ML20199L954: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:.     .
{{#Wiki_filter:.
                                          JUL     3 1986
.
    Docket No. 50-295
JUL
    Docket No. 50-304
3 1986
    Commonwealth Edison Company
Docket No. 50-295
    ATTN: Mr. Cordell Reed
Docket No. 50-304
            Vice President
Commonwealth Edison Company
    Post Office Box 767
ATTN: Mr. Cordell Reed
    Chicago, IL 60690
Vice President
    Gentlemen:
Post Office Box 767
    ~ This refers to the routine safety inspection conducted by M. L. McCormick-Barger
Chicago, IL 60690
    of this office on May 5 through June 5, 1986, and June 11, 1986, of activities
Gentlemen:
    at the Zion Nuclear Generating Station authorized by NRC Operating Licenses
~ This refers to the routine safety inspection conducted by M. L. McCormick-Barger
    No. OPR-39 and No. OPR-48 and to the discussion of our findings with
of this office on May 5 through June 5, 1986, and June 11, 1986, of activities
    Mr. G. Pliml and others of your staff at the conclusion of the inspection.
at the Zion Nuclear Generating Station authorized by NRC Operating Licenses
    The enclosed copy of our inspection report identifies areas examined during
No. OPR-39 and No. OPR-48 and to the discussion of our findings with
    the inspection. Within these areas, the inspection consisted of a selective
Mr. G. Pliml and others of your staff at the conclusion of the inspection.
    examination of procedures and representative records, observations, and
The enclosed copy of our inspection report identifies areas examined during
    interviews with personnel.
the inspection. Within these areas, the inspection consisted of a selective
    During this inspection, certain of your activities appeared to be in violation
examination of procedures and representative records, observations, and
    of NRC requirements, as specified in the enclosed Notice. A written response
interviews with personnel.
    is required. In view of the violation discussed in the enclosed Notice,
During this inspection, certain of your activities appeared to be in violation
    coupled with considerable personnel turnover in the nuclear engineering group,
of NRC requirements, as specified in the enclosed Notice. A written response
    we believe that close management attention to the activities performed by the
is required.
    nuclear engineering group is warranted. Please address this area in your
In view of the violation discussed in the enclosed Notice,
    response.
coupled with considerable personnel turnover in the nuclear engineering group,
    In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
we believe that close management attention to the activities performed by the
    this letter, the enclosures, and your response to this letter will be placed
nuclear engineering group is warranted. Please address this area in your
    in the NRC Public Document Room.
response.
    The responses directed by this letter and the accompanying Notice (Order)
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
    are not subject to the clearance procedures of the Office of Management
this letter, the enclosures, and your response to this letter will be placed
    and Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.
in the NRC Public Document Room.
      .
The responses directed by this letter and the accompanying Notice (Order)
are not subject to the clearance procedures of the Office of Management
and Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.
.
3
3
      8607100070 860703
8607100070 860703
        DR   ADOCK 05000295
DR
                          PDR
ADOCK 05000295
                                                                                    k
PDR
                                                .
k
                                                                                966/   -
.
966/
-


