1 I                                 YlltOINIA ISLl:CTitlO AND l'OWillt COhll'ANY lt teituoxii,Viuoixir utiu oi April 15, 1991 U. S. Nuclear Regulatory Commission                             Serial No. 91 214 Attention: Document Control Desk                                 NL&P/JMJ:Jm)
1 I
Washington, D.C. 20555                                           Docket Nos. 50 338 50 339 License Nos. NPF 4 NPF 7 Gentlemen:
YlltOINIA ISLl:CTitlO AND l'OWillt COhll'ANY lt teituoxii,Viuoixir utiu oi April 15, 1991 U. S. Nuclear Regulatory Commission Serial No.
91 214 Attention: Document Control Desk NL&P/JMJ:Jm)
Washington, D.C. 20555 Docket Nos.
50 338 50 339 License Nos. NPF 4 NPF 7 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 MONTHLY OPER ATING R.EPORT Enclosed is the Monthly Operating Report for North Anna Power Station Units 1 and 2 for the month of March 1991.
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 MONTHLY OPER ATING R.EPORT Enclosed is the Monthly Operating Report for North Anna Power Station Units 1 and 2 for the month of March 1991.
Very truly)yours,
Very truly)yours,
                \M:      .?
\\M
                      ~. .
.?
C$d))n W. L. Stewart 1
: ~..
i Senior Vice President - Nuclear Enclosures ec:   U.S. Nuclear Regulatory Commission 101 Marietta Street, NW Suite 2900 Atlanta, GA 30323 Mr. M. S. Lesser NRC Senior Resident inspector North Anna Power Station o
C$d))n 1 W. L. Stewart i
910422O264 910331                                                                         /
Senior Vice President - Nuclear Enclosures ec:
DR  ADOCK0500g,8
U.S. Nuclear Regulatory Commission 101 Marietta Street, NW Suite 2900 Atlanta, GA 30323 Mr. M. S. Lesser NRC Senior Resident inspector North Anna Power Station o
910422O264 910331
/
ADOCK0500g,8 DR


VIRGINIA POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH:   March             YEARt 1991 Approved:
VIRGINIA POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH:
March YEARt 1991 Approved:
I i
I i
S atiion Manager i
S atiion Manager i


4               .
4 OPERAllNG DATA REPORT DOCKET NO.:
OPERAllNG DATA REPORT DOCKET NO.:       50 338 DATE: April 1,1991 COMPLETED Bf   C. Mladen PHONE: (703) 894 2537 OPERATING STATUS
50 338 DATE: April 1,1991 COMPLETED Bf C. Mladen PHONE: (703) 894 2537 OPERATING STATUS 1.
: 1. Unit Names................................ North Anna 1
Unit Names................................ North Anna 1 2.
: 2. R epor t i ng Per i od s . . . . . . . . . . . . . . . . . . . . . . . . . Ma rch 1991
R epor t i ng Per i od s......................... Ma rch 1991 3.
: 3. Licensed Thermal Power (MWt) .............                                         2,893 4 Nameplate Rat ing (Gross MWe): . . . . . . . . . . . . .                               947
Licensed Thermal Power (MWt).............
: 5. Design Electrical Rating (Net MWe):. . . . . ..                                   907
2,893 4 Nameplate Rat ing (Gross MWe):.............
: 6. Maximum Dependable capacity (Gross MWe):..                                         959
947 5.
: 7. Maximum Dependable Capacity (Net MWe) . . . .                                       911
Design Electrical Rating (Net MWe):.......
: 8. If char.ges occur in Capacity Ratings (ltens ho. 3 thru 7) since last report, give reasons:
907 6.
N/A
Maximum Dependable capacity (Gross MWe):..
: 9. Power level to which restricted, if any (Net MWe): ___N/A
959 7.
: 10. Reasons for restrictions, if any:                                                           N/A This Month                       YtD                 Cumulative
Maximum Dependable Capacity (Net MWe)....
: 11. H our s i n R epor t i ng Pe r i od. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .       744.0                       2,160.0             111,972.0
911 8.
: 12. N umber of Hours R eac t or was Cri t i c al . . . . . . . . . . . . . . . . . . . . .                   5 77.7                         842.6             80,833.5
If char.ges occur in Capacity Ratings (ltens ho. 3 thru 7) since last report, give reasons:
: 13. Reac t or R eserve shut down Hours. . . . . . . . . . . . . . . . . . . . . . . . . . .                   17.1                         21.6               6,625.2
N/A 9.
: 14. Hours Generator 0n Line..................................                                               547.0                         R11.9             78,031.9
Power level to which restricted, if any (Net MWe): ___N/A
: 15. Unit Reserve shutdown Hours..............................                                                     0.0                         0.0                     0.0
: 10. Reasons for restrictions, if any:
: 16. Gross Thermal Energy Generat ed (MWH) . . . . . . . . . . . . . . . . . . . . . 1,395,520.6                                     1,725,616.3         206,711,852.3
N/A This Month YtD Cumulative
: 17. Gross Elect rical Energy Generated (MWH ) . . . . . . . . . . . . . . . . . .                       461,610.0                     567,784.0           67,909,122.0
: 11. H our s i n R epor t i ng Pe r i od................................
: 18. Net E l ect rical Energy Generated (MWH ) . . . . . . . . . . . . . . . . . . . .                   437,541.0                     533,915.0           64,262.667.0
744.0 2,160.0 111,972.0
: 19. Unit service Factor......................................                                                 73.5 %                       37.6%                   69.7%
: 12. N umber of Hours R eac t or was Cri t i c al.....................
: 20. Unit Avaltability Factor.................................                                                 73.5 %                       37.6%                   69.7%
5 77.7 842.6 80,833.5
: 21. Unit capacity f actor (using MDC Net)... .................                                                64.6%                         27.1%                   64.1%
: 13. Reac t or R eserve shut down Hours...........................
: 22. Uni t capaci ty F actor (using DER Net ) . . . . . . . . . . . . . . . . . . . . .                         64.8%                         27.3%                 63.3%
17.1 21.6 6,625.2
: 23. Forced Outage Rate.... ............................ .. ..                                                         0.0                     0.0%                   12.4%
: 14. Hours Generator 0n Line..................................
547.0 R11.9 78,031.9
: 15. Unit Reserve shutdown Hours..............................
0.0 0.0 0.0
: 16. Gross Thermal Energy Generat ed (MWH)..................... 1,395,520.6 1,725,616.3 206,711,852.3
: 17. Gross Elect rical Energy Generated (MWH )..................
461,610.0 567,784.0 67,909,122.0
: 18. Net E l ect rical Energy Generated (MWH )....................
437,541.0 533,915.0 64,262.667.0
: 19. Unit service Factor......................................
73.5 %
37.6%
69.7%
: 20. Unit Avaltability Factor.................................
73.5 %
37.6%
69.7%
: 21. Unit capacity f actor (using MDC Net)...
64.6%
27.1%
64.1%
: 22. Uni t capaci ty F actor (using DER Net ).....................
64.8%
27.3%
63.3%
: 23. Forced Outage Rate....................................
0.0 0.0%
12.4%
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): th3rM3
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): th3rM3
: 25. If $hutdown at end of Report Period, estimated time of Startup: II!II
: 25. If $hutdown at end of Report Period, estimated time of Startup: II!II
: 26. Units in Test Status (Prior to Commercial Operation):
: 26. Units in Test Status (Prior to Commercial Operation):
Forecast             Achieved                                                           !
Forecast Achieved lNITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERAT!DN
lNITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERAT!DN


