Beaver Valley PowerStation P. 0. Box 4 Shippingport,PA 15077 L-02-096 September 6, 2002 Beaver Valley Power Station Unit  I - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Operating Report U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:
In accordance with NRC Generic Letter 97-02, "Revised Contents of the Monthly Operating Report", and Unit 1 and 2 Technical Specification 6.9.4, the "Monthly Operating Report" is submitted for Unit 1 and Unit 2 for the month of August 2002.
Also included is a revised "Operating Data Report" for BVPS-1 for September 2001. The number of hours the reactor was critical was originally reported as zero (0) hours. The correct value should be 0.9 hours critical based on- BVPS-1 entering Mode 3 at 0055 hours on 9/1/01 after shutting down for its 14th refueling outage at 0000 hours on 9/1/01. This was discovered during a self-assessment of the NRC Performance Indicators last month.
Respectfully, M. B. Bezilla Vice-President DTJ/caj Enclosures                                                                                        <N cc:    NRC Regional Office King of Prussia, PA
 
UNIT SHUTDOWNS DOCKET NO. 50-334 UNIT NAME    BVPS Unit #1 DATE    September 3, 2002
                                                                                                                                                              ,COMPLETED BY    David T. Jones TELEPHONE    (724) 682-4962 REPORTING PERIOD:                                                                                        Auaust 2002 No.                        Date                                      Type                          Duration                      Reason      Method of              Cause I Corrective Actions (Y/MID)                              F: Forced                                (Hours)                      (1)        Shutting S: Scheduled                                                                        Down (2)                    Comments NONE (1) Reason                                                                                                                        (2) Method A - Equipment Failure (Explain)                                                                                                1 - Manual B - Maintenance or Test                                                                                                        2 - Manual Trip / Scram C - Refueling                                                                                                                  3 - Automatic Trip I Scram D - Regulatory Restriction                                                                                                    4 - Continuation E - Operator Training / License Examination                                                                                  5 - Other (Explain)
F - Administrative G - Operational Error (Explain)
H - Other (Explain)
 
==SUMMARY==
The Unit operated at a nominal value of 100% output for the entire report period.
 
OPERATING DATA REPORT DOCKET NO.:      50-334 UNIT NAME:        BVPS UNIT #1 REPORT DATE:      09/03/02 COMPLETED BY:    DAVID T. JONES TELEPHONE:        (724)  682-4962 la. REPORTING PERIOD:      AUGUST 2002
                                                                "* Nolte: Rated thermal power at *
                                                                "* BVPS-1 was uprated from 2652 MWt*
: 1. DESIGN ELECTRICAL RATING  (Net MWe):        835
                                                                "* to 2689 MWt on 10/20/01. Net *
                                                                "* MDC was also uprated from          *
: 2. MAX. DEPENDABLE CAPACITY (Net XWe):          821            "* 810 MWe to 821 MWe.
* THIS MONTH      YEAR TODATE            CUMULATIVE 3a. HOURS IN  REPORTING PERIOD:                            744.0            5831.0            230855.0
: 3. NO. OF HRS. REACTOR WAS CRITICAL:                    744.0            5831.0            157913.4
: 4. SERVICE HOURS GENERATOR ON LINE:                      744.0            5831.0            155452.9
: 5. UNIT RESERVE SHUTDOWN HOURS:                            0.0                0.0                  0.0
: 6. NET ELECTRICAL ENERGY GEN.    (MWH):              610100.0          4795740.0        116461883.0
: 7. GROSS ELECT. ENERGY GEN.  (MWH):                  646460.0          5077320.0        124344106.0
: 8. GROSS THERMAL ENERGY GEN.    (MWH):                1997954.0        15546165.0        383180970.5
: 9. UNIT AVAILABILITY FACTOR    (M):                      100.0              100.0                  68.8
: 10. UNIT CAPACITY FACTOR (MDC)    ('}):                    99.9              100.2                  64.1
: 11. UNIT FORCED OUTAGE RATE  (M}:                          0.0                0.0                  15.9
 
