L-2007-036, Inservice Inspection Report: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:MARo 8 2oo, L-2007-036 FPL                                                              10 CFR 50.55a U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re:      Turkey Point Unit 4 Docket No. 50-251 Inservice Inspection Report Attached are the Executive Summary and the following reports for Turkey Point Unit 4 in accordance with the provisions of the ASME Code, Section XI:
{{#Wiki_filter:}}
Form NIS-1 Owners' Report for Inservice Inspections.
Summary of Inservice Inspection Examinations.
Summary of Inservice Inspections IWE Examinations.
Summary of Visual Examinations and Functional Testing of Snubbers.
Summary of System Pressure Testing.
Form NIS-BB Owners' Data Report for Eddy Current Examination Results.
Form NIS-2 Owners' Report for Repairs or Replacements.
v~ey  ruly yu Should there be any questions concerning this report, please contact James W. Connolly at 305-246-6632.
1ilamnJe      o ,r Vice President Turkey Point Nuclear Plant SM Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC Ak~+7 an FPL Group company
 
TURKEY POINT PLANT UNIT 4 2006 REFUELING OUTAGE INSERVICE INSPECTION REPORT Executive Summary This Inservice Inspection report is for the 2006 Turkey Point Unit 4 refueling outage. This was the second outage of the first period of the fourth 10-year interval.
Inservice examinations consisted of augmented Feedwater ultrasonic examinations on the A, B and C Steam Generator Feedwater nozzles, adjacent piping, and fittings. Also examined were selected components from the Reactor Pressure Vessel, Reactor Coolant System, Pressurizer, Residual Heat Removal System, Safety Injection System, Main Feedwater System, Steam Generator "A, B, and C" Secondary Side, and Chemical and Volume Control System. The attached Inservice Inspection summary tables detail the examinations performed during the outage. The examinations credited to the fourth interval are detailed in Attachment 1 and Table 1.
This outage completed the first period of the fourth 10-year interval.
The NIS-2 forms document the repair and replacement activities for the period from 6/14/2005 to 12/8/2006.
IWE examinations were performed on the containment liner, moisture barrier seal and penetrations. This was the first outage of the third period of the First 10-year interval. Preservice examinations were performed in areas of coating repairs to the containment metallic liner and moisture barrier seal. Details can be found in  for examination scope and results.
There were no IWL examinations scheduled for this outage.
Snubber visual examinations and functional tests were conducted in accordance with ASME Section XI and Turkey Point Plant Technical Specifications. Details of examination scope and results can be found in , Summary of Visual Examinations and FunctionalTesting of Snubbers.
System pressure testing was conducted in accordance with the requirements of ASME Section XI and Turkey Point Technical Specifications. Details of test boundaries and results can be found in Attachment 4, Summary of System Pressure Testing.
In-service examination and plugging of the Turkey Point Unit 4 Steam Generator tubing was completed between November 7, 2006 and November 16, 2006. The number and extent of tubes examined was 100% of all inservice tubes, in row 3 and higher, in S/G's 4A, 4B and 4C from tube end to tube end using the bobbin coil technique. The bobbin coil technique was also used to examine the hot leg and cold leg straight sections of rows 1 and 2 in all three S/G's. Rotating Plus Point probe techniques were employed to examine 100% of the hot leg tube expansion transitions to an extent of
+3 inches to -17 inches in all three steam generators. Approximately 50% of the Row 1 and Row 2 u-bends were examined with the Plus Point probe. Additional Plus Point probe examinations consisted of a minimum 50% sample hot leg dings (> 5.0 volts), 50% of u-bend region dings, and 50% of the dents/dings at hot leg structures. The total tube count is shown under "Total Tubes Examined" on the attached "FORM NIS-BB "OWNERS' DATA REPORT FOR EDDY CURRENT EXAMINATION RESULTS" (Attachment 5).
 
