{{#Wiki_filter:.h   *.
{{#Wiki_filter:.h VIHOINIA ELECTHIC AND PowEit CoupANy Ricnwoxo,Vruots A 202 61 January 10, 1995 U. S. Nuclear Regulatory Commission Serial No.
VIHOINIA ELECTHIC AND PowEit CoupANy Ricnwoxo,Vruots A 202 61 January 10, 1995 U. S. Nuclear Regulatory Commission                       Serial No. 95-014 Attention: Document Control Desk                         NL&P/GSS     R0 Washington, D.C. 20555                                   Docket Nos. 50-338 50-339 License Nos. NPF-4 NPF-7 Gentlemen:
95-014 Attention: Document Control Desk NL&P/GSS R0 Washington, D.C. 20555 Docket Nos.
50-338 50-339 License Nos. NPF-4 NPF-7 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT Enclosed is the Monthly Operating Report for North Anna Power Station Units 1 and 2 for the month of December 1994.
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT Enclosed is the Monthly Operating Report for North Anna Power Station Units 1 and 2 for the month of December 1994.
Very truly yours, M. L. Bowling, Manager Nuclear Licensing and Programs Enclosure cc:     U.S. Nuclear Regulatory Commission Region ll 101 Marietta Street, NW Suite 2900 Atlanta, GA 30323 Mr. R. D. McWhorter NRC Senior Resident inspector North Anna Power Station 950118o216 941231 PDR     ADOCK 0500o338 POR R   -
Very truly yours, M. L. Bowling, Manager Nuclear Licensing and Programs Enclosure cc:
4
U.S. Nuclear Regulatory Commission Region ll 101 Marietta Street, NW Suite 2900 Atlanta, GA 30323 Mr. R. D. McWhorter NRC Senior Resident inspector North Anna Power Station 950118o216 941231 PDR ADOCK 0500o338 R
POR 4


y       ..
y 4
4 VIRGINIA POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH: December   YEAR:   1994 Approved:
VIRGINIA POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH:
J g     staum neger -
December YEAR:
1994 Approved:
J g
staum neger -


