Beaver Valley PowerStation P. 0. Box 4 Shippingport,PA 15077 L-02-096 September 6, 2002 Beaver Valley Power Station Unit I - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Operating Report U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen: | |||
In accordance with NRC Generic Letter 97-02, "Revised Contents of the Monthly Operating Report", and Unit 1 and 2 Technical Specification 6.9.4, the "Monthly Operating Report" is submitted for Unit 1 and Unit 2 for the month of August 2002. | |||
Also included is a revised "Operating Data Report" for BVPS-1 for September 2001. The number of hours the reactor was critical was originally reported as zero (0) hours. The correct value should be 0.9 hours critical based on- BVPS-1 entering Mode 3 at 0055 hours on 9/1/01 after shutting down for its 14th refueling outage at 0000 hours on 9/1/01. This was discovered during a self-assessment of the NRC Performance Indicators last month. | |||
Respectfully, M. B. Bezilla Vice-President DTJ/caj Enclosures <N cc: NRC Regional Office King of Prussia, PA | |||
UNIT SHUTDOWNS DOCKET NO. 50-334 UNIT NAME BVPS Unit #1 DATE September 3, 2002 | |||
,COMPLETED BY David T. Jones TELEPHONE (724) 682-4962 REPORTING PERIOD: Auaust 2002 No. Date Type Duration Reason Method of Cause I Corrective Actions (Y/MID) F: Forced (Hours) (1) Shutting S: Scheduled Down (2) Comments NONE (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip / Scram C - Refueling 3 - Automatic Trip I Scram D - Regulatory Restriction 4 - Continuation E - Operator Training / License Examination 5 - Other (Explain) | |||
F - Administrative G - Operational Error (Explain) | |||
H - Other (Explain) | |||
==SUMMARY== | |||
The Unit operated at a nominal value of 100% output for the entire report period. | |||
OPERATING DATA REPORT DOCKET NO.: 50-334 UNIT NAME: BVPS UNIT #1 REPORT DATE: 09/03/02 COMPLETED BY: DAVID T. JONES TELEPHONE: (724) 682-4962 la. REPORTING PERIOD: AUGUST 2002 | |||
"* Nolte: Rated thermal power at * | |||
"* BVPS-1 was uprated from 2652 MWt* | |||
: 1. DESIGN ELECTRICAL RATING (Net MWe): 835 | |||
"* to 2689 MWt on 10/20/01. Net * | |||
"* MDC was also uprated from * | |||
: 2. MAX. DEPENDABLE CAPACITY (Net XWe): 821 "* 810 MWe to 821 MWe. | |||
* THIS MONTH YEAR TODATE CUMULATIVE 3a. HOURS IN REPORTING PERIOD: 744.0 5831.0 230855.0 | |||
: 3. NO. OF HRS. REACTOR WAS CRITICAL: 744.0 5831.0 157913.4 | |||
: 4. SERVICE HOURS GENERATOR ON LINE: 744.0 5831.0 155452.9 | |||
: 5. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0 | |||
: 6. NET ELECTRICAL ENERGY GEN. (MWH): 610100.0 4795740.0 116461883.0 | |||
: 7. GROSS ELECT. ENERGY GEN. (MWH): 646460.0 5077320.0 124344106.0 | |||
: 8. GROSS THERMAL ENERGY GEN. (MWH): 1997954.0 15546165.0 383180970.5 | |||
: 9. UNIT AVAILABILITY FACTOR (M): 100.0 100.0 68.8 | |||
: 10. UNIT CAPACITY FACTOR (MDC) ('}): 99.9 100.2 64.1 | |||
: 11. UNIT FORCED OUTAGE RATE (M}: 0.0 0.0 15.9 | |||
4-.. -. | |||
I UNIT SHUTDOWNS DOCKET NO. 50-412 UNIT NAME BVPS Unit #2 DATE September 3, 2002 COMPLETED BY David T. Jones TELEPHONE (724) 682-4962 REPORTING PERIOD: August 2002 No. Date Type Duration Reason Method of Cause / Corrective Actions | |||
"(YIM/D) F: Forced (Hours) (1) Shutting S: Scheduled Down (2) Comments NONE (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Tnp / Scram C - Refueling 3 - Automatic Trip / Scram D - Regulatory Restriction 4 - Continuation E - Operator Training / Ucense Examination 5 - Other (Explain) | |||