        ~
~
o      a'   ,
a' o
                                                                                                      'l AVERAGE DAILY UNIT-POWER LEVEL Docket No.:       50-338' Unit               NA-1 Dates         April   1. 1991 Completed byt_   C. Mladen Phones         (703) 894-2537 1
'l AVERAGE DAILY UNIT-POWER LEVEL Docket No.:
50-338' Unit NA-1 Dates April 1.
1991 Completed byt_
C.
Mladen Phones (703) 894-2537 1
l
l
                                                                                                    -l MONTH: ; March-1991                                                                   l i
-l MONTH: ; March-1991 i
LDAY         AVERAGE DAILY POWER               DAY     AVERAGE DAILY LEVEL LEVEL-(NWe-Net)                           LEVEL-(NWe-Net) .     ,
LDAY AVERAGE DAILY POWER DAY AVERAGE DAILY LEVEL LEVEL-(NWe-Net)
  ,                      1-                 0                       17                 909 2                 0                       18                 907       --
LEVEL-(NWe-Net).
                        -3                 0                       19                 908 4
1-0 17 909 2
                                        '0         _              20                 908 5                 0                       21                 908 O'                     22               -909-
0 18 907
                      '7                   0                       23                 911 8'                 O                       24               -910 9                 118                     25-               912 10                 -184                       26                 913
-3 0
                  .11-282-                   27-               909 112                     531                     28                 911
19 908 4
                  '13-                     798                     29                 912-114 -                   860                     30                 910 15                   902-                   31                 911 16                   908 s
'0 20 908 5
0 21 908 O' 22
-909-
'7 0
23 911 8'
O 24
-910 9
118 25-912 10
-184 26 913
.11-282-27-909 112 531 28 911
'13-798 29 912-114 -
860 30 910 15 902-31 911 16 908 s
Instructions:
Instructions:
On this format, list the average daily unit; power level in MWe-.-
On this format, list the average daily unit; power level in MWe-.-
                ' Net for each day in the! reporting month.             Compute.to the nearest whole-megawatt.
' Net for each day in the! reporting month.
Compute.to the nearest whole-megawatt.


UNIT SHUTDOWNS AND POWER REDUCTIONS                                             .
UNIT SHUTDOWNS AND POWER REDUCTIONS 4
4
DOCKET No.:
                                                                                                                          ~
50-338
5 DOCKET No.:         50-338 UNIT NAME:           NA-1 DATE: April 1, 1991
~
!                                                                                        COMPLETED BY:     C. Mladen REPORT MONTH: March 1991 PHONE:   (703) 894-2537 i
5 UNIT NAME:
3                   4           5 1                2                                                    cause & Corrective Method of  Licensee  System    Component No.       Date Type   Duration Reason                                       Code               Action to Shutting      Event    Code i                            (hrs)                                                                Prevent Recurrence
NA-1 DATE: April 1, 1991 COMPLETED BY:
!                                            Down Reactor Report #
C. Mladen REPORT MONTH: March 1991 PHONE:
4             N/A       N/A       N/A         S/G Maintenance planned 91-01 910112    S      216      C r
(703) 894-2537 i
1 2
3 4
5 No.
Date Type Duration Reason Method of Licensee System Component cause & Corrective (hrs)
Shutting Event Code Code Action to Prevent Recurrence i
Down Reactor Report #
91-01 910112 S
216 C
4 N/A N/A N/A S/G Maintenance planned r
l l
l l
3: Method               4:
3: Method 4:
1: Type        2: Reason                                          1= Manual              Exhibit F - Instructions F= Forced       A= Equipment Failure (explain)                   2= Manual Scram         for preparation of Data S= Scheduled   B= Maintenance or Test C= Refueling 3= Automatic Scram Entry Event Sheets for Licensee Report (LER) File D= Regulatory Restriction                         4= Continuations 5= Load Reduction       (NUREG-0161)
F= Forced A= Equipment Failure (explain) 1= Manual Exhibit F - Instructions 1: Type 2: Reason 2= Manual Scram for preparation of Data S= Scheduled B= Maintenance or Test 3= Automatic Scram Entry Sheets for Licensee C= Refueling 4= Continuations Event Report (LER) File D= Regulatory Restriction E= Operator Training & License Eyamination 5= Load Reduction (NUREG-0161) 9=Other l
E= Operator Training & License Eyamination        9=Other F= Administrative                                                       5:                                 l G= Operational Error                                                     Exhibit H - Same Source H=Other (explain)
F= Administrative 5:
G= Operational Error Exhibit H - Same Source H=Other (explain)


