ML20066D891: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot change
StriderTol Bot change
 
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:.
{{#Wiki_filter:.
APPENDIX D AVERAGE DAILY POWER LEVEL DOCl(ET NO. 000-0325 UNIT BRUNSWICl( UNIT 1 DATE 11/02/82 COMPLETED DY FRANCES HARRISON TELEPHONE ( 919 ) <157-9521 OCTODER               1982 DAY       AVG. DAILY POWER LEVEL         DAY AVO. DAILY POWER LEVEL (MWE-NCT~,                           (MWE-NLT) 1                 -10                   17             -6 2                   -10                   18             319 3                   -10                   19             404 el                 -11                   20             414 0                   -10                   21             407 6                   -10                   22             -14 7                   -10                   23             -13 0                   -10                   24             -11 9                   -11                   25               4 l
APPENDIX D AVERAGE DAILY POWER LEVEL DOCl(ET NO. 000-0325 UNIT BRUNSWICl( UNIT 1 DATE 11/02/82 COMPLETED DY FRANCES HARRISON TELEPHONE ( 919 ) <157-9521 OCTODER 1982 DAY AVG. DAILY POWER LEVEL DAY AVO. DAILY POWER LEVEL (MWE-NCT~,
1 10                   -12                   26             401 f                           ,
(MWE-NLT) 1
11                   -12                   27             463 12                   -11                   28             600 1
-10 17
13                   -12                   29             576 l ei                 -12                   30             493 l 15                   -10                   31             526 16                   -11 1.16 - 0 8211120327 821104 PDR ADOCK 05000324 R                 PDR
-6 2
-10 18 319 3
-10 19 404 el
-11 20 414 0
-10 21 407 6
-10 22
-14 7
-10 23
-13 0
-10 24
-11 9
-11 25 4
l 1
10
-12 26 401 f
11
-12 27 463 12
-11 28 600 1
13
-12 29 576 l ei
-12 30 493 l
15
-10 31 526 16
-11 1.16 - 0 8211120327 821104 PDR ADOCK 05000324 R
PDR


i                                                                                                                               1 OPERATING DATA REPORT pAit J AEET11/o4      NO,/8a053-0325 COMPLETED BY FRANCE 5 HARRISON t
i 1
OPERATING DATA REPORT pAit AEET NO,/8a053-0325 11/o4 J
COMPLETED BY FRANCE 5 HARRISON t
TELEPHONE 919-457-9521
TELEPHONE 919-457-9521
      .:FERATING STATU?
.:FERATING STATU?
: 1. UNIT NAME: BRUNSWICK UNIT 1                           I NOTES                                                       I
1.
: 2. , REPORTING PERIOD: OCTOBER 82                         ]                                                             I
UNIT NAME: BRUNSWICK UNIT 1 I NOTES I
: 3. LICENSED THERr'ALfPOWER (MWT): 2436                   I                                                             I 4, NAMEPLATE RATING tCROS5 MWE): 867.0                   I                                                             I
: 2., REPORTING PERIOD: OCTOBER 82
: 5. DESIGN ELECTRICAL RATING (NET MWE) : 821.0 I                                                                         I
]
: 6. MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 I                                                                         I
I
: 7. MAX DEPENDABLE CADACITY (NET MWE) 790.0
: 3. LICENSED THERr'ALfPOWER (MWT): 2436 I
: 8. IF CHANGES OCCUR IN CAPACIT( RATINGS (ITEMS 3 THRU 7) SINCE LAST REFORT, GIVE, REASONS:
I 4,
: 9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): NONE la. REASONS IJP RESTRICTION IF ANY:
NAMEPLATE RATING tCROS5 MWE): 867.0 I
I
: 5. DESIGN ELECTRICAL RATING (NET MWE) : 821.0 I
I
: 6. MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 I I
: 7. MAX DEPENDABLE CADACITY (NET MWE) 790.0 8.
IF CHANGES OCCUR IN CAPACIT( RATINGS (ITEMS 3 THRU 7) SINCE LAST REFORT, GIVE, REASONS:
9.
POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): NONE la. REASONS IJP RESTRICTION IF ANY:
i.
i.
THIS                       YR TO                 CUMUL MONTH                           DATE               ATIVE
THIS YR TO CUMUL MONTH DATE ATIVE
: 11. HOURS IN REPGRTING PERIOD                                   745.0                     7296.0             49297.0
: 11. HOURS IN REPGRTING PERIOD 745.0 7296.0 49297.0
: 12. NUMDER OF HOURS REACTOR WA5 CRITIC AL                         309.6                     4661.6             32926.9 13, 3.EACTOR RESEh')E SHUTDOWN HUUR9                                   0.0                           6.0           1647.1
: 12. NUMDER OF HOURS REACTOR WA5 CRITIC AL 309.6 4661.6 32926.9 13, 3.EACTOR RESEh')E SHUTDOWN HUUR9 0.0 6.0 1647.1
: 14. HOURS GENERATOR ON LINE                                     244.2                     4468.7             31003.a
: 14. HOURS GENERATOR ON LINE 244.2 4468.7 31003.a
: 15. UNIT RESERVE SHUTDOWN HOURS                                       3.0                           0.0               0.0
: 15. UNIT RESERVE SHUTDOWN HOURS 3.0 0.0 0.0
: 16. GROSS THERMAL ENERGY GENERATED ( MWH)                 359033.6                   7900320.5           62318125.1
: 16. GROSS THERMAL ENERGY GENERATED ( MWH) 359033.6 7900320.5 62318125.1
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH)               115714.0                   2541153.0           20542361.0
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 115714.0 2541153.0 20542361.0
: 18. NET ELECT 3l:ICIAL ENERGY GENERATED ( PNH)           105927.0                   2425399.6* 19728896.0
: 18. NET ELECT 3l:ICIAL ENERGY GENERATED ( PNH) 105927.0 2425399.6* 19728896.0
: 19. UNIT SERjfCE F ETOR                                             32.8                         61.2               62.9
: 19. UNIT SERjfCE F ETOR 32.8 61.2 62.9
: 20. UNIT 4/AlLABILITi FAC MR                                         32.3                         61.2               62.9 i_1. UNIT CAPACITY FACTOR (USING MDC NET)                           18.0                         4,2 .1             50.7
: 20. UNIT 4/AlLABILITi FAC MR 32.3 61.2 62.9 i_1.
: 22. UNIT CAPACITY FACTOR (USING DER NET)                             17.3                         40.5               48.7
UNIT CAPACITY FACTOR (USING MDC NET) 18.0 4,2.1 50.7
: 25. UNIT FOM ED OUTACE RATE                                         67.2                         37.4               24.7
: 22. UNIT CAPACITY FACTOR (USING DER NET) 17.3 40.5 48.7
: 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION                                     OF EACH):
: 25. UNIT FOM ED OUTACE RATE 67.2 37.4 24.7
: 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
Refueling 11/27/82 - 5/12/83 s
Refueling 11/27/82 - 5/12/83 s
: 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:                                           0/ O/ 9
: 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
: 26. UNITS IN TEST :.laiU3 (PRIOR TO COMMERICI AL OPERATION): FORCA5T                                       ACHEIVED INITIAL CRITICALITY                                                         --------        --------
0/ O/ 9
INITIAL ELECTRICITY                                                         --------        --------
: 26. UNITS IN TEST :.laiU3 (PRIOR TO COMMERICI AL OPERATION): FORCA5T ACHEIVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERICI AL OPERATIO!?
COMMERICI AL OPERATIO!?                                                       --------        --------
1.16 - O
1.16 - O
* Year To Date & Cumulative have been adjusted to reflect correction made to Sept.
* Year To Date & Cumulative have been adjusted to reflect correction made to Sept.
report of 1 mwh.
report of 1 mwh.
s                           t s                                   ,
s t
g
s g
_s  ,
--w a
-e
-~
s


APPENDIX DOCKET NO.:   050-325 UNIT:   Brunswick No. 1 DATE: November 1982 COMPLETED BY:   Francis Harrison OPERATIONS  
APPENDIX DOCKET NO.:
050-325 UNIT:
Brunswick No. 1 DATE: November 1982 COMPLETED BY:
Francis Harrison OPERATIONS  


==SUMMARY==
==SUMMARY==
BRUNSWICK UNIT NO. 1 Brunswick Unit No. I returned to service on October 17, 1982, after the Integrated Leak Rate Testing outage. The unit operated at 32.8 percent availability factor and 18.0 percent capacity factor. There were three off-line outages and two power reductions.
BRUNSWICK UNIT NO. 1 Brunswick Unit No. I returned to service on October 17, 1982, after the Integrated Leak Rate Testing outage. The unit operated at 32.8 percent availability factor and 18.0 percent capacity factor. There were three off-line outages and two power reductions.
The Integrated Leak Rate Testing Outage detailed report will follow at a later date when completed.
The Integrated Leak Rate Testing Outage detailed report will follow at a later date when completed.
There are 476 BWR and     160 PWR spent fuel bundles in the Brunswick Unit No. 1 fuel pool.
There are 476 BWR and 160 PWR spent fuel bundles in the Brunswick Unit No. 1 fuel pool.


