ML20203E269: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 13: Line 13:
| document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE
| page count = 3
| page count = 3
| project = TAC:M98747
| stage = Other
}}
}}


=Text=
=Text=
{{#Wiki_filter:_.           -                           _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ . _ _ _ __ _ _ _ . _ .
{{#Wiki_filter:_.
February 12, 1998
6-February 12, 1998
                                                                                                                                            ~
~
6-  c.
c.
Mr. George Ai Hunger, Jr.
Mr. George Ai Hunger, Jr.
Oltector Lloonsing, MC 62A-1                                                                                                             y PECO Energy Company                                                                                                                           .
Oltector Lloonsing, MC 62A-1 y
1
PECO Energy Company
      ~ Nuclear Group Headquarters
~ Nuclear Group Headquarters 1
.        Corresp ndence Control Desk
Corresp ndence Control Desk
      . P.O. Box No.195
. P.O. Box No.195 l'
: Wayne, PA 19087-0196                                                                                                                         -
: Wayne, PA 19087-0196 i
l' i      


==SUBJECT:==
==SUBJECT:==
PEACH BOTTOM ATOMIC POWER STATION, UNIT 3 - CORRECTION TO
PEACH BOTTOM ATOMIC POWER STATION, UNIT 3 - CORRECTION TO NOVEMBER 25,1997 LETTER ON CORE SARAY PIPING EXAMINATION PLANS -
;                        NOVEMBER 25,1997 LETTER ON CORE SARAY PIPING EXAMINATION PLANS -
(TAC M98747) ;
(TAC M98747) ;                                                                                                             ,


==Dear Mr. Hunger:==
==Dear Mr. Hunger:==
 
[-
[-       By letter dated November 25,1997, the NRC strff accepted your plans for inspection of core                                                 '
By {{letter dated|date=November 25, 1997|text=letter dated November 25,1997}}, the NRC strff accepted your plans for inspection of core spray piping within the reactor vessel for the Peach Bottom Atomic Power Station (PBAPS),
o        spray piping within the reactor vessel for the Peach Bottom Atomic Power Station (PBAPS),
o Unit 3. These plans were described in your letter of May 20,1997. The second sentence of the i
Unit 3. These plans were described in your letter of May 20,1997. The second sentence of the i       first paragraph of page 2 of our November 25,1997, letter refers to PBAPS Unit 2. Since the
first paragraph of page 2 of our {{letter dated|date=November 25, 1997|text=November 25,1997, letter}} refers to PBAPS Unit 2. Since the subject of this corresponconce was limited to PBAPS Unit A Fie reference to Unit 2 is in error.
;        subject of this corresponconce was limited to PBAPS Unit A Fie reference to Unit 2 is in error.
This ser,tence should read as follows:
This ser,tence should read as follows:                                                                                                     ,
Therefore, b : sed on the abcVe, the NRC staff finds that your proposed revision in scope and examination techniques, to that recommendert in BWRVIP-18, to perform inspections of the PB3 [PBAPS Unit 3) core spray piping, is acceptable -
Therefore, b : sed on the abcVe, the NRC staff finds that your proposed revision in scope and examination techniques, to that recommendert in BWRVIP-18, to perform inspections of the PB3 [PBAPS Unit 3) core spray piping, is acceptable -
for one operating cycle while the NRC staff ccmpletes its review of BWRVIP-18.
for one operating cycle while the NRC staff ccmpletes its review of BWRVIP-18.
{       Please contact me at (301) 415-1470 if you have questions on this topic.
{
[.                                                                   Sincerely, ~
Please contact me at (301) 415-1470 if you have questions on this topic.
[.
Sincerely, ~
JosepkF. Williams; Project Manager
JosepkF. Williams; Project Manager
[                                                                   Project Directorate 1-2 ' _                                                   >
[
Project Directorate 1-2 ' _
e Division of Reactor Projects - t/ll Office of Nuclear Reactor Regulation -
e Division of Reactor Projects - t/ll Office of Nuclear Reactor Regulation -
:        Docket Nos. 50-277/50-278                                                                                                       i cc: Eee next page                                                                                                                   7 DISTRIBUTION i         Docket File PUBLIC PDI-2 Reading                                                                                                             n e        JZwolinski                                                                                                                \1
Docket Nos. 50-277/50-278 i
cc: Eee next page 7
DISTRIBUTION i
Docket File PUBLIC PDI-2 Reading n
(
(
JStolz
e JZwolinski
:        JWilliams I         MO'Brien
\\1 JStolz JWilliams I
!        OGC i         ACRS ESullivan                                                                                                                             ^
MO'Brien OGC i
;[       CAnderson; RGN-l OFFICE       PDI-2/PM h P"Di-[GGb %2/D NAME        JWilliamsd         Md'Briek                       JStb j         DATE         2 l'I /98 '         M/ \ /98                     bM98                                                                   '
ACRS ESullivan
OFFICIAL RECORD COPY i
^
DOCUMENT NAME: PB98747 COR                                                                               p g.         O         y
;[
: j.                                                                                                       " " ' '  "  ~ ' "   "      'J 9802270005 980212 PDR       ADOCK 05000277 G
CAnderson; RGN-l OFFICE PDI-2/PM h P"Di-[GGb
  >                                PDR                                                                               a c . . .
%2/D JWilliamsd Md'Briek JStb NAME j
          ~                                                                                              _ 3ya
DATE 2 l'I /98 '
M/ \\ /98 bM98 i
OFFICIAL RECORD COPY DOCUMENT NAME: PB98747 COR p g.
O y
j.
'J
~ ' "
9802270005 980212 PDR ADOCK 05000277 G
PDR a c...
_ 3ya
~


