ML20094L630: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:. .     . . - . _ . . _      . . . . - . . . ,
{{#Wiki_filter:..
5-                             .
5-Peach Ecttom Ltamic Power Etztlan 4
Peach Ecttom Ltamic Power Etztlan 4
..t A
..t   . A
y.
: y.                                                                                                               ;
PECO ENERGY
c PECO ENERGY                                                               ;;cM;;;an
;;cM;;;an -a ">
                                                                                              ,      -a ">
c Delta. PA 17314 9739 717 456 7014 November 10,1995 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Docket Nos. 50-277 and 50-278 Gentlemen:
Delta. PA 17314 9739 717 456 7014 November 10,1995 U.S. Nuclear Regulatory Commission                                                                               ,
Document Control Desk Washington, D.C. 20555 Docket Nos. 50-277 and 50-278                                                                                   ;
Gentlemen:
Enclosed are twelve copies of the monthly operating report for Peach Bottom Units 2 and 3 for the month of October 1995 forwarded pursuant to Technical Specification 6.9.1.d under the guidance of Regulatory Guide 10.1, Revision 4.
Enclosed are twelve copies of the monthly operating report for Peach Bottom Units 2 and 3 for the month of October 1995 forwarded pursuant to Technical Specification 6.9.1.d under the guidance of Regulatory Guide 10.1, Revision 4.
Sincerely,                                                                                                       .
Sincerely,
['
['
Gerald R. Rainey l
l Gerald R. Rainey Vice President, i
Vice President,                                                                                                 i Peach Bottom Atomic Power Station kd6N GRR/AJW/GHG/TNM/JGH:wjj i
Peach Bottom Atomic Power Station kd6N GRR/AJW/GHG/TNM/JGH:wjj i
enclosures cc:     R.A. Burricelli, Public Service Electric & Gas W.P. Dornsife, Commonwealth of Pennsylvania                                                             -
enclosures cc:
R.I. McLean, State of Maryland T.T. Martin, Administrator, Region I, USNRC W.L Schmidt, USNRC, Senior Resident inspector H.C Schwemm, Atlantic Electric A.F. Kirby, Ill, Delmarva Power & Ught INPO Records Center l
R.A. Burricelli, Public Service Electric & Gas W.P. Dornsife, Commonwealth of Pennsylvania R.I. McLean, State of Maryland T.T. Martin, Administrator, Region I, USNRC W.L Schmidt, USNRC, Senior Resident inspector H.C Schwemm, Atlantic Electric A.F. Kirby, Ill, Delmarva Power & Ught INPO Records Center 0-n: e, e,
0-n: e,       .      .
L u u tj ccn 95-14097 9511210043 951031 PDR ADDCK 05000277 i
e, L u u tj ccn 95-14097 9511210043 951031 PDR ADDCK 05000277                                                                   ,                        i R.                       PDR
R.
PDR


I
I
    ..(   ,"                          PEACH BOTTOM ATOMIC POWER STATION NRC MONTHLY CPERATIONS  
..(
PEACH BOTTOM ATOMIC POWER STATION NRC MONTHLY CPERATIONS  


==SUMMARY==
==SUMMARY==
 
OCTOBER 1995 UNIT 2 Unit 2 began the month of October at 100% nominal power and operated at that power level until October 26. Power was reduced to approximately 95% after isolating the "B" feedwater string in response to a feedwater heater leak.
OCTOBER 1995 UNIT 2 Unit 2 began the month of October at 100% nominal power and operated at that power level until   .
UNIT 3 Unit 3 began the month of October shut down for the tenth refueling outage. The unit returned to power operation on October 22. Ndminal 100% power was achelved on October 23 and remained at that level for the rest of the month.
October 26. Power was reduced to approximately 95% after isolating the "B" feedwater string in response to a feedwater heater leak.
UNIT 3 Unit 3 began the month of October shut down for the tenth refueling outage. The unit returned to power operation on October 22. Ndminal 100% power was achelved on October 23 and remained       ,
at that level for the rest of the month.                                                         ,
i I
i I
l l
I f
l f
l f
i e
f i
e


_. . . .  ~ - . _           . - . _ . - _ - - - -                            - . . ~     . - -        --    - . - - . - ~ . .
~ -. _
I Attachment to         '
-.. ~
4
~..
        .                                                                                              Monthly Operating
I Attachment to 4
:                                                                                                Report for October 1995           ,
Monthly Operating Report for October 1995 t
t P
P
^
^
UNIT 2 REFUELING INFORMATION                                           .
UNIT 2 REFUELING INFORMATION 1.
: 1.        Name of facNity:                                                                                             !
Name of facNity:
Peach Bottom Unit 2                                                                               ;
Peach Bottom Unit 2 i
i
2.
: 2.       Scheduled date for next refueling shutdown:                                                                   j Reload 11 scheduled for September 20,1996.
Scheduled date for next refueling shutdown:
: 3.       Scheduled date for restart following refueling:                                                               l i
j Reload 11 scheduled for September 20,1996.
Restart following refueling forecast for November 2,1996.                                         l i
3.
i
Scheduled date for restart following refueling:
: 4.       Will refueling or resumption of operation therefore require a technical specification change or other         l license emendment?                                                                                           ,
l i
N/A                                                                                              ,
Restart following refueling forecast for November 2,1996.
                                                                                                                                'i If answer is yes, what, in general, wHI these be?                                                            l
l i
: 5.        Scheduled date(s) for submitting proposed licensing action and supporting information:                      ;
i 4.
i N/A
Will refueling or resumption of operation therefore require a technical specification change or other l
: 6.        Important licensing considerations associated with refueling, e.g., new or different fuel design or          l
license emendment?
                    . supplier, unreviewed design or performance analysis methods, significant changes in fuel design,              l new operating procedures:
N/A
N/A
: 7.         The number of fuel assembliec (a) in the core and (b) in the spent fuel storage pool:
'i If answer is yes, what, in general, wHI these be?
l 5.
Scheduled date(s) for submitting proposed licensing action and supporting information:
N/A i
6.
Important licensing considerations associated with refueling, e.g., new or different fuel design or
. supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
N/A 7.
The number of fuel assembliec (a) in the core and (b) in the spent fuel storage pool:
(a) Core - 764 Fuel Assemblies 1
(a) Core - 764 Fuel Assemblies 1
(b) Fuel Pool - 2436 Fuel Assemblies,59 Fuel Rods                                               ]
(b) Fuel Pool - 2436 Fuel Assemblies,59 Fuel Rods
]
4
4


