ML18143A979
| ML18143A979 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 11/24/1975 |
| From: | White L Rochester Gas & Electric Corp |
| To: | Goller K Office of Nuclear Reactor Regulation |
| References | |
| Download: ML18143A979 (4) | |
Text
)
I)
NRC DISTRIBUTION FOR PART 50 DOCKET MATERIAL (TEMPORARY FORM)
CONTROL NO 13456 FILE'ROM.
Rochester Gas 6( Elec.
Co Rnches ter;.N.Y.'4649 L D White Jr.
KARATE OF DOC 11-20-75.
DATE R EC'D LTR TWX 11-28-75 RPT OTHER TO:
Min Karl Goller ORIG 1 siggdd:
CC OTHER SENT NRC P DR SENT LOCALPDR CLASS UNCLASS PROPINFO INPUT s
PLANT NAMF.
R.E. Ginna Flan't XXX DESCRIPTION: Ltr re our 10-1-73 ltr....furn
. info on inspection of hydraulic
-shock'bsorbers(snubbers) at the R.E. Ginna Plant
~ ~ ~ ~
~ '.
NO CYS REC'D 1
ENCLOSUR ES:
DOCKET NO:
50-244 6,
.E(l((t)lgliPL~4~
r BUTLER (L)
W/ Copies CLARK (L)
W/ Copies PARR (L)
W/ Copies KNIEL (L)
W/ Copies REGAN (E)
W/ Copies LEAR (0 W/ Copies SPIES/ Copies PM W/
opies ZIEMANN(L)
W/ Copies DICKER (E)
W/ Copies KNIGHTON (E)
W/ Copies
~
YOUNGBLOOD (E)
W/ Copies SCHWENCER (L)
W/ Copies STOLZ (L)
W/ Copies VASSALLO (L)
W/ Copies CUTE (L)
W//Copies INTERNALDISTRIBUTION FOR ACTION/INFORf'RATION DHL 12-3-75 REID(L)
W/
COPIES FG FIL OGC, ROOM P-506A GOSSI CK/STAFF CASE GIAMBUSSO BOYD MOORE (L)
DEYOUNG (L)
SKOVHOLT (L)
GOLLER (L) (Ltr)
P. COLLINS DENISE REG OPR
~
s litI LE Sr REGION (2)
MIPC TECH REVIEW SCH ROE DER MACCARY KNIGHT
- PAWLICKI, SHAO STELLO HOUSTON NOVAK ROSS IPPOLITO
- TEDESCO SeCOLLINS LAINAS BENAROYA VOLLMER DENTON GR IMES GAMMILL KASTNER BALLARD SPANGLER'IC ASST R. DIGGS (L)
H. GEARIN (L)
E. GOULBOURNE (L)
P. KREUTZER (E)
J. LEE (L)
M. RUSHBROOK(L)
ENVIRO S. 'R E ED (E)
MULLER M. SERVICE (L)
DICKER yC. SHFPPARD (L)
KNIGHTON M. SLATER (E)
~ YOUNGBLOOD H. SMITH (L)
BEGAN S. TEETS (L)
PROJECT LDR G. WILLIAMS(F-)
V. WI~SO~ (L)
N)IO..ESS R. INGR'sll (L)
M DUNCAN A/T IND.
8 RAITMAN SALTZMAN ME LTZ PLANS MCDONALD CHAPMAN '
DUBE (Ltr)
E. COUPE PETERSON HARTFIELD (2)
KLECKER EISENHUT WIGGINTON EXTkrtNALDISTRIBUTION N-LOCALPDRLyons, N.Y.---Rochester, N.Y.
1 TIC (ABERNATHY)
(1)(2)('IO) NATIONALLABS 1 NSIC (BUCHANAN) 1 W. PENNINGTON, Rm E-201 GT 1 ASLB CONSULTANTS
.Newson Anderson NEWMARK/BLUME/AGBABI AN ACRS E)lWIIII)SENT7 W - g +
1 P D R-SAN/LA/NY 1 BROOKHAVEN NAT LAB 1 G. ULRIKSON ORNL s
p/P'i "'
4
~
~
~
~
~
~ 44 J ~ $ pl4 ~l~
~
~
4
~ 4 ~
~
~
4
~
~
t yizzszssrz uzszz sigjyui zzzxzsz m(Z/
vzuf'OCHESTER GAS AND ELE r'
(
IaI~
,II4Ikjetgy Docket ILi~g aaal 0
~ aa Og'OAD g'
IIA'Ve I ON o
89 EAST AVENUE, ROCHESTER, N.Y. 14649 LEON EI. WHITE. JR.
VICE PRESIDENT
~oc Il Ugy@<D spic 5
@egg
/5~
~~+op TELEPHONE AREA CODE TIE, 546.2700 November 24, 1975 Director of Nuclear Reactor Regulation ATTN: Mr. Karl Goller Assistant Director for Operating Reactors Division of Reactor Licensing U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Qj g/pg Naggy tlPfjg~~
Subject:
Inspection of Hydraulic Shock Absorbers (Snubbers)
R. E. Ginna Nuclear Power Plant, Unit No.
1 Docket No. 50-244
Dear Mr. Goller:
In accordance with Mr. Skovholt's letter of October 1, 1973, con-cerning periodic inspection of hydraulic shock absorbers (snubbers),
an inspection of all snubbers outside of containment was completed on November 13, 1975.
All snubbers were considered operable at this inspection.
No fluid additions were necessary.
One of the Bergen-Paterson units was observed to have developed wear at its attachment pin.
This does not affect its seismic performance.
The unit willbe repaired when conditions permit.
Very truly yours,
~t~
0 t
/=
r~
I'I h
4 t
/
t N