_i o __
_i o __
O                                                                             n o
O n
UNITSilUTDOWNS AND POWER REDUCTIONS                                 DOCKET NO.       050-0325                 .
o UNITSilUTDOWNS AND POWER REDUCTIONS DOCKET NO.
UNIT NASIE Brunswick I DATE November 1982 REPORT MONTil October                                     COMPLETED BY Froncoa Morriann TELEPHONE (919) 457-9521 "E                                       -
050-0325 UNIT NASIE Brunswick I DATE November 1982 REPORT MONTil October COMPLETED BY Froncoa Morriann TELEPHONE (919) 457-9521 "E
.! E S
.h.5 k Licensee
,E%
be.
No.
No.
                              ;,    .! E        S      .h .5 k        Licensee              ,E%        be.
Date Cause & Corrective g
Date     g       3g           g     ,3 g 5                                                                Cause & Corrective H
3g g
                                    $5          5 Event               u?       83                           Action to ji5g 6
,3 g 5 Event u?
Report #             @G
83 Action to H
[u                     Prevent Recurrence 82-92A     821010       2   Unit         A         1           %                  IE       VALVEX was                                                                            Reactor scram - manual - scram due to down.                                                                         relief valve F013J stuck open.
$5 5
At, temp-ting I&C replaced solenoid valve and as a precautionary measure Mechanical                 ,
ji5g Report #
to Maintenance replaced the pilot Startup                                                                       assembly.
@G
[u Prevent Recurrence 6
82-92A 821010 2
Unit A
1 IE VALVEX Reactor scram - manual - scram due to was down.
relief valve F013J stuck open.
At, temp-I&C replaced solenoid valve and as a ting precautionary measure Mechanical to Maintenance replaced the pilot Startup assembly.
h
h
                                                                                                                                                                          .i I                   2                                                                                                                                 .
.i I
F: Forced                                                                       3                                  4 Reason:
2 3
S: Schedufed                                                                         Method:
F: Forced Reason:
A Equipment Failure (Explain)                                   1-Manual Exhibit G-Instructions           -
4 Method:
B-Maintenance of Test                                                                               for Preparation of Data       '
S: Schedufed A Equipment Failure (Explain) 1-Manual Exhibit G-Instructions B-Maintenance of Test for Preparation of Data 2 Manual Scrarn.
2 Manual Scrarn.                   Entry Sheets for Licensee
Entry Sheets for Licensee C Refueling 3 Automatic Scram.
        '                C Refueling D. Regulatory Restriction                                        3 Automatic Scram.                 Event Report (LER) File (NUREG .
Event Report (LER) File (NUREG.
I' Opee.iion Ti iining & I.leense IIxaminatloa                 4-Continuations                     0161) 12-Adnunistiative                                               5-Load Reductions G-Operational Error (Explain)                                                                   5 (9/77)                 li-Other (Explain)                                             6-Other                            Exhibit !- Same Source
D. Regulatory Restriction I' Opee.iion Ti iining & I.leense IIxaminatloa 4-Continuations 0161) 12-Adnunistiative 5-Load Reductions 5
G-Operational Error (Explain) 6-Other Exhibit !- Same Source (9/77) li-Other (Explain)


                                                                                                                                                          ,, e. __ , , _ _
,, e. __,, _ _
O n
O n
o UNITSilUTDOWNS AND POWER REDUCTIONS                                   DOCKET NO. 050-0325                                           ,
o UNITSilUTDOWNS AND POWER REDUCTIONS DOCKET NO. 050-0325 UNIT NAh!E Brunswick 1 DATE _ November 1982.
UNIT NAh!E Brunswick 1 DATE _ November 1982.
REPORT MONTil _0c tober COMPLETED By Frances Harrison TELEPHONE (414) 457-9521 e.
REPORT MONTil _0c tober                                 COMPLETED By Frances Harrison TELEPHONE (414) 457-9521
t
: e.    .
=
t                                         -
re
                              ~
.3 -x =
                                      =          re     .3 -x =                                         E a5d y,""
E 5 _E E
    '            y, #         u     5 _E        E                        Licensee Ev.     g*o                                                                       '
a5d Licensee
gge                                                                      Cause & Currective h     y .g       g                             Event         p                                                                                .
~
g]
y,""
: g.                           Action to c0
y, #
* y i3 5               Report #           mO Prevent Recurrence 6                                                                                                                  -
u Ev.
82-92B     821014         F   Unit was       A                               NA             IE   VALVEX 1
g*o Cause & Currective h
Re' actor shutdown due to problems with.
y.g g
* down.
gge Event g]
p g.
Action to y i3 5 Report #
mO c0 Prevent Recurrence
_6 82-92B 821014 F
Unit was A
1 NA IE VALVEX Re' actor shutdown due to problems with.
down.
F013D and E safecy relief valve.
F013D and E safecy relief valve.
                                . Attempt-
Attempt-ing.to Action dependent on outcome of root sta'rtup cause investigation, when problem occurred j
* ing.to                                                                       Action dependent on outcome of root sta'rtup                                               .
s I
cause investigation, when                                                                     .
2 3
problem occurred                                                                                                 -
F: Forced Reason:
j s
4 Method:
I                      2                                                           '                                                                                .
S: Scheduled A Equipment Failure (Exolain) 1-Manual Exhibit G-Instructions B-Maintenance of Test for Preparation of Data 2 Manual Scram.
F: Forced                                                                             3                                4 Reason:                                                                                                                                       -
Entry Sheets for I.ieensee C-Refucting 3-Automatic Scram.
S: Scheduled                                                                             Method:
D Regulatory Restriction Event Report (LER) File (NUREG.
A Equipment Failure (Exolain)                                     1-Manual                           Exhibit G-Instructions               '
17 O pes.ito Ti.ilning & IJecuse lixamination le-Continuations 0161) 12 Administiative 5-Load Reductions.
B-Maintenance of Test                                                                               for Preparation of Data                                 -
5 G. Operational Error (Explain) 6-Other (9/77)
C-Refucting                                                      2 Manual Scram.     .              Entry Sheets for I.ieensee D Regulatory Restriction                                        3-Automatic Scram.                 Event Report (LER) File (NUREG .
Il-Other (Explain)
* 17 O pes.ito Ti.ilning & IJecuse lixamination le-Continuations                   0161) 12 Administiative G. Operational Error (Explain) 5-Load Reductions .            5 (9/77)                     Il-Other (Explain)                                               6-Other                            Exhibit I Same Sourec
Exhibit I Same Sourec