    ,      pmurg                                                                                                                                             1
pmurg 1
        ,y             i                                                                                     UNITED STATES 1
,y i
g               g            NUCLEAR REGULATORY COMMISSION o                                                                                                WASHINGTON D.C. 20066 4 001 Y
UNITED STATES
        %*****p$                                                                                                February 12, 1998 Mr. George A. Hunger, Jr.                                                                                                                         -
#1 g
g NUCLEAR REGULATORY COMMISSION
%*****p$
WASHINGTON D.C. 20066 4 001 o
Y February 12, 1998 Mr. George A. Hunger, Jr.
Director-Licensing, MC 62A-1 PECO Energy Company Nuclear Group Headquart6,rs Correspondence Control Desk P.O. Box No.195 Wayne, PA 19087-0195
Director-Licensing, MC 62A-1 PECO Energy Company Nuclear Group Headquart6,rs Correspondence Control Desk P.O. Box No.195 Wayne, PA 19087-0195


Line 69: Line 88:
  ?EACH BOTTOM ATOMIC POWER STATION, UNIT 3 - CORRECTION TO NOVEMBER 25,1997 LETTER ON CORE SPRAY PIPING EXAMINATION PLANS (TAC M98747)
  ?EACH BOTTOM ATOMIC POWER STATION, UNIT 3 - CORRECTION TO NOVEMBER 25,1997 LETTER ON CORE SPRAY PIPING EXAMINATION PLANS (TAC M98747)
Dear Mr. Hunger.
Dear Mr. Hunger.
By letter dated November 25,1997, the NRC staff accepted your plans for inspection of core sprar Ming within the reactor vessel for the reach Bottom Atomic Power Station (PBAPS),
By {{letter dated|date=November 25, 1997|text=letter dated November 25,1997}}, the NRC staff accepted your plans for inspection of core sprar Ming within the reactor vessel for the reach Bottom Atomic Power Station (PBAPS),
Unit 4. T hese plans were described in , or letter of May 20,1997. The second sentence of the first paragraph of page 2 of our November 25,1997, letter refers to PBAPS Unit 2. Since the subject of this correspondence was limited to PBAPS Unit 3, the reference to Unit 2 is in error.
Unit 4. T hese plans were described in, or letter of May 20,1997. The second sentence of the first paragraph of page 2 of our {{letter dated|date=November 25, 1997|text=November 25,1997, letter}} refers to PBAPS Unit 2. Since the subject of this correspondence was limited to PBAPS Unit 3, the reference to Unit 2 is in error.
l           This sentence should read as follows:
l This sentence should read as follows:
i Therefore, based on the above, the NRC staff finds that your proposed revision in scope and examination techniques, to that recommended in BWRVIP-18, to perform inspections of the PB3 [PSAPS Unit 3] core spray piping, is acceptable for one operating cycle while the NRC staff completes its review of BWRVIP-18.
Therefore, based on the above, the NRC staff finds that your proposed revision in i
scope and examination techniques, to that recommended in BWRVIP-18, to perform inspections of the PB3 [PSAPS Unit 3] core spray piping, is acceptable for one operating cycle while the NRC staff completes its review of BWRVIP-18.
Please contact me at (301) 415-1470 if you have questions on this topic.
Please contact me at (301) 415-1470 if you have questions on this topic.
Sincerely,
Sincerely,
                                                                                                                    /g/
/g/
J i         m Joseph F. Williams, Project Manager Project Directorate 1-2 Division of Reactor Projects - t/ll Office of Nuclear Reactor Regula*Jon Docket Nos. 50 277/50-278 cc Ses next page
J i
m Joseph F. Williams, Project Manager Project Directorate 1-2 Division of Reactor Projects - t/ll Office of Nuclear Reactor Regula*Jon Docket Nos. 50 277/50-278 cc Ses next page