      .     .
.
        Comonwealth Edison Company.                             2
.
                        ,                                                            JUL   3 1986
Comonwealth Edison Company.
        We will gladly discuss any questions you have concerning this inspection.
2
                                                                  Sincerely,
JUL
                                                                    &   W          /W
3 1986
                                                                  C. W. Hehl, Chief
,
                                                                  Operations Branch                     -
We will gladly discuss any questions you have concerning this inspection.
        Enclosures:
Sincerely,
        1.   Notice of Violaticn
W
        2.   Inspection Report
&
                  No.50-295/86012(DRS);
/W
                    No. 50-304/86011(DRS)
C. W. Hehl, Chief
        cc w/ enclosures:
Operations Branch
        D. L. Farrar, Director
-
            of Nuclear Licensing
Enclosures:
        G. J. Plim1, Station Manager
1.
        Jan Norris, Project Manager, NRR
Notice of Violaticn
    -
2.
        DCS/RSB (RIDS)
Inspection Report
        Licensing Fee Management Branch
No.50-295/86012(DRS);
  -     Resident Inspector, RIII                                                                   ,.
No. 50-304/86011(DRS)
        Phyllis Dunton, Attorney
cc w/ enclosures:
            General's Office, Environmental
D. L. Farrar, Director
            Control Division
of Nuclear Licensing
        Mayor, City of Zion
G. J. Plim1, Station Manager
                                                                .
Jan Norris, Project Manager, NRR
-
DCS/RSB (RIDS)
Licensing Fee Management Branch
-
Resident Inspector, RIII
,.
Phyllis Dunton, Attorney
General's Office, Environmental
Control Division
Mayor, City of Zion
.
i
i
                                                                                                      .~
.~
gesa~~~~~~~k
' .
R1 y
'
MLMcCormick-Barger/jk
Burgess
Ring
Hetil
06/26/86
06/p/86
06/u/86
6
7 31b
'
'
                          gesa~~~~~~~k                                    '.        R1 y
        MLMcCormick-Barger/jk                  Burgess            Ring              Hetil
        06/26/86                              06/p/86            06/u/86                    6
                                                                                        7 31b
                                                                                  '
,
,
t
t
!
!
      .         - . ,     _         , . . _ _         . , , _   _           . .                       r
.
- . ,
_
, . . _ _
. , , _
_
. .
.
r
}}
}}

Latest revision as of 03:46, 8 December 2024

Forwards Safety Insp Repts 50-295/86-12 & 50-304/86-11 on 860505-0605 & Notice of Violation.Close Mgt Attention to Activities Performed by Nuclear Engineering Group Warranted
ML20199L954
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 07/03/1986
From: Hehl C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20199L961 List:
References
NUDOCS 8607100070
Download: ML20199L954 (2)


See also: IR 05000295/1986012

Text

.

.

JUL

3 1986

Docket No. 50-295

Docket No. 50-304

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

~ This refers to the routine safety inspection conducted by M. L. McCormick-Barger

of this office on May 5 through June 5, 1986, and June 11, 1986, of activities

at the Zion Nuclear Generating Station authorized by NRC Operating Licenses

No. OPR-39 and No. OPR-48 and to the discussion of our findings with

Mr. G. Pliml and others of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

During this inspection, certain of your activities appeared to be in violation

of NRC requirements, as specified in the enclosed Notice. A written response

is required.

In view of the violation discussed in the enclosed Notice,

coupled with considerable personnel turnover in the nuclear engineering group,

we believe that close management attention to the activities performed by the

nuclear engineering group is warranted. Please address this area in your

response.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter, the enclosures, and your response to this letter will be placed

in the NRC Public Document Room.

The responses directed by this letter and the accompanying Notice (Order)

are not subject to the clearance procedures of the Office of Management

and Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.

.

3

8607100070 860703

DR

ADOCK 05000295

PDR

k

.

966/

-

.

.

Comonwealth Edison Company.

2

JUL

3 1986

,

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

W

&

/W

C. W. Hehl, Chief

Operations Branch

-

Enclosures:

1.

Notice of Violaticn

2.

Inspection Report

No.50-295/86012(DRS);

No. 50-304/86011(DRS)

cc w/ enclosures:

D. L. Farrar, Director

of Nuclear Licensing

G. J. Plim1, Station Manager

Jan Norris, Project Manager, NRR

-

DCS/RSB (RIDS)

Licensing Fee Management Branch

-

Resident Inspector, RIII

,.

Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

Mayor, City of Zion

.

i

.~

gesa~~~~~~~k

' .

R1 y

'

MLMcCormick-Barger/jk

Burgess

Ring

Hetil

06/26/86

06/p/86

06/u/86

6

7 31b

'

,

t

!

.

- . ,

_

, . . _ _

. , , _

_

. .

.

r