-  . .    .'                                                                                    Docket No. 50-277 Attachment to Monthly Operating
Docket No. 50-277 Attachment to Monthly Operating Report for October 1995 Page 2 4
* Report for October 1995
UNIT 2 REFUELING INFORMATION (Continued) i 8.
                                                                      .                                      Page 2 4
The present licensed spent fuel pool storage capacky and the size of any increase in licensed storage capacky that has been requested or is planned, in number of fuel assemblies:
UNIT 2 REFUELING INFORMATION (Continued)                                         i
: 8.     The present licensed spent fuel pool storage capacky and the size of any increase in licensed storage capacky that has been requested or is planned, in number of fuel assemblies:
The spent fuel pool storage capacky has been relicensed for 3819 fuel assemblies.
The spent fuel pool storage capacky has been relicensed for 3819 fuel assemblies.
i i
i i
: 9.      The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacky:
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the 9.
present capacky:
September 2004 without full core offload capability.
September 2004 without full core offload capability.
September 1998 with full bore offload capabilty.                                             1 6
September 1998 with full bore offload capabilty.
1 6
i e
i e


                                        .-        .      -  ..    -.        .      . . - - - - ~ .                   - _~
.. - - - - ~.
        .'                                                                                            Docket No. 50-278 Attachment to Monthly Operating -     j Report for October 1995             !
_~
UNIT 3 REFUELING INFORMATION
Docket No. 50-278 Attachment to Monthly Operating -
: 1. Name of facility:                                               .
j Report for October 1995 UNIT 3 REFUELING INFORMATION 1.
Peach Bottom Unit 3
Name of facility:
: 2.     Scheduled date for next refueling shutdown:
Peach Bottom Unit 3 2.
Reload 11 scheduled for September 15,1997                                                               ,
Scheduled date for next refueling shutdown:
: 3. Scheduled date for restart following refueling                                                                     {
Reload 11 scheduled for September 15,1997 3.
Scheduled date for restart following refueling
{
Restart following refueling scheduled for October 20,1997 i
Restart following refueling scheduled for October 20,1997 i
: 4. Will refueling or resumption of operation thereafter require a technical specification change or other             I license amendment?
4.
j N/A If answer is yes, what, in general, will these be?                                                                 l S. Scheduled date(s) for submitting proposed licensing action and supporting information:                           ;
Will refueling or resumption of operation thereafter require a technical specification change or other I
i
license amendment?
: 6. Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
N/A j
N/A
If answer is yes, what, in general, will these be?
: 7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
l S.
(a) Core - 764 Fuel Assemblies (b) Fuel Pool - 2201 Fuel Assemblies, 6 Fuel Rods
Scheduled date(s) for submitting proposed licensing action and supporting information:
: 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
i 6.
Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
N/A 7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
(a) Core - 764 Fuel Assemblies (b) Fuel Pool - 2201 Fuel Assemblies, 6 Fuel Rods 8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.
The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.


  ...7
...7 Docket No. 50-278 Attachment to Monthly Operating Report for October 1995 Page 2 L
      ..  ."                                                                                                  Docket No. 50-278 Attachment to Monthly Operating Report for October 1995 Page 2 L                                     UNIT 3 REFUEUNG INFORMATION (Continued) l
UNIT 3 REFUEUNG INFORMATION (Continued) l 9.
: 9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:
September 2003 without full core offload capab8ity.
September 2003 without full core offload capab8ity.
September 1999 with full core offload capablity.
September 1999 with full core offload capablity.
Line 118: Line 128:


l i
l i
(                                                                                                                                                                                                                                                                                                       .'
(
AVER?.GE DAILY UNIT POWE3 LEVEL                                                                                                                                                                                                       '',
AVER?.GE DAILY UNIT POWE3 LEVEL DOCKET NO. 50 - 277 UNIT PEACH 80TTO4 UNIT 2 DATE NOVEMBER 9.1995 COMPANY PECO ENERGY COMPANY L. P. HYDRICK l
DOCKET NO. 50 - 277                                                                                                                                                                                   ,
SUSINESS SERVICES SITE SUPPORT OIVISION I'
UNIT PEACH 80TTO4 UNIT 2                         _
PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-4383 MONTH OCTOBER 1995 l
DATE NOVEMBER 9.1995 COMPANY PECO ENERGY COMPANY                                                                                                                                                 ,
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET)
L. P. HYDRICK l
(WWE-MET)'
SUSINESS SERVICES SITE SUPPORT OIVISION                                                                                                                                                                     ,
i 1
I' PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-4383
1104 17 1108 2
!                  MONTH OCTOBER 1995 l                                                                                                                                                                                                                                                                                                                 '
1096 18 1099 3
DAY AVERAGE DAILY POWER LEVEL                                                                     DAY     AVERAGE DAILY POWER LEVEL (MWE-NET)                                                                                   (WWE-MET)'
1104 19 1100
i 1                                             1104                                                 17                                   1108                                                                                                 -
{
2                                            1096                                                 18                                   1099 3                                             1104                                                 19                                   1100 4                                             1100                                               20                                   1107                                                                                                                                                 {
4 1100 20 1107 5
5                                            1096                                               21                                   1098                                                                                                                                                 ;
1096 21 1098 6
6                                              1108                                               22                                   1089 7                                             1100                                               23                                   1102                                                                                                                                                 ;
1108 22 1089 7
8                                            1110                                                 24                                   1101.
1100 23 1102 8
9                                             1102                                               25                                   1100 10                                             1110                                               26                                   1078 11                                             1109                                               27                                   1043 12                                             1105                                               28                                   1030 13                                             1099                                               29                                   1079 14                                             1106                                               30                                   1035 15                                             1102                                               31                                   1039                                                                                                                                                   8 i
1110 24 1101.
16                                             1102 b
9 1102 25 1100 10 1110 26 1078 11 1109 27 1043 12 1105 28 1030 13 1099 29 1079 14 1106 30 1035 8
__ _ . . _ _ .        _ _ _ _ _ . _ _ _ . _ _ _ _ _ _ _ _ . . _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ . _ _                      _ _ _ _ _ _ _ _ _ _ _ _ _ .        . _ _ . - . . . . . _ _ _ ~ _ _ _ _ _ _ _ . . . . _ , _ _ _ . . . . _ _ ._ . . , . _ _ . . - . . _ . . - . _ _ . _ . . . . . _ _ _ . ,
15 1102 31 1039 i
16 1102 b
. _ _. -..... _ _ _ ~ _ _ _ _ _ _ _.... _, _ _ _.... _ _._