                                                          ,              .s                                                                                                           _ _ _      . . _ .
.s
                                                                                                                                                                                                                                      's u-O O
's u-O O
O                     .
O UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO. 050-ovs UNIT NAME Brim =t. f, te t DATE November 1982 REPORT MONTil October COMPLETED BY Frances Harrison TELEPHONE (919) 457-9521
UNIT SilUTDOWNS AND POWER REDUCTIONS                                         DOCKET NO. 050-ovs                                     '
.! E 3
UNIT NAME Brim =t.     f, te t DATE November 1982 REPORT MONTil October                                           COMPLETED BY Frances Harrison TELEPHONE (919) 457-9521 No.                                          Date o      .! E 3g 3 .-).Ek       Licensee 5%       !E.
.-).Ek Licensee 5%
                                                                                    *g                                         5 ,3 g 5                 Event           wT                                     Cause & Currective                              .'
!E.
                                                                                          $E                                 $                                        N0        83-                                Action to
No.
* j15g         Report *
Date o
[U                           Prevent Recurrence 0                                 .
Cause & Currective
82-95                                               821021   F       94.3 B    3           NA                                                                                                           .
*g 3g 5
IIA         TURBIN
,3 g 5 Event wT 83-
                                                                                                                                                              ,                              Reactor scram. Turbine load unbalance test with CV closure.
$E Action to j15g Report
(REPORT WILL FOLLOW WilEN COMPLETED) .                   ,
* N0
                                                                                                                                                                                                ,                              e       .
[U Prevent Recurrence 0
6 I                                                             -
82-95 821021 F
2
94.3 3
* F: Forced                                             Reason:
NA B
3                                          4                                         -
IIA TURBIN Reactor scram. Turbine load unbalance test with CV closure.
S: Scheduled                                                                                                                               Method:                                                                                                  .
(REPORT WILL FOLLOW WilEN COMPLETED).
A Equipment Failure (Explain)                                                     1 Manual                                   Exhibit C-Instructions
e 6
* B Maintenance of Test                                                                                                         for Preparation of Data         '                            .
I 2
C Refueling                                                                       2 Manual Scram.            .              Entry Sheets for Licensee                 .
3 F: Forced Reason:
D Regulatory Restriction                                                         3 Automatic Scram.                         Event Report (LER) File (NUREG .
4 Method:
I 17 Opesatos Taaluing & 1,leenso lixamination                                     h-Continuations                             0161) 13 Administiative G-Operational Error (Explain)                                                     S-Load Reductions.                  -
S: Scheduled A Equipment Failure (Explain) 1 Manual Exhibit C-Instructions B Maintenance of Test for Preparation of Data 2 Manual Scram.
5 (9/77)                                                                         H Other (Explain)                                                                 6-Other                                    Exhibit I Same Source                                      .
C Refueling Entry Sheets for Licensee D Regulatory Restriction 3 Automatic Scram.
Event Report (LER) File (NUREG.
I 17 Opesatos Taaluing & 1,leenso lixamination h-Continuations 0161) 13 Administiative S-Load Reductions.
G-Operational Error (Explain) 6-Other Exhibit I Same Source 5
(9/77)
H Other (Explain)


n .           . .      .      2u_ ,
n.
O                                                                                                       n
2u_,
                                                                                                                                                                                      .g                     ,
O n
UNITSilUTDOWNS AND POWER REDUC 110NS                                   DOCK E T NO. 050-ovs                                           4 UNIT NAME Brunswick 1 DATE November 1982 REPORT MONTl! - Octohnr                               COMPLETED BY _ Frances Harrison TELEPHONE (919) 457-9521
.g UNITSilUTDOWNS AND POWER REDUC 110NS DOCK E T NO. 050-ovs 4
: e.          .
UNIT NAME Brunswick 1 DATE November 1982 REPORT MONTl! - Octohnr COMPLETED BY _ Frances Harrison TELEPHONE (919) 457-9521 e.
                                                                                            =                                                                                                 .
=
                                                        =                 rs .3 ss. O                                           C No.           D.ite                     E. j                   j gjy                               a jj       $j                   Cause & Corrective y       g .2               E 5a e                         vent       a CC                  %
=
                                                                              $ I?i g Report #       'sue      g gRo                          Action to Prevent Recurrence O                                                                                                       -
rs
82-97         821030                     F       9.5               A'   5                       NA           XX       PUMPXX Recirc. pump tripped.
.3 ss. O C
J                                                                                                                                    ,
No.
(REPORT WILL FOLLOW WHEN COMPLETED) t
D.ite E.
\                                                                                                                                                                                                                       .
j j
ll                                         2                                                                   *                                                                    -
gjy jj
F: Forced                                                                                                 3                                4 Re.ison:                                                                                                                                     -
$j Cause & Corrective a
0: Scheduled                                                                                                 Method:                                                                                          .
y g.2 E
A Equipment Failure (Explain)                                           1. Manual                       Exhibit C Instructions         '
5a e vent
: n. Maintenance of Test                                                                                   for Preparation of Data
$ I?i g Report #
* C Refueling                                                            2 Manual Serarn.      .
'su gR Action to a
Entry Sheets for Licensee D Regulatory Restricti.m                                               3 Automatic Scram.               Event Report (LER) File (NUREC. .                           '
e o
l
CC g
              -                              Itopeiatos Tialaing A 1.leense fixamination                             4-ContInuaeions                   0161)
Prevent Recurrence O
F Adnunlunative                                                                                                                                                       t C-Operational Error (Explain)                                           5-Load Reductions.          -
82-97 821030 F
5 i F4/77)
9.5 A'
                ~
5 NA XX PUMPXX Recirc. pump tripped.
it-Other (Explain)                                                     6-Cther                           Exhibit I Same Souree
(REPORT WILL FOLLOW WHEN COMPLETED)
\
J t
\\
ll 2
3 F: Forced Re.ison:
4 Method:
0: Scheduled A Equipment Failure (Explain)
: 1. Manual Exhibit C Instructions
: n. Maintenance of Test for Preparation of Data 2 Manual Serarn.
Entry Sheets for Licensee C Refueling l
D Regulatory Restricti.m 3 Automatic Scram.
Event Report (LER) File (NUREC..
Itopeiatos Tialaing A 1.leense fixamination 4-ContInuaeions 0161)
F Adnunlunative t
5-Load Reductions.
5 C-Operational Error (Explain) i F4/77) it-Other (Explain) 6-Cther Exhibit I Same Souree
\\
~


        .          ~   .                                                                                        ...          . _ _ _
~
                                                                                                                                                    '4 c._- . . _ _
'4 c._-
O O                                                                     o               .
O O
UNITSilUTDOWNS AND POWER REDUCTIONS                               DOCKETNO. 050-0179
o UNITSilUTDOWNS AND POWER REDUCTIONS DOCKETNO. 050-0179 UNIT NAME Brunswick 1 DATE November 1982 REPORTMONTil October COMPLETED BY Frances Harrison TELEPliONE (919) 457-9521 q
* UNIT NAME Brunswick 1 DATE November 1982 REPORTMONTil           October                       COMPLETED BY Frances Harrison TELEPliONE (919) 457-9521 q     .
.! ?
No.          Date
3
                                  ,    .! ?
.Y Licensee
3g 3g        .Y               Licensee       ,Evo      bE
,Ev bE No.
                                                        ,g g 5
Date
                              *g                                            Event                   E "o                  Cause & Corrective                            .
*g 3g g
,g g 5 Event
:t ?
:t ?
c i:.,     5     ji5g               Report *r     N0                                       Action to
E "o Cause & Corrective o
* Q
Action to c i:.,
[d-                   . Prevent Recurrence 82-98         821031     F       9.0       A-     5                 NA           XX     XXXXXX Reduced power to less than 30 percent-due to EHC-PSL-1759 problems.                               -
5 ji5g Report *r N0
(REPORT WILL FOLLOW WilEN COMPLETED) ,
[d-
t
. Prevent Recurrence Q
* 2                                                       '                                                                            .
82-98 821031 F
F: Forced                                                                         3                                4 Reason:                                                                                                                                 -
9.0 A-5 NA XX XXXXXX Reduced power to less than 30 percent-due to EHC-PSL-1759 problems.
S: Scheduled                                                                         Method:
(REPORT WILL FOLLOW WilEN COMPLETED),
A Equipment Failure (Explain)                                 1 Manual                           Exhibit G-Instructions                *
t 2
* B-Maintenance of Test                                                                           for Preparation of Data             '
3 F: Forced Reason:
* C-Refueling                                                  2 Manual Scram.     .            Entry Sheets for Licensee D-Regulatory Restriction                                      3-Automatic Scram.                 Event Report (LER) Fi!c (NUREG. .
4 Method:
* I' Opci ito rialning & 1.leense !!xamination                 4-Continuations                   0161) 17 Administiative C-Operational Error (Explain) 5-Load Reductions .        -
S: Scheduled Exhibit G-Instructions A Equipment Failure (Explain) 1 Manual B-Maintenance of Test for Preparation of Data 2 Manual Scram.
5 (9/77)                     ll Other (Explain)                                           6-Other                          Exhibit ! Same Souree                                      .
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Report (LER) Fi!c (NUREG..
D-Regulatory Restriction I' Opci ito rialning & 1.leense !!xamination 4-Continuations 0161) 17 Administiative 5-Load Reductions.
5 C-Operational Error (Explain) 6-Other Exhibit ! Same Souree (9/77) ll Other (Explain)


APPENDIX DOCKET NO.: 050-324 UNIT: Brunswick No. 2 DATE: November 1982 COMPLETED BY: Francis Harrison OPERATIONS  
APPENDIX DOCKET NO.: 050-324 UNIT: Brunswick No. 2 DATE: November 1982 COMPLETED BY: Francis Harrison OPERATIONS  