f 1
f 1
Mr. George A. Hunger, Jr.                                     Peach Bottom Atomic Power Station, PECO Er, orgy Ccmpany .                                         Units 2 and 3 cc:
Mr. George A. Hunger, Jr.
J. W. Durham, Sr., Esquire                                     Chief-Division of Nuclear Safety Sr. V.P. & General Counsel                                     PA Dept. of PECO Energy Company                                             Environmental Resources 2301 Market Street, S26-1                                       P.O. Box 6469                             '
Peach Bottom Atomic Power Station, PECO Er, orgy Ccmpany.
Philadelphia, PA 19101                                         Harrisburg, PA 17105-8469 PECO Energy Company ATTN: Mr. T. N. Mitchell, Vice Presim,t                         Board of Supervisors Peach Bottom Atomic Power Station                               Peach Bottom Township 1848 Lay Road                                                   R.D.#1 Delta, PA 17314                                                 Delta, PA 17314 PECO Energy Company                                             Public Service Commission of Maryland
Units 2 and 3 cc:
                    ' ATTN: Regulatory Engineer, A4-SS .                             Engineering Division Peach Bottom Atomic Power Station                               Chief Engineer 1848 Lay Road 6 St. Paul Centre Delta, PA- 17314                                               Bahimere, MD 21202-6806
J. W. Durham, Sr., Esquire Chief-Division of Nuclear Safety Sr. V.P. & General Counsel PA Dept. of PECO Energy Company Environmental Resources 2301 Market Street, S26-1 P.O. Box 6469 Philadelphia, PA 19101 Harrisburg, PA 17105-8469 PECO Energy Company ATTN: Mr. T. N. Mitchell, Vice Presim,t Board of Supervisors Peach Bottom Atomic Power Station Peach Bottom Township 1848 Lay Road R.D.#1 Delta, PA 17314 Delta, PA 17314 PECO Energy Company Public Service Commission of Maryland
                    ' Resident inspector                                             Mr. Richard McLean U.S. Nuclear Regulatory Commission Power Plant and Environmental Peach Bottom Atomic Power Station                               Review Division P.O. Box 399                                                   Department of Natural Resources Delta, PA 17314 B-3, Tawes State Office Building Annapolis, MD 21401 Regional Administrator, Region i U.S. Nuclear Regulatory Commission                             Dr. Judith Johnsrud
' ATTN: Regulatory Engineer, A4-SS.
                  - 475 Allendale Road                                               National Energy Committee King of Prussia, PA 19406                                       Sierra Club 433 Orlando Avenue Mr. Roland Fletcher                                             State College, PA 16803 Department of Environment 201 West Preston Street                                         Manager-Financial Control & Co-Owner Baltimore, MD 21201                                             Affairs Public Service Electric and Gas A. F. Kirby,111                                                 Company Extemal Operations - Nuclear                                   P.O. Box 236 Delmarva Power & Light Company                                 Hancocks Bridge, NJ 08038-0236 P.O. Box 231 Wilming'on, DE 19899 Manager-Peach Bottom Licensing PECO Energy Company PECO Energy Company                                           Nuclear Group Headquarters Plant Manager                                                 Correspondence Control Desk Peach Bottom Atomic Power Station                             P.O. Box No.195 1848 Lay Road                                                 Wayne, PA 19087-0195 Delta, PA 17314
Engineering Division Peach Bottom Atomic Power Station Chief Engineer 1848 Lay Road 6 St. Paul Centre Delta, PA-17314 Bahimere, MD 21202-6806
                                                                                                                            -- _}}
' Resident inspector Mr. Richard McLean U.S. Nuclear Regulatory Commission Power Plant and Environmental Peach Bottom Atomic Power Station Review Division P.O. Box 399 Department of Natural Resources Delta, PA 17314 B-3, Tawes State Office Building Annapolis, MD 21401 Regional Administrator, Region i U.S. Nuclear Regulatory Commission Dr. Judith Johnsrud
- 475 Allendale Road National Energy Committee King of Prussia, PA 19406 Sierra Club 433 Orlando Avenue Mr. Roland Fletcher State College, PA 16803 Department of Environment 201 West Preston Street Manager-Financial Control & Co-Owner Baltimore, MD 21201 Affairs Public Service Electric and Gas A. F. Kirby,111 Company Extemal Operations - Nuclear P.O. Box 236 Delmarva Power & Light Company Hancocks Bridge, NJ 08038-0236 P.O. Box 231 Wilming'on, DE 19899 Manager-Peach Bottom Licensing PECO Energy Company PECO Energy Company Nuclear Group Headquarters Plant Manager Correspondence Control Desk Peach Bottom Atomic Power Station P.O. Box No.195 1848 Lay Road Wayne, PA 19087-0195 Delta, PA 17314
-- _}}