TURKEY POINT UNIT 4 2006 REFUELING OUTAGE
 
FORM NIS-1 OWNER'S REPORT FOR INSERVICE INSPECTIONS                            Page 1 of 4 February 9, 2007
: 1. Owner:    Florida Power and Light Company 700 Universe Blvd.
Juno Beach, Florida 33408
: 2. Plant:    Florida Power & Light Company Turkey Point Nuclear Power Plant 9760 SW 344 Street Florida City, Florida 33035
: 3. Plant Unit: 4                                    4. Owner Certificate of Authorization (if required): N/A
: 5. Commercial Service Date: September 7, 1973        6. National Board Number for Unit:      N/A
: 7. Components Inspected:
Component or      Manufacturer or        Manufacturer      State or Province  National Board Appurtenance            Installer          or Installer            No.              No.
Serial No.
Reactor Pressure        Babcock and          610-0116              N/A              N-161 Vessel              Wilcox Pressurizer        Westinghouse          HTPT-0021              N/A              N-68-1 Regenerative Heat      Westinghouse            4E200                N/A              N/A Exchanger Reactor Coolant          Southwest System          Fabricators Co.
Safety Injection          Bechtel              N/A                  N/A              N/A System Residual  Heat Removal Syst            Bechtel              N/A                  N/A              N/A Removal System Steam Generator                          16A-6341-1, 2, 3 A, B,C          Westinghouse      FSGT-2991,                N/A        N-772 and N-776 2992, 2993 MainSystem Feedwater Bechtel              N/A                  N/A              N/A System Chemical volme Cnt  and Bechtel              N/A                  N/A              N/A volume ControlII11
: 8. Examination Dates: from 6/14/2005 to 12/8/2006
: 9. Inspection Period Identification: First Period, from 04/15/2004 to 04/14/2007.
: 10. Inspection Interval Identification: Fourth Interval, from 04/15/2004 to 04/14/2014.
 
-FORM NIS-1 Report                                                                          Page 2 of 4 February 9, 2007 Owner: Florida Power & Light Company, 700 Universe Blvd. Juno Beach, Florida 33408 Plant:    Turkey Point Nuclear Power Plant, 9760 SW 344 Street, Florida City, Florida 33035 Plant Unit: 4 Owner Certificate of Authorization (if required) N/A Commercial Service Date : September 7. 1973 National Board Number for Unit: N/A
: 11. Applicable Edition of Section XI: 1998 Edition, 2000 Addenda, (IWE/IWL) 1992/1992 Addenda
: 12. Date/Revision of Inspection Plan: April 15, 2004 Rev. 0.
: 13. Abstract of examinations and test. Include a list of examinations and tests and a statement concerning status of work required for the inspection plan.
Inservice Examination of selected Class 1, 2 and 3 components and piping systems of Florida Power and Light's (FPL) Turkey Point Unit 4 were performed during the 2006 Refueling Outage.
This cycle began on 6/14/2005 and ended 12/8/2006. This was the second outage of the first period of the fourth 10-year interval.
The components and piping systems examined were selected in accordance with the Fourth 10-Year Inservice Inspection Program. The inspection plan includes an alternative to the examination and Pressure Test requirements of Table IWB-2500-1, Category B-F and B-J piping welds, as defined in American Society of Mechanical Engineers (ASME) Section XI 1998 Edition with Addenda through 2000. This alternative implements a risk informed inspection program for the examination selection for the Class 1, Category B-F and B-J piping welds in lieu of the requirements of Table IWB-2500-1. The alternative allows examination selection for Unit 4 to be in accordance with "Florida Power & Light Turkey Point Unit 4 Risk-Informed Inservice Inspection Program."
Manual ultrasonic, visual, magnetic particle and liquid penetrant non-destructive methods were used to examine components, piping, and their supports. FPL personnel supported by Washington Group International personnel performed the examinations. Details can be found in Attachment 1 and Table 1, Turkey Point Unit 4 Inservice Inspection, for examination scope, results, and percentages completed.
Snubber visual examinations and functional testing were conducted in accordance with ASME Section XI and Turkey Point Technical Specifications. Basic-PSA, Inc supplied examination and testing services. Details of examination scope and results can be found in Attachment 3 Summary of Visual Examinationsand FunctionalTesting of Snubbers.
FPL visual examiners conducted system pressure testing in accordance with the requirements of ASME Section XI and Turkey Point Technical Specifications. Details of test boundaries and results can be found in Attachment 4, Summary of System Pressure Testing.
IWE examinations were performed on the containment liner, moisture barrier seal and penetrations this outage. This was the first outage of the third period of the First 10-year
 