                          ..        .      -          _      m                 _ _ .                        - .            _ . _ _ ._                __ ..                    . -  . . - . _    ..
m OPERATING DATA REPORT.
OPERATING DATA REPORT.
DOCKET NO.:
DOCKET NO.:           50-338 DATE: January 5, 1995                                                     !
50-338 DATE: January 5, 1995 CONTACT: J. A. Stall PHONE: (703) 894-2101
CONTACT: J. A. Stall PHONE: (703) 894-2101
'0PERATING STATUS I
                              '0PERATING STATUS                                                                                                                                                             ,
. 1.
I
Uni t Name s................................ Nor th Anna 1 2.
    . 1. Uni t Name s . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Nor th Anna 1
Reporting Period:......................... December 1994
: 2. Reporting     Period:......................... December 1994
. 3.
    . 3.     Licensed Thermal Power (MWt) .............                                         '2,893
Licensed Thermal Power (MWt).............
: 4. Nameplate Rating (Gross MWe):.............                                           994                                                                                                     ;
'2,893 4.
: 5. Dtsign Electrical Rating (Net MWe):.......                                           907                                                                                                     l
Nameplate Rating (Gross MWe):.............
: 6. M ximum Dependable Capacity (Gross MWe):..                                           948                                                                                                     ,
994 5.
: 7. MIximum Dependable Capacity (Net MWe):....                                           900
Dtsign Electrical Rating (Net MWe):.......
: 8. If changes occur in Capacity Ratings (Items No. 3 thru 7) since last report, give reasonst _N/A i
907 l
    ' 9. Power level to which restricted, if any (Net MWe): _ N/A                                                                                                                                         ,
6.
: 10. Rsasons for restrictions, if any:                                         N/A I
M ximum Dependable Capacity (Gross MWe):..
i This Month                     Y*t-D                   Ctmulative                         [
948 7.
: 11. Hours in Reporting             Period................................                                   744.0                     8,760.0                   144,876.0                         I
MIximum Dependable Capacity (Net MWe):....
: 12. Number of Hours Reactor was                       Critical.....................                           744.0                     8,042.1                   108,447.8                         j
900 8.
: 13. RIac t or R eserve Shutdown Hours. . . . . . . . . . . . . . . . . . . . . . . . . . .                     0.0                       103.7                   6,930.5
If changes occur in Capacity Ratings (Items No. 3 thru 7) since last report, give reasonst _N/A i
: 14. Hours Generator 0n Line..................................                                                 744.0                     8,012.8                   105,453.7                       !
' 9.
: 15. Unit Reserve Shutdown Hours..............................                                                   0.0                         0.0                       0.0
Power level to which restricted, if any (Net MWe): _ N/A
: 16. Gross Thermal Fnergy Generat ed (MWH ) . . . . . . . . . . . . . . . . . . . . . 2,151,651.5                                   21,733,343.5         280,185,579.9                             :
: 10. Rsasons for restrictions, if any:
e
N/A I
: 17. Gross Electrical Energy Generated (MWH)..................                                           709,438.0                 7,160,263.0           92,075,620.0                             ;
i This Month Y*t-D Ctmulative
: 18. Nic E lec t r i cal Energy Generated (MWH ) . . . . . . . . . . . . . . . . . . . .                 675,974.0                 6,795,701.0           87,202,286.0                             l
[
: 19. Unit Service         Factor......................................                                         100.0%                       91.5%                     72.8%
: 11. Hours in Reporting Period................................
: 20. Uni t Ava i l abi l i ty F ac t or. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .       100.0%                       91.5%                     72.8%                       ,
744.0 8,760.0 144,876.0 I
: 21. Unit capacity Factor (using MDC                           Net).....................                       101.0%                       86.2%                     67.3%                       ;
: 12. Number of Hours Reactor was Critical.....................
: 22. Unit Capacity Factor (using DER                           Net).....................                       100.2%                       85.5%                     66.4%                       '
744.0 8,042.1 108,447.8 j
: 23. Forced Outage Rate.......................................                                                   0.0%                         0.0%                     10.0%                       ,
: 13. RIac t or R eserve Shutdown Hours...........................
: 24. Shutdowns Scheduled over Next 6 Months (Type, Date, and Duration of Each)_N/A i
0.0 103.7 6,930.5
: 14. Hours Generator 0n Line..................................
744.0 8,012.8 105,453.7
: 15. Unit Reserve Shutdown Hours..............................
0.0 0.0 0.0
: 16. Gross Thermal Fnergy Generat ed (MWH )..................... 2,151,651.5 21,733,343.5 280,185,579.9 e
: 17. Gross Electrical Energy Generated (MWH)..................
709,438.0 7,160,263.0 92,075,620.0
: 18. Nic E lec t r i cal Energy Generated (MWH )....................
675,974.0 6,795,701.0 87,202,286.0 l'
: 19. Unit Service Factor......................................
100.0%
91.5%
72.8%
: 20. Uni t Ava i l abi l i ty F ac t or.................................
100.0%
91.5%
72.8%
: 21. Unit capacity Factor (using MDC Net).....................
101.0%
86.2%
67.3%
: 22. Unit Capacity Factor (using DER Net).....................
100.2%
85.5%
66.4%
: 23. Forced Outage Rate.......................................
0.0%
0.0%
10.0%
: 24. Shutdowns Scheduled over Next 6 Months (Type, Date, and Duration of Each)_N/A i;
i
i
: 25. If Shutdown at end of Report Period, estimated time of Startup:_N/A                                                                                                                             fr
: 25. If Shutdown at end of Report Period, estimated time of Startup:_N/A f
      ' 26. Units in Test Status (Prior to Commercial Operation):                                                                                                                                           j Forecast           Achieved l
r
' 26. Units in Test Status (Prior to Commercial Operation):
j Forecast Achieved l
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION t
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION t
i t
i t


AVERAGE DAILY UNIT POWER LEVEL Docket No.:       50-338 Unit:                 NA-1               l Date:           January 5. 1995       l
AVERAGE DAILY UNIT POWER LEVEL Docket No.:
50-338 Unit:
NA-1 Date:
January 5.
1995 l


==Contact:==
==Contact:==
J. A. Stall           l Phone:         (703) 894-2101 i
J. A.
MONTH: December 1994                                                           ]
Stall l
l DAY     AVERAGE DAILY POWER           DAY   AVERAGE DAILY POWER           ,
Phone:
LEVEL (MWe-Ne t)                         LEVEL (MWe-Net)           l 1             910                     17                 908 2             910                     18                 908             ;
(703) 894-2101 i
3              910                     19                 908 4             911                     20                 908 5             910                     21                 909 6             909                     22                 907             !
MONTH: December 1994
7              911                     23                 908             :
]
8              911                     24                 908             i 9             900                     25                 909             l 10             910                     26                 909             i 11             910                     27                 909             ;
DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL (MWe-Ne t)
12             909                     28                 908 13             909                     29       _
LEVEL (MWe-Net) l 1
908 14             908                     30                 907             l 15             909                     31                 907             l 16             909                                                           ,
910 17 908 2
l t
910 18 908 3
Instructions:                                                                   i On this format, list the average daily unit power level in MWe-           !
910 19 908 4
Net for each day in the reporting month. Compute to the nearest                 ,
911 20 908 5
whole megawatt.
910 21 909 6
909 22 907 7
911 23 908 8
911 24 908 i
9 900 25 909 l
10 910 26 909 i
11 910 27 909 12 909 28 908 13 909 29 908 14 908 30 907 l
15 909 31 907 l
16 909 l
t Instructions:
i On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.