Page               1 of __1 UNIT SHUTDOWN AND POWER REDUCTIONS Explanation Sheet Docket No.:   50-338 Report Month March     Unit Namot     NA-1 Yeart   1991   Date: April   1, 1991 Completed by:     Cathio Mladen
Page 1
          #91-1 January 12, 1991 Main Generator taken off-line at 0050 hours.                         Unit ontored Mode 3 at 0123 hours.       Unit entered Mode 4 at 1210 hours.
of __1 UNIT SHUTDOWN AND POWER REDUCTIONS Explanation Sheet Docket No.:
50-338 Report Month March Unit Namot NA-1 Yeart 1991 Date: April 1,
1991 Completed by:
Cathio Mladen
#91-1 January 12, 1991 Main Generator taken off-line at 0050 hours.
Unit ontored Mode 3 at 0123 hours.
Unit entered Mode 4 at 1210 hours.
January 13, 1991 Unit entered Mode 5 at 0550 hours for Refueling Outage.
January 13, 1991 Unit entered Mode 5 at 0550 hours for Refueling Outage.
January 21, 1991 Unit entered Mode 6 at 0435 hours.
January 21, 1991 Unit entered Mode 6 at 0435 hours.
February 14, 1991 Unit entered Mode 5 at 1200 hours.
February 14, 1991 Unit entered Mode 5 at 1200 hours.
March 5, 1991 Unit entered Mode 4 at 1610 hours.
March 5, 1991 Unit entered Mode 4 at 1610 hours.
March 7, 1991 Unit entered Mode 3 at 0113 hours.       Unit entered Mode 2 at 2217 hours.
March 7, 1991 Unit entered Mode 3 at 0113 hours.
March 9, 1991 Unit entered Mode 1 at 0440 hours. Main Generator placed on-line at 0500 hours and commenced unit ramp-up. Unit stable at 30% power at 0609 hours.             Unit ramp-down commenced to decrease steam leakage from high pressure pump packing gland at 1235 hours. Unit stable at 50 MWe at 1453 hours. High pressure pump packing gland repacked and commenced unit ramp-up at 1603 hours. Unit stable at 30% power at 1702 hours.
Unit entered Mode 2 at 2217 hours.
March 9, 1991 Unit entered Mode 1 at 0440 hours.
Main Generator placed on-line at 0500 hours and commenced unit ramp-up.
Unit stable at 30% power at 0609 hours.
Unit ramp-down commenced to decrease steam leakage from high pressure pump packing gland at 1235 hours.
Unit stable at 50 MWe at 1453 hours. High pressure pump packing gland repacked and commenced unit ramp-up at 1603 hours.
Unit stable at 30% power at 1702 hours.
March 15, 1991 Unit stable at 99% power with turbine governor valve #4 full open at 0343 hours.
March 15, 1991 Unit stable at 99% power with turbine governor valve #4 full open at 0343 hours.


  .    .                                                                                                                                j
j i
  . i   .
NORTH ANNA POWER STATION UNIT NO.
NORTH ANNA POWER STATION UNIT NO.     1 MONTH:     March
1 MONTH:
March


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE Listed below   in   chronological     sequence is     a                                 summary           of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
OF OPERATING EXPERIENCE Listed below in chronological sequence is a
Date           Time                       Data March 1,   1991       0000         Began month with unit in Mode 5.
summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
March 5,   1991       1610         Entered Mode 4.
Date Time Data March 1, 1991 0000 Began month with unit in Mode 5.
March 7,   1991       0113         Entered Mode 3.
March 5, 1991 1610 Entered Mode 4.
2217         Entered Mode 2.
March 7, 1991 0113 Entered Mode 3.
March 9,   1991       0440         Entered Mode 1.
2217 Entered Mode 2.
0500         Generator on-line, commenced unit ramp-up to 30% power.
March 9, 1991 0440 Entered Mode 1.
0609         Unit stable at 30% power.
0500 Generator on-line, commenced unit ramp-up to 30% power.
1235         Commenced unit ramp-down to decrease steam leakage from high pressure pump packing gland.
0609 Unit stable at 30% power.
1322         Unit stable at 125 MWe, 1331         Commenced unit ramp-down to 50 MWe to allow repack of high pressure pump packing gland.
1235 Commenced unit ramp-down to decrease steam leakage from high pressure pump packing gland.
1453         Unit stable at 50 MWe, 1603         High pressure pump packing gland repacked, commenced unit ramp-up to 30% power.
1322 Unit stable at 125 MWe, 1331 Commenced unit ramp-down to 50 MWe to allow repack of high pressure pump packing gland.
1702         Unit stable at 30% power, Chemistry hold.
1453 Unit stable at 50 MWe, 1603 High pressure pump packing gland repacked, commenced unit ramp-up to 30% power.
1702 Unit stable at 30% power, Chemistry hold.
March 13, 1991 0615 Cleared Chemistry hold, commenced
~
~
March 13, 1991        0615        Cleared Chemistry hold, commenced unit ramp-up to full power.
unit ramp-up to full power.
March 15, 1991       0343         Unit   stable at 99%                                                   power with turbine governor valve #4 full open.
March 15, 1991 0343 Unit stable at 99%
March 31, 1991       2400         Ended month with unit at 99.4%, 959 MWe.
power with turbine governor valve #4 full open.
                                                                                                                                            \
March 31, 1991 2400 Ended month with unit at 99.4%, 959 MWe.
\\
l
l