==SUMMARY==
==SUMMARY==
BRUNSWICK UNIT NO. 2 Brunswick Unit No. 2 returned to service on October 3, 1982, after the refueling and Integrated Leak Rate Testing outages. The unit operated at a 53.8 percent availability factor and 27.5 capacity factor. There were four off-line outages this month.
BRUNSWICK UNIT NO. 2 Brunswick Unit No. 2 returned to service on October 3, 1982, after the refueling and Integrated Leak Rate Testing outages. The unit operated at a 53.8 percent availability factor and 27.5 capacity factor. There were four off-line outages this month.
i The refueling and Integrated Leak Rate Testing outages detailed reports will follow n1 a later date when c unple_ted.
i The refueling and Integrated Leak Rate Testing outages detailed reports will follow n1 a later date when c unple_ted.
There are 424     BWR and 144   PWR spent fuel bundles in the Brunswick No. 2 fuel pool.
There are 424 BWR and 144 PWR spent fuel bundles in the Brunswick No. 2 fuel pool.
l l
l l
l l
l l
l
l


    . _ . _ _ _.-. _ _... _ ___ _ _ __.- _ - _ . _ . _ . . - _ _ _ . . _ . _ _ - ~ . . . _ _ _ . . - - . _ _ . _ . . _ _ . . _
. _. _ _ _.-. _ _... _ ___ _ _ __.- _ - _. _. _.. - _ _ _.. _. _ _ - ~... _ _ _.. - -. _ _. _.. _ _.. _
i                                                                                                                                                                       -
i l' '
l' '                                                                                                                                                                 I I 4 l1 i
I I
l                                                                                                         APPENDIX B i
4 l1 i
I AVERAGE DAILY POWER LEVEL i                                                                                                                                                                       !
l APPENDIX B i
;                                                                                                                                        DOCKET NO. 050-0324           {
AVERAGE DAILY POWER LEVEL I
i                                                                                                                                       UNIT BRUNSWICK UNIT 2         i l                                                                                                                                         DATE 11/01/82                 l l                                                                                                                                     CnMPLETED BY FRANCEA HARRISON :
i DOCKET NO. 050-0324
;                                                                                                                                        TBLEPHUNE 919-457-9321       l l
{
I                  OCTOBER 8'                                                                                                                                         '
i UNIT BRUNSWICK UNIT 2 i
DAY             AVG. DAILY POWER LEVEL                                                                     DAY AVG. DAILY POWER LEVEL             l (MWE-NET)                                                                             (MWE-NET) .                   j 1                                       -16.                                                         17           -15.                     i 2                                         -18.                                                         18           214, 3                                           32.                                                         19           514.                     }
l DATE 11/01/82 l
4                                         184.                                                         20           540.                     P 5                                         197.                                                         21           571.
l CnMPLETED BY FRANCEA HARRISON :
t 6                                         237.                                                         22           593.                     ;
TBLEPHUNE 919-457-9321 l
7                                         283.                                                         23           613.
l I
OCTOBER 8' DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL l
(MWE-NET)
(MWE-NET).
j 1
-16.
17
-15.
i 2
-18.
18
: 214, 3
32.
19 514.
}
4 184.
20 540.
P 5
197.
21 571.
t 6
237.
22 593.
7 283.
23 613.
+
+
i                                                                                                                                                                       ,
i l
l                        8                                         423.                                                         24           208,                     i
8 423.
!                        9                                         423.                                                         25           315.                     5 i
24
10                                         341.                                                         26           610.                     i i
: 208, i
1 11                                         -12.                                                         27           582.                     l
9 423.
!                      12                                          -11.                                                         28             29.                     '
25 315.
l                                                                                                                                                                       !
5 i
I                                                                                                                                                                       "
10 341.
13                                         -11.                                                         29           -11.
26 610.
i 1
i i
14                                          -14.                                                         30           -11.                   !
1 11
4
-12.
;                      15                                         -14.                                                         31           -11.                   ;
27 582.
1                                                                                                                                                                     i i                   16                                         -14.
l 12
I i                                                                                                                                                                       l i
-11.
28 29.
l I
13
-11.
29
-11.
i 14
-14.
30
-11.
1 4
15
-14.
31
-11.
1 i
i 16
-14.
I i
l i
I i
I i
l                                                                                                                                                                     i
l i
{                                                                                                                                                                       i i                                                                                                                                                                       !
{
i                                                                                                                 1.16 - 8 i
i i
l 1                                                                                                                                                                       i, 4.-,,,- - ,                                               . . , _
i 1.16 - 8 i
l 1
i 4.-,,,- -,


OPERATING DATA REPORT DOCKET NO. 050-0324 DATE 11/01/82 COMPLETED BY FRANCES HARRISON TELEPHONE 919-457-9521 OPERATING STATUS
OPERATING DATA REPORT DOCKET NO. 050-0324 DATE 11/01/82 COMPLETED BY FRANCES HARRISON TELEPHONE 919-457-9521 OPERATING STATUS
: 1. UNIT NAME: BRUNSWICK UNIT 2                             I NOTES                                                     I i     2. REPORTING PERIOD: OCTOBER 82                           I                                                           I
: 1. UNIT NAME: BRUNSWICK UNIT 2 I NOTES I
: 3. LICENSED THERMAL POWER (MWT): 2436                       I                                                           I
i
: 4. NAMEPLATE RATING (GROSS MWE): 867.0                     I                                                           I
: 2. REPORTING PERIOD: OCTOBER 82 I
: 5. DESIGN ELECTR1 CAL RATING (NET MWE): 821.0 I                                                                         I
I
: 6. MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 I                                                                         I i
: 3. LICENSED THERMAL POWER (MWT): 2436 I
: 7. MAX DEPENDABLE CAPACITY (NET MWE): 790.0               -------------------------------
I
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
: 4. NAMEPLATE RATING (GROSS MWE): 867.0 I
I
: 5. DESIGN ELECTR1 CAL RATING (NET MWE): 821.0 I
I 6.
MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 I I
i
: 7. MAX DEPENDABLE CAPACITY (NET MWE): 790.0 8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
: 9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): NONE
: 9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): NONE
: 10. REASONS FOR RESTRICTION IF ANY:
: 10. REASONS FOR RESTRICTION IF ANY:
THIS                     YR TO                 CUMUL MONTH                         DATE               ATIVE
THIS YR TO CUMUL MONTH DATE ATIVE
: 11. HOURS IN REPORTING PERIOD                                   745.0                   7296.0'           61321.0
: 11. HOURS IN REPORTING PERIOD 745.0 7296.0' 61321.0
: 12. NUMBER OF HOURS REACTOR uA3 CRITICAL                         483.6                   2975.8           38142.7
: 12. NUMBER OF HOURS REACTOR uA3 CRITICAL 483.6 2975.8 38142.7
: 13. REACTOR RESERVE SHUTDOWN HOURS                                   0.0                         0.0               0.0
: 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
: 14. HOURS GENERATOR ON LINE                                     400.7                   2785.3           35554.6
: 14. HOURS GENERATOR ON LINE 400.7 2785.3 35554.6
: 15. UNIT RES'ERVE SHUTDOWN HOURS                                     0.0                         0.0               0.0
: 15. UNIT RES'ERVE SHUTDOWN HOURS 0.0 0.0 0.0
: 16. GROSS THERMAL ENERGY GENERATED (MWH)               557346.4                   5025312.2           65022849.9
: 16. GROSS THERMAL ENERGY GENERATED (MWH) 557346.4 5025312.2 65022849.9
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH)           174335.0                   1589624.0           21583561.0
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 174335.0 1589624.0 21583561.0
: 18. NET ELECTRICIAL ENERGY GENERATED (H4H)             161984.0                   1491798.0. 20681200.0
: 18. NET ELECTRICIAL ENERGY GENERATED (H4H) 161984.0 1491798.0. 20681200.0
: 19. UNIT SERVICE FACTOR                                           53.8                         38.2               58.0
: 19. UNIT SERVICE FACTOR 53.8 38.2 58.0
: 20. UNIT AVAILABILITY FACTOR                                       53.8                         38.2               58.0
: 20. UNIT AVAILABILITY FACTOR 53.8 38.2 58.0
: 21. UNIT CAPACITY FACTOR (USING MDC NET)                           27.5                         25.9               42.7 l     22. UNIT CAPACITY FACTOR (USING DER NET)                           26.5                         24.9               41.1 i
: 21. UNIT CAPACITY FACTOR (USING MDC NET) 27.5 25.9 42.7 l
: 23. UNIT FORCED OUTAGE RATE                                         18.3                       17.3               17.1
: 22. UNIT CAPACITY FACTOR (USING DER NET) 26.5 24.9 41.1 i
: 23. UNIT FORCED OUTAGE RATE 18.3 17.3 17.1
: 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPEr DATER AND DURATION OF EACH):
: 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPEr DATER AND DURATION OF EACH):
: 25. IF SHUTDOWN AT END OF REPORT PERIODr ESTIMATED DATE OF START UP: 11/ 2/92
: 25. IF SHUTDOWN AT END OF REPORT PERIODr ESTIMATED DATE OF START UP: 11/ 2/92
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERICI AL OPERATION): FORCAST                                     ACHEIVED INITIAL CRITICALITY                                                           --------      --------
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERICI AL OPERATION): FORCAST ACHEIVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERICIAL OPERATION 1.16 - 9
INITIAL ELECTRICITY                                                           --------      --------
COMMERICIAL OPERATION                                                         --------      --------
1.16 - 9


