ML20073K772: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:, | ||
', ~ | |||
a< n. =v.ci ne=i | ~ | ||
a< n. =v.ci ne=i pg,g NUCLE R LANT OPER TIO ARTMENT CORPORATE EMERGENCY RESPONSE PLAN p | |||
pg,g | p CONTROLLED DOCUMENT TRANSMITTAL SetEET Nuclear Emergency Response Communications Directory Approved: | ||
Change Number: | |||
05 | |||
/[ | |||
* INSTRUCTIONS | pg Change Date: | ||
01/17/83 Date: | |||
CHANGES) | |||
* INSTRUCTIONS CHANGE | |||
==SUMMARY== | ==SUMMARY== | ||
Implerenting Procedure 1. | |||
Insert under Tab Replaces Implementing Procedur! | |||
" Table of Organization" | |||
" Implementing Procedures" Table of Contents (dated ' | |||
(dated 01/01/83) in CERP Manual 5/14/81) 2. | |||
Destroy superceded item imediately Replaces / reissues CERP Implementing Affected Appendix Appendices with Effective Procedure Appendix Date Dates as follows: | |||
1.1 E-1 04/15/81 Insert CERP Implementing 04/15/81 E-2,3,4,5 01/01/83 Procedure Appendices 10/01/82 into CERP Manual and E-8,9 08/82 destroy superceded items 04/15/81 insnediately 3.1 E-2,3,4,5 01/01/83 10/01/82 E-7,,8 06/82 05/12/81 3.2 E-1 08/13/81 08/13/81 E-2,3 01/01/83 10/01/82 E-7,8 08/82 08/13/81 3.3 E-2,3 01/01/83 10/01/82 E-5,6 08/82 05/01/81 3.4 E-2,3 01/01/83 10~01/82 | |||
/ | |||
E-5,6 08/82 05/01/81 | |||
~ | |||
l 3.5 E-2,3 01/01/83 | |||
~ | |||
05/01/82 10/01/82 E-5,6 08/82 3.6 E-1 05/01/81 05/01/81 E-2,3 01/01/83 10/01/82 E-4 11/24/80 11/24/80 E-5 12/01/82 07/14/81 E-7,8 08/82 _ | |||
05/01/81 3.7 E-1 05/01/81 05/01/81 E-2,3 01/01/83 10/01/82 E-4 05/01/81 05/01/81 E-6,7 08/82 05/01/81 4.1 E-2,3 01/01/83 10/01/82 E-5,6 08/82 05/01/81 X | |||
CONTINUED ON REVERSE SIDE A''ter revising your controlled document in acmrdance with the above appropriate instructions place this sheet in the front of the affected document. Future cfianges will be numbered consecutively. If there are any questions please call: Stephen Foster 8304200451 830413 22-6522 PDR ADOCK 05000275 F | |||
PDR | |||
ATTACIDfENT.2 e. | |||
~ | |||
Location of Bracketed Privacy / Proprietary Information s | |||
Appendices with Procedure Bracketed Information 1.1 E-2, 3, 4, 5 3.1 | |||
,E-2, 3, 4, 5 3.2 E-1, 2, 3 3.3 E-2, 3 3.4 E-2, 3 3.5 E-2, 3 3.6 E-2, 3, 5 3.7 E-2, 3 4.1 E-2, 3 4.2 E-2, 3 4.3 E-2, 3 4.4 E-2, 3' 4.5 E-2, 3 4.6 E-2, 3 4.7 E-2, 3 4.8 E-2, 3 4.9 E-2, 3 | |||
1.1 | -,-n | ||
3.3 | |||
.~ | |||
.y, | |||
.c REY 1 | |||
~ | |||
05/14/81 PACIFIC GAS AND ELECTRIC CdMPANY CORPORATE EMERGENCY. RESPONSE PLAN p | |||
IMPLEMENTING PROCEDURES Effective Date:01/01/83 TABLE OF ORGANIZATION Number Revision Date Title | |||
.1.1 01 04/15/81 Activation.of the Corporate Emergency Response Organization | |||
3.2 | ~ | ||
3.3 | : 1. 2 ' | ||
3.5 | 01 05/01/81 Activation of the Corporate Incident Response Center 2.1 01 05/12/81 Plan Maintenance 3.1 01 05/01/81 Governmental Relations 3.2 02 08/13/81 Public Relations 3.3 01 05/01/81 Law 3.4 01 05/01/81 Insurance 3.5 01 05/,01/81 Safety, Health and Claims 3.6 01 05/01/81 Security 3.7 00 05/01/81 Personnel Relations 4.1 01 05/01/81 Materials 4.2 01 05/01/81 Communications 4.3 02 08/08/81 Radiological Analysis and Protection 4.4 01 05/01/81 General Construction 4.5 01 05/01/81 Engineering and Technical Support 4.6 01 05/01/81 Computer Systems and Services, | ||
4.2 | 4.7 01 05/01/81 Nuclear Plant Operations 4.8 01 05/01/81 Division Steport 4.9 01 05/01/81 Quality Assurance em e | ||
4.4 | l 5'-t T | ||
rT1 | |||
--w | |||
=---a-- | |||
w N | |||
w* | |||
w c-- | |||
v--t-- | |||
---A | |||
c, m | |||
+ ' | |||
~ | |||
./ | |||
REV 1 | |||
~ | |||
c, | |||
m | |||
* 05/14/81 | * 05/14/81 | ||
~ | ~ | ||
PACIFIC GAS AND ELECTRIC COMPANY | PACIFIC GAS AND ELECTRIC COMPANY | ||
CORPORATE EMERGENCY RESPONSE PLAN | ~ | ||
( | CORPORATE EMERGENCY RESPONSE PLAN 1 | ||
( | |||
IMPLEMENTING PROCEDURE APPENDICIES | |||
~ | |||
Fffective Date? 01/01/83 | ~~ | ||
APPEN01x MUMBER PROCEDURE 3 | Fffective Date? 01/01/83 APPEN01x MUMBER PROCEDURE NUMBER 1 | ||
1.2 | 2 3 | ||
01/01/83 | 4 5 | ||
08/82 | 6 7-8 9 | ||
1.1 04/15/31 01/01/83 01/01/83 01/01/83 01/01/C3 04/15/81 10/01/82 08/82 08/82 1.2 05/0'1/81 07/14/81 05/01/81 05/01/81 I | |||
I I | |||
x x | |||
2.1 05/1'2/81 10/82 10/82_ | |||
x x | |||
x x | |||
x x | |||
3.1 05/12/81 01/01/83 01/01/83 01/01/83 01/01/83 05/01/82 08/82 08/82 x | |||
3.2 08/13/81 01/01/83 01/01/83 08/13/81 08/13/81 08/13/81 08/82 08/82 1 | |||
3.3 05/01/81 01/01/83 01/01/03 05/01/81 08/82 08/82 x | |||
x x | |||
3.4 05/01/81 01/01/83 01/01/83 05/01/81 08/82 08/81 x | |||
x x | |||
3.5 05/01/81 01/01/83 01/01/83 05/01/81 08/81 08/81 x-I x | |||
3.6 05/01/81 01/01/83 01/01/83 11/24/80 12/01/82 05/01/81 08/82 08/82 x | |||
3.7 05/01/81 01/01/83 01/01/83 05/01/81 05/01/81 08/82 08/82 x | |||
I 4.1 05/01/81 01/01/83 01/01/83 05/01/81 08/82 08/82 I | |||
I x | |||
4.2 05/01/81 01/01/83 01/01/83 05/01/81 08/82 08/82 1 | |||
x x | |||
4.3 08/08/81 01/01/83 01/01/83 08/08/82 08/02 08/82 08/08/81 I | |||
x 4.4 05/01/81 01/01/83 01/01/83 05/01/81 08/82 08/82 x | |||
x x | |||
4.5 05/01/81 01/01/83 01/01/83 05/01/81 08/82 08/82 x | |||
x x | |||
4.6 05/01/81 01/01/83 01/01/83 05/01/81 08/82 08/82 x | |||
x x | |||
4.7 05/01/81 01/01/83 05/01/81 08/82 08/82 x | |||
x x | |||
x 4.8 05/01/81 01/01/83 01/01/83 05/01/81 08/82 08/82 X | |||
X X | |||
4.9 05/01/81 01/01/83 01/01/83 05/01/81 08/82 08/82 x | |||
x I | |||
e e | |||
6 e | 6 e | ||
L.- | L.- | ||
.-e g | |||
PACIFIC GAS .AND ELECTRIC COMPARY | PACIFIC GAS.AND ELECTRIC COMPARY | ||
' Rev. 1 CORPO, RATE EMERGENCY RESPONSE PLAN 4/16/81 IMPLEMENTING PROCEDURE 1 | |||
PROCEDURE 1.1 ACTIVATION OF THE CORPORATE EMERGENCY ORGANIZATION APPENDIX E-1 EMERGENCY N ANIZATION, i | |||
CORPORATE EMERGENCY RESPONSE OHGANIZATION MANAGEMENT I | |||
Cn | ~ | ||
: m. tort c | Cn | ||
: m. tort r | |||
co , | c | ||
.a i l | |||
co,,,,,. | |||
..c,. | |||
on. | on. | ||
- =" | |||
r. | |||
..e--..- | |||
..,...,,a f.r | |||
..I. | |||
I | .. - ic., | ||
I I | |||
I I | |||
I I | |||
,.X &.,H.G.E | |||
.W4..esE.. | |||
LI.t. | |||
1 | |||
.,t. | |||
W RAE I.. | |||
ICS | |||
.W'#,t. | |||
4 E.n. | |||
. eth.u.G. | |||
CWWI | |||
,4. | |||
Ctll..W g | |||
l | |||
( | |||
1 I | |||
I l | |||
l I | |||
I r | |||
_ m, | |||
,,,,, _ = | |||
.--i c.-., | |||
,,,,.,e., | |||
..c c | |||
.c c-- | |||
wy e,., _ | |||
--.i.. | |||
.ici | |||
,e.r i. | |||
I I | |||
I I | |||
I I | |||
1.l.ll"l". '." | |||
c.""'. | |||
r,c= | |||
1 | 1 | ||
~ | |||
= = = = | |||
== | |||
: u.,- | |||
- in | |||
.a. | |||
.o uA o,,,,,,, | |||
e | |||
,c., | |||
c-=, | |||
...<rieri | |||
--.1 n, | |||
.c | |||
..,,,n, | |||
e e. | |||
u-u, On.e44 | |||
.s me - % es-.u-.,= suer coac-m | |||
-a 4 | |||
Page 19 of 40 | |||
--,wv.--e y | |||
e | n-tw | ||
u- | ,"g----m--- | ||
On.e44 | w-r----------m&wm-r=----T-we--y-es | ||
me - % es-.u-.,= suer | -w*-- | ||
coac-m | -ww---- | ||
--r-g-*y | |||
----yw-w'+ | |||
www--- | |||
ne e-e e-w | |||
- ~ ' ' - | |||
1 Rev. 1 | |||
.l 04/15/81 | |||
-PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE PROCEDURE 1.1 ACTIVIATION OF THE CORPORATE EMERGENCY ORGANIZATION APPENDIX E-2 REC 0VERY MANAGER NOTIFICATION LIST Effective Date: 01/01/83 Name Home Phone Emergency Plan Title Nonemergency Title Business Phone Recovery Manager 1. | |||
J. D. Shiffer | |||
\\. | |||
Manager, Nuclear | |||
) | |||
PROCEDURE 1.1 | Plant Operations 2. | ||
ACTIVIATION OF THE CORPORATE EMERGENCY ORGANIZATION APPENDIX E-2 REC 0VERY MANAGER | R. C. Thornberry DCPP Plant Manager 3. | ||
NOTIFICATION LIST | J. D. T'ownsend Supervising Nuclear Generation Enijineer Corporate Emergency 1. | ||
J. O. Schuyler Coordinator VP - Nuclear Power Generation 2. | |||
Name | G. A. Mar :stis Exec. VP - F,acilities. | ||
Manager, Nuclear | |||
Plant Operations | |||
Generation Enijineer Corporate Emergency | |||
Generation | |||
and Electric Resources. | and Electric Resources. | ||
Development | Development 3. | ||
E. B. Langley, Jr. | |||
Sr. VP - Operations Corporate Technical | Sr. VP - Operations Corporate Technical 1. | ||
and Logistical | J. B. Hoch and Logistical Project Manager, | ||
~ | |||
Coordinator | Coordinator Diablo Canyon 2. | ||
M. R. Tresler Supervising Project Control Engineer 3. | |||
Supervising Project Control Engineer | R. A. Young Project Design Coordinator | ||
Project Design Coordinator | |||
* Confidential number. Establish contact through Cmmunications PBX Operator at t Page 20 of 40 | * Confidential number. Establish contact through Cmmunications PBX Operator at t Page 20 of 40 | ||
Rev. 1 | Rev. 1 04/15/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE | ||
04/15/81 PACIFIC GAS AND ELECTRIC COMPANY | ( | ||
CORPORATE EMERGENCY RESPONSE PLAN | PROCEDURE 1.1 ACTIVIATION OF THE CORPORATE EMERGENCY ORGANIZATION APPENDIX E-2 (Continued) | ||
RECOVERY MANAGER lhTTIFICATION LIST Effective Date:- 0.1/01/83 Home Phone Name Emergency Plan Title Nonemergency Title Business Phone Corporate Liaison 1. | |||
( | R. J. McDevitt Coordinator Senior Nuclear Power Generation Engineer 2. | ||
PROCEDURE 1.1 | S. R. Foster Health Physicist 3. | ||
T. A. Moulia Technical Assistant Vice President NPG 4. | |||
RECOVERY MANAGER | G. A. Pierce l | ||
Nuclear Budget | |||
Effective Date:- 0.1/01/83 | ~ | ||
Engineer t | |||
Home Phone Emergency Plan Title | Public Information l'. | ||
D. J. Baxter Recovery Manager Manager of Public Information Z. | |||
C. H. Peterson Senior Public Infor-mation Representative 3. | |||
S. N. Coffey Public Information | |||
~ | |||
Representative Radiological 1. | |||
W. H. Fujimoto Emergency Recovery Supervising Nuclear Manager Engineer 2. | |||
Unassigned | |||
Recovery Manager | 's Page 21 of 40 | ||
Z. C. H. Peterson Senior Public Infor-mation Representative | |||
Representative Radiological | |||
Emergency Recovery | |||
Page 21 of 40 | |||
n | n 3 | ||
Rev. 1 04/15/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN I | |||
04/15/81 | IMPLEMENTING PROCEDURE PROCEDURE 1.1 ACTIVIATION OF THE CORPORATE EMERGENCY ORGANIZATION APPENDIX E-2 (Continued) | ||
PACIFIC GAS AND ELECTRIC COMPANY | REC 0VERY MANAGER NOTIFICATION LIST Effective Date: 01/01/83 Name Home Phone Emergency Plan Titl_e Nonemergency Title Business Phone Radiologica.1 Emergency 3. | ||
CORPORATE EMERGENCY RESPONSE PLAN I | D. P. Serpa | ||
IMPLEMENTING PROCEDURE PROCEDURE 1.1 ACTIVIATION OF THE CORPORATE EMERGENCY ORGANIZATION | } | ||
APPENDIX E-2 (Continued) | Recovery Manager Senior Nuclear (continued) | ||
REC 0VERY MANAGER | Generation Engineer 4. | ||
NOTIFICATION LIST | S. M. Skidmore Assistant Project Manager Engineering and 1. | ||
Effective Date: 01/01/83 | B. W. Giffin Logistics Senior Nuclear Recovery Manager Generation Engineer 2. | ||
Name | A. L. Simmons Nuclear Generation Engineer' l | ||
Recovery Manager | 3. | ||
G. C. Russell Nuclear Generation Engineer Operations and 1. | |||
Assistant Project | J. D. Townsend l | ||
Analytical Supervising Nuclear l | |||
B. W. Giffin | Recovery Manager Generation Engineer 2. | ||
Logistics | W. T. Rapp Senior Nuclear Generation Engineer 3. | ||
B. W. Giffin Senior Nuclear Generation Engineer Electric System 1. | |||
Nuclear Generation Engineer' | A. D. _ Lyon Dispatcher | ||
(, | |||
,] | |||
Shift Supervisor 2. | |||
On-duty Shif t Suoervisar Page 22 of 40 | |||
Shift Supervisor | |||
Suoervisar Page 22 of 40 | |||
6 m | 6 m | ||
\\ | |||
Rev. 1 | Rev. 1 04/15/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN (MPLEMENTING PROCEDURE PROCEDURE 1.1 ACTIVIATION OF THE CORPORATE EMERGENCY ORGANIZATION APPENDIX E-3 EMERGENCY ORGANIZATION CONTACT LIST Effective Date: 01/01/83 | ||
04/15/81 | ;1ame Errergency Location Emergency Plan Title itormal Business Phone Emergency Phone | ||
~ | |||
Communications 1. | |||
On-duty Operator General Office PBX Operator 2. | |||
PROCEDURE 1.1 | R. Larsen L-370. Corona L | ||
ACTIVIATION OF THE CORPORATE EMERGENCY ORGANIZATION | ~ | ||
Site Emergency 1 | |||
7,R. C. Thornberry TSC Coordinator | |||
: 2.,.R. Patterson L | |||
Communications | : 3.,J. M. Giscion | ||
: 4. pW. B. Kaefer L | |||
L- | Shift Foreman | ||
370. Corona | : 1. r~0. A. Col e Control Room (Interim Site | ||
L | ~ | ||
'^ ^ ^ / or g | |||
Site Emergency | Emergency Coordinator | ||
: 2. ,.R. Patterson | : 2. yW. J. Dilbeck L | ||
L | - 3. pW. F. White | ||
: 3. ,J. M. Giscion | ] | ||
: 4. pW. B. Kaefer | L | ||
L | : 4. r_0. E. Sundquist L | ||
Shift Foreman | i i | ||
1 l | |||
Page 23 of 40 | |||
L | |||
L | |||
: 4. r_0. E. Sundquist | |||
Rev. 1 04/.15/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE 7 | |||
04/.15/81 PACIFIC GAS AND ELECTRIC COMPANY | PROCEDURE 1.1 ACTIVIATION OF THE CORPORATE EMERGENCY ORGANIZATION APPENDIX E-3 (Continued) | ||
CORPORATE EMERGENCY RESPONSE PLAN | ~ | ||
IMPLEMENTING PROCEDURE | Effective Date: 01/01/83 | ||
~ | |||
ACTIVIATION OF THE CORPORATE EMERGENCY ORGANIZATION | Name Energency Location Emergency Plan Title Nonnal Business Phone Emergency FHone Shift Foreman | ||
: 5. _R. L. Ewing - | |||
(Interim Site | |||
Effective Date: 01/01/83 | ) | ||
m Emergency Coordinator 6. | |||
D. C. Bashaw (continued) 7 | |||
Shift Foreman | ] | ||
7 4 Collins u | |||
(Interim Site | |||
7 4 Collins | |||
u | |||
J | J | ||
: 4. g. A. Pierce | '8.. T Ken singer 3 | ||
9 4 A. Rhodes m | |||
\ | Corporate Technical 1.,_J. B. Hoch | ||
Page 24 of 40 | _ CIRC and Logistical J | ||
4- | or g. | ||
Coo rdinator | |||
: 2. _M. R. Tresler | |||
~ | |||
t. | |||
J | |||
: 4.,R. A. Young J | |||
Corporate Liaison 1 4 J. McDevitt CIRC | |||
_3 Coordinator | |||
.y or 2. | |||
S. R. Foster W | |||
6 J _ | |||
3. | |||
T. A. Moulia J | |||
: 4. g. A. Pierce J | |||
\\ | |||
Page 24 of 40 4- | |||
,n,. | |||
Rev.1 | Rev.1 04/15/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAh IMPLEMENTING PROCED'URE PROCEDURE 1.1 ACTIVIATION OF THE CORPORATE EMERGENCY ORGANIZATION APPENDIX E-4 CORPORATE TECHNICAL AND LOGIST.! CAL COORDINATOR NOTIFICATION LIST Effective Date: 01/01/83 Name Home Phone Emergency Plan Title Nonemergency Title Business Phone, | ||
04/15/81 | Corporate Engineering 1. | ||
G. H. Moore | |||
PROCEDURE 1.1 | |||
ACTIVIATION OF THE CORPORATE EMERGENCY ORGANIZATION APPENDIX E-4 CORPORATE TECHNICAL AND LOGIST.! CAL COORDINATOR NOTIFICATION LIST Effective Date: 01/01/83 | |||
Home Phone Emergency Plan Title | |||
Corporate Engineering | |||
( | ( | ||
Coordinator DC, Project Engineer 2. | |||
J. V. Rocca Chief Mechanical & | |||
Nuclear Engineer | Nuclear Engineer | ||
' 3.- | |||
Chief Civil Engineer | R. V. Bettinger Chief Civil Engineer 4. | ||
J. R. Herrera Chief Electrical Engineer 5. | |||
Chief Electrical Engineer | G. H. Aster | ||
: Chief, I | |||
Corporate | Design-Dra f ting I | ||
Manager, Station Coordinator | I Corporate 1. | ||
Construction | R. S. Bain i | ||
Construction Manager, Station Coordinator Construction 2. | |||
Superintendent Station Construction | J. R. Manning | ||
~ | |||
Station Construction Admin. Superintendent | ~ | ||
Superintendent Station Construction 3. | |||
Page 25 of 40 | B. T. Saenz | ||
~ | |||
Station Construction Admin. Superintendent | |||
s.., | /' | ||
Page 25 of 40 a | |||
Rev. 1 | a. | ||
s s.., | |||
CORPORATE EMERGENCY RESPONSE PLAN | 4' Rev. 1 | ||
~ | |||
04/15/81 PACIFIC GAS AND ELECTRIC COMPANY | |||
R10CEDURE 1.1' , | ~ | ||
ACTIVIATION OF THE_ CORPORATE EMERGENCY ORGANIZATION APPENDIX E-4 (Continued) | CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE | ||
CORPORATE TECHNICAL _ AND LOGISTICAL COORDINATOR NOTIFICATION LIST | < s. | ||
R10CEDURE 1.1', | |||
Name | ACTIVIATION OF THE_ CORPORATE EMERGENCY ORGANIZATION APPENDIX E-4 (Continued) | ||
CORPORATE TECHNICAL _ AND LOGISTICAL COORDINATOR NOTIFICATION LIST Effective Date: 01/01/83 Name Home Phone Emergency Plan Title Nonemergency Title Business Phone Corporate Division 1. | |||
Manager | D. L. Kennady Coordinator Los Padres District. | ||
Manager 2. | |||
B. McCloskey Los Padres District Marketing Manager 3. | |||
R. J. McKell Los Padres District Electric Superintendent 4. | |||
Center Corporate Materials | Alternate Number Morro Bay Switching Center Corporate Materials 1. | ||
E. J. Meyers I | |||
Coordinator Director, Project Purchasing 2. | |||
D. | |||
R'. Shaffer I | |||
Director, Materials Purchasing 3. | |||
.J. E, f.eanhan Sur cv' (ng Buyer 4. | |||
L. J. | |||
.Jdick bdpEri..; < ng Buyer 5. | |||
R. R. Ochsner Supervising Buyer 6. | |||
R. E. Gleason Supervising Buyer Page 26 of 40 | |||
o Rev. 1-04/15/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE PROCEDURE 1.1 ACTIVIATION OF THE CORPORATE EMERGENCY ORGANIZATION APPENDIX E-4 (Continued) | |||
CORPORATE TECHNICAL AND LOGISTICAL COORDINATOR NOTIFICATION LIST Effective Date: 01/01/83 Name Home Phone Emergency Plan Title Nonemergency Title Business Phone Corporate Computer 1. | |||
A. W. Simila Applications Manager, Engineering Coordinator Computer Applications 2. | |||
R. M. Wetherell l | |||
S.upervising Mathema - | |||
CORPORATE TECHNICAL AND LOGISTICAL COORDINATOR NOTIFICATION LIST Effective Date: 01/01/83 Name | tician-Programmer | ||
' 3.- | |||
Corporate Computer | B. M. Speckman | ||
Applications | ~ | ||
Supervising Computer' Applications Engineer Corporate 1. | |||
T. R. Ferry Communications Mngr Canmunications Department 2. | |||
Supervising Computer' Applications Engineer Corporate | A. J. Nevolo Seoior Communications Engineer 3. | ||
Communications | C. D. Gilson Supervising Communi-I cations Engineer og Page 27 of 40 | ||
Department | |||
Seoior Communications Engineer | |||
og Page 27 of 40 | |||
~ | |||
-v Re.v. 1 04/15/81 PACIFIC, GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN I | |||
IMPLEMENTING' PROCEDURE * | |||
~ | |||
IMPLEMENTING' PROCEDURE | PROCEDURE 1.1 ACTIVIATION OF THE CORPORATE EMERGENCY ORGANIZATION APPENDIX E-4 (Continued _) | ||
CORPORATE TECHNICAL AND LOGISTICAL COORDINATOR - | CORPORATE TECHNICAL AND LOGISTICAL COORDINATOR - | ||
NOTIFICATION LIST Effective Date: 01/01/83 Name | NOTIFICATION LIST Effective Date: 01/01/83 Name Home Phone Emergency Plan Title Nonemergency Title Business Phone Corporate Quality 1. | ||
W. A. Raymond | |||
[ | [ | ||
Assurance Coordinator | Assurance Coordinator Manager Quality Assurance 2. | ||
P. C. Burgess l | |||
Records Management j | |||
Senio.r Quality | System Supervisor l | ||
3. | |||
e | T. G. de Uriarte Senio.r Quality I | ||
Engineer t | |||
\\ | |||
e i | |||
Page 28 of 40 | |||
Rev. 1 | Rev. 1 o | ||
04/15/81 | |||
CORPORATE EMERGEhCY RESPONSE PLAN IMPLEMEllTING PRO,CEDURE | ., PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGEhCY RESPONSE PLAN IMPLEMEllTING PRO,CEDURE PROCEDURE 1.1 ACTIVIATION OF THE CORFORATE Et ERGENCY ORGANIZATION APPEtiDIX E-5 CORPORATE LIAISON C00PDINATOR fiOTIFICATION LIST Effective Date: 01/,01/83 Name Home Phone Emergency Plan Title Nonemergency Title Business Phone Corporate Public 1. | ||
R. H. Miller Information Mngr, Advertising Dept. | |||
ACTIVIATION OF THE CORFORATE Et ERGENCY ORGANIZATION APPEtiDIX E-5 CORPORATE LIAISON C00PDINATOR | Coo rdinator 2. | ||
C. G. Poncelet Mngr., Comn. Planning 3. | |||
Home Phone Emergency Plan Title | H. N. Peelor Mngr., Pubite Activities Corporate 1. | ||
Coo rdinator | G. A. Blanc | ||
~ | |||
Governmental Hngr, Agency Relations Relations Coordinator 2. | |||
Governmental | R. F. Nichols i | ||
tingr, Local Gov' t Rel. | |||
[ | |||
Sr Representative Corporate Law | ~ | ||
Oepartment | 3. | ||
J. R. Torrens Sr Representative Corporate Law 1. | |||
P. A. Crane, Jr. | |||
Oepartment Asst General Counsel Coo rdinator 2. | |||
R. Ohlbach VP and I | |||
General Attorrey 3. | |||
R. F. Locke i | |||
~ | |||
Sr Counsel Confidential number. Establish contact through Canmunications PBX Operator at (415)781-2893. | Sr Counsel Confidential number. Establish contact through Canmunications PBX Operator at (415)781-2893. | ||
Page 29 of 40 | Page 29 of 40 | ||
Rev. l' 04/15/81 e | |||
PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE FLAN IMPLEMENTIhG PROCEDURE PROCEDURE 1.1-ACTIVIATION OF THE CORPORATE EMERGENCY ORGANIZATION APPENDIX E-5-(Continued) | |||
CORPORATE LIAISON 'C00RDINATOR NOTIFICATION LIST Effective Date: 01/01/83 Name Home Phone Emergency Plan Title Nonemergency Title Business Phone Corpcrate Insurance 1. | |||
W. P. Noone Cecrdinator Mngr of Insurance 2. | |||
R. M. Reider Director, Insurance Administration 3. | |||
APPENDIX E-5-(Continued) | C. A Lewis Coora. of Property loss Cntrl. | ||
CORPORATE LIAISON 'C00RDINATOR NOTIFICATION LIST Effective Date: 01/01/83 Name | Corporate Safety, 1. | ||
B. P. Sadler health, and Claims Mngr, Safety, Coordinator Health and Claims 2. | |||
A. L. Bechtold Sr. Attorney 3. | |||
C. W. All en Attorney 4. | |||
J. C. Vocke Attorney Page 30 of 40 | |||
Coora. of Property loss Cntrl. | |||
Corporate Safety, | |||
Mngr, Safety, Coordinator | |||
~ | |||
Rev. 1 04/15/81 PACIFIC MS ~AND ELECTRIC C0ttPANY CORPORATE EMERGENCY RESPONSE PLAN | |||
04/15/81 PACIFIC MS ~AND ELECTRIC C0ttPANY | ~ | ||
IMPLEMENTING PROCEDURE N | |||
CORPORATE EMERGENCY RESPONSE PLAN | PROCEDURE 1.1 ACTIVIATION OF THE CORPORATE EMERGENCY ORGANIZATION APPENDIX E-5 (Continued) | ||
CORPORATE LIAIS0N COORDINATOR NOTIFICATION LIST Effective Date: 01/01/83 Home Phone Emergen y Plan Title. | |||
Name Nonemergency Title Business Phone Corporate 1. | |||
PROCEDURE 1.1 | L. H. Shaffer Security Director, Security Coordinator 2. | ||
ACTIVIATION OF THE CORPORATE EMERGENCY ORGANIZATION | J.-R. Van Schaick Supervising Security Representative 3. | ||
APPENDIX E-5 (Continued) | R. Dunleavy i | ||
CORPORATE LIAIS0N COORDINATOR | Senior Security Representative Corporate Personnel 1. | ||
NOTIFICATION LIST Effective Date: 01/01/83 | H. S. Pitner Relations Director, Enployment Coordinator and Planning 2. | ||
Home Phone Emergen y Plan Title . | T. J. Walsh, Jr. | ||
J.-R. Van Schaick | 1 Employment Represen-ta ~l1ve | ||
~ | |||
~ | |||
Senior Security | 3. | ||
Unassigned 1 | |||
l Page 31 of 40 | |||
Page 31 of 40 | |||
PACIFIC GAS AN;,) ELECT. lC COMPANY | PACIFIC GAS AN;,) ELECT. lC COMPANY EMER tENCY LOCATION yo g CORPORATE EMERGENCY RESPONSE PLAN TODAY'S DATE | ||
gg | ' AGE EMERGENCY COMMUNICATIONS LOG SHEET tu (2) | ||
(a TIME NAME ACTIVITV 12400 hrs.) | |||
180 ENTERED 2 (7) gg EMERGENCY TITLE OR AFFILIATION tesTIALSI W | |||
i c | i c | ||
89484 (8/82) Rev. 00 | 89484 (8/82) Rev. 00 SEE INSTRUCT 10fS O d REVERSE | ||
-..o PACIFIC GAS ANO ELECTRIC COMPANY | |||
PACIFIC GAS ANO ELECTRIC COMPANY | ~ | ||
CORPORATE EMERGENCY RESPONSE PLAN po.3 | CORPORATE EMERGENCY RESPONSE PLAN po.3 EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET EMERGENCY LOCATION TOOAY'S OATE PAGE 7;x 10 (2) la TIME | ||
EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET EMERGENCY LOCATION | \\ | ||
10 | ENTERED BY (2400 hr J (INITIALS) u; (s) | ||
==SUMMARY== | ==SUMMARY== | ||
OF ACTIVITY PERFORMED | OF ACTIVITY PERFORMED toi i | ||
~ | |||
O | O | ||
~ | |||
l | l l | ||
~ | |||
\\ | |||
81M85 (8/82) Rev. 00 SEE INETRUCT IONE ON REVarsal, | |||
81M85 (8/82) Rev. 00 | |||
u Rev. 1 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE PROCEDURE 3.1 GOVERNMENTAL RELATIONS APPENDIX E-2 EMERGENCY PLAN TITLES AND PERSONNEL ASSIGNMENTS NOTIFICATION LIST Effective Date: 01/01/83 Name Home Phone Emergency Plan Title Nonemergency Title Business Phone Corporate 1. | |||
G. A. Blanc i | |||
Governmental Mngr., Agency Relations | |||
( | |||
Relations Coordinator | Relations Coordinator 1 | ||
2. | |||
R. F.Nichols Mngr., Local Gov't ret. | |||
3. | |||
Representatives | J. R. Torrens Sr. Representative Governmental Relations Representatives | ||
~ | |||
-Coast Valleys 1.' | |||
C. L. Richmond Division Special Representative 2. | |||
Mngr. Santa Maria | R. L. Royster Mngr. Santa Maria 3. | ||
B. J. Hoppert Mngr., Paso Robles | |||
Mngr., Paso Robles | { | ||
t | t | ||
~ | |||
-Sacramento 1. | |||
R. D. Testa Drc tr., S ta te Agency Relations 2. | |||
J. H. Fraser Mngr., State Leg. Rel. | |||
( _ | |||
(_ | |||
l Page 9 of 22 | l Page 9 of 22 | ||
m | m l | ||
Rev. 1 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN i | |||
IMPLEMENTING PROCEDURL PROCEDURE 3.1 GOVERNMENTAL RELATIONS APPENDIX E-2 (Continued) | |||
PACIFIC GAS AND ELECTRIC COMPANY | Effective Datei 01/01/83 Name Home Phone Emergency Plan Title Nonemergency Title Business Phone Governmental Relations Representatives (continued) | ||
-Washington, D.C. | |||
Effective Datei 01/01/83 Name | 1. | ||
Governmental Relations Representatives | J. H. Bergler Representative-Agency Relations 2. | ||
(continued) | J. A. Vance Washington, D.C., | ||
Counsel Page 10 of 22 O | |||
Counsel Page 10 of 22 | |||
O | |||
Rev. 1 | Rev. 1 05/01/81 l | ||
PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERSENCY RESPONSE PLAN t | |||
PACIFIC GAS AND ELECTRIC COMPANY | * IMPLEMENTING PROCEDURE PROCEDURE 3.1 GOVERNMENTAL RELATIONS APPENDIX E-3 EMERGENCY -ORGANIZATION CONTACT LIST Effective Date: 01/01/83 Name Emergency Location Emeroency Plan Title Normal Business Phone Emergency Phone | ||
,s F | |||
* IMPLEMENTING PROCEDURE | Recovery Manager 1 4 0. Shiffer | ||
PROCEDURE 3.1 GOVERNMENTAL RELATIONS APPENDIX E-3 EMERGENCY -ORGANIZATION CONTACT LIST | |||
Effective Date: 01/01/83 | |||
Name | |||
Emergency Location Emeroency Plan Title | |||
{ | { | ||
L. | L-L. | ||
2 . ,,. R C. Thornberry | 2.,,. R C. Thornberry J | ||
: 3. g | : 3. g | ||
._D. Townsend | |||
Corporate Liaison | . J! +. | ||
: 2. ,S. R. Foster | Corporate Liaison | ||
: 1.,R. J. McDevitt | |||
: 3. ,T. A. Moulia L | , CIRC Coordinator | ||
: 4. _G. A. Pierce | . ') | ||
Corporate Techn.ical | : 2.,S. R. Foster | ||
: 2. . M | ' ] | ||
L- | L | ||
I | : 3.,T. A. Moulia | ||
: 3. r_R. A. Young | ~ | ||
Page 11 of 22 | L | ||
: 4. _G. A. Pierce Corporate Techn.ical 1.g.B.Hoch CIRC and Logistical p' | |||
or Coordinator | |||
: 2.. M D. Tresler L-I | |||
: 3. r_R. A. Young Page 11 of 22 | |||
Rev. 1 05/01/81, PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN s | |||
05/01/81, | ( | ||
IMPLEMENTING PROCEDURE N | |||
( | P PROCEDURE 3.1 GOVERNMENTAL RELATIONS. | ||
APPENDIX E-3 ENERGENCY ORGANIZATION CONTACT LIS( | |||
PROCEDURE 3.1 | Effective Date: 01/01/83 Name. | ||
GOVERNMENTAL RELATIONS . | Energency Location Emergency Plan Title Normal Business Phone Emergency Phone Corporate Ptblic | ||
APPENDIX E-3 | : 1. yR. H. Miller | ||
ENERGENCY ORGANIZATION CONTACT LIS( | _J l | ||
Effective Date: 01/01/83 | General Office Information v | ||
Coordinator 1. | |||
Information | 2. | ||
C. G. Poncelet | C. G. Poncelet | ||
: 3. _H. N. Peelor | |||
: 3. _H. N. Peelor | ) | ||
u | |||
~ | |||
Public Information | Public Information | ||
: 2. ,C_. H. Peterson 6 | : 1. _D. J. Baxter E0F Recovery Manager g | ||
: 3. ,S. N. Coffey | : 2.,C_. H. Peterson 6 | ||
w | : 3.,S. N. Coffey w | ||
Page 12 of 22 | Page 12 of 22 | ||
- - ~ | |||
Rev. 1 | Rev. 1 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE PROCEDURE 3.1 GOVERNMENTAL RELATIONS | ||
05/01/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE | ~ | ||
PROCEDURE 3.1 GOVERNMENTAL RELATIONS | APPENDIX E-4 GOVERNMENTAL BRIEFING CENTERS Effective Date: 01/01/83 Locations Phone Numbers g_ | ||
Washington, D.C. Office - Suite 1180 1r 1050 - 17th Street NW Washington, D.C. | |||
APPENDIX E-4 | 20036 i | ||
) | |||
Locations | ~ | ||
Washington, D.C. Office - Suite 1180 | Sacramento Office - Park Executive Building Suite 890, 925 L Street Sacramento, California 95814 Officials) Conference Room, San Luis Obispo Office, Coast Valleys Division - District (Government and Public | ||
~ | |||
~ | |||
Sacramento Office - Park Executive Building | |||
Suite 890, 925 L Street Sacramento, California 95814 | |||
Officials) Conference Room, San Luis Obispo Office, | |||
Page 13 of 22 | Page 13 of 22 | ||
S-Rev. 1 05/01/81 | |||
~ | |||
Rev. 1 | ~ | ||
PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN | |||
. I IMPLEMENTING PROCEDURE s | |||
PROCEDURE 3.1 GOVERNhENTAL RELATIONS APPENDIX E-5 GOVERNMENTAL 0FFICIALS AND AGENCIES Effective Date: 01'/01/83 | |||
IMPLEMENTING PROCEDURE s | ===Response=== | ||
PGandE Nane of Governmental Governmental Relations Official Representative or Agency' Add ress Phone 1. | |||
Response | San Luis Obispo Courthouse Annex Coast Val'ieys Board of San Luis Obispo. | ||
PGandE | Division Supervisors 93401 2. | ||
Division | City of 990 Palm Street San Luis Obispo San Luis Obispo 93401 3. | ||
City of 214 E Branch St. | |||
~ | |||
Arroyo Grande Arroyo Grande 93420 4. | |||
Arroyo Grande | City of 6500 Palma Ave. | ||
City of | Atascadero Atascadero 93422 5. | ||
Atascadero | City of 595 Harbor St. | ||
Morro Bay Morro Bay 93442 6. | |||
Morro Bay | City of 1030 Spring _St. | ||
Paso Robles Paso Robles 93446 7. | |||
Paso Robles | City of 1000 Bello St. | ||
Pismo Beach Pismo Beach 93449 8. | |||
Pismo Beach | City of 154 S. 8th St. | ||
Grover City Grover City 93433 Page 14 of 22 | |||
Grover City | |||
u Rev. 1 | |||
~. | |||
05/01/81 PACIFIC GAS'AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN (G | |||
IMPLEMENTING PROCEDURE PROCEDURE 3.1 GOVERNMENTAL RELATIONS APPENDIX E-5 (Continued) | |||
Effective Date: 01/01/83 | |||
===Response=== | |||
PGandE Nane of Governmental | |||
. Governmental | |||
^ | |||
Relations Official Representative or Agency Add ress Phone Coast Valleys 9. | |||
City of 110 East Cook Division Santa Maria Santa Maria-(continued) 93454 o | |||
10. | |||
Santa Barbara-Courthouse Board of Santa Barbara Supervisors 931ct 11. | |||
PGandE | City of 918 Obispo Guadalupe Guadalupe 93434 1 | ||
Sacramento 1. | |||
10 . | R. D. Testa Park Executive Bldg., Sui te 890 925 L Street Sacramento, CA 95814 2. | ||
J. H. Fraser Park Executive Bldg., Suite 890 925 L Street Sacramento, IA 95814 Washington, D.C.' | |||
93434 | 1. | ||
J. H. Bergler Washington, D.C. | |||
05b h St NW- | |||
05b | |||
[))~ | [))~ | ||
~ | |||
Washington, D.C. | |||
20036 Page 15 of 22 | 20036 Page 15 of 22 | ||
~ | |||
v | v | ||
~.. | |||
? | |||
e | e PACIFIC GAS AND ELECTRIC COMPANY s | ||
s | |||
CORPORATE EMERGENCY' RESPONSE PLAN | CORPORATE EMERGENCY' RESPONSE PLAN | ||
~ | |||
IMPLEMENTING PROCEDURE PROCEDURE 3.1 GOVERNMENTAL RELATIONS APPENDIX E-5 (Continued) | |||
APPENDIX E-5 (Continued) | ~ | ||
Effecti' e Date: 01/01/83 v | |||
Effecti' | |||
Response | ===Response=== | ||
PGandE | PGandE Nane of Governmental Governmental Relations Official Representative or Agency Add ress Phone Washington, D.C. | ||
2. | |||
(continued) | J. A. Vance Washington, D.C. | ||
1050 17th St. NW | / | ||
(continued) | |||
Off. Sui te 1180 | |||
/ | |||
~ | |||
1050 17th St. NW | |||
[ | |||
Washington, D.C.- | Washington, D.C.- | ||
20036 t | 20036 t | ||
i i | |||
~ | |||
\\ | |||
Page 16 of 22 | Page 16 of 22 | ||
~ | |||
~ | |||
h PACIFIC GAS ANO ELECTRIC COaWANY | h PACIFIC GAS ANO ELECTRIC COaWANY EMERGENCY LOCATION TODAY'SDATE | ||
' AGE pg g CORPORATE EAGERGENCY RESPONSE PLAN EMERGENCY COMMUNICATIONS LOG SHEET to to ' | |||
Ea4ERGENCY TITLE OR AFFILIATION | (8 7.se NAmE Acr.viTY (2400Imej M | ||
lNmunm (7) | |||
N g | |||
Ea4ERGENCY TITLE OR AFFILIATION 1 | |||
s f, | |||
t t | t t | ||
2 6 18 22) R n M | 2 6 18 22) R n M SE119ETRUCTIO95 O d REVERSE | ||
i | i EMERGENCY COMMUNICATIONS t.OG SHEET INSTRUCTIONS Entry Number Instructions 1. | ||
EMERGENCY COMMUNICATIONS t.OG SHEET INSTRUCTIONS | Identify the emergency location where this LogSheet is maintained during an emergency (i.e.; Corporate incident Response Center, Materials Dept., Emergency Operations Facility, etc.) | ||
Entry Number | 2. | ||
Enter the date which this Form is being used. Start a new Log Sheet each day. | |||
(i.e.; Corporate incident Response Center, Materials Dept., Emergency Operations Facility, etc.) | c 3. | ||
Consecutively number each page used each day. | |||
c | 4. | ||
Enter the time for each Log entry. Use the 2400 hobr clock to avoid confusion. | |||
i S. | |||
i S. | Clearly record the nameof the individual calling you or whom you are. calling. | ||
6. | |||
Record the individuals PGandE Emergency Organization Title or their non PGandE affiliation. | |||
7. | |||
Che k the entry activity as to whether the individual called you or you are calling them. | |||
l | c 8. | ||
Enter the entire context of the message being communicated. Read back ti)e message to the individual to assure correct copy / transmission. | |||
9. | |||
Enter your initials upon completion of each Log Sheet entry. | |||
l l | |||
l l | l l | ||
s- | s- | ||
~ | |||
[ | [ | ||
PACsFN ANO ELawirilC COMPANY GGewvEATE """5"'Y RESPOfSE PLAN 90e3 EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET EMERGENCY LOCATION TODAY'S OATE PAGE | |||
\\ | |||
e (1) | |||
(1) | (2) | ||
(3 TIME ENTERED BY (2400 hrs.) | |||
(INITIALS) tai am | |||
==SUMMARY== | ==SUMMARY== | ||
OF ACTIVITY PERFORMED | OF ACTIVITY PERFORMED is t | ||
s | s | ||
-e e | |||
~ | |||
i B | i B | ||
N E A" N | N E A" N SEE INSTRUCTIONS ON REVERSE | ||
<m EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET, INSTRUCTIONS Entry Number Instructions 1. | |||
Identify the emergency location where this Log Shee* is maintained s | |||
Number | during an emergency (i.e.; Corporate incident Response Center, Materials Dept., Emergency Operations Facility, etc.) | ||
2. | |||
each day. | Enter the date which this form is being used. Start a new Log Sheet each day. | ||
/ | / | ||
3. | |||
Consecutively number each page used each day. | |||
4. | |||
Enter the time foreach Log entry. Use the 2400 hour clock to avoid confusion. | |||
6 8 | 5. | ||
Enter a summary of each activity being recorded. | |||
6. | |||