            .- .                            -        . . _ . .._. ~ _ - .
.._. ~
,'    .                NORTH ANNA POWER STATION                                       l l
NORTH ANNA POWER STATION l
    .                        UNIT NO.:   1 MONTH:     December
UNIT NO.:
1 MONTH:
December


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE i
OF OPERATING EXPERIENCE i
Page 1 of 1                                     ,
Page 1 of 1 Listed below in chronological sequence is a
Listed below in chronological sequence is a summary of operating               ;
summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
experiences for this month which required load reductions or resulted in significant non-load related incidents.
Date Time Data December 01, 1994 0000 Began month with unit at 100% power, 954 MWe.
Date           Time                 Data December 01, 1994   0000     Began month with unit at 100% power, 954 MWe.
December 09, 1994 0806 Commenced unit ramp-down for TVFT.
December 09, 1994   0806     Commenced unit ramp-down for TVFT.       Unit at   !
Unit at 100% power, 953 MWe.
100% power, 953 MWe.
1 0900 Unit stable at 90% power, 869 MWe.
1 0900     Unit stable at 90% power, 869 MWe.
1031 Commenced unit ramp-up following TVFT. Unit at 90% power, 869 MWe.
1031     Commenced unit ramp-up following TVFT. Unit at 90% power, 869 MWe.
1148 Unit stable at 100% power, 953 IfWe.
1148     Unit stable at 100% power, 953 IfWe.
December 31, 1994 2400 Ended month with unit at 100% power, 952 MWe.
December 31, 1994   2400     Ended month with unit at 100% power, 952 MWe.    ; .
i I
i I
t s
t s
l h
h 1
1
.]
                                                                                  .]


  )
)
Page 1       o f ,_1 UNIT SHUTDOWN AND POWER REDUCTIONS Explanation Sheet Docket No.:     50-338 Report Month pecember       Unit Name:                             NA                                     Year:   1994   Date: Januarv 5,                           1995
Page 1
o f,_1 UNIT SHUTDOWN AND POWER REDUCTIONS Explanation Sheet Docket No.:
50-338 Report Month pecember Unit Name:
NA Year:
1994 Date: Januarv 5, 1995


==Contact:==
==Contact:==
J. A. Stall
J.
                  *No entry this month   .
A.
Stall
*No entry this month.
l l
l l
{
{
Line 114: Line 172:
l
l


DOCKET NO.: 50-338           -
DOCKET NO.:
                                                                                                                                ~'
50-338
UNIT NAME:       NA-1 DATE: January 5, 1995*
~'
REPORT MONTH: December 1994                       CONTACT: J. A. Stall PHONE: (703) 894-2101 1                     2             3                       4           5 No.         Date Type   Duration Reason         Method of     Licensee       System   Component         Cause & Corrective (hrs)                 Shutting         Event       Code       Code               Action to Down Reactor   Report #                                   Prevent Recurrence ONo entry this month 1: Type           2: Reason                                                   3: Method             4:
UNIT NAME:
F= Forced     A= Equipment Failure (explain)                             1= Manual             Exhibit F - Instructions S= Scheduled B= Maintenance or Test                                     2= Manual Scram       for preparation of Data C= Refueling                                               3= Automatic Scram     Entry Sheets for Licensee D= Regulatory Restriction                                   4= Continuations       Event Report (LER) File E= Operator Training & License Examination                 5= Load Reduction       (NUREG-0161)
NA-1 DATE: January 5, 1995*
F= Administrative                                           9=Other G= Operational Error                                                             5:
REPORT MONTH: December 1994 CONTACT: J. A.
H=Other (explain)                                                                 Exhibit H - Same Source
Stall PHONE: (703) 894-2101 1
2 3
4 5
No.
Date Type Duration Reason Method of Licensee System Component Cause & Corrective (hrs)
Shutting Event Code Code Action to Down Reactor Report #
Prevent Recurrence ONo entry this month 1: Type 2: Reason 3: Method 4:
F= Forced A= Equipment Failure (explain) 1= Manual Exhibit F - Instructions S= Scheduled B= Maintenance or Test 2= Manual Scram for preparation of Data C= Refueling 3= Automatic Scram Entry Sheets for Licensee D= Regulatory Restriction 4= Continuations Event Report (LER) File E= Operator Training & License Examination 5= Load Reduction (NUREG-0161)
F= Administrative 9=Other G= Operational Error 5:
H=Other (explain)
Exhibit H - Same Source


