{{#Wiki_filter:VERMONT YANKEE NUCLEAR POWER STATION P.O. Box 157, Governor Hunt Road Vernon, Vermont 05354-0157 (802) 257-7711 June 10, 2002 BVY-02-39 United States Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555
{{#Wiki_filter:VERMONT YANKEE NUCLEAR POWER STATION P.O. Box 157, Governor Hunt Road Vernon, Vermont 05354-0157 (802) 257-7711 June 10, 2002 BVY-02-39 United States Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555  


==Reference:==
==Reference:==
Line 25: Line 25:
VERMONT YANKEE NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 02-05 FOR THE MONTH OF MAY 2002
VERMONT YANKEE NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 02-05 FOR THE MONTH OF MAY 2002


OPERATING DATA REPORT DOCKET   NO.50-271 DATE 020610 COMPLETED BY G.A. WALLIN TELEPHONE (802)258-5414 OPERATING STATUS
OPERATING DATA REPORT DOCKET NO.50-271 DATE 020610 COMPLETED BY G.A. WALLIN TELEPHONE (802)258-5414 OPERATING STATUS
: 1. Unit Name:       Vermont Yankee
: 1. Unit Name:
: 2. Reporting Period:         May
Vermont Yankee
: 2. Reporting Period:
May
: 3. Licensed Thermal Power(MWt):1593
: 3. Licensed Thermal Power(MWt):1593
: 4. Nameplate Rating(Gross MWe):       540
: 4. Nameplate Rating(Gross MWe): 540
: 5. Design Electrical Rating(Net MWe):       522
: 5. Design Electrical Rating(Net MWe):
: 6. Maximum Dependable Capacity(Gross MWe):       535
522
: 7. Maximum Dependable Capacity(Net MWe):         510
: 6. Maximum Dependable Capacity(Gross MWe):
: 8. If changes, occur in capacity ratings(Items Number 3 through 7)         since last report, give reasons:
535
: 9. Power level to which restricted, if     any(Net MWe):     N/A
: 7. Maximum Dependable Capacity(Net MWe):
: 10. Reasons for restrictions,       if any:             N/A This Month   Yr-to-Date Cumulative
510
: 11. Hours in Reporting Period                         744.00     3623.00     257831.00
: 8. If changes, occur in capacity ratings(Items Number 3 through 7) since last report, give reasons:
: 12. Number Of Hours Reactor was Critical               487.88     3366.88     218482.30
: 9.
: 13. Reactor Reserve Shutdown Hours                       0.00       0.00         0.00
Power level to which restricted, if any(Net MWe):
: 14. Hours Generator On-Line                           460.70     3339.70     214886.14
N/A
: 15. Unit Reserve Shutdown Hours                           0.00       0.00         0.00
: 10. Reasons for restrictions, if any:
: 16. Gross Thermal Energy Generated(MWH)           645131.15   4958251.70 325148335.91
N/A This Month Yr-to-Date Cumulative
: 17. Gross Electrical Energy Generated(MWH)         219181.00   1700969.00 109130558.00
: 11. Hours in Reporting Period 744.00 3623.00 257831.00
: 18. Net Electrical Energy Generated(MWH)           209953.00   1633782.00 103853525.00
: 12. Number Of Hours Reactor was Critical 487.88 3366.88 218482.30
: 19. Unit Service Factor                                 61.90       92.20         82.30
: 13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00
: 20. Unit Availability Factor                           61.90       92.20         82.30
: 14. Hours Generator On-Line 460.70 3339.70 214886.14
: 21. Unit Capacity Factor(Using MDC Net)                 55.30       88.40         78.70
: 15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
: 22. Unit Capacity Factor(Using DER Net)                 54.10       86.40         77.10
: 16. Gross Thermal Energy Generated(MWH) 645131.15 4958251.70 325148335.91
: 23. Unit Forced Outage Rate                               0.00       0.00         4.02
: 17. Gross Electrical Energy Generated(MWH) 219181.00 1700969.00 109130558.00
: 18. Net Electrical Energy Generated(MWH) 209953.00 1633782.00 103853525.00
: 19. Unit Service Factor 61.90 92.20 82.30
: 20. Unit Availability Factor 61.90 92.20 82.30
: 21. Unit Capacity Factor(Using MDC Net) 55.30 88.40 78.70
: 22. Unit Capacity Factor(Using DER Net) 54.10 86.40 77.10
: 23. Unit Forced Outage Rate 0.00 0.00 4.02
: 24. Shutdowns scheduled over next 6 months(Type, Date, and Duration of Each:
: 24. Shutdowns scheduled over next 6 months(Type, Date, and Duration of Each:
: 25. If shut down at end of report period, estimated date of startup:         N/A
: 25.
If shut down at end of report period, estimated date of startup: N/A
: 26. Units In Test Status(prior to commercial operation): N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION VYDPF 0411.01 (Sample)
: 26. Units In Test Status(prior to commercial operation): N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION VYDPF 0411.01 (Sample)
DP 0411 Rev. 7 Page 1 of 1 RT No. 13.F01.19F
DP 0411 Rev.
7 Page 1 of 1 RT No.
13.F01.19F


AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-271 UNIT Vermont Yankee DATE 020610 COMPLETED BY G.A. WALLIN TELEPHONE   (802)258-5414 MONTH May DAY   AVERAGE DAILY POWER LEVEL       DAY   AVERAGE DAILY POWER LEVEL (MWe-Net)                              (MWe-Net)
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
: 1.            476                    17.               0
50-271 UNIT Vermont Yankee DATE 020610 COMPLETED BY G.A. WALLIN TELEPHONE (802)258-5414 MONTH May DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 1.
: 2.            476                    18.               0
: 2.
: 3.            476                    19.               0
: 3.
: 4.            476                    20.               0
: 4.
: 5.            476                    21.               0
: 5.
: 6.            458                    22.               0
6.
: 7.            474                    23.               93
7.
: 8.            474                    24.             312
476 476 476 476 476 458 474 474
: 9.            474                    25.             430
: 8.
: 10.            474                    26.             419
9.
: 11.            222                    27.             481
: 10.
: 12.                0                  28.             524
: 11.
: 13.                0                  29.             524
: 12.
: 14.                0                  30.             525
: 13.
: 15.               0                   31.            524
: 14.
: 16.                0 INSTRUCTIONS:
: 15.
On this format, list   the average daily unit power level in MWE-Net for each day in the reporting month.     Compute to the nearest whole megawatt.
16.
474 474 222 0
0 0
0 0
DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
: 17.
: 18.
: 19.
: 20.
: 21.
: 22.
: 23.
: 24.
: 25.
: 26.
: 27.
: 28.
: 29.
: 30.
31.
0 0
0 0
0 0
93 312 430 419 481 524 524 525 524 INSTRUCTIONS:
On this format, list the average daily unit power level in MWE-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
VYDPF 0411.02 (Sample)
VYDPF 0411.02 (Sample)
DP 0411 Rev. 7 Page 1 of 1 RT No. 13.F01.18V
DP 0411 Rev.
7 Page 1 of 1 RT No.
13.F01.18V


UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH MAY                                     DOCKET NO 50-271 UNIT NAME  Vermont Yankee DATE 020610 COMPLETED BY  G.A. Wallin TELEPHONE  (802)258-5414 1                   2         3                   4       5 No. Date     Type   Duration   Reason Method of License   System   Component   Cause and Corrective (hours)           Shutting   Event     Code     Code       Action to Prevent Down       Report #                       Recurrence Reactor 02-09   020511     5     283.30     B,C         1     N/A       RB     CONROD     Shutdown for Mid-Cycle Refueling outage 02-10   020526     S       0.00       H         4       N/A       RB     CONROD     Rod pattern adjustment Power Reduction 1  F: Forced        2 Reason:                        3 Method:              4 Exhibit G- Instructions S: Scheduled      A-Equipment Failure (Explain)      1 - Manual            for Preparation of Data B-Maintenance or Test              2 - Manual Scram      Entry Sheets for License C-Refueling                        3 - Automatic Scram    Event Report (LER) File D-Regulatory Restriction          4 - Other (Explain)    (NUREG 0161)
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH MAY 1
E-Operator Training and License Examination                                  5 Exhibit I - Same Source VYDPF 0411.03          F-Administrative DP 0411 Rev. 7        G-Operational Error (Explain)
F: Forced S: Scheduled VYDPF 0411.03 DP 0411 Rev.
Page 1 of 1            H-(Explain) - Rod pattern exchange
7 Page 1 of 1 DOCKET NO UNIT NAME DATE COMPLETED BY TELEPHONE 2 Reason:
3 Method:
A-Equipment Failure (Explain) 1 -
Manual B-Maintenance or Test 2 - Manual Scram C-Refueling 3 - Automatic Scram D-Regulatory Restriction 4 - Other (Explain)
E-Operator Training and License Examination F-Administrative G-Operational Error (Explain)
H-(Explain) -
Rod pattern exchange 50-271 Vermont Yankee 020610 G.A. Wallin (802)258-5414 4 Exhibit G-Instructions for Preparation of Data Entry Sheets for License Event Report (LER) File (NUREG 0161) 5 Exhibit I -
Same Source 1
2 3
4 5
No.
Date Type Duration Reason Method of License System Component Cause and Corrective (hours)
Shutting Event Code Code Action to Prevent Down Report #
Recurrence Reactor 02-09 020511 5
283.30 B,C 1
N/A RB CONROD Shutdown for Mid-Cycle Refueling outage 02-10 020526 S
0.00 H
4 N/A RB CONROD Rod pattern adjustment Power Reduction