Enter your initials upon comple'..;on of each Log Sheet entry. - | |||
6 8 | |||
== | |||
.w. | |||
o | |||
= | |||
r w | |||
w | ~ | ||
PACIFIC GAS AND ELECTRIC COMPANY Rev. 2 CORPORATE EMERGENCY RESPONSE PLAN 8-13-81 IMPLEMENTING PROCEDURE, 7'' | |||
PACIFIC GAS AND ELECTRIC COMPANY | ~ | ||
PROCEDURE 3.2 PUBLIC RELATIONS APPENDIX E-1 EMERGENCY RESPONSE ORGANIZATION PUBLIC RELATIONS DEPARTMENT RELATIONSHIPS | |||
.-~, | |||
PROCEDURE 3.2 | |||
I i | I i | ||
1.._.._..._: | |||
g e | |||
e | |||
..e | |||
e | :,-,j,,,, ;i,,,, l- | ||
;llll:=,,;. | |||
'g,h. | |||
:,- ,j,,,, ;i ,,,, | -= | ||
l- | ,,,,,,,,,m | ||
.u,,:;,;,, | |||
.a - | |||
ll | l ll | ||
~ | |||
,9 | |||
... _. i.l, | |||
..l | |||
l | -l l: | ||
l 1 | |||
l | |||
, ic i | |||
_ l lm-. | |||
l l | |||
- m.i i m., | |||
i l . . _ .. | l | ||
..... ~. - | |||
i l.. _.. | |||
l i | |||
i- | |||
j | - -ia i | ||
_... _1 | |||
.__i l | |||
g l | |||
Pa g e 16A o f 30 | 1 1 | ||
. lllll"".:., | |||
l | |||
,,,,,,;=,,,,, | |||
u j | |||
- = = > | |||
u,=='=.,.'''= | |||
e i | |||
u | |||
-..--e,.,...u | |||
. -i | |||
==ry- | |||
,,,, ;;;-- j | |||
=e. | |||
w. | |||
=,. | |||
u iu, Pa g e 16A o f 30 | |||
e_ | |||
Rev. 2' 08/13/81 PACIFIC GAS AND ELECTRIC COMPANY | Rev. 2' 08/13/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE PROCEDURE 3.2 | ||
CORPORATE EMERGENCY RESPONSE PLAN | ~ | ||
PUBLIC RELATIONS APPENDIX E-2 EMERGENCY PLAN TITET! AND PERSONNEL ASSIGNMENTS NOTIFICATION LIST Effective Date: 01/01/03 Name Home Phone Emergency Plan Title Nonemergency Title Business Phone | |||
~ | |||
PROCEDURE 3.2 PUBLIC RELATIONS APPENDIX E-2 EMERGENCY PLAN TITET! AND PERSONNEL ASSIGNMENTS NOTIFICATION LIST | Corporate Pubite 1. | ||
Effective Date: 01/01/03 | R. H. Miller Information Mngr., Advertising Dept. | ||
Name | Coordinator 2. | ||
C. G. Poncelet Mngr., Commn. Planning 3. | |||
Corporate Pubite | H. N. Peelor Mngr., Public Activities | ||
Information | .4edia Center 1. | ||
Mngr., Advertising Dept. | R. P. Davin Representative Sr. Public-Info. Rep. | ||
Coordinator | 2. | ||
G. C. Sarkisian Prjct. Information Spec. | |||
3. | |||
P. M. Zweif'el | |||
, Mngr. Community Activities Task Force News Director 1. | |||
D. R. Hanes News Director i | |||
2. | |||
J. M. Kilbatrick Drctr., Elec. Media 3. | |||
R. R. Rutkowski Sr. Public Info.- Rep. | |||
L 3 | |||
-l Page 17 of 30 | |||
v- | |||
~ | |||
08/13/81 PACIFIC GAS AND ELECTRIC COMPANY | |||
PACIFIC GAS AND ELECTRIC COMPANY | ~ | ||
CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE PROCEDURE 3.2 PUBLIC RELATIONS APPENDIX E-2 (Continued) | |||
IMPLEMENTING PROCEDURE | Effective Date: 01/01/83 Name Home Phone Emergency _ Plan Title Nonemergency Title Business Phone u | ||
PROCEDURE 3.2 | Interim Public 1. | ||
PUBLIC RELATIONS APPENDIX E-2 (Continued) | S. G. Brown Infonnation Recovery Sr. Public Info. Rep. | ||
Effective Date: 01/01/83 Name | Manager 2. | ||
Interim Public | G. C. Sarkistan Prjt. Infonnation Spec. | ||
Manager | 3. | ||
P. M. Zweifel | |||
~ | |||
Manger, Community Activities Task Force Public Infonnation 1. | |||
D. J. Baxter Recovery Manager Mngr., Pub. Infonnation 2. | |||
C. H. Peterson Sr. Pub. Info. Rep. | |||
3. | |||
S. N. Coffey Public Info. Rep. | |||
a Page 18 of 30 | a Page 18 of 30 | ||
~- | |||
Rev. 2 08/13/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN-i IMPLEMENTING PROCEDURE | |||
PACIFIC GAS AND ELECTRIC COMPANY | ' ~ | ||
CORPORATE EMERGENCY RESPONSE PLAN- | PROCEDURE 3.2 e PUBLIC RELATIONS APPENDIX E-3 EMERGENCY ORGANIZATION CONTACT LIST Effective Date:- 01/01/83 | ||
'Name Emergency Location Emergency Plan Title Normal Business Phone Emergency Phone Recovery Manager | |||
: 1.,J. D. Shiffer I' | |||
PROCEDURE 3.2 e PUBLIC RELATIONS APPENDIX E-3 | ~ | ||
or | |||
?- | |||
Recovery Manager | |||
2.,.R. C. Thornberry q | 2.,.R. C. Thornberry q | ||
L | L | ||
37 h D. Tnwnsend | .1 37 h D. Tnwnsend L | ||
L | Corporate Liaison I.,.R. J. McDevitt | ||
Corporate Liaison | , CIRC Coordinator | ||
2.,,S. R. Fost_er | -] | ||
3.r T. A. Moulia | g 2.,,S. R. Fost_er | ||
4.r . | ) | ||
L- | L 3.r T. A. Moulia | ||
Corporate Technical | ) | ||
Coordinator | L 4.r. A. Pierce G | ||
2.f M. R. Tresler | L-Corporate Technical 1.r J. R. Hnch CIRC and Logistical. | ||
_L 3.r . | ] | ||
Coordinator b | |||
2.f M. R. Tresler L | |||
Public Infomation | _L 3.r. A. Young R | ||
t. | |||
: 2. , C. H. Peterson | J | ||
~ | |||
Public Infomation 1.r. J. Baxter | |||
,E0F D | |||
Recovery Manager. | |||
} | |||
: 2., C. H. Peterson L | |||
Page 19 of 30 | |||
m | m Rev. 2 08/13/81 PACIFIC GAS AND ELECTRIC COMPANY, | ||
Rev. 2 | CORPORATE EMERGENCT RESPONSE PLAN IMPLEMENTING PROCE. DURE PROCEDURE 3.2 PUBLIC RELATIONS APPENDIX E-3 (Continued) | ||
08/13/81 | * Effective Date: 01/01/83 Name Energency Location Emergency Plan Title Normal Business Phone Emergency Phone a | ||
i Public Infonnation | |||
: 3. _S. N. Coff5y | |||
_J Recovery Manager (co,ntinued) | |||
PROCEDURE 3.2 PUBLIC RELATIONS | Corporate Governmental 1. | ||
APPENDIX E-3 (Continued) | G. A. Blanc General Office Relations Coordinator | ||
* Effective Date: 01/01/83 | [ | ||
Name | ] | ||
{ | |||
Public Infonnation | : 2. _R. F. Nichols L. | ||
J | |||
Corporate Governmental | : 3. _J. R. Torrens | ||
: 2. _R. F. Nichols | ) | ||
g | |||
: 3. _J. R. Torrens | ~ | ||
g | Radiological 1 7. H. Fujimoto EOF W | ||
Emergency Recovery | |||
Radiological | ( | ||
L Manager 2. | |||
UNASSIGNED | |||
~ | |||
3 4 P. Serpa_ | |||
L J | |||
'~ | |||
Corporate Law 1. | |||
P. A. Crane, Jr. | |||
General Office Department | |||
] | |||
~ | |||
Coo rdinator 2. | |||
R. Ohlbach | |||
) | |||
L 3.'_R. F. Locke | |||
] | |||
Corporate 1. | |||
T. R. Ferry General Office | |||
~ | |||
Communications l | |||
Coordinator L~ | |||
~ | |||
: 2.,A. J. Nevolo g | |||
) | |||
l 3. | |||
C. D. Gilson 1 | |||
6 Page 20 of 30 | |||
Rev. 2 | |||
-08/13/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE. PLAN IMPLEMENTING PROCEDURE PROCEDURE 3.2 PUBLIC RELATIONS APPENDIX E-3 (Continued)' | |||
Effective Date: 01/01/83 Name Emergency Location | |||
. Emergency Plan Title Normal Business Phone Emergency Phone County Public | |||
: 1.,Duane Lieb EOC Information | |||
[s | |||
-{. | |||
s Officer | |||
: 2.,- D. L. Ri chter L. | |||
3. | |||
Stava Keil 3 | |||
L-Technical Advisor f. | |||
W'. J. Keyworth EOF to the Public L | |||
I nformati og.. | |||
= | |||
Recovery 2. | |||
T. E. Brake | |||
] | |||
Manager | Manager | ||
{ | |||
Advisor to the | |||
' 1. g. B. Kae fer | |||
'Eg County Emergency | |||
] | |||
g. | |||
Organization | |||
: 2.,W. J. Keyworth | |||
~ | |||
3. | |||
T. E. Brake p | |||
c 4.[W.B. Scott | |||
~ | |||
-L Media Center 1. | |||
R. P. Davin Media Briefing Center Representative | |||
{ | |||
~ | |||
: 2.. G. C. Sarkisian L | |||
3. | |||
P_. M. Zweifel L | |||
: 2. ,W. J. Keyworth | |||
c | |||
4.[W.B. Scott | |||
Media Center | |||
Media Briefing Center Representative | |||
{ | |||
: 2. . G. C. Sarkisian | |||
L | |||
L | |||
Page El of 30 | Page El of 30 | ||
Rev. 2 08/13/81 PACIFIC, GAS AND ELECTRIC COMPANY | Rev. 2 08/13/81 PACIFIC, GAS AND ELECTRIC COMPANY | ||
. CORPORATE EMERGENCY RESPONSE PLAN | |||
, ~. | |||
s | IMPLDIENTING PROCEDURE s | ||
PUBLIC RELATIONS APPENDIX E-3 (Continued) | PROCEDURE 3.2 PUBLIC RELATIONS APPENDIX E-3 (Continued) | ||
Effective Da'te: 01/01/83 | |||
Effective Da'te: 01/01/83 Name Energency Location Emergency Plan Title | ~ | ||
Name Energency Location Emergency Plan Title Normal Business Phone Emergency Phone 1. | |||
R. H. Miller IGeneral Office Corporate Ptblic Information | |||
{' | |||
1 s | |||
[' | Coo rdinator | ||
: 3. ,H. N. Peelor | ~ | ||
L | 2. | ||
Corporate | C. G. Poncelet | ||
Los Padres District Off. | [' | ||
Division | 3 | ||
: 3.,H. N. Peelor L | |||
7 Corporate 1. | |||
D. L. - Kennady Los Padres District Off. | |||
Division | |||
[" | [~ | ||
3., R. J. McKell | -] | ||
Coordinator 2. | |||
B. McCloskey | |||
Morro Bay Switching Cntr. | [ | ||
Morro Bay Switching | [" | ||
Center | ,) | ||
: 2. ,D. G. Lubbock | 3., R. J. McKell L | ||
3 s | |||
1 | 4. | ||
3._ D. A. Oglesby L | Alternate Number Morro Bay Switching Cntr. | ||
Technical' Advisor | Morro Bay Switching Center t | ||
Onsite Attorney 1. | |||
to the News | O F. Locke EOF (ifassigned) | ||
{ | |||
} | |||
~ | |||
: 2.,D. G. Lubbock | |||
~ | |||
1 3._ D. A. Oglesby L | |||
Technical' Advisor 1. | |||
B. E. Thinger SF Media' Center | |||
~ | |||
to the News Director | |||
} | |||
{ | |||
} | } | ||
* 2.p & W. Medcalf | * 2.p & W. Medcalf | ||
~ | |||
3. | |||
UNASSIGNED Page 22 of 30 | |||
+ | |||
b | b e | ||
3 | PACIFIC GAS AND ELECTRIC COMPANY EMERGENCY LOCATION TODAY'S DATE | ||
EMERGENCY COMMUNICATIONS LOG SHEET / e | ' AGE, | ||
pg.g CORFOHATE EMERGENCY RESPONSE Pl.AN 3 | |||
EMERGENCY COMMUNICATIONS LOG SHEET / e f | |||
s tu TIME NAME m. | |||
(# | |||
EMERGENCY TITLE OR AFFILIATION | ACTIVITY * | ||
(2400 hrs.) | |||
ist | |||
+ | |||
NE (7) | |||
,s | |||
4 | /, | ||
43 EMERGENCY TITLE OR AFFILIATION N | |||
l | (ep CALLED CALUNG MESSAGE te e | ||
f | |||
s | , l s | ||
i g | |||
t | i f | ||
6948418182) Rev. 00 | w t i | ||
4 e | |||
t e | |||
l l | |||
i, I | |||
l s | |||
s f | |||
t 6948418182) Rev. 00 SEE INETRUCTIONE O d REVERSE | |||
EMERGENCY COMMUNICATIONS LOG SHEET INSTRUCTIONS | EMERGENCY COMMUNICATIONS LOG SHEET INSTRUCTIONS | ||
~ | |||
Entry | Entry Number Instructions | ||
Number | ~ | ||
1. | 1. | ||
Identify the emergency location where this LogSheet is maintained during an emergency | Identify the emergency location where this LogSheet is maintained during an emergency (i.e.; Corporate incident Response Center, Materials Dept., Emergency Operations Facility, etc.) | ||
2. | 2. | ||
Enter the date which this Form is being used. Start a new Log Sheet each day. | Enter the date which this Form is being used. Start a new Log Sheet each day. | ||
3. | |||
Consecutively number each page used each day. | |||
4. | 4. | ||
Enter the time for each Log entry. Use the 240d hour clock to avoid confusion. | Enter the time for each Log entry. Use the 240d hour clock to avoid confusion. | ||
| Line 1,018: | Line 1,093: | ||
Clearly record the name of the individual calling you or whom you are calling. | Clearly record the name of the individual calling you or whom you are calling. | ||
6. | 6. | ||
Record the individuals PGandE Emergency Organization T"itle or their non PGandE affiliation | Record the individuals PGandE Emergency Organization T"itle or their non PGandE affiliation. | ||
7. | 7. | ||
Che k the entry activity as to whether the individual called you or you are calling them. | |||
c e | |||
8. | 8. | ||
Enter the entire context of the message being communicated. ' Read back the message to the | Enter the entire context of the message being communicated. ' Read back the message to the - | ||
individual to assure correct copy / transmission. | individual to assure correct copy / transmission. | ||
Enter your initials h completion of each Log Sheet entry. | |||
4 | 9. | ||
4 C | |||
( | ( | ||
c | ,8 | ||
.) | |||
..s c | |||
^ | |||
v- | v- | ||
,o | |||
.r, PACIFICTAS AND ELECTR6C COMPANY CORPORATE EMERGENCY RESPONSE PLAN, | |||
EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET EMERGENCY LOCATION TOOAY'S OATE PAGE | |||
EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET EMERGENCY LOCATION | (~ | ||
(~ | (1) | ||
(1) | (2) | ||
(I TIME ENTERED BY (2400 hrs.) | |||
(INITIALS) u) | |||
(s) | |||
==SUMMARY== | ==SUMMARY== | ||
OF ACTIVITY PERFORMED | OF ACTIVITY PERFORMED (a | ||
l 1 | |||
I | 1 I | ||
l | I l | ||
8946 (8/s2) Rev. 00 | l 8946 (8/s2) Rev. 00 SF.E INSTRUCTlONS ON REVERSI. | ||
i | i | ||
v | |||
~- | |||
~ | |||
d | d. | ||
r s | |||
EMERGENCY RESPONSE AND RECOVERY ACTIVITIES t.00 SNEET - | |||
INSTRUCTIONS Entry | INSTRUCTIONS Entry | ||
* Number | * Number instructions 1. | ||
1. | |||
Identify the emergency location where this Log Sheet is maintained during an emergency (i.e.; Corporate incident Response Center, Materials Dept., Emergency Operations Facility, etc.) | Identify the emergency location where this Log Sheet is maintained during an emergency (i.e.; Corporate incident Response Center, Materials Dept., Emergency Operations Facility, etc.) | ||
2. | 2. | ||
Enter the date which this form is being used. Start a new Log Sheet | Enter the date which this form is being used. Start a new Log Sheet each day. | ||
3. | 3. | ||
Consecutively number each page used each day.- | Consecutively number each page used each day.- | ||
4. | |||
Enter the time for each Log entry. Use the 2400 hour clock to avoid confusion. | Enter the time for each Log entry. Use the 2400 hour clock to avoid confusion. | ||
5. | 5. | ||
Enter a summary of each activity being recorded. | Enter a summary of each activity being recorded. | ||
6. | |||
Enter your initials upon complation of each Log Sheet entry. | Enter your initials upon complation of each Log Sheet entry. | ||
~ ~ | |||
1 e | 1 e | ||
w' | w' m | ||
q | q Rev. 1 | ||
~ | |||
05/01/81 PACIFIC GAS AND ELECTRIC COMPANY | |||
~ | |||
05/01/81 | CORPORATE EMERGENCY RESPONSE PLAN 3 | ||
CORPORATE EMERGENCY RESPONSE PLAN 3 | |||
IMPLEMENTING PROCEDURE O | IMPLEMENTING PROCEDURE O | ||
PR0bEDURE 3.3 LAW APPENDIX E-2. | |||
LAW | EMERGENCY PLAN TITLES AND PERSONNEL ASSIGNMENTS IOTIFICATION LIST Effective Date: 01/01/83 Name Home Pho'ne Emergency Plan Title Nonemergency Title Business Phone Corporate Law 1. | ||
APPENDIX E-2 . | P. A. C ra nc, J r. | ||
EMERGENCY PLAN TITLES AND PERSONNEL ASSIGNMENTS | ( | ||
IOTIFICATION LIST | Depar.tment Assistant General Coordinator Counsel 2. | ||
Effective Date: 01/01/83 | R. Ohlbach Vice President and General Attorney 3. | ||
Name | R. F. Locke Senior Counsel Onsite Attorney 1. | ||
Depar.tment | R. F. Locke (if assigned) | ||
Senior Counsel E. | |||
Vice President and | D. G. Lubbock Senior Counsel 3. | ||
General Attorney | D. A. Oglesby Senior Counsel Law Department 1. | ||
R. J. Peters Staff Members Attorney | |||
(if assigned) | ~ | ||
2. | |||
J. A. Shaffer Attorney | |||
* Confidential number. | |||
* Confidential number. Establish contact through Communications P8X Operator at (415)781-2893. | Establish contact through Communications P8X Operator at (415)781-2893. | ||
Page 9 of 18 | Page 9 of 18 | ||
u | u Rey, f 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY CORF0PATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE PROCEDURE 3.3 LAW PP5N0!X E-2 (Continued) | ||
EffectiveDIte: 01/01/83 Name Home Phone | |||
. Emergency Plan Title Nonemergency Title Business Phone Law Departaent 3.. | |||
CORF0PATE EMERGENCY RESPONSE PLAN | UNASSGINED Staff Members 4. | ||
UNASSIGNED 5. | |||
EffectiveDIte: 01/01/83 | UNASSIGNED 6. | ||
UNASSIGNED 5 | |||
California Public 1. | |||
J. E: Bryson. | |||
i Utilities Canmission President, CPUC 2. | |||
J. E. Bodovitz Executive Director, CPUC j | |||
California Public | 3. | ||
J. E. Kerr General Counsel, CPUC | |||
= | |||
Page 10 of 18 | Page 10 of 18 | ||
u m | |||
e | e | ||
..Rev. 1 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN - | |||
IMPLEMENTI.NG PROCEDURE Pf'CCEDURE 3.3 LAW APPENDIX E-3 EMERGENCY ORGANIZATION CONTACT LIST Effective Date: 01/01/83 Name Emergency Location Emergency Plan Title Normal Business Phone Emergency Phone Recovery Manager 1.r _. D. shiffer 3 | |||
J EOF 2. | |||
05/01/81 | R. C. Thornberry J | ||
PACIFIC GAS AND ELECTRIC COMPANY | u | ||
CORPORATE EMERGENCY RESPONSE PLAN - | : 3.,J. D. Townsend | ||
') | |||
LAW APPENDIX E-3 EMERGENCY ORGANIZATION CONTACT LIST | o Corporate Liaison | ||
Effective Date: 01/01/83 Name | : 1.,R. J. McDevitt CIRC | ||
'] | |||
Coordinator g | |||
.o 2. | |||
S. R. Foster c. | |||
. _3 L | |||
Corporate Liaison | : 3.,,T. A. Moulia | ||
. ] | |||
: 4.. G. A. Pierce | |||
] | |||
: 3. ,,T. A. Moulia | Corporate Ptblic 1. | ||
R. H. Miller General Office Information | |||
: 4. . G. A. Pierce | ] | ||
'. G. Poncelet Coo rdinator | |||
Corporate Ptblic | ~ | ||
2. | |||
C | |||
) | |||
~ | |||
~ | |||
~3. | |||
H. N. Peelor a | |||
General Office Health and Claims | Corporate Safety, 1. | ||
Coo rdinator | 'B. P. Sadler General Office Health and Claims | ||
[ | ] | ||
Coo rdinator | |||
[~ | [ | ||
2. | |||
A. L. Bechtold | |||
[~ | |||
3 Page 11 of 18 | |||
~,, | |||
.u Rev. 1 PACIFLC GAS AND ELECTRIC COMPANY CORPORATE EMERGENtY RESP.GdSE PLAN IMPLEMENTING PROCEDURE PROCEDURE 3.3 LAW APPENDIX E-3 (Continued). | |||
Effective Date: 01/01/83 Name Emergency Location Emergency Plan Title Normal Business Phone Emergency Phone | |||
CORPORATE EMERGENtY RESP.GdSE PLAN | ~ Corporate Safety, 3. | ||
C. W. Allen Health and Claims 3 | |||
g Coo rdinator (continued) | |||
Effective Date: 01/01/83 Name | Corporate Insurance 1. | ||
Emergency Phone | W. P. Noone fGeneral Office | ||
~ | |||
Cecrdinator | |||
[' | |||
Corporate Insurance | 3 L | ||
: 2. sR. M. Reider u | : 2. sR. M. Reider 3 | ||
C. A. Lewis | u 3. | ||
e-b Public Information- | C. A. Lewis e-b Public Information-1. | ||
D. J. Baxter | D. J. Baxter E0F Recovery Manager | ||
Recovery Manager | ] | ||
.i | |||
~ | |||
: 3. ,S. | ' ' ~ | ||
Page 12 of 18 1 | 2. | ||
C. H. Peterson J | |||
: 3.,S. N. Coffey | |||
] | |||
L Page 12 of 18 1 | |||
s PACIFIC GAS AND ELECT IC COMPANY | s PACIFIC GAS AND ELECT IC COMPANY EMERGENCY LOCATION pg.g COMPOAATE EMERGENCY RESPONSE PLAN TOOAY'S DATE | ||
' AGE EMERGENCY COMMUNICATIONS LOG SHEET TIME NAME ta is (u | |||
Acnv3yy (2400IwsJ 181 e-WWTEREDm 17) | |||
EMERGENCY TITLE OR AFFILIATION N | |||
i i | IU tes cAtteo CALuMG MESSAGE tot t. | ||
e | i i | ||
e i. | |||
e 4 | e 4 | ||
1 | 1 i | ||
som taisa n.oo sEE esesTauCTiOsss O e mEvansE | |||
sEE esesTauCTiOsss O e mEvansE | |||
< -; J ' | |||
I l | I l | ||
l | l s's E_MERGENCY COMMUNICATIONS LOG SHEET | ||
s's | _ INSTRUCTIONS Entry instructions | ||
E_MERGENCY COMMUNICATIONS LOG SHEET | _ Number Identify the emergency location where this LogSheet is maintained during an emergency Facility, etc.) | ||
_ INSTRUCTIONS Entry instructions | (i.e.; Corporate incident Response Center, Materials Dept., Emergency Operations 1. | ||
_ Number Identify the emergency location where this LogSheet is maintained | ,{ | ||
li. | |||
Enter the date which this Form is being used. Start a new Log Sheet eai:h day. | |||
Enter the date which this Form is being used. Start a new Log Sheet eai:h day | n-2. | ||
2. | |||
Consecutively number each page used each day.- | Consecutively number each page used each day.- | ||
3. | |||
Enter the time for each Log entry. Use the 2400 hour clock to avoid confusion., | Enter the time for each Log entry. Use the 2400 hour clock to avoid confusion., | ||
4. | |||
Clearly record the name of the individual calling you or whom you are calling. | Clearly record the name of the individual calling you or whom you are calling. | ||
5. | |||
E affiliation. | |||
J | J Record the individuals PGandE Emergency Organization Title or their non PGand 6. | ||
i h | |||
i | ck the entry activity as to whether the' individual called you or you are call ng t em. | ||
7. | |||
Che e | |||
5 Enter the entire context of the message being communicated. Read back th 6 | |||
4 individual to assure correct copy / transmission. | |||
Enter your initials upon completion of each Log Sheet entry. | 8. | ||
Enter your initials upon completion of each Log Sheet entry. | |||
9. | |||
i. | i. | ||
i | i n | ||
i b | i b | ||
l- | l- | ||
a e, | |||
4 + | 4 | ||
PIEIFICTAE AND'ELEf7RIC COMPANY | + | ||
* EMER'GENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET | PIEIFICTAE AND'ELEf7RIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN POwB i | ||
* EMER'GENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET EMERGENCY 1.OCATION TODAY'S DATE PAGE (1) e (2) | |||
(1) | (3) | ||
TIME | TIME ENTERED BY 12400 tws.) | ||
(INITIALS) ui (s) | |||
ui | |||
==SUMMARY== | ==SUMMARY== | ||
OF ACTIVITY PERFORMED | OF ACTIVITY PERFORMED | ||
i | ~ ' | ||
tai s | |||
i l | |||
4 | |||
{ | { | ||
81NM5 48/82) R w.00 | 81NM5 48/82) R w.00 ggt IISTRUCTIONE ON REVER51; w, | ||
ggt IISTRUCTIONE ON REVER51; w | ---r | ||
o | o | ||
~ | |||
n r\\ | |||
W | W EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET ~ | ||
EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET ~ | INSTRUCTIONS Entry Number Instructions | ||
INSTRUCTIONS Entry Number | ~ | ||
1. | |||
Identify the emergency location where this Log Sheet is maintained during an emergency (i.e.; Corporate incident Response Center, Materials Dept., Emergency Operations Facility, etc.) | |||
2. | |||
Enter the date which this form is being used. Start anew Log Sheet each day. | |||
3. | |||
4. | Consecutively number each page used each day. | ||
r 4. | |||
confusion | Enter the time for each Log entry. Use the 2400 hour clock to avoid confusion. | ||
5. | |||
Enter a summary of each activity being recorded. | |||
6. | |||
Enter your initials upon completion of each Log Sheet entry. | |||
i | i | ||
c | m c | ||
.1 Rev. I 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE | |||
, PRDCEDURE 3.4 s | |||
INSURANCE APPENDIX E-2 EMERGENCY PLAN TITLES AND PfKSONNEL ASSIGNMENTS NOTIFICATION LIST Effective Date: 01/01/83 Name Home Phone Emergency Plan Title Nonocergency Title Business Phone Corporate Insurance 1. | |||
05/01/81 | W. P. Noone Coordinator Manager of Insurance 2. | ||
PACIFIC GAS AND ELECTRIC COMPANY | R. M. Reider Director, Insurance Administration 3. | ||
CORPORATE EMERGENCY RESPONSE PLAN | C. A. Lewis Coorainator of Prop-erty Loss. Con trol Coordinator of Property 1. | ||
IMPLEMENTING PROCEDURE | C. h. Lewis Loss Control Coordinator of Prop-erty Loss Control 2. | ||
UNASSIGNED 3. | |||
INSURANCE | B. J.'Casey Assistant Insurance Ana lyst ' | ||
Coordinator of 1. | |||
EMERGENCY PLAN TITLES AND PfKSONNEL ASSIGNMENTS NOTIFICATION LIST Effective Date: 01/01/83 | R. M. Reider Insurance Director, Insurance - | ||
Administration Administration 2. | |||
B. J. Casey Assistant Insurance Analyst 3. | |||
Administration | C. A. Lewis Coordinator of Property loss Control Page 10 of 19 | ||
Coordinator of | |||
Administration | |||
Page 10 of 19 | |||
~ | |||
Rev. 1 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY CORP. ORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE PROCECURE 3.4 INSURANCE AP'PENDIX E-2 (Ccntinued) | |||
Effective Date: 01/01/83 Name Home Phone Emergency Plan Title Nonemergency Title Business Phone NHL/ Marsh and McLennan 1. | |||
Quentin Jackson General Mgr. Nuclear Mutual Limited 2. | |||
D. F. Brown 1 | |||
INSURANCE | Fire / Extended Coverage | ||
Effective Date: 01/01/83 Name | |||
Nonemergency Title | |||
General Mgr. Nuclear Mutual Limited | |||
( | ( | ||
Loss Control Supervisor 3. | |||
J. Mra s Loss Adjustment Supervisor m | |||
Page 11 of 19 | |||
Loss Adjustment Supervisor | |||
. Rev. 1 - | |||
- 05/01/81 PACIFIC GAS ANU ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEllENTING PROCEDURE PROCEDURE,3.4 s | |||
PACIFIC GAS ANU ELECTRIC COMPANY | IllSURANCE APPENDIX E-3 EMERGEllCY ORGANIZATION CONTACT LIST Effective Date: 01/01/83 Name Energency Location ' - | ||
Emergency Plan Title Normal Business Phone Emergency Phone Recovery Manager | |||
IMPLEllENTING PROCEDURE | : 1. pJ. D. Shiffer fEOF L-3 L | ||
J 2. | |||
R C. Thornberry J | |||
IllSURANCE | g 3. | ||
APPENDIX E-3 | J. n Town <gnd e | ||
EMERGEllCY ORGANIZATION CONTACT LIST | n Corporate Liaison 1. | ||
Effective Date: 01/01/83 Name | R. J. McDevitt | ||
Emergency Plan Title | . CIRC Coordinator | ||
{ | |||
g | 3 L | ||
: 2., S. R. Foster | |||
; ] | |||
Corporate Liaison | : 3.,T. A. Moulia 3 | ||
3 | m 4. | ||
: 2. , S. R. Foster | G. A. Pierce p | ||
~) | |||
: 3. ,T. A. Moulia | 6 Corporate Public 1. | ||
m | R. H. Miller General Office Information | ||
] | |||
g Coo rdinator 2. | |||
Corporate Public | C. G. Poncelet C- | ||
Coo rdinator | ] | ||
: 3.,,H. N. Peelor | |||
: 3. ,,H. N. Peelor | ) | ||
Corporate Safety, | |||
Corporate Safety, | : 1.,8. P. Sadler General Office Health and Claims | ||
Health and Claims | } | ||
Coordinator A. L. Bechtold 2. | |||
r i | |||
3. | 3. | ||
C. W. Allen e | |||
6 | 6 Pagy 1. cf '.f | ||
Pagy 1. cf '.f | |||
m | m F.cv. 1 05/01/81-PACIFIC GAS AND ELECTRIC. COMPANY | ||
- CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE | |||
, PROCEDURE 3.4 INSURANCE APPENDIX E-3 (Continued) | |||
Effective Date: 01/01/83 Name Emergency location Emergency Plan Title Normal Business Phone Emergency Phone Corporate Law | |||
: 1. _P. A. C ra ne, J r. | |||
INSURANCE APPENDIX E-3 (Continued) | |||
Effective Date: 01/01/83 | |||
Corporate Law | |||
heneral Office _ | heneral Office _ | ||
Department Coordinator | ~ | ||
Department | |||
] | |||
Coordinator b | |||
_J Accounting | 2. | ||
R. Ohlbach L | |||
l 3. | |||
R. F. Locke | |||
_J Department | |||
{ | |||
fGeneralOffice Accounting 1. | |||
.. D. Lee | |||
] | |||
~ | |||
2. | |||
UNASSIGNED 3. | |||
UNASSIGNED Page 13 of 19 | |||
6 | 6 Y | ||
"~ | |||
\\ | |||
1) | |||
PACIFIC GAS ANO ELECTRIC COMPANY EMERGENCY LOCATION pg,3 CORPORATE EMERGENCY RESPONSE PLAN TOOAY1 DATE | |||
PACIFIC GAS ANO ELECTRIC COMPANY | ' AGE EMERGENCY COMMUNICATIONS LOG SHEET pl (a | ||
tm TIME NAME ACTIVITY (2400 hrs.) | |||
(El WHEBED m 17) egnaam gg EMERGENCY TITLE OR AFFILIATION i | |||
e 3 | e 3 | ||
e I | e I | ||
= | |||
e e | |||
e t | |||
8 i | |||
4 69084 (8/87) Rev. 00 SEE INSTRUCTIO88 O e IlEVERSE S | |||
e | e | ||
t | t | ||
( | ( | ||
pm mmw nummmmmaeeenaan t.no aHEaT INateMpt276DNS Entry | pm mmw nummmmmaeeenaan t.no aHEaT INateMpt276DNS Entry Number Instructions 1 | ||
Number | Identify the emergency k) cation where this LogSheet is maintained during an emergency (i.e.; Corporate incident Response Center Materials Dept., Emergency Operations Facility, etc.) | ||
i s-2. | |||
i | |||
Enter the date which this Form is being uJed. Start a new Log Sheet each day. | Enter the date which this Form is being uJed. Start a new Log Sheet each day. | ||
3. | |||
Consecutively number each page used each day. | |||
~ | |||
4. | |||
Enter the time for each Log entry. Use the 2400 hour clock to avoid confusion. | |||
t | t | ||
~ | |||
5. | |||
l | Clearly record the name of the individual calling you or whom you are calling. | ||
I | l 6. | ||
l | Record the individuals PGandE Emergency Organization Title or their non PGandE affiliation. | ||
I l | |||
l | l 7. | ||
Che k the entry activity as to whether the individual called you or you are calling them. | |||
~ | |||
c l | |||
e 1 | |||
8. | |||
Enter the entire context of the message being communicated. Read back the message to the individual to assure correct copy / transmission. | |||
9. | |||
Enter your initia'Is upon completion of each Log Sheet entry. | |||
s e | s e | ||
r | r i | ||
8 | |||
-g CORPORATE EMERGENCY RESPONSE PLAN PACIFIC GAS AND ELECTRIC COMPANY Pows EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET EMERGENCY LOCATION TOOAY'S DATE PAGE (1) 12) | |||
EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET EMERGENCY LOCATION | (3) | ||
TOOAY'S DATE | TIME ENTERED BY (2400 sws.) | ||
TIME | (INITIAL 5) | ||
(4) | (4) | ||
(si | |||
==SUMMARY== | ==SUMMARY== | ||
OF ACTIVITY PERFORMED | OF ACTIVITY PERFORMED (si b | ||
e 9 | e 9 | ||
4, e | 4, e | ||
4 esass (s/s2) Rw.oo | 4 esass (s/s2) Rw.oo sat - | ||
sat - | m'CTION5 ON REVEr.8Y | ||
= | |||
e EMERGENCY RESPONSE 'AND RECOVEMY ACTIVITIES LOG SHEET INSTRUCTIONS. | |||
Entry | Entry. | ||
Number | Number instructions 1.' | ||
1.' | identify the emergency location where this Log Sheet is maintained during an emergency (i.e.; Corporate incident Response Center, Materials Dept., Emergency Operations Facility, etc.) | ||
2. | |||
Enter the date which this form is being used. Start a new Log Sheet each day. | |||
3. | |||
confusion. | Consecutively number each page used each day. | ||
4. | |||
Enter the time for each Log entry. Use the 2400 hour clock to avoid confusion. | |||
~ | |||
5. | 5. | ||
Enter a summary of each ac,tivity being recorded. | Enter a summary of each ac,tivity being recorded. | ||
6. | |||
Enter your initials upon completion of each Log Sheet entry. | |||
f | f | ||
~ | |||
f l | f | ||
O | ~ | ||
l O | |||
e i | |||
7 | |||
'] | |||
Rev. 1 | |||
~ | |||
05/01/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE PROCEDURE 3.5, s | |||
SAFETY, HEALTH, AND CLAIMS APPENDIX E-2 EMERGENCY PLAN TITLES AND PERSONNEL ASSIGNMENTS NOTIFICATION LIST Effective Date: 01/01/83 Name Hane Phone Emergency Plan Title Nonemergency Title Business Phone Corporate Safety, 1. | |||
B. P. 'Sadler Health, and Claims Manager, Safety, Coo rdinator Health, and Claims 2. | |||
A. L. Rechtold Senior Attorney 3. | |||
APPENDIX E-2 | C. W.' Allen Attorney 4. | ||
EMERGENCY PLAN TITLES AND PERSONNEL ASSIGNMENTS NOTIFICATION LIST Effective Date: 01/01/83 Name | J. C. Vocke Attorney Director - Safety 1. | ||
Business Phone Corporate Safety, | R. D. Fagg Engineering Director, Safety Engineering 2. | ||
R. W. Hall Supervisor, Safety Engineering 3. | |||
M. W. Johnson Supervisor, Safety Engineering 4. | |||
P. C. Boe ttcher Supervisor, Safety Engineering Senior Claims 1. | |||
A. L. Bechtold Attorney Senior Attorney J | |||
Supervisor, Safety Engineering Senior Claims | |||
Page 15 of 25 | Page 15 of 25 | ||
m | m | ||
~ | |||
~~ | |||
] | |||
Rev. 1 05/01/81 | ~ | ||
Rev. 1 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCE. DURE | |||
_ PROCEDURE 3.5 i | |||
. SAFETY, HEALTH, AND CLAIMS l | |||
i | ~ | ||
' APPENDIX E-2 (Continued) | |||
l | Effective Date: 01/01/83 Name Home Phone Emergency Plan Title Nonemergency Title Business Phone Senior Claims 2. | ||
J. C. Vocke Attorney Attorney | |||
~ | |||
Effective Date: 01/01/83 Name | (continued) 3. | ||
C.' W. All en Attorney 4. | |||
(continued) | M. Jonas Attorney Senior Health 1. | ||
H. W. Reynolds Physicist Senior Health Physicist 2. | |||
P. C. Boettcher Supervisor, Safety Engineering Senior Claims 1. | |||
Attorney | E. A. Giudici Investigator Senior Claims Invest.igator 2. | ||
D. G. Keeler Casualty Claims Supervisor | |||
~ | |||
3. | |||
J. C. Echols Senior Casualty Claims Supervisor 4. | |||
R. Wetzel Senior Claims | |||
' Investigator j | |||
Page 16 of 25 | |||
~ | |||
~ | |||
~ | |||
Rev. 1 05/01/81 | |||
05/01/81 PACIFIC GAS AND ELECTRIC COMPANY | ~ | ||
CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCE, DURE | PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCE, DURE | ||
' PROCEDURE 3.5 s | |||
SAFETY, HEALTH, AND CLAIMS APPENDIX E-2 (Continued) | SAFETY, HEALTH, AND CLAIMS APPENDIX E-2 (Continued) | ||
' Effective Date: 01/01/83 | |||
^ | |||
Name | Name Home Phone Emergency Plan Title fionemergency Title Business Phone Claims Attorney 1. | ||
Home Phone | J. C. Vocke Attorney 2. | ||
'C. W. All en Attorney 3. | |||
M. C. Dolan Attorney 4. | |||
'M. Jonas Attorney Field Claims 1. | |||
C. 0. Schreil Investigator Claims Investigator | |||
, (San Luis Obispo) 2. | |||
T. F. Morris Claims investigator (Fresno) 3. | |||
S. P. Robison Claims Investigator (San Jose) 4. | |||
.E. Fortner Claims Investigator (Stockton) | |||
(Stockton) | J | ||
( | ( | ||
Page 17 of 25 | Page 17 of 25 | ||
u Rev. 1 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE | |||
. PROCEDURE 3.5 SAFETY, HEALTH, Afd0 CLAIMS APPEtl0IX E-2 (Continued) | |||
Effective Date: 01/01/83 Nam'e Hone Phone Emergency Plan Title Nonemergency Title Business Phone | |||
PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE | ~ | ||
Senior Fire 1. | |||
SAFETY, HEALTH, Afd0 CLAIMS | W. S. Garrett Protection Senior Fire Protec-Engineer tion Engineer 2. | ||
APPEtl0IX E-2 (Continued) | L. L. McCune Senior Safety Specialist Safety Coordinator | ||
Effective Date: 01/01/83 | . 1. | ||
Nam'e | 'J. L. Frazier Safety Engineering Representative 2. | ||
M. W. Johnson Supervising, Safety Engineering 3. | |||
M. J. Johnson Safety Specialist 4. | |||
Senior Fire | R. J.'Delucchi Safety Engineering Representative i | ||
Protection | American Nuclear Insurers Hospitals 1. | ||
Engineer | French Hospital (San Lui s Obispo) 2. | ||
St. Francis Hospital (San Francisco), | |||
Specialist | |||
Safety Coordinator | |||
Hospitals | |||
Page 18 of 25 | Page 18 of 25 | ||
c. | |||
.v v | |||
- Rev. 1 05/01/81 | |||
*l PACIFIC GAS AND. ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE i | |||
PROCEDURE 3.5 SAFETY, HEALTH, AND CLAIMS APPENDIX E-3 EMERGENCY ORGANIZATION CONTACT LIST | |||
. Effective Date: 01/01/83 Emergency locattor$ | |||
SAFETY, HEALTH, AND CLAIMS | Name Emergency Plan Title Normal Business Phon _e Emergency Phone Recovery Manager | ||
: 1. _J. D. Shiffer hnr | |||
] | |||
_3 L-u s | |||
2. | |||
R, C. Thornberry 3 | |||
Emergency Plan Title | s | ||
L- | : 3.,J. D. Townsend | ||
] | |||
L Corporate Lia'ison 1. | |||
s | R. J. Menavitt h~!RC Coordinator | ||
: 3. ,J. | -] | ||
Corporate Lia'ison | R. Foster | ||
: 2., Sg | |||
_3 6 | |||
: 2. , Sg | 1 3. | ||
_3 6 | T. A. Moulia 3 | ||
L 4. | |||
L | G; A. Pierce 3 | ||
Corporate 1. | |||
W. P. Noone heneral Office Insurance | |||
Corporate | |||
{ | { | ||
] | |||
g | g Coordinator 2. | ||
R. M. Reider | |||
) | |||
3.;C.A. Lewis u | ~ | ||
L 3.;C.A. Lewis | |||
_3 u | |||
: 3. ,R. F. Locke | Corporate Law | ||
: 1., P. A._ Cra ne, J r. | |||
heneral Offica Department | |||
Page 19 of 25 | ] | ||
Coo rdinator k | |||
2. | |||
R Ohlbach | |||
) | |||
6 | |||
: 3.,R. F. Locke | |||
) | |||
-~ | |||
L Page 19 of 25 | |||
T t | T I | ||
t i | |||
j' - | |||
i I | i I | ||
t 4 | t 4 | ||
| Line 1,582: | Line 1,659: | ||
i 1-t I | i 1-t I | ||
a t | a t | ||
) | |||