                                                                                                                                                                                                                                                                ^ '
^ '
AVERAGE DOILY UNIT POWEQ LEVEL                                                                                                                                                                 .
AVERAGE DOILY UNIT POWEQ LEVEL DOCKET NO. 50 - 278 UNIT PEACH BOTTOM UNIT 3 DATE NOVEMBER 9,1995 COMPANY PECO ENERGY COMPANY L. P. HYDRICK SUSINESS SERVICES SITE SUPPORT DIVISION PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-4383 MONTH OCTOBER 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (WWE-NET)
DOCKET NO. 50 - 278 UNIT PEACH BOTTOM UNIT 3                                                                                                             .,
(WWE-NET) 1 0
DATE NOVEMBER 9,1995 COMPANY PECO ENERGY COMPANY                                                                                                                     ,
17 156 2
L. P. HYDRICK SUSINESS SERVICES SITE SUPPORT DIVISION PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-4383                     _
0 18 204 3
MONTH OCTOBER 1995 DAY AVERAGE DAILY POWER LEVEL                             DAY   AVERAGE DAILY POWER LEVEL (WWE-NET)                                                         (WWE-NET) 1               0                                         17                 156 2               0                                         18                 204 3               0                                         19                 324 4               0                                         20                 606 5               0                                         21                 865 6               0                                         22               1055 7               0                                         23               1108 8               0                                         24               1078 9               0                                         25               1099 1
0 19 324 4
10               0                                         26               1106 11               0                                         27               1126 12               0                                         28               1110 13               0                                         29               1162 14               0                                         30               1118 15               0                                         31               1109 16               0
0 20 606 5
_. .      .. ... ,...  - - . . - . . . . . . . ~ . . . . - . - , - - . ~ . . - - . , _ , . _ . . . . . . . - . - . . - - - - . _ . -
0 21 865 6
0 22 1055 7
0 23 1108 8
0 24 1078 9
0 25 1099 1
10 0
26 1106 11 0
27 1126 12 0
28 1110 13 0
29 1162 14 0
30 1118 15 0
31 1109 16 0
- -.. -....... ~..
.. -. -, - -. ~.. - -., _,. _.


                                                                                                                                                                                                          .      -+:
-+:
OPEIATING D?.TA REPORT                                                                                                                                                     ,
OPEIATING D?.TA REPORT DOCKET NO. 50.- 277 DATE NOVEMBER 9.1995 COMPLETED BY PECO ENERGY COMPANY L. P. HYDRICK BUSINESS SERVICES ~
DOCKET NO. 50.- 277                                                                                                                         ,
SITE SUPPORT DIVT'4 ;'F-PEACH BOTTOM ATOh
DATE NOVEMBER 9.1995                                                                                               ,
-MER STATION TELEPHONE (717) 456-4383 OPERATING STATUS
COMPLETED BY PECO ENERGY COMPANY L. P. HYDRICK BUSINESS SERVICES ~
=-.
SITE SUPPORT DIVT'4 ;'F-PEACH BOTTOM ATOh                                                               -MER STATION TELEPHONE (717) 456-4383                                                         - -                          . - _ _ _                              ,
: 1. UNIT MAME: PEACH BOTTOM UNIT 2 NOTES:
OPERATING STATUS                                                                                                                                                                                                 ,
: 2. REPORTING PERIOD:
__.-          =-.
OCTOBER, 1995
: 1. UNIT MAME: PEACH BOTTOM UNIT 2                             NOTES:
: 2. REPORTING PERIOD:     OCTOBER, 1995                                                                                                                                                                               ,
(
(
                                                                                                                                                                                                                      )
: 3. LICENSED THERMAL POWER (MWT):
: 3. LICENSED THERMAL POWER (MWT):                 3458 1221                                                                                                                                                                ;
3458
)
4 NAMEPLATE RATING (GROSS MWE):
4 NAMEPLATE RATING (GROSS MWE):
: 5. DESIGN ELECTRICAL RATING (NET MWE):           1119                                                                                                                                                               '{
1221
: 5. DESIGN ELECTRICAL RATING (NET MWE):
1119
'{
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 1159
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 1159
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):       1093
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
: 8. IF CHANGES OCCUR IN CAPACITV RATINGS (ITEMS MUMBER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS:
1093 8.
: 9. POWER LEVEL TO WHICH RESTRICTED. IF ANY (NET MWE):                                                                                                                                                               ,
IF CHANGES OCCUR IN CAPACITV RATINGS (ITEMS MUMBER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS:
: 10. REASONS FOR RESTRICTIONS. IF ANY:                                                                                                                                                                                 s i
9.
THIS MONTH                                             YR-TO-DATE                                                 CUMULATIVE                                   [
POWER LEVEL TO WHICH RESTRICTED. IF ANY (NET MWE):
: 11. HOURS IN REPORTING PERIOD                                               745                                               7.296                                                     186.936
: 10. REASONS FOR RESTRICTIONS. IF ANY:
                                                                                                                                                                                                                      ?
s i
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL                             745.0                                               7.296.0                                             121.259.1
THIS MONTH YR-TO-DATE CUMULATIVE
                                                                        .__                                                              ..                                                                          [
[
: 13. REACTOR RESERVE SHUTDOWN MURS                                           0.0                                                       0.0                                                   0.0.
: 11. HOURS IN REPORTING PERIOD 745 7.296 186.936
m                                               ._
?
14 HOURS GENERATOR ON-LINE                                           745.0                                               7.296.0                                             117.299.2                               ,
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL 745.0 7.296.0 121.259.1
0.0                                                       0.0                                                   0.0                     f
[
: 15. UNIT RESERVE SHUTDOWN HOURS
: 13. REACTOR RESERVE SHUTDOWN MURS 0.0 0.0 0.0.
: 16. GROSS THERMAL ENERGY GENERATED (MWH)               2.546.810                                             24.946.480                                             353.267.363                                       !
m 14 HOURS GENERATOR ON-LINE 745.0 7.296.0 117.299.2
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH)                   839.700                                             8.244.300                                           118.123.690                                     ,
: 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 f
: 18. NET ELECTRICAL ENERGY GENERATED (MWH)                     812.587                                             7.988.143                                           111.430.599                                     -
: 16. GROSS THERMAL ENERGY GENERATED (MWH) 2.546.810 24.946.480 353.267.363
PAGE 1 OF 2
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 839.700 8.244.300 118.123.690
                                                      . . . - . ., , _ _ _ . _ _ _ - - _ _ _ . __ _._.__._ _ . ~ . . - - - . - _ _ , , . _ - - , _ . _ . . _ _ _ - - - _ , . .
: 18. NET ELECTRICAL ENERGY GENERATED (MWH) 812.587 7.988.143 111.430.599 PAGE 1 OF 2
... -..,, _ _ _. _ _ _ - - _ _ _. __ _._.__._ _. ~.. - - -. - _ _,,. _ - -, _. _.. _ _ _ - - - _,..