        '                                                              OPERA 11NG DATA REPORT l
OPERA 11NG DATA REPORT l
l l                                                                                                                                     DOCKET No.:   50 339 DATE: April 1, 1991 COMPLETED BY:   C. Mladen PHONE: (703) 894 2537 OPER ATIL 3 ST ATUS
l l
: 1. Un i t N ame s . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . N o r t h A nna 2
DOCKET No.:
: 2. Reporting Periodt......................... March                               1991 2893
50 339 DATE: April 1, 1991 COMPLETED BY:
: 3. Licensed thermal Power (MWt) .............
C. Mladen PHONE: (703) 894 2537 OPER ATIL 3 ST ATUS Un i t N ame s................................ N o r t h A nna 2 1.
947
Reporting Periodt......................... March 1991 2.
: 4. N ameplat e R ating (Gross MWe) . . . . . . . . . . . . .
2893 3.
907
Licensed thermal Power (MWt).............
: 5. Design Electrical Rating (Net HWe) .......
947 4.
957
N ameplat e R ating (Gross MWe).............
: 6. Maximum Dependable Capacity (Gross MWe) ..
907 5.
909
Design Electrical Rating (Net HWe).......
: 7. Maximum Dependable capacity (Net MWe) ....
957 6.
: 8.      If changes occur in Capacity Ratings (Items No. 3 thru 7) Since last report, give reasons:
Maximum Dependable Capacity (Gross MWe)..
N/A
909 7.
: 9.     Power levet to which restricted, if any (Net MWe): ,_,N/A N/A
Maximum Dependable capacity (Net MWe)....
: 10. Reasons f or restrictions, if any This Month           TtD                                               Cuautative 744.0             2,160.0                                             90,240.0
If changes occur in Capacity Ratings (Items No. 3 thru 7) Since last report, give reasons:
: 11. Hours in Reporting Period....... ........................                                                                       2,160.0                                             '3,294.3 744.0
8.
: 12. Number of Hours Reactor was Cr iticat . . . . . . . . . . . . . . . . . . . .                                   0,0                                     0.0                         5,949.6
N/A 9.
: 13. Reactor Reserve Shutdown Hours. .........................                                                     744.0           2,160.0                                             72,394.3
Power levet to which restricted, if any (Net MWe):,_,N/A N/A
: 14. Houi s Gene r at or 0n L i ne . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .                                                           0.0                           0.0 0.0
: 10. Reasons f or restrictions, if any This Month TtD Cuautative 744.0 2,160.0 90,240.0
: 15. Uni t R eserve shutdown H ours. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .                                   6,247,408.2                                      193,496,521.6
: 11. Hours in Reporting Period...............................
: 16. Crosa T hermal Energy Generated (MVH) . . . . . . . . . , ......... 2,151,635.3 715.200.0       2,076,305.0                                         63,378,891.0
744.0 2,160.0
: 17. Cross Electrical Energy Generated (MWH).... .............                                                                                                                      60,793,278.0
'3,294.3
                                                                                                            .........            681,777.0       1,977,798.0
: 12. Number of Hours Reactor was Cr iticat....................
: 18. Net Elec t rical Energy Generated (MWM). . . . . . . . . .                                                                                                                               80.2%
0,0 0.0 5,949.6
100.0%                       100.0%
: 13. Reactor Reserve Shutdown Hours..........................
: 19. Unit service Factor............. ........................                                                                                    100.0%                                    80.2%
744.0 2,160.0 72,394.3
: 14. Houi s Gene r at or 0n L i ne..................................
0.0 0.0 0.0
: 15. Uni t R eserve shutdown H ours..............................
: 16. Crosa T hermal Energy Generated (MVH).........,......... 2,151,635.3 6,247,408.2 193,496,521.6 715.200.0 2,076,305.0 63,378,891.0
: 17. Cross Electrical Energy Generated (MWH)....
681,777.0 1,977,798.0 60,793,278.0
: 18. Net Elec t rical Energy Generated (MWM)..........
100.0%
100.0%
80.2%
: 19. Unit service Factor.............
100.0%
100.0%
100.0%
: 20. Unit Availability Factor.................................                                                                                     100.7%                                    74.9%
80.2%
: 20. Unit Availability Factor.................................
100.8%
100.8%
: 21. Uni t Capaci ty F actor (using MDC N e t) . . . . . . . . . . . . . . . . . . . . .                                                                                                     74.3%
100.7%
101.D%                           101.0%
74.9%
: 22. Uni t Capac i ty f ac t or ( us ing DE R N et ) . . . . . . . . . . . . . . . . . . . . .                                                                                                 6.2%
: 21. Uni t Capaci ty F actor (using MDC N e t).....................
0.0%                                               0.0%
101.D%
: 23. F o r c ed Out a ge R a t e . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
101.0%
74.3%
: 22. Uni t Capac i ty f ac t or ( us ing DE R N et ).....................
0.0%
0.0%
6.2%
: 23. F o r c ed Out a ge R a t e......................................
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): _,NONE N/A
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): _,NONE N/A
: 25. If Shutdown at end of Report Perled, estimated time of Startupt
: 25. If Shutdown at end of Report Perled, estimated time of Startupt
: 26. Units in Test Status (Prior to Commercist Operation):
: 26. Units in Test Status (Prior to Commercist Operation):
Forecast                   Achieved INITIAL CRITICALITY INITIAL ELECTRICit?
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICit?
l COMMERCIAL OPERATION
COMMERCIAL OPERATION l