c 4 | c 4 | ||
l i | l i | ||
| Line 1,588: | Line 1,666: | ||
1 | 1 | ||
? | ? | ||
ki t | |||
J i' | |||
i' i | i i | ||
i | fi 1 | ||
l i. | l i. | ||
f I | f I | ||
i E | i E | ||
1i J | |||
I | |||
). | ). | ||
f' 1 | f' 1 | ||
e i | e i | ||
k. | k. | ||
i I | i I; | ||
f i-d 1 | f i-d 1 | ||
J | J | ||
.f | .f. | ||
s *. | |||
Wg | I Wg Dg g | ||
Mg g | |||
Mg fBg E | |||
Mg E | G A | ||
n 9 | |||
9 A | i E | ||
TA D | |||
S Y' | |||
A O | |||
O n | |||
T' i | |||
I 6 | |||
/ | |||
N s | |||
O I | |||
T A | T A | ||
C O | |||
Y | L i | ||
O | YCN E | ||
G R | |||
E M | |||
o E | |||
t i | |||
O I | TE e | ||
T | EH Y T | ||
A | S I | ||
C O | W N G T A O C Y L NP L A | ||
Y C | A E S P S MN N | ||
N E | ) | ||
G | y OO O g | ||
CP I | |||
S C | |||
T I E RR A T Y C N | |||
e O | |||
C t | |||
C I | |||
LN N T | |||
E E U A | |||
E G | |||
I D R M NE M IL F | |||
AM F | |||
O A | |||
SE A E C R | |||
GT Y O | |||
CA E | |||
R C I | |||
L FI O N IT CP E T | |||
AR POG Y | |||
C R C | |||
E N | |||
E E | |||
M M G | |||
E A | |||
R N | |||
E 0 | |||
M E | M E | ||
0 v | |||
l e | |||
E R | |||
( | |||
) | |||
( | |||
2 | 2 | ||
) | |||
r | 8 | ||
.s | |||
g | /8 r | ||
g E h | |||
4 | ( | ||
g | M0 46 0 | ||
1 I | |||
g T4 4 | |||
2 9 | |||
g 6 | |||
p | |||
( | |||
g | |||
EMERGENCY COMMUNICATIONS LOG SHEET INSTRUCTIONS i | EMERGENCY COMMUNICATIONS LOG SHEET INSTRUCTIONS i | ||
~ | |||
Entry | Entry Number Instructions 1. | ||
Number | Identify the emergency location where this LogSheet is maintained during an emergency (i.e.; Corporate incident Response Center, Materials Dept., Emergency Operations Facility, etc.) | ||
\\ | |||
(i.e.; Corporate incident Response Center, Materials Dept., Emergency Operations Facility, etc.) | Enter the date which this Form is being used. Start a new Log Sheet each' day. | ||
2. | |||
3. | |||
Consecutively number each page used each day. | |||
4. | |||
i | Enter the time'for each Log entry. Use the 2400 hour clock to avoid confusion. | ||
i 5. | |||
Clearly record the name of the individual calling you or whom you are calling. | |||
I | |||
*s 6. | |||
Record the individuals PGandE Emergency Organization Title or their non PGandE affiliation. | |||
Che k the entry activity as to w'hether the, individual called you or you are cilling them. | |||
individual to assure correct copy / transmission. | 7. | ||
c t | |||
8. | |||
Enter the entire context of the message being communicated. Read back the message to the individual to assure correct copy / transmission. | |||
9. | |||
Enter your initials upon completion of each Log Sheet entry. | |||
4 P | 4 P | ||
o | o | ||
.. s. | |||
FKflFICCAS AND ELECTRIC COMPANY | FKflFICCAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN POes EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET EMER4ENCY LOCATION 700AY'S DATE PAGE n | ||
EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET 700AY'S DATE | ~ | ||
str - | |||
tai im TIME ENTERED BY (2400 hesj llNITIALS se tai | |||
tai | |||
==SUMMARY== | ==SUMMARY== | ||
OF ACTIVITY PERFORMED | OF ACTIVITY PERFORMED tm 4a4 | ||
{ | { | ||
e t | e t | ||
\\ | |||
N MI A" # | N MI A" # | ||
SEE INSTRUCTIONS ON REVERSE | |||
r | r C | ||
/p EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET | |||
. INSTRUCTIONS | |||
.y Entry Number Instructions b | |||
1. | |||
Number | Identify the emergency location where this Log Sheet is maintained during an emergency (i.e.; Corporate Incident Response Center, Materials Dept., Emergency Operations Facility, etc.) | ||
b | 2. | ||
Enter the date which this form is being used. Start a new Log Sheet each day. | |||
during an emergency (i.e.; Corporate Incident Response Center, Materials Dept., Emergency Operations Facility, etc.) | ~ | ||
3. | |||
Consecutively number each pa'ge used each day. | |||
T 4. | |||
Enter the time for each Log entry. Use the 2400 hour clock to avoid j | |||
confus, ion. | |||
5. | |||
Enter a summary of each activity being recorded. | |||
l 6. | l 6. | ||
Enter your initials upon completion of each Log Sheet entry. . | Enter your initials upon completion of each Log Sheet entry.. | ||
= | |||
l v, | l v, | ||
~J i | |||
9 | 9 | ||
3 | 3 | ||
.,v. | |||
s | .~. | ||
s o | |||
PACIFIC GAS AND ELECTRIC COMPANY Re v. | |||
IMPLEMENTING PROCEDURE | 1 CORPORATE EMERGENCY RESPONSE PLAN 05/01/81 | ||
<^-s IMPLEMENTING PROCEDURE I | |||
e J | |||
J PROCEDURE 3.6 SECURIC APPENDIX E-1 EMERGENCY RESPONSE ORGANIZATION, CORPORATE SECURITY DEPARTMENT RELATIONSHIPS RECOVEks | |||
* MAhACEh (LOf ) | * MAhACEh (LOf ) | ||
/ | |||
CCEPAATE LI AISs%I COORCINATCP | CCEPAATE LI AISs%I COORCINATCP (CIRC) | ||
(CIRC) | -.q COaPGAATL h!TE CH s RATL SECUh17Y SkWhtTY jf[h COORCINATOR SUILRVISCR CO'6CIhAN D (CENEkAL OtFICE) s t h.*) | ||
UJhE E Of6 ICE) | |||
COaPGAATL | } | ||
h!TE | i. | ||
SECUh17Y | n BUILDING CLhKMTE Shah:TY oNSITE SECLAITY REPRESENTATIVE KJ RErkESEh"FATIVES PEkh6NNEL SurERv! Son CONT uCT SECURITY (GENEhAL CITICE 6 REPPESLNTAT!vE (CENEAAL OFFICE) | ||
ISAN LIIIS 091$f0) | |||
SAN LUIS OSISFO) | |||
n | (CIABLO CANYOf) | ||
BUILDING | ..i l | ||
g-.. | |||
(CENEAAL OFFICE) | I i. | ||
SAN LUIS OBISPO COUNTY SHERITr*$ | SAN LUIS OBISPO COUNTY SHERITr*$ | ||
orTICE | orTICE Legand1 Line Authority Coordination | ||
- -.- Corporate Security Department Personnel OSC - Operational Support Center CIRC - Corporate Incident Response Ce'nter Ect' | |||
- Ipergency Operations Facality 1, | |||
Page 11 of 32 | Page 11 of 32 | ||
Rev. 1 | Rev. 1 05/01/81.* | ||
PACIFIC GAS AND EldCTRIC COMPAN'Y CORPORATE EMERGENCY RESPONSE PLAN | |||
PACIFIC GAS AND EldCTRIC COMPAN'Y | ~ | ||
IMPLEMENTING PROCEDURE PROCEDURE 3.6 SECURITY | |||
CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE | ~ APPENDIX E-2 EMERGENCY PLAN TITLES AND PERSONNEL ASSIGNMENTS NOTIFICATION LIST Effective Date: 01/01/83 Name Ho[ne Phone Emergency Plan Titia Nonemergency Title | ||
. Business Phone Corporate Security 1. | |||
L. H. Shaffer Coordinator Director of Security 2. | |||
J. R. Van Schaick Supervising Securi-ty | |||
. Representative 3. | |||
Coordinator | R. Dunleavy Senior Security Representative. | ||
Security 1. | |||
V. Dettman Representatives Securi ty Representative 2. | |||
M. Person Security Representative 3. | |||
Security | J. Nichols Security Representative 4. | ||
L. Lawrence Security Representative 5. | |||
L. Adams Securi ty Representative 6. | |||
Security Representative | F. C. Kobely Security Representative Page 12 of 32 l- | ||
Representative | |||
Page 12 of 32 l- | |||
v | v | ||
~ | |||
Rev. 1 | Rev. 1 05/01/81 PACIFIC GAS AF.0 ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE | ||
~ | |||
(..,. | |||
PROCEDURE 3.6 SECURITY | |||
~ | |||
' APPENDIX E-2 (Continued) | |||
( ..,. | Effective Date: 01/01'/83 Name Home Phone Emergency Plan Title Nonemergency Title Business Phone 3 | ||
PROCEDURE 3.6 SECURITY | San Luis Obispo 1. | ||
Sheriff's Operations County Sheriff's | |||
* Facility Office Buildirig Security 1. | |||
Effective Date: 01/01'/83 Name | R. J. Eiden Supervisor Security Supervisor 2. | ||
A. Jinkerson A_dministrative Assistant 3. | |||
* Facility Office Buildirig Security | R. D. Manning Mngr. Building Administrative w | ||
Services Department Page 13 of 32 | |||
~, | |||
v Rev. 1 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE r-e' PROCEDURE 3.6 SECURITY APPENDIX E-3 EMERGENCY ORGANIZATION CONTACT LIST Effective Date: 01/01/83 Name Emergency Location Emergency Plan Title Normal Business Phone Emergency Phone | |||
~ | |||
PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE | Recovery Manager | ||
r- | : 1.,J. D. Shiffer EOF | ||
e' | 'l L | ||
SECURITY APPENDIX E-3 EMERGENCY ORGANIZATION CONTACT LIST Effective Date: 01/01/83 | ] | ||
: 2. _R. C. Thornberry 6 | |||
~ | |||
Recovery Manager | 3' 3. | ||
J. D. Townsend Corporate Liaison 1. | |||
R. J. McDevitt | |||
3' | .{ | ||
CIRC | |||
Corporate Liaison | "~ | ||
Coordinator | |||
t | } | ||
t 2. | |||
S. R. Foster e-L | |||
: 3. .T. A. Moulia | : 3..T. A. Moulia J | ||
~ | |||
: 4. . G. A. Pierce | : 4.. G. A. Pierce d | ||
Site Security 1. | |||
Site Security | L. G. Lunsford OSC Supervisor | ||
] | |||
{ | |||
~ | |||
2. | |||
R. G. Todaro | |||
Coordinator | ~ | ||
[, | J 3. | ||
: 2. , T. J. Wal sh , Jr. | UNASSIGNED Corporate Personnel 1. | ||
H. S. Pitner General Office Relations Coordinator L | |||
[, | |||
: 2., T. J. Wal sh, Jr. | |||
) | |||
L 3. | |||
T. J. Zimbrick L | |||
] | |||
Page 14 of 32 | Page 14 of 32 | ||
s' | s' | ||
~ | |||
PACIFIC GAS AN6 ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN | PACIFIC GAS AN6 ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE PROCEDURE 3.6 SECURITY APP 5NDIX E-3 (Continued) | ||
IMPLEMENTING PROCEDURE PROCEDURE 3.6 SECURITY APP 5NDIX E-3 (Continued) | Effective Date: 01/01/83 Name Energency Location Emergency Plan Title Normal Business Phone Emergency Phone Onsite Personnel 1. | ||
Effective Date: 01/01/83 Name | D. Okabayashi | ||
Onsite Personnel | [dSC Representative | ||
D. Okabayashi | ] | ||
L 2. | |||
_L. _ Campbell L | |||
3 1 | |||
Page 15 of 32 rn - | |||
w | |||
c.. | |||
s | s hv. 1 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY | ||
- l CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE p-PROCEDURE 3.6 SECURITY -- | |||
IMPLEMENTING PROCEDURE p- | |||
APPENDIX E-4 PRESCREENED RESPONSE PLAN PE_R_SONNEL LIST i | APPENDIX E-4 PRESCREENED RESPONSE PLAN PE_R_SONNEL LIST i | ||
Effective Date: | Effective Date: | ||
Name | 11/24/80 Name ID No. | ||
ID No. | Department e.+ | ||
9 | |||
9 | + = = ** | ||
ase em 0 | ase em 0 | ||
6 PAGE 16 0F 32 | 6 PAGE 16 0F 32 | ||
.v v | |||
,~ | |||
0$f61f8k | |||
0$f61f8k PACIFIC GAS AND ELECTRIC COMPANY | ~ | ||
PACIFIC GAS AND ELECTRIC COMPANY CORPORATE D1ERGENCY RESPONSE PLAN | |||
IMPLEMENTING PROCEDURE | ~ | ||
PROCEDUAE 3.6 | IMPLEMENTING PROCEDURE. | ||
PROCEDUAE 3.6 SECURITY APPENDIX E-5 RESTRICTED ACCESS AUTHORIZATION LIST Effective Date: 12/01/82 A. | |||
Effective Date: 12/01/82 A. The ON DUTY Corporate Em'ergency Response Organization (CERO) personnel who are | The ON DUTY Corporate Em'ergency Response Organization (CERO) personnel who are a | ||
authorized to make on-the-spot changes to this Restricted Access List are: | |||
~ | |||
1. | |||
Member of Corporate Administrative Suy' port Coordina' tor's Staff at Guards Table, 14th Floor 77 Beale Streeti ' | |||
2. | |||
Corporate Liaison Coordinator [. | |||
DEPARTMENT | 3. | ||
YES | Corporate Emergency Coordinator; B. | ||
PAGES FOR THIS IMPLEMENTING PROCEDURE ATTACHMENT IS ON FILE WITH THE CORPORATE SECURITY COORDINATOR. | Restricted Personnel Access Authorization List (*means CERO member): | ||
CIRC BADGE ISSUED NAME DEPARTMENT YES NO THE INFORMATION ON THIS PAGE AND ALL SUCCESSIVE PAGES FOR THIS IMPLEMENTING PROCEDURE ATTACHMENT IS ON FILE WITH THE CORPORATE SECURITY COORDINATOR. | |||
Page 17 of 32 | Page 17 of 32 | ||
Rev. 1 05/01/81 | Rev. 1 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE | ||
PACIFIC GAS AND ELECTRIC COMPANY | (-~, | ||
CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE | PROCEDURE 3.6 SECURITY APPENDIX E-5 RESTRICTED ACCESS AUTHORIZATION LIST Effective Date: 12/01/82 B. | ||
(-~, | Restrictbd Personnel Access Authorization List (Cont'd.) (*means CERO member): | ||
CIRC BADGE ISSUED NAME DEPARTMENT YES NO l | |||
SECURITY APPENDIX E-5 RESTRICTED ACCESS AUTHORIZATION LIST Effective Date: 12/01/82 B. Restrictbd Personnel Access Authorization List (Cont'd.) (*means CERO member): | |||
CIRC BADGE ISSUED NAME | |||
l l | l l | ||
THE INFORMATION ON THIS PAGE AND ALL SUCCESSIVE PAGES FOR THIS IMPLEMENTING PROCEDURE ATTACHMENT IS ON FILE WITH THE CORPORATE SECURITY COORDINATOR. . | THE INFORMATION ON THIS PAGE AND ALL SUCCESSIVE PAGES FOR THIS IMPLEMENTING PROCEDURE ATTACHMENT IS ON FILE WITH THE CORPORATE SECURITY COORDINATOR.. | ||
Page 18 of 32 | Page 18 of 32 | ||
p | |||
'Rev. 1 | |||
~ | |||
05/01/81 PACIFIC GAS AND ELECTRIC COMPANY | 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE 3 | ||
~ | |||
s PROCEDURE 3.6 SECURITY APPENDIX E-5 RESTRICTED ACCESS AUTHORIZATION LIST. | |||
s | Effective Date: | ||
12/01/82 | |||
' B. | |||
Restricted Personnel Access Authorization List (Cont'd.) (*means CERO member): | |||
. CIRC BADGE ISSUED NAME DEPARTMENT YES NO THE INFORMATION ON THIS PAGE AND ALL SUCCESSIVE | |||
~ | |||
THE INFORMATION ON THIS PAGE AND ALL SUCCESSIVE | PAGES FOR THIS IMPLEMENTING PROCEDURE ATTACHMENT IS ON FILE WITH THE CORPORATE SECURITY. COORDINATOR. | ||
PAGES FOR THIS IMPLEMENTING PROCEDURE ATTACHMENT IS ON FILE WITH THE CORPORATE SECURITY. COORDINATOR. | l l | ||
l l | i Page 19 of 32 l | ||
i Page 19 of 32 s | s | ||
--~,, -.. | |||
s. | |||
Rev. 1 | Rev. 1 05/01/81' | ||
~ | |||
PACIFIC GAS AND ELECTRIC COMPANY | |||
~ | |||
CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE PROCEDURE 3.6 SECURITY APPENDIX E-5 RESTRICTED ACCESS AUTHORIZATION LIST Effective Date: | |||
SECURITY | |||
APPENDIX E-5 RESTRICTED ACCESS AUTHORIZATION LIST Effective Date: | |||
I':/01/82 | I':/01/82 | ||
'B. | |||
CIRC SADGE ISSUED NAME | Restricted Personnel Access Authorization List (Cont'd.),(*means CERO member): | ||
THE INFORMATION ON THIS PAGE AND ALL SUCCESSIVE PAGES FOR THIS IMPLEMENTING PROCEDURE ATTACHMENT IS ON FILE WITH THE CORPORATE SECURITY C00RCINATOR | CIRC SADGE ISSUED NAME DEPARTMENT YES NO o | ||
THE INFORMATION ON THIS PAGE AND ALL SUCCESSIVE PAGES FOR THIS IMPLEMENTING PROCEDURE ATTACHMENT IS ON FILE WITH THE CORPORATE SECURITY C00RCINATOR. | |||
i | i | ||
,Page 20 of 32 | |||
r- | r-s Rev. 1 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE | ||
s | ,s PROCEDURE 3.6 SECURITY APPENDIX E-5 RESTRICTED ACCESS AUTHORIZATION LIST Effective Date: 12/01/8'2 B. | ||
Rev. 1 PACIFIC GAS AND ELECTRIC COMPANY | Restricted Personnel Access Authorization List (Cont'd.) (*means CERO member): | ||
CORPORATE EMERGENCY RESPONSE PLAN | CIRC BADGE ISSUED | ||
. NAME DEPARTMENT YES NO | |||
\\ | |||
s i | |||
THE INFORMATION ON THIS PAGE AND ALL SUCCESSIVE PAGES FOR THIS IMPLEMENTING PROCEDURE ATTACHMENT IS ON FILE WITH THE CORPORATE SECURITY COORDINATOR. | |||
THE INFORMATION ON THIS PAGE AND ALL SUCCESSIVE PAGES FOR THIS IMPLEMENTING PROCEDURE ATTACHMENT IS ON FILE WITH THE CORPORATE SECURITY COORDINATOR. | |||
Page 21 of 32 | Page 21 of 32 | ||
] | |||
~ | |||
~ | |||
~ | |||
'Rev. 1 05/01/81-PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN' IMPLEMENTING PROCEDURE | |||
CORPORATE EMERGENCY RESPONSE PLAN' IMPLEMENTING PROCEDURE | |||
(, | (, | ||
PROCEDURE 3.6 SECURITY APPENDIX E-5 | PROCEDURE 3.6 SECURITY APPENDIX E-5 RESTRICTED ACCESS AUTHORIZATION LIST Effective Date: | ||
12/01/82 B. | |||
Restricted Personnel Access Authorization. List (Cont'd.) (*means' CERO member): | |||
YES | CIRC BADGE ISSUED NAME DEPARTMENT YES NO 1 | ||
W THE INFORMATION ON THIS PAGE AND ALL SUCCESSIVE | |||
~ | |||
THE INFORMATION ON THIS PAGE AND ALL SUCCESSIVE PAGES FOR THIS IMPLEMENTING PROCEDURE ATTACHMENT IS ON FILE WITH THE CORPORATE SECURITY COORDINATOR.. | PAGES FOR THIS IMPLEMENTING PROCEDURE ATTACHMENT IS ON FILE WITH THE CORPORATE SECURITY COORDINATOR.. | ||
I ._ | I._ | ||
Page 22 of 32 | Page 22 of 32 | ||
7 | 7 | ||
~ | |||
g | g 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE | ||
PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN | |||
IMPLEMENTING PROCEDURE | |||
(- | (- | ||
'- PROCEDURE 3.6 SECURITY APPENDIX E-5 RESTRICTED ACCESS AUTHORIZATION LIST Effective Date: | |||
12/01/82 B. | |||
Restricted Personnel Access Authorization List (Cont'd.) (*means CERO member): | |||
CIRC BADGE ISSUED | CIRC BADGE ISSUED | ||
- NAME DEPARTMENT YES NO s | |||
THEINFORMATIONONTHISPdGEANDALLSUCCESSIVE | |||
~ | |||
PAGES FOR THIS IMPLEMENTING PROCEDURE ATTACHMENT j | |||
IS ON FILE WITH THE CORPORATE SECURITY COORDINATOR. | IS ON FILE WITH THE CORPORATE SECURITY COORDINATOR. | ||
1 Page 23 of 32 | 1 Page 23 of 32 | ||
.= | |||
Rev. 1 | Rev. 1 05/01/81 PACIF.IC GAS AND ELECTRIC COMPANY | ||
. CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE | |||
PACIF.IC GAS AND ELECTRIC COMPANY | ',.~ | ||
~ | |||
IMPLEMENTING PROCEDURE | . PROCEDURE 3.6 s | ||
SECURITY APPENDIX E-5 RESTRICTED ACCESS AUTHORIZATION LIST Effective Date: 12/01/82 B. | |||
Restrictid Personnel Access Authorization List (Cont'd.) (*means CERO member): | |||
CIRC BADGE ISSUED NAME DEPARTMENT YES NO ' | |||
SECURITY | THE INFORMATION ON THIS PAGE AND ALL SUCCESSIVE PAGES FOR THIS IMPLEMENTING PROCEDURE ATTACHMENT IS ON FILE WITH THE CORPORATE SECURITY COORDINATOR. | ||
APPENDIX E-5 | l l | ||
h Page 24 of 32 | |||
Effective Date: 12/01/82 | |||
B. Restrictid Personnel Access Authorization List (Cont'd.) (*means CERO member): | |||
CIRC BADGE ISSUED NAME | |||
THE INFORMATION ON THIS PAGE AND ALL SUCCESSIVE | |||
PAGES FOR THIS IMPLEMENTING PROCEDURE ATTACHMENT IS ON FILE WITH THE CORPORATE SECURITY COORDINATOR. | |||
l | |||
Page 24 of 32 | |||
..v. | |||
Rev. 1 | Rev. 1 05/01/81 | ||
~ | |||
PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE | |||
~ | |||
PROCEDORE 3.6 SECURITY APPENDIX E-5 RESTRICTED ACCESS AUTHORIZATION LIST i | |||
PROCEDORE 3.6 | |||
SECURITY APPENDIX E-5 RESTRICTED ACCESS AUTHORIZATION LIST | |||
i | |||
~ | ~ | ||
Effective Date: | Effective Date: | ||
12/01/82 B. | |||
Restricted Personnel Access Authorization List (Cont'd.) (*means CERO member): | Restricted Personnel Access Authorization List (Cont'd.) (*means CERO member): | ||
' CIRC BADGE ISSUED NAME DEPARTMENT YES NO THE INFORMATION ON THIS PAGE AND ALL SUCCESSIVE I | |||
PAGES FOR THIS IMPLEMENTING PROCEDURE ATTACHMENT i | |||
IS ON FILE WITH THE CORPORATE SECURITY COORDINATOR. | |||
Page 25 of 32 | Page 25 of 32 | ||
,1 | |||
.o Rev. 1-05/01/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN | |||
Rev. 1- | ' (~'._ | ||
05/01/81 PACIFIC GAS AND ELECTRIC COMPANY | i IMPLEMENTING PROCEDURE s | ||
CORPORATE EMERGENCY RESPONSE PLAN | PROCEDURE 3.6 e | ||
(~'._ | SECURITY APPENDIX E-5 RESTRICTED ACCESS AUTHORIZATION LIST Effective Date: | ||
i | 12/01/82 B'. | ||
Restricted Personnel Access Authorization List (Cont'd.) (*means CERO member): | |||
PROCEDURE 3.6 | CIRC BADGE ISSUED NAME DEPARTMENT YES NO THE INFORMATION ON THIS PAGE AND'ALL SUCCESSIVE PAGES FOR THIS IMPLEMENTING PROCEDURE ATTACHMENT IS ON FILE WITH THE-CORPORATE SECURITY COORDINATOR. | ||
B'. Restricted Personnel Access Authorization List (Cont'd.) (*means CERO member): | |||
IS ON FILE WITH THE-CORPORATE SECURITY COORDINATOR. | |||
1. | 1. | ||
i Page 26 of 32 i | i Page 26 of 32 i | ||
j | j O | ||
e E | |||
e E | M S | ||
M | l R | ||
Du Es | Du E | ||
Es B | |||
En | V En E | ||
t e | t e e | ||
R BD E | |||
4 G | |||
ti s | O | ||
) | |||
A s | |||
E ti s ON IT E | |||
T C | |||
A U | |||
D RT S | |||
t | E | ||
'Y N | |||
I A | |||
D E | |||
= | |||
E O | |||
a S | |||
T t | |||
= | |||
i N | i N | ||
O I | |||
T A | T A | ||
e. | e. | ||
C O | CO L | ||
YCN E | |||
C N | G R | ||
E G | ) | ||
EM i | |||
E n | |||
T | T E | ||
EH Y T | |||
S IV N G IT A O C Y L NP L A | |||
A E S P S MN N | |||
)7 OO O | |||
( | |||
CP I | |||
S C | |||
T E | |||
IRR A T Y C N | |||
4 O | |||
C C I | |||
N N T | |||
E I | |||
L E U A | |||
E G I | |||
D R M L | |||
I NE M F | |||
AM F | |||
SE O A | |||
A E C R | |||
GT CA Y O | |||
E R C I | |||
L F | |||
ON T | |||
ICP I | |||
AR E T | |||
POG Y | |||
CR C | |||
E N | |||
E E | E E | ||
M M G | |||
E A R | |||
N EM M. | |||
j E | |||
v 9 | |||
eR 4 | |||
) | |||
l 2 | |||
a 4 | |||
g E h (9 | |||
M0 m | |||
6 0 | |||
IT42 4 | |||
9 1 | |||
g 8 | |||
i | |||
4 | |||
l | |||
g | |||
g, | g, PACIFIC GAS ANO ELECTRIC COMPANY COswvsATE EMERGENCY RESPONSE PLAN EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET f'- - | ||
PACIFIC GAS ANO ELECTRIC COMPANY | EMERGENCY LOCATION TODAY'S DATE PAGE (1) | ||
TODAY'S DATE | (2) | ||
(1) | (3) | ||
(2) | TIME | ||
TIME | , (2400 hrs.) | ||
ENTERED BY (INITIALS) | |||
(INITIALS) | |||
==SUMMARY== | ==SUMMARY== | ||
OF ACTIVITY PERFORMED | OF ACTIVITY PERFORMED (en (4 | ||
(s) o m | |||
u | |||
'd w oes<s e aw.no sEE INSTRUCTIONS ON REVERSE | |||
m. | |||
s | s e | ||
EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET INSTRUCTIONS Entry | |||
~ | |||
Number | Number Instructions 1. | ||
Identify the emergency location where this Log Sheet is maintained during an emergency (i.e.; Corporate incident Response Center, Materials Dept., Emergen~cy Operations Facility, etc.) | |||
2. | |||
Enter the date which this form is being used. Start a new Log Sheet each day. | |||
8 3. | |||
Consecutively number each page used each day. | |||
l l | l l | ||
4. | |||
Enter the time for each Log entry. Use the 2400 hour clock to avoid | |||
i | -s confusion. | ||
5. | |||
Enter a summary of each activity being recorded. | |||
i 6. | |||
Enter your initials upon completion of each Log Sheet entry. | |||
i e | i e | ||
O | O e | ||
e | -e=- | ||
~ | |||
PACIFIC GAS AND iLECTRIC COMPANY Re v. O CORPORATE EMERGENCY RESPONSE PLAN 05/01/81 | |||
*r'' | |||
CORPORATE EMERGENCY RESPONSE PLAN | IMPLD4ENTING PROCEDURE PROCEDURE 3.7 PERSONNEL RELATIONS 1 | ||
PERSONNEL RELATIONS | APPENDIX E-1 EMERGENCY RESPONSE ORGANIZATION, CORPORATE PERSONNEL RELATIONS -DEPARTMENT RELATIONSHIPS | ||
APPENDIX E-1 | ~ | ||
EMERGENCY RESPONSE ORGANIZATION, CORPORATE PERSONNEL RELATIONS -DEPARTMENT RELATIONSHIPS | |||
RECOVERY MANAGER (EOF) | RECOVERY MANAGER (EOF) | ||
CORPCRATE-LIAISON | CORPCRATE-LIAISON CCORDINATOR (CIRC) | ||
CCORDINATOR | CORPORATE CORPORATE PERSONNEL SEG RITY g,g, (CENERAL OFFICE) | ||
(CIRC) | (CENERAI 0FFICE) t ONSITE PERSONNEL ggcypITy PERSONNEL REPRESDCATIVES REPRESDCATIVES REPRESENTATIVE ICENERAL OFFICE OP l GENERAL OFFICE OR (DIABLO CANYON) | ||
CORPORATE | SAN LUIS OBISTO) | ||
SAN LUIS CBISPO) i i | |||
I L_____________l_____* | |||
SEG RITY g,g, | __J Legends | ||
(CENERAL OFFICE) | ~ | ||
__J | Line Authority | ||
----- - Coordination | |||
-**-**- Corporate Pe:csonnel Relations Department Personnel CIRC - Corporate Incident Response Center EOF - Emergency Operations Facility Page 9 of 18 6 | |||
e | |||
~ | |||
n | |||
Rev. 1 | Rev. 1 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAR. | ||
IMPLEMENTING PROCEDURE PROCEDURE 3.7 l | |||
CORPORATE EMERGENCY RESPONSE PLAR. | PER30NNEL RELATIONS 1 | ||
l | |||
PROCEDURE 3.7 | ~ | ||
APPENDIX E-2 EMERGENCY PLAN TITEES AND PERSONNEL ASSIGNMENTS NOTIFICATION LIST Effective Date: 01/01,/83 Name Home Phone Emergency Plan Title Nonemergency Title Business Phone Corporate Personnel 1. | |||
l | H. S. Pitner Relations Coordinator Director, Employment and Planning 2. | ||
T. J. Walsh, Jr. | |||
APPENDIX E-2 EMERGENCY PLAN TITEES AND PERSONNEL ASSIGNMENTS NOTIFICATION LIST Effective Date: 01/01,/83 Name | Employment Represen-tative 3. | ||
S. C.-Woodward Employment Rep. | |||
4. | |||
Employment Represen-tative | C. A. Jaskot Affirmative Action Representative 5. | ||
M. T. Lacugna Affirmative Action Representative 6. | |||
C. C. Kristensen Affirmative Action Representative 7. | |||
J. W. Arnett Affirmative Action Representative Onsite Personnel | |||
~ | |||
1. | |||
D. Okabayashi Representative Personnel Representative 2. | |||
L. Campbell Personnel Representative 3 | |||
Page 10 of 18 | |||
Onsite Personnel | |||
~ | |||
Rev. 1 | Rev. 1 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY f | ||
CORPORATE EMERGENCY RESPONSE PLAN - | CORPORATE EMERGENCY RESPONSE PLAN - | ||
IMPLEMENTING PROCEDURE s | |||
PROCEDURE 3.7 | PROCEDURE 3.7 | ||
~. | |||
PERSONNEL RELATIONS | PERSONNEL RELATIONS APPENDIX E-3 EMERGENCY ORGANIZATION CONTACT LIST Effective Date: 01/01/83 | ||
APPENDIX E-3 | ~ | ||
EMERGENCY ORGANIZATION CONTACT LIST | Name Emergency Location Emergency Plan Title Normal Business Phone Emergency Phone Personnel 1. | ||
G. N. Scourkes | |||
Effective Date: 01/01/83 | ~ | ||
Name | Representatives Personnel Manager. | ||
2. | |||
Personnel | J. A. Market Personnel Assistant 3. | ||
Representatives | M. Alderson Personnel Assistant C | ||
Personnel Manager . | Page 10a of 18 | ||
~6' s | |||
Rev. 1 05/01/81 - | |||
* PACIFIC GAS AND ELECTRIC COMPANY | * PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE | ||
(~ | |||
CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE | PROCEDURE 3.7 | ||
(~ | ~ | ||
PERSONNEL RELATIONS APPENDIX E-3 EMERGENCY ORGANIZATION CONTACT LIST | |||
* Effective Date: 01/01/83 Name Emerg'ency Location Emergency Plan Title Normal Business Phone Emergency Phone | |||
PERSONNEL RELATIONS | ~ | ||
APPENDIX E-3 EMERGENCY ORGANIZATION CONTACT LIST | Recovery Manager 1. | ||
* Effective Date: 01/01/83 Name | J. D. Shiffer E0F L | ||
'l L | |||
Recovery Manager | J | ||
E0F L | : 2. J. C. Thornberry 3.g.D.Townsend,.j g | ||
: 2. J. C. Thornberry | Corporate Liaison 1. | ||
3.g.D.Townsend, | R. J. McDevitt CIRC Coordinator | ||
g | ~ | ||
Corporate Liaison | ~3 | ||
[ | |||
'"^ | |||
[- | g 2. | ||
: 3. .T. A. Moulia | S. R. Foster | ||
[- | |||
::a ] | |||
L | : 3..T. A. Moulia 3 | ||
Corporate Security | 4. | ||
G. A. Pierce L | |||
: 2. _R. Dunleavy | Corporate Security | ||
: 1. _ L. H. Shaffer (General Office Coordinator | |||
\ | ] | ||
g | |||
: 2. _R. Dunleavy L | |||
3. | |||
J. R. Van Schaick 1 | |||
\\ | |||
Page 11 of 18 | Page 11 of 18 | ||
3- | |||
~ | |||
w | |||
CORPORATE EMERGENCY RESPONSE PLAN ,, | .- Rev. 1 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN,, | ||
IMPLEMENTING PROCEDURE f:* | IMPLEMENTING PROCEDURE f:* | ||
PROCEDURE 3.7 | e PROCEDURE 3.7 PERTCTfNEL RELATIONS t | ||
APPENDIX E-3 EMERGENCY ORGANIZATION CONTACT LIST Effective Date: 01/01/83-Name Emerge'ncy Location Emergency Plan Title Normal Business Phone Emergency Phone | |||
~ | |||
Effective Date: 01/01/83- | Security | ||
: 1..V. Dettman hSC Representatives J | |||
( | |||
Security | 2. | ||
M. Person L | |||
] | |||
: 3. A Nichols | |||
: 3. A Nichols | ~ | ||
L | L 4. | ||
L. Lawrence 3 | |||
5. | |||
L. Adams | |||
) | |||
g 6. | |||
F. C. Kobely 3 | |||
k. | |||
Page 11A of 18 | Page 11A of 18 | ||
e | |||
~ | |||
i Rev. 1 05/01/81-PACIFIC GAS AND ELE' TRIC COMPANY ". | |||
[' ' | C | ||
[' ' | |||
PERSONNEL RELATIONS APPENDIX E-4 PRESCREENED RESPONSE PLAN PERSONNEL Effective Date: 05/01/81 | CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE PROCED'URE 3.'7 PERSONNEL RELATIONS APPENDIX E-4 PRESCREENED RESPONSE PLAN PERSONNEL Effective Date: 05/01/81 Name ID No. | ||
Name | Department I | ||
i | i | ||
( | ( | ||
Page 12 of 18 t | Page 12 of 18 t | ||
4, A | |||
u--- | |||
N-- | |||
b | b | ||
\\1 11 l | |||
I 1l1 | |||
- - ~ | |||
4 N | |||
E | |||
? | |||
13 NW 4 | |||
E A | |||
W I | |||
T S | |||
1 R | 1 R | ||
M | / | ||
G M | |||
E | |||
). | |||
T | A m | ||
A | W I | ||
t k | |||
S | M E' | ||
T A | |||
D n | |||
m S | |||
T | 'Y 8 | ||
i AD E | |||
N | O m | ||
M T | |||
h s | |||
C | / | ||
O L | N g | ||
O ITA C | |||
O L | |||
YCN E | |||
G R | |||
EM o | |||
) | |||
E t | |||
TE 4 | |||
EH YT S | |||
P S | IV N G IT A O C Y L NP L A | ||
A E S P S M N N | |||
CS I E | )7 O O O 1 | ||
A | CP I | ||
G | CS T I E RR A Y C N | ||
T O | |||
C 4 | |||
L | I E C L N N T | ||
I E E U A | |||
E | G D R M IL t | ||
I N E M F | |||
AM F | |||
v e | SE O A | ||
A E C R | |||
G T Y O | |||
CA E | |||
R C I | |||
L F O N T | |||
ICP E T | |||
I AR POG Y | |||
CR C | |||
E N | |||
E E | |||
M M G | |||
E A | |||
R N | |||
E x | |||
M 0 | |||
E | |||
/( | |||
0 W | |||
v | |||
( | |||
e I | |||
R | R | ||
) | |||
j | j 2 | ||
El | s 8 | ||
u | |||
/ | |||
s, El 8 | |||
M0 | |||
( | |||
0 4 | |||
I o | |||
T4 8 | |||
2 0 | |||
g p | |||
( | ( | ||
9 g | |||
6 4 | |||
4 | 1 l | ||
l1 lll l | |||
O 4 | O 4 | ||
l EMERGENCY COMMUNICATICNS LOG SHEET s, | l EMERGENCY COMMUNICATICNS LOG SHEET s, | ||
INSTRUCTION _S Entry | ~ | ||
Numi.er | INSTRUCTION _S Entry Numi.er Instructions s | ||
1. | |||
Identify the emergency location where thi LogSheet is maintained during an em'ergency | |||
~ | |||
g' (i.e.; Corporate incident Response Center. Materials Dept., Emergency Operations Facility, etc.) | |||
s.s | s.s | ||
~ | |||
Enter the date which this Form is being used. Start a new Log Sheet each day. | 2. | ||
Enter the date which this Form is being used. Start a new Log Sheet each day. | |||
e | |||
~ | |||
3. | |||
Consecutiv'ely number each page used each day. | |||
~- | |||
4. | |||
Enter the time for each Log entry. Use the 2400 hour clock to avoid confusion. | |||
5. | |||
Clearly record the name of the individual calling you or whom you are calling. | |||
6. | |||
Record the individuals PGandE Emergency Organization Title or their non t'GandE affiliation. - | |||
3 Che k the entry activity as to whether the individual called you or you are calling them. | |||
7. | |||
c 8. | |||
Enter the entire context of the message being communicated. Read back the message to the individual to assure correct copy / transmission 9. | |||
Enter your initials upon completion of each Log Sheet entry. | |||
'r e | |||
s. | |||
~ | M | ||
g., | ~ | ||
FRTFRRIAS ANO ELECTRIC COnePAasy | g.,. | ||
po.s | FRTFRRIAS ANO ELECTRIC COnePAasy CGMJRATE ERGERGENCY RESPONSE PLAN po.s EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET EasEROENCY LOCATION TOOAY'S DATE PAGE (r | ||
s sq. | |||
TOOAY'S DATE | tai is TauE kNTE n t o.,sy (2400 hrsj llNITIALS) tai to: | ||
tai | |||
kNTE n t o.,sy (2400 hrsj | |||
==SUMMARY== | ==SUMMARY== | ||
O.* ACTIVITY PERFORMED | O.* ACTIVITY PERFORMED tw I | ||
{ | { | ||
5 9 | 5 9 | ||
y e | |||
e 4 | e 4 | ||
e S | e S | ||
e h | e h | ||
e O | e O | ||
e | e S | ||
M (8/82) Rev.00 | In s | ||
M (8/82) Rev.00 SEE INSTRUCTIONS ON REVER51 | |||
e | |||
~ | |||
Number | EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET INSTRUCTIONS Entry Number instructions 1. | ||
Identify the emergency location'where this Log Sheet is maintained during an emergency (i.e.; Corporate incident Response Center, 6,aterials Dept., Emergency Operations Facility, etc.) | |||
2., | 2., | ||
Enter the date which this form is being used. Start a new Log Sheet each day. | |||
3. | |||
Enter the time for each Log entry. Use the 2400 hour clock to avoid | Consecutively number each page used each day. | ||
? | |||
4. | |||
Enter the time for each Log entry. Use the 2400 hour clock to avoid O '' | |||
confusion. | |||
5. | |||
Enter.a summary of each activity being recorded. | |||
6. | |||
Enter your initials upon completion of each Log Sheet entry. | |||
6 | 6 | ||
\\ | |||
o h | o h | ||
i I | i I | ||
l | l | ||
-m-Rev. 1 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY r | |||
Rev. 1 | CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE PROCEDURE 4.1 MATERIALS APPEN0!X E-2 EMERGENCY PLAN TITLES AND PERSONNEL ASSIGNMENTS NOTIFICATION LIST Effective Date: d1/01/83 Name Home Phone Emergency Plan Title Nonemergency Title Business Phone Corporate 1. | ||
05/01/81 PACIFIC GAS AND ELECTRIC COMPANY r | E. J. Meyers Materials Director, Project. | ||
IMPLEMENTING PROCEDURE | Coordinator Purchasing 2. | ||
PROCEDURE 4.1 MATERIALS APPEN0!X E-2 EMERGENCY PLAN TITLES AND PERSONNEL ASSIGNMENTS | D. R. Shaffer Director, Materials Purchasing 3'. | ||
J. E. Brennan | |||
~ | |||
Supervising Buyer. | |||
4. | |||
Coordinator | B. E. Roddick Supervising Buyer 5. | ||
R. R. Ochsner Supervising Buyer 6. | |||
Director, Materials Purchasing | R. E. Gleason Supervising Buyer e | ||
Procurement 1. | |||
3'. J. E. Brennan Supervising Buyer. | J. M. MacCormack Coordinator Senior Buyer 2. | ||
A. J. Wei s Senior Buyer 3. | |||
M. L. Hurley Buyer Page 11 of 19 | |||
_r-- | |||
Procurement | s,- | ||
_r-- | |||
Rev. 1 | |||
_' 05/01/81 | _' 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN | ||
, IMPLEMENTING P.ROCEDURE | |||
CORPORATE EMERGENCY RESPONSE PLAN | -s, PROCEDURE 4.1 N | ||
, MATERIALS APPENDIX E-2 (Continued) | |||
N | Effective Date:,01/01/83 Name Home Phone Emergency Plan Title Nonemergency Title Business Phone e | ||
4. | |||
APPENDIX E-2 (Continued) | R. G. McInerney Buyer 5. | ||
Effective Date: ,01/01/83 | R. R. Page Buyer 6. | ||
R. W. Wilson Buyer Transportation 1. | |||
H. W. Klocke Coordinator Traffic Analyst 2. | |||
G. Balanesi Traffic Analyst 3. | |||
J. A. Marino Supervisor, Traffic 4. | |||
J. H. Ferrell Traffic Analyst 5. | |||
Buyer Transportation | R. L. Comyns Traffic Assistant 6. | ||
A. R. Dashiell Travel Clerk | |||
Supervisor, Traffic | |||
Travel Clerk | |||
(. | (. | ||
Page 12 of 19 | Page 12 of 19 | ||
r Rev. 1 | r Rev. 1 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE' PLAN | ||
. IMPLEMENTING PROCEDURE PROCEDURE 4.1 MATERIALS APPENDIX E-3 EMERGENCY ORGANIZATION CONTACT LIST Effective Date: 01/01/83 Name Ea rbency Location Emergency Plan Title Normal Business Phone Emergency Phone Recovery Manager 1. | |||
J. n. Shiffer | |||
[ EOF | |||
MATERIALS APPENDIX E-3 EMERGENCY ORGANIZATION CONTACT LIST | ] | ||
L l | |||
Name | i j | ||
[ EOF | 2. | ||
L | R. C. Thornberry L | ||
3 | |||
: 3. _J. D. Townse'nd | : 3. _J. D. Townse'nd | ||
".I L | |||
Corporate Technical | Corporate Technical 1. | ||
Coo rdinator | _J. B. Hoct CIRC and Logistical 7 | ||
g Coo rdinator 2. | |||
_M. R. Tmsler L. | |||
] | |||
Corporate | 3. | ||
R. A. Youno | |||
.I g | |||
: 2. _B. McClo1 key L | Corporate 1. | ||
D. L. Kennady | |||
~los Padres District Off. | |||
~~ | |||
Division j | |||
or Coo rdinator or | |||
: 2. _B. McClo1 key | |||
_d L | |||
3. | |||
R. J. McKell | |||
~ | |||
J | |||
_w j | |||
Page 13 of 19 | |||
PACIFIC GAS AND ELECTRIC COMPANY | PACIFIC GAS AND ELECTRIC COMPANY t | ||
EMERGENCY LOCATION pg,3 CORPORATE EMERGENCY RESPONSE PLAN TOOAY'S DA1 E | |||
' AGE 4 | |||