DOCKET NO. 50-271 DATE 020610 COMPLETED BY   G.A. WALLIN TELEPHONE (802)258-5414 REPORT MONTH May
DOCKET NO.
50-271 DATE 020610 COMPLETED BY G.A. WALLIN TELEPHONE (802)258-5414 REPORT MONTH May  


==SUMMARY==
==SUMMARY==
Line 87: Line 143:
At the beginning of the reporting period the plant was operating at 90.9%
At the beginning of the reporting period the plant was operating at 90.9%
of rated thermal power.
of rated thermal power.
020511   At 0807 hours, commenced a plant shutdown for a mid-cycle refueling.
020511 At 0807 hours, commenced a plant shutdown for a mid-cycle refueling.
See Unit Shutdowns and Power Reductions) 020511   At 1522 hours, the turbine-generator was removed from the grid.
See Unit Shutdowns and Power Reductions) 020511 At 1522 hours, the turbine-generator was removed from the grid.
020511   At 2326 hours, the reactor was sub-critical.
020511 At 2326 hours, the reactor was sub-critical.
020522   At 1533 hours, the reactor was critical.     (See Unit Shutdowns and Power Reductions) 020523   At 1140 hours, the turbine-generator was phased to the grid and began a return to full   power.
020522 At 1533 hours, the reactor was critical.
020526 At 1000 hours, commenced a power reduction to 66% power for a rod pattern adjustment.   (See Unit Shutdowns and Power Reductions) 020526 At 1300 hours, began a return to full   power following the rod pattern adjustment.
(See Unit Shutdowns and Power Reductions) 020523 At 1140 hours, the turbine-generator was phased to the grid and began a return to full power.
020526 At 1000 hours, commenced a power reduction to 66% power for a rod pattern adjustment.
(See Unit Shutdowns and Power Reductions) 020526 At 1300 hours, began a return to full power following the rod pattern adjustment.
At the end of the reporting period the plant was operating at 99.9% of rated thermal power.
At the end of the reporting period the plant was operating at 99.9% of rated thermal power.
VYDPF 0411.04 (Sample)
VYDPF 0411.04 (Sample)
DP 0411 Rev. 7 Page 1 of 1 RT No. 13.FO1.18X}}
DP 0411 Rev.
7 Page 1 of 1 RT No.
13.FO1.18X}}

Latest revision as of 17:54, 16 January 2025

May 2002 Monthly Operating Report for Vermont Yankee
ML021710130
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 06/10/2002
From: Bronson K
Vermont Yankee
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
BVY-02-39
Download: ML021710130 (6)


Text

VERMONT YANKEE NUCLEAR POWER STATION P.O. Box 157, Governor Hunt Road Vernon, Vermont 05354-0157 (802) 257-7711 June 10, 2002 BVY-02-39 United States Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555

Reference:

(a) License No. DPR-28 (Docket No. 50-271)

In accordance with section 6.6.B of the Vermont Yankee Technical Specifications, submitted herewith is the Monthly Statistical Report for the Vermont Yankee Nuclear Power Station for the month of May, 2002.

Sincerely, VERMOY YANKEE NUCLEAR POWER STATION Kevin H. Bronson Plant Manager cc: USNRC Region I Administrator USNRC Resident Inspector - VYNPS USNRC Project Manager - VYNPS

VERMONT YANKEE NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 02-05 FOR THE MONTH OF MAY 2002

OPERATING DATA REPORT DOCKET NO.50-271 DATE 020610 COMPLETED BY G.A. WALLIN TELEPHONE (802)258-5414 OPERATING STATUS

1. Unit Name:

Vermont Yankee

2. Reporting Period:

May

3. Licensed Thermal Power(MWt):1593
4. Nameplate Rating(Gross MWe): 540
5. Design Electrical Rating(Net MWe):

522

6. Maximum Dependable Capacity(Gross MWe):

535

7. Maximum Dependable Capacity(Net MWe):

510

8. If changes, occur in capacity ratings(Items Number 3 through 7) since last report, give reasons:
9.

Power level to which restricted, if any(Net MWe):

N/A

10. Reasons for restrictions, if any:

N/A This Month Yr-to-Date Cumulative

11. Hours in Reporting Period 744.00 3623.00 257831.00
12. Number Of Hours Reactor was Critical 487.88 3366.88 218482.30
13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00
14. Hours Generator On-Line 460.70 3339.70 214886.14
15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
16. Gross Thermal Energy Generated(MWH) 645131.15 4958251.70 325148335.91
17. Gross Electrical Energy Generated(MWH) 219181.00 1700969.00 109130558.00
18. Net Electrical Energy Generated(MWH) 209953.00 1633782.00 103853525.00
19. Unit Service Factor 61.90 92.20 82.30
20. Unit Availability Factor 61.90 92.20 82.30
21. Unit Capacity Factor(Using MDC Net) 55.30 88.40 78.70
22. Unit Capacity Factor(Using DER Net) 54.10 86.40 77.10
23. Unit Forced Outage Rate 0.00 0.00 4.02
24. Shutdowns scheduled over next 6 months(Type, Date, and Duration of Each:
25.