  -  f i
f i
AVERAGE DAILY UNIT POWER LEVEL Docket No.:                             50-339 Unit:                                       NA-2 Dates             April 1. 1991 Completed by: __ C. Mladen Phone             _( 7 03 ) 894-2537 MONTII:       March 1991 DAY           AVERAGE DAILY POWER             DAY       AVERAGE DAILY LEVEL LEVEL (MWe-Net)                             LEVEL (MWe-Net) 1                   917                       17                                   916 2                   917                       18           _
AVERAGE DAILY UNIT POWER LEVEL Docket No.:
917 3                   919                       19                                   917 4                   917                       20                                   917                       __
50-339 Unit:
S                  917                       21                                   916 6                   915                       22                                   918 7                   915                       23                                   918 8                   915                       24                                   917 9                   918                       25                                   918 10             _,
NA-2 Dates April 1.
917                       26                                   919 11                   917                       27                                   916 12                   917                       28                                   917 13                   904                       29                                   917 14                   917                       30                                   918 15                   917                       31                                   914 l
1991 Completed by: __
16                   916 Instructions:
C.
On this format, list the average dajly unit power level in MWe-Het for each day in the reporting month.               Compute to the nearest whole megawatt.
Mladen Phone
_( 7 03 ) 894-2537 MONTII:
March 1991 DAY AVERAGE DAILY POWER DAY AVERAGE DAILY LEVEL LEVEL (MWe-Net)
LEVEL (MWe-Net) 1 917 17 916 2
917 18 917 3
919 19 917 4
917 20 917 S
917 21 916 6
915 22 918 7
915 23 918 8
915 24 917 9
918 25 918 10 917 26 919 11 917 27 916 12 917 28 917 13 904 29 917 14 917 30 918 15 917 31 914 l
16 916 Instructions:
On this format, list the average dajly unit power level in MWe-Het for each day in the reporting month.
Compute to the nearest whole megawatt.


                                                                                                                                                                                      .        .)
.)
UNIT SHUTDOWNS AND POWER REDUCTIONS                                                                                                               ,
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:
DOCKET NO.:                 50-339 UNIT NAME:                   NA-2 DATE: April 1,             1991 REPORT MONTH: March 1991                                                                               COMPLt.1w BY:             C. Mladen PHONE:   (703) 894-2537 1                 2             3                   4                                                                       5 No. Date   Type   Duration Reason     Method of   Licensee   System   Comoonent                                                                 Cause & Corrective (hrs)             Shutting       Event     Code       Code                                                                         Action to Down Reactor Report #                                                                                       Prevent Recurrence oNo entry this month
50-339 UNIT NAME:
' 1: Type       2: Reason                                         3: Method                                                                         4:
NA-2 DATE: April 1,
F= Forced     A= Equipment Failure (explain)                     1= Manual                                                                         Exhibit F - Instructions S= Scheduled   B= Maintenance or Test                           2= Manual Scran                                                                   for preparation of Data C= Refueling                                       3= Automatic Scram                                                               Entry Sheets for Licensee D= Regulatory Restriction                         4= Continuations                                                                 Event Report (LER) File E= Operator Training & License Examination       5= Load Reduction                                                                 (NUREG-Ol61)
1991 REPORT MONTH: March 1991 COMPLt.1w BY:
F= Administrative                                 9-Other G= Operational Error                                                                                                               5:
C. Mladen PHONE:
H=Other (explain)                                                                                                                   Exhibit H - Same Source
(703) 894-2537 1
2 3
4 5
No.
Date Type Duration Reason Method of Licensee System Comoonent Cause & Corrective (hrs)
Shutting Event Code Code Action to Down Reactor Report #
Prevent Recurrence oNo entry this month
' 1: Type 2: Reason 3: Method 4:
F= Forced A= Equipment Failure (explain) 1= Manual Exhibit F - Instructions S= Scheduled B= Maintenance or Test 2= Manual Scran for preparation of Data C= Refueling 3= Automatic Scram Entry Sheets for Licensee D= Regulatory Restriction 4= Continuations Event Report (LER) File E= Operator Training & License Examination 5= Load Reduction (NUREG-Ol61)
F= Administrative 9-Other G= Operational Error 5:
H=Other (explain)
Exhibit H - Same Source


Page             1 o f _1 UNIT S11UTDOWN AND POWER REDUCTIOND Explanation sheet Docket Nc.i   50-339 Report Month March   Unit Namet     NA-2 Yeart   1991 Datet April 1. 1991 Completed by:     Cathic Mlqdpn
Page 1
            *No entry this month
o f _1 UNIT S11UTDOWN AND POWER REDUCTIOND Explanation sheet Docket Nc.i 50-339 Report Month March Unit Namet NA-2 Yeart 1991 Datet April 1.
1991 Completed by:
Cathic Mlqdpn
*No entry this month