m .
m.
OPERATING DATA fLEPORT (CONTINUED)                                                                           'DOCMET NO..:53 - 277                                                 ,
OPERATING DATA fLEPORT (CONTINUED)
DATE NOVEMBER 9,1995                                                                                                     .
'DOCMET NO..:53 - 277 DATE NOVEMBER 9,1995 THIS MONTH VR-TO-DATE CUMULATIVE
THIS MONTH                           VR-TO-DATE               CUMULATIVE
: 19. UNIT SERVICE FACTOR 100.0 100.0 62.7
: 19. UNIT SERVICE FACTOR                                                             100.0                                     100.0                       62.7                                                                           'l
' l
: 20. UNIT AVAILABILITY FACTOR                                                         100.0                                     100.0                       62.7
: 20. UNIT AVAILABILITY FACTOR 100.0 100.0 62.7
: 21. UNIT CAPACITY FACTOR (USING MDC NET)                                             ~ 99.8                                   100.2                       E6.5
: 21. UNIT CAPACITY FACTOR (USING MDC NET)
: 22. UNIT CAPACITY FACTOR (USING DER NET)                                             97.5                                     97.8                       55.7
~ 99.8 100.2 E6.5
: 23. UNIT FORCED OUTAGE RATE                                                           0.0                                       0.0                       12.4
: 22. UNIT CAPACITY FACTOR (USING DER NET) 97.5 97.8 55.7
'                                                                                                                                                                                                                                            i
: 23. UNIT FORCED OUTAGE RATE 0.0 0.0 12.4 i
: 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE. AND DURATION OF EACH):                                                                                                                                                             }
: 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE. AND DURATION OF EACH):
                                                                                                                                                                                                                                            ~t
}
~ t
: 25. IF SHUTDOWN AT END OF REPORT PERIOD.. ESTIMATED DATE OF STARTUP: N/A i
: 25. IF SHUTDOWN AT END OF REPORT PERIOD.. ESTIMATED DATE OF STARTUP: N/A i
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):                                         FORECAST                       ACHIEVED INITIAL CRITICALITY                                                                                       09/16/73 INITIAL ELECTRICITY                                                                                       02/18/74 t
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
COMMERCIAL OPERATION                                                                                     07/05/74 6
FORECAST ACHIEVED INITIAL CRITICALITY 09/16/73 INITIAL ELECTRICITY 02/18/74 t
COMMERCIAL OPERATION 07/05/74 6
0 6
0 6
PAGE 2 OF 2 5
PAGE 2 OF 2 5
6 b
6 b
  -                  _.      _ . - . ____.______________._______._._______m.             ,,m.- , _. _ __ - _ .        .s._    -_s_m,.       .    ....#  , , , , .. , , , . , , .  . . ,,%,y ,,_., ,,,,,-.,,    , ..,___.,,
m.
,,m.-
.s.
-_s_m,.
,,%,y


