

procedures and' representative records, interviews with personnel, and

observations by the NRC inspection team. 'The inspection findings are documented

-in the enclosed. inspection report.

Within.the scope of the inspection, no violations or deviations were

identified.

The' enclosed report identifies four exercise weaknesses in your emergency

preparedness program.

Exercise weaknesses, according to 10 CFR Part 50,

Appendix _E.IV_.F.5, are inspection findings that need to be corrected by the

. licensee. You are requested to provide this office with a description of your

corrective actions-and your schedule for completing these actions within

.30. days af ter receipt of this letter.

We'also. examined actions you have taken with regard to previously identified

inspection fi dings. The status of these items is identified in paragraph 2 of

n

the enclosed report.

b

\\[c;nmt

C:Sg

C:RPB

D

S

D:DRP

1er

'RJEv vett

BMurraj

B

ch

L Callan

Y/t) /89

4 /gV89 -

Q

/89

f/i$/89

/[4/89

1

I

8904270003 9904j4

p

PDR

ADOCK 05000313[7

jfj{

-

G

PNU

-_

._.

_ _ _ _ _ - - _ _ _ _ _ _ _ _ - . _ - - _ _ _ _ _ - -

s,

D

.

--

'

Arkansas Power. & Light Company

-2-

1

Should you have any questions concerning this-inspection, we will be pleased to

discuss them with you.

'

i

Sincerely,

'

,

L. J. Callan, Director

Division of Reactor Projects

,

f

Enclosure:

Appendix - NRC Inspection Report

50-313/89-12

50-368/89-12

cc w/ enclosure:

Arkansas Nuclear One

ATTN:

J. M. Levine, Executive

,

Director, Nuclear Operations

P.O. Box 608

Russellville, Arkansas 72801

Arkansas Radiation Control Program Director

Chief, Technological Hazards Branch

FEMA Region 6

Federal Center

800 North Loop 288

Denton, Texas 76201-3698

bec to DMB (IE35)

bec distrib. by RIV:

"RRI

  • R.

D. Martin, RA

  • RPB-DRSS
  • Section' Chief (DRP/A)

Lisa Shea, RM/ALF

"RIV File

  • DRP
  • MIS System
  • RSTS Operator
  • Project Engineer, DRP/A
  • DRS
  • B.

Beach

  • C. Harbuck, NRR Project Manager (MS:

13-D-18)

  • C. Posiusny, NRR Project Manager (MS:

13-D-18)

  • R. Hall
  • B. Murray
  • J. Everett

"N. Terc

  • w/766

l

U--_____________-_____________-___.

___ _-_