  . _.                                - -        -. - -                      , ..                            -                  . - - .          -            -      --    --.. - _~ . .
--.. - _~..
i OPERATING DATA REPORT DOCKET NO.:         50 339                                     i DATE: January 5, 1995 CONTACT:       J. A. Stall PHONE: (703) 894 2101 i
i OPERATING DATA REPORT DOCKET NO.:
                                ' OPERATING STATUS
50 339 i
: 1. Unit           Name:................................ North Anna 2                                                                                                                   ,
DATE: January 5, 1995 CONTACT:
: 2. R epor t i ng Per i od : . . . . . . . . . . . . . . . . . . . . . . . . . December 1994                                                                                             ;
J. A. Stall PHONE: (703) 894 2101 i
  ' 3.     Licensed Thermal Power (MWt) .............                                           2893                                                                                           ;
' OPERATING STATUS 1.
: 4. Nameplate Rating (Gross MWe) .............                                                 9 79                                                                                         i
Unit Name:................................ North Anna 2 2.
: 5. DIsign Electrical Rating (Net MWe) .......                                             907                                                                                         f
R epor t i ng Per i od :......................... December 1994
: 6. MIximum Dependable Capacity (Gross MWe) ..                                             935                                                                                         ,
' 3.
: 7. M2ximum Dependable Capacity (Net MWe) ....                                             887                                                                                         l,
Licensed Thermal Power (MWt).............
: 8. If changes occur in capacity Ratings (!tems No. 3 thru 7) since last report, givo reasons: __N/A                                                                                   f f
2893 4.
: 9. Power level to which restricted if any (Net MWe): __,N/A
Nameplate Rating (Gross MWe).............
: 10. Psasons for restrictions, if any:                                                                 N/A                                                                               -f 5
9 79 i
                                                                                                                                                                                              .i This Month                 Y-t D               Cumulative
5.
: 11. Hours i n R epor t i ng Per i od. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .               744.0                 8,760.0               123,144.0
DIsign Electrical Rating (Net MWe).......
: 12. N umber of H ours R eact or was C r i t i cal . . . . . . . . . . . . . . . . . . . . .                       744.0                 8,559.9               102,933.5
907 f
: 13. Rsac t or R eserve Shut down Hours. . . . . . . . . . . . . . . . . . . . . . . . . . .                         0.0                   95.7                 6,508.9
6.
: 14. Hours Genera t or Dn L i ne. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .                 744.0                 8,518.3               101,835.7
MIximum Dependable Capacity (Gross MWe)..
: 15. Unit Reserve Shutdown Hours..............................                                                       0.0                     0.0                     0.0
935 7.
: 16. Gross Thermal Energy Generat ed (MWH ) . . . . . . . . . . . . . . . . . . . . 2,151,057.9                                 24,390,3D6.3             276,615,964.0
M2ximum Dependable Capacity (Net MWe)....
: 17. Gross Electrical Energy Generated (MWH).................. 695,801.0                                                           7,881,381.0             90,476,857.0
887 l,
: 18. Nat E l ec t r i ca l E nergy Generat ed ( MWH ) . . . . . . . . . . . . . . . . . . . .                 662,029.0           7,490,267.0             86,539,968.0
8.
: 19. Unit Service Factor......................................                                                     100.0%                   97.2%                   82.7%
If changes occur in capacity Ratings (!tems No. 3 thru 7) since last report, givo reasons: __N/A f
: 20. Unit Availability Factor.................................                                                     100.0%                   97.2%                   82.7%
f 9.
: 21. Unit Capacity Factor (using MDC                         Net).....................                             100.3%                   96.4%                   70.1%
Power level to which restricted if any (Net MWe): __,N/A
: 22. Unit Capacity Factor (using DER                         Net).....................                             98.1%                   94.3%                   77.5%
-f
: 23. F orc ed Dut a ge R a t e . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .         0.0%                     2.8%                   5.2%
: 10. Psasons for restrictions, if any:
N/A 5
.i This Month Y-t D Cumulative
: 11. Hours i n R epor t i ng Per i od................................
744.0 8,760.0 123,144.0
: 12. N umber of H ours R eact or was C r i t i cal.....................
744.0 8,559.9 102,933.5
: 13. Rsac t or R eserve Shut down Hours...........................
0.0 95.7 6,508.9
: 14. Hours Genera t or Dn L i ne..................................
744.0 8,518.3 101,835.7
: 15. Unit Reserve Shutdown Hours..............................
0.0 0.0 0.0
: 16. Gross Thermal Energy Generat ed (MWH ).................... 2,151,057.9 24,390,3D6.3 276,615,964.0
: 17. Gross Electrical Energy Generated (MWH)..................
695,801.0 7,881,381.0 90,476,857.0
: 18. Nat E l ec t r i ca l E nergy Generat ed ( MWH )....................
662,029.0 7,490,267.0 86,539,968.0
: 19. Unit Service Factor......................................
100.0%
97.2%
82.7%
: 20. Unit Availability Factor.................................
100.0%
97.2%
82.7%
: 21. Unit Capacity Factor (using MDC Net).....................
100.3%
96.4%
70.1%
: 22. Unit Capacity Factor (using DER Net).....................
98.1%
94.3%
77.5%
: 23. F orc ed Dut a ge R a t e.......................................
0.0%
2.8%
5.2%
: 24. Shutdowns Scheduled Over Next 6 Ponths (Type, Date, and Duration of Each):_ Refueling / Steam Generator Replacement, 03/25/95, 105 days
: 24. Shutdowns Scheduled Over Next 6 Ponths (Type, Date, and Duration of Each):_ Refueling / Steam Generator Replacement, 03/25/95, 105 days
: 25. If Shutdown at end of Report Period, estimated time of Startup:                                                         N/A
: 25. If Shutdown at end of Report Period, estimated time of Startup:
N/A
: 26. Units in Test Status (Prior to Commercial Operation):
: 26. Units in Test Status (Prior to Commercial Operation):
Forecast                 Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERAT!DN
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERAT!DN