                                                                ...._z                                       . _ ,
...._z 4 L..___....
* 4 L. .___ . . . .
UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO. 050-0324 UNIT NAME Brunswick 2 DATE November 1982 REPORT MONTil o c e nh n,.
UNIT SilUTDOWNS AND POWER REDUCTIONS                             DOCKET NO. 050-0324                                     .
COMPLETED BY Frances Harrison TELEPilONE (919) 457-9521 "E
UNIT NAME Brunswick 2 DATE November 1982 REPORT MONTil o c e nh n ,.                     COMPLETED BY Frances Harrison TELEPilONE (919) 457-9521
=
                                      =
en
                                                            "E                                                                                                  '
.5 -a =
en    .5 -a =
-2 'L
                                    .2 _e       s   , .s X           Licensee No.           Dste o
.2 _e s
g     3g         g   jg5               Event
,.s X Licensee No.
                                                                                    %          -2 c' 'L Cause & Corrective                              .'
Dste o
s cc s-       u a:
c' Cause & Corrective g
Report #     :*?
3g g
m0 83-EU                          Action to
jg5 Event
* 3 Di 's                                   g                     Prevent Recurrence 6                                                                                                       *  '
:*?
82-057       821021       S       1.3     B-         1             NA         IE     XL W         Unit separated from grid for routine e
83-s s-u Report #
overspeed trip test.
m0 E U Action to cc a:
                                                                                    ~
3 Di 's g
Prevent Recurrence 6
82-057 821021 S
1.3 B-1 NA IE XL W e
Unit separated from grid for routine overspeed trip test.
~
I 3
I 3
j
j
                                                                                                                                                                                ?
?
I               ~
I
2                                                 *                                                                            .
~
F: Forced             Reason:
2 3
3                                  4 S: Scheduled                                                                 Method:
F: Forced Reason:
A Equipment Failure (Explain)                           1-Manual                           Exhibit G-Instructions              -
4 Method:
B-Maintenance of Test                                                                       for Preparation of Data           '
S: Scheduled Exhibit G-Instructions A Equipment Failure (Explain) 1-Manual B-Maintenance of Test for Preparation of Data 2 Manual Scrarn.
C-Refueling                                             2 Manual Scrarn.                    Entry Sheets for Licensee D Regulatory Restriction                               3-Automatic Scram.                 Event Report (LER) File (NUREG. .
C-Refueling Entry Sheets for Licensee D Regulatory Restriction 3-Automatic Scram.
li Opciato Ti Ining & l.leense lixumination             4-Con t inua t ions                 0161)
Event Report (LER) File (NUREG..
F Adminisisative G-Operational Error (Explain)                           5-Load Reductions .          -
li Opciato Ti Ining & l.leense lixumination 4-Con t inua t ions 0161)
5 (9/77)                   Il-Other (Explain)                                     6-Other                             Exhibit ! Same Source
F Adminisisative 5-Load Reductions.
G-Operational Error (Explain) 5 (9/77)
Il-Other (Explain) 6-Other Exhibit ! Same Source


                                                                                        -.                          _-      __ _                      _m. _ _ _ _
_m.
O                                                                             n                                                                   .m   .  <
O n
                                                                    ~
.m
UNITSHUTDOWNS AND POWER REDUCTIONS                               DOCKETNO. 050-0324                                         .
~
UNIT NAME Brunswick 2 DATE _ November 1982 REPORTMON111_ October                             COMPLETED BY - Frances Harrison TELEPHONE         (919) 457-9521 e                     ce t m2                                      c No.         Date     E.
UNITSHUTDOWNS AND POWER REDUCTIONS DOCKETNO. 050-0324 UNIT NAME Brunswick 2 DATE _ November 1982 REPORTMON111_ October COMPLETED BY - Frances Harrison TELEPHONE (919) 457-9521 t m2 e
p      h 32 5
ce c
0 35b 5a e      Lh'v#
No.
ent          I*4o a        ok gg E*"S* A C""''8I''
Date E.
Action to CO                      " 3 Di j     Report #           NU         g                       Prevent Recurrence 6
h 5
82-059       821010   F     175.7                   A- 3         NA             SB       PIPEXX                                                             .
35b Lh'v#
Reactor scram. Cracks in heater drain
I*
                                                                                                                , piping. Loss of E-3 Bus #3 diesel g'nerator e      output breaker would not close in on E-3 bus.
ok E*"S* A C""''8I''
p 32 0
5a e ent 4
3 Di j Report #
NU gg Action to a
o CO g
Prevent Recurrence 6
82-059 821010 F
175.7 A-3 NA SB PIPEXX Reactor scram.
Cracks in heater drain
, piping.
Loss of E-3 Bus #3 diesel g'nerator output breaker would not e
close in on E-3 bus.
(REPORT WILL FOLLOW UHEN COMPLETED)
(REPORT WILL FOLLOW UHEN COMPLETED)
                                                                                                                                                                  +
+
i l.
i l.
l:
l:
I l                     2 F: Forced                                                                         3                                4 Reason:
I l
S: Scheduled                                                                         Method:                                                                                          ,
2 3
A liguipment Failure (Exp!ain)                                   1 Manual                             Exhibit G-Instructions           -
F: Forced Reason:
l B Maintenance of Test                                                                                 for Preparation of Data       '
4 Method:
C-Refueling                                                    2. Manual Scram.                     Entry Sheets for Licensee D Regulatory Restriction                                       3-Automatic Scram.                   Event Report (LER) File (NUREG. .
S: Scheduled A liguipment Failure (Exp!ain) 1 Manual Exhibit G-Instructions l
17 Opes.itos is.iining & 1lecuse l*xamination 4-Continuations                       0161)
B Maintenance of Test for Preparation of Data
F Adnunist ative G-Oper:.:ional Error (Explain)                                 S-Load Reductions.            5 (9/77)                   H-Other (Explain)                                               6-Other                              Exhibit ! Same Source i
: 2. Manual Scram.
C-Refueling Entry Sheets for Licensee D Regulatory Restriction 3-Automatic Scram.
Event Report (LER) File (NUREG..
17 Opes.itos is.iining & 1lecuse l*xamination 4-Continuations 0161)
F Adnunist ative S-Load Reductions.
G-Oper:.:ional Error (Explain) 6-Other i
5 (9/77)
H-Other (Explain)
Exhibit ! Same Source


