VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH OCTOBER YEAR 1981 (Revised 12-03-81)
-f
\\
f APPROVED:
J l
l J
STATION MANAGER
/
l l
8211030166 811218 T
DR ADDCK 05000338 PDR
 
.m OPERATING DATA REPORT DOCKET NO.
50-339 DATE 12-03-81 COMPLETED BY L.L. Rogers TELEPHONE (703) 894-5151 X2510 OPERATING STATUS i
Notes
* Reflects corrected 1.
Unit Name:
North Anna 2 number of hours i
2.
Reporting Period:
October 1981 (Revised 12-03-81) generator on line.
3.
Licensed Thermal Power (MWt):
2775 4.
Nameplate Rating (Gross MWe):
947 5.
Design Electrical Rating (Net MWe):
907 6.
Maximum Dependable Capacity (Gross NWe):
939 7.
Maximum Dependable Capacity (Net HWe):
890 8.
If Changes Occur in Capacity Ratings (Items No. 3 thru 7) Since Last Report, Give Reasons l Corrects re-evaluation of auxiliary load consumption dated May 1981.
9.
Power Level To Which Restricted, If Any (Net NWe):
N/A 1
: 10. Reasons For Restrictions, If Any:
N/A 6el h it4 0 M r 9/ ~ 3 9 0
This Month Yr.-to-Date Cumulative 11.
Hours In Reporting Period 745 7,296 7,728 12.
Number of Hours Reactor Was Critical 733.2 5,524.3 5,953.2
: 13. Reactor Reserve Shutdown Hours 7/3,.4 17m1 1.358.5_
1,638.5 14.
Hours Generator On-Line Ok
(*?!; 23 d5,362.M
,*5,775 >
15.
Unit Reserve Shutdown Hours 88 4 0
0 0
16.
Gross Thermal Energy Generated (MWH) 1,898,994 13,802,996 14,889,993 17.
Gross Electrical Energy Generated (MWH) 643,948 4,653,876 5,022,307 18.
Net Electrical Energy Generated (MWH) 611,338 4,402,998 4,752,642 19.
Unit Service Factor
*95.7
*73.5
*74.7 20.
Unit Availability Factor
*95.7
*73.5
*74.7 21.
Unit Capacity Factor (Using MDC Net) 92.2 67.8 69.1
: 22. Unit Capacity Factor (Using DER Net) 90.5 66.5 67.8
: 23. Unit Forced Outage Rate
*4.3
*23.3
*22.2
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
1 Refueling Outane 05-82 thru 05-14-82 25.
If Shut Down At End Of Report Period, Estimated Date of Startup:
N/A
: 26. Units In Test Status (Prior to Commercial Operation):
Forecast
\\.
Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
* corrects duratica of shutdown 81-38' Page 1 of 2 j
I i
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-339 UNIT NAME North Anna 2 DATE 12-03-81 REPORT MONTH OCTOBER (Revised)
COMPLETED BY L. L. ROGERS TELEPHONE (703) 894-5151 X2510 l
2 No. Date Type Duration Reason Method of Licensee System Component Cause & Corrective (Hours)
Shutting Event Code Code Action to 3
4 5
Down Reactor Report #
Prevent Recurrence 81-37 811001 F
N/A F
5 N/A N/A N/A Reduced load to 90% due to "B" Transformer hi alarm and No. 4 governor valve cycling.
81-38 811003 F
*26.8
*A 3
N/A N/A N/
Reactor trip due to ENC line rupture on No.4 governor.
ld M
,(
Closed No. 4 governor valve and
^
l.
Mk -
installed new supports 81-39 811004 F
5.0 A
3 N/A N/A N/A Reactor Trip due to generator leads differential.
81-40 811005 F
N/A F
5 N/A N/A N/A Reduced load to 91% due to "B" Transformer hi temperature i
alarm.
81-41 811006 F
N/A F
5 N/A N/A N/A
' Reduced load to 90% due to "B" Transformer hi temperature alarm.
/
1 1
2 3
4 F: Forced Reason:
Method:
Exhibit F - Instructions 8: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data i
B-Maintenance or Test 2-Maiinh1 Scram.
Entry Sheets for Licensee l
C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuations (NUREG-0161)
E-Operator Training & License Examination 5-Load Reduction F-Administrative 9-Other G-Operational Error (Explain)
H-Other (Explain)
Exhibit H - Same Source
- -}}

Latest revision as of 18:50, 16 December 2024

Corrected Monthly Operating Rept for Oct 1981
ML20065T862
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 12/03/1981
From: Rogers L
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML20065T858 List:
References
NUDOCS 8211030166
Download: ML20065T862 (3)


Text

.. _ _ _.. _ _ - -

VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH OCTOBER YEAR 1981 (Revised 12-03-81)

-f

\\

f APPROVED:

J l

l J

STATION MANAGER

/

l l

8211030166 811218 T

DR ADDCK 05000338 PDR

.m OPERATING DATA REPORT DOCKET NO.