Latest revision as of 01:29, 8 December 2024

Informs That Proposed Rev in Scope & Exam Techniques,To That Recommended in BWRVIP-18,to Perform Insps of Plant,Unit 3 Core Spray Piping,Acceptable,Based on Listed Info
ML20203E269
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 02/12/1998
From: Shawn Williams
NRC (Affiliation Not Assigned)
To: Hunger G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
References
TAC-M98747, NUDOCS 9802270005
Download: ML20203E269 (3)


Text

_.

6-February 12, 1998

~

c.

Mr. George Ai Hunger, Jr.

Oltector Lloonsing, MC 62A-1 y

PECO Energy Company

~ Nuclear Group Headquarters 1

Corresp ndence Control Desk

. P.O. Box No.195 l'

Wayne, PA 19087-0196 i

SUBJECT:

PEACH BOTTOM ATOMIC POWER STATION, UNIT 3 - CORRECTION TO NOVEMBER 25,1997 LETTER ON CORE SARAY PIPING EXAMINATION PLANS -

(TAC M98747) ;

Dear Mr. Hunger:

[-

By letter dated November 25,1997, the NRC strff accepted your plans for inspection of core spray piping within the reactor vessel for the Peach Bottom Atomic Power Station (PBAPS),

o Unit 3. These plans were described in your letter of May 20,1997. The second sentence of the i

first paragraph of page 2 of our November 25,1997, letter refers to PBAPS Unit 2. Since the subject of this corresponconce was limited to PBAPS Unit A Fie reference to Unit 2 is in error.

This ser,tence should read as follows:

Therefore, b : sed on the abcVe, the NRC staff finds that your proposed revision in scope and examination techniques, to that recommendert in BWRVIP-18, to perform inspections of the PB3 [PBAPS Unit 3) core spray piping, is acceptable -

for one operating cycle while the NRC staff ccmpletes its review of BWRVIP-18.

{

Please contact me at (301) 415-1470 if you have questions on this topic.

[.

Sincerely, ~

JosepkF. Williams; Project Manager

[

Project Directorate 1-2 ' _

e Division of Reactor Projects - t/ll Office of Nuclear Reactor Regulation -

Docket Nos. 50-277/50-278 i

cc: Eee next page 7

DISTRIBUTION i

Docket File PUBLIC PDI-2 Reading n

(

e JZwolinski

\\1 JStolz JWilliams I

MO'Brien OGC i

ACRS ESullivan

^

[

CAnderson; RGN-l OFFICE PDI-2/PM h P"Di-[GGb

%2/D JWilliamsd Md'Briek JStb NAME j

DATE 2 l'I /98 '

M/ \\ /98 bM98 i

OFFICIAL RECORD COPY DOCUMENT NAME: PB98747 COR p g.