F - Administrative ' | |||
G - Operational Error (Explain) | |||
H - Other (Explain) | |||
S.................................................................................................................................... | |||
==SUMMARY== | |||
The Unit operated at a nominal value of 100% output for the entire report period. | |||
OPERATING DATA REPORT DOCKET NO.: 50-412 UNIT NAME: BWPS UNIT #2 REPORT DATE: 09103/02 COMPLETED BY: DAVID T. JONES TELEPHONE: (724) 682-4962 | |||
"* Noe: Rated thermal power at | |||
* la. REPORTING PERIOD: AUGUST 2002 "* BVPS-2 was uprated from 2652 MWt* | |||
: 1. DESIGN ELECTRICAL RATING (Net MWe): 836 | |||
"* to 2689 Mwt on 10/30/01. Net * | |||
"* MDC was also uprated from * | |||
: 2. MAX. DEPENDABLE CAPACITY (Net MWe): 831 "* 820 MWe to 831 MWe. | |||
* THIS MONTH YEAR TO DATE CUMULATIVE 3a. HOURS IN REPORTING PERIOD: 744.0 5831.0 129638.0 | |||
: 3. NO. OF HRS. REACTOR WAS CRITICAL: 744.0 5271.6 106626.1 | |||
: 4. SERVICE HOURS GENERATOR ON LINE: 744.0 5204.9 105897.5 | |||
: 5. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0 | |||
: 6. NET ELECTRICAL ENERGY GEN. (MWH): 615702.0 4186161.0 82764253.0 | |||
: 7. GROSS ELECT. ENERGY GEN. (MWH): 648316.0 4416970.0 87491713.0 | |||
: 8. GROSS THERMAL ENERGY GEN. (MWH): 1997895.0 13472362.0 266879943.0 | |||
: 9. UNIT AVAILABILITY FACTOR (M): 100.0 89.3 81.7 | |||
: 10. UNIT CAPACITY FACTOR (MDC) Mi} : 99.6 86.4 77.2 | |||
: 11. UNIT FORCED OUTAGE RATE (M): 0.0 0.3 10.0 | |||
OPERATING DATA REPORT DOCKET NO.: 50-334 UNIT NAME: BVPS UNIT #1 REPORT DATE: 09/03/02 COMPLETED BY: DAVID T. JONES TELEPHONE: (724) 682-4962 la. REPORTING PERIOD: SEPTEMBER 2001 | |||
* Notes: The # critical hours has* | |||
* been revised because the Unit * | |||
: 1. DESIGN ELECTRICAL RATING (Net MWe): 835 | |||
* was shutdown at 0000 hours on * | |||
* 9/1/01, but did not enter Mode 3* | |||
: 2. MAX. DEPENDABLE CAPACITY (Net MWe): 810 | |||
* until 0055 hours on 9/1/01. | |||
* THIS MONTH YEAR TO DATE CUMULATIVE 3a. HOURS IN REPORTING PERIOD: 720.0 6551.0 222815.0 | |||
: 3. NO. OF ERS. REACTOR WAS CRITICAL: 0.9 5554.0 150173.9 | |||
: 4. SERVICE HOURS GENERATOR ON LINE: 0.0 5528.3 147740.5 Ii | |||
: 5. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0 | |||
: 6. NET ELECTRICAL ENERGY GEN. (MWH): 0.0 4490098.0 110165218.0 | |||
: 7. GROSS ELECT. ENERGY GEN. (MWH): 0.0 4757338.0 117667751.0 | |||
: a. GROSS THERMAL ENERGY GEN. (MWH): 0.0 14457753.0 362765269.5 | |||
: 9. UNIT AVAILABILITY FACTOR (M): 0.0 84.4 67.8 | |||
: 10. UNIT CAPACITY FACTOR (MDC) (%): 0.0 84.6 63.0 | |||
: 11. UNIT FORCED OUTAGE RATE (M}: 0.0 1.4 16.5}} |
Latest revision as of 08:25, 26 March 2020
ML022830324 | |
Person / Time | |
---|---|
Site: | Beaver Valley |
Issue date: | 09/06/2002 |
From: | Bezilla M FirstEnergy Nuclear Operating Co |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
L-02-096 | |
Download: ML022830324 (6) | |
Text
FENOC F-OZu 7 11 cý ý,
Beaver Valley PowerStation P. 0. Box 4 Shippingport,PA 15077 L-02-096 September 6, 2002 Beaver Valley Power Station Unit I - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Operating Report U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:
In accordance with NRC Generic Letter 97-02, "Revised Contents of the Monthly Operating Report", and Unit 1 and 2 Technical Specification 6.9.4, the "Monthly Operating Report" is submitted for Unit 1 and Unit 2 for the month of August 2002.