EMERGENCY COMMUNICATIONS LOG SHEET fu - | |||
TIME NAME 12400 hrs.) | |||
i | (W ACTIVITY ts (2 | ||
17) | |||
s | NE O | ||
EMERGENCY TITLE OR AFFILIATION N | |||
09N IS/82) Rev. 00 | 44 CALLED CALLING MESSAGE tes-s | ||
SEE les s m8CTIOIS O d REVERBE | ~ | ||
i a | |||
I s | |||
s a | |||
e, 09N IS/82) Rev. 00 SEE les s m8CTIOIS O d REVERBE 9 | |||
) | |||
EMERGENCY COMMUNICATIONS LOG SHEET s | EMERGENCY COMMUNICATIONS LOG SHEET s | ||
C | C INSTRUCTIONS Entry Number Instructions 1. | ||
Identify the emergency location where this LogSheet is maintained during an emergency (i.e.; Corporate incident Response Center, Materials Dept., Emergency Operations Facility, etc.) | |||
Entry | 2. | ||
Number | Enter the date which this Form is being used. Start a new Log Sheet each day. | ||
3. | |||
(i.e.; Corporate incident Response Center, Materials Dept., Emergency Operations Facility, etc.) | Consecutively number each page used each day. | ||
I e | |||
4. | |||
I | Enter the time for each Log entry. Use the 2400 hour clock to avoid confusion. | ||
s 5. | |||
Clearly record the name of the individual calling you or whom you are calling. | |||
6. | |||
s | Record the individuals PGandE Emergency Organization Title or their non PGandE affiliation.' | ||
s 7. | |||
Check the entry activity as to whether the individual called you or you are calling them. | |||
8. | |||
Enter the entire context of the message being communicated. Read back the message to the individual to assure correct copy / transmission. | |||
l | ~ | ||
i | 9. | ||
Enter your initials upon completion of each Log She' t entry. | |||
e l | |||
i Y | |||
. %) | |||
l i | |||
m | m PACIFIC GAS AN3 ELEffhlC COMPANf CGRn5 ATE EMERGENCY RE5PONBE PLAN POwB EMERGENCY RESPONSE ANb RECOVERY ACTIVITIES LOG SHEET RMERGENCY LOCATION TODAY'S DATE PAGE | ||
,/,, | |||
EMERGENCY RESPONSE ANb RECOVERY ACTIVITIES LOG SHEET RMERGENCY LOCATION | = | ||
til (2) | |||
(3) | |||
til | ~ | ||
TIME ENTERED 5Y (2400 hrs.) | |||
TIME | (INITIALS) tal to | ||
==SUMMARY== | ==SUMMARY== | ||
OF ACTIVITY PERFORMED | OF ACTIVITY PERFORMED tai s | ||
o o | o o | ||
s N (8/823 | s N (8/823 A". 00 SEE INSTRUCTIONS ON REVERSE | ||
O M | |||
o EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET INSTRUCTIONS Entry Number instructions 1. | |||
o | Identify the emergency location where this Log Sheet is maintained during an emergency (i.e.; Corporate incident Response Center, Materials Dept., Energency Operations Facility, etc.) | ||
2. | |||
Enter the date which this form is being used. Stait a new Log Sheet each day. | |||
3. | |||
Consecutively number each page used each day. | |||
4. | |||
Enter the time for each Log entry. Use the 2400 hour clock to avoid confusion. | |||
5. | |||
Enter a summary of each activity being recorded. | |||
6. | 6. | ||
Enter your initials upon completion of each Log Sheet entry. , | Enter your initials upon completion of each Log Sheet entry., | ||
m 4 | m 4 | ||
9 | 9 | ||
o | o PACIFIC GAS AND ELECTRIC COMPANY Rev 1 | ||
PACIFIC GAS AND ELECTRIC COMPANY | CORPORATE EMERGENCY RESPONSE PLAN 05/01/81 IMPLEMENTING PROCEDURE f,- | ||
PROCEDURE 4.2 COMMUNICATIONS APPENDIX E-1 EMERGENCY RESPONSE ORGANIZATION, COMMUNICATIONS DEPARTMENT RELATIONSHIPS RECOVERV MANAF,tp | |||
-g it m l | |||
EMERGENCY RESPONSE ORGANIZATION, | 1 i | ||
e 1 | |||
y Q | |||
~ | |||
CMPORATE SITE EMEPetNCY LIAISON W WIST!CAI. | |||
W WIST!CAI. | L.- | ||
g79gg EcleCl | MINATM COORDINATOR CrORCINATOR l | ||
g79gg EcleCl (CIRC) 1 1 | |||
g CORPORATE | |||
IMF | .I CORPORAft CCSPORATE Cr,eb '9 Aft I | ||
IMF TIN CCMSTptJCTION t, _ | |||
C W JN!CATIN S r!VIstm CocRCINATOR COCRDINATOR COOM INATOR r | |||
C000CINATCR ICENEML OFT!CII (CENERAL CFFICE) | |||
(CENFPAL CFFICtt l | |||
45AN LUIS 091SPal i | |||
L....... | |||
......d.-_.._1 | |||
.I | |||
...J I | |||
.g l | |||
I ll1 l | |||
l | l l | ||
I CrD4MUNICATI Nf C W JMICATIONS | |||
.I ENGINtr2IF, MAINTENANCE | |||
Legend | .I l | ||
$UF PCST | |||
$UPV97 l | |||
l COC CINATCR COOC INATCR I | |||
l | |||
#CENtpAt. cFFICtt ICENERA L OFFICE) l l | |||
1 I | |||
I 8 | |||
l I | |||
L.. L.p..J | |||
--.--..l-...-.. | |||
g l1 | |||
-l l | |||
l' n | |||
t pg,'yggg, PACIFIC TE!.2PNONE u!RE CN!!r 7g g g,,gg,p m (GEMERAL OFFICE) 15A N WIS Cs!5PO | |||
'e CIAs1# CANYN) | |||
Legend TECicelCAL SUFFORT TECHNICAL COAST VALLEYS SUPPORT Line Authority CIVISION CTHER tsAN w!s catsPO) | |||
DIVIS!NS | |||
---------------- Coordination | |||
- Corporate CoRununications Department Personnel CIRC - Corporate incident Response Center EOF - Emergency Operations Facility TSC - Technical Support Center b | |||
Page 11 of 21 | Page 11 of 21 | ||
Rev. 1 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY | Rev. 1 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE | ||
, s. | |||
IMPLEMENTING PROCEDURE | PROCEDURE 4.2 COMMUNICATIONS APPENDIX E-2 EMERGENCY PLAN TITLES AND PERSONNEL ASSIGNMENTS NOTIFICATION LIST Effective Date: 01/01/83 | ||
~ | |||
PROCEDURE 4.2 | Name Home Phone Emergency Plan Title Nonemergency Title Business Phone Corporate 1. | ||
COMMUNICATIONS | T. R. Ferry Communications Mngr., Communications Coo rdinator Department | ||
APPENDIX E-2 | -2. | ||
EMERGENCY PLAN TITLES AND PERSONNEL ASSIGNMENTS NOTIFICATION LIST Effective Date: 01/01/83 | A. J. Nevolo Senior Communications Engineer | ||
~ | |||
Name | 3.- | ||
Mngr., Communications Coo rdinator | C. 9. Gilson Supervising Caumunications Engineer Communications 1. | ||
A. J. Nevolo Engineering Senior Canmunications Support Engineer Coordinator 2. | |||
A. M. Badella Communications Engineer 3. | |||
D. | |||
3 .- | 'G. Pangburn Telecommunications Service Specialist Communications 1. | ||
G. W. Cerer Maintenance Supervisor, Comm. and Support Coordinator Maintenance Operations 2. | |||
G. E. Hubbard Senior Communications Specialist 3. | |||
Maintenance Operations | J. E. Aigeltinger Supervising Comminica-tions Specialist | ||
.J | |||
== | |||
Page 12 of 21 | |||
~ | |||
) | ) | ||
Rev. 1 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY - | |||
05/01/81 PACIFIC GAS AND ELECTRIC COMPANY - | |||
CORPORATE EMERGENCY RESPONSE PLAN | CORPORATE EMERGENCY RESPONSE PLAN | ||
* r''' ' | * r''' ' | ||
- IMPLEMENTING PROCEDURE a. | |||
c PROCEDURE 4.2 COMMUNICATIONS APPENDIX E-2 (Continued) - | |||
c PROCEDURE 4.2 COMMUNICATIONS | Effective Date: 01/01/83 Nane Home Phone Emergency Plan Title Nonemergency Title Business Phone Repair Team 1. | ||
U. E. Ricardo Supervising Communications Tech. | |||
Effective Date: 01/01/83 | 2. | ||
Nane | D. G. Boatman Maintenance Foreman, Substations 3. | ||
M. D. Evans General Foreman, Substations 4. | |||
N. Rutters 0perating Foreman Wire Chief le Office Number (office manned on a 24-hour basis) | |||
Supervising Communications Tech. | Telt-hone Operators 1. | ||
R, Larsen i | |||
(Ch.ef) | |||
Chief Telephone Operator 2. | |||
le | D. Corona Assistant Chief Telephon,e Operator Pacific Telephone and 1. | ||
Telt-hone Operators | R. H. Farschi Telegraph Canpany Account Executive II 2. | ||
K. Valdez Market Administrator 3. | |||
Telephon,e Operator Pacific Telephone and | A. Rosen Operating Foreman Page 13 of 21 | ||
-m m | |||
Rei, 1 05/01/81 PACIFIC' GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAK p | |||
Rei, 1 | IMPLEMENTING PROCEDURE-PROCEDURE 4.2 | ||
05/01/81 PACIFIC' GAS AND ELECTRIC COMPANY | ~' | ||
CORPORATE EMERGENCY RESPONSE PLAK p | C0tHUNICATIONS APPENDIX E-3 EMERGENCY ORGANIZATION CONTACT LIST Effective Date: 01/'01/83 Name Ene'rgency Location Emergency Plan Title Normal Business Phone Emergency Phone Recovery Manager | ||
PROCEDURE 4.2 | : 1.,J. D. Shiffer FAC J | ||
L, 2. | |||
Emergency Plan Title | R. C. Thornberry | ||
] | |||
u. | |||
: 3. _J. D. Townsend | : 3. _J. D. Townsend | ||
. i. | |||
Corporate Technical | J Corporate Technical 1. | ||
Coo rdinator ' | J. B. Hoch | ||
: 2. _M. R. Tresler | _J rTRc and Logistical | ||
[ | |||
g Coo rdinator ' | |||
: 2. _M. R. Tresler u. | |||
J 3. | |||
R. A.. Young | |||
_g 6 | |||
J Corporate Public 1. | |||
R. H. Miller | |||
_J | |||
[ | |||
Information General Offica 2. | |||
C. G. Poncelet | |||
~1 | |||
: 3. _H. N. Peelor | : 3. _H. N. Peelor | ||
) | |||
Corporate | (CIRC Corporate 1. | ||
R. S. Bain | |||
~ | |||
Construction | |||
Coordinator | ] | ||
~ | |||
: 3. | Coordinator | ||
-2. | |||
J. R. Manning | |||
) | |||
u | |||
: 3.,M_. R. Vanz J | |||
Page 14 of 21 i | Page 14 of 21 i | ||
Rev. 1 05/01/81 PAQIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN | |||
( | ( | ||
IMPLEMEffTING PROCEDURE PROCEDURE 4.2 COMMUNICATIGNS APPENDIX E-3 (Continued) | |||
Effective Date: 01/01/83 Name Emrgency Location Emergency Plan Title Normal Business Phone Emergency Phone Site Emergency 1. | |||
Effective Date: 01/01/83 | R. C. Thornberry fSC Coordinator | ||
Name | ] | ||
u 2. | |||
R. Patterson u. | |||
) | |||
3. | |||
{ | J. M. Giscion | ||
Corpora te | { | ||
Division | ] | ||
j Corpora te 1. | |||
D. L. Kennady Los Padres District Off. | |||
: 8. M_cCloskey | Division | ||
.] | |||
Coordinator or 2. | |||
3., ,R. J. McKell w | : 8. M_cCloskey | ||
!or | |||
~1 L | |||
J 3.,,R. J. McKell | |||
) | |||
w | |||
~ | |||
4 Page 15 of 21 | 4 Page 15 of 21 | ||
) | |||
l | ^% | ||
* PACIFIC CAS AND ELECTRIC COMPANY | l | ||
pg.m | ) | ||
EMERGENCY COMMUNICATIONS LOG SHEET | * PACIFIC CAS AND ELECTRIC COMPANY I | ||
EMERGENCY LOCATION pg.m CORPORATE EMERGENCY RESPONSE PLAN TODAY1 OATE | |||
em O | ' AGE t | ||
EMERGENCY COMMUNICATIONS LOG SHEET st) | |||
1 | (at m | ||
t | l TIME NAME ACTIVITY NM 12400 Iws.) | ||
(El 17) l EMERGENCY TITLE OR AFFILIATION N | |||
13 se CAuEn CAtuNo MESSAGE em O | |||
~ | |||
1 t | |||
t s | |||
6 o | |||
694e4 (a/sa n.v.co SEE IWRUCTIONE O G REVERSE a | |||
t. | |||
I. | I. | ||
EMERGENCY COMMUNICATIONS LOG SHEET | EMERGENCY COMMUNICATIONS LOG SHEET INSTRUCTIONS i | ||
INSTRUCTIONS | Entry Number instructions 1. | ||
Number | Identify the emergency location where this LogSheet is maintained during an emergency (i.e.; Corporate incident Response Center, Materials Dept., Emergency Operations Facility, etc.) | ||
1. | 2. | ||
Identify the emergency location where this LogSheet is maintained during an emergency | Enter the date which this Form is being used. Start a new Log Sheet each day. | ||
(i.e.; Corporate incident Response Center, Materials Dept., Emergency Operations Facility, etc.) | 3. | ||
. Consecutively number each page used each day. | |||
4. | |||
Enter the time for each Log entry. Use the 24Q0 hour clock to avoid confusion. | |||
5. | |||
Clearly record the name of the individual calling you or whom you are calling. | |||
s | 6. | ||
Record the individuals PGandE Emergency Organization Title or their non PGandE affiliation. | |||
s Che k the entry activity as to whether the ' individual called you or you are calling them. | |||
individ> Jai to assure correct copy /transmissi'on. | 7. | ||
t | c 8. | ||
Enter the entire context of the message being communicated. Read back the message to the individ> Jai to assure correct copy /transmissi'on. | |||
t e | |||
9. | |||
1 V | Enter your initialt upon completion of each Log Sheet entry. | ||
b d | |||
1 V | |||
g | -d g | ||
FIL'TFTCGAS ANO ELBCTRIC COMPANY CORPORATE EMERGENC,Y RESPONSE PLAN - | |||
POe5 | POe5 EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG 3HEET EMERGENCY LOCATION TOOAY'S DATE PAGE (1) | ||
(2) | |||
EMERGENCY LOCATION | (3) | ||
ENTERED BY TIME tam hm.) | |||
ENTERED BY tam hm.) | .4tNITIALS) te (si | ||
==SUMMARY== | ==SUMMARY== | ||
OF ACTIVITY PERFORMED | OF ACTIVITY PERFORMED tai l | ||
~ | |||
r. | r. | ||
e 4 | e 4 | ||
#486 (8/82) Rev. 00 SEE 4NSTRUCTIONE ON REVER5L | |||
,,,n | |||
.-_.-y e. | |||
EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET INSTRUCTIONS Entry Number | c. | ||
" ~ | |||
') | |||
EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET INSTRUCTIONS Entry Number Instructions 1. | |||
Identify the emergency location where this Log Sheet is maintained during an emergency (i.e.; Corporate incident Response Center, Materials Dept., Emergency Operations Facility, etc.) | |||
~ | |||
confusion. | 2. | ||
Enter the date which this form is being used. Start a new Log Sheet each day. | |||
3. | |||
Consecutively number each page used each day. | |||
4. | |||
Enter the time for each Log entry. Use the 2400 hour clock to avoid confusion. | |||
5. | |||
Enter a summary of each activity oeing recorded. | |||
6. | |||
Enter your initials upon completion of each Log Sheet entry. | |||
6 a | 6 a | ||
m a.ae | m a.ae aw. | ||
.v. | |||
e Rev. 2 | e Rev. 2 08/08/81 PACIFIC GAS AND ELECTRIC COMPAN.Y | ||
~ | |||
CORPORATE EMERGENCY RESPONSE PLAN | |||
(~' | (~' | ||
IMPLEMENTING PROCEDURE PROCEDURE 4.3 RADIOLOGICAL ANALYSIS AND PROTECTION APPENDIX E_1 | |||
* EMERGENCY RESPONSE ORGANIZATION, RADIOLOGICAL ANALYSIS AND PROTECTION RELATIONSHIPS e | * EMERGENCY RESPONSE ORGANIZATION, RADIOLOGICAL ANALYSIS AND PROTECTION RELATIONSHIPS e | ||
_.3 | _.3 l | ||
:i._~} | l | ||
[____ __ __ ______ :i._ _ ___,.__ __ ____ | |||
~} | |||
l | . i | ||
'"4' ","g" lr l | |||
l g | |||
l t, | |||
[I i | |||
i | |||
{ | - { | ||
i:, | ._= _ | ||
=, | |||
j i:, | |||
lll | i I | ||
i lll | |||
. =......1 | |||
~gr | |||
-j,____________- | |||
=,,,,;. | |||
;:r,..,, | |||
::::l.;::,, | |||
l l | |||
= = > | |||
l l | |||
l 1.________.. | |||
l l | |||
l | l | ||
______3 i | |||
i | |||
._4. | |||
.,= | |||
l | l | ||
=:=- | |||
j i | |||
l 1 | |||
i I | |||
L d.. -, | |||
l! | |||
l I | |||
"."r L== | |||
L | I u. | ||
I | - j _.. | ||
: i. _.. _.. | |||
.....i mi n. | |||
7 l | |||
-i | |||
7 | .,..i., | ||
,r,,, | |||
.e. | |||
1c":. | |||
e . . | e.. | ||
i l | i l | ||
l t | l t | ||
~s Page 13 of 25 | |||
.FWy.'2 08/08/81 PACIFIC GAS AND ELECTRIC C0t1PANY. | |||
CORPORATE EMERGENCY RESPONSE PLAN I-,. | |||
CORPORATE EMERGENCY RESPONSE PLAN I- , . | IMPLF'AENTING PROCEDURE s | ||
PROCEDURE 4.3 RADIOLOGICAL ANALYSIS AND PROTECTION | PROCEDURE 4.3 RADIOLOGICAL ANALYSIS AND PROTECTION | ||
~* | |||
APPENDIX E-2 EMERGENCY PLAN TITLES AND PERSONNEL ASSIGNMENTS NOTIFICATION LIST Effective Date: 01/01/83 Name Home Phone Emergency Plan Title Nonemergency Title Business Phone | |||
~ | |||
Effective Date: 01/01/83 | Radiological Emergency l'. | ||
W. H. Fujimoto Recovery Manager Supervising Nuclear Generacion Engineer 2. | |||
Home Phone Emergency Plan Title | UNASSIGNED 3. | ||
D. P. Serpa Sr. Nuclear Generation Engineer 4. | |||
Radiological Emergency | S. M. Skidmore Asst. Project Hngr. | ||
Emergency Supervising 1. | |||
D. P. Serpa Engineer - | |||
Sr. Nuclear Generation Engineer 2. | |||
Emergency Supervising | R. W. Lorenz Sr. Nuclear Generation Engineer 3. | ||
T. A. Mack Sr. Nuclear Generation Engineer Radiological 1. | |||
D. L. Duke Mon itoring Nuclear Generation Director Engineer 2. | |||
K. M. Godfrey Environmental Specialist 3. | |||
Nuclear Generation Director | C. T. Polidoroff Nuclear Generation Engineer J | ||
Page 14 of 25 | Page 14 of 25 | ||
u | |||
~ | |||
~ | |||
~ | |||
~ | |||
Rev. 2 08/08/81 PACIFIC GAS AND ELECTRIC COMPANY- | |||
[ | [ | ||
.s' CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE | |||
PROCEDURE 4.3 | ~ | ||
RADIOLOGICAL ANALYSIS AND PROTECTION APPENDIX E-2 (Continued) | PROCEDURE 4.3 RADIOLOGICAL ANALYSIS AND PROTECTION APPENDIX E-2 (Continued) | ||
Effective Date: 01/01/83 | Effective Date: 01/01/83 Name Home Phone Emergency Plan Title Nonemergency Title Business Phone Radiological Monitoring 4. | ||
S. M. Fandel Director (continued) | |||
Planning Analyst EARS Operator (CIRC) 1. | |||
C. C. Shih Nuclear Generation Engineer 2. | |||
G. A. English Nuclear Generation | |||
* Engineer 3. | |||
S. R. Foster Health Physicist EARS Operator (E0F) 1. | |||
Nuclear Generation | H. C. Shaw Senior Mechanical Engineer 2. | ||
J. S. McKarns Industrial Hygenist 3. | |||
R. A. Uba Nuclear Generation Engineer Supervising 1. | |||
Meteorologist | M. L. Mooney Meteorologist Supervising Meteorologist 2. | ||
R. N. Swanson Senior Meteorologist 1 | |||
1 | 3. | ||
R. H. Thuillier Senior Meteorologist t | |||
Senior Meteorologist t | Page 15 of 25 | ||
Page 15 of 25 | |||
a | a 6 | ||
08/08/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE El1ERGENCY RESPONSE Pl.Afl | Rev. 2 08/08/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE El1ERGENCY RESPONSE Pl.Afl i | ||
('- | ('- | ||
IMPLEMEt(TING PROCEDURE PROCEDURE 4.3 RADIOLOGICAL ANALYSIS Af40 PROTECTION | |||
, APPENDIX E-2 (Continued) | |||
Effective Date: 01/01/83 Name Home Phone Emergency Plan Title Nonemergency Title Business Phone DER Laboratory 1. | |||
Effective Date: 01/01/83 | P. A. Szalinski Director Lead Health Physicist 2. | ||
C. S. Cheng Chemist 3. | |||
J. H. White Lead Health Physicist E0F Secretary 1. | |||
H. G. Weese Secretary B i | |||
, 2. | |||
Lead Health Physicist E0F Secretary | UNASSIGNED General Clerk-Steno 3. | ||
D. A. Campus Admin. Clerk-Steno PGandE' UDAC Sta f f 1. | |||
R. W. Lorenz ' | |||
Senior Nuclear Generation Engineer 2. | |||
T. A. Mack Senior Nuclear Generation Engineer 3. | |||
E. V. Waage Nuclear Generation Engineer 4. | |||
D. L. Duke Nuclear Generation Engineer a | |||
Page 16 of 25 | |||
Engineer | |||
~ | |||
. Rev. 2 08/08/81 PACIFIC GAS AND ELECTRIC COMPANY, CORPORATE EMERGENCY RESPONSE PLAN | |||
(''' | (''' | ||
IMPLEMENTING PROCEDURE | IMPLEMENTING PROCEDURE PROCEDURE 4.3 RADIOLOGICAL ANALYSIS AND PROTECTION APPENDIX E-2 (Continued)_ | ||
PROCEDURE 4.3 | ~ | ||
Effective Date:- 01/01/83 Name Home Phone Emergency Plan Title Nonemergency Title Business Phone PGandE UDAC Staff 5. | |||
G. A. English I | |||
Effective Date:- 01/01/83 | (continued) | ||
Name | Nuclear Generation i | ||
Business Phone PGandE UDAC Staff | Engineer 6. | ||
UNASSIGNED EOF Administrative 1. | |||
EOF Administrative | S. M. Fandel Staff Planning Analyst. | ||
Page 17 of 25 I | Page 17 of 25 I | ||
^ | |||
F | F. | ||
* ~ | |||
Rev. 2 | Rev. 2 08/08/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN | ||
( | |||
CORPORATE EMERGENCY RESPONSE PLAN | . IMPLEMENTING PROCEDURE PROCEDURE 4.3 RADIOLOGICAL ANALYSIS AND PROTECTION APPENDIX E-3 EMERGENCY ORGANIZATION CONTACT LIST Effective Date: 01/01/83 Name Energency Location Emergency Plan Title Normal Business Phone Emergency Phone s | ||
( | Recovery Manager | ||
PROCEDURE 4.3 RADIOLOGICAL ANALYSIS AND PROTECTION APPENDIX E-3 EMERGENCY ORGANIZATION CONTACT LIST | : 1. _J. D. shiffer fEOF L | ||
-) | |||
Name | ( | ||
Recovery Manager | : 2.,R. C. Thornberry g | ||
: 2. ,R. C. Thornberry | |||
g | |||
: 3. J. D. Townsend _ | : 3. J. D. Townsend _ | ||
) | |||
~ | |||
L Public Information | |||
: 1.,p. J. Baxter EOF Recovery Manager | |||
_] | |||
u g | |||
~ | |||
: 2.,C. H. Peterson | |||
] | |||
3. | |||
S. N. Coffey J | |||
Emergency | |||
: 1. _J. V. Boots | |||
[TSC Radiological Advisor L | |||
L | L | ||
: 2.,U. A. O'Hara 6 | |||
-3., H. W. C. Fon g | |||
) | |||
6 r | |||
California Office 1. | |||
Warning Center | |||
-Sacr- ~*~ | |||
of Emergency 24 hour) or Services s. | |||
: 2. ,U. A. O'Hara | |||
6 | |||
California Office | |||
(.. | (.. | ||
Page 18 of 25 | Page 18 of 25 | ||
,~. | |||
Rev. 2 08/0Q/81 PACIFIC GAS AffD ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAtt | |||
(' | (' | ||
IMPLEMENTING PROCEDURE N | |||
RADIOLOGICAL ANALYSIS AND PROTECTION | PROCEDURE 4.3 RADIOLOGICAL ANALYSIS AND PROTECTION | ||
~ | |||
APPENDIX E-3 (Continued) | APPENDIX E-3 (Continued) | ||
Effective Date: 01/01/83 | Effective Date: 01/01/83 | ||
~ | |||
Name Eneroency Location Emeroency Plan Title Normal Business Phone-Emergency Pnone California Office 2. | |||
M. F. Reed htate EOC - Sacramento | |||
California Office | ~ | ||
htate EOC - Sacramento | ' of Emergency | ||
[ | |||
J | J Services (continued) 3. | ||
Services (continued) | J. J. Watki_ns State EOC - Sacramento E | ||
State EOC - Sacramento E | J | ||
' ~ | |||
, Department of 1. | |||
Research | P. A. Szalinski DER - San Ramon Engineering | ||
] | |||
t | Research k | ||
Laboratory | |||
: 2. M._Cheng J | |||
Mobile | t 3. | ||
Mobile Environmental Radiological | J. H. White J | ||
m | |||
~ | |||
Mobile 1. | |||
R. W. Richardson Mobile Environmental Radiological J | |||
Monitorina Lab Laboratory 1r Service LCenter - | |||
2. | |||
M. C. Kunde L | |||
] | |||
- 3. | |||
P. A. Szalinski b | |||
4. | |||
(Member of DCPP | |||
~ | |||
Radiation Protection staff) | Radiation Protection staff) | ||
California | California 1. | ||
(, | E. I Vold Sacramento Department of | ||
(, | |||
] | |||
(all hours) | (all hours) | ||
Emergency Only Radiologic | Health Services Emergency Only Radiologic | ||
: 2. _J. O. Ward U | |||
3ffice Hours Health Section | |||
] | |||
( | ( | ||
3. | |||
L. R. Carter t | |||
J Page 19 of 25 | |||
~ | |||
~ | |||
o | o Rev. 2 08/08/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN' | ||
Rev. 2 | (% | ||
08/08/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN' | IMPLEMENTIfiG PROCE00RE' PROCEDUR 4.3 RADIOLOGICAL ANALYSIS Al10 PROTECTION APPENDIX E-3 (Continued) | ||
(% | Effective Date: 01/01/83 Name Emergency Location Emergency Plan Title Normal Business Phone Emergency Phone PGandE/ Cal Poly State 1. | ||
IMPLEMENTIfiG PROCE00RE' | J. H. White lalPoly-SanLuisObispo,CA"' | ||
PROCEDUR 4.3 RADIOLOGICAL ANALYSIS Al10 PROTECTION APPENDIX E-3 (Continued) | |||
PGandE/ Cal Poly State | |||
Univ. Radiological | Univ. Radiological | ||
[ | |||
j | |||
~ | |||
. or Laboratory e | |||
2. | |||
QmpusPolice 3. | |||
NRC - Region V | _T. Ushino | ||
(24 hours) | _J | ||
~ | |||
~ | |||
NRC - Region V 1. | |||
H. E. Book Walnut Creek, CA (24 hours) 2. | |||
D. Kunihiro or 3. | |||
V. S. Department | D. Sternberg 4. | ||
J. Crews FEMA - Region IX 1. | |||
J. Eldridge S,anFranciscb,CA | |||
or Agency | 'tuty hours) 2. | ||
(24 hour) | K. Nauman or I (24 hours) | ||
V. S. Department 1. | |||
C. Jackson Oakland. CA of Energy 2. | |||
F. Fong Environmental | |||
: 1. - D. Duncan San Francisco, CA Protection | |||
~ or Agency (24 hour) | |||
= | |||
i V | i V | ||
l Page 19a of 25 | l Page 19a of 25 | ||
e f'' | |||
.] | |||
) | |||
f | |||
PACIFIC GAS AND ELECTRIC COMPANY | = | ||
i PACIFIC GAS AND ELECTRIC COMPANY EMERGENCY LOCATION peg CORPORATE EMERGENCY RESPONSE PLAN TOOAY1 DATE | |||
' AGE EMERGENCY COMMUNICATIONS LdG SHEET tu fl8AE NAME la im ACTIVITY (2400 lws.) | |||
M NE 17) d g | |||
EIAERGENCY TITLE OR AFFILIATION. | |||
M e | |||
e t | e t | ||
s s' | s s' | ||
t 8 | |||
8 | g s | ||
i 4 | |||
= | |||
4 | GEN)S4 (8/82) Rev. 00 SEE 185TRUCTl006 0 t REVERSE | ||
GEN)S4 (8/82) Rev. 00 | |||
s EMERGENCY COMMUNICATIONS LOG SHEET INSTRUCTIONS | s EMERGENCY COMMUNICATIONS LOG SHEET INSTRUCTIONS t | ||
t | Entry s | ||
s | e< | ||
" ~ ' | |||
Eomber Instructions 1. | |||
Eomber | Identify the emergency location where this Log 5heet is maintained during an emergency (i.e.; Corporate incident Response Cent'er, Materials Dept., Emergency Operations Facility, etc.) | ||
(i.e.; Corporate incident Response Cent'er, Materials Dept., Emergency Operations Facility, etc.) | |||
~~ | ~~ | ||
'2. | |||
Enter the date which this Form is being used. Start a new Log Sheet each day. | |||
3. | |||
Consecutively number each page used each day. | |||
Clearly record the name of tne i idO!duaicalling you or whom you are callipg. | Enter tb time for each Ldg entry. Use the 2400 hour clock to avoid confusion. | ||
4. | |||
Clearly record the name of tne i idO!duaicalling you or whom you are callipg. | |||
5. | |||
~ | |||
6. | |||
Enter the entire context of the message being communicated. Read back the message to tlw individual to assure correct copy / transmission. | Record the individuals PGandE Emergency Organization Title or their non PGandE affiliation. | ||
- s i | |||
7. | |||
Che k the entry activity as to whether the individual called you or you are calling them. | |||
c 8. | |||
Enter the entire context of the message being communicated. Read back the message to tlw individual to assure correct copy / transmission. | |||
g | |||
? | |||
9. | |||
Enter your initials upon completion of each Log Sheet entry. | |||
h | h | ||
~ | |||
ry | ry e | ||
PIETFICTAS AND ELECTRIC GGiviFANY CORPORATE EMERUENGY RE5PONSE PLAN Poes g | |||
PIETFICTAS AND ELECTRIC GGiviFANY | EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET EM8RGENCY LOCATION | ||
,.s, TODAY'E DATE IPAUa tu tai tai TIME ENTERED BY (8400 hm) | |||
(INITIALS) se is: | |||
tu | |||
(INITIALS) se | |||
==SUMMARY== | ==SUMMARY== | ||
OF ACTIVITY PERFORMED | OF ACTIVITY PERFORMED tai O | ||
e y | e y | ||
0 e | |||
n O | n O | ||
O O | O O | ||
e | 4 e | ||
0 e | 0 e | ||
6 m | 6 m | ||
4 E | 4 E | ||
M (8/82) Aew. 00 | M (8/82) Aew. 00 SEE INSTRUCTIONS ON REVERSE | ||
SEE INSTRUCTIONS ON REVERSE | |||
-y. | |||
s | |||
~ | |||
j | |||
~ | |||
o m | |||
O I | |||
~ | |||
EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET l | |||
INSTRUCTIONS 1 | |||
Entry Number instructions 1. | |||
Number | Identify the emergency location where this Log Sheet is maintained during an emergency (i.e.; Corporate incident Response Canter, Materials Dept., Emergency Operations Facility, etc.) | ||
2. | |||
Materials Dept., Emergency Operations Facility, etc.) | Enter the date which this form is being used. Start a new Log Sheet each day. | ||
3. | |||
Consecutively number each page used each day, w | |||
4. | |||
Enter the time for each Log entry. Use the 2400 hour clock to avoid | |||
) | |||
confusion. | |||
5. | |||
Enter a summary of each activity being recorded. | |||
6. | |||
Enter your initials upon completion of each Log Sheet entry. | |||
1 e | 1 e | ||
l f | l f | ||
e | |||
~. | |||
PACIFIC GAS AND ELECTRIC COMPANY | PACIFIC GAS AND ELECTRIC COMPANY Rev. 1 CORPORATE EMERGENCY RESPONSE PLAN * | ||
.05/01/81 IMPLEMENTING PROCEDURE. | |||
IMPLEMENTING PROCEDURE. | 3 i | ||
3 | / | ||
PROCEDURE 4.4 | PROCEDURE 4.4 GENERAL CONSTRUCTION | ||
\\ | |||
GENERAL CONSTRUCTION | |||
i l | i l | ||
APPEN6IX E-1 EMEN.*ENCY RESPONSE ORGANIZATION, GENERAL CONSTRUCTION DEPARTMENT RELATIONSHIPS matwest ma.s.a.se,s r | |||
M89 4. | |||
'"c Mi, li'' | |||
M89 | = | ||
or.or, a | |||
_.._..-..-.._.._..-..q l | |||
etummaan s.- | |||
l v | |||
sumacan | - -,o, | ||
8 | l l | ||
l l | |||
1 l | |||
agew, mew, g | i 9 | ||
g saw sumacan ammaca umancas amaacu yggg,, | |||
tant Crvat.sveno cas 8 | |||
.l. | |||
e.spasgnant au apsu.ust, | |||
e.m.a.ssmaur p | |||
p agew, mew, g | |||
.a.m. mans a.m. | |||
. -in, | |||
. - >ce, e<=== -,ai | |||
.. -.. -.. -==.. -.. -.. -.. | |||
18 Weed a Line Aetemraty Coordinataan | 18 Weed a Line Aetemraty Coordinataan | ||
" * * = *. *=. C.o.rporate Cuestrisetten geportmee. | |||
==. | |||
c=. | r-a,.r ui., | ||
c=. | |||
,.r i | |||
1a.v. | |||
Page 9 of 19 | Page 9 of 19 | ||
-c m m Rev. 1 05/05/81 | |||
Rev. 1 | ~ | ||
PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN s, | |||
IMPLEMENTING Pit 0CCOURE I | IMPLEMENTING Pit 0CCOURE I | ||
PROCEDURE 4.4 GENERAL CONSTRUCTION APPENDIX E-2 EMERGENCY PLAN TITLES AND PERSONNEL ASSIGNMENTS tOTIFICATION. LIST Effectfi.e Date: Oi/01/83 Name Home Phone Emergerty Plan Title Nonemergency Title Business Phone Corporate Construction 1. | |||
R. S. Bain Coordirator Manager, Station Construction 2. | |||
J. R. Manning Superintendent, | |||
Home Phone Emergerty Plan Title | Station Construction 3. | ||
M. R Kunz Superintendent, I | |||
Superintendent , | Station Construction 4. | ||
Station Construction | P. J. Nelson Asst. Superintendent, Station Construction 5. | ||
B. T. Saenz | |||
~ | |||
Asst. Superintendent, | Station Construct Admin. Supervisor | ||
~ | |||
Site Construction 1. | |||
Station Construct | R. D. Etzler Coordinator DCPP Construction Superintendent 2. | ||
M. N. Norem Resident Startup Engineer 3. | |||
D. A. Rockwell Resident Electrical Engineer Manager, Line 1. | |||
Site Construction | W. M. Stubblefield i | ||
Department Manager, Line J | |||
Resident Startup | Construction k | ||
Resident Electrical Engineer Manager, Line | |||
Construction | |||
Page 10 of 19 | Page 10 of 19 | ||
~ | ~ | ||
n | n | ||
\\ | |||
Rev. 1 | Rev. 1 05/05/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN s | ||
05/05/81 | |||
CORPORATE EMERGENCY RESPONSE PLAN s | |||
IMPLEMENTING PROCEDURE | IMPLEMENTING PROCEDURE | ||
( | ( | ||
PR'0CEDURE 4.4 | PR'0CEDURE 4.4 GENERAL CONSTRUCTION APPENDIX E-2 (Con'tinued) | ||
GENERAL CONSTRUCTION | Effective Date: 01/01/83 Name Home Phone Emergency Plan Title Nonemergency Title Business Phone Manager, Line 2. | ||
Effective Date: 01/01/83 Name | J. V. Butler Department Line Construction (continued) | ||
Home Phone Emergency Plan Title | Superintendent 3. | ||
O. D. Smith Supervisor, Line Construction | |||
Supervisor, | ~ | ||
Manager, Civil-Hydro 1. | |||
P. G. Damask Department Manager, Civil-Hydro Construction 2. | |||
Manager, Civil-Hydro | L. G. Rasmussen Civil-Hydro Construc-tion Superintendent 3. | ||
R. R. Friedrichs Civil-Hydro Construc-tion Superintendent Manager, Gas-Mechanical 1. | |||
Civil-Hydro Construc-tion Superintendent | W. Funabiki Services Department Manager, Gas-Mechanical Services Construction 2. | ||
R. P. Baur Gas-Construction Superintendent 3. | |||
Manager, Gas-Mechanical | M. R. Biro Gas-Construction Mech. Sycs. Transpor-tation Superintendent | ||
'4. | |||
J. R. Darby Gas-Construction Superintendent | |||
( | |||
( | 5. | ||
Mech. Sycs. Assistant | T. Long s-e Gas-Construction - | ||
Mech. Sycs. Assistant J | |||
Superintendent Page 11 of 19 | |||
m | m Rev. 1 05/05/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN, | ||
IMPL,EMENTING PROCEDURE I( s 1 | |||
j PROCEDURE 4.4 1 | |||
PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN , | GENERAL CONSTRUCTION Effective Date: 01/01/83 | ||
.Name Home Phone Emergency Plan Title Nonemergency Title Business Phone Manager, Personnel 1. | |||
L. C. Beanland and Clerical Manager, G.C. | |||
Services Personnel and Clerical Department Services Department 2. | |||
A. B. Stetler Superintendent, Personnel and Clerical Services Department 3. | |||
H. Little Administrative Super-visor, Personnel and | |||
Business Phone Manager, Personnel | ,j Clerical Services Department | ||
Services | ~ | ||
~ | |||
Personnel and Clerical Services Department | |||
l Page 12 of 19 | l Page 12 of 19 | ||
.ww c | |||
~ | |||
Rev. 1 | Rev. 1 PACIFIC GAS AND ELECTRIC COMPANY 05/05/,81 CORPORATE EMERGENCY' RESPONSE PLM I | ||
PACIFIC GAS AND ELECTRIC COMPANY | |||
IMPLEMENTING PROCEDURE | IMPLEMENTING PROCEDURE | ||
( | |||
PROCEDURE 4.4 GENERAL CONSTRUCTION APPENDIX E-3 EMERGENCY ORGANIZATION CONTACT LIST Effective Date: 01/01/83 NamE Emergency Plan Title Normal Business Phone Emergency Location Emergency Phone Recovery Manager 1. | |||
J. D. Shiffer g | |||
NamE Emergency Plan Title | EOF WaI l. | ||
~,, | |||
L | L 2. | ||
R. C. Thornberry | |||
- J L | |||
] | |||
~ | |||
: 3. _J. D. Townsend | : 3. _J. D. Townsend | ||
- -- 3 Corporate Technical 1. | |||
Corporate Technical | J. B. Hoch and Logistical 1 -CIRC c' | ||
Coo rdinator L | |||
3 L | |||
L | 2. | ||
M. R. Tresler | |||
L' | ^ | ||
3 1 A. Young | L' | ||
] | |||
Corporate | 3 1 A. Young | ||
~ | |||
Corporate 1. | |||
T. R. Ferry Communications 3 | |||
: 2. | -Gen.. 1 office _ | ||
Coordinat:r 2. | |||
A. J. Nevolo | |||
( | |||
) | |||
Coordin@r | 6 3. | ||
C. D. Gilson L | |||
3 C | |||
j | r | ||
u | : 1. _D. L. Kennady | ||
: 3. | $los Padres District Off. | ||
~ | |||
Coordin@r 6 | |||
3 0F 2. | |||
B. McCloskey t. | |||
j u | |||
: 3.,_R. J_. McKell L | |||
Page 13 of 19 | Page 13 of 19 | ||
e | e q | ||
q | 1 Rev. 1 | ||
~ | |||
05/05/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLA1 IMPLEMENTING PROCEDURE | |||
( | ( | ||
s | s PROCEDURE 4.4 i | ||
GENERAL CONSTRUCTION l | |||
APPENDIX E-3 | APPENDIX E-3 EMERGENCY ORGANIZATION CONTACT LIST Effective Date: 01/01/83 Nam 6 EnErgency Location Emergency Plan Title Normal Business Phone Emergency Phone Recovery Manager 1. | ||
J. D. Shiffer h0F | |||
~ | |||
L | |||
] | |||
L 2. | |||
Recovery Manager | R. C. Thornberry L | ||
J 3. | |||
J. D. Townser.c | |||
-~3 Corporate Technical 1. | |||
J. B. Hoch | |||
-CIRC and Logistical | |||
Coordinator | { | ||
L | ] | ||
~ | |||
Coordinator L | |||
2. | |||
Corporate | M. R. Tresler L' | ||
L. | 3 3. | ||
R. A. Young | |||
A. J. Nevolo | ] | ||
Corporate 1. | |||
T. R. Ferry Gena -1 office Communications | |||
] | |||
Corporate | Coordinat:r L. | ||
2. | |||
Division | A. J. Nevolo 3 | ||
n 3. | |||
C. D. Gilson L | |||
) | |||
: 3. ,R. J. McKell L | ~ | ||
Corporate | |||
: 1. 'D. L. Kennady Los Padres District Off. | |||
~ | |||
Division j | |||
or Coordince or 2. | |||
B. McCloskey g. | |||
: 3.,R. J. McKell L | |||
Page 13 of 19 | Page 13 of 19 | ||
PACIFIC OAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN EMERGENCY LOCATION pe,g iuuAYS DATE | |||
* AGE EMERGENCY COMMUNICATIONS t.OG SHEET til TIME NAME (2400 lws.) | |||
* AGE | l# | ||
(2400 lws.) l# | ACTivlTY la (a | ||
17) | 17) | ||
I4 | I4 EMERGENCY TITLE OR AFFILIATION NE een N | ||
CALLED CALUNG MESSAGE | |||
,tet 4 | |||
s 9 | |||
s | 1 s | ||
p i | |||
t i | |||
t i | 1 e | ||
1 | e t | ||
e | i i | ||
e t | 2 SEE BOSTRUCTl005 0 0 REVERSE. | ||
I. | |||
69484 (8/82) Rev. 00 | |||
i EMERGENCY COMMUNICATIONS LOG SHEET INSTRUCTIONS | i EMERGENCY COMMUNICATIONS LOG SHEET INSTRUCTIONS | ||
3 Entry | = | ||
Number | 3 Entry Number Instructions | ||
'f 1. | |||
Identify the emergency location where this Log 5heet is maintained during an emergency | Identify the emergency location where this Log 5heet is maintained during an emergency (i.e.; Corporate Incident Response Center, Materials Dept., Emergency Operations Facility, etc.) | ||