FORM NIS-1 Report                                                                          Page 3 of 4 February 9, 2007 Owner: Florida Power & Light Company, 700 Universe Blvd. Juno Beach, Florida 33408 Plant:    Turkey Point Nuclear Power Plant, 9760 SW 344 Street, Florida City, Florida 33035 Plant Unit: 4 Owner Certificate of Authorization (if required) N/A Commercial Service Date: September 7. 1973 National Board Number for Unit: N/A interval. Preservice examinations were performed in areas of coating repairs to the containment metallic liner and moisture barrier seal. Details of examination scope and results can be found in Attachment 2.
There were no IWL examinations scheduled for this outage.
: 14. Abstract of Results of Examinations and Tests.
Refer to Attachment 1 for list of components and examination results during the Fall 2006 outage.
: 15. Abstract of Corrective Measures Unit 4 Reactor Sump Pit liner plate was found to have a through wall pinhole in the bottom plate. The as-built thickness of the sump pit floor is .250 inches. The minimum liner plate thickness of .1875 inches was measured adjacent to the pinhole. Engineering calculations qualified an acceptable thickness of .130 inches. Engineering disposition directed that the pinhole area be repaired using a carbon steel plug welded to the liner plate. This repair restored the leak tightness function and containment liner integrity to design conditions. Unit 4 has only one Reactor Sump pit; therefore no sample expansion is warranted. Engineering requested that the Unit 4 Reactor Sump Pit area be re-examined in accordance with IWE-2420.
 
==Reference:==
CR No. 2006-34489.
Equipment Hatch (Penetration 40) was found to have nineteen (19) bolts, two (2) nuts and seven (7) washers that exhibited signs of over torque. The bolts were elongated and the nuts and washers were gouged. Engineering Disposition stated that under a design basis accident, the pressure in containment will push the hatch closed; therefore the damaged bolts, nuts and washers would not have prevented the equipment hatch cover from performing its design basis function. The apparent cause for the damaged bolting was improper installation. The defective bolts, nuts and washers were replaced. Due to the fact that the elongation of the bolts and the gouging of the nuts and washers were not service induced and did not fail, no expansion of the sample is required.
 
==Reference:==
CR No. 2006-33269.
Steam Generator Eddy Current - Six (6) tubes were plugged during the examination as is summarized in the upper portion of the attached "FORM NIS-B B". All tubes were plugged due to the presence of tube wear most likely caused by a foreign object at the top of the cold leg tube sheet in S/G 4A. FOSAR/SSI investigation established that a foreign object was no longer present. The wear signals were in very close proximity to the expansion transition and as such, did not allow sizing using a qualified technique, therefore, all six tubes were conservatively (preventively) plugged based on detection and assigned an SVI (single volumetric indication) code. None of the indications required in situ pressure testing.
 
FORM NIS-1 Report                                                                                Page 4 of 4 February 9, 2007 Owner: Florida Power & Light Company, 700 Universe Blvd. Juno Beach, Florida 33408 Plant    Turkey Point Nuclear Power Plant, 9760 SW 344 Street, Florida City, Florida 33035 Plant Unit: 4 Owner Certificate of Authorization (if required) N/A Commercial Service Date: September 7, 1973 National Board Number for Unit: N/A We certify that a) the statements made in this report are correct, b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section XI, and c) corrective measures taken conform to the rules of the ASME Code, Section XM.
Certificate of Authorization No.                N/A                    Expiration Date Date: 6'              Signed.( &                                            By      /Z P 6-CERTIFICATE OF INSERVICE INSPECTION.
I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Florida, and employed by The Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, CT have inspected the components described in this Owner's Report during the period during the period 6/14/2005 to 12/8/2006, and state that to the best of my knowledge and belief, the Owner has performed examinations and tests and taken corrective measures described in the Owner's Report in accordance with the Inspection Plan and as required by the ASME Code, Section XI.
By signing this certificate, neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations, tests, and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Y4-77 _-                (X, c, Al      r)
Inspector's Signature                          National Board, State, Province, and Endorsements Date:        2-23-07
 
TURKEY POINT UNIT 4 2006 REFUELING OUTAGE Abstract of Examinations and Tests Total Population and Percentages 4 th Interval - 1 st Period Table 1
 