4-..  -.
I UNIT SHUTDOWNS DOCKET NO.          50-412 UNIT NAME        BVPS Unit #2 DATE      September 3, 2002 COMPLETED BY          David T. Jones TELEPHONE          (724) 682-4962 REPORTING PERIOD:                      August 2002 No.        Date            Type      Duration      Reason        Method of                Cause / Corrective Actions
        "(YIM/D)      F: Forced      (Hours)        (1)        Shutting S: Scheduled                              Down (2)                          Comments NONE (1) Reason                                          (2) Method A - Equipment Failure (Explain)                      1 - Manual B - Maintenance or Test                              2 - Manual Tnp / Scram C - Refueling                                        3 - Automatic Trip / Scram D - Regulatory Restriction                          4 - Continuation E - Operator Training / Ucense Examination          5 - Other (Explain)
F - Administrative '
G - Operational Error (Explain)
H - Other (Explain)
S....................................................................................................................................
 
==SUMMARY==
The Unit operated at a nominal value of 100% output for the entire report period.
 
OPERATING DATA REPORT DOCKET NO.:            50-412 UNIT NAME:            BWPS UNIT #2 REPORT DATE:          09103/02 COMPLETED BY:          DAVID T. JONES TELEPHONE:            (724) 682-4962
                                                                  "* Noe:      Rated thermal power at
* la. REPORTING PERIOD:      AUGUST 2002                            "* BVPS-2 was uprated from 2652 MWt*
: 1. DESIGN ELECTRICAL RATING  (Net MWe):          836
                                                                  "* to 2689 Mwt on 10/30/01. Net *
                                                                  "* MDC was also uprated from                *
: 2. MAX. DEPENDABLE CAPACITY (Net MWe):          831            "* 820 MWe to 831 MWe.
* THIS MONTH      YEAR TO DATE                  CUMULATIVE 3a. HOURS IN REPORTING PERIOD:                              744.0                5831.0                  129638.0
: 3. NO. OF HRS. REACTOR WAS CRITICAL:                      744.0                5271.6                  106626.1
: 4. SERVICE HOURS GENERATOR ON LINE:                        744.0                5204.9                  105897.5
: 5. UNIT RESERVE SHUTDOWN HOURS:                              0.0                    0.0                      0.0
: 6. NET ELECTRICAL ENERGY GEN.    (MWH):                615702.0            4186161.0                82764253.0
: 7. GROSS ELECT. ENERGY GEN.  (MWH):                    648316.0            4416970.0                87491713.0
: 8. GROSS THERMAL ENERGY GEN.    (MWH):                1997895.0          13472362.0              266879943.0
: 9. UNIT AVAILABILITY FACTOR (M):                          100.0                    89.3                    81.7
: 10. UNIT CAPACITY FACTOR (MDC)      Mi} :                    99.6                    86.4                    77.2
: 11. UNIT FORCED OUTAGE RATE  (M):                            0.0                    0.3                    10.0
 
OPERATING DATA REPORT DOCKET NO.:        50-334 UNIT NAME:          BVPS UNIT #1 REPORT DATE:        09/03/02 COMPLETED BY:      DAVID T. JONES TELEPHONE:          (724) 682-4962 la. REPORTING PERIOD:      SEPTEMBER 2001
* Notes:    The # critical  hours has*
* been revised because the Unit        *
: 1. DESIGN ELECTRICAL RATING    (Net MWe):        835
* was shutdown at 0000 hours on        *
* 9/1/01, but did not enter Mode 3*
: 2. MAX. DEPENDABLE CAPACITY (Net MWe):          810
* until    0055 hours on 9/1/01.
* THIS MONTH      YEAR TO DATE              CUMULATIVE 3a. HOURS IN REPORTING PERIOD:                            720.0              6551.0              222815.0
: 3. NO. OF ERS. REACTOR WAS CRITICAL:                      0.9              5554.0              150173.9
: 4. SERVICE HOURS GENERATOR ON LINE:                        0.0              5528.3              147740.5  Ii
: 5. UNIT RESERVE SHUTDOWN HOURS:                            0.0                0.0                  0.0
: 6. NET ELECTRICAL ENERGY GEN.    (MWH):                    0.0          4490098.0            110165218.0
: 7. GROSS ELECT. ENERGY GEN.  (MWH):                      0.0          4757338.0            117667751.0
: a. GROSS THERMAL ENERGY GEN.    (MWH):                    0.0        14457753.0            362765269.5
: 9. UNIT AVAILABILITY FACTOR (M):                            0.0                84.4                  67.8
: 10. UNIT CAPACITY FACTOR  (MDC)    (%):                      0.0                84.6                  63.0
: 11. UNIT FORCED OUTAGE RATE  (M}:                          0.0                1.4                  16.5}}