_w-.--_-
_w-.--_-
O n                                                                           o UNIT SIIUTDOWNS AND POWER REDUCTIONS                       DOCKET NO. 050-0324                                     ,
O n
UNIT N AME Brunswick 2 DATE November 1982 REPORTMONTif _ October                           COMPLETED BY Frances Harrison TELEPliONE (919) 457-9571 e.
o UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO. 050-0324 UNIT N AME Brunswick 2 DATE November 1982 REPORTMONTif _ October COMPLETED BY Frances Harrison TELEPliONE (919) 457-9571 e.
e        en      '3 2 E                                       5c No.
'3 2 E 5
                              ;.,    .a _:       s     7 .E X           Licensee Date      g.     gg         g                                         _=%                      Cause & Corrective
e en
                                                          ,3 g 5             Event         5?         8.4                                                                 -
.a _:
                                      $ F.       5       j di g         Report
s 7.E X Licensee
* N0           jb"                  Action to                                        '
_=%
Prevent Recurrence 6                                                                                                         '
g.
82-062     821024     F     15.5         A*       2             NA           XX
gg g
* XXXXXX   Normal reactor shutdown in order to lower AT between steam dome saturation temperature and bottom head drain, e
,3 g 5 Event 5?
8.4 Cause & Corrective No.
Date c
jb" Action to
$ F.
5 j di g Report
* N0 Prevent Recurrence 6
82-062 821024 F
15.5 A*
2 NA XX XXXXXX Normal reactor shutdown in order to lower AT between steam dome saturation temperature and bottom head drain, e
t i
t i
1 I
1 I
t i                   2 F: Forced                                                                   3                            4 Reason:                                                                                                                                             !
t i
S: Scheduled                                                                   Method:
2 3
A Equipment Failure (Explain)                               1. Manual                     Exhibit G-Instructions
F: Forced Reason:
* B. Maintenance or Test                                                                     for Preparation of Data
4 Method:
: 2. Manual Scra,m.                                                                        .
S: Scheduled Exhibit G-Instructions A Equipment Failure (Explain)
          '                C. Refueling                                                                              Entry Sheets for Licensee                                 '
: 1. Manual B. Maintenance or Test for Preparation of Data
D-Regulatory Restriction                                   3-Automatic Scram.            Event Report (LER) File (NUREG .
: 2. Manual Scra,m.
17 Opes.itos Ts.iining & l.icense Examination               4-Continuations               0161)
Entry Sheets for Licensee C. Refueling 3-Automatic Scram.
I .Administiative G-Operationa! Error (Explain)                               S-Load Reductions.          5 (9/77)                 li-Other(Explain)                                           6-Other                        Exliibi I-Same Source                                   ?
D-Regulatory Restriction Event Report (LER) File (NUREG.
17 Opes.itos Ts.iining & l.icense Examination 4-Continuations 0161)
I.Administiative S-Load Reductions.
G-Operationa! Error (Explain) 6-Other 5
(9/77) li-Other(Explain)
Exliibi I-Same Source
?


                                                                                                      .=                    .-    *-u   -
*-u
O                                                                   O                                                           O UNIT SHUTDOWNS AND POWER REDUCTIONS                       DOCKETNO. 050-0324                           .
.=
UNIT NAME Brunswick 2 DATE _ November 1982 REPORTMONTH October                         COMPLETED BY Frances Harrison TELEPHONE       (919) 457-9521 No.          Date
O O
                            ;,    .!E 3g 3g        .$
O UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKETNO. 050-0324 UNIT NAME Brunswick 2 DATE _ November 1982 REPORTMONTH October COMPLETED BY Frances Harrison TELEPHONE (919) 457-9521
                                                    ,;; g 5 Licensee     ,E%       !
.!E 3
o%                 Cause & Corrective
Licensee
                          *g                                         Event       =?       o-lv c3 5       5     jgg             Report #   #G                                 Action to Prevent Recurrence c5 82-064     821028     F                 A'           2               NA                       TIP outage in progress.
,E%
e
!o%
                                                                                                                                .      .                          k i
Cause & Corrective No.
i.
Date
*g 3g g
,;; g 5 Event
=?
o-l Action to c3 5 5
jgg Report #
#G v
Prevent Recurrence c5 82-064 821028 F
A' 2
NA TIP outage in progress.
e k
i i
b 1
b 1
2                                                                                                                   -
2 1
1 F: Forced                                                               3                            4 Reason:                                               Method:
3 F: Forced Reason:
I S: Scheduled       A 1:quipment Failure (Explain)                                                         Exhibit G-Instruellons          -
4 I
1-Manual                       for Preparation of Data
Method:
* B Maintenance of Test                                 2-Manual Scram.
S: Scheduled Exhibit G-Instruellons A 1:quipment Failure (Explain) 1-Manual for Preparation of Data B Maintenance of Test 2-Manual Scram.
      .                  C-Refucting                                                                .        Entry Sheets for Licensee D-Regulatory Restriction                              3 Automatic Scram.             Event Report (LER) File (NUREG .
Entry Sheets for Licensee C-Refucting 3 Automatic Scram.
1:-Opeiason Tiaining & I.iecuse !!xamination           4-Continuations               0161)
Event Report (LER) File (NUREG.
* I Administrative                                       5-Load Reductions .
D-Regulatory Restriction 1:-Opeiason Tiaining & I.iecuse !!xamination 4-Continuations 0161)
G-Operational Error (Explain)                                                     $
I Administrative 5-Load Reductions.
19/77)                 H-Other (Explain)                                     6-Other                        Exhibit I- Same Source
G-Operational Error (Explain) 6-Other 19/77)
H-Other (Explain)
Exhibit I-Same Source
.}}
.}}

Latest revision as of 18:32, 16 December 2024

Monthly Operating Repts for Oct 1982
ML20066D891
Person / Time
Site: Brunswick  
Issue date: 11/02/1982
From: Harrison F
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML20066D885 List:
References
NUDOCS 8211120327
Download: ML20066D891 (15)


Text

.

APPENDIX D AVERAGE DAILY POWER LEVEL DOCl(ET NO. 000-0325 UNIT BRUNSWICl( UNIT 1 DATE 11/02/82 COMPLETED DY FRANCES HARRISON TELEPHONE ( 919 ) <157-9521 OCTODER 1982 DAY AVG. DAILY POWER LEVEL DAY AVO. DAILY POWER LEVEL (MWE-NCT~,

(MWE-NLT) 1

-10 17

-6 2

-10 18 319 3

-10 19 404 el

-11 20 414 0

-10 21 407 6

-10 22

-14 7

-10 23

-13 0

-10 24

-11 9

-11 25 4

l 1

10

-12 26 401 f

11

-12 27 463 12

-11 28 600 1

13

-12 29 576 l ei

-12 30 493 l

15

-10 31 526 16

-11 1.16 - 0 8211120327 821104 PDR ADOCK 05000324 R

PDR

i 1

OPERATING DATA REPORT pAit AEET NO,/8a053-0325 11/o4 J

COMPLETED BY FRANCE 5 HARRISON t

TELEPHONE 919-457-9521

.:FERATING STATU?

1.

UNIT NAME: BRUNSWICK UNIT 1 I NOTES I

2., REPORTING PERIOD: OCTOBER 82

]

I

3. LICENSED THERr'ALfPOWER (MWT): 2436 I

I 4,

NAMEPLATE RATING tCROS5 MWE): 867.0 I

I

5. DESIGN ELECTRICAL RATING (NET MWE) : 821.0 I

I

6. MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 I I
7. MAX DEPENDABLE CADACITY (NET MWE) 790.0 8.

IF CHANGES OCCUR IN CAPACIT( RATINGS (ITEMS 3 THRU 7) SINCE LAST REFORT, GIVE, REASONS:

9.

POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): NONE la. REASONS IJP RESTRICTION IF ANY:

i.

THIS YR TO CUMUL MONTH DATE ATIVE

11. HOURS IN REPGRTING PERIOD 745.0 7296.0 49297.0
12. NUMDER OF HOURS REACTOR WA5 CRITIC AL 309.6 4661.6 32926.9 13, 3.EACTOR RESEh')E SHUTDOWN HUUR9 0.0 6.0 1647.1
14. HOURS GENERATOR ON LINE 244.2 4468.7 31003.a
15. UNIT RESERVE SHUTDOWN HOURS 3.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED ( MWH) 359033.6 7900320.5 62318125.1
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 115714.0 2541153.0 20542361.0
18. NET ELECT 3l:ICIAL ENERGY GENERATED ( PNH) 105927.0 2425399.6* 19728896.0
19. UNIT SERjfCE F ETOR 32.8 61.2 62.9
20. UNIT 4/AlLABILITi FAC MR 32.3 61.2 62.9 i_1.

UNIT CAPACITY FACTOR (USING MDC NET) 18.0 4,2.1 50.7

22. UNIT CAPACITY FACTOR (USING DER NET) 17.3 40.5 48.7
25. UNIT FOM ED OUTACE RATE 67.2 37.4 24.7
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

Refueling 11/27/82 - 5/12/83 s

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:

0/ O/ 9

26. UNITS IN TEST :.laiU3 (PRIOR TO COMMERICI AL OPERATION): FORCA5T ACHEIVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERICI AL OPERATIO!?