Page 1 of 4 Table 1 (Post Fall 2006 Outage)
Turkey Point Unit 4 FOURTH INSPECTION INTERVAL - FIRST PERIOD ABSTRACT OF EXAMINATION AND TESTS ITotal          Total            Total            Total Examination  Examinations  Examinations      Examinations      Examinations Category/Item  Required for    Credited for    Credited (%)      Credited (%)                          Remarks the Interval    the Period    for the period      Interval B-A                  5              0              0%                0%
B 1.11            3                                                            Deferral Permissible B1.21            1                                                            Deferral Permissible B1.30            1                                                            Code Case N-623 Applied, Deferral Permissible B-B                  5              1              100%              20%
B2.11            2 B2.12            2 B2.40            1 B-D                  24              5              100%              20.8%
B3.90            6                                                            Deferral Permissible B3.100            6                                                            Deferral Permissible B3.120            6 B3.140            6 RR #4 being submitted to implement a risk informed program. The B-F examination category items are included in the Category R-A po ulation.
B-G-i                18              3              100%              16.7%diasme)Total includes Item B6.190 (only required if disassembled)
B6.10            3                                                            Deferral Permissible B6.30            3                                                            Deferral Permissible B6.40            3                                                            Deferral Permissible B6.50            6                                                            Deferral Permissible B6.180            1                                                            Deferral Permissible B6.190            1                                                            Deferral Permissible B6.200            I                                                            Deferral Permissible B-G-2                19              7              100%              25%
B7.20            1 B7.30            6
 
Page 2 of 4 Total Total            Total            Total        Exam Examination  Examinations      Examinations    Examinations      Editeoma Category/Item  Required for      Credited for    Credited (%)    Credite (%)the the Interval      the Period    for the period      Interval B7.50              9 B7.70              3 B-J          RR #4 being submitted to implement a risk informed program. The B-F examination category items are included in the Category R-A population.
4(1st Period2 B-K              6 (2 nd & 3ry        1              100%              25%
Period)
B10.10              2                                                          Preservice performed on 6 new welds in the 1st period.
25% will be performed in the next two periods.
B10.20              3 B10.30              1 B-L-1                  3              0                0%              0%
B12.10              3                                                          Deferral Permissible B-L-2                  1          Partial            50%              50%        Diffuser was left in place.
B 12.20            1                                                          Examination required only when disassembled B-M-2                  3              1              33.3%          33.3.%
B12.50              31                                                            valve in each group requires examination when B12.50              3    _
disassembled for maintenance. Deferral Permissible B-N-1                  16              3              100%            18.8%
B13.10            16                                                          Each item (3) must be examined each period B-N-2                  1              0                0%              0%
B 13.60            1                                                          Deferral Permissible B-N-3                  27              0                0%              0%
B13.70            27                                                          Deferral Permissible Preservice performed on 24 new welds in the 1 st period.
B-O                    3              0                0%              0%        25% will be performed in the next two periods.
Deferral Permissible.
B14.10              3              0                0%              0%
B-P          System leakage tests are performed each outage (IWB-5220) in accordance with plant procedures.
B-Q          Steam Generator tubing is examined in accordance with Plant Technical Specifications.
C-A                    7              2              100%            28.6%
C1.10              4
 
Page 3 of 4 Total            Total            Total            Total Examination  Examinations    Examinations      Examinations        Editedns Category/Item  Required for      Credited for    Credited (%)          dite ()                                Remarks the Interval      the Period      for the period      Interval C1.20            2 C1.30            1 C-B                  7                4              100%              30.8%        C-B total does not include C2.33 items that are required each period C2.21            3 C2.22            2 C2.31            2 C2.33            6                2              100%              33.3%        VT examinations required each period C-C                  9                2              100%              22.2%
C3.10            1 C3.20            8 C-F-1                52                18              100%              34.6%
C5.11          22 C5.21          13 C5.30          14 C5.41            3 Less than 28 welds would be required if 7.5% criteria is followed, FPL raised the total count to 28 per note 2.
C5.51          22 C5.81            6 C-H          System pressure tests are performed in accordance with plant procedures. Quantification of the number of tests is not practical.
D-A                  15                4              100%              36.3%
D1.10            4 D1.20          11 D-B          System pressure tests are performed in accordance with plant procedures. Quantification of the number of tests is not practical.
(TWE) B-A        267                91              100%              100%        Currently in the 3 rd period for IWE. 100% General (IWE)____-A      267__91__00_      _100Exam                                                required each period RR 26, Currently in the 3 r' period of IWE. Includes exam of 1/3 of moisture barrier. Examination of 8 of the total items required, if made accessible. Deferral permissible.
(IWE) E-G          14                4              100%              100%        RR 22, Currently in the 3 rd period of IWE, deferral
 