Latest revision as of 08:25, 26 March 2020

August 2002 Monthly Operating Report for Beaver Valley Units 1 & 2
ML022830324
Person / Time
Site: Beaver Valley
Issue date: 09/06/2002
From: Bezilla M
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-02-096
Download: ML022830324 (6)


Text

FENOC F-OZu 7 11 cý ý,

Beaver Valley PowerStation P. 0. Box 4 Shippingport,PA 15077 L-02-096 September 6, 2002 Beaver Valley Power Station Unit I - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Operating Report U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

In accordance with NRC Generic Letter 97-02, "Revised Contents of the Monthly Operating Report", and Unit 1 and 2 Technical Specification 6.9.4, the "Monthly Operating Report" is submitted for Unit 1 and Unit 2 for the month of August 2002.

Also included is a revised "Operating Data Report" for BVPS-1 for September 2001. The number of hours the reactor was critical was originally reported as zero (0) hours. The correct value should be 0.9 hours1.041667e-4 days <br />0.0025 hours <br />1.488095e-5 weeks <br />3.4245e-6 months <br /> critical based on- BVPS-1 entering Mode 3 at 0055 hours6.365741e-4 days <br />0.0153 hours <br />9.093915e-5 weeks <br />2.09275e-5 months <br /> on 9/1/01 after shutting down for its 14th refueling outage at 0000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> on 9/1/01. This was discovered during a self-assessment of the NRC Performance Indicators last month.

Respectfully, M. B. Bezilla Vice-President DTJ/caj Enclosures <N cc: NRC Regional Office King of Prussia, PA

UNIT SHUTDOWNS DOCKET NO. 50-334 UNIT NAME BVPS Unit #1 DATE September 3, 2002

,COMPLETED BY David T. Jones TELEPHONE (724) 682-4962 REPORTING PERIOD: Auaust 2002 No. Date Type Duration Reason Method of Cause I Corrective Actions (Y/MID) F: Forced (Hours) (1) Shutting S: Scheduled Down (2) Comments NONE (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip / Scram C - Refueling 3 - Automatic Trip I Scram D - Regulatory Restriction 4 - Continuation E - Operator Training / License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

The Unit operated at a nominal value of 100% output for the entire report period.

OPERATING DATA REPORT DOCKET NO.: 50-334 UNIT NAME: BVPS UNIT #1 REPORT DATE: 09/03/02 COMPLETED BY: DAVID T. JONES TELEPHONE: (724) 682-4962 la. REPORTING PERIOD: AUGUST 2002

"* Nolte: Rated thermal power at *

"* BVPS-1 was uprated from 2652 MWt*

1. DESIGN ELECTRICAL RATING (Net MWe): 835

"* to 2689 MWt on 10/20/01. Net *

"* MDC was also uprated from *

2. MAX. DEPENDABLE CAPACITY (Net XWe): 821 "* 810 MWe to 821 MWe.
  • THIS MONTH YEAR TODATE CUMULATIVE 3a. HOURS IN REPORTING PERIOD: 744.0 5831.0 230855.0
3. NO. OF HRS. REACTOR WAS CRITICAL: 744.0 5831.0 157913.4
4. SERVICE HOURS GENERATOR ON LINE: 744.0 5831.0 155452.9
5. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
6. NET ELECTRICAL ENERGY GEN. (MWH): 610100.0 4795740.0 116461883.0
7. GROSS ELECT. ENERGY GEN. (MWH): 646460.0 5077320.0 124344106.0
8. GROSS THERMAL ENERGY GEN. (MWH): 1997954.0 15546165.0 383180970.5
9. UNIT AVAILABILITY FACTOR (M): 100.0 100.0 68.8
10. UNIT CAPACITY FACTOR (MDC) ('}): 99.9 100.2 64.1
11. UNIT FORCED OUTAGE RATE (M}: 0.0 0.0 15.9

4-.. -.