Also included is a revised "Operating Data Report" for BVPS-1 for September 2001. The number of hours the reactor was critical was originally reported as zero (0) hours. The correct value should be 0.9 hours1.041667e-4 days <br />0.0025 hours <br />1.488095e-5 weeks <br />3.4245e-6 months <br /> critical based on- BVPS-1 entering Mode 3 at 0055 hours6.365741e-4 days <br />0.0153 hours <br />9.093915e-5 weeks <br />2.09275e-5 months <br /> on 9/1/01 after shutting down for its 14th refueling outage at 0000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> on 9/1/01. This was discovered during a self-assessment of the NRC Performance Indicators last month.
Respectfully, M. B. Bezilla Vice-President DTJ/caj Enclosures <N cc: NRC Regional Office King of Prussia, PA
UNIT SHUTDOWNS DOCKET NO. 50-334 UNIT NAME BVPS Unit #1 DATE September 3, 2002
,COMPLETED BY David T. Jones TELEPHONE (724) 682-4962 REPORTING PERIOD: Auaust 2002 No. Date Type Duration Reason Method of Cause I Corrective Actions (Y/MID) F: Forced (Hours) (1) Shutting S: Scheduled Down (2) Comments NONE (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip / Scram C - Refueling 3 - Automatic Trip I Scram D - Regulatory Restriction 4 - Continuation E - Operator Training / License Examination 5 - Other (Explain)
F - Administrative G - Operational Error (Explain)
H - Other (Explain)
SUMMARY
The Unit operated at a nominal value of 100% output for the entire report period.
OPERATING DATA REPORT DOCKET NO.: 50-334 UNIT NAME: BVPS UNIT #1 REPORT DATE: 09/03/02 COMPLETED BY: DAVID T. JONES TELEPHONE: (724) 682-4962 la. REPORTING PERIOD: AUGUST 2002
"* Nolte: Rated thermal power at *
"* BVPS-1 was uprated from 2652 MWt*
- 1. DESIGN ELECTRICAL RATING (Net MWe): 835
"* to 2689 MWt on 10/20/01. Net *
"* MDC was also uprated from *
- 2. MAX. DEPENDABLE CAPACITY (Net XWe): 821 "* 810 MWe to 821 MWe.
- THIS MONTH YEAR TODATE CUMULATIVE 3a. HOURS IN REPORTING PERIOD: 744.0 5831.0 230855.0
- 3. NO. OF HRS. REACTOR WAS CRITICAL: 744.0 5831.0 157913.4
- 4. SERVICE HOURS GENERATOR ON LINE: 744.0 5831.0 155452.9
- 5. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
- 6. NET ELECTRICAL ENERGY GEN. (MWH): 610100.0 4795740.0 116461883.0
- 7. GROSS ELECT. ENERGY GEN. (MWH): 646460.0 5077320.0 124344106.0
- 8. GROSS THERMAL ENERGY GEN. (MWH): 1997954.0 15546165.0 383180970.5
- 9. UNIT AVAILABILITY FACTOR (M): 100.0 100.0 68.8
- 10. UNIT CAPACITY FACTOR (MDC) ('}): 99.9 100.2 64.1
- 11. UNIT FORCED OUTAGE RATE (M}: 0.0 0.0 15.9
4-.. -.