Page 4 of 4 Total          Total        Total        Total Examination  Examinations  Examinations  Examinations  Examinations Credited (%)                          Remarks Category/Item Required for  Credited for Credited (%)  to Date for the the Interval  the Period  for the period    Interval permissible.
F-A                122          36          100%          29.5%
F1.10          40 F1.20          34 F1.30          31 F1.40            17 R-A total does not include item Ri. 12. RR4 is being R-A                20            6          100%          30%        submitted to implement a risk informed inspection program. The selections in program are based on the Risk Informed Program approval on August 1, 2003.
R1.11          20 R1.12          129                                                  Visual examination is performed each outage
 
TURKEY POINT UNIT 4 2006 REFUELING OUTAGE Summary of Inservice Inspection Examinations 4 th Interval - 1 st Period Attachment 1
 
DATE: 03/06/2007                              Turkey Point Nuclear Plant [PTN] -- Unit 4                                      Page 1 REVISION: 0                                    Inservice Inspection Results Summary Interval 4, Period 1, Outage 2 (06)
Completed Components (C, R, B, P, A, E)
REACTOR PRESSURE VESSEL Zone # 4-001 N    I    0 ASME  Status                                  0    N  G T Sec XI                                          R    S  E H Summary      Examination Area      Categ                                            E      I 0 E Number      Identification IISO # Item No    Method        Data Sheet Number      C    G  M R                Remarks 010000    VESSEL INTERIOR        B-N-I  C VT-3          4.3-002                X            11/6/2006 - VT-3 complete. No ACCESSIBLE AREAS        B113.10                                                        Recordable Indications.
ISO# 5614-M-4000 011793    VESSEL TO CLOSURE HI B-N-1      C VT-3          4.3-002                X            11/6/2006 - VT-3 complete. No MATING SURFACE ON B13.10                                                              Recordable Indications.
VESSEL ISo# 5614-M-4000 011795    VESSEL TO CLOSURE HE B-N-1      C VT-3          4.3-001                X      -  - - 11/7/2006-VT-3 complete. No MATING SURFACE ON B13.10                                                              Recordable Indications.
HEAD ISO# 5614-M-4000
 
DATE: 03/06/2007                              Turkey Point Nuclear Plant [PTN] - Unit 4                                            Page 2 REVISION: 0                                      Inservice Inspection Results Summary Interval 4, Period 1, Outage 2 (06)
Completed Components (C, R, B, P, A, E)
STEAM GENERATOR A PRIMARY SIDE Zone # 4-003 N  I    0 ASME Status                                      0  N  G T Sec XI                                          R  S  E H Summary        Examination Area      Categ                                            E  I 0 E Number      Identification /ISO # Item No    Method        Data Sheet Number      C  G  M R                Remarks 050900    4-SGA-I-IRS              B-D    C VT            4.8-004                  X          11/8/2006 - Enhanced VT-I complete.
INLET NOZZLE INNER      B3.140                                                        No Recordable Indications RADIUS SECTION ISO# 5614-M-4003 051000    4-SGA-O-IRS            B-D    C VT            4.8-003                  X    - - -  11/8/2006 - Enhanced VT-1 complete.
OUTLET NOZZLE          B3.140                                                        No Recordable Indications.
INNER RADIUS
* SECTION ISO# 5614-M-4003 051100    4-SGA-IBOLTING          B-G-2  C VT-1          4.1-005                  X    - -  - 11/9/2006 -VT-i complete. No STEAM GENERATOR        B7.30                                                        Recordable Indications. One thread was INLET MANWAY                                                                          nicked outside the zone of thread BOLTING                                                                                engagemenL ISO# 5614-M-4003 051200    4-SGA-O BOLTING        B-G-2  C VT-1          4.1-006                  X          11/9/2006 -VT-1 complete. No STEAM GENERATOR        B7.30                                                        Recordable Indications. One thread OUTLET MANWAY                                                                          nicked outside the zone of thread BOLTING                                                                                engagement.
ISO# 5614-M-4003 051400    4-SGA-TUBING            B-Q    A VOL            NDE 1.3                  -  - - -
B 16.20 ISO# 5614-M-4003
 