1 NORTH ANNA POWER DTATION UNIT No.:   2 MONTH:     March
1 NORTH ANNA POWER DTATION UNIT No.:
                                  #_QHBARY-0F oflRATING EXPERIIlLQE Listed     below   in chronological     sequenco   is a summary                       of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
2 MONTH:
PJ11e             Ilite                   Pata March 1,     1991         0000       Bogan month with unit at 100%, 963 MWo.
March
March 13, 1991           0905       Commenced unit ramp down for TVFT.
#_QHBARY-0F oflRATING EXPERIIlLQE Listed below in chronological sequenco is a
0940       Unit stable at 863 MWo.
summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
1145       TVFT completed satisfactorily.
PJ11e Ilite Pata March 1, 1991 0000 Bogan month with unit at 100%, 963 MWo.
1155       Commenced unit ramp up to 100%.
March 13, 1991 0905 Commenced unit ramp down for TVFT.
1337       Unit stable at 100%.
0940 Unit stable at 863 MWo.
March 31, 1991         2400       Ended   month   with unit   at 100%,
1145 TVFT completed satisfactorily.
963MWo.                                                       (
1155 Commenced unit ramp up to 100%.
                                                                                                                  )}}
1337 Unit stable at 100%.
March 31, 1991 2400 Ended month with unit at 100%,
963MWo.
(
)}}

Latest revision as of 03:56, 14 December 2024

Monthly Operating Repts for Mar 1991 for North Anna Power Station Units 1 & 2
ML20084U719
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 03/31/1991
From: Mladen C, Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
91-214, NUDOCS 9104220264
Download: ML20084U719 (12)


Text

- _ _ - _ _ -

1 I

YlltOINIA ISLl:CTitlO AND l'OWillt COhll'ANY lt teituoxii,Viuoixir utiu oi April 15, 1991 U. S. Nuclear Regulatory Commission Serial No.

91 214 Attention: Document Control Desk NL&P/JMJ:Jm)

Washington, D.C. 20555 Docket Nos.

50 338 50 339 License Nos. NPF 4 NPF 7 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 MONTHLY OPER ATING R.EPORT Enclosed is the Monthly Operating Report for North Anna Power Station Units 1 and 2 for the month of March 1991.

Very truly)yours,

\\M

.?

~..

C$d))n 1 W. L. Stewart i

Senior Vice President - Nuclear Enclosures ec:

U.S. Nuclear Regulatory Commission 101 Marietta Street, NW Suite 2900 Atlanta, GA 30323 Mr. M. S. Lesser NRC Senior Resident inspector North Anna Power Station o

910422O264 910331

/

ADOCK0500g,8 DR

VIRGINIA POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH:

March YEARt 1991 Approved:

I i

S atiion Manager i

4 OPERAllNG DATA REPORT DOCKET NO.:

50 338 DATE: April 1,1991 COMPLETED Bf C. Mladen PHONE: (703) 894 2537 OPERATING STATUS 1.

Unit Names................................ North Anna 1 2.

R epor t i ng Per i od s......................... Ma rch 1991 3.

Licensed Thermal Power (MWt).............

2,893 4 Nameplate Rat ing (Gross MWe):.............

947 5.

Design Electrical Rating (Net MWe):.......

907 6.

Maximum Dependable capacity (Gross MWe):..

959 7.

Maximum Dependable Capacity (Net MWe)....

911 8.

If char.ges occur in Capacity Ratings (ltens ho. 3 thru 7) since last report, give reasons:

N/A 9.

Power level to which restricted, if any (Net MWe): ___N/A

10. Reasons for restrictions, if any:

N/A This Month YtD Cumulative

11. H our s i n R epor t i ng Pe r i od................................

744.0 2,160.0 111,972.0

12. N umber of Hours R eac t or was Cri t i c al.....................

5 77.7 842.6 80,833.5

13. Reac t or R eserve shut down Hours...........................

17.1 21.6 6,625.2

14. Hours Generator 0n Line..................................

547.0 R11.9 78,031.9

15. Unit Reserve shutdown Hours..............................

0.0 0.0 0.0

16. Gross Thermal Energy Generat ed (MWH)..................... 1,395,520.6 1,725,616.3 206,711,852.3
17. Gross Elect rical Energy Generated (MWH )..................

461,610.0 567,784.0 67,909,122.0

18. Net E l ect rical Energy Generated (MWH )....................

437,541.0 533,915.0 64,262.667.0

19. Unit service Factor......................................

73.5 %

37.6%

69.7%

20. Unit Avaltability Factor.................................

73.5 %

37.6%

69.7%

21. Unit capacity f actor (using MDC Net)...

64.6%

27.1%

64.1%

22. Uni t capaci ty F actor (using DER Net ).....................

64.8%

27.3%

63.3%

23. Forced Outage Rate....................................

0.0 0.0%

12.4%

24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): th3rM3
25. If $hutdown at end of Report Period, estimated time of Startup: II!II
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved lNITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERAT!DN

~

a' o

'l AVERAGE DAILY UNIT-POWER LEVEL Docket No.:

50-338' Unit NA-1 Dates April 1.

1991 Completed byt_

C.

Mladen Phones (703) 894-2537 1

l

-l MONTH: ; March-1991 i

LDAY AVERAGE DAILY POWER DAY AVERAGE DAILY LEVEL LEVEL-(NWe-Net)

LEVEL-(NWe-Net).

