{{#Wiki_filter:_ _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ | {{#Wiki_filter:_ _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ | ||
O APPENDIX A NOTICE OF VIOLATION | O APPENDIX A NOTICE OF VIOLATION Public Service Company of Colorsdo Docket: | ||
Public Service Company of Colorsdo | 50-267 Fort St. Vrain Nuclear Generating Station Operating License: DRP-34 l | ||
Fort St. Vrain Nuclear Generating Station | l During an NRC inspection conducted on September 26-30, 1988, a vio!<Aian of Nr.C requirements was identified. | ||
l During an NRC inspection conducted on September 26-30, 1988, a vio!<Aian of Nr.C | The violation involved a failure to 6Hlow d | ||
requirements was identified. The violation involved a failure to 6Hlow procedures. In accordance with the "General Statement of Policy ved Procedure for NRC Enforcement Actions," 10 CF! Part 2. Appendir C (1988), ch* violation is listed below: | procedures. | ||
Fort St. Vrain Nuclear Generating Station Technical Specificatfor. AC7.4.a. | In accordance with the "General Statement of Policy ved Procedure for NRC Enforcement Actions," 10 CF! Part 2. Appendir C (1988), ch* violation is listed below: | ||
requires that, "Written procedures shall be established, implemented, arid | Fort St. Vrain Nuclear Generating Station Technical Specificatfor. AC7.4.a. | ||
maintained covering . . . 1. The applicable proceduras recommended in | requires that, "Written procedures shall be established, implemented, arid maintained covering... | ||
1. | |||
The applicable proceduras recommended in L | |||
Appendix A of Safety Guide 33, November 1972." Safety Guide 33 includes fire safety prevention. | |||
Procedure P-8, "Fire Fighting and Prevention," states that the use of combustibles in plant operating areas may be allowed temporarily and only when immediate use is intended; combustibles must be removed f.om the area when not being used. | Procedure P-8, "Fire Fighting and Prevention," states that the use of combustibles in plant operating areas may be allowed temporarily and only when immediate use is intended; combustibles must be removed f.om the area when not being used. | ||
Contrary to the above, the licensee has established a radwaste storage | Contrary to the above, the licensee has established a radwaste storage area on Elevation 4771 feet of the reactor building. | ||
area on Elevation 4771 feet of the reactor building. This storage area i | This storage area i | ||
i This is a Severity Level V violation. | and the combustibles within it had not been identified in the Appendix R evaluation report or in the justification prcvided in conjunction with the licensee's exemption request for the reactor building. | ||
letter transmitting this Notice, a written statement or explanation in reply, | i This is a Severity Level V violation. | ||
(Supplement 1)(267/8821-04) i Pursuant to the provisions of 10 CFR 2.201, Public Service Comoany of Colorado is hereby required to submit to this office, within 30 days of the date of the L | |||
letter transmitting this Notice, a written statement or explanation in reply, including for each violation: | |||
: 4) the date when full compliance will be achieved. Where good cause is shown, consideration will be given to extending the response time. | (1) the reason for the violation if admitted, l | ||
: 2) the corrective steps which have been taken and the results achieved, j | |||
l | |||
: 3) the corrective steps which will be taken to avoid further violations, and | |||
: 4) the date when full compliance will be achieved. Where good cause is shown, consideration will be given to extending the response time. | |||
i j | i j | ||
i j | i j | ||
Dated at Arlington, Texas, j | |||
this day of 1988. | |||
I t | I t | ||
G812050331 001110 PDR | G812050331 001110 PDR ADOCK 05000P67 0 | ||
PDH l | |||
t 2 | t 2 | ||
i steps that have been taken and the results achieved. (3) the corrective steps that will be taken to avoid further deviations, and (4) the date when full | i steps that have been taken and the results achieved. (3) the corrective steps that will be taken to avoid further deviations, and (4) the date when full s | ||
Dated at Arlington, is. | compliance will be achieved. Where good cause is shown, consideration will be given to extending the response time. | ||
l L | |||
Dated at Arlington, is. | |||
3, a | |||
thh day cf 1980. | |||
+ | + | ||
f i | f i | ||
| Line 49: | Line 62: | ||
I I | I I | ||
l 1 | l 1 | ||
f d | f I | ||
d I | |||
I I | I I | ||
l | l | ||
'}} | |||
Latest revision as of 01:18, 7 December 2024
| ML20206N085 | |
| Person / Time | |
|---|---|
| Site: | Fort Saint Vrain |
| Issue date: | 11/18/1988 |
| From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | |
| Shared Package | |
| ML20206L974 | List: |
| References | |
| 50-267-88-21, NUDOCS 8812050331 | |
| Download: ML20206N085 (1) | |
Text
_ _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _
O APPENDIX A NOTICE OF VIOLATION Public Service Company of Colorsdo Docket:
50-267 Fort St. Vrain Nuclear Generating Station Operating License: DRP-34 l
l During an NRC inspection conducted on September 26-30, 1988, a vio!<Aian of Nr.C requirements was identified.
The violation involved a failure to 6Hlow d
procedures.
In accordance with the "General Statement of Policy ved Procedure for NRC Enforcement Actions," 10 CF! Part 2. Appendir C (1988), ch* violation is listed below:
Fort St. Vrain Nuclear Generating Station Technical Specificatfor. AC7.4.a.
requires that, "Written procedures shall be established, implemented, arid maintained covering...
1.
The applicable proceduras recommended in L
Appendix A of Safety Guide 33, November 1972." Safety Guide 33 includes fire safety prevention.
Procedure P-8, "Fire Fighting and Prevention," states that the use of combustibles in plant operating areas may be allowed temporarily and only when immediate use is intended; combustibles must be removed f.om the area when not being used.
Contrary to the above, the licensee has established a radwaste storage area on Elevation 4771 feet of the reactor building.
This storage area i
and the combustibles within it had not been identified in the Appendix R evaluation report or in the justification prcvided in conjunction with the licensee's exemption request for the reactor building.
i This is a Severity Level V violation.
(Supplement 1)(267/8821-04) i Pursuant to the provisions of 10 CFR 2.201, Public Service Comoany of Colorado is hereby required to submit to this office, within 30 days of the date of the L
letter transmitting this Notice, a written statement or explanation in reply, including for each violation:
(1) the reason for the violation if admitted, l
- 2) the corrective steps which have been taken and the results achieved, j
l
- 3) the corrective steps which will be taken to avoid further violations, and
- 4) the date when full compliance will be achieved. Where good cause is shown, consideration will be given to extending the response time.
i j
i j
Dated at Arlington, Texas, j
this day of 1988.
I t
G812050331 001110 PDR ADOCK 05000P67 0
PDH l
t 2
i steps that have been taken and the results achieved. (3) the corrective steps that will be taken to avoid further deviations, and (4) the date when full s
compliance will be achieved. Where good cause is shown, consideration will be given to extending the response time.
l L
Dated at Arlington, is.
3, a
thh day cf 1980.
+
f i
I i
i 4
I I
l 1
f I
d I