ML20207P225: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:'. ,
{{#Wiki_filter:'.
      t
4
        P
P
        4
,
          aa ns%                               UNITED STATES
t
                #*,
aa ns%
                  ,
UNITED STATES
                                    NUCLEAR REGULATORY COMMisslON
#*,
      g             S                           REGION lli
NUCLEAR REGULATORY COMMisslON
      5
,
      0,
g
                    f                      799 ROOSEVELT ROAD
S
                                        GLEN ELLYN ILLINOl$ 60137
REGION lli
        %,*****/'                           3 03137
5
          Docket No. 50-254
f
          Docket No. 50-265
799 ROOSEVELT ROAD
          Commonwealth Edison Company
GLEN ELLYN ILLINOl$ 60137
          ATTN: Mr. Cordell Reed
0,
                  Vice President
%,*****/'
          Post Office Box 767
3 03137
          Chicago, IL 60690
Docket No. 50-254
          This refers to the special safety inspection conducted by Messrs. S. Hare,
Docket No. 50-265
          D. Damon, and F. Clark of this office on November 10-21, 1986, of activities
Commonwealth Edison Company
          at Quad Cities Nuclear Power Station, Units 1 and 2, authorized by NRC
ATTN: Mr. Cordell Reed
          Operating Licenses No. DPR-29 and No. DPR-30, and to the discussion of our
Vice President
          findings with N. Kalvianakis and R. Bax and others of your staff at the
Post Office Box 767
          conclusion of the inspection.
Chicago, IL 60690
          The enclosed copy of our inspection report identifies areas examined during
This refers to the special safety inspection conducted by Messrs. S. Hare,
          the inspection. Within these areas, the inspection consisted of a selective
D. Damon, and F. Clark of this office on November 10-21, 1986, of activities
          examination of procedures and representative records, observations, and
at Quad Cities Nuclear Power Station, Units 1 and 2, authorized by NRC
          interviews with personnel.
Operating Licenses No. DPR-29 and No. DPR-30, and to the discussion of our
          No violations of NRC requirements were identified during the course of this
findings with N. Kalvianakis and R. Bax and others of your staff at the
          inspection. However, significant deficiencies were identified in your
conclusion of the inspection.
          Licensed Operator Requalification Training Program. These deficiencies, as
The enclosed copy of our inspection report identifies areas examined during
          documented in this report require that significant upgrades be made to your
the inspection. Within these areas, the inspection consisted of a selective
          requalification program. Subsequent to these program changes, the revised
examination of procedures and representative records, observations, and
          Requalification Program Topical Report should be sent to the NRC for
interviews with personnel.
          approval. In the interim period, the effectiveness of your short and long
No violations of NRC requirements were identified during the course of this
          term corrective action will be monitored by Region III Operator Licensing
inspection. However, significant deficiencies were identified in your
          personnel through their periodic administration of requalification
Licensed Operator Requalification Training Program. These deficiencies, as
          examinations.
documented in this report require that significant upgrades be made to your
          In accordance with 10 CFR 2.790 of the Connission's regulations, a copy of
requalification program.
          this letter and the enclosed inspection report will be placed in the NRC
Subsequent to these program changes, the revised
          Public Document Room.
Requalification Program Topical Report should be sent to the NRC for
approval.
In the interim period, the effectiveness of your short and long
term corrective action will be monitored by Region III Operator Licensing
personnel through their periodic administration of requalification
examinations.
In accordance with 10 CFR 2.790 of the Connission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC
Public Document Room.
!
!
                  S0$$A$l@fgy
S0$$A$l@fgy
                              PDR
PDR
                                                                                      I I
I
l                                                                               2r 6 /
I
l
2r 6 /