OPESATING DATA REPOCT                                                                                                                                                                                                                                                                                           .
OPESATING DATA REPOCT DOCKET NO. 50 - 278
DOCKET NO. 50 - 278                                                                                                                                                                                                               .
^
                                                                                                                                                                                                                                                                            ^                                                                                                                                             . i DATE NOVEMBER 9.1995                                                                                                                                                                                             .
i DATE NOVEMBER 9.1995 5
5 COMPLETED BY PECO ENERGY COMPANY-
COMPLETED BY PECO ENERGY COMPANY-
                                                                                                                                                                                                ~L. P. HYDRICK BUSINESS SERVICES SITE SUPPORT DIVISION PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-4383
~L. P. HYDRICK BUSINESS SERVICES SITE SUPPORT DIVISION PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-4383
                                                                                                                                                                                                                    .- .                                                    = - -       _
= - -
OPERATING STATUS
OPERATING STATUS
: 1. UNIT HAME: PEACH BOTTOM UNIT 3                                                                                                                           NOTES:
: 1. UNIT HAME: PEACH BOTTOM UNIT 3 NOTES:
: 2. REPORTING PERIOD:                                           OCTOBER, 1995
: 2. REPORTING PERIOD:
: 3. LICENSED THERMAL POWER (MWT):                                                                                                       3458
OCTOBER, 1995
: 4. NAMEPLATE RATING (GROSS MWE):                                                                                                       1221
: 3. LICENSED THERMAL POWER (MWT):
: 5. DESIGN ELECTRICAL RATING (HET MWE):                                                                                                 1119
3458 4.
NAMEPLATE RATING (GROSS MWE):
1221
: 5. DESIGN ELECTRICAL RATING (HET MWE):
1119
: 6. MAXIMUM OEPENDABLE CAPACITY (GROSS MWE): 1159
: 6. MAXIMUM OEPENDABLE CAPACITY (GROSS MWE): 1159
: 7. MAXIMUM DEPENDABLE CAPACITY (HET MWE):                                                                                               1093
: 7. MAXIMUM DEPENDABLE CAPACITY (HET MWE):
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS:                                                                                                                                                                                                                                                                                                 !
1093 8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS:
93-12 POWER RERATE CHANGED THE RATINGS OF ITEMS 3-7.
93-12 POWER RERATE CHANGED THE RATINGS OF ITEMS 3-7.
: 9. POWER LEVEL TO WHICH RESTRICTED. IF ANY (HET MWE):
: 9. POWER LEVEL TO WHICH RESTRICTED. IF ANY (HET MWE):
: 10. REASONS FOR RESTRICTIONS. IF ANY:
: 10. REASONS FOR RESTRICTIONS. IF ANY:
THIS MONTH                         YR-TO-DATE                                                                                                   CUMULATIVE
THIS MONTH YR-TO-DATE CUMULATIVE
: 11. HOURS IN REPORTING PERIOD                                                                                                                                   745                                                           7.296                                                                                             182.832 i
: 11. HOURS IN REPORTING PERIOD 745 7.296 182.832 i
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL                                                                                                                       360.0                                               6.578.5                                                                                         119,837.9
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL 360.0 6.578.5 119,837.9
: 13. REACTOR RESERVE SHUTDOWN HOURS                                                                                                                               0.0                                                                         0.0                                                                                                           0.0
: 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
: 14. HOURS GENERATOR ON-LINE                                                                                                                                   360.0                                               6.564.0                                                                                         116.443.2
: 14. HOURS GENERATOR ON-LINE 360.0 6.564.0 116.443.2
: 15. UNIT RESERVE SHUTDOWN HOURS                                                                                                                                 0.0                                                                         0.0                                                                                                           0.0                                         ,
: 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
: 16. GROSS THERMAL ENERGY GENERATED (MWH)                                                                                                                   1.001.028                           18.497.725                                                                                           345.071.668
: 16. GROSS THERMAL ENERGY GENERATED (MWH) 1.001.028 18.497.725 345.071.668
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH)                                                                                                                 329.600                                 5.937.600                                                                                         113.083.632
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 329.600 5.937.600 113.083.632
: 18. NET ELECTRICAL ENERGY GENERATED (MWH)                                                                                                                   314.451                                 5.678.158                                                                                       108.519.517 i
: 18. NET ELECTRICAL ENERGY GENERATED (MWH) 314.451 5.678.158 108.519.517 i
PAGE 1 OF 2                                                                                 ,
PAGE 1 OF 2 I
I
..----...- a.---.---...-
                                                                                                                                                ..----._._.-_a.---.---._..-___-a_-                                - _ _ _ . - - - - - - - _ _ - - - _ _ . _ _ - -                                                                                                              .
-a -
                                                                                                                                                                                                                                                                                                                                                                                                  - -- n -o-. -
n
w   ~
-o-.
w
~


                                                                                            ' OPERATING DATA REPORT (CONTINUED)                                   DOCKET NO. 50.- 278~                                               ,
' OPERATING DATA REPORT (CONTINUED)
                                                                                                                                'DATE NOVEMBER 9.1995                                                                           .
DOCKET NO. 50.- 278~
THIS MONTH-     YR-TO-DATE             CUMULATIVE D
'DATE NOVEMBER 9.1995 THIS MONTH-YR-TO-DATE CUMULATIVE D
: 19. UNIT SERVICE FACTOR                                                                                                     48.3           90.0                   63.7
: 19. UNIT SERVICE FACTOR 48.3 90.0 63.7
                                                                                                                      =                                                 __
=
: 20. UNIT AVAILABILITV FACTOR                                                                                                 48.3           90.0                   63.7.
: 20. UNIT AVAILABILITV FACTOR 48.3 90.0 63.7.
: 21. UNIT CAPACITY FACTOR (USING MDC NET)                                                                                     38.6'           75.0                   57.3
: 21. UNIT CAPACITY FACTOR (USING MDC NET) 38.6' 75.0 57.3
: 22. UNIT CAPACITY FACTOR (USING DER NET)                                                                                   ~37.7           72.9 55.7
: 22. UNIT CAPACITY FACTOR (USING DER NET)
: 23. UNIT FORCED OUTAGE RATE                                                                                                   O.0             2.3                   11.1
~37.7 72.9 55.7
: 23. UNIT FORCED OUTAGE RATE O.0 2.3 11.1
: 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
: 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
: 25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP: N/A
: 25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP: N/A
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):                                                                         FORECAST       ACHIEVED INITIAL CRITICALITY                                                             08/07/74 INITIAL ELECTRICITY                                                               09/01/74 COMMERCIAL OPERATION                                                               12/23/74                                                                 ,
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
PAGE 2 OF 2
FORECAST ACHIEVED INITIAL CRITICALITY 08/07/74 INITIAL ELECTRICITY 09/01/74 COMMERCIAL OPERATION 12/23/74 PAGE 2 OF 2 s
                                                                                                                                  .        .  . . _                        _ _ - . . _ -___________..______________________s


UNIT SHUTDOWNS AND POWER REDUCTIONS                 DOCKET NO. 50 - 277 UNIT NAME PEACH 80TTOM UNIT 2 DATE NOVEMBER 9.1995 REPORT MONTH   OCTOBER. 1995                 COMPLETED BY PECO ENERGY COMPANY L. P. HYDRICK BUSINESS SERVICES SITE SUPPORT DIVISION PEACH 80TTOM ATOMIC POWER STATION TELEPHONE (717) 456-4383 METHOD OF     LICENSEE   SYSTEM COMPONENT   CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN         EVENT       CODE     COOE       ACTION TO NO.       DATE (1) (HOURS)       (2)   REACTOR (3)   REPORT #     (4)       (5)   PREVENT RECURRENCE (1)                     (2)                                             (3)                       (4) 4 F - FORCED             REASON                                           METHOD                     EXHIBIT G - INSTRUCTIONS-S - SCHEDULED         A - EQUIPMENT FAILURE (EXPLAIN)                 1 - MANUAL                 FOR PREPARATION OF DATA B - MAINTENANCE OR TEST                         2 - MANUAL SCRAM.         ENTRY SHEETS FOR LICENSEE C - REFUELING                                   3 - AUTDMATIC SCRAM.       EVENT REPORT (LER)
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 - 277 UNIT NAME PEACH 80TTOM UNIT 2 DATE NOVEMBER 9.1995 REPORT MONTH OCTOBER. 1995 COMPLETED BY PECO ENERGY COMPANY L. P. HYDRICK BUSINESS SERVICES SITE SUPPORT DIVISION PEACH 80TTOM ATOMIC POWER STATION TELEPHONE (717) 456-4383 METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE COOE ACTION TO NO.
D - REGULATORY RESTRICTION                       4 - OTHER (EXPLAIN)           FILE (NUREG-0161)
DATE (1)
E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE                                                                   (5)
(HOURS)
(2)
REACTOR (3)
REPORT #
(4)
(5)
PREVENT RECURRENCE (1)
(2)
(3)
(4) 4 F - FORCED REASON METHOD EXHIBIT G - INSTRUCTIONS-S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM.
ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTDMATIC SCRAM.
EVENT REPORT (LER)
D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)
FILE (NUREG-0161)
E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5)
G - OPERATIONAL ERROR (EXPLAIN)
G - OPERATIONAL ERROR (EXPLAIN)
H - OTHER(EXPLAIN)                                                         EXHIBIT I - SAME SOURCE
H - OTHER(EXPLAIN)
EXHIBIT I - SAME SOURCE