DATE: 03/06/2007                            Turkey Point Nuclear Plant [PTN] -- Unit 4                                      Page 3 REVISION: 0                                    Inservice Inspection Results Summary Interval 4, Period 1, Outage 2 (06)
Completed Components (C, R, B, P, A, E)
STEAM GENERATOR B PRIMARY SIDE Zone # 4-004 N    I    0 ASME Status                                    0    N G T Sec XI                                          R    S  E H Summary      Examination Area    Categ                                            E    I 0 E Number      Identification /ISO# Item No    Method        Data Sheet Number      C    G  M R                Remarks 051800    4-SGB-I-IRS            B-D    C VT            4.8-002                X          11/7/2006 - Enhanced VT-I complete.
INLET NOZZLE INNER B3.140                                                          No Recordable Indications.
RADIUS SECTION ISO# 5614-M-4004 051900    4-SGB-O-IRS            B-D    C VT            4.8-001                X    - - - 11/7/2006 -Enhanced VT-I complete.
OUTLET NOZZLE          B3.140                                                      No Recordable Indicaiton INNER RADIUS SECTION ISO# 5614-M-4004 052300    4-SGB-TUBING          B-Q    A VOL            NDE 1.3                  -    - - -
B 16.20 ISO# 5614-M-4004
 
DATE: 03/06/2007                              Turkey Point Nuclear Plant [PTN] -- Unit 4                Page 4 REVISION: 0                                    Inservice Inspection Results Summary Interval 4, Period 1, Outage 2 (06)
Completed Components (C, R, B, P, A, E)
STEAM GENERATOR C PRIMARY SIDE Zone # 4-005 N    I    0 ASME  Status                                    0    N  G T Sec XI                                          R    S  E H Summary      Examination Area    Categ                                            E    I 0 E Number      Identification /ISO# Item No    Method        Data Sheet Number      C    G  M R Remarks 053200    4-SGC-TUBING          B-Q    A VOL            NDE 1.3                  -    - - -
B 16.20 ISO# 5614-M-4005
 
DATE: 03/06/2007                              Turkey Point Nuclear Plant [PTN] - Unit 4                                          Page 5 REVISION: 0                                    Inservice Inspection Results Summary Interval 4, Period 1, Outage 2 (06)
Completed Components (C, R, B, P, A, E)
PRESSURIZER Zone # 4-006 N I    0 ASME  Status                                    0 N  G T Sec XI                                          R S  E H Summary      Examination Area    Categ                                            E l  O E Number      Identification /ISO# Item No    Method        Data Sheet Number      C G  M R                  Remarks 053600    4-SRGN-01-IR          B-D    C UT            5.13-002                  -  - - - 11/11/2006 - UT complete. No SURGE NOZZLE INNER B3.120        45S2.25AX                              X  - - - Recordable Indications. Silver oxide paint RADIUS SECTION                                                                    was observed on the bottom of the Pressurizer in the area of interest Paint ISO# 5614-M-4002                                                                        was removed 3.9" from the radius, but the remaining paint was not removed due to the close proximity of the Pressurizer heaters. A 0 degree was used to determine the dB difference between the painted surface and unpainted surface. This difference was 11.0 dBs. After exam sensitivity was established from the clad roll, the additional 11.0 dB was added to the exam sensitivity.
 