1-0 17 909 2

0 18 907

-3 0

19 908 4

'0 20 908 5

0 21 908 O' 22

-909-

'7 0

23 911 8'

O 24

-910 9

118 25-912 10

-184 26 913

.11-282-27-909 112 531 28 911

'13-798 29 912-114 -

860 30 910 15 902-31 911 16 908 s

Instructions:

On this format, list the average daily unit; power level in MWe-.-

' Net for each day in the! reporting month.

Compute.to the nearest whole-megawatt.

UNIT SHUTDOWNS AND POWER REDUCTIONS 4

DOCKET No.:

50-338

~

5 UNIT NAME:

NA-1 DATE: April 1, 1991 COMPLETED BY:

C. Mladen REPORT MONTH: March 1991 PHONE:

(703) 894-2537 i

1 2

3 4

5 No.

Date Type Duration Reason Method of Licensee System Component cause & Corrective (hrs)

Shutting Event Code Code Action to Prevent Recurrence i

Down Reactor Report #

91-01 910112 S

216 C

4 N/A N/A N/A S/G Maintenance planned r

l l

3: Method 4:

F= Forced A= Equipment Failure (explain) 1= Manual Exhibit F - Instructions 1: Type 2: Reason 2= Manual Scram for preparation of Data S= Scheduled B= Maintenance or Test 3= Automatic Scram Entry Sheets for Licensee C= Refueling 4= Continuations Event Report (LER) File D= Regulatory Restriction E= Operator Training & License Eyamination 5= Load Reduction (NUREG-0161) 9=Other l

F= Administrative 5:

G= Operational Error Exhibit H - Same Source H=Other (explain)

Page 1

of __1 UNIT SHUTDOWN AND POWER REDUCTIONS Explanation Sheet Docket No.:

50-338 Report Month March Unit Namot NA-1 Yeart 1991 Date: April 1,

1991 Completed by:

Cathio Mladen

  1. 91-1 January 12, 1991 Main Generator taken off-line at 0050 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br />.

Unit ontored Mode 3 at 0123 hours0.00142 days <br />0.0342 hours <br />2.03373e-4 weeks <br />4.68015e-5 months <br />.

Unit entered Mode 4 at 1210 hours0.014 days <br />0.336 hours <br />0.002 weeks <br />4.60405e-4 months <br />.

January 13, 1991 Unit entered Mode 5 at 0550 hours0.00637 days <br />0.153 hours <br />9.093915e-4 weeks <br />2.09275e-4 months <br /> for Refueling Outage.

January 21, 1991 Unit entered Mode 6 at 0435 hours0.00503 days <br />0.121 hours <br />7.19246e-4 weeks <br />1.655175e-4 months <br />.

February 14, 1991 Unit entered Mode 5 at 1200 hours0.0139 days <br />0.333 hours <br />0.00198 weeks <br />4.566e-4 months <br />.

March 5, 1991 Unit entered Mode 4 at 1610 hours0.0186 days <br />0.447 hours <br />0.00266 weeks <br />6.12605e-4 months <br />.

March 7, 1991 Unit entered Mode 3 at 0113 hours0.00131 days <br />0.0314 hours <br />1.868386e-4 weeks <br />4.29965e-5 months <br />.

Unit entered Mode 2 at 2217 hours0.0257 days <br />0.616 hours <br />0.00367 weeks <br />8.435685e-4 months <br />.

March 9, 1991 Unit entered Mode 1 at 0440 hours0.00509 days <br />0.122 hours <br />7.275132e-4 weeks <br />1.6742e-4 months <br />.

Main Generator placed on-line at 0500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> and commenced unit ramp-up.

Unit stable at 30% power at 0609 hours0.00705 days <br />0.169 hours <br />0.00101 weeks <br />2.317245e-4 months <br />.

Unit ramp-down commenced to decrease steam leakage from high pressure pump packing gland at 1235 hours0.0143 days <br />0.343 hours <br />0.00204 weeks <br />4.699175e-4 months <br />.

Unit stable at 50 MWe at 1453 hours0.0168 days <br />0.404 hours <br />0.0024 weeks <br />5.528665e-4 months <br />. High pressure pump packing gland repacked and commenced unit ramp-up at 1603 hours0.0186 days <br />0.445 hours <br />0.00265 weeks <br />6.099415e-4 months <br />.

Unit stable at 30% power at 1702 hours0.0197 days <br />0.473 hours <br />0.00281 weeks <br />6.47611e-4 months <br />.

March 15, 1991 Unit stable at 99% power with turbine governor valve #4 full open at 0343 hours0.00397 days <br />0.0953 hours <br />5.671296e-4 weeks <br />1.305115e-4 months <br />.

j i

NORTH ANNA POWER STATION UNIT NO.

1 MONTH:

March

SUMMARY

OF OPERATING EXPERIENCE Listed below in chronological sequence is a

summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.

Date Time Data March 1, 1991 0000 Began month with unit in Mode 5.

March 5, 1991 1610 Entered Mode 4.

March 7, 1991 0113 Entered Mode 3.

2217 Entered Mode 2.

March 9, 1991 0440 Entered Mode 1.

0500 Generator on-line, commenced unit ramp-up to 30% power.

0609 Unit stable at 30% power.

1235 Commenced unit ramp-down to decrease steam leakage from high pressure pump packing gland.

1322 Unit stable at 125 MWe, 1331 Commenced unit ramp-down to 50 MWe to allow repack of high pressure pump packing gland.