50-339 DATE 12-03-81 COMPLETED BY L.L. Rogers TELEPHONE (703) 894-5151 X2510 OPERATING STATUS i

Notes

  • Reflects corrected 1.

Unit Name:

North Anna 2 number of hours i

2.

Reporting Period:

October 1981 (Revised 12-03-81) generator on line.

3.

Licensed Thermal Power (MWt):

2775 4.

Nameplate Rating (Gross MWe):

947 5.

Design Electrical Rating (Net MWe):

907 6.

Maximum Dependable Capacity (Gross NWe):

939 7.

Maximum Dependable Capacity (Net HWe):

890 8.

If Changes Occur in Capacity Ratings (Items No. 3 thru 7) Since Last Report, Give Reasons l Corrects re-evaluation of auxiliary load consumption dated May 1981.

9.

Power Level To Which Restricted, If Any (Net NWe):

N/A 1

10. Reasons For Restrictions, If Any:

N/A 6el h it4 0 M r 9/ ~ 3 9 0

This Month Yr.-to-Date Cumulative 11.

Hours In Reporting Period 745 7,296 7,728 12.

Number of Hours Reactor Was Critical 733.2 5,524.3 5,953.2

13. Reactor Reserve Shutdown Hours 7/3,.4 17m1 1.358.5_

1,638.5 14.

Hours Generator On-Line Ok

(*?!; 23 d5,362.M

,*5,775 >

15.

Unit Reserve Shutdown Hours 88 4 0

0 0

16.

Gross Thermal Energy Generated (MWH) 1,898,994 13,802,996 14,889,993 17.

Gross Electrical Energy Generated (MWH) 643,948 4,653,876 5,022,307 18.

Net Electrical Energy Generated (MWH) 611,338 4,402,998 4,752,642 19.

Unit Service Factor

  • 95.7
  • 73.5
  • 74.7 20.

Unit Availability Factor

  • 95.7
  • 73.5
  • 74.7 21.

Unit Capacity Factor (Using MDC Net) 92.2 67.8 69.1

22. Unit Capacity Factor (Using DER Net) 90.5 66.5 67.8
23. Unit Forced Outage Rate
  • 4.3
  • 23.3
  • 22.2
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

1 Refueling Outane 05-82 thru 05-14-82 25.

If Shut Down At End Of Report Period, Estimated Date of Startup:

N/A

26. Units In Test Status (Prior to Commercial Operation):

Forecast

\\.

Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

  • corrects duratica of shutdown 81-38' Page 1 of 2 j

I i

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-339 UNIT NAME North Anna 2 DATE 12-03-81 REPORT MONTH OCTOBER (Revised)

COMPLETED BY L. L. ROGERS TELEPHONE (703) 894-5151 X2510 l

2 No. Date Type Duration Reason Method of Licensee System Component Cause & Corrective (Hours)

Shutting Event Code Code Action to 3

4 5

Down Reactor Report #

Prevent Recurrence 81-37 811001 F

N/A F

5 N/A N/A N/A Reduced load to 90% due to "B" Transformer hi alarm and No. 4 governor valve cycling.

81-38 811003 F

  • 26.8
  • A 3

N/A N/A N/

Reactor trip due to ENC line rupture on No.4 governor.

ld M

,(

Closed No. 4 governor valve and

^

l.

Mk -

installed new supports 81-39 811004 F

5.0 A

3 N/A N/A N/A Reactor Trip due to generator leads differential.

81-40 811005 F

N/A F

5 N/A N/A N/A Reduced load to 91% due to "B" Transformer hi temperature i

alarm.

81-41 811006 F

N/A F

5 N/A N/A N/A

' Reduced load to 90% due to "B" Transformer hi temperature alarm.

/

1 1

2 3

4 F: Forced Reason:

Method:

Exhibit F - Instructions 8: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data i

B-Maintenance or Test 2-Maiinh1 Scram.

Entry Sheets for Licensee l

C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuations (NUREG-0161)

E-Operator Training & License Examination 5-Load Reduction F-Administrative 9-Other G-Operational Error (Explain)

H-Other (Explain)