~     '
~
,r   '.
,r AVERAGE DAILY UNIT POWER LEVEL i
AVERAGE DAILY UNIT POWER LEVEL i
t Docket No.:
t Docket No.:           50-339 Unit:                   NA-2 Date:             Januarv 5,   1995
50-339 Unit:
NA-2 Date:
Januarv 5, 1995


==Contact:==
==Contact:==
J. A. Stall Phone:             (703) 894-2101 i
J.
MONTH: December 1994 DAY     AVERAGE DAILY POWER           DAY           AVERAGE DAILY POWER LEVEL (MWe-Net)                             LEVEL (MWe-Net)                   v 1             891                     17                     890 2             881                     18                     891 3             888                     19                     891 4             889                     20                     890 5             891                     21                     891 6             890                     22                     891 7             891                     23                     890 8             890                     24                     891 9             891                     25                     891 10             890                     26                     891 11             891                     27                     891 12             891                     28                     r,9 0 j
A.
13             891       .            29                     890 14             891         _
Stall Phone:
30                     883 15             891                     31                     887 16             891 i
(703) 894-2101 i
MONTH: December 1994 DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
LEVEL (MWe-Net) v 1
891 17 890 2
881 18 891 3
888 19 891 4
889 20 890 5
891 21 891 6
890 22 891 7
891 23 890 8
890 24 891 9
891 25 891 10 890 26 891 11 891 27 891 12 891 28 r,9 0 j
13 891 29 890 14 891 30 883 15 891 31 887 16 891 i
1 Instructions:
1 Instructions:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest                             i whole megawatt.                                                                             j i
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
I l
Compute to the nearest i
whole megawatt.
j i
I


NORTH ANNA POWER STATION UNIT NO.: 2 MONTH:   December                                   i
NORTH ANNA POWER STATION UNIT NO.:
2 MONTH:
December i


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE Page 1 of 1                                   l Listed below in chronological sequence is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
OF OPERATING EXPERIENCE Page 1 of 1 Listed below in chronological sequence is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
Date           Time               Data December 01, 1994   0000     Began month with unit at 100% power, 935 MWe.
Date Time Data December 01, 1994 0000 Began month with unit at 100% power, 935 MWe.
December 04, 1994   0900     Commenced unit ramp-down for TVFT. Unit at :
December 04, 1994 0900 Commenced unit ramp-down for TVFT.
100% power, 934 MWe.
Unit at 100% power, 934 MWe.
0945     Unit stable at 90% power, 860 MWe.
0945 Unit stable at 90% power, 860 MWe.
1103     Commenced unit ramp-up following TVFT. Unit at 90% power, 860 MWe.
1103 Commenced unit ramp-up following TVFT. Unit at 90% power, 860 MWe.
1 1245     Unit stable at 100% power, 933 MWe.           ;
1 1245 Unit stable at 100% power, 933 MWe.
December 30, 1994   0953     Commenced unit ramp-down for T7FT. Unit at 100% power, 940 MWe.
December 30, 1994 0953 Commenced unit ramp-down for T7FT.
I 1025     Unit stable at 90% power, 860 MWe.
Unit at 100% power, 940 MWe.
1128     Commenced unit ramp-up following TVFT. Unit at 90% power, 860 MWe.
1025 Unit stable at 90% power, 860 MWe.
1200     Unit stable at 100% power, 933 MWe.
1128 Commenced unit ramp-up following TVFT. Unit at 90% power, 860 MWe.
December 31, 1994   2400     Ended month with unit at 100% power, 933 MWe,   1 l
1200 Unit stable at 100% power, 933 MWe.
December 31, 1994 2400 Ended month with unit at 100% power, 933 MWe, 1
i l
i l
l l
l 1
l 1


  ,4, Page 1 of __1 UNIT SHUTDOWN AND POWER REDUCTIONS Explanation Sheet Docket No.:         50-339 Report Month December         Unit Name:   NA-2 Year:       1994   Date: Januarv 5, 1995
,4, Page 1
of __1 UNIT SHUTDOWN AND POWER REDUCTIONS Explanation Sheet Docket No.:
50-339 Report Month December Unit Name:
NA-2 Year:
1994 Date: Januarv 5, 1995


