| title = Informs of Completion of Review of Piping Analysis W/Revised Valve Discharged Loads,Per NRC 900205 Ltr
| title = Informs of Completion of Review of Piping Analysis W/Revised Valve Discharged Loads,Per NRC
| author name = Tuckman M
| author name = Tuckman M
| author affiliation = DUKE POWER CO.
| author affiliation = DUKE POWER CO.
Line 12: Line 12:
| case reference number = RTR-NUREG-0737, RTR-NUREG-737, TASK-2.D.1, TASK-TM
| case reference number = RTR-NUREG-0737, RTR-NUREG-737, TASK-2.D.1, TASK-TM
| document report number = NUDOCS 9012050191
| document report number = NUDOCS 9012050191
| title reference date = 02-05-1990
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE
| page count = 1
| page count = 1
Line 17: Line 18:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:Il I
puhe 1%urr Company (70()37J40ll Nucl ear Productiva Department PO Bat 1007 Charlot*e, NC262011007
\\
DUKE POWER November 27, 1990 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.
20555
 
==Subject:==
. Catawba Nuclear Station, Units 1 and 2 Docket Nos. 50-413 and 50-414 Technical Evaluation Report for NUREG-0737 Item II.D.1 The NRC's. letter _ dated February 5, 1990 requested an implementation date be provided to the Catawba Project Manager for the piping analysis and support restraint concerns. Duke Power Company accepted the vendors final report for the safety and relief valve discharge loads on September 12, 1990. Duke Power has completed its review of the piping analysis with the revised valve discharge loads.
The current as-built configuration is acceptable as is, and will not require modification to the piping or-the pipe supports. This review resolves the open item, Item II.D.1, of the subject Technical Evaluation Report.
VbW p-M. S. Tuckman, Vice President Nuclear Operations T
CRb/6/lcs cci Mr. W. T. Orders NRC Resident Inspector
. Catawba Nuclear Station Mr. S. E. Ebneter Regional Administrator, Region II U. S. Nuclear Regulatory Commission 101 Marietta Street, NW., Suite 2900 Atlanta, Georgia. 30323 Mr. R. E. Martin Offlee of Nuclear Regulatory Commission U. S. Nuclear ~ Regulatory Commission One White Flint North, Mail Stop 9113 Washington, D.C.
20555 h
0 (t )
e 7}}

Latest revision as of 19:30, 16 December 2024

Informs of Completion of Review of Piping Analysis W/Revised Valve Discharged Loads,Per NRC
ML20065L066
Person / Time
Site: Catawba  
Issue date: 11/27/1990
From: Tuckman M
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.D.1, TASK-TM NUDOCS 9012050191
Download: ML20065L066 (1)


Text

Il I

puhe 1%urr Company (70()37J40ll Nucl ear Productiva Department PO Bat 1007 Charlot*e, NC262011007

\\

DUKE POWER November 27, 1990 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.

20555

Subject:

. Catawba Nuclear Station, Units 1 and 2 Docket Nos. 50-413 and 50-414 Technical Evaluation Report for NUREG-0737 Item II.D.1 The NRC's. letter _ dated February 5, 1990 requested an implementation date be provided to the Catawba Project Manager for the piping analysis and support restraint concerns. Duke Power Company accepted the vendors final report for the safety and relief valve discharge loads on September 12, 1990. Duke Power has completed its review of the piping analysis with the revised valve discharge loads.

The current as-built configuration is acceptable as is, and will not require modification to the piping or-the pipe supports. This review resolves the open item, Item II.D.1, of the subject Technical Evaluation Report.

VbW p-M. S. Tuckman, Vice President Nuclear Operations T

CRb/6/lcs cci Mr. W. T. Orders NRC Resident Inspector

. Catawba Nuclear Station Mr. S. E. Ebneter Regional Administrator, Region II U. S. Nuclear Regulatory Commission 101 Marietta Street, NW., Suite 2900 Atlanta, Georgia. 30323 Mr. R. E. Martin Offlee of Nuclear Regulatory Commission U. S. Nuclear ~ Regulatory Commission One White Flint North, Mail Stop 9113 Washington, D.C.

20555 h

0 (t )

e 7