(i.e.; Corporate Incident Response Center, Materials Dept., Emergency Operations Facility, etc.) | i l | ||
l | 2. | ||
Enter the date which this Form is being used. Start a new Log Sheet each day. | |||
3. | |||
Consecutively number each page used each day. | |||
t | 4. | ||
Enter the time for each Log entry. ' Use the 2400 hour clock to avoid confusion. | |||
t 5. | |||
Clearly record the name of the individual calling you or whom you are calling. | |||
s | 6. | ||
Record the individuals PGandE Emergency Organization Title or their non PGandE affiliation. | |||
7. | |||
Che k the entry activity as to whether the individual called you or you are calling them. | |||
c s | |||
e | 8. | ||
Enter the entire context of the message being communicated. Read back the message to the individual to assure correct copy / transmission t | |||
i 9. | |||
Enter your initials upon completion of each Log Sheet entry., | |||
~ | |||
e S | |||
e i | |||
e S | |||
1 | |||
q | q | ||
.3, | |||
~. | |||
a | } | ||
o | *y a | ||
FAEIFRf5AE AND ELECTRIC COMPANY | o FAEIFRf5AE AND ELECTRIC COMPANY C0hrwhATE EMERGENCY RESPONSE PLAN po.s s | ||
EMERGENCY RESPONSE AND RECOVERY A'CTIVITIES LOG SHEET EMERGENCY LOCATION i | |||
TOOAY'S DATE PAGE Ill (2) | |||
(2 TIME ENTERED BY (2400 lwsJ llNITIALS) | |||
==SUMMARY== | ==SUMMARY== | ||
OF ACTIVITY PERFORMED | OF ACTIVITY PERFORMED te ese is i). | ||
m 4 | m 4 | ||
e e | e e | ||
O f | |||
e 5 | |||
9 g | |||
O e | O e | ||
/ | |||
( | |||
( | |||
u.. | u.. | ||
I | I SEE INSTRUCTIONS ON REVERSI, | ||
~ | |||
3 0 | |||
EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET | |||
- INSTRNCTIONS | |||
~ | |||
Entry | Entry | ||
~ | |||
~ | |||
Number - | Number - | ||
* Instructions | * Instructions 1. | ||
Identify the emergency lxation where this Log Sheet is maintained s during an emergency (i.e.; Corporate incident Response Center, Materials Dept., Emergency Operations Facility, etc.) | |||
~ | |||
2. | |||
Enter the date which this form is being used. Start a new Log Sheet i | |||
each day. | |||
~ | |||
3. | |||
Consecutively number each page used each day 4. | |||
Enter the time for each L-og entry. Use the 2400 hour clock te avoid confusion. | |||
~ | |||
5. | |||
Enter a summary of each activity being recorded. | |||
6. | |||
Enter your initials upon completion of each Log Sheet entry.. | |||
O 4 | O 4 | ||
05/01/81 | 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE, | ||
( | |||
CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE , | ~ | ||
PROCEDURE 4.5 ENGINEERING AND TECHNICAL SUPPORT APPENDIX E-2 EMERGENCY PLAN TITLES AND PERSONNEL ASSIGNMENTS NOTIFICATION LIST Effective Date: 01/01/83 | |||
.Hane Phone Name s | |||
PROCEDURE 4.5 ENGINEERING AND TECHNICAL SUPPORT APPENDIX E-2 | Emergency Plan Title Nonemergency Title Business Phone Corporate Engineering 1. | ||
G. H. Moore Coordinator-DC Project Engineer 2. | |||
NOTIFICATION LIST Effective Date: 01/01/83 | J. V. Rocca Chief Mechanical and Nuclear Engineer 3. | ||
R. V. Bettinger Chief Civil Engineer 4. | |||
J. R. Herrera | |||
( | |||
Chief Electrical Engineer 5. | |||
( | G. H. Aster Chief, Design-Draf ting Chief, Design-Drafting 1. | ||
G. H. Aster Chief, Design-Drafting t | |||
2. | |||
Chief, Design-Drafting | G. A. Kaschube Project Coordination l | ||
t | Section Supervisor 3. | ||
E. A. Punzalan l | |||
Project Coordination | Project Coordinator Chief Mechanical & | ||
Section Supervisor | 1. | ||
J. V. Rocca Nuclear Engineer Chief Mechanical and Nuclear Engineer Page 9 of 17 | |||
Project Coordinator Chief Mechanical & | |||
Page 9 of 17 | |||
~,, - | |||
u. | |||
g 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE | |||
CORPORATE EMERGENCY RESPONSE PLAN | ,s | ||
IMPLEMENTING PROCEDURE | '. ( | ||
PROCEDURE 4.5 ENGINEERING AND TECHNICAL SUPPORT APPENDIX E-2 (Continued) | |||
EffectiveDatek 01/01/83 Name' Home Phone' Emergency Plan Title Nonemerge.ncy Title Business Phone Chief Mechanical & | |||
PROCEDURE 4.5 ENGINEERING AND TECHNICAL SUPPORT APPENDIX E-2 (Continued) | 2. | ||
EffectiveDatek 01/01/83 | D. O. Brand Nuclear Engineer Supervising Mechanical (continued) | ||
Name' | Engineer 3. | ||
R. M. Laverty Mechanical Systems Group Leader Chief Electrical 1. | |||
Chief Electrical | J. R. Herrera Engineer | ||
. Chief ~ Electrical Engineer 2. | |||
J. W. Colwell Chief Electrical Engineer 3. | |||
F. J. Dan Supervising Electrical Engineer C'hief Civil ' Engineer 1. | |||
R. V. Bettinger Chief Civil Engineer 2. | |||
V. J. Ghio Senior Civil Engineer 3. | |||
J. A. McLoughlin Sr. Civil Engineer e' | |||
Page 10 of 17 | Page 10 of 17 | ||
.] | |||
. Rev. 1 - | |||
PACIFIC GAS'AND ELECTRIC COMPANY. | |||
05/01/81 CORPORATE EMERGENCY RESPONSE Pi.AN | |||
CORPORATE EMERGENCY RESPONSE Pi.AN | . / | ||
INPLEMENTING PROCEDURE | |||
~ | |||
PROCEDURE 4.5 | PROCEDURE 4.5 ENGINEERING AND TECHN-ICAL SUPPORT APPENDIX E-3 EMERGENCY ORGANIZATION CONTACT LIST Effective Date: 01/01/83 Name Emergency Location Emergency Plah Title Normal Business Phone Emergency Phone | ||
~ | |||
EMERGENCY ORGANIZATION CONTACT LIST | Recovery Manager 1. | ||
Effective Date: 01/01/83 Name | J. D. Shiffer h0F L' | ||
Emergency Location Emergency Plah Title | [ | ||
J 2. | |||
Recovery Manager | R. C. Thornberry | ||
] | |||
w | |||
w | : 3. _J. D. Townsend... | ||
Corporate Technical 1. | |||
J. B. Hoch/ | |||
rCIRC s | |||
{ | and Logistical | ||
j | {. | ||
Coo rdinator | j g | ||
g - | |||
f | Coo rdinator 2. | ||
U 3: | M. R. Tresler f | ||
U 3: | |||
R. A. Young | |||
6 | , ~ | ||
3 6 | |||
6 o | |||
e e | |||
Page 11 of 17 i | |||
e I | e I | ||
'N | |||
L | ) | ||
L | |||
.'s l | |||
PACIFIC GAS AND ELECTRIC COMPANY | PACIFIC GAS AND ELECTRIC COMPANY I | ||
sa | EMERGENCY LOCATION i | ||
CORPORATE EMERGENCY RESPONSE PLAN TOOAY1DATE | |||
TIME | ' AGE pg.,g EMERGENCY COMMUNICATIONS LOG SHEET | ||
(2400 Bus.) l# | ~ | ||
(7) | in sa ta TIME NAME ACTIVITY (2400 Bus.) | ||
l# | |||
e | NM (7) g EMERGENCY TITLE OR AFFILIATION SSTMaal E | ||
i t | |||
1 | 0 e | ||
e t | |||
g | i 1 | ||
e | 1 i | ||
I g | |||
81N)8418/82) Rev.00 | e 1 | ||
6 I | |||
4 81N)8418/82) Rev.00 W P '=" = N * ** * | |||
* e I | |||
I EMERGENCY COMMUNICATIONS LOG SHEET INSTRUCTIONS l | |||
/ | |||
Entry Number instructions 1. | |||
identify the emergency location where this LogSheet is maintained during an emergency (i.e.; Corporate incident Response Center, Materials Dept., Emergency Operations Facility, etc.) | |||
l 2. | |||
Enter the date which this Form is being used. Start a new Log Sheet each day. | |||
t 3. | |||
Consecutively number each page used each day. | |||
i 4. | |||
Enter the time for each Log entry. Use the 2400 hour clock to avoid confusion. | |||
5. | |||
Clearly record the name of the individual calling you or whom you are calling. | |||
6. | |||
Record the individuals PGandE Emergency. Organization Title or their non PGandE affiliation. | |||
7. | |||
Chhk the entry activity as to whether the individual called you or you are I:alling them. | |||
~ | |||
8. | |||
Enter the entire context of the message being communicated. Read back the message to the individual.to assurp correct copy / transmission. | |||
9. | |||
Enter your initials upon completion of each Log Sheet entry. | |||
) | |||
~ | |||
^^ | |||
' ~ | |||
\\ | |||
I o | |||
PACIFIC GAS AN,3 ELECTRIC COMPANY | |||
""r anA EP E& | |||
l 1 | |||
POwB EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET, | |||
EMERGENCY LOCATION TODAY'S DATE PAGE I | |||
(~% | |||
I (1) | |||
(2) | |||
(3) | |||
TIME ENTERED SY (INITIALS) | |||
(2400 hre.) | |||
(m - | |||
(sl ' | |||
POwB | |||
EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET , | |||
EMERGENCY LOCATION TODAY'S DATE | |||
(~% | |||
(1) | |||
TIME | |||
(m - | |||
==SUMMARY== | ==SUMMARY== | ||
OF ACTIVITY PERFORMED | OF ACTIVITY PERFORMED te i | ||
e G | |||
e m | |||
1 | 7 1 | ||
t e | t e | ||
m N_,j | m N_,j e..e | ||
=. -- | |||
--w | |||
- = | |||
-. y o | |||
S EMERGENCY RESPONSE AND RECOVERY ACTIVITIES t.OG SHEET INSTRUCTION _$ | |||
Entry Nurnber instructions l | |||
l | 1. | ||
Identify the emergency location where this Log Sheet is maintained during an emergency (i.e.; Corporate incident Response Center, Materials Dept., Emergency Operations Facility, etc.) | |||
2. | |||
Enter the date which this form is being used. Staria new Log Sheet each day. | |||
3. | |||
Consecutively number each page used each day. | |||
i i | |||
i i | i i | ||
4. | |||
Enter the time for each Log entry. Use the 2400 hour clock to avoid j | |||
confusion. | |||
~ | |||
5. | |||
Enter a summary of each activity being recorded. | |||
6. | |||
Enter your initials upon completion of each Log Sheet entry.. | |||
~ | |||
m e | m e | ||
m J | m J | ||
Rev. 1 | Rev. 1 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY, | ||
05/01/81 | CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE x | ||
. PROCEDURE 4.6 COMPUTER SYSTEMS AND SERVICES i | |||
CORPORATE EMERGENCY RESPONSE PLAN | APPENDIX E-2 EMERGENCY PLAN TITLES AND PERSONNEL ASSIGNMENTS IOTIFICATION LIST Effective Date: 01/,01/83 Name Mme Phone Emergency Plan Title. | ||
Nonemergency Title Business Phone Corporate Computer 1. | |||
APPENDIX E-2 | A. W. Simila Applications Manager, Engineering Coordinator Computer Applications 2. | ||
R. M. Wetherell Supervising Mathema-tician-Programer 3. | |||
B. M. Speckman | |||
Name | |||
Corporate Computer | |||
* Supervising Computer Applications Engr. | * Supervising Computer Applications Engr. | ||
Supervis'ing Engineering' | Supervis'ing Engineering' 1. | ||
R. M. Wetherell Computer Applications Supervising Mathema-Specialist tician-Programer 2. | |||
B. M. Speckman Supervising Computer Applications Engr. | |||
Specialist | 3. | ||
F. M. Perfetto Senior Computer Systems Analyst Supervising Computer 1. | |||
L. H. Carter Technology Senior Cmputer Specialist Systems Analyst 2. | |||
R. C. Knisely Software Specialist 3. | |||
Senior Computer | D. W. Holmes Senior Computer Systems Analyst | ||
Systems Analyst | |||
(. | (. | ||
Page 11 of 20 | Page 11 of 20 | ||
7 | |||
.a.- | |||
o s | |||
Rev. 1 05/01/81 PACIFIC GAS AND ELECTRIC C0f1PANY | |||
PACIFIC GAS AND ELECTRIC C0f1PANY CORPORATE'EtiERGENCY RESPONSE PLAK- | ~ | ||
CORPORATE'EtiERGENCY RESPONSE PLAK- | |||
. IMPLEMENTING PROCEDURE PROCEDURE 4.6 | |||
~ | |||
COMPUTER SYSTEllS AND SERVICES | COMPUTER SYSTEllS AND SERVICES | ||
~ | |||
APPENDIX E-2 (Continued) | |||
Effective Date: 01/01/83 | Effective Date: 01/01/83 Name ' | ||
Name ' | Home Phone Emergency Plan Title Nonemergency Title Business Phone Supervising Computer 1. | ||
Business Phone Supervising Computer | W. R. Barnes Operations Supervising Computer Specialist Operations Analyst 2. | ||
Operations | J. J. Monahan Scheduling and Con- '. | ||
. trols Sect. Super. | |||
3. | |||
W. R._ Richardson Sectio,n Supervisor Production Supervising Information 1. | |||
Supervising Information | G. Swallow Systems Specialist Senior Information Systems Analyst 2. | ||
J. C. Simpson Supervising Analyst 3. | |||
H. S. Stout Information Systems Analyst | |||
~ | |||
~~ | |||
Page 12 of 20 | Page 12 of 20 | ||
n. | |||
Rev. 1 - | Rev. 1 - | ||
05/01/81 PACIFIC GAS AND ELECTRIC COMPANY | 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY | ||
' CORPORATE EMERGENCY RESPONSE PLAtt | |||
( ' '. | ( ' '. | ||
PROCEDU' E 4.6 COMPUTER SYSTEMS AND SERVICES APPENDIX E-3 EMERGENCY ORGANIZATION CONTACT LIST | IMPLEMENTING PROCEDURE PROCEDU' E 4.6 COMPUTER SYSTEMS AND SERVICES APPENDIX E-3 EMERGENCY ORGANIZATION CONTACT LIST | ||
* Effective Date: 01/01/83 | * Effective Date: 01/01/83 Name Emergency Location Emergency Plan Title Normal Business Phone Emergency Phone | ||
~ | |||
Recovery Manager | |||
: 1..J. D. Shiffer | |||
Recovery Manager | ._ 'J EOF 5-L 2. | ||
O C. Thornberry J | |||
3. | |||
J. D. Townsend j | |||
Corporate Technical 1. | |||
Corporate Technical | J. B. Hoch CIRC l | ||
CIRC | and Logistical | ||
Coo rdinator | [. | ||
J Coo rdinator L | |||
2. | |||
t | M. R. Tresler | ||
L | ~ | ||
t L | |||
3. | |||
R. A. Youno Y | |||
General Office Systems Technology | ^'1J Manager, Computer 1. | ||
H. Liu General Office Systems Technology J | |||
~ | |||
: 2. ,_L. H. Carter L | ~ | ||
: 2.,_L. H. Carter | |||
_3 L | |||
: | ~ | ||
3. | |||
Corporate | : o. W. Holmes | ||
Coordinator | ] | ||
L | |||
~ | |||
Corporate 1. | |||
A. W. Simila Gena--' MHea Computer | |||
,j Applications L | |||
Coordinator 2. | |||
R. M. Wetherell L | |||
J 3. | |||
R. M. Speckman L. | |||
Page 13 of 20 | Page 13 of 20 | ||
^ | |||
~ | |||
Rev. 1 | Rev. 1 PACIFIC GAS AfiD ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN | ||
'5 | |||
' IMPLEMENTING PROCEDURE a. | |||
~ | |||
PROCEDURE 4.6 | |||
~ | |||
COMPUTER SYSTEMS Al40 SERVICES APPENDIX Ec3 (Continued) | |||
~ | |||
APPENDIX Ec3 (Continued) | Effectivi Date: 01/01/83 Eiergency Location Name Emergency Plan Title Normal Business Phone Emergency Phone | ||
Effectivi Date: 01/01/83 | : Manager, | ||
: 1. _R. W. Barbey fGeneral Office Information 3 | |||
( | 3 | ||
: 2. _G. Swallow 6. | ( | ||
3 | Systems | ||
: 2. _G. Swallow 3 | |||
6. | |||
Manager, Computer | 3. | ||
J. C. Simpson J | |||
Manager, Computer 1. | |||
D. L. Hawkins fGeneral Office | |||
~ | |||
Operations | |||
) | |||
' '1 g | |||
2. | |||
W. R. Barnes | |||
] | |||
t 3. | |||
R. J. Wells | |||
] | |||
k._ | k._ | ||
Page 14 of 20 | Page 14 of 20 | ||
o | o t | ||
PACIFIC GAS AND ELECTRIC COMPANY EMERGENCY LOCATION pg g CORPORATE EMERGENCY RESPONSE PLAN TOOAY'S DATE | |||
(2400 tws.) (# | ' AGE EMERGENCY COMMUNICATIONS LOG SHEET tti TIME NAME tal t3l (2400 tws.) | ||
(# | |||
ACTIVITY 17) | |||
NE EMERGENCY TITLE OR AFFILIATION N | |||
s 0 | s 0 | ||
n | n | ||
,a R | |||
4 | t 4 | ||
o 604384 (8/82) Rev. 00 | o 604384 (8/82) Rev. 00 SEE IONTRUCTIONS O d REVERSE | ||
SEE IONTRUCTIONS O d REVERSE | |||
j r | j r | ||
EMERGENCY COMMUNICATIONS LOG SHEET | EMERGENCY COMMUNICATIONS LOG SHEET | ||
\\ | |||
INSTRUCTIONS s | |||
Entry | s Entry Number Instructions 1. | ||
Identify the emergency location where this LogSheet is maintained during an emergency (i.e.; Corporate Incident Response Center, Materials Dept., Emergency Operations Facility, etc.) | |||
2. | |||
Enter the date which this Form is being used. Start a new Log Sheet each day. | |||
/ | |||
3. | |||
Consecutively number each page used each day. | |||
4. | |||
Enter the time for each Log entry.' Use the 2400 hour clock to avoid confusion. | |||
5. | |||
Clearly record the name of the individual calling you or whom you are calling. | |||
6. | |||
Record the individuals PGandE Emergency Organization Title or their non PGandE affiliation. | |||
Che k the entry activity as to whether the individual called you or you are calling them. | |||
7. | |||
c 8. | |||
Enter the entire context of the message being communicated. Read back the message to the individual to assure correct copy / transmission. | |||
9. | |||
Enter your initials upon completion of each Log Sheet entry. | |||
J | |||
.7, g | |||
PActrm. GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RE5PONSE PLAN PN EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET | |||
,TODAY'S DATE PAGE | |||
/ | |||
\\ | |||
EMERGENCY LOCATION (1) | |||
TIME | (2) | ||
ENTERED BY (E400 hrs.) | (3) | ||
(si | TIME ENTERED BY (E400 hrs.) | ||
(INITIALSI (e | |||
(si | |||
==SUMMARY== | ==SUMMARY== | ||
OF ACTIVITY PERIORMED | OF ACTIVITY PERIORMED (s) j 4 | ||
i | i | ||
\\ | |||
1 | \\ | ||
1 I | |||
S486 (8/02) Rev.00 | W | ||
/ | |||
S486 (8/02) Rev.00 SEE 80STRUCT1085 ON REVERSE | |||
o | |||
~ | |||
( | |||
~ | |||
l | l | ||
s | .~ 3 F | ||
s a | |||
EMERGENCY RESPONSE AND RECOfliRY ACTIVITIES LOG SHEET | |||
~ | |||
Number | INSTRUCTIONS Entry Number instructions 1. | ||
Identify the emergency location where this Log Sheet is maintained during an emergency (i.e.; Corporate incident Response Center, Materials Dept., Emergency Operations Facility, etc.) | |||
~ | |||
2. | |||
Enter the date which this form is being used. Start a new Log Sheet each day. | |||
confusion. | 3. | ||
Consecutively ilumtieriach page used each day. | |||
4. | |||
Enter the time for each Log entry. Use the 2400 hour clock to avoid' ; | |||
I | confusion. | ||
i s-5. | |||
Enter a summary of each activity being recorded. | |||
6. | |||
Enter your initials upon completion of each Log Sheet entry. | |||
*f f | |||
v. | |||
I J | |||
4t x | |||
n | n. | ||
.g o | |||
o PACIFIC GAS AND ELECTRIC COMPANY Rev. 1 CORPORATE EMERGENCY RESPONSE PLAN 05/01/81 | |||
o | |||
(" | (" | ||
IMPLEMENTING PROCEDURE | IMPLEMENTING PROCEDURE. | ||
PROCEDURE 4.7 | PROCEDURE 4.7 NUCLEAR PLANT OPERATIONS | ||
~ | |||
NUCLEAR PLANT OPERATIONS | APPENDIX E-1 t | ||
APPENDIX E-1 | EMERGENCY IT5PON37.rORGANIZATION, NUCLEAR PLANT OPERATIONS DEPARTMENT RELATIONSHIPS c | ||
EMERGENCY IT5PON37.rORGANIZATION, | .e-s | ||
NUCLEAR PLANT OPERATIONS DEPARTMENT RELATIONSHIPS c | ~ | ||
t I | |||
t | : n.. n., | ||
fTV.6 f,0..P. | fTV.6 f,0..P. | ||
i e.-, | |||
r,. | |||
an | |||
- l l | |||
=m.,.. | |||
=,,::,'.:; | |||
r-- | r-- | ||
c,,,,.- | |||
ci | |||
-, ~. | |||
~ | |||
.,c cr. | |||
v. | v. | ||
e j | |||
l.._.i_.._.._.j_.._._.j_..J i | |||
e F.. - | |||
e | J g*gy. _ _ _ ____... _.. _ _ _ _ _...$...........m....... | ||
e i | |||
.,.4,,..,y;,, | |||
e e | |||
1 0 | |||
j/. | |||
I-c ae, i | |||
I- | |||
n | n | ||
",.] | |||
u A th.,aiy t, | |||
o,...u | e,',q, : | ||
..r | |||
....................--.s c~*~u~ | |||
.,.m c.,,,..,, | |||
i...,s, ca... | |||
o,...u c.. | |||
~ i | |||
/. | |||
7 | 7 | ||
, j var - so.. | |||
cy ap...... r.e m e, | |||
-b ei.e. e.. | |||
,.t. | |||
i.,eis.. | |||
. -.. c..., | |||
.t >V s,' | |||
, ne. v....i. | |||
n c.., | |||
t. | |||
s c.e. | |||
..u | |||
:.. n e..... | |||
A | A | ||
\\ | |||
s | s | ||
N ,l ' | <N,l ' | ||
v | v | ||
.s Page 9 of 18 s | |||
E | E | ||
*he i-w, ep. | |||
,e.g | |||
.iep- | |||
,,m,*,m.,e-w y.p--- | |||
4-- | |||
-g T | |||
w | |||
!'S%d81 PACIFIC GAS AND ELECTRIC COMPANY | |||
~ | |||
CORPORATE EMERGENCY RESPONSE PLAN - | CORPORATE EMERGENCY RESPONSE PLAN - | ||
IMPLEMENTING PROCEDURE g | |||
s, PROCEDURE 4.7 NUCLEAR PLANT OPERATIONS APPENDIX E-2 EMERGENCY ORGANIZATION CONTACT LIST Effective Date: 01/01/83 Name Emergency Location Emergency Plan Title Normal Business Phone Emergency Phone Recovery Manager | |||
EMERGENCY ORGANIZATION CONTACT LIST | : 1. _J. D. Shiffer EOF L | ||
Effective Date: 01/01/83 | : 2..R. C. Thornberry 3 | ||
Name | |||
L | |||
: 2. .R. C. Thornberry | |||
6 | 6 | ||
: | : 3. _J. D. Townwnd 6 | ||
J v | |||
Corporate Liaison Coordinator 1. | |||
R. J. McDevitt CIRC g_ | |||
Corporate Technical | ~] | ||
(CIRC and Logistical | 2. | ||
S R. Foster | |||
: 3. ,R. A. Young | } | ||
--,o b | |||
: 3. J. A. Moulia | |||
Operations and | .r | ||
) | |||
6 4. | |||
G. A. Pierce | |||
~~ | |||
3 Corporate Technical 1. | |||
J. B. Hoch (CIRC | |||
~ | |||
and Logistical bs... | |||
J Coo rdinator L | |||
2. | |||
M. R. Tresler or | |||
: 3.,R. A. Young | |||
-j | |||
~ | |||
Operations and 1. | |||
J. D. Townsend EOF Analytical 7 | |||
~ | |||
] | |||
or Recovery Manager w | |||
i w.. | |||
2. | |||
u T. Rapp J | |||
Page 10 of 18 | |||
m. | |||
Rev. 1 | Rev. 1 | ||
~ | |||
05/01/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN | |||
/- | |||
IMPLEMENTING' PROCEDURE PROCEDURE 4.7 NUCLEAR PLANT OPERATIONS APPENDIXE-2.(Continuedl Effective Date: 01/01/83 Name Emergency Location Emergency Plan Title Normal Business Phone Emergency Phone Operations and 3. | |||
PROCEDURE 4.7 NUCLEAR PLANT OPERATIONS APPENDIXE-2.(Continuedl | L. W. Giffin Analytical Recovery | ||
Effective Date: 01/01/83 | { | ||
Name | " ] | ||
Emergency Plan Title | Manager (continued) | ||
Manager (continued) | Radiological biergency 1. | ||
Radiological biergency | W. H. Foiimoto E0F Recovery Manager | ||
[ | |||
Recovery Manager | 7 | ||
~ | |||
L 2. | |||
UNASSIGNED | |||
~ | |||
~ 3. | |||
D. P. Serpa '- | |||
_J | |||
' ~' 7 7 4. | |||
3 3 C. Ru'ssell 6 | S. M. Skidmore Engineering and 1. | ||
B. W. Giffin EOF Logistics Recovery G. | |||
3 L | |||
: 3. _J._M. Giscion | 2. | ||
A. l. Simmons | |||
) | |||
6 3 3 C. Ru'ssell | |||
_J 6 | |||
Site Emergency 1. | |||
R. C. Thornberry FTsr Coordinator | |||
] | |||
2. | |||
R. Patterson L- | |||
] | |||
: 3. _J._M. Giscion J | |||
Emergency Evaluations 1. | |||
J. M. Gisclon TSC and Recovery j | |||
Coo rdinator L-2. | |||
D. A. Miklush 6 | |||
Page 11 of 18 h | Page 11 of 18 h | ||
~ | ~ | ||
m | |||
-m v | |||
a-i Rev. 1 | |||
,05/01/81 PACIFIC GAa AND ELECTRIC COMPANY CORPORATE EMERGENCY REf PONSE PLAN - | |||
IMPLEMENTING PROCEDURE PROC 200RE 4.4 NUCLEAR PLANT OPERATIONS.. | |||
APPENDIX E-2 (Continued)_ | |||
IMPLEMENTING PROCEDURE PROC 200RE 4.4 NUCLEAR PLANT OPERATIONS.. | Effective Date: 01/01/83 - | ||
Name Energency location Emergency Plan Title Normal Business Phone | |||
Effective Date: 01/01/83 - | * Emergency Phone Emergency Evaluations 3. | ||
Name | L. F. Womack and' Recovery (continued) | ||
-] | |||
Emergency Plan Title | |||
* Emergency Phone Emergency Evaluations | |||
and' Recovery (continued) | |||
Coordinator e | Coordinator e | ||
Emergency Radiological | ] | ||
Emergency Radiological 1. | |||
J. V. Boots TSC Advisor J | |||
j g.. | |||
2. | |||
W. A. O'Hara | |||
~ | |||
.J | |||
: 3 | : 3. _H. W. C. Fong Corporate Security 1. | ||
Corporate Security | L. N. Shaffer heneral Office Coordinator | ||
heneral Office | ) | ||
Coordinator | 2. | ||
J. R. Van Schaick J | |||
3. | |||
R. Dunleavy | |||
] | |||
Site Security (On-duty Security Shift OSC Supervisor Supervisor | |||
Site Security | ~ | ||
L | |||
_R. G. Todaro i | |||
L | L. | ||
_R. G. Todaro | J.G.Lunsford 3 | ||
L . | a l | ||
l P. D. Olsen | P. D. Olsen J | ||
J | J | ||
. L. Harnes tL- | |||
._ M. | |||
: 1. Goo da l e | |||
] | |||
Page 12 of 18 | |||
b i | b i | ||
t | t PACIFIC GAS AND ELECTRIC COAWANY EMERGEleCY LOCATMNI p | ||
PACIFIC GAS AND ELECTRIC COAWANY | CORFORATE ERGERGENCY RESPONSE PLAN TODAY1 OATE - | ||
* AGE | * AGE EMERGENCY COMMUNICATIONS LOG SHEET | ||
ta | ~ | ||
m em ta Tih4E MARSE ACTIVITY | |||
MARSE | _W (2400 InsJ M | ||
17) g EAAERGEldCY TITLE OR AFFILI ATION ggyptag 0 | |||
4 4 | 4 4 | ||
W | W e | ||
e | c e | ||
S O | |||
S | m 9 | ||
O 6 | |||
e 9 | |||
er O | |||
9 6 | |||
e 9 | |||
m h | |||
e 8 | |||
en t | |||
I i | |||
e M | e M | ||
O 4 | O 4 | ||
| Line 3,898: | Line 4,198: | ||
09 404 18/82) %v.00 EEEIDETRUCT.OON OeREVER5E | 09 404 18/82) %v.00 EEEIDETRUCT.OON OeREVER5E | ||
, ). | |||
EMERGENCY COMMUNICATIONS LOG SHEET | EMERGENCY COMMUNICATIONS LOG SHEET INSTRUCTIONS Entry Number Instructions 1. | ||
INSTRUCTIONS | Identify the emergency location witere this LogSheet is maintained during an emergehcy (i.e.; Corporate incident Response Center, Materials Dept., Emergency Operations Facility, etc.) | ||
Entry Number | 2. | ||
Enter the date which this Fonh is being used. Start a new Log Sheet each day, g | |||
(i.e.; Corporate incident Response Center, Materials Dept., Emergency Operations Facility, etc.) | 3. | ||
Enter the date which this Fonh is being used. Start a new Log Sheet each day, | Consecutively number each page used each day. | ||
4. | |||
Enter the time for each Log entry. Use the 24,00 hour clock to avoid confusion. | |||
5. | |||
Clearly record the name of the individual calling you or whom you are calling. | |||
6. | |||
Record the individuals PGandE Emergency Organization Title or their non PGandE affiliation. | |||
/ | |||
Che k the entry activity as to whether the individual called you or you are calling them. | |||
7. | |||
c s | |||
~ | e 8. | ||
Enter the entire context of the message being communicated. Read back the message to the individual to assure correct copy /tranwnission. | |||
9. | |||
Enter your initisls upo completion of each Log Sheet entry. | |||
~ | |||
( | ( | ||
i. | i. | ||
'. ~. | |||
e | J e | ||
~ :.~ | |||
^ | |||
1 j | |||
PACIPIG GAS AND ELECTRIC COMPANY cG,.rv6 ATE EMERUENCY R-d5 PLAN s | |||
pods EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET | |||
] | |||
SMERGEMCY LOCATION | ( | ||
, SMERGEMCY LOCATION TOOAY'8 DATE fAus. | |||
j a | |||
1 (1) | |||
TIME | (2) | ||
(3) | |||
TIME ENTERED BY (INITIALS) l (2400 h l (m | |||
==SUMMARY== | ==SUMMARY== | ||
OF ACTIVITY PERFORMED | OF ACTIVITY PERFORMED (m | ||
I k | |||
3 | 3 | ||
\\ | |||
1 I | |||
1 I | |||
l l | |||
I l | I l | ||
I 89406 (S/82) Rev. 00 SEE vismissui.e wome cW HEveruse, | |||
89406 (S/82) Rev. 00 | |||
r | r | ||
~3 4 | |||
EMERGENCY RESPONSE AND RECOVERY ACTIVITIES' LOG SHEET INSTRUCYlONS Entry Num'y Instructions 1. | |||
INSTRUCYlONS Entry | Identify the emergency location where this Log Sheetis maintained during an emergency (i.e.; Corporate incident Response Center, Materials Dept., Emergency Operations Facility, etc.) | ||
Num'y | 2. | ||
Enter the date which this form is being used. Start a new Log Sheet | |||
Materials Dept., Emergency Operations Facility, etc.) | ,each day. | ||
3. | |||
Consecutively number each page used each day. | |||
I l | I l | ||
6 | 6 4. | ||
Enter the time for each Log entry. Use the 2400 hour clock to avoid confusion. | |||
confusion. | l l | ||
l l | l S. | ||
l | Enter a summary of each activity being recorded. | ||
6. | |||
Enter your initials upon completion of each Log Sheet entry. | |||
l | l | ||
-o. | |||
~ | |||
~^ | |||
~' | |||
PACIFIC OAS AND ELECTRIC COMPANY | PACIFIC OAS AND ELECTRIC COMPANY Rev. 1 CORPORATE EMERGENCY RESPONSE PLAN 05/01/81 IMPLEMENTING TROCEDURE t ', | ||
t ', | a | ||
^ | |||
PROCEDUR3'4.8 DIVISION SUPPORT APPENDIX E-1 EMERGENCY RESPONSE ORGANIZATION, DIVISION SUPPORT RELATIONSHIPS ancovnar MANAGER | |||
=q (sor) 1 l | |||
PROCEDUR3'4.8 | l l-CORPORATE PUBI.IC TEOOi! CAL AND INFCDATIoM IDGISTICAL ABCoVERY | ||
DIVISION SUPPORT | = | ||
coonoINAToa 1 | |||
ancovnar MANAGER | MANAGER tezact I | ||
l CORPORATE TEOOi! CAL AND | <cori 1 | ||
I | I | ||
.. _ l-.. | |||
componATz | I componATz coarenars conPonArt | ||
coomoruATom | -J mATraIAt.s consTauctrou cIvzSrox. | ||
coomoruATom coonoINaton C" | |||
s | coonoINAton l | ||
I | (causmAL orrrer) | ||
I | (czac) | ||
t | (SAN t.UIS oBISPo) s I | ||
I t | |||
m ImA m | ,,g,,,n,,373, SITE, | ||
w | Coas? VAI.tzys a | ||
cxassTaucTIou DIVIstow m ImA m w | |||
,, Q % "o,3 g | |||
(sAu Luzs ourseo) | |||
("""=u orrrm orvrszons e | |||
i I | |||
L _ _ _ _ _ _ _ _ _ _ _ _ _.s._ _ _ _ _.J Eagend Line Authority | |||
------ Coordination | |||
-..- - Corporate Division Support Personnel EF - amargency Operations Facility CIRC - Corporate Incident Response Center | |||
( | ( | ||
Page 7 of 16 | Page 7 of 16 m,. | ||
w- | |||
w | ,m | ||
m 7 | |||
o m | |||
~ | |||
~- | |||
Rev. 1 | ~ | ||
Rev. 1 05/01/81 | |||
~ | |||
PACIFIC GAS AND ELECTRIC GOMPANY | PACIFIC GAS AND ELECTRIC GOMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE | ||
IMPLEMENTING PROCEDURE | |||
(~''. | (~''. | ||
= | |||
DIVISION SUPPORT | PROCTOURE 4.8 s. | ||
DIVISION SUPPORT APPENDIX E-2 EMERGENCY PLAN TITLES AND PERSONNEL ASSIGNMENTS NOTIFICATION LIST Effective Date: 01/01/83 Name Home Phone Emergency Plan Title Nonemergency Title Business Phone Corporate 1. | |||
EMERGENCY PLAN TITLES AND PERSONNEL ASSIGNMENTS NOTIFICATION LIST Effective Date: 01/01/83 | D. L. Kennady Division Los Padres District Coordinator Manager 2. | ||
B. McCloskev Los Padres District - | |||
Marketing Manager 3.- | |||
R. J. McKell Los Padres District Electric Superintendent 4. | |||
Alternate number - | |||
Morro Bay Switching Center | Morro Bay Switching Center | ||
~ | |||
L | L l | ||
l | |||
(, | (, | ||
Page 8 of 16 i | Page 8 of 16 i | ||
~- | |||
Rev. 1 | Rev. 1 05/01/81. | ||
05/01/81. | PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN (S | ||
PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN | , IMPLEMENTING PROCEDURE - | ||
~ | |||
PROCEDURE 4.8 DIVTSTO~N SUPPORT' APPENDIX E-3 EMERGENCY ORGANIZATION CONTACT LIST | |||
PROCEDURE 4.8 | '01/01[83 Effective Date: | ||
Name Errergency Location Emergency Plan Title Normal Business Phone Emergency Phone Recovery Manager 1. | |||
Name | J. D. Shiffer fE05 | ||
. _}, | |||
fE05 | d, f | ||
_}, | t 2. | ||
R. C. Thornberry | |||
R. C. Thornberry | ~ | ||
J L. | |||
J | ' 3. _J. D. Townsend J | ||
Corporate Technical | |||
: 1. _J. B. Hoch QIRC | |||
and Logistical | "] | ||
and Logistical | |||
] | |||
l-Coo rdinator L | |||
J 2 4 R. Tresler | |||
Public Information | ) | ||
Recovery Manager | 3. | ||
R. A. Youna b | |||
~ | |||
[ | Public Information 1. | ||
D. J. Ravter EOF I | |||
l | Recovery Manager F | ||
j L | |||
2. | |||
Site Construction | C. n Daterson | ||
[ | |||
: 2. _N. M. Norem e | j 3. | ||
: 3. ,0. A. Rockwell | S. N. Coffey l | ||
L | J Site Construction 1. | ||
R. D. Etzler (Si n e-~4~ | |||
renter | |||
~ | |||
Coordinator 7 | |||
J l | |||
L | |||
: 2. _N. M. Norem | |||
_J e | |||
: 3.,0. A. Rockwell J | |||
L Page 9 of 16 | |||
.. ~, | |||
-m a' | |||
Rev. 1 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE s | |||
Rev. 1 | PROCEDURE 4.8 DIVISION SUPPORT APPENDIXE-3(Continujed EMERGENCY ORGANIZATION CONTRACT LIST _ | ||
05/01/81 PACIFIC GAS AND ELECTRIC COMPANY | Effect'ive Date: 01/01/'.,) | ||
Name Energency Location Emergency Plan Title Normal Business Phone Emergency Phone (General Office Transportation | |||
IMPLEMENTING PROCEDURE s | : 1. " H. W. Klocke Coordinator | ||
EMERGENCY ORGANIZATION CONTRACT LIST _ | ] | ||
Effect'ive Date: 01/01/'.,) | 2. | ||
__G. Balanesi h | |||
] | |||
s. | |||
3. | |||
J. A. Marino | |||
,j | |||
~ | |||
: 4. _J. H. Ferrell | : 4. _J. H. Ferrell | ||
'A L | |||
s 5. | |||
R. L. Comyns s | |||
(; | 6. | ||
A. R. Dashiell | |||
_J | |||
(; | |||
-i Page 10 of 16 | |||
,9 C | |||
C | o. | ||
~ | |||
e E | e E | ||
M | M S | ||
D N E | |||
l l. | |||
A NM V | |||
. ET E | |||
fE R | |||
f BD E | |||
e G | |||
O A | |||
a s | |||
t ec i | |||
E TC TA U | |||
D RT S | |||
Y W | |||
l A | |||
I D | |||
EE O | |||
a S | |||
T t | |||
N O | |||
ITAC O | |||
L Y | |||
i C | |||
N IGR EM n | |||
E | E | ||
( | ( | ||
s | s TE E | ||
H YT S | |||
E | IV N G IT A O C Y L NP L A | ||
H | A E S WS N R N | ||
)7 OO O 1 | |||
CP I | |||
7 OO CP | |||
S C | S C | ||
T E | |||
I | IRR A T Y C N | ||
O C | |||
OR M | I C | ||
NE M AM F | I E N N T | ||
LE 2 U A | |||
G I | |||
L | OR M L | ||
O NE M F | |||
AM F | |||
O A | |||
SEA E C R | |||
OT Y O | |||
CA E | |||
R C S | |||
L F ON T | |||
ICP E T | |||
I AR POG Y | |||
C R C | |||
E N | |||
E E | |||
M M G | |||
E A R | |||
N EM 0 | |||
E 0 | E 0 | ||
i M | |||
ve R | |||
W | |||
) | |||
28 | |||
/ | |||
sT 8 | |||
EM0 | |||
( | ( | ||
g | 0 4 | ||
I 4 | |||
8 2 | |||
4 g | |||
( | |||
98 | |||
} ' | |||
(!I i | |||
l!i' (1t ll | |||
( | |||
1 | |||
t i EMERGENCY COMMUNICATIONS LOG SHEET INSTRUCTIONS Entry | t i EMERGENCY COMMUNICATIONS LOG SHEET INSTRUCTIONS Entry Number instructions 1. | ||
Number | Identify the emergency location where this LogSheet is maintained during an emergency (i.e.; Corporate incident Response Center, Materials Dept., Emergermy Operations Facility, etc.) | ||
2. | |||
Enter the date which this Form is being used. Start a new Log Sheet each day. | |||
3. | |||
Consecutively number each page used each -fay. | |||
~ | |||
4. | |||
Enter the time for each Log entry.,Use the 2400 hour clock to avoid confusion. | |||
5. | |||
Clearly record the name of the individual calling you or whom you are calling. | |||
e 6. | |||
Record the individuals PGandE Emergency Organization Title or their non PGandE affiliation. t Che k the entry activity as to whether the individual cdiled you or you are calling them. | |||
Enter the entire context of the message being communicated. Read back the message to the | 7. | ||
c Enter the entire context of the message being communicated. Read back the message to the 8. | |||
individual to as.ure correct copy / transmission. | |||
9. | |||
/ | Enter your initials upon completion of each Log Sheet entry. | ||
/ | |||
/ | |||
,,/ | |||
*- ~ | |||
..f- | |||
..~. | |||
-) | |||
g PACIPlc GAS ANO ELECTRIC COMPANY CORPORATE EMERGENCY RE5PONSE PLAN POe5 EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET | |||
PACIPlc GAS ANO ELECTRIC COMPANY | ('s sMsRoaNCY LOCATION. | ||
EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET | TODAY'S DATE PAGE tu' tai tm TIME ENTERED BY (2iO0 lus.) | ||
('s sMsRoaNCY LOCATION . | (INITIALS) te im | ||
TODAY'S DATE | |||
tai | |||
te | |||
==SUMMARY== | ==SUMMARY== | ||
OF ACTIVITY PERFORMED | OF ACTIVITY PERFORMED to s | ||
eh C | |||
9 | 9 a | ||
e G | |||
S I | |||
I | |||
e e | e e | ||
e | |||
' s) | |||
3DM 18/82) Rev. 00 | ~ | ||
3DM 18/82) Rev. 00 SEE me n hui.: rw== UN Hivues | |||
~ | |||
] | |||
m. | |||
,EMERGENCT RESPONSE AND RECOVERY ACTIVITIE5 t.OG SHEET INSTRUCTIONS Entry Number instructions 1. | |||
Identify the emergency location where this Log Sheet is maintained during an emergency (i.e.: Corporate incident Response Center, Materials Dept., Emergency Operations Facility, etc.) | |||
Entry | 2. | ||
Number | Enter the date which this forr.iis being used. Start a new Log Sheet each day. | ||
3. | |||
Consecutively number eacE page used each day. | |||
3 4. | |||
Enter the time for each Log entry. Use the 2400 hour clock to avoid confusion. | |||
3 | 5. | ||
Enter a summary of each activity being recorded. | |||
6. | |||
Enter your initials upon completion of each Log Sheet entry. | |||
l I | l I | ||
I | I | ||
) | |||
l r- | l | ||