O y

j.

'J

~ ' "

9802270005 980212 PDR ADOCK 05000277 G

PDR a c...

_ 3ya

~

pmurg 1

,y i

UNITED STATES

  1. 1 g

g NUCLEAR REGULATORY COMMISSION

%*****p$

WASHINGTON D.C. 20066 4 001 o

Y February 12, 1998 Mr. George A. Hunger, Jr.

Director-Licensing, MC 62A-1 PECO Energy Company Nuclear Group Headquart6,rs Correspondence Control Desk P.O. Box No.195 Wayne, PA 19087-0195

SUBJECT:

?EACH BOTTOM ATOMIC POWER STATION, UNIT 3 - CORRECTION TO NOVEMBER 25,1997 LETTER ON CORE SPRAY PIPING EXAMINATION PLANS (TAC M98747)

Dear Mr. Hunger.

By letter dated November 25,1997, the NRC staff accepted your plans for inspection of core sprar Ming within the reactor vessel for the reach Bottom Atomic Power Station (PBAPS),

Unit 4. T hese plans were described in, or letter of May 20,1997. The second sentence of the first paragraph of page 2 of our November 25,1997, letter refers to PBAPS Unit 2. Since the subject of this correspondence was limited to PBAPS Unit 3, the reference to Unit 2 is in error.

l This sentence should read as follows:

Therefore, based on the above, the NRC staff finds that your proposed revision in i

scope and examination techniques, to that recommended in BWRVIP-18, to perform inspections of the PB3 [PSAPS Unit 3] core spray piping, is acceptable for one operating cycle while the NRC staff completes its review of BWRVIP-18.

Please contact me at (301) 415-1470 if you have questions on this topic.

Sincerely,

/g/

J i

m Joseph F. Williams, Project Manager Project Directorate 1-2 Division of Reactor Projects - t/ll Office of Nuclear Reactor Regula*Jon Docket Nos. 50 277/50-278 cc Ses next page

f 1

Mr. George A. Hunger, Jr.

Peach Bottom Atomic Power Station, PECO Er, orgy Ccmpany.

Units 2 and 3 cc:

J. W. Durham, Sr., Esquire Chief-Division of Nuclear Safety Sr. V.P. & General Counsel PA Dept. of PECO Energy Company Environmental Resources 2301 Market Street, S26-1 P.O. Box 6469 Philadelphia, PA 19101 Harrisburg, PA 17105-8469 PECO Energy Company ATTN: Mr. T. N. Mitchell, Vice Presim,t Board of Supervisors Peach Bottom Atomic Power Station Peach Bottom Township 1848 Lay Road R.D.#1 Delta, PA 17314 Delta, PA 17314 PECO Energy Company Public Service Commission of Maryland

' ATTN: Regulatory Engineer, A4-SS.

Engineering Division Peach Bottom Atomic Power Station Chief Engineer 1848 Lay Road 6 St. Paul Centre Delta, PA-17314 Bahimere, MD 21202-6806

' Resident inspector Mr. Richard McLean U.S. Nuclear Regulatory Commission Power Plant and Environmental Peach Bottom Atomic Power Station Review Division P.O. Box 399 Department of Natural Resources Delta, PA 17314 B-3, Tawes State Office Building Annapolis, MD 21401 Regional Administrator, Region i U.S. Nuclear Regulatory Commission Dr. Judith Johnsrud

- 475 Allendale Road National Energy Committee King of Prussia, PA 19406 Sierra Club 433 Orlando Avenue Mr. Roland Fletcher State College, PA 16803 Department of Environment 201 West Preston Street Manager-Financial Control & Co-Owner Baltimore, MD 21201 Affairs Public Service Electric and Gas A. F. Kirby,111 Company Extemal Operations - Nuclear P.O. Box 236 Delmarva Power & Light Company Hancocks Bridge, NJ 08038-0236 P.O. Box 231 Wilming'on, DE 19899 Manager-Peach Bottom Licensing PECO Energy Company PECO Energy Company Nuclear Group Headquarters Plant Manager Correspondence Control Desk Peach Bottom Atomic Power Station P.O. Box No.195 1848 Lay Road Wayne, PA 19087-0195 Delta, PA 17314

-- _