I UNIT SHUTDOWNS DOCKET NO. 50-412 UNIT NAME BVPS Unit #2 DATE September 3, 2002 COMPLETED BY David T. Jones TELEPHONE (724) 682-4962 REPORTING PERIOD: August 2002 No. Date Type Duration Reason Method of Cause / Corrective Actions

"(YIM/D) F: Forced (Hours) (1) Shutting S: Scheduled Down (2) Comments NONE (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Tnp / Scram C - Refueling 3 - Automatic Trip / Scram D - Regulatory Restriction 4 - Continuation E - Operator Training / Ucense Examination 5 - Other (Explain)

F - Administrative '

G - Operational Error (Explain)

H - Other (Explain)

S....................................................................................................................................

SUMMARY

The Unit operated at a nominal value of 100% output for the entire report period.

OPERATING DATA REPORT DOCKET NO.: 50-412 UNIT NAME: BWPS UNIT #2 REPORT DATE: 09103/02 COMPLETED BY: DAVID T. JONES TELEPHONE: (724) 682-4962

"* Noe: Rated thermal power at

  • la. REPORTING PERIOD: AUGUST 2002 "* BVPS-2 was uprated from 2652 MWt*
1. DESIGN ELECTRICAL RATING (Net MWe): 836

"* to 2689 Mwt on 10/30/01. Net *

"* MDC was also uprated from *

2. MAX. DEPENDABLE CAPACITY (Net MWe): 831 "* 820 MWe to 831 MWe.
  • THIS MONTH YEAR TO DATE CUMULATIVE 3a. HOURS IN REPORTING PERIOD: 744.0 5831.0 129638.0
3. NO. OF HRS. REACTOR WAS CRITICAL: 744.0 5271.6 106626.1
4. SERVICE HOURS GENERATOR ON LINE: 744.0 5204.9 105897.5
5. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
6. NET ELECTRICAL ENERGY GEN. (MWH): 615702.0 4186161.0 82764253.0
7. GROSS ELECT. ENERGY GEN. (MWH): 648316.0 4416970.0 87491713.0
8. GROSS THERMAL ENERGY GEN. (MWH): 1997895.0 13472362.0 266879943.0
9. UNIT AVAILABILITY FACTOR (M): 100.0 89.3 81.7
10. UNIT CAPACITY FACTOR (MDC) Mi} : 99.6 86.4 77.2
11. UNIT FORCED OUTAGE RATE (M): 0.0 0.3 10.0

OPERATING DATA REPORT DOCKET NO.: 50-334 UNIT NAME: BVPS UNIT #1 REPORT DATE: 09/03/02 COMPLETED BY: DAVID T. JONES TELEPHONE: (724) 682-4962 la. REPORTING PERIOD: SEPTEMBER 2001

  • Notes: The # critical hours has*
  • been revised because the Unit *
1. DESIGN ELECTRICAL RATING (Net MWe): 835
  • was shutdown at 0000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> on *
  • 9/1/01, but did not enter Mode 3*
2. MAX. DEPENDABLE CAPACITY (Net MWe): 810
  • until 0055 hours6.365741e-4 days <br />0.0153 hours <br />9.093915e-5 weeks <br />2.09275e-5 months <br /> on 9/1/01.
  • THIS MONTH YEAR TO DATE CUMULATIVE 3a. HOURS IN REPORTING PERIOD: 720.0 6551.0 222815.0
3. NO. OF ERS. REACTOR WAS CRITICAL: 0.9 5554.0 150173.9
4. SERVICE HOURS GENERATOR ON LINE: 0.0 5528.3 147740.5 Ii
5. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
6. NET ELECTRICAL ENERGY GEN. (MWH): 0.0 4490098.0 110165218.0
7. GROSS ELECT. ENERGY GEN. (MWH): 0.0 4757338.0 117667751.0
a. GROSS THERMAL ENERGY GEN. (MWH): 0.0 14457753.0 362765269.5
9. UNIT AVAILABILITY FACTOR (M): 0.0 84.4 67.8
10. UNIT CAPACITY FACTOR (MDC) (%): 0.0 84.6 63.0
11. UNIT FORCED OUTAGE RATE (M}: 0.0 1.4 16.5