.-.,,e r- | |||
-s | |||
. ~.. | |||
w Rev. 1 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY. | |||
CORPORATE EMERGENCY RESPONSE PLAN p | |||
CORPORATE EMERGENCY RESPONSE PLAN p | , IMPLEMENTING PROCEDURE PROCCDURE 4.9 QUALITY ASSURAt(CE, | ||
APPENDIX E-2 EMERGENCY PLAN TITLES AND PERSONNEL ASSIGNMENTS t0TIFICAT10N LIST Effective Date: 01/01/83 Name Home Phone Emergency Plan title Nonemergency Title Business Phone | |||
PROCCDURE 4.9 QUALITY ASSURAt(CE , | '. A. Raymond Corporate Quality 1. | ||
APPENDIX E-2 EMERGENCY PLAN TITLES AND PERSONNEL ASSIGNMENTS | W Assurhnce | ||
t0TIFICAT10N LIST | : Manager, Coordinator Quality Assurance 2. | ||
Effective Date: 01/01/83 | P. C. Burgess Records Management System Supervisor 3. | ||
T. G. de Uriarte Senior Quality Engineer Records Management 1. | |||
Home Phone Emergency Plan title | P.CTBurgess Coordinator Records Management | ||
Nonemergency Title | ~ | ||
System Supervisor 2. | |||
E. S. Grenfell Records Analyst 3. | |||
Engineer Records Management | H. M. Cox Records Supervisor 4. | ||
S. E. Earley-Iwert Records Analyst Senior Quality | |||
~ | |||
1. | |||
F. J. Dodd Enginder(Pro Senior Quality Development) gram Engineer Page 11 of 20 | |||
Page 11 of 20 | |||
Rei. 1 | |||
05/01/81 PACIFIC GAS AND ELECTRIC COMPANY | ~ | ||
CORPORATE EMERGENCY RESPONSE PLAN | 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMEtiTIN | ||
==G. PROCEDURE== | ==G. PROCEDURE== | ||
~ | |||
hUAL | hUAL U | ||
CE APPENDIX E-2 (Continued) | |||
APPENDIX E-2 (Continued) | ~ | ||
Effective Date: 01/01/83 | Effective Date: 01/01/83 Name Home Phone Emergency Plan Title Nonemergency Title Business Phone 5 | ||
Senior Quality 2. | |||
H. J. Hansen, Jr. | |||
Engineer (Program | Engineer (Program Quality Engineer Development) | ||
(continued) | (continued) 3. | ||
G. W. Heggli Quality Engineer | |||
~ | |||
Senior Quality 1. | |||
T. G. de Uriarte Engineer Senior Quality (Auditing) | |||
Eng tneer 2. | |||
K. T. Bergmann Quality Engineer 3. | |||
Quality Engineer | D. S. Aaron Quality Assurance Analyst Quality Assurance 1. | ||
R. T. Twiddy Supervisor Quality Assurance Supervisor 2. | |||
Qualits Engineer | C. M. Seward, Jr. | ||
Quality Engineer 3. | |||
R. W. 'aylor Qualits Engineer | |||
~ | |||
4. | |||
M. S. Dobrzensky Quality Engineer g | |||
i l | |||
l l | l l | ||
l l | l l | ||
Page 12 of 20 l | Page 12 of 20 l | ||
'v-Rev. 1 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE | |||
Rev. 1 | ( -s PROCEDURE 4.9 QUALITY ASSURANCE APPENDIX E-2 (Continued) | ||
Effective Date: 01/01/83 Name Home Phone Emergency Plan Title Nonemergency Title Business Phone Design-Dra f ting 1. | |||
H. E. Deady Records Engineering Records | |||
( -s | ' Coordinator Supervisor 2. | ||
QUALITY ASSURANCE APPENDIX E-2 (Continued) | D. W. Houghton Supervisor, Engineer. | ||
Effective Date: 01/01/83 Name | ing Rec,ords-& Admin-istrative Services 3. | ||
Business Phone Design-Dra f ting | D. C. Bullard Administra tive Services Superviso'r s | ||
v Page 13 of 20 | |||
ing Rec,ords-& Admin- | |||
Page 13 of 20 | |||
s' Rev. 1-05/01/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE s | |||
PROCEDURE 4.9 QUALITY ASSURANCE APPENDIX E-3 EMERGENCY ORGANIZATION CONTACT LIST Effective Da,te: 01/01/83 Name Energency location Emergency Plan Title Normal Business Phone Emergency Phone Recovery Manager | |||
: 1. J. D. Shiffer (E_OF | |||
IMPLEMENTING PROCEDURE s | .] | ||
G -i L: | |||
EMERGENCY ORGANIZATION CONTACT LIST Effective Da,te: 01/01/83 | 2. | ||
_R. C. T'hornberry b. | |||
Energency location Emergency Plan Title | f-- | ||
3 | |||
~ | |||
: 3. g D. To_wnsend | |||
_3 w | |||
: 3. g D. To_wnsend w | Corporate Technical | ||
: 1.,J. R. Hoch gRC and Logistical | |||
(, | |||
Coordinator | ) | ||
Coordinator 6 | |||
2. | |||
M. R. Tresler ar 6 | |||
~ | |||
3. | |||
6 | R. A. Younc f) | ||
b | ~ | ||
: u. . | 6 b | ||
: u.. | |||
Page 14 of 20 | Page 14 of 20 | ||
T | T p | ||
p | (j e | ||
(j | PACIFIC GAS ANO ELECTalC COe#ANY EMERGENCY LOCATION ym CORPORATE EMERGENCY RESPONSE PLAN TODAY'S DATE | ||
PACIFIC GAS ANO ELECTalC COe#ANY | ' ACE EMERGENCY COMMUNICATIONS LOG SHEET to TimeE NAME ts is ACTWITY 12400BusJ l# | ||
EMERGENCY LOCATION ym | BRENDM 179 g4 ERGERGENCY TITLE OR AFFILIATION s | ||
DSTM&SI i, | |||
179 g4 | |||
O e | O e | ||
S O | S O | ||
w 4 | w 4 | ||
t | 8 G | ||
t s | |||
k 1 | |||
i | i | ||
( | ( | ||
l u : | |||
I - | |||
l | k li1 l | ||
l n. | |||
e | e e | ||
inoce4istaal Rev.oo | O sEE NsTRuCTNEss O e REvE'HER inoce4istaal Rev.oo n | ||
j I | j I | ||
O j | |||
EMERGENCY COMMUNICATIONS LOG SHEET INSTRUCTIONS | EMERGENCY COMMUNICATIONS LOG SHEET INSTRUCTIONS | ||
~ | |||
e Entry Number | e Entry Number Instructions o | ||
1. | |||
(i.e.; Corporate incident Response Center, Materials Dept., Emergency Operations Facility, etc.) _ | Identify the emergency location where this Log 5heet is maintained during an emergency (i.e.; Corporate incident Response Center, Materials Dept., Emergency Operations Facility, etc.) _ | ||
I | I 2. | ||
Enter the date wNch this Form is being used. Start a new Log Sheet each day. | |||
Enter the date wNch this Form is being used. Start a new Log Sheet each day. | 3. | ||
Consecutively number each page used each day. | |||
4. | 4. | ||
Enter the time for each Log entry. Use the 2400 hour clock to avoid confusion. | |||
l | ~ | ||
l S. | |||
4 | Clearly record the name of the individual calling you or whom you are calling. | ||
6. | |||
Record the individuals PGandE Emergency Organization Title or their pon PGandE affiliation. | |||
individual to assure correct copy / transmission. | 4 Che k the entry activity as to whether the individual balled you or you are calling them. | ||
7. | |||
o e | c 8. | ||
M- | Enter the entire context of the message being communicated. Read back the message to the individual to assure correct copy / transmission. | ||
9. | |||
Enter your initials upon completion of each Log Sheet entry. | |||
o e | |||
g j' | |||
W M- | |||
4 | 4 | ||
~,- | |||
o | o PAciricoAs Ano ELacTRic company CORPORATE EMERGENCY RESPONSE PLAN POwB EMERGENCY RESPONSB AND RECOVERY ACTIVITIES LOG SHEET (N-autRogmcv Location TooAv s oATE raos | ||
PAciricoAs Ano ELacTRic company | ~~ | ||
EMERGENCY RESPONSB AND RECOVERY ACTIVITIES LOG SHEET (N- | Its (2) tm ENTEREoBy TIME (2W hesJ (INITIALS: | ||
lai (si | |||
autRogmcv Location | |||
lai | |||
==SUMMARY== | ==SUMMARY== | ||
OF ACTIVITY PERFORMED | OF ACTIVITY PERFORMED con o | ||
9 e | 9 e | ||
e 49 S | e 49 S | ||
e o | e o | ||
,. CD405 (8/82: Rev.00 | |||
.y. | |||
-,ogIREVER50 | |||
EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET INSTRUCTIONS | |||
~~ | |||
Entry Number instructions 1. | |||
Entry Number | Identig the emergency location where this Log Sheet is maintained (furirigp'n emergency (i.e.: Corporate incident Response Center, | ||
~ | |||
Materials Dept., Emergency Operations Facility, etc.) | Materials Dept., Emergency Operations Facility, etc.) | ||
2. | |||
Enter the date which this form is being used. Start a,'ew L:; Sheet each day. | |||
4. | 3. | ||
Consecutively number eacfi page used each day. | |||
Enter the time for each Log entry. Use the 2400 hour clock to avoid | l 4. | ||
Enter the time for each Log entry. Use the 2400 hour clock to avoid | |||
i | ).. | ||
~ | |||
. confus,on. | |||
r | i 5. | ||
Enter a summary of each activity being recorded. | |||
6. | |||
Enter your initials upon completion of each Leg Sheet entry. | |||
r O | |||
r | |||
- -.}} | |||
Latest revision as of 03:34, 15 December 2024
| ML20073K772 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 01/28/1983 |
| From: | PACIFIC GAS & ELECTRIC CO. |
| To: | |
| Shared Package | |
| ML16340D309 | List: |
| References | |
| PROC-830128, NUDOCS 8304200451 | |
| Download: ML20073K772 (174) | |
Text
{{#Wiki_filter:, ', ~ ~ a< n. =v.ci ne=i pg,g NUCLE R LANT OPER TIO ARTMENT CORPORATE EMERGENCY RESPONSE PLAN p p CONTROLLED DOCUMENT TRANSMITTAL SetEET Nuclear Emergency Response Communications Directory Approved: Change Number: 05 /[ pg Change Date: 01/17/83 Date: CHANGES)
- INSTRUCTIONS CHANGE
SUMMARY
Implerenting Procedure 1. Insert under Tab Replaces Implementing Procedur! " Table of Organization" " Implementing Procedures" Table of Contents (dated ' (dated 01/01/83) in CERP Manual 5/14/81) 2. Destroy superceded item imediately Replaces / reissues CERP Implementing Affected Appendix Appendices with Effective Procedure Appendix Date Dates as follows: 1.1 E-1 04/15/81 Insert CERP Implementing 04/15/81 E-2,3,4,5 01/01/83 Procedure Appendices 10/01/82 into CERP Manual and E-8,9 08/82 destroy superceded items 04/15/81 insnediately 3.1 E-2,3,4,5 01/01/83 10/01/82 E-7,,8 06/82 05/12/81 3.2 E-1 08/13/81 08/13/81 E-2,3 01/01/83 10/01/82 E-7,8 08/82 08/13/81 3.3 E-2,3 01/01/83 10/01/82 E-5,6 08/82 05/01/81 3.4 E-2,3 01/01/83 10~01/82 / E-5,6 08/82 05/01/81 ~ l 3.5 E-2,3 01/01/83 ~ 05/01/82 10/01/82 E-5,6 08/82 3.6 E-1 05/01/81 05/01/81 E-2,3 01/01/83 10/01/82 E-4 11/24/80 11/24/80 E-5 12/01/82 07/14/81 E-7,8 08/82 _ 05/01/81 3.7 E-1 05/01/81 05/01/81 E-2,3 01/01/83 10/01/82 E-4 05/01/81 05/01/81 E-6,7 08/82 05/01/81 4.1 E-2,3 01/01/83 10/01/82 E-5,6 08/82 05/01/81 X CONTINUED ON REVERSE SIDE Ater revising your controlled document in acmrdance with the above appropriate instructions place this sheet in the front of the affected document. Future cfianges will be numbered consecutively. If there are any questions please call: Stephen Foster 8304200451 830413 22-6522 PDR ADOCK 05000275 F PDR
ATTACIDfENT.2 e. ~ Location of Bracketed Privacy / Proprietary Information s Appendices with Procedure Bracketed Information 1.1 E-2, 3, 4, 5 3.1 ,E-2, 3, 4, 5 3.2 E-1, 2, 3 3.3 E-2, 3 3.4 E-2, 3 3.5 E-2, 3 3.6 E-2, 3, 5 3.7 E-2, 3 4.1 E-2, 3 4.2 E-2, 3 4.3 E-2, 3 4.4 E-2, 3' 4.5 E-2, 3 4.6 E-2, 3 4.7 E-2, 3 4.8 E-2, 3 4.9 E-2, 3 -,-n
.~ .y, .c REY 1 ~ 05/14/81 PACIFIC GAS AND ELECTRIC CdMPANY CORPORATE EMERGENCY. RESPONSE PLAN p IMPLEMENTING PROCEDURES Effective Date:01/01/83 TABLE OF ORGANIZATION Number Revision Date Title .1.1 01 04/15/81 Activation.of the Corporate Emergency Response Organization ~
- 1. 2 '
01 05/01/81 Activation of the Corporate Incident Response Center 2.1 01 05/12/81 Plan Maintenance 3.1 01 05/01/81 Governmental Relations 3.2 02 08/13/81 Public Relations 3.3 01 05/01/81 Law 3.4 01 05/01/81 Insurance 3.5 01 05/,01/81 Safety, Health and Claims 3.6 01 05/01/81 Security 3.7 00 05/01/81 Personnel Relations 4.1 01 05/01/81 Materials 4.2 01 05/01/81 Communications 4.3 02 08/08/81 Radiological Analysis and Protection 4.4 01 05/01/81 General Construction 4.5 01 05/01/81 Engineering and Technical Support 4.6 01 05/01/81 Computer Systems and Services, 4.7 01 05/01/81 Nuclear Plant Operations 4.8 01 05/01/81 Division Steport 4.9 01 05/01/81 Quality Assurance em e l 5'-t T rT1 --w =---a-- w N w* w c-- v--t-- ---A
c, m + ' ~ ./ REV 1 ~
- 05/14/81
~ PACIFIC GAS AND ELECTRIC COMPANY ~ CORPORATE EMERGENCY RESPONSE PLAN 1 ( IMPLEMENTING PROCEDURE APPENDICIES ~ ~~ Fffective Date? 01/01/83 APPEN01x MUMBER PROCEDURE NUMBER 1 2 3 4 5 6 7-8 9 1.1 04/15/31 01/01/83 01/01/83 01/01/83 01/01/C3 04/15/81 10/01/82 08/82 08/82 1.2 05/0'1/81 07/14/81 05/01/81 05/01/81 I I I x x 2.1 05/1'2/81 10/82 10/82_ x x x x x x 3.1 05/12/81 01/01/83 01/01/83 01/01/83 01/01/83 05/01/82 08/82 08/82 x 3.2 08/13/81 01/01/83 01/01/83 08/13/81 08/13/81 08/13/81 08/82 08/82 1 3.3 05/01/81 01/01/83 01/01/03 05/01/81 08/82 08/82 x x x 3.4 05/01/81 01/01/83 01/01/83 05/01/81 08/82 08/81 x x x 3.5 05/01/81 01/01/83 01/01/83 05/01/81 08/81 08/81 x-I x 3.6 05/01/81 01/01/83 01/01/83 11/24/80 12/01/82 05/01/81 08/82 08/82 x 3.7 05/01/81 01/01/83 01/01/83 05/01/81 05/01/81 08/82 08/82 x I 4.1 05/01/81 01/01/83 01/01/83 05/01/81 08/82 08/82 I I x 4.2 05/01/81 01/01/83 01/01/83 05/01/81 08/82 08/82 1 x x 4.3 08/08/81 01/01/83 01/01/83 08/08/82 08/02 08/82 08/08/81 I x 4.4 05/01/81 01/01/83 01/01/83 05/01/81 08/82 08/82 x x x 4.5 05/01/81 01/01/83 01/01/83 05/01/81 08/82 08/82 x x x 4.6 05/01/81 01/01/83 01/01/83 05/01/81 08/82 08/82 x x x 4.7 05/01/81 01/01/83 05/01/81 08/82 08/82 x x x x 4.8 05/01/81 01/01/83 01/01/83 05/01/81 08/82 08/82 X X X 4.9 05/01/81 01/01/83 01/01/83 05/01/81 08/82 08/82 x x I e e 6 e L.-
.-e g PACIFIC GAS.AND ELECTRIC COMPARY ' Rev. 1 CORPO, RATE EMERGENCY RESPONSE PLAN 4/16/81 IMPLEMENTING PROCEDURE 1 PROCEDURE 1.1 ACTIVATION OF THE CORPORATE EMERGENCY ORGANIZATION APPENDIX E-1 EMERGENCY N ANIZATION, i CORPORATE EMERGENCY RESPONSE OHGANIZATION MANAGEMENT I ~ Cn
- m. tort r
c .a i l co,,,,,. ..c,. on. - =" r. ..e--..- ..,...,,a f.r ..I. .. - ic., I I I I I I ,.X &.,H.G.E .W4..esE.. LI.t. 1 .,t. W RAE I.. ICS .W'#,t. 4 E.n. . eth.u.G. CWWI ,4. Ctll..W g l ( 1 I I l l I I r _ m, ,,,,, _ = .--i c.-., ,,,,.,e., ..c c .c c-- wy e,., _ --.i.. .ici ,e.r i. I I I I I I 1.l.ll"l". '." c.""'. r,c= 1 ~
= =
==
- u.,-
- in .a. .o uA o,,,,,,, e ,c., c-=, ...<rieri --.1 n, .c ..,,,n, e e. u-u, On.e44 .s me - % es-.u-.,= suer coac-m -a 4 Page 19 of 40 --,wv.--e y n-tw ,"g----m--- w-r----------m&wm-r=----T-we--y-es -w*-- -ww---- --r-g-*y
yw-w'+
www--- ne e-e e-w - ~ ' ' -
1 Rev. 1 .l 04/15/81 -PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE PROCEDURE 1.1 ACTIVIATION OF THE CORPORATE EMERGENCY ORGANIZATION APPENDIX E-2 REC 0VERY MANAGER NOTIFICATION LIST Effective Date: 01/01/83 Name Home Phone Emergency Plan Title Nonemergency Title Business Phone Recovery Manager 1. J. D. Shiffer \\. Manager, Nuclear ) Plant Operations 2. R. C. Thornberry DCPP Plant Manager 3. J. D. T'ownsend Supervising Nuclear Generation Enijineer Corporate Emergency 1. J. O. Schuyler Coordinator VP - Nuclear Power Generation 2. G. A. Mar :stis Exec. VP - F,acilities. and Electric Resources. Development 3. E. B. Langley, Jr. Sr. VP - Operations Corporate Technical 1. J. B. Hoch and Logistical Project Manager, ~ Coordinator Diablo Canyon 2. M. R. Tresler Supervising Project Control Engineer 3. R. A. Young Project Design Coordinator
- Confidential number. Establish contact through Cmmunications PBX Operator at t Page 20 of 40
Rev. 1 04/15/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE ( PROCEDURE 1.1 ACTIVIATION OF THE CORPORATE EMERGENCY ORGANIZATION APPENDIX E-2 (Continued) RECOVERY MANAGER lhTTIFICATION LIST Effective Date:- 0.1/01/83 Home Phone Name Emergency Plan Title Nonemergency Title Business Phone Corporate Liaison 1. R. J. McDevitt Coordinator Senior Nuclear Power Generation Engineer 2. S. R. Foster Health Physicist 3. T. A. Moulia Technical Assistant Vice President NPG 4. G. A. Pierce l Nuclear Budget ~ Engineer t Public Information l'. D. J. Baxter Recovery Manager Manager of Public Information Z. C. H. Peterson Senior Public Infor-mation Representative 3. S. N. Coffey Public Information ~ Representative Radiological 1. W. H. Fujimoto Emergency Recovery Supervising Nuclear Manager Engineer 2. Unassigned 's Page 21 of 40
n 3 Rev. 1 04/15/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN I IMPLEMENTING PROCEDURE PROCEDURE 1.1 ACTIVIATION OF THE CORPORATE EMERGENCY ORGANIZATION APPENDIX E-2 (Continued) REC 0VERY MANAGER NOTIFICATION LIST Effective Date: 01/01/83 Name Home Phone Emergency Plan Titl_e Nonemergency Title Business Phone Radiologica.1 Emergency 3. D. P. Serpa } Recovery Manager Senior Nuclear (continued) Generation Engineer 4. S. M. Skidmore Assistant Project Manager Engineering and 1. B. W. Giffin Logistics Senior Nuclear Recovery Manager Generation Engineer 2. A. L. Simmons Nuclear Generation Engineer' l 3. G. C. Russell Nuclear Generation Engineer Operations and 1. J. D. Townsend l Analytical Supervising Nuclear l Recovery Manager Generation Engineer 2. W. T. Rapp Senior Nuclear Generation Engineer 3. B. W. Giffin Senior Nuclear Generation Engineer Electric System 1. A. D. _ Lyon Dispatcher (, ,] Shift Supervisor 2. On-duty Shif t Suoervisar Page 22 of 40
6 m \\ Rev. 1 04/15/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN (MPLEMENTING PROCEDURE PROCEDURE 1.1 ACTIVIATION OF THE CORPORATE EMERGENCY ORGANIZATION APPENDIX E-3 EMERGENCY ORGANIZATION CONTACT LIST Effective Date: 01/01/83
- 1ame Errergency Location Emergency Plan Title itormal Business Phone Emergency Phone
~ Communications 1. On-duty Operator General Office PBX Operator 2. R. Larsen L-370. Corona L ~ Site Emergency 1 7,R. C. Thornberry TSC Coordinator
- 2.,.R. Patterson L
- 3.,J. M. Giscion
- 4. pW. B. Kaefer L
Shift Foreman
- 1. r~0. A. Col e Control Room (Interim Site
~ '^ ^ ^ / or g Emergency Coordinator
- 2. yW. J. Dilbeck L
- 3. pW. F. White ] L
- 4. r_0. E. Sundquist L
i i 1 l Page 23 of 40
Rev. 1 04/.15/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE 7 PROCEDURE 1.1 ACTIVIATION OF THE CORPORATE EMERGENCY ORGANIZATION APPENDIX E-3 (Continued) ~ Effective Date: 01/01/83 ~ Name Energency Location Emergency Plan Title Nonnal Business Phone Emergency FHone Shift Foreman
- 5. _R. L. Ewing -
(Interim Site ) m Emergency Coordinator 6. D. C. Bashaw (continued) 7 ] 7 4 Collins u J '8.. T Ken singer 3 9 4 A. Rhodes m Corporate Technical 1.,_J. B. Hoch _ CIRC and Logistical J or g. Coo rdinator
- 2. _M. R. Tresler
~ t. J
- 4.,R. A. Young J
Corporate Liaison 1 4 J. McDevitt CIRC _3 Coordinator .y or 2. S. R. Foster W 6 J _ 3. T. A. Moulia J
- 4. g. A. Pierce J
\\ Page 24 of 40 4-
,n,. Rev.1 04/15/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAh IMPLEMENTING PROCED'URE PROCEDURE 1.1 ACTIVIATION OF THE CORPORATE EMERGENCY ORGANIZATION APPENDIX E-4 CORPORATE TECHNICAL AND LOGIST.! CAL COORDINATOR NOTIFICATION LIST Effective Date: 01/01/83 Name Home Phone Emergency Plan Title Nonemergency Title Business Phone, Corporate Engineering 1. G. H. Moore ( Coordinator DC, Project Engineer 2. J. V. Rocca Chief Mechanical & Nuclear Engineer ' 3.- R. V. Bettinger Chief Civil Engineer 4. J. R. Herrera Chief Electrical Engineer 5. G. H. Aster
- Chief, I
Design-Dra f ting I I Corporate 1. R. S. Bain i Construction Manager, Station Coordinator Construction 2. J. R. Manning ~ ~ Superintendent Station Construction 3. B. T. Saenz ~ Station Construction Admin. Superintendent /' Page 25 of 40 a
a. s s.., 4' Rev. 1 ~ 04/15/81 PACIFIC GAS AND ELECTRIC COMPANY ~ CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE < s. R10CEDURE 1.1', ACTIVIATION OF THE_ CORPORATE EMERGENCY ORGANIZATION APPENDIX E-4 (Continued) CORPORATE TECHNICAL _ AND LOGISTICAL COORDINATOR NOTIFICATION LIST Effective Date: 01/01/83 Name Home Phone Emergency Plan Title Nonemergency Title Business Phone Corporate Division 1. D. L. Kennady Coordinator Los Padres District. Manager 2. B. McCloskey Los Padres District Marketing Manager 3. R. J. McKell Los Padres District Electric Superintendent 4. Alternate Number Morro Bay Switching Center Corporate Materials 1. E. J. Meyers I Coordinator Director, Project Purchasing 2. D. R'. Shaffer I Director, Materials Purchasing 3. .J. E, f.eanhan Sur cv' (ng Buyer 4. L. J. .Jdick bdpEri..; < ng Buyer 5. R. R. Ochsner Supervising Buyer 6. R. E. Gleason Supervising Buyer Page 26 of 40
o Rev. 1-04/15/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE PROCEDURE 1.1 ACTIVIATION OF THE CORPORATE EMERGENCY ORGANIZATION APPENDIX E-4 (Continued) CORPORATE TECHNICAL AND LOGISTICAL COORDINATOR NOTIFICATION LIST Effective Date: 01/01/83 Name Home Phone Emergency Plan Title Nonemergency Title Business Phone Corporate Computer 1. A. W. Simila Applications Manager, Engineering Coordinator Computer Applications 2. R. M. Wetherell l S.upervising Mathema - tician-Programmer ' 3.- B. M. Speckman ~ Supervising Computer' Applications Engineer Corporate 1. T. R. Ferry Communications Mngr Canmunications Department 2. A. J. Nevolo Seoior Communications Engineer 3. C. D. Gilson Supervising Communi-I cations Engineer og Page 27 of 40
~ -v Re.v. 1 04/15/81 PACIFIC, GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN I IMPLEMENTING' PROCEDURE * ~ PROCEDURE 1.1 ACTIVIATION OF THE CORPORATE EMERGENCY ORGANIZATION APPENDIX E-4 (Continued _) CORPORATE TECHNICAL AND LOGISTICAL COORDINATOR - NOTIFICATION LIST Effective Date: 01/01/83 Name Home Phone Emergency Plan Title Nonemergency Title Business Phone Corporate Quality 1. W. A. Raymond [ Assurance Coordinator Manager Quality Assurance 2. P. C. Burgess l Records Management j System Supervisor l 3. T. G. de Uriarte Senio.r Quality I Engineer t \\ e i Page 28 of 40
Rev. 1 o 04/15/81 ., PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGEhCY RESPONSE PLAN IMPLEMEllTING PRO,CEDURE PROCEDURE 1.1 ACTIVIATION OF THE CORFORATE Et ERGENCY ORGANIZATION APPEtiDIX E-5 CORPORATE LIAISON C00PDINATOR fiOTIFICATION LIST Effective Date: 01/,01/83 Name Home Phone Emergency Plan Title Nonemergency Title Business Phone Corporate Public 1. R. H. Miller Information Mngr, Advertising Dept. Coo rdinator 2. C. G. Poncelet Mngr., Comn. Planning 3. H. N. Peelor Mngr., Pubite Activities Corporate 1. G. A. Blanc ~ Governmental Hngr, Agency Relations Relations Coordinator 2. R. F. Nichols i tingr, Local Gov' t Rel. [ ~ 3. J. R. Torrens Sr Representative Corporate Law 1. P. A. Crane, Jr. Oepartment Asst General Counsel Coo rdinator 2. R. Ohlbach VP and I General Attorrey 3. R. F. Locke i ~ Sr Counsel Confidential number. Establish contact through Canmunications PBX Operator at (415)781-2893. Page 29 of 40
Rev. l' 04/15/81 e PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE FLAN IMPLEMENTIhG PROCEDURE PROCEDURE 1.1-ACTIVIATION OF THE CORPORATE EMERGENCY ORGANIZATION APPENDIX E-5-(Continued) CORPORATE LIAISON 'C00RDINATOR NOTIFICATION LIST Effective Date: 01/01/83 Name Home Phone Emergency Plan Title Nonemergency Title Business Phone Corpcrate Insurance 1. W. P. Noone Cecrdinator Mngr of Insurance 2. R. M. Reider Director, Insurance Administration 3. C. A Lewis Coora. of Property loss Cntrl. Corporate Safety, 1. B. P. Sadler health, and Claims Mngr, Safety, Coordinator Health and Claims 2. A. L. Bechtold Sr. Attorney 3. C. W. All en Attorney 4. J. C. Vocke Attorney Page 30 of 40
~ Rev. 1 04/15/81 PACIFIC MS ~AND ELECTRIC C0ttPANY CORPORATE EMERGENCY RESPONSE PLAN ~ IMPLEMENTING PROCEDURE N PROCEDURE 1.1 ACTIVIATION OF THE CORPORATE EMERGENCY ORGANIZATION APPENDIX E-5 (Continued) CORPORATE LIAIS0N COORDINATOR NOTIFICATION LIST Effective Date: 01/01/83 Home Phone Emergen y Plan Title. Name Nonemergency Title Business Phone Corporate 1. L. H. Shaffer Security Director, Security Coordinator 2. J.-R. Van Schaick Supervising Security Representative 3. R. Dunleavy i Senior Security Representative Corporate Personnel 1. H. S. Pitner Relations Director, Enployment Coordinator and Planning 2. T. J. Walsh, Jr. 1 Employment Represen-ta ~l1ve ~ ~ 3. Unassigned 1 l Page 31 of 40
PACIFIC GAS AN;,) ELECT. lC COMPANY EMER tENCY LOCATION yo g CORPORATE EMERGENCY RESPONSE PLAN TODAY'S DATE ' AGE EMERGENCY COMMUNICATIONS LOG SHEET tu (2) (a TIME NAME ACTIVITV 12400 hrs.) 180 ENTERED 2 (7) gg EMERGENCY TITLE OR AFFILIATION tesTIALSI W i c 89484 (8/82) Rev. 00 SEE INSTRUCT 10fS O d REVERSE
-..o PACIFIC GAS ANO ELECTRIC COMPANY ~ CORPORATE EMERGENCY RESPONSE PLAN po.3 EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET EMERGENCY LOCATION TOOAY'S OATE PAGE 7;x 10 (2) la TIME \\ ENTERED BY (2400 hr J (INITIALS) u; (s)
SUMMARY
OF ACTIVITY PERFORMED toi i ~ O ~ l l ~ \\ 81M85 (8/82) Rev. 00 SEE INETRUCT IONE ON REVarsal,
u Rev. 1 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE PROCEDURE 3.1 GOVERNMENTAL RELATIONS APPENDIX E-2 EMERGENCY PLAN TITLES AND PERSONNEL ASSIGNMENTS NOTIFICATION LIST Effective Date: 01/01/83 Name Home Phone Emergency Plan Title Nonemergency Title Business Phone Corporate 1. G. A. Blanc i Governmental Mngr., Agency Relations ( Relations Coordinator 1 2. R. F.Nichols Mngr., Local Gov't ret. 3. J. R. Torrens Sr. Representative Governmental Relations Representatives ~ -Coast Valleys 1.' C. L. Richmond Division Special Representative 2. R. L. Royster Mngr. Santa Maria 3. B. J. Hoppert Mngr., Paso Robles { t ~ -Sacramento 1. R. D. Testa Drc tr., S ta te Agency Relations 2. J. H. Fraser Mngr., State Leg. Rel. ( _ l Page 9 of 22
m l Rev. 1 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN i IMPLEMENTING PROCEDURL PROCEDURE 3.1 GOVERNMENTAL RELATIONS APPENDIX E-2 (Continued) Effective Datei 01/01/83 Name Home Phone Emergency Plan Title Nonemergency Title Business Phone Governmental Relations Representatives (continued) -Washington, D.C. 1. J. H. Bergler Representative-Agency Relations 2. J. A. Vance Washington, D.C., Counsel Page 10 of 22 O
Rev. 1 05/01/81 l PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERSENCY RESPONSE PLAN t
- IMPLEMENTING PROCEDURE PROCEDURE 3.1 GOVERNMENTAL RELATIONS APPENDIX E-3 EMERGENCY -ORGANIZATION CONTACT LIST Effective Date: 01/01/83 Name Emergency Location Emeroency Plan Title Normal Business Phone Emergency Phone
,s F Recovery Manager 1 4 0. Shiffer { L-L. 2.,,. R C. Thornberry J
- 3. g
._D. Townsend . J! +. Corporate Liaison
- 1.,R. J. McDevitt
, CIRC Coordinator . ')
- 2.,S. R. Foster
' ] L
- 3.,T. A. Moulia
~ L
- 4. _G. A. Pierce Corporate Techn.ical 1.g.B.Hoch CIRC and Logistical p'
or Coordinator
- 2.. M D. Tresler L-I
- 3. r_R. A. Young Page 11 of 22
Rev. 1 05/01/81, PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN s ( IMPLEMENTING PROCEDURE N P PROCEDURE 3.1 GOVERNMENTAL RELATIONS. APPENDIX E-3 ENERGENCY ORGANIZATION CONTACT LIS( Effective Date: 01/01/83 Name. Energency Location Emergency Plan Title Normal Business Phone Emergency Phone Corporate Ptblic
- 1. yR. H. Miller
_J l General Office Information v Coordinator 1. 2. C. G. Poncelet
- 3. _H. N. Peelor
) u ~ Public Information
- 1. _D. J. Baxter E0F Recovery Manager g
- 2.,C_. H. Peterson 6
- 3.,S. N. Coffey w
Page 12 of 22
- - ~ Rev. 1 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE PROCEDURE 3.1 GOVERNMENTAL RELATIONS ~ APPENDIX E-4 GOVERNMENTAL BRIEFING CENTERS Effective Date: 01/01/83 Locations Phone Numbers g_ Washington, D.C. Office - Suite 1180 1r 1050 - 17th Street NW Washington, D.C. 20036 i ) ~ Sacramento Office - Park Executive Building Suite 890, 925 L Street Sacramento, California 95814 Officials) Conference Room, San Luis Obispo Office, Coast Valleys Division - District (Government and Public ~ ~ Page 13 of 22
S-Rev. 1 05/01/81 ~ ~ PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN . I IMPLEMENTING PROCEDURE s PROCEDURE 3.1 GOVERNhENTAL RELATIONS APPENDIX E-5 GOVERNMENTAL 0FFICIALS AND AGENCIES Effective Date: 01'/01/83
Response
PGandE Nane of Governmental Governmental Relations Official Representative or Agency' Add ress Phone 1. San Luis Obispo Courthouse Annex Coast Val'ieys Board of San Luis Obispo. Division Supervisors 93401 2. City of 990 Palm Street San Luis Obispo San Luis Obispo 93401 3. City of 214 E Branch St. ~ Arroyo Grande Arroyo Grande 93420 4. City of 6500 Palma Ave. Atascadero Atascadero 93422 5. City of 595 Harbor St. Morro Bay Morro Bay 93442 6. City of 1030 Spring _St. Paso Robles Paso Robles 93446 7. City of 1000 Bello St. Pismo Beach Pismo Beach 93449 8. City of 154 S. 8th St. Grover City Grover City 93433 Page 14 of 22
u Rev. 1 ~. 05/01/81 PACIFIC GAS'AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN (G IMPLEMENTING PROCEDURE PROCEDURE 3.1 GOVERNMENTAL RELATIONS APPENDIX E-5 (Continued) Effective Date: 01/01/83
Response
PGandE Nane of Governmental . Governmental ^ Relations Official Representative or Agency Add ress Phone Coast Valleys 9. City of 110 East Cook Division Santa Maria Santa Maria-(continued) 93454 o 10. Santa Barbara-Courthouse Board of Santa Barbara Supervisors 931ct 11. City of 918 Obispo Guadalupe Guadalupe 93434 1 Sacramento 1. R. D. Testa Park Executive Bldg., Sui te 890 925 L Street Sacramento, CA 95814 2. J. H. Fraser Park Executive Bldg., Suite 890 925 L Street Sacramento, IA 95814 Washington, D.C.' 1. J. H. Bergler Washington, D.C. 05b h St NW- [))~ ~ Washington, D.C. 20036 Page 15 of 22
~ v ~.. ? e PACIFIC GAS AND ELECTRIC COMPANY s CORPORATE EMERGENCY' RESPONSE PLAN ~ IMPLEMENTING PROCEDURE PROCEDURE 3.1 GOVERNMENTAL RELATIONS APPENDIX E-5 (Continued) ~ Effecti' e Date: 01/01/83 v
Response
PGandE Nane of Governmental Governmental Relations Official Representative or Agency Add ress Phone Washington, D.C. 2. J. A. Vance Washington, D.C. / (continued) Off. Sui te 1180 / ~ 1050 17th St. NW [ Washington, D.C.- 20036 t i i ~ \\ Page 16 of 22
~ ~ h PACIFIC GAS ANO ELECTRIC COaWANY EMERGENCY LOCATION TODAY'SDATE ' AGE pg g CORPORATE EAGERGENCY RESPONSE PLAN EMERGENCY COMMUNICATIONS LOG SHEET to to ' (8 7.se NAmE Acr.viTY (2400Imej M lNmunm (7) N g Ea4ERGENCY TITLE OR AFFILIATION 1 s f, t t 2 6 18 22) R n M SE119ETRUCTIO95 O d REVERSE
i EMERGENCY COMMUNICATIONS t.OG SHEET INSTRUCTIONS Entry Number Instructions 1. Identify the emergency location where this LogSheet is maintained during an emergency (i.e.; Corporate incident Response Center, Materials Dept., Emergency Operations Facility, etc.) 2. Enter the date which this Form is being used. Start a new Log Sheet each day. c 3. Consecutively number each page used each day. 4. Enter the time for each Log entry. Use the 2400 hobr clock to avoid confusion. i S. Clearly record the nameof the individual calling you or whom you are. calling. 6. Record the individuals PGandE Emergency Organization Title or their non PGandE affiliation. 7. Che k the entry activity as to whether the individual called you or you are calling them. c 8. Enter the entire context of the message being communicated. Read back ti)e message to the individual to assure correct copy / transmission. 9. Enter your initials upon completion of each Log Sheet entry. l l l l
s- ~ [ PACsFN ANO ELawirilC COMPANY GGewvEATE """5"'Y RESPOfSE PLAN 90e3 EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET EMERGENCY LOCATION TODAY'S OATE PAGE \\ e (1) (2) (3 TIME ENTERED BY (2400 hrs.) (INITIALS) tai am
SUMMARY
OF ACTIVITY PERFORMED is t s -e e ~ i B N E A" N SEE INSTRUCTIONS ON REVERSE
<m EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET, INSTRUCTIONS Entry Number Instructions 1. Identify the emergency location where this Log Shee* is maintained s during an emergency (i.e.; Corporate incident Response Center, Materials Dept., Emergency Operations Facility, etc.) 2. Enter the date which this form is being used. Start a new Log Sheet each day. / 3. Consecutively number each page used each day. 4. Enter the time foreach Log entry. Use the 2400 hour clock to avoid confusion. 5. Enter a summary of each activity being recorded. 6. Enter your initials upon comple'..;on of each Log Sheet entry. - 6 8
== .w. o = r w ~ PACIFIC GAS AND ELECTRIC COMPANY Rev. 2 CORPORATE EMERGENCY RESPONSE PLAN 8-13-81 IMPLEMENTING PROCEDURE, 7 ~ PROCEDURE 3.2 PUBLIC RELATIONS APPENDIX E-1 EMERGENCY RESPONSE ORGANIZATION PUBLIC RELATIONS DEPARTMENT RELATIONSHIPS .-~, I i 1.._.._..._: g e e ..e
- ,-,j,,,, ;i,,,, l-
- llll
- =,,;.
'g,h. -= ,,,,,,,,,m .u,,:;,;,, .a - l ll ~ ,9 ... _. i.l, ..l -l l: l 1 l , ic i _ l lm-. l l - m.i i m., l ..... ~. - i l.. _.. l i i- - -ia i _... _1 .__i l g l 1 1 . lllll"".:., l ,,,,,,;=,,,,, u j - = = > u,=='=.,.= e i u -..--e,.,...u . -i
==ry- ,,,, ;;;-- j =e. w. =,. u iu, Pa g e 16A o f 30
e_ Rev. 2' 08/13/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE PROCEDURE 3.2 ~ PUBLIC RELATIONS APPENDIX E-2 EMERGENCY PLAN TITET! AND PERSONNEL ASSIGNMENTS NOTIFICATION LIST Effective Date: 01/01/03 Name Home Phone Emergency Plan Title Nonemergency Title Business Phone ~ Corporate Pubite 1. R. H. Miller Information Mngr., Advertising Dept. Coordinator 2. C. G. Poncelet Mngr., Commn. Planning 3. H. N. Peelor Mngr., Public Activities .4edia Center 1. R. P. Davin Representative Sr. Public-Info. Rep. 2. G. C. Sarkisian Prjct. Information Spec. 3. P. M. Zweif'el , Mngr. Community Activities Task Force News Director 1. D. R. Hanes News Director i 2. J. M. Kilbatrick Drctr., Elec. Media 3. R. R. Rutkowski Sr. Public Info.- Rep. L 3 -l Page 17 of 30
v- ~ 08/13/81 PACIFIC GAS AND ELECTRIC COMPANY ~ CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE PROCEDURE 3.2 PUBLIC RELATIONS APPENDIX E-2 (Continued) Effective Date: 01/01/83 Name Home Phone Emergency _ Plan Title Nonemergency Title Business Phone u Interim Public 1. S. G. Brown Infonnation Recovery Sr. Public Info. Rep. Manager 2. G. C. Sarkistan Prjt. Infonnation Spec. 3. P. M. Zweifel ~ Manger, Community Activities Task Force Public Infonnation 1. D. J. Baxter Recovery Manager Mngr., Pub. Infonnation 2. C. H. Peterson Sr. Pub. Info. Rep. 3. S. N. Coffey Public Info. Rep. a Page 18 of 30
~- Rev. 2 08/13/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN-i IMPLEMENTING PROCEDURE ' ~ PROCEDURE 3.2 e PUBLIC RELATIONS APPENDIX E-3 EMERGENCY ORGANIZATION CONTACT LIST Effective Date:- 01/01/83 'Name Emergency Location Emergency Plan Title Normal Business Phone Emergency Phone Recovery Manager
- 1.,J. D. Shiffer I'
~ or ?- 2.,.R. C. Thornberry q L .1 37 h D. Tnwnsend L Corporate Liaison I.,.R. J. McDevitt , CIRC Coordinator -] g 2.,,S. R. Fost_er ) L 3.r T. A. Moulia ) L 4.r. A. Pierce G L-Corporate Technical 1.r J. R. Hnch CIRC and Logistical. ] Coordinator b 2.f M. R. Tresler L _L 3.r. A. Young R t. J ~ Public Infomation 1.r. J. Baxter ,E0F D Recovery Manager. }
- 2., C. H. Peterson L
Page 19 of 30
m Rev. 2 08/13/81 PACIFIC GAS AND ELECTRIC COMPANY, CORPORATE EMERGENCT RESPONSE PLAN IMPLEMENTING PROCE. DURE PROCEDURE 3.2 PUBLIC RELATIONS APPENDIX E-3 (Continued)
- Effective Date: 01/01/83 Name Energency Location Emergency Plan Title Normal Business Phone Emergency Phone a
i Public Infonnation
- 3. _S. N. Coff5y
_J Recovery Manager (co,ntinued) Corporate Governmental 1. G. A. Blanc General Office Relations Coordinator [ ] {
- 2. _R. F. Nichols L.