1.16 - O

  • Year To Date & Cumulative have been adjusted to reflect correction made to Sept.

report of 1 mwh.

s t

s g

--w a

-e

-~

s

APPENDIX DOCKET NO.:

050-325 UNIT:

Brunswick No. 1 DATE: November 1982 COMPLETED BY:

Francis Harrison OPERATIONS

SUMMARY

BRUNSWICK UNIT NO. 1 Brunswick Unit No. I returned to service on October 17, 1982, after the Integrated Leak Rate Testing outage. The unit operated at 32.8 percent availability factor and 18.0 percent capacity factor. There were three off-line outages and two power reductions.

The Integrated Leak Rate Testing Outage detailed report will follow at a later date when completed.

There are 476 BWR and 160 PWR spent fuel bundles in the Brunswick Unit No. 1 fuel pool.

_i o __

O n

o UNITSilUTDOWNS AND POWER REDUCTIONS DOCKET NO.

050-0325 UNIT NASIE Brunswick I DATE November 1982 REPORT MONTil October COMPLETED BY Froncoa Morriann TELEPHONE (919) 457-9521 "E

.! E S

.h.5 k Licensee

,E%

be.

No.

Date Cause & Corrective g

3g g

,3 g 5 Event u?

83 Action to H

$5 5

ji5g Report #

@G

[u Prevent Recurrence 6

82-92A 821010 2

Unit A

1 IE VALVEX Reactor scram - manual - scram due to was down.

relief valve F013J stuck open.

At, temp-I&C replaced solenoid valve and as a ting precautionary measure Mechanical to Maintenance replaced the pilot Startup assembly.

h

.i I

2 3

F: Forced Reason:

4 Method:

S: Schedufed A Equipment Failure (Explain) 1-Manual Exhibit G-Instructions B-Maintenance of Test for Preparation of Data 2 Manual Scrarn.

Entry Sheets for Licensee C Refueling 3 Automatic Scram.

Event Report (LER) File (NUREG.

D. Regulatory Restriction I' Opee.iion Ti iining & I.leense IIxaminatloa 4-Continuations 0161) 12-Adnunistiative 5-Load Reductions 5

G-Operational Error (Explain) 6-Other Exhibit !- Same Source (9/77) li-Other (Explain)

,, e. __,, _ _

O n

o UNITSilUTDOWNS AND POWER REDUCTIONS DOCKET NO. 050-0325 UNIT NAh!E Brunswick 1 DATE _ November 1982.

REPORT MONTil _0c tober COMPLETED By Frances Harrison TELEPHONE (414) 457-9521 e.

t

=

re

.3 -x =

E 5 _E E

a5d Licensee

~

y,""

y, #

u Ev.

g*o Cause & Currective h

y.g g

gge Event g]

p g.

Action to y i3 5 Report #

mO c0 Prevent Recurrence

_6 82-92B 821014 F

Unit was A

1 NA IE VALVEX Re' actor shutdown due to problems with.

down.

F013D and E safecy relief valve.

Attempt-ing.to Action dependent on outcome of root sta'rtup cause investigation, when problem occurred j

s I

2 3

F: Forced Reason:

4 Method:

S: Scheduled A Equipment Failure (Exolain) 1-Manual Exhibit G-Instructions B-Maintenance of Test for Preparation of Data 2 Manual Scram.

Entry Sheets for I.ieensee C-Refucting 3-Automatic Scram.

D Regulatory Restriction Event Report (LER) File (NUREG.

17 O pes.ito Ti.ilning & IJecuse lixamination le-Continuations 0161) 12 Administiative 5-Load Reductions.

5 G. Operational Error (Explain) 6-Other (9/77)

Il-Other (Explain)

Exhibit I Same Sourec

.s

's u-O O

O UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO. 050-ovs UNIT NAME Brim =t. f, te t DATE November 1982 REPORT MONTil October COMPLETED BY Frances Harrison TELEPHONE (919) 457-9521

.! E 3

.-).Ek Licensee 5%

!E.

No.

Date o

Cause & Currective

  • g 3g 5

,3 g 5 Event wT 83-

$E Action to j15g Report

  • N0

[U Prevent Recurrence 0

82-95 821021 F

94.3 3

NA B

IIA TURBIN Reactor scram. Turbine load unbalance test with CV closure.

(REPORT WILL FOLLOW WilEN COMPLETED).

e 6

I 2

3 F: Forced Reason:

4 Method:

S: Scheduled A Equipment Failure (Explain) 1 Manual Exhibit C-Instructions B Maintenance of Test for Preparation of Data 2 Manual Scram.

C Refueling Entry Sheets for Licensee D Regulatory Restriction 3 Automatic Scram.

Event Report (LER) File (NUREG.

I 17 Opesatos Taaluing & 1,leenso lixamination h-Continuations 0161) 13 Administiative S-Load Reductions.

G-Operational Error (Explain) 6-Other Exhibit I Same Source 5

(9/77)

H Other (Explain)

n.

2u_,

O n

.g UNITSilUTDOWNS AND POWER REDUC 110NS DOCK E T NO. 050-ovs 4

UNIT NAME Brunswick 1 DATE November 1982 REPORT MONTl! - Octohnr COMPLETED BY _ Frances Harrison TELEPHONE (919) 457-9521 e.

=

=

rs

.3 ss. O C

No.

D.ite E.

j j

gjy jj

$j Cause & Corrective a

y g.2 E

5a e vent

$ I?i g Report #

'su gR Action to a

e o

CC g

Prevent Recurrence O

82-97 821030 F

9.5 A'

5 NA XX PUMPXX Recirc. pump tripped.

(REPORT WILL FOLLOW WHEN COMPLETED)

J t

\\

ll 2

3 F: Forced Re.ison:

4 Method:

0: Scheduled A Equipment Failure (Explain)

1. Manual Exhibit C Instructions
n. Maintenance of Test for Preparation of Data 2 Manual Serarn.

Entry Sheets for Licensee C Refueling l

D Regulatory Restricti.m 3 Automatic Scram.

Event Report (LER) File (NUREC..

Itopeiatos Tialaing A 1.leense fixamination 4-ContInuaeions 0161)

F Adnunlunative t

5-Load Reductions.

5 C-Operational Error (Explain) i F4/77) it-Other (Explain) 6-Cther Exhibit I Same Souree

\\

~

~

'4 c._-

O O

o UNITSilUTDOWNS AND POWER REDUCTIONS DOCKETNO. 050-0179 UNIT NAME Brunswick 1 DATE November 1982 REPORTMONTil October COMPLETED BY Frances Harrison TELEPliONE (919) 457-9521 q

.! ?

3

.Y Licensee

,Ev bE No.

Date

  • g 3g g

,g g 5 Event

t ?

E "o Cause & Corrective o

Action to c i:.,

5 ji5g Report *r N0

[d-

. Prevent Recurrence Q

82-98 821031 F

9.0 A-5 NA XX XXXXXX Reduced power to less than 30 percent-due to EHC-PSL-1759 problems.

(REPORT WILL FOLLOW WilEN COMPLETED),

t 2

3 F: Forced Reason:

4 Method:

S: Scheduled Exhibit G-Instructions A Equipment Failure (Explain) 1 Manual B-Maintenance of Test for Preparation of Data 2 Manual Scram.

Entry Sheets for Licensee C-Refueling 3-Automatic Scram.

Event Report (LER) Fi!c (NUREG..

D-Regulatory Restriction I' Opci ito rialning & 1.leense !!xamination 4-Continuations 0161) 17 Administiative 5-Load Reductions.

5 C-Operational Error (Explain) 6-Other Exhibit ! Same Souree (9/77) ll Other (Explain)

APPENDIX DOCKET NO.: 050-324 UNIT: Brunswick No. 2 DATE: November 1982 COMPLETED BY: Francis Harrison OPERATIONS

SUMMARY

BRUNSWICK UNIT NO. 2 Brunswick Unit No. 2 returned to service on October 3, 1982, after the refueling and Integrated Leak Rate Testing outages. The unit operated at a 53.8 percent availability factor and 27.5 capacity factor. There were four off-line outages this month.

i The refueling and Integrated Leak Rate Testing outages detailed reports will follow n1 a later date when c unple_ted.