If shut down at end of report period, estimated date of startup: N/A

26. Units In Test Status(prior to commercial operation): N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION VYDPF 0411.01 (Sample)

DP 0411 Rev.

7 Page 1 of 1 RT No.

13.F01.19F

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-271 UNIT Vermont Yankee DATE 020610 COMPLETED BY G.A. WALLIN TELEPHONE (802)258-5414 MONTH May DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 1.

2.
3.
4.
5.

6.

7.

476 476 476 476 476 458 474 474

8.

9.

10.
11.
12.
13.
14.
15.

16.

474 474 222 0

0 0

0 0

DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.

31.

0 0

0 0

0 0

93 312 430 419 481 524 524 525 524 INSTRUCTIONS:

On this format, list the average daily unit power level in MWE-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

VYDPF 0411.02 (Sample)

DP 0411 Rev.

7 Page 1 of 1 RT No.

13.F01.18V

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH MAY 1

F: Forced S: Scheduled VYDPF 0411.03 DP 0411 Rev.

7 Page 1 of 1 DOCKET NO UNIT NAME DATE COMPLETED BY TELEPHONE 2 Reason:

3 Method:

A-Equipment Failure (Explain) 1 -

Manual B-Maintenance or Test 2 - Manual Scram C-Refueling 3 - Automatic Scram D-Regulatory Restriction 4 - Other (Explain)

E-Operator Training and License Examination F-Administrative G-Operational Error (Explain)

H-(Explain) -

Rod pattern exchange 50-271 Vermont Yankee 020610 G.A. Wallin (802)258-5414 4 Exhibit G-Instructions for Preparation of Data Entry Sheets for License Event Report (LER) File (NUREG 0161) 5 Exhibit I -

Same Source 1

2 3

4 5

No.

Date Type Duration Reason Method of License System Component Cause and Corrective (hours)

Shutting Event Code Code Action to Prevent Down Report #

Recurrence Reactor 02-09 020511 5

283.30 B,C 1

N/A RB CONROD Shutdown for Mid-Cycle Refueling outage 02-10 020526 S

0.00 H

4 N/A RB CONROD Rod pattern adjustment Power Reduction

DOCKET NO.

50-271 DATE 020610 COMPLETED BY G.A. WALLIN TELEPHONE (802)258-5414 REPORT MONTH May

SUMMARY

OF OPERATING EXPERIENCES Highlights Vermont Yankee operated at 54.4 of rated thermal power for the month.

Gross electrical generation was 219,181 MWHe or 53.9% design electrical capacity.

Operating Summary The following is a chronological description of plant operations including other pertinent items of interest for the month:

At the beginning of the reporting period the plant was operating at 90.9%

of rated thermal power.

020511 At 0807 hours0.00934 days <br />0.224 hours <br />0.00133 weeks <br />3.070635e-4 months <br />, commenced a plant shutdown for a mid-cycle refueling.

See Unit Shutdowns and Power Reductions) 020511 At 1522 hours0.0176 days <br />0.423 hours <br />0.00252 weeks <br />5.79121e-4 months <br />, the turbine-generator was removed from the grid.

020511 At 2326 hours0.0269 days <br />0.646 hours <br />0.00385 weeks <br />8.85043e-4 months <br />, the reactor was sub-critical.

020522 At 1533 hours0.0177 days <br />0.426 hours <br />0.00253 weeks <br />5.833065e-4 months <br />, the reactor was critical.

(See Unit Shutdowns and Power Reductions) 020523 At 1140 hours0.0132 days <br />0.317 hours <br />0.00188 weeks <br />4.3377e-4 months <br />, the turbine-generator was phased to the grid and began a return to full power.

020526 At 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br />, commenced a power reduction to 66% power for a rod pattern adjustment.

(See Unit Shutdowns and Power Reductions) 020526 At 1300 hours0.015 days <br />0.361 hours <br />0.00215 weeks <br />4.9465e-4 months <br />, began a return to full power following the rod pattern adjustment.

At the end of the reporting period the plant was operating at 99.9% of rated thermal power.

VYDPF 0411.04 (Sample)

DP 0411 Rev.

7 Page 1 of 1 RT No.

13.FO1.18X