                                                                                                                                                              \
\\
4 T
4 T
UNIT SHUTDOWNS AND POWER REDUCTIONS                     DOCMET NO. 50 - 278 UNIT NAME PEACH BOTTOM UNIT 3 '
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCMET NO. 50 - 278 UNIT NAME PEACH BOTTOM UNIT 3 '
DATE NOVEMBER 9.1995 REPORT MONTH   OCTOBER. 1995                     COMPLETED BV PECO ENERGY COMPANY L. P. HYDRICK BUSINESS SERVICES SITE SUPPORT DIVISION PEACH BOTTON ATOMIC POWER STATION TELEPHONE (717) 456-4383 METHOO OF     LICENSEE     SYSTEM COMPONENT l CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DCNN     EVENT         CODE     CODE I       ACTION TO NO. DATE   (1) (HOURS)     (2)   REACTOR (3)   REPORT dr       (4)     (5) l PREVENT RECURRENCE 13   951001   S   385.0       H         4                         RC     CONROO     REACTOR SHUTDOWN FOR 3R10 REFUEL OUTAGE 1
DATE NOVEMBER 9.1995 REPORT MONTH OCTOBER. 1995 COMPLETED BV PECO ENERGY COMPANY L. P. HYDRICK BUSINESS SERVICES SITE SUPPORT DIVISION PEACH BOTTON ATOMIC POWER STATION TELEPHONE (717) 456-4383 METHOO OF LICENSEE SYSTEM COMPONENT l CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DCNN EVENT CODE CODE I ACTION TO NO.
1 385.0 (1)                   (2)                                               (3)                         (4)
DATE (1)
F - FORCED       REASON                                             METHOD                     EXHIBIT G - INSTRUCTIONS S - SCHEDULED     A - EQUIPMENT FAILURE (EXPLAIN)                     1 - MANUAL                 FOR PREPARATION OF DATA B - MAINTENANCE OR TEST                           2 - MANUAL SCRAM.           ENTRY SHEETS FOR LICENSEE C - REFUELING                                     3 - AUTOMATIC SCRAM.       EVENT REPORT (LER)
(HOURS)
D - REGULATORY RelTRICTION                         4 - OTHER (EXPLAIN)           FILE (NUREG-0161)
(2)
E - OPERATOR TRC 11MG + LICENSE EXAMINATION F - ADMINISTRATIVE                                                                       (5)
REACTOR (3)
REPORT dr (4)
(5) l PREVENT RECURRENCE 13 951001 S
385.0 H
4 RC CONROO REACTOR SHUTDOWN FOR 3R10 REFUEL OUTAGE 1
1 385.0 (1)
(2)
(3)
(4)
F - FORCED REASON METHOD EXHIBIT G - INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM.
ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM.
EVENT REPORT (LER)
D - REGULATORY RelTRICTION 4 - OTHER (EXPLAIN)
FILE (NUREG-0161)
E - OPERATOR TRC 11MG + LICENSE EXAMINATION F - ADMINISTRATIVE (5)
G - OPERATIONAL EkROR (EXPLAIN)
G - OPERATIONAL EkROR (EXPLAIN)
H - OTHER(EXPLAIN)                                                             EXHIBIT I - SAME SOURCE
H - OTHER(EXPLAIN)
                                                                                                                                        . . . . . .}}
EXHIBIT I - SAME SOURCE
......}}

Latest revision as of 09:20, 13 December 2024

Monthly Operating Repts for Oct 1995 for Peach Bottom Units 2 & 3
ML20094L630
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 10/31/1995
From: Hydrick L, Rainey G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9511210043
Download: ML20094L630 (14)


Text

..

5-Peach Ecttom Ltamic Power Etztlan 4

..t A

y.

PECO ENERGY

cM;;;an -a ">

c Delta. PA 17314 9739 717 456 7014 November 10,1995 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Docket Nos. 50-277 and 50-278 Gentlemen:

Enclosed are twelve copies of the monthly operating report for Peach Bottom Units 2 and 3 for the month of October 1995 forwarded pursuant to Technical Specification 6.9.1.d under the guidance of Regulatory Guide 10.1, Revision 4.

Sincerely,

['

l Gerald R. Rainey Vice President, i

Peach Bottom Atomic Power Station kd6N GRR/AJW/GHG/TNM/JGH:wjj i

enclosures cc:

R.A. Burricelli, Public Service Electric & Gas W.P. Dornsife, Commonwealth of Pennsylvania R.I. McLean, State of Maryland T.T. Martin, Administrator, Region I, USNRC W.L Schmidt, USNRC, Senior Resident inspector H.C Schwemm, Atlantic Electric A.F. Kirby, Ill, Delmarva Power & Ught INPO Records Center 0-n: e, e,

L u u tj ccn 95-14097 9511210043 951031 PDR ADDCK 05000277 i

R.

PDR

I

..(

PEACH BOTTOM ATOMIC POWER STATION NRC MONTHLY CPERATIONS

SUMMARY

OCTOBER 1995 UNIT 2 Unit 2 began the month of October at 100% nominal power and operated at that power level until October 26. Power was reduced to approximately 95% after isolating the "B" feedwater string in response to a feedwater heater leak.

UNIT 3 Unit 3 began the month of October shut down for the tenth refueling outage. The unit returned to power operation on October 22. Ndminal 100% power was achelved on October 23 and remained at that level for the rest of the month.

i I

l f

f i

e

~ -. _

-.. ~

~..