J
- 3. _J. R. Torrens
) g ~ Radiological 1 7. H. Fujimoto EOF W Emergency Recovery ( L Manager 2. UNASSIGNED ~ 3 4 P. Serpa_ L J '~ Corporate Law 1. P. A. Crane, Jr. General Office Department ] ~ Coo rdinator 2. R. Ohlbach ) L 3.'_R. F. Locke ] Corporate 1. T. R. Ferry General Office ~ Communications l Coordinator L~ ~
- 2.,A. J. Nevolo g
) l 3. C. D. Gilson 1 6 Page 20 of 30
Rev. 2 -08/13/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE. PLAN IMPLEMENTING PROCEDURE PROCEDURE 3.2 PUBLIC RELATIONS APPENDIX E-3 (Continued)' Effective Date: 01/01/83 Name Emergency Location . Emergency Plan Title Normal Business Phone Emergency Phone County Public
- 1.,Duane Lieb EOC Information
[s -{. s Officer
- 2.,- D. L. Ri chter L.
3. Stava Keil 3 L-Technical Advisor f. W'. J. Keyworth EOF to the Public L I nformati og.. = Recovery 2. T. E. Brake ] Manager { Advisor to the ' 1. g. B. Kae fer 'Eg County Emergency ] g. Organization
- 2.,W. J. Keyworth
~ 3. T. E. Brake p c 4.[W.B. Scott ~ -L Media Center 1. R. P. Davin Media Briefing Center Representative { ~
- 2.. G. C. Sarkisian L
3. P_. M. Zweifel L Page El of 30
Rev. 2 08/13/81 PACIFIC, GAS AND ELECTRIC COMPANY . CORPORATE EMERGENCY RESPONSE PLAN , ~. IMPLDIENTING PROCEDURE s PROCEDURE 3.2 PUBLIC RELATIONS APPENDIX E-3 (Continued) Effective Da'te: 01/01/83 ~ Name Energency Location Emergency Plan Title Normal Business Phone Emergency Phone 1. R. H. Miller IGeneral Office Corporate Ptblic Information {' 1 s Coo rdinator ~ 2. C. G. Poncelet [' 3
- 3.,H. N. Peelor L
7 Corporate 1. D. L. - Kennady Los Padres District Off. Division [~ -] Coordinator 2. B. McCloskey [ [" ,) 3., R. J. McKell L 3 s 4. Alternate Number Morro Bay Switching Cntr. Morro Bay Switching Center t Onsite Attorney 1. O F. Locke EOF (ifassigned) { } ~
- 2.,D. G. Lubbock
~ 1 3._ D. A. Oglesby L Technical' Advisor 1. B. E. Thinger SF Media' Center ~ to the News Director } { }
- 2.p & W. Medcalf
~ 3. UNASSIGNED Page 22 of 30
+ b e PACIFIC GAS AND ELECTRIC COMPANY EMERGENCY LOCATION TODAY'S DATE ' AGE, pg.g CORFOHATE EMERGENCY RESPONSE Pl.AN 3 EMERGENCY COMMUNICATIONS LOG SHEET / e f s tu TIME NAME m. (# ACTIVITY * (2400 hrs.) ist + NE (7) ,s /, 43 EMERGENCY TITLE OR AFFILIATION N (ep CALLED CALUNG MESSAGE te e f , l s i g i f w t i 4 e t e l l i, I l s s f t 6948418182) Rev. 00 SEE INETRUCTIONE O d REVERSE
EMERGENCY COMMUNICATIONS LOG SHEET INSTRUCTIONS ~ Entry Number Instructions ~ 1. Identify the emergency location where this LogSheet is maintained during an emergency (i.e.; Corporate incident Response Center, Materials Dept., Emergency Operations Facility, etc.) 2. Enter the date which this Form is being used. Start a new Log Sheet each day. 3. Consecutively number each page used each day. 4. Enter the time for each Log entry. Use the 240d hour clock to avoid confusion. 5. Clearly record the name of the individual calling you or whom you are calling. 6. Record the individuals PGandE Emergency Organization T"itle or their non PGandE affiliation. 7. Che k the entry activity as to whether the individual called you or you are calling them. c e 8. Enter the entire context of the message being communicated. ' Read back the message to the - individual to assure correct copy / transmission. Enter your initials h completion of each Log Sheet entry. 9. 4 C ( ,8 .) ..s c ^
v- ,o .r, PACIFICTAS AND ELECTR6C COMPANY CORPORATE EMERGENCY RESPONSE PLAN, EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET EMERGENCY LOCATION TOOAY'S OATE PAGE (~ (1) (2) (I TIME ENTERED BY (2400 hrs.) (INITIALS) u) (s)
SUMMARY
OF ACTIVITY PERFORMED (a l 1 1 I I l l 8946 (8/s2) Rev. 00 SF.E INSTRUCTlONS ON REVERSI. i
v ~- ~ d. r s EMERGENCY RESPONSE AND RECOVERY ACTIVITIES t.00 SNEET - INSTRUCTIONS Entry
- Number instructions 1.
Identify the emergency location where this Log Sheet is maintained during an emergency (i.e.; Corporate incident Response Center, Materials Dept., Emergency Operations Facility, etc.) 2. Enter the date which this form is being used. Start a new Log Sheet each day. 3. Consecutively number each page used each day.- 4. Enter the time for each Log entry. Use the 2400 hour clock to avoid confusion. 5. Enter a summary of each activity being recorded. 6. Enter your initials upon complation of each Log Sheet entry. ~ ~ 1 e w' m
q Rev. 1 ~ 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY ~ CORPORATE EMERGENCY RESPONSE PLAN 3 IMPLEMENTING PROCEDURE O PR0bEDURE 3.3 LAW APPENDIX E-2. EMERGENCY PLAN TITLES AND PERSONNEL ASSIGNMENTS IOTIFICATION LIST Effective Date: 01/01/83 Name Home Pho'ne Emergency Plan Title Nonemergency Title Business Phone Corporate Law 1. P. A. C ra nc, J r. ( Depar.tment Assistant General Coordinator Counsel 2. R. Ohlbach Vice President and General Attorney 3. R. F. Locke Senior Counsel Onsite Attorney 1. R. F. Locke (if assigned) Senior Counsel E. D. G. Lubbock Senior Counsel 3. D. A. Oglesby Senior Counsel Law Department 1. R. J. Peters Staff Members Attorney ~ 2. J. A. Shaffer Attorney
- Confidential number.
Establish contact through Communications P8X Operator at (415)781-2893. Page 9 of 18
u Rey, f 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY CORF0PATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE PROCEDURE 3.3 LAW PP5N0!X E-2 (Continued) EffectiveDIte: 01/01/83 Name Home Phone . Emergency Plan Title Nonemergency Title Business Phone Law Departaent 3.. UNASSGINED Staff Members 4. UNASSIGNED 5. UNASSIGNED 6. UNASSIGNED 5 California Public 1. J. E: Bryson. i Utilities Canmission President, CPUC 2. J. E. Bodovitz Executive Director, CPUC j 3. J. E. Kerr General Counsel, CPUC = Page 10 of 18
u m e ..Rev. 1 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN - IMPLEMENTI.NG PROCEDURE Pf'CCEDURE 3.3 LAW APPENDIX E-3 EMERGENCY ORGANIZATION CONTACT LIST Effective Date: 01/01/83 Name Emergency Location Emergency Plan Title Normal Business Phone Emergency Phone Recovery Manager 1.r _. D. shiffer 3 J EOF 2. R. C. Thornberry J u
- 3.,J. D. Townsend
') o Corporate Liaison
- 1.,R. J. McDevitt CIRC
'] Coordinator g .o 2. S. R. Foster c. . _3 L
- 3.,,T. A. Moulia
. ]
- 4.. G. A. Pierce
] Corporate Ptblic 1. R. H. Miller General Office Information ] '. G. Poncelet Coo rdinator ~ 2. C ) ~ ~ ~3. H. N. Peelor a Corporate Safety, 1. 'B. P. Sadler General Office Health and Claims ] Coo rdinator [ 2. A. L. Bechtold [~ 3 Page 11 of 18
~,, .u Rev. 1 PACIFLC GAS AND ELECTRIC COMPANY CORPORATE EMERGENtY RESP.GdSE PLAN IMPLEMENTING PROCEDURE PROCEDURE 3.3 LAW APPENDIX E-3 (Continued). Effective Date: 01/01/83 Name Emergency Location Emergency Plan Title Normal Business Phone Emergency Phone ~ Corporate Safety, 3. C. W. Allen Health and Claims 3 g Coo rdinator (continued) Corporate Insurance 1. W. P. Noone fGeneral Office ~ Cecrdinator [' 3 L
- 2. sR. M. Reider 3
u 3. C. A. Lewis e-b Public Information-1. D. J. Baxter E0F Recovery Manager ] .i ~ ' ' ~ 2. C. H. Peterson J
- 3.,S. N. Coffey
] L Page 12 of 18 1
s PACIFIC GAS AND ELECT IC COMPANY EMERGENCY LOCATION pg.g COMPOAATE EMERGENCY RESPONSE PLAN TOOAY'S DATE ' AGE EMERGENCY COMMUNICATIONS LOG SHEET TIME NAME ta is (u Acnv3yy (2400IwsJ 181 e-WWTEREDm 17) EMERGENCY TITLE OR AFFILIATION N IU tes cAtteo CALuMG MESSAGE tot t. i i e i. e 4 1 i som taisa n.oo sEE esesTauCTiOsss O e mEvansE
< -; J ' I l l s's E_MERGENCY COMMUNICATIONS LOG SHEET _ INSTRUCTIONS Entry instructions _ Number Identify the emergency location where this LogSheet is maintained during an emergency Facility, etc.) (i.e.; Corporate incident Response Center, Materials Dept., Emergency Operations 1. ,{ li. Enter the date which this Form is being used. Start a new Log Sheet eai:h day. n-2. Consecutively number each page used each day.- 3. Enter the time for each Log entry. Use the 2400 hour clock to avoid confusion., 4. Clearly record the name of the individual calling you or whom you are calling. 5. E affiliation. J Record the individuals PGandE Emergency Organization Title or their non PGand 6. i h ck the entry activity as to whether the' individual called you or you are call ng t em. 7. Che e 5 Enter the entire context of the message being communicated. Read back th 6 4 individual to assure correct copy / transmission. 8. Enter your initials upon completion of each Log Sheet entry. 9. i. i n i b l-
a e, 4 + PIEIFICTAE AND'ELEf7RIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN POwB i
- EMER'GENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET EMERGENCY 1.OCATION TODAY'S DATE PAGE (1) e (2)
(3) TIME ENTERED BY 12400 tws.) (INITIALS) ui (s)
SUMMARY
OF ACTIVITY PERFORMED ~ ' tai s i l 4 { 81NM5 48/82) R w.00 ggt IISTRUCTIONE ON REVER51; w, ---r
o ~ n r\\ W EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET ~ INSTRUCTIONS Entry Number Instructions ~ 1. Identify the emergency location where this Log Sheet is maintained during an emergency (i.e.; Corporate incident Response Center, Materials Dept., Emergency Operations Facility, etc.) 2. Enter the date which this form is being used. Start anew Log Sheet each day. 3. Consecutively number each page used each day. r 4. Enter the time for each Log entry. Use the 2400 hour clock to avoid confusion. 5. Enter a summary of each activity being recorded. 6. Enter your initials upon completion of each Log Sheet entry. i
m c .1 Rev. I 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE , PRDCEDURE 3.4 s INSURANCE APPENDIX E-2 EMERGENCY PLAN TITLES AND PfKSONNEL ASSIGNMENTS NOTIFICATION LIST Effective Date: 01/01/83 Name Home Phone Emergency Plan Title Nonocergency Title Business Phone Corporate Insurance 1. W. P. Noone Coordinator Manager of Insurance 2. R. M. Reider Director, Insurance Administration 3. C. A. Lewis Coorainator of Prop-erty Loss. Con trol Coordinator of Property 1. C. h. Lewis Loss Control Coordinator of Prop-erty Loss Control 2. UNASSIGNED 3. B. J.'Casey Assistant Insurance Ana lyst ' Coordinator of 1. R. M. Reider Insurance Director, Insurance - Administration Administration 2. B. J. Casey Assistant Insurance Analyst 3. C. A. Lewis Coordinator of Property loss Control Page 10 of 19
~ Rev. 1 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY CORP. ORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE PROCECURE 3.4 INSURANCE AP'PENDIX E-2 (Ccntinued) Effective Date: 01/01/83 Name Home Phone Emergency Plan Title Nonemergency Title Business Phone NHL/ Marsh and McLennan 1. Quentin Jackson General Mgr. Nuclear Mutual Limited 2. D. F. Brown 1 Fire / Extended Coverage ( Loss Control Supervisor 3. J. Mra s Loss Adjustment Supervisor m Page 11 of 19
. Rev. 1 - - 05/01/81 PACIFIC GAS ANU ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEllENTING PROCEDURE PROCEDURE,3.4 s IllSURANCE APPENDIX E-3 EMERGEllCY ORGANIZATION CONTACT LIST Effective Date: 01/01/83 Name Energency Location ' - Emergency Plan Title Normal Business Phone Emergency Phone Recovery Manager
- 1. pJ. D. Shiffer fEOF L-3 L
J 2. R C. Thornberry J g 3. J. n Town <gnd e n Corporate Liaison 1. R. J. McDevitt . CIRC Coordinator { 3 L
- 2., S. R. Foster
- ]
- 3.,T. A. Moulia 3
m 4. G. A. Pierce p ~) 6 Corporate Public 1. R. H. Miller General Office Information ] g Coo rdinator 2. C. G. Poncelet C- ]
- 3.,,H. N. Peelor
) Corporate Safety,
- 1.,8. P. Sadler General Office Health and Claims
} Coordinator A. L. Bechtold 2. r i 3. C. W. Allen e 6 Pagy 1. cf '.f
m F.cv. 1 05/01/81-PACIFIC GAS AND ELECTRIC. COMPANY - CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE , PROCEDURE 3.4 INSURANCE APPENDIX E-3 (Continued) Effective Date: 01/01/83 Name Emergency location Emergency Plan Title Normal Business Phone Emergency Phone Corporate Law
- 1. _P. A. C ra ne, J r.
heneral Office _ ~ Department ] Coordinator b 2. R. Ohlbach L l 3. R. F. Locke _J Department { fGeneralOffice Accounting 1. .. D. Lee ] ~ 2. UNASSIGNED 3. UNASSIGNED Page 13 of 19
6 Y "~ \\ 1) PACIFIC GAS ANO ELECTRIC COMPANY EMERGENCY LOCATION pg,3 CORPORATE EMERGENCY RESPONSE PLAN TOOAY1 DATE ' AGE EMERGENCY COMMUNICATIONS LOG SHEET pl (a tm TIME NAME ACTIVITY (2400 hrs.) (El WHEBED m 17) egnaam gg EMERGENCY TITLE OR AFFILIATION i e 3 e I = e e e t 8 i 4 69084 (8/87) Rev. 00 SEE INSTRUCTIO88 O e IlEVERSE S e
t ( pm mmw nummmmmaeeenaan t.no aHEaT INateMpt276DNS Entry Number Instructions 1 Identify the emergency k) cation where this LogSheet is maintained during an emergency (i.e.; Corporate incident Response Center Materials Dept., Emergency Operations Facility, etc.) i s-2. Enter the date which this Form is being uJed. Start a new Log Sheet each day. 3. Consecutively number each page used each day. ~ 4. Enter the time for each Log entry. Use the 2400 hour clock to avoid confusion. t ~ 5. Clearly record the name of the individual calling you or whom you are calling. l 6. Record the individuals PGandE Emergency Organization Title or their non PGandE affiliation. I l l 7. Che k the entry activity as to whether the individual called you or you are calling them. ~ c l e 1 8. Enter the entire context of the message being communicated. Read back the message to the individual to assure correct copy / transmission. 9. Enter your initia'Is upon completion of each Log Sheet entry. s e r i 8
-g CORPORATE EMERGENCY RESPONSE PLAN PACIFIC GAS AND ELECTRIC COMPANY Pows EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET EMERGENCY LOCATION TOOAY'S DATE PAGE (1) 12) (3) TIME ENTERED BY (2400 sws.) (INITIAL 5) (4) (si
SUMMARY
OF ACTIVITY PERFORMED (si b e 9 4, e 4 esass (s/s2) Rw.oo sat - m'CTION5 ON REVEr.8Y
= e EMERGENCY RESPONSE 'AND RECOVEMY ACTIVITIES LOG SHEET INSTRUCTIONS. Entry. Number instructions 1.' identify the emergency location where this Log Sheet is maintained during an emergency (i.e.; Corporate incident Response Center, Materials Dept., Emergency Operations Facility, etc.) 2. Enter the date which this form is being used. Start a new Log Sheet each day. 3. Consecutively number each page used each day. 4. Enter the time for each Log entry. Use the 2400 hour clock to avoid confusion. ~ 5. Enter a summary of each ac,tivity being recorded. 6. Enter your initials upon completion of each Log Sheet entry. f ~ f ~ l O e i
7 '] Rev. 1 ~ 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE PROCEDURE 3.5, s SAFETY, HEALTH, AND CLAIMS APPENDIX E-2 EMERGENCY PLAN TITLES AND PERSONNEL ASSIGNMENTS NOTIFICATION LIST Effective Date: 01/01/83 Name Hane Phone Emergency Plan Title Nonemergency Title Business Phone Corporate Safety, 1. B. P. 'Sadler Health, and Claims Manager, Safety, Coo rdinator Health, and Claims 2. A. L. Rechtold Senior Attorney 3. C. W.' Allen Attorney 4. J. C. Vocke Attorney Director - Safety 1. R. D. Fagg Engineering Director, Safety Engineering 2. R. W. Hall Supervisor, Safety Engineering 3. M. W. Johnson Supervisor, Safety Engineering 4. P. C. Boe ttcher Supervisor, Safety Engineering Senior Claims 1. A. L. Bechtold Attorney Senior Attorney J Page 15 of 25
m ~ ~~ ] ~ Rev. 1 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCE. DURE _ PROCEDURE 3.5 i . SAFETY, HEALTH, AND CLAIMS l ~ ' APPENDIX E-2 (Continued) Effective Date: 01/01/83 Name Home Phone Emergency Plan Title Nonemergency Title Business Phone Senior Claims 2. J. C. Vocke Attorney Attorney ~ (continued) 3. C.' W. All en Attorney 4. M. Jonas Attorney Senior Health 1. H. W. Reynolds Physicist Senior Health Physicist 2. P. C. Boettcher Supervisor, Safety Engineering Senior Claims 1. E. A. Giudici Investigator Senior Claims Invest.igator 2. D. G. Keeler Casualty Claims Supervisor ~ 3. J. C. Echols Senior Casualty Claims Supervisor 4. R. Wetzel Senior Claims ' Investigator j Page 16 of 25
~ ~ ~ Rev. 1 05/01/81 ~ PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCE, DURE ' PROCEDURE 3.5 s SAFETY, HEALTH, AND CLAIMS APPENDIX E-2 (Continued) ' Effective Date: 01/01/83 ^ Name Home Phone Emergency Plan Title fionemergency Title Business Phone Claims Attorney 1. J. C. Vocke Attorney 2. 'C. W. All en Attorney 3. M. C. Dolan Attorney 4. 'M. Jonas Attorney Field Claims 1. C. 0. Schreil Investigator Claims Investigator , (San Luis Obispo) 2. T. F. Morris Claims investigator (Fresno) 3. S. P. Robison Claims Investigator (San Jose) 4. .E. Fortner Claims Investigator (Stockton) J ( Page 17 of 25
u Rev. 1 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE . PROCEDURE 3.5 SAFETY, HEALTH, Afd0 CLAIMS APPEtl0IX E-2 (Continued) Effective Date: 01/01/83 Nam'e Hone Phone Emergency Plan Title Nonemergency Title Business Phone ~ Senior Fire 1. W. S. Garrett Protection Senior Fire Protec-Engineer tion Engineer 2. L. L. McCune Senior Safety Specialist Safety Coordinator . 1. 'J. L. Frazier Safety Engineering Representative 2. M. W. Johnson Supervising, Safety Engineering 3. M. J. Johnson Safety Specialist 4. R. J.'Delucchi Safety Engineering Representative i American Nuclear Insurers Hospitals 1. French Hospital (San Lui s Obispo) 2. St. Francis Hospital (San Francisco), Page 18 of 25
c. .v v - Rev. 1 05/01/81
- l PACIFIC GAS AND. ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE i
PROCEDURE 3.5 SAFETY, HEALTH, AND CLAIMS APPENDIX E-3 EMERGENCY ORGANIZATION CONTACT LIST . Effective Date: 01/01/83 Emergency locattor$ Name Emergency Plan Title Normal Business Phon _e Emergency Phone Recovery Manager
- 1. _J. D. Shiffer hnr
] _3 L-u s 2. R, C. Thornberry 3 s
- 3.,J. D. Townsend
] L Corporate Lia'ison 1. R. J. Menavitt h~!RC Coordinator -] R. Foster
- 2., Sg
_3 6 1 3. T. A. Moulia 3 L 4. G; A. Pierce 3 Corporate 1. W. P. Noone heneral Office Insurance { ] g Coordinator 2. R. M. Reider ) ~ L 3.;C.A. Lewis _3 u Corporate Law
- 1., P. A._ Cra ne, J r.
heneral Offica Department ] Coo rdinator k 2. R Ohlbach ) 6
- 3.,R. F. Locke
) -~ L Page 19 of 25
T I t i j' - i I t 4 I s a i 1 I i 1-t I a t ) c 4 l i i 0 3 i 1 ? ki t J i' i i fi 1 l i. f I i E 1i J I ). f' 1 e i k. i I; f i-d 1 J .f.
s *. I Wg Dg g Mg g Mg fBg E G A n 9 i E TA D S Y' A O O n T' i I 6 / N s O I T A C O L i YCN E G R E M o E t i TE e EH Y T S I W N G T A O C Y L NP L A A E S P S MN N ) y OO O g CP I S C T I E RR A T Y C N e O C t C I LN N T E E U A E G I D R M NE M IL F AM F O A SE A E C R GT Y O CA E R C I L FI O N IT CP E T AR POG Y C R C E N E E M M G E A R N E 0 M E 0 v l e E R ( ) 2 ) 8 .s /8 r g E h ( M0 46 0 1 I g T4 4 2 9 g 6 p ( g
EMERGENCY COMMUNICATIONS LOG SHEET INSTRUCTIONS i ~ Entry Number Instructions 1. Identify the emergency location where this LogSheet is maintained during an emergency (i.e.; Corporate incident Response Center, Materials Dept., Emergency Operations Facility, etc.) \\ Enter the date which this Form is being used. Start a new Log Sheet each' day. 2. 3. Consecutively number each page used each day. 4. Enter the time'for each Log entry. Use the 2400 hour clock to avoid confusion. i 5. Clearly record the name of the individual calling you or whom you are calling. I
- s 6.
Record the individuals PGandE Emergency Organization Title or their non PGandE affiliation. Che k the entry activity as to w'hether the, individual called you or you are cilling them. 7. c t 8. Enter the entire context of the message being communicated. Read back the message to the individual to assure correct copy / transmission. 9. Enter your initials upon completion of each Log Sheet entry. 4 P
o .. s. FKflFICCAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN POes EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET EMER4ENCY LOCATION 700AY'S DATE PAGE n ~ str - tai im TIME ENTERED BY (2400 hesj llNITIALS se tai
SUMMARY
OF ACTIVITY PERFORMED tm 4a4 { e t \\ N MI A" # SEE INSTRUCTIONS ON REVERSE
r C /p EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET . INSTRUCTIONS .y Entry Number Instructions b 1. Identify the emergency location where this Log Sheet is maintained during an emergency (i.e.; Corporate Incident Response Center, Materials Dept., Emergency Operations Facility, etc.) 2. Enter the date which this form is being used. Start a new Log Sheet each day. ~ 3. Consecutively number each pa'ge used each day. T 4. Enter the time for each Log entry. Use the 2400 hour clock to avoid j confus, ion. 5. Enter a summary of each activity being recorded. l 6. Enter your initials upon completion of each Log Sheet entry.. = l v, ~J i 9
3 .,v. .~. s o PACIFIC GAS AND ELECTRIC COMPANY Re v. 1 CORPORATE EMERGENCY RESPONSE PLAN 05/01/81 <^-s IMPLEMENTING PROCEDURE I e J J PROCEDURE 3.6 SECURIC APPENDIX E-1 EMERGENCY RESPONSE ORGANIZATION, CORPORATE SECURITY DEPARTMENT RELATIONSHIPS RECOVEks
- MAhACEh (LOf )
/ CCEPAATE LI AISs%I COORCINATCP (CIRC) -.q COaPGAATL h!TE CH s RATL SECUh17Y SkWhtTY jf[h COORCINATOR SUILRVISCR CO'6CIhAN D (CENEkAL OtFICE) s t h.*) UJhE E Of6 ICE) } i. n BUILDING CLhKMTE Shah:TY oNSITE SECLAITY REPRESENTATIVE KJ RErkESEh"FATIVES PEkh6NNEL SurERv! Son CONT uCT SECURITY (GENEhAL CITICE 6 REPPESLNTAT!vE (CENEAAL OFFICE) ISAN LIIIS 091$f0) SAN LUIS OSISFO) (CIABLO CANYOf) ..i l g-.. I i. SAN LUIS OBISPO COUNTY SHERITr*$ orTICE Legand1 Line Authority Coordination - -.- Corporate Security Department Personnel OSC - Operational Support Center CIRC - Corporate Incident Response Ce'nter Ect' - Ipergency Operations Facality 1, Page 11 of 32
Rev. 1 05/01/81.* PACIFIC GAS AND EldCTRIC COMPAN'Y CORPORATE EMERGENCY RESPONSE PLAN ~ IMPLEMENTING PROCEDURE PROCEDURE 3.6 SECURITY ~ APPENDIX E-2 EMERGENCY PLAN TITLES AND PERSONNEL ASSIGNMENTS NOTIFICATION LIST Effective Date: 01/01/83 Name Ho[ne Phone Emergency Plan Titia Nonemergency Title . Business Phone Corporate Security 1. L. H. Shaffer Coordinator Director of Security 2. J. R. Van Schaick Supervising Securi-ty . Representative 3. R. Dunleavy Senior Security Representative. Security 1. V. Dettman Representatives Securi ty Representative 2. M. Person Security Representative 3. J. Nichols Security Representative 4. L. Lawrence Security Representative 5. L. Adams Securi ty Representative 6. F. C. Kobely Security Representative Page 12 of 32 l-
v ~ Rev. 1 05/01/81 PACIFIC GAS AF.0 ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE ~ (..,. PROCEDURE 3.6 SECURITY ~ ' APPENDIX E-2 (Continued) Effective Date: 01/01'/83 Name Home Phone Emergency Plan Title Nonemergency Title Business Phone 3 San Luis Obispo 1. Sheriff's Operations County Sheriff's
- Facility Office Buildirig Security 1.
R. J. Eiden Supervisor Security Supervisor 2. A. Jinkerson A_dministrative Assistant 3. R. D. Manning Mngr. Building Administrative w Services Department Page 13 of 32
~, v Rev. 1 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE r-e' PROCEDURE 3.6 SECURITY APPENDIX E-3 EMERGENCY ORGANIZATION CONTACT LIST Effective Date: 01/01/83 Name Emergency Location Emergency Plan Title Normal Business Phone Emergency Phone ~ Recovery Manager
- 1.,J. D. Shiffer EOF
'l L ]
- 2. _R. C. Thornberry 6
~ 3' 3. J. D. Townsend Corporate Liaison 1. R. J. McDevitt .{ CIRC "~ Coordinator } t 2. S. R. Foster e-L
- 3..T. A. Moulia J
~
- 4.. G. A. Pierce d
Site Security 1. L. G. Lunsford OSC Supervisor ] { ~ 2. R. G. Todaro ~ J 3. UNASSIGNED Corporate Personnel 1. H. S. Pitner General Office Relations Coordinator L [,
- 2., T. J. Wal sh, Jr.
) L 3. T. J. Zimbrick L ] Page 14 of 32
s' ~ PACIFIC GAS AN6 ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE PROCEDURE 3.6 SECURITY APP 5NDIX E-3 (Continued) Effective Date: 01/01/83 Name Energency Location Emergency Plan Title Normal Business Phone Emergency Phone Onsite Personnel 1. D. Okabayashi [dSC Representative ] L 2. _L. _ Campbell L 3 1 Page 15 of 32 rn - w
c.. s hv. 1 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY - l CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE p-PROCEDURE 3.6 SECURITY -- APPENDIX E-4 PRESCREENED RESPONSE PLAN PE_R_SONNEL LIST i Effective Date: 11/24/80 Name ID No. Department e.+ 9 + = = ** ase em 0 6 PAGE 16 0F 32
.v v ,~ 0$f61f8k ~ PACIFIC GAS AND ELECTRIC COMPANY CORPORATE D1ERGENCY RESPONSE PLAN ~ IMPLEMENTING PROCEDURE. PROCEDUAE 3.6 SECURITY APPENDIX E-5 RESTRICTED ACCESS AUTHORIZATION LIST Effective Date: 12/01/82 A. The ON DUTY Corporate Em'ergency Response Organization (CERO) personnel who are a authorized to make on-the-spot changes to this Restricted Access List are: ~ 1. Member of Corporate Administrative Suy' port Coordina' tor's Staff at Guards Table, 14th Floor 77 Beale Streeti ' 2. Corporate Liaison Coordinator [. 3. Corporate Emergency Coordinator; B. Restricted Personnel Access Authorization List (*means CERO member): CIRC BADGE ISSUED NAME DEPARTMENT YES NO THE INFORMATION ON THIS PAGE AND ALL SUCCESSIVE PAGES FOR THIS IMPLEMENTING PROCEDURE ATTACHMENT IS ON FILE WITH THE CORPORATE SECURITY COORDINATOR. Page 17 of 32
Rev. 1 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE (-~, PROCEDURE 3.6 SECURITY APPENDIX E-5 RESTRICTED ACCESS AUTHORIZATION LIST Effective Date: 12/01/82 B. Restrictbd Personnel Access Authorization List (Cont'd.) (*means CERO member): CIRC BADGE ISSUED NAME DEPARTMENT YES NO l l l THE INFORMATION ON THIS PAGE AND ALL SUCCESSIVE PAGES FOR THIS IMPLEMENTING PROCEDURE ATTACHMENT IS ON FILE WITH THE CORPORATE SECURITY COORDINATOR.. Page 18 of 32
p 'Rev. 1 ~ 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE 3 ~ s PROCEDURE 3.6 SECURITY APPENDIX E-5 RESTRICTED ACCESS AUTHORIZATION LIST. Effective Date: 12/01/82 ' B. Restricted Personnel Access Authorization List (Cont'd.) (*means CERO member): . CIRC BADGE ISSUED NAME DEPARTMENT YES NO THE INFORMATION ON THIS PAGE AND ALL SUCCESSIVE ~ PAGES FOR THIS IMPLEMENTING PROCEDURE ATTACHMENT IS ON FILE WITH THE CORPORATE SECURITY. COORDINATOR. l l i Page 19 of 32 l s
--~,, -.. s. Rev. 1 05/01/81' ~ PACIFIC GAS AND ELECTRIC COMPANY ~ CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE PROCEDURE 3.6 SECURITY APPENDIX E-5 RESTRICTED ACCESS AUTHORIZATION LIST Effective Date: I':/01/82 'B. Restricted Personnel Access Authorization List (Cont'd.),(*means CERO member): CIRC SADGE ISSUED NAME DEPARTMENT YES NO o THE INFORMATION ON THIS PAGE AND ALL SUCCESSIVE PAGES FOR THIS IMPLEMENTING PROCEDURE ATTACHMENT IS ON FILE WITH THE CORPORATE SECURITY C00RCINATOR. i ,Page 20 of 32
r-s Rev. 1 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE ,s PROCEDURE 3.6 SECURITY APPENDIX E-5 RESTRICTED ACCESS AUTHORIZATION LIST Effective Date: 12/01/8'2 B. Restricted Personnel Access Authorization List (Cont'd.) (*means CERO member): CIRC BADGE ISSUED . NAME DEPARTMENT YES NO \\ s i THE INFORMATION ON THIS PAGE AND ALL SUCCESSIVE PAGES FOR THIS IMPLEMENTING PROCEDURE ATTACHMENT IS ON FILE WITH THE CORPORATE SECURITY COORDINATOR. Page 21 of 32
] ~ ~ ~ 'Rev. 1 05/01/81-PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN' IMPLEMENTING PROCEDURE (, PROCEDURE 3.6 SECURITY APPENDIX E-5 RESTRICTED ACCESS AUTHORIZATION LIST Effective Date: 12/01/82 B. Restricted Personnel Access Authorization. List (Cont'd.) (*means' CERO member): CIRC BADGE ISSUED NAME DEPARTMENT YES NO 1 W THE INFORMATION ON THIS PAGE AND ALL SUCCESSIVE ~ PAGES FOR THIS IMPLEMENTING PROCEDURE ATTACHMENT IS ON FILE WITH THE CORPORATE SECURITY COORDINATOR.. I._ Page 22 of 32
7 ~ g 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE (- '- PROCEDURE 3.6 SECURITY APPENDIX E-5 RESTRICTED ACCESS AUTHORIZATION LIST Effective Date: 12/01/82 B. Restricted Personnel Access Authorization List (Cont'd.) (*means CERO member): CIRC BADGE ISSUED - NAME DEPARTMENT YES NO s THEINFORMATIONONTHISPdGEANDALLSUCCESSIVE ~ PAGES FOR THIS IMPLEMENTING PROCEDURE ATTACHMENT j IS ON FILE WITH THE CORPORATE SECURITY COORDINATOR. 1 Page 23 of 32
.= Rev. 1 05/01/81 PACIF.IC GAS AND ELECTRIC COMPANY . CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE ',.~ ~ . PROCEDURE 3.6 s SECURITY APPENDIX E-5 RESTRICTED ACCESS AUTHORIZATION LIST Effective Date: 12/01/82 B. Restrictid Personnel Access Authorization List (Cont'd.) (*means CERO member): CIRC BADGE ISSUED NAME DEPARTMENT YES NO ' THE INFORMATION ON THIS PAGE AND ALL SUCCESSIVE PAGES FOR THIS IMPLEMENTING PROCEDURE ATTACHMENT IS ON FILE WITH THE CORPORATE SECURITY COORDINATOR. l l h Page 24 of 32
..v. Rev. 1 05/01/81 ~ PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE ~ PROCEDORE 3.6 SECURITY APPENDIX E-5 RESTRICTED ACCESS AUTHORIZATION LIST i ~ Effective Date: 12/01/82 B. Restricted Personnel Access Authorization List (Cont'd.) (*means CERO member): ' CIRC BADGE ISSUED NAME DEPARTMENT YES NO THE INFORMATION ON THIS PAGE AND ALL SUCCESSIVE I PAGES FOR THIS IMPLEMENTING PROCEDURE ATTACHMENT i IS ON FILE WITH THE CORPORATE SECURITY COORDINATOR. Page 25 of 32 ,1
.o Rev. 1-05/01/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN ' (~'._ i IMPLEMENTING PROCEDURE s PROCEDURE 3.6 e SECURITY APPENDIX E-5 RESTRICTED ACCESS AUTHORIZATION LIST Effective Date: 12/01/82 B'. Restricted Personnel Access Authorization List (Cont'd.) (*means CERO member): CIRC BADGE ISSUED NAME DEPARTMENT YES NO THE INFORMATION ON THIS PAGE AND'ALL SUCCESSIVE PAGES FOR THIS IMPLEMENTING PROCEDURE ATTACHMENT IS ON FILE WITH THE-CORPORATE SECURITY COORDINATOR. 1. i Page 26 of 32 i
j O e E M S l R Du E Es B V En E t e e R BD E 4 G O ) A s E ti s ON IT E T C A U D RT S E 'Y N I A D E = E O a S T t = i N O I T A e. CO L YCN E G R ) EM i E n T E EH Y T S IV N G IT A O C Y L NP L A A E S P S MN N )7 OO O ( CP I S C T E IRR A T Y C N 4 O C C I N N T E I L E U A E G I D R M L I NE M F AM F SE O A A E C R GT CA Y O E R C I L F ON T ICP I AR E T POG Y CR C E N E E M M G E A R N EM M. j E v 9 eR 4 ) l 2 a 4 g E h (9 M0 m 6 0 IT42 4 9 1 g 8 i
g, PACIFIC GAS ANO ELECTRIC COMPANY COswvsATE EMERGENCY RESPONSE PLAN EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET f'- - EMERGENCY LOCATION TODAY'S DATE PAGE (1) (2) (3) TIME , (2400 hrs.) ENTERED BY (INITIALS)
SUMMARY
OF ACTIVITY PERFORMED (en (4
(s) o m
u
'd w oes Jai to assure correct copy /transmissi'on.
t e
9.
Enter your initialt upon completion of each Log Sheet entry.
b d
1 V
-d g
FIL'TFTCGAS ANO ELBCTRIC COMPANY CORPORATE EMERGENC,Y RESPONSE PLAN -
POe5 EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG 3HEET EMERGENCY LOCATION TOOAY'S DATE PAGE (1)
(2)
(3)
ENTERED BY TIME tam hm.)
.4tNITIALS) te (si
SUMMARY
OF ACTIVITY PERFORMED tai l ~ r. e 4
- 486 (8/82) Rev. 00 SEE 4NSTRUCTIONE ON REVER5L
,,,n .-_.-y e.
c. " ~ ') EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET INSTRUCTIONS Entry Number Instructions 1. Identify the emergency location where this Log Sheet is maintained during an emergency (i.e.; Corporate incident Response Center, Materials Dept., Emergency Operations Facility, etc.) ~ 2. Enter the date which this form is being used. Start a new Log Sheet each day. 3. Consecutively number each page used each day. 4. Enter the time for each Log entry. Use the 2400 hour clock to avoid confusion. 5. Enter a summary of each activity oeing recorded. 6. Enter your initials upon completion of each Log Sheet entry. 6 a m a.ae aw.
.v. e Rev. 2 08/08/81 PACIFIC GAS AND ELECTRIC COMPAN.Y ~ CORPORATE EMERGENCY RESPONSE PLAN (~' IMPLEMENTING PROCEDURE PROCEDURE 4.3 RADIOLOGICAL ANALYSIS AND PROTECTION APPENDIX E_1
- EMERGENCY RESPONSE ORGANIZATION, RADIOLOGICAL ANALYSIS AND PROTECTION RELATIONSHIPS e
_.3 l l [____ __ __ ______ :i._ _ ___,.__ __ ____ ~} . i '"4' ","g" lr l l g l t, [I i i - { ._= _ =, j i:, i I i lll . =......1 ~gr -j,____________- =,,,,;.
- r,..,,
-
- l.;::,,
l l = = > l l l 1.________.. l l l ______3 i i ._4. .,= l =:=- j i l 1 i I L d.. -, l! l I "."r L== I u. - j _..
- i. _.. _..
.....i mi n. 7 l -i .,..i., ,r,,, .e. 1c":. e.. i l l t ~s Page 13 of 25
.FWy.'2 08/08/81 PACIFIC GAS AND ELECTRIC C0t1PANY. CORPORATE EMERGENCY RESPONSE PLAN I-,. IMPLF'AENTING PROCEDURE s PROCEDURE 4.3 RADIOLOGICAL ANALYSIS AND PROTECTION ~* APPENDIX E-2 EMERGENCY PLAN TITLES AND PERSONNEL ASSIGNMENTS NOTIFICATION LIST Effective Date: 01/01/83 Name Home Phone Emergency Plan Title Nonemergency Title Business Phone ~ Radiological Emergency l'. W. H. Fujimoto Recovery Manager Supervising Nuclear Generacion Engineer 2. UNASSIGNED 3. D. P. Serpa Sr. Nuclear Generation Engineer 4. S. M. Skidmore Asst. Project Hngr. Emergency Supervising 1. D. P. Serpa Engineer - Sr. Nuclear Generation Engineer 2. R. W. Lorenz Sr. Nuclear Generation Engineer 3. T. A. Mack Sr. Nuclear Generation Engineer Radiological 1. D. L. Duke Mon itoring Nuclear Generation Director Engineer 2. K. M. Godfrey Environmental Specialist 3. C. T. Polidoroff Nuclear Generation Engineer J Page 14 of 25
u ~ ~ ~ ~ Rev. 2 08/08/81 PACIFIC GAS AND ELECTRIC COMPANY- [ .s' CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE ~ PROCEDURE 4.3 RADIOLOGICAL ANALYSIS AND PROTECTION APPENDIX E-2 (Continued) Effective Date: 01/01/83 Name Home Phone Emergency Plan Title Nonemergency Title Business Phone Radiological Monitoring 4. S. M. Fandel Director (continued) Planning Analyst EARS Operator (CIRC) 1. C. C. Shih Nuclear Generation Engineer 2. G. A. English Nuclear Generation
- Engineer 3.
S. R. Foster Health Physicist EARS Operator (E0F) 1. H. C. Shaw Senior Mechanical Engineer 2. J. S. McKarns Industrial Hygenist 3. R. A. Uba Nuclear Generation Engineer Supervising 1. M. L. Mooney Meteorologist Supervising Meteorologist 2. R. N. Swanson Senior Meteorologist 1 3. R. H. Thuillier Senior Meteorologist t Page 15 of 25
a 6 Rev. 2 08/08/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE El1ERGENCY RESPONSE Pl.Afl i ('- IMPLEMEt(TING PROCEDURE PROCEDURE 4.3 RADIOLOGICAL ANALYSIS Af40 PROTECTION , APPENDIX E-2 (Continued) Effective Date: 01/01/83 Name Home Phone Emergency Plan Title Nonemergency Title Business Phone DER Laboratory 1. P. A. Szalinski Director Lead Health Physicist 2. C. S. Cheng Chemist 3. J. H. White Lead Health Physicist E0F Secretary 1. H. G. Weese Secretary B i , 2. UNASSIGNED General Clerk-Steno 3. D. A. Campus Admin. Clerk-Steno PGandE' UDAC Sta f f 1. R. W. Lorenz ' Senior Nuclear Generation Engineer 2. T. A. Mack Senior Nuclear Generation Engineer 3. E. V. Waage Nuclear Generation Engineer 4. D. L. Duke Nuclear Generation Engineer a Page 16 of 25
~ . Rev. 2 08/08/81 PACIFIC GAS AND ELECTRIC COMPANY, CORPORATE EMERGENCY RESPONSE PLAN ( IMPLEMENTING PROCEDURE PROCEDURE 4.3 RADIOLOGICAL ANALYSIS AND PROTECTION APPENDIX E-2 (Continued)_ ~ Effective Date:- 01/01/83 Name Home Phone Emergency Plan Title Nonemergency Title Business Phone PGandE UDAC Staff 5. G. A. English I (continued) Nuclear Generation i Engineer 6. UNASSIGNED EOF Administrative 1. S. M. Fandel Staff Planning Analyst. Page 17 of 25 I
^ F.