DATE: 03/06/2007                              Turkey Point Nuclear Plant [PTN] - Unit 4                                        Page 6 REVISION: 0                                    Inservice Inspection Results Summary Interval 4, Period 1, Outage 2 (06)
Completed Components (C, R, B, P. A, E)
REACTOR COOLANT SYSTEM LOOP A COLD LEG              -
Zone # 4-009 N  I    0 ASME Status                                    0  N  G T Sec XI                                          R  S  E H Summary      Examination Area      Categ                                            E  I 0 E Number      Identification IISO # Item No    Method        Data Sheet Number      C  (3 M R                  Remarks 057800    27.5"-RCS-1407-21      R-A    C VT-2          4.2-001                  X      -. 10/30/2006 - VT-2 complete. No 2" BRANCH              R1.12                                                        Recordable. Indications.
CONNECTION ISO# 5614-P-766-S SH. 1 057820    27.5"-RCS-1407-24      R-A    C VT-2          4.2-001                  X  - - -  10/30/2006 - VT-2 complete. No BRANCH CONNECTION R1.12                                                              Recordable Indications.
TO INST. CONNECTION ISO# 5614-P-766-S SH. 1
 
DATE: 03/0612007                            Turkey Point Nuclear Plant [PTN] -- Unit 4                                      Page 7 REVISION: 0                                  Inservice Inspection Results Summary Interval 4, Period 1, Outage 2 (06)
Completed Components (C, R, B, P, A, E)
REACTOR COOLANT SYSTEM PRESSURIZER SURGE UlI Zone# 4-016 N    I    0 ASME  Status                                    O    N  G T Sec XI                                          R    S  E H Summary      Examination Area    Categ                                            E    I 0 E Number      Identification/ISO# Item No    Method        Data Sheet Number C          G  M R                Remarks 063000    12"-RC-1401-7        R-A    C UT            5.4-001                  -    - - - 11/9/2006 - UT complete. Geometry PIPE TO PIPE          RLI.1    45S2.25 AX                              X      - - - seen 360 deg intermittent 45S2.25 CIR                            X      - - -
60S2.25 AX                              -    - X -
ISO# 5614-P-766-S SH. 2 063100    12"-RC-1401-8        R-A    C UT            5.4-001                  X      -  - 11/9/2006 - UT complete. No PIPE TO REDUCER      RI ll                                                          Recordable Indications.
ISO# 5614-P-766-S SH. 2 063200    12"-RC-1401-8A        R-A    C UT            5.4-002                  -    -  - - 11/9/2006 - UT complete. No REDUCER TO            RI.1      45S2.25AX                              X    -  - - Recordable Indications.
SAFE-END                        45S2.25CIR                              X    -  - -
60S2.25AX                              X    -  - -
ISO# 5614-P-766-S SH. 2
 
DATE: 03/06/2007                                Turkey Point Nuclear Plant [PTN] -- Unit 4                                      Page 8 REVISION: 0                                      Inservice Inspection Results Summary Interval 4, Period 1, Outage 2 (06)
Completed Components (C, R, B, P, A, E)
REACTOR COOLANT LOOP A DRAIN Zone # 4-026 N    I    0 ASME  Status                                    0    N  G T Sec XI                                          R    S  E H Summary      Examination Area      Categ                                            E    I 0 E Number      Identification / ISO # Item No    Method        Data Sheet Number C          G  M R                Remarks 082700    2"-RC-1401-l            R-A    C VT-2          4.2-002                  X    -    10/30/2006 - VT-2 complete. No BRANCH CONNECTION R1.12                                                                Recordable Indications.
TO PIPE ISO# 5614-P-577-S SH. 1 082800    2"-RC-1401-2            R-A    C VT-2          4.2-002                  X          10/30/2006 - VT-2 complete. No PIPE TO ELBOW            RI.12                                                        Recordable Indications.
ISO# 5614-P-577-S SH. 1 082900    2"-RC-1401-3            R-A    C VT-2          4.2-002                  X          10/30/2006 - VT-2 complete. No ELBOW TO PIPE            Rl.12                                                        Recordable Indications.
ISO# 5614-P-577-S SH. 1 083000    2"-RC-1401-4            R-A    C VT-2          4.2-002                  X          10/30/2006 - VT-2 complete. No PIPE TO TEE              R1.12                                                        Recordable Indications.
ISO# 5614-P-577-S SH. 1 083100    2"-RC-1401-5            R-A    C VT-2          4.2-002                  X          10/30/2006 - VT-2 complete. No TEE TO REDUCING          Rl.12                                                        Recordable Indications.
INSERT ISO# 5614-P-577-S SH. 1 083200    2"-RC-1401-6            R-A    C VT-2          4.2-002                  X          10/30/2006 - VT-2 complete. No TEE TO PIPE              R1.12                                                        Recordable Indications.
ISO# 5614-P-577-S SH. 1 083300    2"-RC-1401-7            R-A    C VT-2          4.2-002                  X          10/30/2006 - VT-2 complete. No PIPE TO VALVE 4-508A RI.12                                                            Recordable Indications.
ISO# 5614-P-577-S SH. 1
 