I Attachment to 4

Monthly Operating Report for October 1995 t

P

^

UNIT 2 REFUELING INFORMATION 1.

Name of facNity:

Peach Bottom Unit 2 i

2.

Scheduled date for next refueling shutdown:

j Reload 11 scheduled for September 20,1996.

3.

Scheduled date for restart following refueling:

l i

Restart following refueling forecast for November 2,1996.

l i

i 4.

Will refueling or resumption of operation therefore require a technical specification change or other l

license emendment?

N/A

'i If answer is yes, what, in general, wHI these be?

l 5.

Scheduled date(s) for submitting proposed licensing action and supporting information:

N/A i

6.

Important licensing considerations associated with refueling, e.g., new or different fuel design or

. supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

N/A 7.

The number of fuel assembliec (a) in the core and (b) in the spent fuel storage pool:

(a) Core - 764 Fuel Assemblies 1

(b) Fuel Pool - 2436 Fuel Assemblies,59 Fuel Rods

]

4

Docket No. 50-277 Attachment to Monthly Operating Report for October 1995 Page 2 4

UNIT 2 REFUELING INFORMATION (Continued) i 8.

The present licensed spent fuel pool storage capacky and the size of any increase in licensed storage capacky that has been requested or is planned, in number of fuel assemblies:

The spent fuel pool storage capacky has been relicensed for 3819 fuel assemblies.

i i

The projected date of the last refueling that can be discharged to the spent fuel pool assuming the 9.

present capacky:

September 2004 without full core offload capability.

September 1998 with full bore offload capabilty.

1 6

i e

.. - - - - ~.

_~

Docket No. 50-278 Attachment to Monthly Operating -

j Report for October 1995 UNIT 3 REFUELING INFORMATION 1.

Name of facility:

Peach Bottom Unit 3 2.

Scheduled date for next refueling shutdown:

Reload 11 scheduled for September 15,1997 3.

Scheduled date for restart following refueling

{

Restart following refueling scheduled for October 20,1997 i

4.

Will refueling or resumption of operation thereafter require a technical specification change or other I

license amendment?

N/A j

If answer is yes, what, in general, will these be?

l S.

Scheduled date(s) for submitting proposed licensing action and supporting information:

i 6.

Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

N/A 7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

(a) Core - 764 Fuel Assemblies (b) Fuel Pool - 2201 Fuel Assemblies, 6 Fuel Rods 8.

The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.

...7 Docket No. 50-278 Attachment to Monthly Operating Report for October 1995 Page 2 L

UNIT 3 REFUEUNG INFORMATION (Continued) l 9.

The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:

September 2003 without full core offload capab8ity.

September 1999 with full core offload capablity.

I e

l i

(

AVER?.GE DAILY UNIT POWE3 LEVEL DOCKET NO. 50 - 277 UNIT PEACH 80TTO4 UNIT 2 DATE NOVEMBER 9.1995 COMPANY PECO ENERGY COMPANY L. P. HYDRICK l

SUSINESS SERVICES SITE SUPPORT OIVISION I'

PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-4383 MONTH OCTOBER 1995 l

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET)

(WWE-MET)'

i 1

1104 17 1108 2

1096 18 1099 3

1104 19 1100

{

4 1100 20 1107 5

1096 21 1098 6

1108 22 1089 7

1100 23 1102 8

1110 24 1101.

9 1102 25 1100 10 1110 26 1078 11 1109 27 1043 12 1105 28 1030 13 1099 29 1079 14 1106 30 1035 8

15 1102 31 1039 i

16 1102 b

. _ _. -..... _ _ _ ~ _ _ _ _ _ _ _.... _, _ _ _.... _ _._

^ '

AVERAGE DOILY UNIT POWEQ LEVEL DOCKET NO. 50 - 278 UNIT PEACH BOTTOM UNIT 3 DATE NOVEMBER 9,1995 COMPANY PECO ENERGY COMPANY L. P. HYDRICK SUSINESS SERVICES SITE SUPPORT DIVISION PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-4383 MONTH OCTOBER 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (WWE-NET)

(WWE-NET) 1 0

17 156 2

0 18 204 3

0 19 324 4

0 20 606 5

0 21 865 6

0 22 1055 7

0 23 1108 8

0 24 1078 9

0 25 1099 1

10 0

26 1106 11 0

27 1126 12 0

28 1110 13 0

29 1162 14 0

30 1118 15 0

31 1109 16 0

- -.. -....... ~..

.. -. -, - -. ~.. - -., _,. _.

-+:

OPEIATING D?.TA REPORT DOCKET NO. 50.- 277 DATE NOVEMBER 9.1995 COMPLETED BY PECO ENERGY COMPANY L. P. HYDRICK BUSINESS SERVICES ~

SITE SUPPORT DIVT'4 ;'F-PEACH BOTTOM ATOh

-MER STATION TELEPHONE (717) 456-4383 OPERATING STATUS

=-.

1. UNIT MAME: PEACH BOTTOM UNIT 2 NOTES:
2. REPORTING PERIOD:

OCTOBER, 1995

(

3. LICENSED THERMAL POWER (MWT):

3458

)

4 NAMEPLATE RATING (GROSS MWE):

1221

5. DESIGN ELECTRICAL RATING (NET MWE):

1119

'{

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 1159
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):

1093 8.

IF CHANGES OCCUR IN CAPACITV RATINGS (ITEMS MUMBER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS:

9.

POWER LEVEL TO WHICH RESTRICTED. IF ANY (NET MWE):

10. REASONS FOR RESTRICTIONS. IF ANY:

s i

THIS MONTH YR-TO-DATE CUMULATIVE

[

11. HOURS IN REPORTING PERIOD 745 7.296 186.936

?

12. NUMBER OF HOURS REACTOR WAS CRITICAL 745.0 7.296.0 121.259.1

[

13. REACTOR RESERVE SHUTDOWN MURS 0.0 0.0 0.0.

m 14 HOURS GENERATOR ON-LINE 745.0 7.296.0 117.299.2

15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 f
16. GROSS THERMAL ENERGY GENERATED (MWH) 2.546.810 24.946.480 353.267.363
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 839.700 8.244.300 118.123.690
18. NET ELECTRICAL ENERGY GENERATED (MWH) 812.587 7.988.143 111.430.599 PAGE 1 OF 2

... -..,, _ _ _. _ _ _ - - _ _ _. __ _._.__._ _. ~.. - - -. - _ _,,. _ - -, _. _.. _ _ _ - - - _,..

m.

