ML20084D973: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| (One intermediate revision by the same user not shown) | |||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:. . _ _ _ _ _ _ _ _ | {{#Wiki_filter:.. _ _ _ _ _ _ _ _ | ||
o | o iioCHESTER Ga5 ula D 2:'9tc ~ a ' n: - - | ||
iioCHESTER Ga5 ula D 2:'9tc ~ a ' n: - - | ~ | ||
ul% O NH'TE | ul% O NH'TE | ||
.t | |||
January 26, 1976 Director of Nuclear Reactor Regulation | .c,**ts'c. | ||
ATTN: Mr. Karl Goller | January 26, 1976 Director of Nuclear Reactor Regulation ATTN: Mr. Karl Goller | ||
-4 Assistant Director for Operating Reactors | |||
U. S. Nuclear Regulator / Commission | ~ | ||
Q,g | Division of Operating Reactors U. S. Nuclear Regulator / Commission g | ||
p Washington, D. C. | |||
20555 Q,g | |||
==Subject:== | ==Subject:== | ||
| Line 32: | Line 34: | ||
==Dear Mr. Goller:== | ==Dear Mr. Goller:== | ||
In accordance with Mr. Skovholt's letter of October 1,1973, con- | |||
In accordance with Mr. Skovholt's letter of October 1,1973, con- | ) | ||
cerning periodic inspection of hydraulic shock absorbers (snubbers), an | cerning periodic inspection of hydraulic shock absorbers (snubbers), an l | ||
All snubbers were considered operable at this inspection. The accumulator of the Bergen-Paterson unit outside of containment, reported in our letter dated December 23, 1975, was replaced and found to have a scored cylinder. The strut of the Bergen-Paterson unit outside of contain-ment, reported in our letter dated November 24, 1975 as having developed | inspection of all snubbers both inside and outside of containment was completed on January 12, 1976. | ||
All snubbers were considered operable at this inspection. The accumulator of the Bergen-Paterson unit outside of containment, reported in our {{letter dated|date=December 23, 1975|text=letter dated December 23, 1975}}, was replaced and found to have a scored cylinder. The strut of the Bergen-Paterson unit outside of contain-ment, reported in our {{letter dated|date=November 24, 1975|text=letter dated November 24, 1975}} as having developed wear at its attachment pin, w(to be within tolerances s replaced. Examination of the pin and bearing indicated the bearing. | |||
During the inspection fluid was added to five of the eight Grinnell snubber units located on the pressuri::er relief piping. There was no evi-dence of leakage. The "A" Steam Generator reservoir for the Steam Generator restraints was found to be empty after the outage. The reservoir was refilled and surveillance has been increased on it. The reservoir acts as a makeup tank only since the hydraulic units are dual chambered with internal displacement tubing. Leakage is believed to be from the tubing connections to the units which are not readily accessible for maintenance. | During the inspection fluid was added to five of the eight Grinnell snubber units located on the pressuri::er relief piping. There was no evi-dence of leakage. The "A" Steam Generator reservoir for the Steam Generator restraints was found to be empty after the outage. The reservoir was refilled and surveillance has been increased on it. The reservoir acts as a makeup tank only since the hydraulic units are dual chambered with internal displacement tubing. Leakage is believed to be from the tubing connections to the units which are not readily accessible for maintenance. | ||
Very truly yours , | Very truly yours, | ||
/ | |||
p,/...' <. (~ | |||
4 83041207SS 760126 PDR ADOCK 05000244 0 | |||
PDR TOPY SENT REG 1M7 ' %}} | |||
Latest revision as of 05:46, 14 December 2024
| ML20084D973 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 01/26/1976 |
| From: | White L ROCHESTER GAS & ELECTRIC CORP. |
| To: | Goller K Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8304120755 | |
| Download: ML20084D973 (1) | |
Text
.. _ _ _ _ _ _ _ _
o iioCHESTER Ga5 ula D 2:'9tc ~ a ' n: - -
~
ul% O NH'TE
.t
.c,**ts'c.
January 26, 1976 Director of Nuclear Reactor Regulation ATTN: Mr. Karl Goller
-4 Assistant Director for Operating Reactors
~
Division of Operating Reactors U. S. Nuclear Regulator / Commission g
p Washington, D. C.
20555 Q,g
Subject:
Inspection of Hydraulic Shock Absorbers (Snubbers)
R. E. Ginna Nuclear Power Plant, Unit No.1 Docket No. 50-244
Dear Mr. Goller:
In accordance with Mr. Skovholt's letter of October 1,1973, con-
)
cerning periodic inspection of hydraulic shock absorbers (snubbers), an l
inspection of all snubbers both inside and outside of containment was completed on January 12, 1976.
All snubbers were considered operable at this inspection. The accumulator of the Bergen-Paterson unit outside of containment, reported in our letter dated December 23, 1975, was replaced and found to have a scored cylinder. The strut of the Bergen-Paterson unit outside of contain-ment, reported in our letter dated November 24, 1975 as having developed wear at its attachment pin, w(to be within tolerances s replaced. Examination of the pin and bearing indicated the bearing.
During the inspection fluid was added to five of the eight Grinnell snubber units located on the pressuri::er relief piping. There was no evi-dence of leakage. The "A" Steam Generator reservoir for the Steam Generator restraints was found to be empty after the outage. The reservoir was refilled and surveillance has been increased on it. The reservoir acts as a makeup tank only since the hydraulic units are dual chambered with internal displacement tubing. Leakage is believed to be from the tubing connections to the units which are not readily accessible for maintenance.