There are 424 BWR and 144 PWR spent fuel bundles in the Brunswick No. 2 fuel pool.

l l

l l

l

. _. _ _ _.-. _ _... _ ___ _ _ __.- _ - _. _. _.. - _ _ _.. _. _ _ - ~... _ _ _.. - -. _ _. _.. _ _.. _

i l' '

I I

4 l1 i

l APPENDIX B i

AVERAGE DAILY POWER LEVEL I

i DOCKET NO. 050-0324

{

i UNIT BRUNSWICK UNIT 2 i

l DATE 11/01/82 l

l CnMPLETED BY FRANCEA HARRISON :

TBLEPHUNE 919-457-9321 l

l I

OCTOBER 8' DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL l

(MWE-NET)

(MWE-NET).

j 1

-16.

17

-15.

i 2

-18.

18

214, 3

32.

19 514.

}

4 184.

20 540.

P 5

197.

21 571.

t 6

237.

22 593.

7 283.

23 613.

+

i l

8 423.

24

208, i

9 423.

25 315.

5 i

10 341.

26 610.

i i

1 11

-12.

27 582.

l 12

-11.

28 29.

l I

13

-11.

29

-11.

i 14

-14.

30

-11.

1 4

15

-14.

31

-11.

1 i

i 16

-14.

I i

l i

I i

l i

{

i i

i 1.16 - 8 i

l 1

i 4.-,,,- -,

OPERATING DATA REPORT DOCKET NO. 050-0324 DATE 11/01/82 COMPLETED BY FRANCES HARRISON TELEPHONE 919-457-9521 OPERATING STATUS

1. UNIT NAME: BRUNSWICK UNIT 2 I NOTES I

i

2. REPORTING PERIOD: OCTOBER 82 I

I

3. LICENSED THERMAL POWER (MWT): 2436 I

I

4. NAMEPLATE RATING (GROSS MWE): 867.0 I

I

5. DESIGN ELECTR1 CAL RATING (NET MWE): 821.0 I

I 6.

MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 I I

i

7. MAX DEPENDABLE CAPACITY (NET MWE): 790.0 8.

IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): NONE
10. REASONS FOR RESTRICTION IF ANY:

THIS YR TO CUMUL MONTH DATE ATIVE

11. HOURS IN REPORTING PERIOD 745.0 7296.0' 61321.0
12. NUMBER OF HOURS REACTOR uA3 CRITICAL 483.6 2975.8 38142.7
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
14. HOURS GENERATOR ON LINE 400.7 2785.3 35554.6
15. UNIT RES'ERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 557346.4 5025312.2 65022849.9
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 174335.0 1589624.0 21583561.0
18. NET ELECTRICIAL ENERGY GENERATED (H4H) 161984.0 1491798.0. 20681200.0
19. UNIT SERVICE FACTOR 53.8 38.2 58.0
20. UNIT AVAILABILITY FACTOR 53.8 38.2 58.0
21. UNIT CAPACITY FACTOR (USING MDC NET) 27.5 25.9 42.7 l
22. UNIT CAPACITY FACTOR (USING DER NET) 26.5 24.9 41.1 i
23. UNIT FORCED OUTAGE RATE 18.3 17.3 17.1
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPEr DATER AND DURATION OF EACH):
25. IF SHUTDOWN AT END OF REPORT PERIODr ESTIMATED DATE OF START UP: 11/ 2/92
26. UNITS IN TEST STATUS (PRIOR TO COMMERICI AL OPERATION): FORCAST ACHEIVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERICIAL OPERATION 1.16 - 9

...._z 4 L..___....

UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO. 050-0324 UNIT NAME Brunswick 2 DATE November 1982 REPORT MONTil o c e nh n,.

COMPLETED BY Frances Harrison TELEPilONE (919) 457-9521 "E

=

en

.5 -a =

-2 'L

.2 _e s

,.s X Licensee No.

Dste o

c' Cause & Corrective g

3g g

jg5 Event

  • ?

83-s s-u Report #

m0 E U Action to cc a:

3 Di 's g

Prevent Recurrence 6

82-057 821021 S

1.3 B-1 NA IE XL W e

Unit separated from grid for routine overspeed trip test.

~

I 3

j

?

I

~

2 3

F: Forced Reason:

4 Method:

S: Scheduled Exhibit G-Instructions A Equipment Failure (Explain) 1-Manual B-Maintenance of Test for Preparation of Data 2 Manual Scrarn.

C-Refueling Entry Sheets for Licensee D Regulatory Restriction 3-Automatic Scram.

Event Report (LER) File (NUREG..

li Opciato Ti Ining & l.leense lixumination 4-Con t inua t ions 0161)

F Adminisisative 5-Load Reductions.

G-Operational Error (Explain) 5 (9/77)

Il-Other (Explain) 6-Other Exhibit ! Same Source

_m.

O n

.m

~

UNITSHUTDOWNS AND POWER REDUCTIONS DOCKETNO. 050-0324 UNIT NAME Brunswick 2 DATE _ November 1982 REPORTMON111_ October COMPLETED BY - Frances Harrison TELEPHONE (919) 457-9521 t m2 e

ce c

No.

Date E.

h 5

35b Lh'v#

I*

ok E*"S* A C""8I

p 32 0

5a e ent 4

3 Di j Report #

NU gg Action to a

o CO g

Prevent Recurrence 6

82-059 821010 F

175.7 A-3 NA SB PIPEXX Reactor scram.

Cracks in heater drain

, piping.

Loss of E-3 Bus #3 diesel g'nerator output breaker would not e

close in on E-3 bus.

(REPORT WILL FOLLOW UHEN COMPLETED)

+

i l.

l:

I l

2 3

F: Forced Reason:

4 Method:

S: Scheduled A liguipment Failure (Exp!ain) 1 Manual Exhibit G-Instructions l

B Maintenance of Test for Preparation of Data

2. Manual Scram.

C-Refueling Entry Sheets for Licensee D Regulatory Restriction 3-Automatic Scram.

Event Report (LER) File (NUREG..

17 Opes.itos is.iining & 1lecuse l*xamination 4-Continuations 0161)

F Adnunist ative S-Load Reductions.

G-Oper:.:ional Error (Explain) 6-Other i

5 (9/77)

H-Other (Explain)

Exhibit ! Same Source

_w-.--_-

O n

o UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO. 050-0324 UNIT N AME Brunswick 2 DATE November 1982 REPORTMONTif _ October COMPLETED BY Frances Harrison TELEPliONE (919) 457-9571 e.

'3 2 E 5

e en

.a _:

s 7.E X Licensee

_=%

g.

gg g

,3 g 5 Event 5?

8.4 Cause & Corrective No.

Date c

jb" Action to

$ F.

5 j di g Report

  • N0 Prevent Recurrence 6

82-062 821024 F

15.5 A*

2 NA XX XXXXXX Normal reactor shutdown in order to lower AT between steam dome saturation temperature and bottom head drain, e

t i

1 I

t i

2 3

F: Forced Reason:

4 Method:

S: Scheduled Exhibit G-Instructions A Equipment Failure (Explain)

1. Manual B. Maintenance or Test for Preparation of Data
2. Manual Scra,m.

Entry Sheets for Licensee C. Refueling 3-Automatic Scram.

D-Regulatory Restriction Event Report (LER) File (NUREG.

17 Opes.itos Ts.iining & l.icense Examination 4-Continuations 0161)

I.Administiative S-Load Reductions.

G-Operationa! Error (Explain) 6-Other 5

(9/77) li-Other(Explain)

Exliibi I-Same Source

?

  • -u

.=

O O

O UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKETNO. 050-0324 UNIT NAME Brunswick 2 DATE _ November 1982 REPORTMONTH October COMPLETED BY Frances Harrison TELEPHONE (919) 457-9521

.!E 3

Licensee

,E%

!o%

Cause & Corrective No.

Date

  • g 3g g

,;; g 5 Event

=?

o-l Action to c3 5 5

jgg Report #

  1. G v

Prevent Recurrence c5 82-064 821028 F

A' 2

NA TIP outage in progress.

e k

i i

b 1

2 1

3 F: Forced Reason:

4 I

Method:

S: Scheduled Exhibit G-Instruellons A 1:quipment Failure (Explain) 1-Manual for Preparation of Data B Maintenance of Test 2-Manual Scram.

Entry Sheets for Licensee C-Refucting 3 Automatic Scram.

Event Report (LER) File (NUREG.

D-Regulatory Restriction 1:-Opeiason Tiaining & I.iecuse !!xamination 4-Continuations 0161)

I Administrative 5-Load Reductions.

G-Operational Error (Explain) 6-Other 19/77)

H-Other (Explain)

Exhibit I-Same Source

.