OPERATING DATA fLEPORT (CONTINUED)

'DOCMET NO..:53 - 277 DATE NOVEMBER 9,1995 THIS MONTH VR-TO-DATE CUMULATIVE

19. UNIT SERVICE FACTOR 100.0 100.0 62.7

' l

20. UNIT AVAILABILITY FACTOR 100.0 100.0 62.7
21. UNIT CAPACITY FACTOR (USING MDC NET)

~ 99.8 100.2 E6.5

22. UNIT CAPACITY FACTOR (USING DER NET) 97.5 97.8 55.7
23. UNIT FORCED OUTAGE RATE 0.0 0.0 12.4 i
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE. AND DURATION OF EACH):

}

~ t

25. IF SHUTDOWN AT END OF REPORT PERIOD.. ESTIMATED DATE OF STARTUP: N/A i
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY 09/16/73 INITIAL ELECTRICITY 02/18/74 t

COMMERCIAL OPERATION 07/05/74 6

0 6

PAGE 2 OF 2 5

6 b

m.

,,m.-

.s.

-_s_m,.

,,%,y

OPESATING DATA REPOCT DOCKET NO. 50 - 278

^

i DATE NOVEMBER 9.1995 5

COMPLETED BY PECO ENERGY COMPANY-

~L. P. HYDRICK BUSINESS SERVICES SITE SUPPORT DIVISION PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-4383

= - -

OPERATING STATUS

1. UNIT HAME: PEACH BOTTOM UNIT 3 NOTES:
2. REPORTING PERIOD:

OCTOBER, 1995

3. LICENSED THERMAL POWER (MWT):

3458 4.

NAMEPLATE RATING (GROSS MWE):

1221

5. DESIGN ELECTRICAL RATING (HET MWE):

1119

6. MAXIMUM OEPENDABLE CAPACITY (GROSS MWE): 1159
7. MAXIMUM DEPENDABLE CAPACITY (HET MWE):

1093 8.

IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS:

93-12 POWER RERATE CHANGED THE RATINGS OF ITEMS 3-7.

9. POWER LEVEL TO WHICH RESTRICTED. IF ANY (HET MWE):
10. REASONS FOR RESTRICTIONS. IF ANY:

THIS MONTH YR-TO-DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 745 7.296 182.832 i
12. NUMBER OF HOURS REACTOR WAS CRITICAL 360.0 6.578.5 119,837.9
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
14. HOURS GENERATOR ON-LINE 360.0 6.564.0 116.443.2
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 1.001.028 18.497.725 345.071.668
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 329.600 5.937.600 113.083.632
18. NET ELECTRICAL ENERGY GENERATED (MWH) 314.451 5.678.158 108.519.517 i

PAGE 1 OF 2 I

..----...- a.---.---...-

-a -

n

-o-.

w

~

' OPERATING DATA REPORT (CONTINUED)

DOCKET NO. 50.- 278~

'DATE NOVEMBER 9.1995 THIS MONTH-YR-TO-DATE CUMULATIVE D

19. UNIT SERVICE FACTOR 48.3 90.0 63.7

=

20. UNIT AVAILABILITV FACTOR 48.3 90.0 63.7.
21. UNIT CAPACITY FACTOR (USING MDC NET) 38.6' 75.0 57.3
22. UNIT CAPACITY FACTOR (USING DER NET)

~37.7 72.9 55.7

23. UNIT FORCED OUTAGE RATE O.0 2.3 11.1
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP: N/A
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY 08/07/74 INITIAL ELECTRICITY 09/01/74 COMMERCIAL OPERATION 12/23/74 PAGE 2 OF 2 s

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 - 277 UNIT NAME PEACH 80TTOM UNIT 2 DATE NOVEMBER 9.1995 REPORT MONTH OCTOBER. 1995 COMPLETED BY PECO ENERGY COMPANY L. P. HYDRICK BUSINESS SERVICES SITE SUPPORT DIVISION PEACH 80TTOM ATOMIC POWER STATION TELEPHONE (717) 456-4383 METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE COOE ACTION TO NO.

DATE (1)

(HOURS)

(2)

REACTOR (3)

REPORT #

(4)

(5)

PREVENT RECURRENCE (1)

(2)

(3)

(4) 4 F - FORCED REASON METHOD EXHIBIT G - INSTRUCTIONS-S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM.

ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTDMATIC SCRAM.

EVENT REPORT (LER)

D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)

FILE (NUREG-0161)

E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5)

G - OPERATIONAL ERROR (EXPLAIN)

H - OTHER(EXPLAIN)

EXHIBIT I - SAME SOURCE

\\

4 T

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCMET NO. 50 - 278 UNIT NAME PEACH BOTTOM UNIT 3 '

DATE NOVEMBER 9.1995 REPORT MONTH OCTOBER. 1995 COMPLETED BV PECO ENERGY COMPANY L. P. HYDRICK BUSINESS SERVICES SITE SUPPORT DIVISION PEACH BOTTON ATOMIC POWER STATION TELEPHONE (717) 456-4383 METHOO OF LICENSEE SYSTEM COMPONENT l CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DCNN EVENT CODE CODE I ACTION TO NO.

DATE (1)

(HOURS)

(2)

REACTOR (3)

REPORT dr (4)

(5) l PREVENT RECURRENCE 13 951001 S

385.0 H

4 RC CONROO REACTOR SHUTDOWN FOR 3R10 REFUEL OUTAGE 1

1 385.0 (1)

(2)

(3)

(4)

F - FORCED REASON METHOD EXHIBIT G - INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM.

ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM.

EVENT REPORT (LER)

D - REGULATORY RelTRICTION 4 - OTHER (EXPLAIN)

FILE (NUREG-0161)

E - OPERATOR TRC 11MG + LICENSE EXAMINATION F - ADMINISTRATIVE (5)

G - OPERATIONAL EkROR (EXPLAIN)

H - OTHER(EXPLAIN)

EXHIBIT I - SAME SOURCE

......