==Contact:==
==Contact:==
J. A. Stall
J.
            *No entry this month.
A.
Stall
*No entry this month.
l
l


44 DOCKET NO.: 50-339                     ?,
44 DOCKET NO.:
UNIT NAME:         NA-2
50-339
* DATE: January 5, 1995 REPORT MONTH: December 1994                                       CONTACT: J. A. Stall PHONE: (703) 894-2101 1                 2                   3                         4                   5 No.                           Date                                                 Type                         Duration Reason   Method of             Licensee       System     Component                   Cause & Corrective (hrs)             Shutting               Event         Code                 Code                 Action to Down Reactor           Report #                                               Prevent Recurrence
?,
            *No entry this month.
UNIT NAME:
1: Type                                                                     2: Reason                                                                               3: Method                         4:
NA-2 DATE: January 5, 1995 REPORT MONTH: December 1994 CONTACT:
F= Forced                                                                         A= Equipment Failure (explain)                                                         1= Manual                         Exhibit F - Instructions S= Scheduled                                                                       B= Maintenance or Test                                                               2= Manual Scram                   for preparation of Data C= Refueling                                                                         3= Automatic Scran                 Entry Sheets for Licensee D= Regulatory Restriction                                                             4= Continuations                   Event Report (LER) File E= Operator Training & License Examination                                           5= Load Reduction                   (NUREG-0161)
J. A.
F= Administrative                                                                     9=Other G= Operational Error                                                                                                 5:
Stall PHONE: (703) 894-2101 1
H=Other (explain)                                                                                                         Exhibit H - Same Source
2 3
  . _ _ _ _    _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . .                        _ _ _ _ . - . _ . . _ _  . _ _          _ _ _ _ _ _ _        . . . _            __  _._    _ _ _}}
4 5
No.
Date Type Duration Reason Method of Licensee System Component Cause & Corrective (hrs)
Shutting Event Code Code Action to Down Reactor Report #
Prevent Recurrence
*No entry this month.
1: Type 2: Reason 3: Method 4:
F= Forced A= Equipment Failure (explain) 1= Manual Exhibit F - Instructions S= Scheduled B= Maintenance or Test 2= Manual Scram for preparation of Data C= Refueling 3= Automatic Scran Entry Sheets for Licensee D= Regulatory Restriction 4= Continuations Event Report (LER) File E= Operator Training & License Examination 5= Load Reduction (NUREG-0161)
F= Administrative 9=Other G= Operational Error 5:
H=Other (explain)
Exhibit H - Same Source
.}}

Latest revision as of 01:10, 15 December 2024

Monthly Operating Repts for Dec 1994 for North Anna Power Units 1 & 2
ML20077P688
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 12/31/1994
From: Bowling M, Stall J
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
95-014, 95-14, NUDOCS 9501180216
Download: ML20077P688 (12)


Text

.h VIHOINIA ELECTHIC AND PowEit CoupANy Ricnwoxo,Vruots A 202 61 January 10, 1995 U. S. Nuclear Regulatory Commission Serial No.95-014 Attention: Document Control Desk NL&P/GSS R0 Washington, D.C. 20555 Docket Nos.

50-338 50-339 License Nos. NPF-4 NPF-7 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT Enclosed is the Monthly Operating Report for North Anna Power Station Units 1 and 2 for the month of December 1994.

Very truly yours, M. L. Bowling, Manager Nuclear Licensing and Programs Enclosure cc:

U.S. Nuclear Regulatory Commission Region ll 101 Marietta Street, NW Suite 2900 Atlanta, GA 30323 Mr. R. D. McWhorter NRC Senior Resident inspector North Anna Power Station 950118o216 941231 PDR ADOCK 0500o338 R

POR 4

y 4

VIRGINIA POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH:

December YEAR:

1994 Approved:

J g

staum neger -

m OPERATING DATA REPORT.

DOCKET NO.:

50-338 DATE: January 5, 1995 CONTACT: J. A. Stall PHONE: (703) 894-2101

'0PERATING STATUS I

. 1.

Uni t Name s................................ Nor th Anna 1 2.

Reporting Period:......................... December 1994

. 3.

Licensed Thermal Power (MWt).............

'2,893 4.

Nameplate Rating (Gross MWe):.............

994 5.

Dtsign Electrical Rating (Net MWe):.......

907 l

6.

M ximum Dependable Capacity (Gross MWe):..

948 7.

MIximum Dependable Capacity (Net MWe):....

900 8.

If changes occur in Capacity Ratings (Items No. 3 thru 7) since last report, give reasonst _N/A i

' 9.