1453 Unit stable at 50 MWe, 1603 High pressure pump packing gland repacked, commenced unit ramp-up to 30% power.

1702 Unit stable at 30% power, Chemistry hold.

March 13, 1991 0615 Cleared Chemistry hold, commenced

~

unit ramp-up to full power.

March 15, 1991 0343 Unit stable at 99%

power with turbine governor valve #4 full open.

March 31, 1991 2400 Ended month with unit at 99.4%, 959 MWe.

\\

l

OPERA 11NG DATA REPORT l

l l

DOCKET No.:

50 339 DATE: April 1, 1991 COMPLETED BY:

C. Mladen PHONE: (703) 894 2537 OPER ATIL 3 ST ATUS Un i t N ame s................................ N o r t h A nna 2 1.

Reporting Periodt......................... March 1991 2.

2893 3.

Licensed thermal Power (MWt).............

947 4.

N ameplat e R ating (Gross MWe).............

907 5.

Design Electrical Rating (Net HWe).......

957 6.

Maximum Dependable Capacity (Gross MWe)..

909 7.

Maximum Dependable capacity (Net MWe)....

If changes occur in Capacity Ratings (Items No. 3 thru 7) Since last report, give reasons:

8.

N/A 9.

Power levet to which restricted, if any (Net MWe):,_,N/A N/A

10. Reasons f or restrictions, if any This Month TtD Cuautative 744.0 2,160.0 90,240.0
11. Hours in Reporting Period...............................

744.0 2,160.0

'3,294.3

12. Number of Hours Reactor was Cr iticat....................

0,0 0.0 5,949.6

13. Reactor Reserve Shutdown Hours..........................

744.0 2,160.0 72,394.3

14. Houi s Gene r at or 0n L i ne..................................

0.0 0.0 0.0

15. Uni t R eserve shutdown H ours..............................
16. Crosa T hermal Energy Generated (MVH).........,......... 2,151,635.3 6,247,408.2 193,496,521.6 715.200.0 2,076,305.0 63,378,891.0
17. Cross Electrical Energy Generated (MWH)....

681,777.0 1,977,798.0 60,793,278.0

18. Net Elec t rical Energy Generated (MWM)..........

100.0%

100.0%

80.2%

19. Unit service Factor.............

100.0%

100.0%

80.2%

20. Unit Availability Factor.................................

100.8%

100.7%

74.9%

21. Uni t Capaci ty F actor (using MDC N e t).....................

101.D%

101.0%

74.3%

22. Uni t Capac i ty f ac t or ( us ing DE R N et ).....................

0.0%

0.0%

6.2%

23. F o r c ed Out a ge R a t e......................................
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): _,NONE N/A
25. If Shutdown at end of Report Perled, estimated time of Startupt
26. Units in Test Status (Prior to Commercist Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICit?

COMMERCIAL OPERATION l

f i

AVERAGE DAILY UNIT POWER LEVEL Docket No.:

50-339 Unit:

NA-2 Dates April 1.

1991 Completed by: __

C.

Mladen Phone

_( 7 03 ) 894-2537 MONTII:

March 1991 DAY AVERAGE DAILY POWER DAY AVERAGE DAILY LEVEL LEVEL (MWe-Net)

LEVEL (MWe-Net) 1 917 17 916 2

917 18 917 3

919 19 917 4

917 20 917 S

917 21 916 6

915 22 918 7

915 23 918 8

915 24 917 9

918 25 918 10 917 26 919 11 917 27 916 12 917 28 917 13 904 29 917 14 917 30 918 15 917 31 914 l

16 916 Instructions:

On this format, list the average dajly unit power level in MWe-Het for each day in the reporting month.

Compute to the nearest whole megawatt.

.)

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:

50-339 UNIT NAME:

NA-2 DATE: April 1,

1991 REPORT MONTH: March 1991 COMPLt.1w BY:

C. Mladen PHONE:

(703) 894-2537 1

2 3

4 5

No.

Date Type Duration Reason Method of Licensee System Comoonent Cause & Corrective (hrs)

Shutting Event Code Code Action to Down Reactor Report #

Prevent Recurrence oNo entry this month

' 1: Type 2: Reason 3: Method 4:

F= Forced A= Equipment Failure (explain) 1= Manual Exhibit F - Instructions S= Scheduled B= Maintenance or Test 2= Manual Scran for preparation of Data C= Refueling 3= Automatic Scram Entry Sheets for Licensee D= Regulatory Restriction 4= Continuations Event Report (LER) File E= Operator Training & License Examination 5= Load Reduction (NUREG-Ol61)

F= Administrative 9-Other G= Operational Error 5:

H=Other (explain)

Exhibit H - Same Source

Page 1

o f _1 UNIT S11UTDOWN AND POWER REDUCTIOND Explanation sheet Docket Nc.i 50-339 Report Month March Unit Namet NA-2 Yeart 1991 Datet April 1.

1991 Completed by:

Cathic Mlqdpn

  • No entry this month

1 NORTH ANNA POWER DTATION UNIT No.:

2 MONTH:

March

  1. _QHBARY-0F oflRATING EXPERIIlLQE Listed below in chronological sequenco is a

summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.

PJ11e Ilite Pata March 1, 1991 0000 Bogan month with unit at 100%, 963 MWo.

March 13, 1991 0905 Commenced unit ramp down for TVFT.

0940 Unit stable at 863 MWo.

1145 TVFT completed satisfactorily.

1155 Commenced unit ramp up to 100%.

1337 Unit stable at 100%.

March 31, 1991 2400 Ended month with unit at 100%,

963MWo.

(

)