                                        9
9
  -e .
- e
        Commonwealth Edison Company               2
.
                                                                            M08W
Commonwealth Edison Company
        We will gladly discuss any questions you have concerning this inspection.
2
                                                  Sincerely,
M08W
                                                    b)       -
We will gladly discuss any questions you have concerning this inspection.
                                                                  'CU
Sincerely,
                                                  Carl J Paperfello, Director
b)
                                                  Divisi n of Abactor Safety
'CU
          Enclosure: Inspection Report
-
            No. 50-254/86019(DRS); and
Carl J Paperfello, Director
            No. 50-265/86020(DRS)
Divisi n of Abactor Safety
Enclosure:
Inspection Report
No. 50-254/86019(DRS); and
No. 50-265/86020(DRS)
"
"
          cc w/ enclosure:
cc w/ enclosure:
          D. L. Farrar, Director
D. L. Farrar, Director
            of Nuclear Licensing
of Nuclear Licensing
          R. L. Bax, Plant Manager
R. L. Bax, Plant Manager
          DCS/RSB (RIDS)
DCS/RSB (RIDS)
          Licensing Fee Management Branch
Licensing Fee Management Branch
          Resident Inspector, RIII
Resident Inspector, RIII
          Phyllis Dunton, Attorney         _
Phyllis Dunton, Attorney
                                                            .
_
            General's Office, Environmental
.
            Control Division
General's Office, Environmental
Control Division
4
4
                                                3
3
                                                      85r+
85r+
                                                                      F
F
                                                            s
s
                                                                        ,.
,.
                                                                          P
P
          Hare lms       Da o             Clar           B                     allo
allo
                                                                            a
@ HehhPapder,n
                                                              fbick @ HehhPapder,n
fbick
      . -                 .
Hare lms
                                  . . .   -                     --
Da o
Clar
B
a
. -
.
. . .
-
--
}}
}}

Latest revision as of 20:06, 6 December 2024

Forwards Special Safety Insp Repts 50-254/86-19 & 50-265/86-20 on 861110-21.No Violations Noted.Significant Deficiencies Identified in Licensed Operator Requalification Training Program
ML20207P225
Person / Time
Site: Quad Cities  
Issue date: 01/08/1987
From: Paperiello C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20207P226 List:
References
NUDOCS 8701150265
Download: ML20207P225 (2)


See also: IR 05000254/1986019

Text

'.

4

P

,

t

aa ns%

UNITED STATES

    • ,

NUCLEAR REGULATORY COMMisslON

,

g

S

REGION lli

5

f

799 ROOSEVELT ROAD

GLEN ELLYN ILLINOl$ 60137

0,

%,*****/'

3 03137

Docket No. 50-254

Docket No. 50-265

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

This refers to the special safety inspection conducted by Messrs. S. Hare,

D. Damon, and F. Clark of this office on November 10-21, 1986, of activities

at Quad Cities Nuclear Power Station, Units 1 and 2, authorized by NRC

Operating Licenses No. DPR-29 and No. DPR-30, and to the discussion of our

findings with N. Kalvianakis and R. Bax and others of your staff at the

conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection. However, significant deficiencies were identified in your

Licensed Operator Requalification Training Program. These deficiencies, as

documented in this report require that significant upgrades be made to your

requalification program.

Subsequent to these program changes, the revised

Requalification Program Topical Report should be sent to the NRC for

approval.

In the interim period, the effectiveness of your short and long

term corrective action will be monitored by Region III Operator Licensing

personnel through their periodic administration of requalification

examinations.

In accordance with 10 CFR 2.790 of the Connission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

!

S0$$A$l@fgy

PDR

I

I

l

2r 6 /

9

- e

.

Commonwealth Edison Company

2

M08W

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

b)

'CU

-

Carl J Paperfello, Director

Divisi n of Abactor Safety

Enclosure:

Inspection Report

No. 50-254/86019(DRS); and

No. 50-265/86020(DRS)

"

cc w/ enclosure:

D. L. Farrar, Director

of Nuclear Licensing

R. L. Bax, Plant Manager

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Phyllis Dunton, Attorney

_

.

General's Office, Environmental

Control Division

4

3

85r+

F

s

,.

P

allo

@ HehhPapder,n

fbick

Hare lms

Da o

Clar

B

a

. -

.

. . .

-

--