Power level to which restricted, if any (Net MWe): _ N/A

10. Rsasons for restrictions, if any:

N/A I

i This Month Y*t-D Ctmulative

[

11. Hours in Reporting Period................................

744.0 8,760.0 144,876.0 I

12. Number of Hours Reactor was Critical.....................

744.0 8,042.1 108,447.8 j

13. RIac t or R eserve Shutdown Hours...........................

0.0 103.7 6,930.5

14. Hours Generator 0n Line..................................

744.0 8,012.8 105,453.7

15. Unit Reserve Shutdown Hours..............................

0.0 0.0 0.0

16. Gross Thermal Fnergy Generat ed (MWH )..................... 2,151,651.5 21,733,343.5 280,185,579.9 e
17. Gross Electrical Energy Generated (MWH)..................

709,438.0 7,160,263.0 92,075,620.0

18. Nic E lec t r i cal Energy Generated (MWH )....................

675,974.0 6,795,701.0 87,202,286.0 l'

19. Unit Service Factor......................................

100.0%

91.5%

72.8%

20. Uni t Ava i l abi l i ty F ac t or.................................

100.0%

91.5%

72.8%

21. Unit capacity Factor (using MDC Net).....................

101.0%

86.2%

67.3%

22. Unit Capacity Factor (using DER Net).....................

100.2%

85.5%

66.4%

23. Forced Outage Rate.......................................

0.0%

0.0%

10.0%

24. Shutdowns Scheduled over Next 6 Months (Type, Date, and Duration of Each)_N/A i;

i

25. If Shutdown at end of Report Period, estimated time of Startup:_N/A f

r

' 26. Units in Test Status (Prior to Commercial Operation):

j Forecast Achieved l

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION t

i t

AVERAGE DAILY UNIT POWER LEVEL Docket No.:

50-338 Unit:

NA-1 Date:

January 5.

1995 l

Contact:

J. A.

Stall l

Phone:

(703) 894-2101 i

MONTH: December 1994

]

DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL (MWe-Ne t)

LEVEL (MWe-Net) l 1

910 17 908 2

910 18 908 3

910 19 908 4

911 20 908 5

910 21 909 6

909 22 907 7

911 23 908 8

911 24 908 i

9 900 25 909 l

10 910 26 909 i

11 910 27 909 12 909 28 908 13 909 29 908 14 908 30 907 l

15 909 31 907 l

16 909 l

t Instructions:

i On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

.._. ~

NORTH ANNA POWER STATION l

UNIT NO.:

1 MONTH:

December

SUMMARY

OF OPERATING EXPERIENCE i

Page 1 of 1 Listed below in chronological sequence is a

summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.

Date Time Data December 01, 1994 0000 Began month with unit at 100% power, 954 MWe.

December 09, 1994 0806 Commenced unit ramp-down for TVFT.

Unit at 100% power, 953 MWe.

1 0900 Unit stable at 90% power, 869 MWe.

1031 Commenced unit ramp-up following TVFT. Unit at 90% power, 869 MWe.

1148 Unit stable at 100% power, 953 IfWe.

December 31, 1994 2400 Ended month with unit at 100% power, 952 MWe.

i I

t s

h 1

.]

)

Page 1

o f,_1 UNIT SHUTDOWN AND POWER REDUCTIONS Explanation Sheet Docket No.:

50-338 Report Month pecember Unit Name:

NA Year:

1994 Date: Januarv 5, 1995

Contact:

J.

A.

Stall

  • No entry this month.

l l

{

l l

l

DOCKET NO.:

50-338

~'

UNIT NAME:

NA-1 DATE: January 5, 1995*

REPORT MONTH: December 1994 CONTACT: J. A.

Stall PHONE: (703) 894-2101 1

2 3

4 5

No.

Date Type Duration Reason Method of Licensee System Component Cause & Corrective (hrs)

Shutting Event Code Code Action to Down Reactor Report #

Prevent Recurrence ONo entry this month 1: Type 2: Reason 3: Method 4:

F= Forced A= Equipment Failure (explain) 1= Manual Exhibit F - Instructions S= Scheduled B= Maintenance or Test 2= Manual Scram for preparation of Data C= Refueling 3= Automatic Scram Entry Sheets for Licensee D= Regulatory Restriction 4= Continuations Event Report (LER) File E= Operator Training & License Examination 5= Load Reduction (NUREG-0161)

F= Administrative 9=Other G= Operational Error 5:

H=Other (explain)

Exhibit H - Same Source

--.. - _~..

i OPERATING DATA REPORT DOCKET NO.:

50 339 i

DATE: January 5, 1995 CONTACT:

J. A. Stall PHONE: (703) 894 2101 i

' OPERATING STATUS 1.

Unit Name:................................ North Anna 2 2.

R epor t i ng Per i od :......................... December 1994

' 3.

Licensed Thermal Power (MWt).............

2893 4.

Nameplate Rating (Gross MWe).............

9 79 i

5.

DIsign Electrical Rating (Net MWe).......

907 f

6.

MIximum Dependable Capacity (Gross MWe)..

935 7.

M2ximum Dependable Capacity (Net MWe)....