I UNIT SHUTDOWNS DOCKET NO. 50-412 UNIT NAME BVPS Unit #2 DATE September 3, 2002 COMPLETED BY David T. Jones TELEPHONE (724) 682-4962 REPORTING PERIOD: August 2002 No. Date Type Duration Reason Method of Cause / Corrective Actions
"(YIM/D) F: Forced (Hours) (1) Shutting S: Scheduled Down (2) Comments NONE (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Tnp / Scram C - Refueling 3 - Automatic Trip / Scram D - Regulatory Restriction 4 - Continuation E - Operator Training / Ucense Examination 5 - Other (Explain)
F - Administrative '
G - Operational Error (Explain)
H - Other (Explain)
S....................................................................................................................................
SUMMARY
The Unit operated at a nominal value of 100% output for the entire report period.
OPERATING DATA REPORT DOCKET NO.: 50-412 UNIT NAME: BWPS UNIT #2 REPORT DATE: 09103/02 COMPLETED BY: DAVID T. JONES TELEPHONE: (724) 682-4962
"* Noe: Rated thermal power at
- la. REPORTING PERIOD: AUGUST 2002 "* BVPS-2 was uprated from 2652 MWt*
- 1. DESIGN ELECTRICAL RATING (Net MWe): 836
"* to 2689 Mwt on 10/30/01. Net *
"* MDC was also uprated from *
- 2. MAX. DEPENDABLE CAPACITY (Net MWe): 831 "* 820 MWe to 831 MWe.
- THIS MONTH YEAR TO DATE CUMULATIVE 3a. HOURS IN REPORTING PERIOD: 744.0 5831.0 129638.0
- 3. NO. OF HRS. REACTOR WAS CRITICAL: 744.0 5271.6 106626.1
- 4. SERVICE HOURS GENERATOR ON LINE: 744.0 5204.9 105897.5
- 5. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
- 6. NET ELECTRICAL ENERGY GEN. (MWH): 615702.0 4186161.0 82764253.0
- 7. GROSS ELECT. ENERGY GEN. (MWH): 648316.0 4416970.0 87491713.0
- 8. GROSS THERMAL ENERGY GEN. (MWH): 1997895.0 13472362.0 266879943.0
- 9. UNIT AVAILABILITY FACTOR (M): 100.0 89.3 81.7
- 10. UNIT CAPACITY FACTOR (MDC) Mi} : 99.6 86.4 77.2
- 11. UNIT FORCED OUTAGE RATE (M): 0.0 0.3 10.0
OPERATING DATA REPORT DOCKET NO.: 50-334 UNIT NAME: BVPS UNIT #1 REPORT DATE: 09/03/02 COMPLETED BY: DAVID T. JONES TELEPHONE: (724) 682-4962 la. REPORTING PERIOD: SEPTEMBER 2001
- Notes: The # critical hours has*
- been revised because the Unit *
- 1. DESIGN ELECTRICAL RATING (Net MWe): 835
- was shutdown at 0000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> on *
- 9/1/01, but did not enter Mode 3*
- 2. MAX. DEPENDABLE CAPACITY (Net MWe): 810
- until 0055 hours6.365741e-4 days <br />0.0153 hours <br />9.093915e-5 weeks <br />2.09275e-5 months <br /> on 9/1/01.
- THIS MONTH YEAR TO DATE CUMULATIVE 3a. HOURS IN REPORTING PERIOD: 720.0 6551.0 222815.0
- 3. NO. OF ERS. REACTOR WAS CRITICAL: 0.9 5554.0 150173.9
- 4. SERVICE HOURS GENERATOR ON LINE: 0.0 5528.3 147740.5 Ii
- 5. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
- 6. NET ELECTRICAL ENERGY GEN. (MWH): 0.0 4490098.0 110165218.0
- 7. GROSS ELECT. ENERGY GEN. (MWH): 0.0 4757338.0 117667751.0
- a. GROSS THERMAL ENERGY GEN. (MWH): 0.0 14457753.0 362765269.5
- 9. UNIT AVAILABILITY FACTOR (M): 0.0 84.4 67.8
- 10. UNIT CAPACITY FACTOR (MDC) (%): 0.0 84.6 63.0
- 11. UNIT FORCED OUTAGE RATE (M}: 0.0 1.4 16.5