- ~
Rev. 2 08/08/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN ( . IMPLEMENTING PROCEDURE PROCEDURE 4.3 RADIOLOGICAL ANALYSIS AND PROTECTION APPENDIX E-3 EMERGENCY ORGANIZATION CONTACT LIST Effective Date: 01/01/83 Name Energency Location Emergency Plan Title Normal Business Phone Emergency Phone s Recovery Manager
- 1. _J. D. shiffer fEOF L
-) (
- 2.,R. C. Thornberry g
- 3. J. D. Townsend _
) ~ L Public Information
- 1.,p. J. Baxter EOF Recovery Manager
_] u g ~
- 2.,C. H. Peterson
] 3. S. N. Coffey J Emergency
- 1. _J. V. Boots
[TSC Radiological Advisor L L
- 2.,U. A. O'Hara 6
-3., H. W. C. Fon g ) 6 r California Office 1. Warning Center -Sacr- ~*~ of Emergency 24 hour) or Services s. (.. Page 18 of 25
,~. Rev. 2 08/0Q/81 PACIFIC GAS AffD ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAtt (' IMPLEMENTING PROCEDURE N PROCEDURE 4.3 RADIOLOGICAL ANALYSIS AND PROTECTION ~ APPENDIX E-3 (Continued) Effective Date: 01/01/83 ~ Name Eneroency Location Emeroency Plan Title Normal Business Phone-Emergency Pnone California Office 2. M. F. Reed htate EOC - Sacramento ~ ' of Emergency [ J Services (continued) 3. J. J. Watki_ns State EOC - Sacramento E J ' ~ , Department of 1. P. A. Szalinski DER - San Ramon Engineering ] Research k Laboratory
- 2. M._Cheng J
t 3. J. H. White J m ~ Mobile 1. R. W. Richardson Mobile Environmental Radiological J Monitorina Lab Laboratory 1r Service LCenter - 2. M. C. Kunde L ] - 3. P. A. Szalinski b 4. (Member of DCPP ~ Radiation Protection staff) California 1. E. I Vold Sacramento Department of (, ] (all hours) Health Services Emergency Only Radiologic
- 2. _J. O. Ward U
3ffice Hours Health Section ] ( 3. L. R. Carter t J Page 19 of 25
~ ~ o Rev. 2 08/08/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN' (% IMPLEMENTIfiG PROCE00RE' PROCEDUR 4.3 RADIOLOGICAL ANALYSIS Al10 PROTECTION APPENDIX E-3 (Continued) Effective Date: 01/01/83 Name Emergency Location Emergency Plan Title Normal Business Phone Emergency Phone PGandE/ Cal Poly State 1. J. H. White lalPoly-SanLuisObispo,CA"' Univ. Radiological [ j ~ . or Laboratory e 2. QmpusPolice 3. _T. Ushino _J ~ ~ NRC - Region V 1. H. E. Book Walnut Creek, CA (24 hours) 2. D. Kunihiro or 3. D. Sternberg 4. J. Crews FEMA - Region IX 1. J. Eldridge S,anFranciscb,CA 'tuty hours) 2. K. Nauman or I (24 hours) V. S. Department 1. C. Jackson Oakland. CA of Energy 2. F. Fong Environmental
- 1. - D. Duncan San Francisco, CA Protection
~ or Agency (24 hour) = i V l Page 19a of 25
e f .] ) f = i PACIFIC GAS AND ELECTRIC COMPANY EMERGENCY LOCATION peg CORPORATE EMERGENCY RESPONSE PLAN TOOAY1 DATE ' AGE EMERGENCY COMMUNICATIONS LdG SHEET tu fl8AE NAME la im ACTIVITY (2400 lws.) M NE 17) d g EIAERGENCY TITLE OR AFFILIATION. M e e t s s' t 8 g s i 4 = GEN)S4 (8/82) Rev. 00 SEE 185TRUCTl006 0 t REVERSE
s EMERGENCY COMMUNICATIONS LOG SHEET INSTRUCTIONS t Entry s e< " ~ ' Eomber Instructions 1. Identify the emergency location where this Log 5heet is maintained during an emergency (i.e.; Corporate incident Response Cent'er, Materials Dept., Emergency Operations Facility, etc.) ~~ '2. Enter the date which this Form is being used. Start a new Log Sheet each day. 3. Consecutively number each page used each day. Enter tb time for each Ldg entry. Use the 2400 hour clock to avoid confusion. 4. Clearly record the name of tne i idO!duaicalling you or whom you are callipg. 5. ~ 6. Record the individuals PGandE Emergency Organization Title or their non PGandE affiliation. - s i 7. Che k the entry activity as to whether the individual called you or you are calling them. c 8. Enter the entire context of the message being communicated. Read back the message to tlw individual to assure correct copy / transmission. g ? 9. Enter your initials upon completion of each Log Sheet entry. h ~
ry e PIETFICTAS AND ELECTRIC GGiviFANY CORPORATE EMERUENGY RE5PONSE PLAN Poes g EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET EM8RGENCY LOCATION ,.s, TODAY'E DATE IPAUa tu tai tai TIME ENTERED BY (8400 hm) (INITIALS) se is:
SUMMARY
OF ACTIVITY PERFORMED tai O e y 0 e n O O O 4 e 0 e 6 m 4 E M (8/82) Aew. 00 SEE INSTRUCTIONS ON REVERSE
-y. s ~ j ~ o m O I ~ EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET l INSTRUCTIONS 1 Entry Number instructions 1. Identify the emergency location where this Log Sheet is maintained during an emergency (i.e.; Corporate incident Response Canter, Materials Dept., Emergency Operations Facility, etc.) 2. Enter the date which this form is being used. Start a new Log Sheet each day. 3. Consecutively number each page used each day, w 4. Enter the time for each Log entry. Use the 2400 hour clock to avoid ) confusion. 5. Enter a summary of each activity being recorded. 6. Enter your initials upon completion of each Log Sheet entry. 1 e l f e
~. PACIFIC GAS AND ELECTRIC COMPANY Rev. 1 CORPORATE EMERGENCY RESPONSE PLAN * .05/01/81 IMPLEMENTING PROCEDURE. 3 i / PROCEDURE 4.4 GENERAL CONSTRUCTION \\ i l APPEN6IX E-1 EMEN.*ENCY RESPONSE ORGANIZATION, GENERAL CONSTRUCTION DEPARTMENT RELATIONSHIPS matwest ma.s.a.se,s r M89 4. '"c Mi, li = or.or, a _.._..-..-.._.._..-..q l etummaan s.- l v - -,o, l l l l 1 l i 9 g saw sumacan ammaca umancas amaacu yggg,, tant Crvat.sveno cas 8 .l. e.spasgnant au apsu.ust, e.m.a.ssmaur p p agew, mew, g .a.m. mans a.m. . -in, . - >ce, e<=== -,ai .. -.. -.. -==.. -.. -.. -.. 18 Weed a Line Aetemraty Coordinataan " * * = *. *=. C.o.rporate Cuestrisetten geportmee.
==. r-a,.r ui., c=. ,.r i 1a.v. Page 9 of 19
-c m m Rev. 1 05/05/81 ~ PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN s, IMPLEMENTING Pit 0CCOURE I PROCEDURE 4.4 GENERAL CONSTRUCTION APPENDIX E-2 EMERGENCY PLAN TITLES AND PERSONNEL ASSIGNMENTS tOTIFICATION. LIST Effectfi.e Date: Oi/01/83 Name Home Phone Emergerty Plan Title Nonemergency Title Business Phone Corporate Construction 1. R. S. Bain Coordirator Manager, Station Construction 2. J. R. Manning Superintendent, Station Construction 3. M. R Kunz Superintendent, I Station Construction 4. P. J. Nelson Asst. Superintendent, Station Construction 5. B. T. Saenz ~ Station Construct Admin. Supervisor ~ Site Construction 1. R. D. Etzler Coordinator DCPP Construction Superintendent 2. M. N. Norem Resident Startup Engineer 3. D. A. Rockwell Resident Electrical Engineer Manager, Line 1. W. M. Stubblefield i Department Manager, Line J Construction k Page 10 of 19
~ n \\ Rev. 1 05/05/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN s IMPLEMENTING PROCEDURE ( PR'0CEDURE 4.4 GENERAL CONSTRUCTION APPENDIX E-2 (Con'tinued) Effective Date: 01/01/83 Name Home Phone Emergency Plan Title Nonemergency Title Business Phone Manager, Line 2. J. V. Butler Department Line Construction (continued) Superintendent 3. O. D. Smith Supervisor, Line Construction ~ Manager, Civil-Hydro 1. P. G. Damask Department Manager, Civil-Hydro Construction 2. L. G. Rasmussen Civil-Hydro Construc-tion Superintendent 3. R. R. Friedrichs Civil-Hydro Construc-tion Superintendent Manager, Gas-Mechanical 1. W. Funabiki Services Department Manager, Gas-Mechanical Services Construction 2. R. P. Baur Gas-Construction Superintendent 3. M. R. Biro Gas-Construction Mech. Sycs. Transpor-tation Superintendent '4. J. R. Darby Gas-Construction Superintendent ( 5. T. Long s-e Gas-Construction - Mech. Sycs. Assistant J Superintendent Page 11 of 19
m Rev. 1 05/05/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN, IMPL,EMENTING PROCEDURE I( s 1 j PROCEDURE 4.4 1 GENERAL CONSTRUCTION Effective Date: 01/01/83 .Name Home Phone Emergency Plan Title Nonemergency Title Business Phone Manager, Personnel 1. L. C. Beanland and Clerical Manager, G.C. Services Personnel and Clerical Department Services Department 2. A. B. Stetler Superintendent, Personnel and Clerical Services Department 3. H. Little Administrative Super-visor, Personnel and ,j Clerical Services Department ~ ~ l Page 12 of 19
.ww c ~ Rev. 1 PACIFIC GAS AND ELECTRIC COMPANY 05/05/,81 CORPORATE EMERGENCY' RESPONSE PLM I IMPLEMENTING PROCEDURE ( PROCEDURE 4.4 GENERAL CONSTRUCTION APPENDIX E-3 EMERGENCY ORGANIZATION CONTACT LIST Effective Date: 01/01/83 NamE Emergency Plan Title Normal Business Phone Emergency Location Emergency Phone Recovery Manager 1. J. D. Shiffer g EOF WaI l. ~,, L 2. R. C. Thornberry - J L ] ~
- 3. _J. D. Townsend
- -- 3 Corporate Technical 1. J. B. Hoch and Logistical 1 -CIRC c' Coo rdinator L 3 L 2. M. R. Tresler ^ L' ] 3 1 A. Young ~ Corporate 1. T. R. Ferry Communications 3 -Gen.. 1 office _ Coordinat:r 2. A. J. Nevolo ( ) 6 3. C. D. Gilson L 3 C r
- 1. _D. L. Kennady
$los Padres District Off. ~ Coordin@r 6 3 0F 2. B. McCloskey t. j u
- 3.,_R. J_. McKell L
Page 13 of 19
e q 1 Rev. 1 ~ 05/05/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLA1 IMPLEMENTING PROCEDURE ( s PROCEDURE 4.4 i GENERAL CONSTRUCTION l APPENDIX E-3 EMERGENCY ORGANIZATION CONTACT LIST Effective Date: 01/01/83 Nam 6 EnErgency Location Emergency Plan Title Normal Business Phone Emergency Phone Recovery Manager 1. J. D. Shiffer h0F ~ L ] L 2. R. C. Thornberry L J 3. J. D. Townser.c -~3 Corporate Technical 1. J. B. Hoch -CIRC and Logistical { ] ~ Coordinator L 2. M. R. Tresler L' 3 3. R. A. Young ] Corporate 1. T. R. Ferry Gena -1 office Communications ] Coordinat:r L. 2. A. J. Nevolo 3 n 3. C. D. Gilson L ) ~ Corporate
- 1. 'D. L. Kennady Los Padres District Off.
~ Division j or Coordince or 2. B. McCloskey g.
- 3.,R. J. McKell L
Page 13 of 19
PACIFIC OAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN EMERGENCY LOCATION pe,g iuuAYS DATE
- AGE EMERGENCY COMMUNICATIONS t.OG SHEET til TIME NAME (2400 lws.)
l# ACTivlTY la (a 17) I4 EMERGENCY TITLE OR AFFILIATION NE een N CALLED CALUNG MESSAGE ,tet 4 s 9 1 s p i t i 1 e e t i i 2 SEE BOSTRUCTl005 0 0 REVERSE. I. 69484 (8/82) Rev. 00
i EMERGENCY COMMUNICATIONS LOG SHEET INSTRUCTIONS = 3 Entry Number Instructions 'f 1. Identify the emergency location where this Log 5heet is maintained during an emergency (i.e.; Corporate Incident Response Center, Materials Dept., Emergency Operations Facility, etc.) i l 2. Enter the date which this Form is being used. Start a new Log Sheet each day. 3. Consecutively number each page used each day. 4. Enter the time for each Log entry. ' Use the 2400 hour clock to avoid confusion. t 5. Clearly record the name of the individual calling you or whom you are calling. 6. Record the individuals PGandE Emergency Organization Title or their non PGandE affiliation. 7. Che k the entry activity as to whether the individual called you or you are calling them. c s 8. Enter the entire context of the message being communicated. Read back the message to the individual to assure correct copy / transmission t i 9. Enter your initials upon completion of each Log Sheet entry., ~ e S e i e S 1
q .3, ~. }
- y a
o FAEIFRf5AE AND ELECTRIC COMPANY C0hrwhATE EMERGENCY RESPONSE PLAN po.s s EMERGENCY RESPONSE AND RECOVERY A'CTIVITIES LOG SHEET EMERGENCY LOCATION i TOOAY'S DATE PAGE Ill (2) (2 TIME ENTERED BY (2400 lwsJ llNITIALS)
SUMMARY
OF ACTIVITY PERFORMED te ese is i). m 4 e e O f e 5 9 g O e / ( u.. I SEE INSTRUCTIONS ON REVERSI,
~ 3 0 EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET - INSTRNCTIONS ~ Entry ~ ~ Number -
- Instructions 1.
Identify the emergency lxation where this Log Sheet is maintained s during an emergency (i.e.; Corporate incident Response Center, Materials Dept., Emergency Operations Facility, etc.) ~ 2. Enter the date which this form is being used. Start a new Log Sheet i each day. ~ 3. Consecutively number each page used each day 4. Enter the time for each L-og entry. Use the 2400 hour clock te avoid confusion. ~ 5. Enter a summary of each activity being recorded. 6. Enter your initials upon completion of each Log Sheet entry.. O 4
05/01/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE, ( ~ PROCEDURE 4.5 ENGINEERING AND TECHNICAL SUPPORT APPENDIX E-2 EMERGENCY PLAN TITLES AND PERSONNEL ASSIGNMENTS NOTIFICATION LIST Effective Date: 01/01/83 .Hane Phone Name s Emergency Plan Title Nonemergency Title Business Phone Corporate Engineering 1. G. H. Moore Coordinator-DC Project Engineer 2. J. V. Rocca Chief Mechanical and Nuclear Engineer 3. R. V. Bettinger Chief Civil Engineer 4. J. R. Herrera ( Chief Electrical Engineer 5. G. H. Aster Chief, Design-Draf ting Chief, Design-Drafting 1. G. H. Aster Chief, Design-Drafting t 2. G. A. Kaschube Project Coordination l Section Supervisor 3. E. A. Punzalan l Project Coordinator Chief Mechanical & 1. J. V. Rocca Nuclear Engineer Chief Mechanical and Nuclear Engineer Page 9 of 17
~,, - u. g 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE ,s '. ( PROCEDURE 4.5 ENGINEERING AND TECHNICAL SUPPORT APPENDIX E-2 (Continued) EffectiveDatek 01/01/83 Name' Home Phone' Emergency Plan Title Nonemerge.ncy Title Business Phone Chief Mechanical & 2. D. O. Brand Nuclear Engineer Supervising Mechanical (continued) Engineer 3. R. M. Laverty Mechanical Systems Group Leader Chief Electrical 1. J. R. Herrera Engineer . Chief ~ Electrical Engineer 2. J. W. Colwell Chief Electrical Engineer 3. F. J. Dan Supervising Electrical Engineer C'hief Civil ' Engineer 1. R. V. Bettinger Chief Civil Engineer 2. V. J. Ghio Senior Civil Engineer 3. J. A. McLoughlin Sr. Civil Engineer e' Page 10 of 17
.] . Rev. 1 - PACIFIC GAS'AND ELECTRIC COMPANY. 05/01/81 CORPORATE EMERGENCY RESPONSE Pi.AN . / INPLEMENTING PROCEDURE ~ PROCEDURE 4.5 ENGINEERING AND TECHN-ICAL SUPPORT APPENDIX E-3 EMERGENCY ORGANIZATION CONTACT LIST Effective Date: 01/01/83 Name Emergency Location Emergency Plah Title Normal Business Phone Emergency Phone ~ Recovery Manager 1. J. D. Shiffer h0F L' [ J 2. R. C. Thornberry ] w
- 3. _J. D. Townsend...
Corporate Technical 1. J. B. Hoch/ rCIRC s and Logistical {. j g g - Coo rdinator 2. M. R. Tresler f U 3: R. A. Young , ~ 3 6 6 o e e Page 11 of 17 i
e I 'N ) L .'s l PACIFIC GAS AND ELECTRIC COMPANY I EMERGENCY LOCATION i CORPORATE EMERGENCY RESPONSE PLAN TOOAY1DATE ' AGE pg.,g EMERGENCY COMMUNICATIONS LOG SHEET ~ in sa ta TIME NAME ACTIVITY (2400 Bus.) l# NM (7) g EMERGENCY TITLE OR AFFILIATION SSTMaal E i t 0 e e t i 1 1 i I g e 1 6 I 4 81N)8418/82) Rev.00 W P '=" = N * ** *
- e I
I EMERGENCY COMMUNICATIONS LOG SHEET INSTRUCTIONS l / Entry Number instructions 1. identify the emergency location where this LogSheet is maintained during an emergency (i.e.; Corporate incident Response Center, Materials Dept., Emergency Operations Facility, etc.) l 2. Enter the date which this Form is being used. Start a new Log Sheet each day. t 3. Consecutively number each page used each day. i 4. Enter the time for each Log entry. Use the 2400 hour clock to avoid confusion. 5. Clearly record the name of the individual calling you or whom you are calling. 6. Record the individuals PGandE Emergency. Organization Title or their non PGandE affiliation. 7. Chhk the entry activity as to whether the individual called you or you are I:alling them. ~ 8. Enter the entire context of the message being communicated. Read back the message to the individual.to assurp correct copy / transmission. 9. Enter your initials upon completion of each Log Sheet entry. )
~ ^^ ' ~ \\ I o PACIFIC GAS AN,3 ELECTRIC COMPANY ""r anA EP E& l 1 POwB EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET, EMERGENCY LOCATION TODAY'S DATE PAGE I (~% I (1) (2) (3) TIME ENTERED SY (INITIALS) (2400 hre.) (m - (sl '
SUMMARY
OF ACTIVITY PERFORMED te i e G e m 7 1 t e m N_,j e..e =. -- --w
- = -. y o S EMERGENCY RESPONSE AND RECOVERY ACTIVITIES t.OG SHEET INSTRUCTION _$ Entry Nurnber instructions l 1. Identify the emergency location where this Log Sheet is maintained during an emergency (i.e.; Corporate incident Response Center, Materials Dept., Emergency Operations Facility, etc.) 2. Enter the date which this form is being used. Staria new Log Sheet each day. 3. Consecutively number each page used each day. i i i i 4. Enter the time for each Log entry. Use the 2400 hour clock to avoid j confusion. ~ 5. Enter a summary of each activity being recorded. 6. Enter your initials upon completion of each Log Sheet entry.. ~ m e m J
Rev. 1 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY, CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE x . PROCEDURE 4.6 COMPUTER SYSTEMS AND SERVICES i APPENDIX E-2 EMERGENCY PLAN TITLES AND PERSONNEL ASSIGNMENTS IOTIFICATION LIST Effective Date: 01/,01/83 Name Mme Phone Emergency Plan Title. Nonemergency Title Business Phone Corporate Computer 1. A. W. Simila Applications Manager, Engineering Coordinator Computer Applications 2. R. M. Wetherell Supervising Mathema-tician-Programer 3. B. M. Speckman
- Supervising Computer Applications Engr.
Supervis'ing Engineering' 1. R. M. Wetherell Computer Applications Supervising Mathema-Specialist tician-Programer 2. B. M. Speckman Supervising Computer Applications Engr. 3. F. M. Perfetto Senior Computer Systems Analyst Supervising Computer 1. L. H. Carter Technology Senior Cmputer Specialist Systems Analyst 2. R. C. Knisely Software Specialist 3. D. W. Holmes Senior Computer Systems Analyst (. Page 11 of 20
7 .a.- o s Rev. 1 05/01/81 PACIFIC GAS AND ELECTRIC C0f1PANY ~ CORPORATE'EtiERGENCY RESPONSE PLAK- . IMPLEMENTING PROCEDURE PROCEDURE 4.6 ~ COMPUTER SYSTEllS AND SERVICES ~ APPENDIX E-2 (Continued) Effective Date: 01/01/83 Name ' Home Phone Emergency Plan Title Nonemergency Title Business Phone Supervising Computer 1. W. R. Barnes Operations Supervising Computer Specialist Operations Analyst 2. J. J. Monahan Scheduling and Con- '. . trols Sect. Super. 3. W. R._ Richardson Sectio,n Supervisor Production Supervising Information 1. G. Swallow Systems Specialist Senior Information Systems Analyst 2. J. C. Simpson Supervising Analyst 3. H. S. Stout Information Systems Analyst ~ ~~ Page 12 of 20
n. Rev. 1 - 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY ' CORPORATE EMERGENCY RESPONSE PLAtt ( ' '. IMPLEMENTING PROCEDURE PROCEDU' E 4.6 COMPUTER SYSTEMS AND SERVICES APPENDIX E-3 EMERGENCY ORGANIZATION CONTACT LIST
- Effective Date: 01/01/83 Name Emergency Location Emergency Plan Title Normal Business Phone Emergency Phone
~ Recovery Manager
- 1..J. D. Shiffer
._ 'J EOF 5-L 2. O C. Thornberry J 3. J. D. Townsend j Corporate Technical 1. J. B. Hoch CIRC l and Logistical [. J Coo rdinator L 2. M. R. Tresler ~ t L 3. R. A. Youno Y ^'1J Manager, Computer 1. H. Liu General Office Systems Technology J ~ ~
- 2.,_L. H. Carter
_3 L ~ 3.
- o. W. Holmes
] L ~ Corporate 1. A. W. Simila Gena--' MHea Computer ,j Applications L Coordinator 2. R. M. Wetherell L J 3. R. M. Speckman L. Page 13 of 20
^ ~ Rev. 1 PACIFIC GAS AfiD ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN '5 ' IMPLEMENTING PROCEDURE a. ~ PROCEDURE 4.6 ~ COMPUTER SYSTEMS Al40 SERVICES APPENDIX Ec3 (Continued) ~ Effectivi Date: 01/01/83 Eiergency Location Name Emergency Plan Title Normal Business Phone Emergency Phone
- Manager,
- 1. _R. W. Barbey fGeneral Office Information 3
3 ( Systems
- 2. _G. Swallow 3
6. 3. J. C. Simpson J Manager, Computer 1. D. L. Hawkins fGeneral Office ~ Operations ) ' '1 g 2. W. R. Barnes ] t 3. R. J. Wells ] k._ Page 14 of 20
o t PACIFIC GAS AND ELECTRIC COMPANY EMERGENCY LOCATION pg g CORPORATE EMERGENCY RESPONSE PLAN TOOAY'S DATE ' AGE EMERGENCY COMMUNICATIONS LOG SHEET tti TIME NAME tal t3l (2400 tws.) (# ACTIVITY 17) NE EMERGENCY TITLE OR AFFILIATION N s 0 n ,a R t 4 o 604384 (8/82) Rev. 00 SEE IONTRUCTIONS O d REVERSE
j r EMERGENCY COMMUNICATIONS LOG SHEET \\ INSTRUCTIONS s s Entry Number Instructions 1. Identify the emergency location where this LogSheet is maintained during an emergency (i.e.; Corporate Incident Response Center, Materials Dept., Emergency Operations Facility, etc.) 2. Enter the date which this Form is being used. Start a new Log Sheet each day. / 3. Consecutively number each page used each day. 4. Enter the time for each Log entry.' Use the 2400 hour clock to avoid confusion. 5. Clearly record the name of the individual calling you or whom you are calling. 6. Record the individuals PGandE Emergency Organization Title or their non PGandE affiliation. Che k the entry activity as to whether the individual called you or you are calling them. 7. c 8. Enter the entire context of the message being communicated. Read back the message to the individual to assure correct copy / transmission. 9. Enter your initials upon completion of each Log Sheet entry. J
.7, g PActrm. GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RE5PONSE PLAN PN EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET ,TODAY'S DATE PAGE / \\ EMERGENCY LOCATION (1) (2) (3) TIME ENTERED BY (E400 hrs.) (INITIALSI (e (si
SUMMARY
OF ACTIVITY PERIORMED (s) j 4 i \\ \\ 1 I W / S486 (8/02) Rev.00 SEE 80STRUCT1085 ON REVERSE
o ~ ( ~ l .~ 3 F s a EMERGENCY RESPONSE AND RECOfliRY ACTIVITIES LOG SHEET ~ INSTRUCTIONS Entry Number instructions 1. Identify the emergency location where this Log Sheet is maintained during an emergency (i.e.; Corporate incident Response Center, Materials Dept., Emergency Operations Facility, etc.) ~ 2. Enter the date which this form is being used. Start a new Log Sheet each day. 3. Consecutively ilumtieriach page used each day. 4. Enter the time for each Log entry. Use the 2400 hour clock to avoid' ; confusion. i s-5. Enter a summary of each activity being recorded. 6. Enter your initials upon completion of each Log Sheet entry.
- f f
v. I J 4t x
n. .g o o PACIFIC GAS AND ELECTRIC COMPANY Rev. 1 CORPORATE EMERGENCY RESPONSE PLAN 05/01/81 (" IMPLEMENTING PROCEDURE. PROCEDURE 4.7 NUCLEAR PLANT OPERATIONS ~ APPENDIX E-1 t EMERGENCY IT5PON37.rORGANIZATION, NUCLEAR PLANT OPERATIONS DEPARTMENT RELATIONSHIPS c .e-s ~ t I
- n.. n.,
fTV.6 f,0..P. i e.-, r,. an - l l =m.,.. =,,::,'.:; r-- c,,,,.- ci -, ~. ~ .,c cr. v. e j l.._.i_.._.._.j_.._._.j_..J i e F.. - J g*gy. _ _ _ ____... _.. _ _ _ _ _...$...........m....... e i .,.4,,..,y;,, e e 1 0 j/. I-c ae, i n ",.] u A th.,aiy t, e,',q, : ..r ....................--.s c~*~u~ .,.m c.,,,..,, i...,s, ca... o,...u c.. ~ i /. 7 , j var - so.. cy ap...... r.e m e, -b ei.e. e.. ,.t. i.,eis.. . -.. c..., .t >V s,' , ne. v....i. n c.., t. s c.e. ..u
- .. n e.....
A \\ s <N,l ' v .s Page 9 of 18 s E
- he i-w, ep.
,e.g .iep- ,,m,*,m.,e-w y.p--- 4-- -g T w
!'S%d81 PACIFIC GAS AND ELECTRIC COMPANY ~ CORPORATE EMERGENCY RESPONSE PLAN - IMPLEMENTING PROCEDURE g s, PROCEDURE 4.7 NUCLEAR PLANT OPERATIONS APPENDIX E-2 EMERGENCY ORGANIZATION CONTACT LIST Effective Date: 01/01/83 Name Emergency Location Emergency Plan Title Normal Business Phone Emergency Phone Recovery Manager
- 1. _J. D. Shiffer EOF L
- 2..R. C. Thornberry 3
6
- 3. _J. D. Townwnd 6
J v Corporate Liaison Coordinator 1. R. J. McDevitt CIRC g_ ~] 2. S R. Foster } --,o b
- 3. J. A. Moulia
.r ) 6 4. G. A. Pierce ~~ 3 Corporate Technical 1. J. B. Hoch (CIRC ~ and Logistical bs... J Coo rdinator L 2. M. R. Tresler or
- 3.,R. A. Young
-j ~ Operations and 1. J. D. Townsend EOF Analytical 7 ~ ] or Recovery Manager w i w.. 2. u T. Rapp J Page 10 of 18
m. Rev. 1 ~ 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN /- IMPLEMENTING' PROCEDURE PROCEDURE 4.7 NUCLEAR PLANT OPERATIONS APPENDIXE-2.(Continuedl Effective Date: 01/01/83 Name Emergency Location Emergency Plan Title Normal Business Phone Emergency Phone Operations and 3. L. W. Giffin Analytical Recovery { " ] Manager (continued) Radiological biergency 1. W. H. Foiimoto E0F Recovery Manager [ 7 ~ L 2. UNASSIGNED ~ ~ 3. D. P. Serpa '- _J ' ~' 7 7 4. S. M. Skidmore Engineering and 1. B. W. Giffin EOF Logistics Recovery G. 3 L 2. A. l. Simmons ) 6 3 3 C. Ru'ssell _J 6 Site Emergency 1. R. C. Thornberry FTsr Coordinator ] 2. R. Patterson L- ]
- 3. _J._M. Giscion J
Emergency Evaluations 1. J. M. Gisclon TSC and Recovery j Coo rdinator L-2. D. A. Miklush 6 Page 11 of 18 h
~ m -m v a-i Rev. 1 ,05/01/81 PACIFIC GAa AND ELECTRIC COMPANY CORPORATE EMERGENCY REf PONSE PLAN - IMPLEMENTING PROCEDURE PROC 200RE 4.4 NUCLEAR PLANT OPERATIONS.. APPENDIX E-2 (Continued)_ Effective Date: 01/01/83 - Name Energency location Emergency Plan Title Normal Business Phone
- Emergency Phone Emergency Evaluations 3.
L. F. Womack and' Recovery (continued) -] Coordinator e ] Emergency Radiological 1. J. V. Boots TSC Advisor J j g.. 2. W. A. O'Hara ~ .J
- 3. _H. W. C. Fong Corporate Security 1.
L. N. Shaffer heneral Office Coordinator ) 2. J. R. Van Schaick J 3. R. Dunleavy ] Site Security (On-duty Security Shift OSC Supervisor Supervisor ~ L _R. G. Todaro i L. J.G.Lunsford 3 a l P. D. Olsen J J . L. Harnes tL- ._ M.
- 1. Goo da l e
] Page 12 of 18
b i t PACIFIC GAS AND ELECTRIC COAWANY EMERGEleCY LOCATMNI p CORFORATE ERGERGENCY RESPONSE PLAN TODAY1 OATE -
- AGE EMERGENCY COMMUNICATIONS LOG SHEET
~ m em ta Tih4E MARSE ACTIVITY _W (2400 InsJ M 17) g EAAERGEldCY TITLE OR AFFILI ATION ggyptag 0 4 4 W e c e S O m 9 O 6 e 9 er O 9 6 e 9 m h e 8 en t I i e M O 4 9 9 I 9 09 404 18/82) %v.00 EEEIDETRUCT.OON OeREVER5E
, ). EMERGENCY COMMUNICATIONS LOG SHEET INSTRUCTIONS Entry Number Instructions 1. Identify the emergency location witere this LogSheet is maintained during an emergehcy (i.e.; Corporate incident Response Center, Materials Dept., Emergency Operations Facility, etc.) 2. Enter the date which this Fonh is being used. Start a new Log Sheet each day, g 3. Consecutively number each page used each day. 4. Enter the time for each Log entry. Use the 24,00 hour clock to avoid confusion. 5. Clearly record the name of the individual calling you or whom you are calling. 6. Record the individuals PGandE Emergency Organization Title or their non PGandE affiliation. / Che k the entry activity as to whether the individual called you or you are calling them. 7. c s e 8. Enter the entire context of the message being communicated. Read back the message to the individual to assure correct copy /tranwnission. 9. Enter your initisls upo completion of each Log Sheet entry. ~ ( i. '. ~. J e
~ :.~ ^ 1 j PACIPIG GAS AND ELECTRIC COMPANY cG,.rv6 ATE EMERUENCY R-d5 PLAN s pods EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET ] ( , SMERGEMCY LOCATION TOOAY'8 DATE fAus. j a 1 (1) (2) (3) TIME ENTERED BY (INITIALS) l (2400 h l (m
SUMMARY
OF ACTIVITY PERFORMED (m I k 3 \\ 1 I 1 I l l I l I 89406 (S/82) Rev. 00 SEE vismissui.e wome cW HEveruse,
r ~3 4 EMERGENCY RESPONSE AND RECOVERY ACTIVITIES' LOG SHEET INSTRUCYlONS Entry Num'y Instructions 1. Identify the emergency location where this Log Sheetis maintained during an emergency (i.e.; Corporate incident Response Center, Materials Dept., Emergency Operations Facility, etc.) 2. Enter the date which this form is being used. Start a new Log Sheet ,each day. 3. Consecutively number each page used each day. I l 6 4. Enter the time for each Log entry. Use the 2400 hour clock to avoid confusion. l l l S. Enter a summary of each activity being recorded. 6. Enter your initials upon completion of each Log Sheet entry. l
-o. ~ ~^ ~' PACIFIC OAS AND ELECTRIC COMPANY Rev. 1 CORPORATE EMERGENCY RESPONSE PLAN 05/01/81 IMPLEMENTING TROCEDURE t ', a ^ PROCEDUR3'4.8 DIVISION SUPPORT APPENDIX E-1 EMERGENCY RESPONSE ORGANIZATION, DIVISION SUPPORT RELATIONSHIPS ancovnar MANAGER =q (sor) 1 l l l-CORPORATE PUBI.IC TEOOi! CAL AND INFCDATIoM IDGISTICAL ABCoVERY = coonoINAToa 1 MANAGER tezact I <cori 1 I .. _ l-.. I componATz coarenars conPonArt -J mATraIAt.s consTauctrou cIvzSrox. coomoruATom coonoINaton C" coonoINAton l (causmAL orrrer) (czac) (SAN t.UIS oBISPo) s I I t ,,g,,,n,,373, SITE, Coas? VAI.tzys a cxassTaucTIou DIVIstow m ImA m w ,, Q % "o,3 g (sAu Luzs ourseo) ("""=u orrrm orvrszons e i I L _ _ _ _ _ _ _ _ _ _ _ _ _.s._ _ _ _ _.J Eagend Line Authority
Coordination
-..- - Corporate Division Support Personnel EF - amargency Operations Facility CIRC - Corporate Incident Response Center ( Page 7 of 16 m,. w- ,m
m 7 o m ~ ~- ~ Rev. 1 05/01/81 ~ PACIFIC GAS AND ELECTRIC GOMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE (~. = PROCTOURE 4.8 s. DIVISION SUPPORT APPENDIX E-2 EMERGENCY PLAN TITLES AND PERSONNEL ASSIGNMENTS NOTIFICATION LIST Effective Date: 01/01/83 Name Home Phone Emergency Plan Title Nonemergency Title Business Phone Corporate 1. D. L. Kennady Division Los Padres District Coordinator Manager 2. B. McCloskev Los Padres District - Marketing Manager 3.- R. J. McKell Los Padres District Electric Superintendent 4. Alternate number - Morro Bay Switching Center ~ L l (, Page 8 of 16 i
~- Rev. 1 05/01/81. PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN (S , IMPLEMENTING PROCEDURE - ~ PROCEDURE 4.8 DIVTSTO~N SUPPORT' APPENDIX E-3 EMERGENCY ORGANIZATION CONTACT LIST '01/01[83 Effective Date: Name Errergency Location Emergency Plan Title Normal Business Phone Emergency Phone Recovery Manager 1. J. D. Shiffer fE05 . _}, d, f t 2. R. C. Thornberry ~ J L. ' 3. _J. D. Townsend J Corporate Technical
- 1. _J. B. Hoch QIRC
"] and Logistical ] l-Coo rdinator L J 2 4 R. Tresler ) 3. R. A. Youna b ~ Public Information 1. D. J. Ravter EOF I Recovery Manager F j L 2. C. n Daterson [ j 3. S. N. Coffey l J Site Construction 1. R. D. Etzler (Si n e-~4~ renter ~ Coordinator 7 J l L
- 2. _N. M. Norem
_J e
- 3.,0. A. Rockwell J
L Page 9 of 16
.. ~, -m a' Rev. 1 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE s PROCEDURE 4.8 DIVISION SUPPORT APPENDIXE-3(Continujed EMERGENCY ORGANIZATION CONTRACT LIST _ Effect'ive Date: 01/01/'.,) Name Energency Location Emergency Plan Title Normal Business Phone Emergency Phone (General Office Transportation
- 1. " H. W. Klocke Coordinator
] 2. __G. Balanesi h ] s. 3. J. A. Marino ,j ~
- 4. _J. H. Ferrell
'A L s 5. R. L. Comyns s 6. A. R. Dashiell _J (; -i Page 10 of 16
,9 C o. ~ e E M S D N E l l. A NM V . ET E fE R f BD E e G O A a s t ec i E TC TA U D RT S Y W l A I D EE O a S T t N O ITAC O L Y i C N IGR EM n E ( s TE E H YT S IV N G IT A O C Y L NP L A A E S WS N R N )7 OO O 1 CP I S C T E IRR A T Y C N O C I C I E N N T LE 2 U A G I OR M L O NE M F AM F O A SEA E C R OT Y O CA E R C S L F ON T ICP E T I AR POG Y C R C E N E E M M G E A R N EM 0 E 0 i M ve R W ) 28 / sT 8 EM0 ( 0 4 I 4 8 2 4 g ( 98 } ' (!I i l!i' (1t ll ( 1
t i EMERGENCY COMMUNICATIONS LOG SHEET INSTRUCTIONS Entry Number instructions 1. Identify the emergency location where this LogSheet is maintained during an emergency (i.e.; Corporate incident Response Center, Materials Dept., Emergermy Operations Facility, etc.) 2. Enter the date which this Form is being used. Start a new Log Sheet each day. 3. Consecutively number each page used each -fay. ~ 4. Enter the time for each Log entry.,Use the 2400 hour clock to avoid confusion. 5. Clearly record the name of the individual calling you or whom you are calling. e 6. Record the individuals PGandE Emergency Organization Title or their non PGandE affiliation. t Che k the entry activity as to whether the individual cdiled you or you are calling them. 7. c Enter the entire context of the message being communicated. Read back the message to the 8. individual to as.ure correct copy / transmission. 9. Enter your initials upon completion of each Log Sheet entry. / / ,,/
- - ~
..f- ..~. -) g PACIPlc GAS ANO ELECTRIC COMPANY CORPORATE EMERGENCY RE5PONSE PLAN POe5 EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET ('s sMsRoaNCY LOCATION. TODAY'S DATE PAGE tu' tai tm TIME ENTERED BY (2iO0 lus.) (INITIALS) te im
SUMMARY
OF ACTIVITY PERFORMED to s eh C 9 a e G S I e e e ' s) ~ 3DM 18/82) Rev. 00 SEE me n hui.: rw== UN Hivues
~ ] m. ,EMERGENCT RESPONSE AND RECOVERY ACTIVITIE5 t.OG SHEET INSTRUCTIONS Entry Number instructions 1. Identify the emergency location where this Log Sheet is maintained during an emergency (i.e.: Corporate incident Response Center, Materials Dept., Emergency Operations Facility, etc.) 2. Enter the date which this forr.iis being used. Start a new Log Sheet each day. 3. Consecutively number eacE page used each day. 3 4. Enter the time for each Log entry. Use the 2400 hour clock to avoid confusion. 5. Enter a summary of each activity being recorded. 6. Enter your initials upon completion of each Log Sheet entry. l I I ) l .-.,,e r- -s
. ~.. w Rev. 1 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY. CORPORATE EMERGENCY RESPONSE PLAN p , IMPLEMENTING PROCEDURE PROCCDURE 4.9 QUALITY ASSURAt(CE, APPENDIX E-2 EMERGENCY PLAN TITLES AND PERSONNEL ASSIGNMENTS t0TIFICAT10N LIST Effective Date: 01/01/83 Name Home Phone Emergency Plan title Nonemergency Title Business Phone '. A. Raymond Corporate Quality 1. W Assurhnce
- Manager, Coordinator Quality Assurance 2.
P. C. Burgess Records Management System Supervisor 3. T. G. de Uriarte Senior Quality Engineer Records Management 1. P.CTBurgess Coordinator Records Management ~ System Supervisor 2. E. S. Grenfell Records Analyst 3. H. M. Cox Records Supervisor 4. S. E. Earley-Iwert Records Analyst Senior Quality ~ 1. F. J. Dodd Enginder(Pro Senior Quality Development) gram Engineer Page 11 of 20
Rei. 1 ~ 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMEtiTIN
G. PROCEDURE
~ hUAL U CE APPENDIX E-2 (Continued) ~ Effective Date: 01/01/83 Name Home Phone Emergency Plan Title Nonemergency Title Business Phone 5 Senior Quality 2. H. J. Hansen, Jr. Engineer (Program Quality Engineer Development) (continued) 3. G. W. Heggli Quality Engineer ~ Senior Quality 1. T. G. de Uriarte Engineer Senior Quality (Auditing) Eng tneer 2. K. T. Bergmann Quality Engineer 3. D. S. Aaron Quality Assurance Analyst Quality Assurance 1. R. T. Twiddy Supervisor Quality Assurance Supervisor 2. C. M. Seward, Jr. Quality Engineer 3. R. W. 'aylor Qualits Engineer ~ 4. M. S. Dobrzensky Quality Engineer g i l l l l l Page 12 of 20 l
'v-Rev. 1 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE ( -s PROCEDURE 4.9 QUALITY ASSURANCE APPENDIX E-2 (Continued) Effective Date: 01/01/83 Name Home Phone Emergency Plan Title Nonemergency Title Business Phone Design-Dra f ting 1. H. E. Deady Records Engineering Records ' Coordinator Supervisor 2. D. W. Houghton Supervisor, Engineer. ing Rec,ords-& Admin-istrative Services 3. D. C. Bullard Administra tive Services Superviso'r s v Page 13 of 20
s' Rev. 1-05/01/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE s PROCEDURE 4.9 QUALITY ASSURANCE APPENDIX E-3 EMERGENCY ORGANIZATION CONTACT LIST Effective Da,te: 01/01/83 Name Energency location Emergency Plan Title Normal Business Phone Emergency Phone Recovery Manager
- 1. J. D. Shiffer (E_OF
.] G -i L: 2. _R. C. T'hornberry b. f-- 3 ~
- 3. g D. To_wnsend
_3 w Corporate Technical
- 1.,J. R. Hoch gRC and Logistical
(, ) Coordinator 6 2. M. R. Tresler ar 6 ~ 3. R. A. Younc f) ~ 6 b
- u..
Page 14 of 20
T p (j e PACIFIC GAS ANO ELECTalC COe#ANY EMERGENCY LOCATION ym CORPORATE EMERGENCY RESPONSE PLAN TODAY'S DATE ' ACE EMERGENCY COMMUNICATIONS LOG SHEET to TimeE NAME ts is ACTWITY 12400BusJ l# BRENDM 179 g4 ERGERGENCY TITLE OR AFFILIATION s DSTM&SI i, O e S O w 4 8 G t s k 1 i ( l u : I - k li1 l l n. e e O sEE NsTRuCTNEss O e REvE'HER inoce4istaal Rev.oo n
j I O j EMERGENCY COMMUNICATIONS LOG SHEET INSTRUCTIONS ~ e Entry Number Instructions o 1. Identify the emergency location where this Log 5heet is maintained during an emergency (i.e.; Corporate incident Response Center, Materials Dept., Emergency Operations Facility, etc.) _ I 2. Enter the date wNch this Form is being used. Start a new Log Sheet each day. 3. Consecutively number each page used each day. 4. Enter the time for each Log entry. Use the 2400 hour clock to avoid confusion. ~ l S. Clearly record the name of the individual calling you or whom you are calling. 6. Record the individuals PGandE Emergency Organization Title or their pon PGandE affiliation. 4 Che k the entry activity as to whether the individual balled you or you are calling them. 7. c 8. Enter the entire context of the message being communicated. Read back the message to the individual to assure correct copy / transmission. 9. Enter your initials upon completion of each Log Sheet entry. o e g j' W M-
4 ~,- o PAciricoAs Ano ELacTRic company CORPORATE EMERGENCY RESPONSE PLAN POwB EMERGENCY RESPONSB AND RECOVERY ACTIVITIES LOG SHEET (N-autRogmcv Location TooAv s oATE raos ~~ Its (2) tm ENTEREoBy TIME (2W hesJ (INITIALS: lai (si
SUMMARY
OF ACTIVITY PERFORMED con o 9 e e 49 S e o ,. CD405 (8/82: Rev.00 .y. -,ogIREVER50
EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET INSTRUCTIONS ~~ Entry Number instructions 1. Identig the emergency location where this Log Sheet is maintained (furirigp'n emergency (i.e.: Corporate incident Response Center, ~ Materials Dept., Emergency Operations Facility, etc.) 2. Enter the date which this form is being used. Start a,'ew L:; Sheet each day. 3. Consecutively number eacfi page used each day. l 4. Enter the time for each Log entry. Use the 2400 hour clock to avoid ).. ~ . confus,on. i 5. Enter a summary of each activity being recorded. 6. Enter your initials upon completion of each Leg Sheet entry. r O r - -.}}