887 l,

8.

If changes occur in capacity Ratings (!tems No. 3 thru 7) since last report, givo reasons: __N/A f

f 9.

Power level to which restricted if any (Net MWe): __,N/A

-f

10. Psasons for restrictions, if any:

N/A 5

.i This Month Y-t D Cumulative

11. Hours i n R epor t i ng Per i od................................

744.0 8,760.0 123,144.0

12. N umber of H ours R eact or was C r i t i cal.....................

744.0 8,559.9 102,933.5

13. Rsac t or R eserve Shut down Hours...........................

0.0 95.7 6,508.9

14. Hours Genera t or Dn L i ne..................................

744.0 8,518.3 101,835.7

15. Unit Reserve Shutdown Hours..............................

0.0 0.0 0.0

16. Gross Thermal Energy Generat ed (MWH ).................... 2,151,057.9 24,390,3D6.3 276,615,964.0
17. Gross Electrical Energy Generated (MWH)..................

695,801.0 7,881,381.0 90,476,857.0

18. Nat E l ec t r i ca l E nergy Generat ed ( MWH )....................

662,029.0 7,490,267.0 86,539,968.0

19. Unit Service Factor......................................

100.0%

97.2%

82.7%

20. Unit Availability Factor.................................

100.0%

97.2%

82.7%

21. Unit Capacity Factor (using MDC Net).....................

100.3%

96.4%

70.1%

22. Unit Capacity Factor (using DER Net).....................

98.1%

94.3%

77.5%

23. F orc ed Dut a ge R a t e.......................................

0.0%

2.8%

5.2%

24. Shutdowns Scheduled Over Next 6 Ponths (Type, Date, and Duration of Each):_ Refueling / Steam Generator Replacement, 03/25/95, 105 days
25. If Shutdown at end of Report Period, estimated time of Startup:

N/A

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERAT!DN

~

,r AVERAGE DAILY UNIT POWER LEVEL i

t Docket No.:

50-339 Unit:

NA-2 Date:

Januarv 5, 1995

Contact:

J.

A.

Stall Phone:

(703) 894-2101 i

MONTH: December 1994 DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

LEVEL (MWe-Net) v 1

891 17 890 2

881 18 891 3

888 19 891 4

889 20 890 5

891 21 891 6

890 22 891 7

891 23 890 8

890 24 891 9

891 25 891 10 890 26 891 11 891 27 891 12 891 28 r,9 0 j

13 891 29 890 14 891 30 883 15 891 31 887 16 891 i

1 Instructions:

On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest i

whole megawatt.

j i

I

NORTH ANNA POWER STATION UNIT NO.:

2 MONTH:

December i

SUMMARY

OF OPERATING EXPERIENCE Page 1 of 1 Listed below in chronological sequence is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.

Date Time Data December 01, 1994 0000 Began month with unit at 100% power, 935 MWe.

December 04, 1994 0900 Commenced unit ramp-down for TVFT.

Unit at 100% power, 934 MWe.

0945 Unit stable at 90% power, 860 MWe.

1103 Commenced unit ramp-up following TVFT. Unit at 90% power, 860 MWe.

1 1245 Unit stable at 100% power, 933 MWe.

December 30, 1994 0953 Commenced unit ramp-down for T7FT.

Unit at 100% power, 940 MWe.

1025 Unit stable at 90% power, 860 MWe.

1128 Commenced unit ramp-up following TVFT. Unit at 90% power, 860 MWe.

1200 Unit stable at 100% power, 933 MWe.

December 31, 1994 2400 Ended month with unit at 100% power, 933 MWe, 1

i l

l 1

,4, Page 1

of __1 UNIT SHUTDOWN AND POWER REDUCTIONS Explanation Sheet Docket No.:

50-339 Report Month December Unit Name:

NA-2 Year:

1994 Date: Januarv 5, 1995

Contact:

J.

A.

Stall

  • No entry this month.

l

44 DOCKET NO.:

50-339

?,

UNIT NAME:

NA-2 DATE: January 5, 1995 REPORT MONTH: December 1994 CONTACT:

J. A.

Stall PHONE: (703) 894-2101 1

2 3

4 5

No.

Date Type Duration Reason Method of Licensee System Component Cause & Corrective (hrs)

Shutting Event Code Code Action to Down Reactor Report #

Prevent Recurrence

  • No entry this month.

1: Type 2: Reason 3: Method 4:

F= Forced A= Equipment Failure (explain) 1= Manual Exhibit F - Instructions S= Scheduled B= Maintenance or Test 2= Manual Scram for preparation of Data C= Refueling 3= Automatic Scran Entry Sheets for Licensee D= Regulatory Restriction 4= Continuations Event Report (LER) File E= Operator Training & License Examination 5= Load Reduction (NUREG-0161)

F= Administrative 9=Other G= Operational Error 5:

H=Other (explain)

Exhibit H - Same Source

.