DATE: 03/06/2007                              Turkey Point Nuclear Plant [PTN] - Unit 4                                        Page 9 REVISION: 0                                    Inservice Inspection Results Summary Interval 4, Period 1, Outage 2 (06)
Completed Components (C, R, B, P, A, E)
REACTOR COOLANT LOOP B DRAIN Zone # 4-027 N  I    0 ASME Status                                      0  N  G T Sec XI                                          R  S  E H Summary      Examination Area      Categ                                            E  I 0 E Number      Identification /ISO # Item No    Method        Data Sheet Number C        G  M R                Remarks 083500    2"-RC-1402-1            R-A    C VT-2          4.2-003                  X  -  - - 10/30/2006 - VT-2 complete. No BRANCH CONNECTION Rl.12                                                              Recordable Indications.
TO PIPE ISO# 5614-P-577-S SH. 2 083600    2"-RC-1402-2            R-A    C VT-2          4.2-003                  X  -  - - 10/30/2006 - VT-2 complete. No PIPE TO ELBOW          R1.12                                                        Recordable Indications.
ISO# 5614-P-577-S SH. 2 083700    2"-RC-1402-3            R-A    C VT-2          4.2-003                  X  -  - - 10/30/2006 - VT-2 complete. No ELBOW TO PIPE          Rl.12                                                        Recordable Indications.
ISO# 5614-P-577-S SH. 2 083800    2"-RC-1402-4            R-A    C VT-2          4.2-003                  X  -  - - 10/30/2006 - VT-2 complete. No PIPE TO VALVE 4-515A Rl.12                                                          Recordable Indications.
ISO# 5614-P-577-S SH. 2
 
DATE: 03/06/2007                              Turkey Point Nuclear Plant [PTN] -- Unit 4                                    Page 10 REVISION: 0                                    Inservice Inspection Results Summary Interval 4, Period 1, Outage 2 (06)
Completed Components (C, R, B, P, A, E)
REACTOR COOLANT LOOP C DRAIN Zone # 4-028 N  I    0 ASME Status                                    0  N  G T Sec XI                                          R  S  E H Summary      Examination Area      Categ                                            E  I 0 E Number      Identification /ISO # Item No    Method        Data Sheet Number      C  G  M R                Remarks 084100    2"-RC-1403-1            R-A    C VT-2          4.2-004                  X          10/30/2006 - Vt-2 complete. No BRANCH CONNECTION Rl.12                                                              Recordable Indications.
TO PIPE ISO# 5614-P-577-S SH. 3 084200    2"-RC-1403-2            R-A    C VT-2          4.2-004                  X    - - - 10/30/2006 - VT-2 complete. No PIPE TO ELBOW          R1.12                                                        Recordable Indications.
ISO# 5614-P-577-S SH. 3 084300    2"-RC-1403-3            R-A    C VT-2          4.2-004                  X    - - - 10/30/2006 - VT-2 complete. No ELBOW TO PIPE          RI.12                                                        Recordable Indications.
ISO# 5614-P-577-S SH. 3 084400    2"-RC-1403-4            R-A    C VT-2          4.2-004                  X    - - - 10/30/2006 - VT-2 complete. No PIPE TO VALVE 4-505A Rl.12                                                          Recordable Indications.
ISO# 5614-P-577-S SH. 3
 
DATE: 03/06/2007                            Turkey Point Nuclear Plant [PTN] - Unit 4                                      Page 11 REVISION: 0                                  Inservice Inspection Results Summary Interval 4, Period 1, Outage 2 (06)
Completed Components (C, R, B, P, A, E)
CHEMICAL AND VOLUME CONTROL AUXLUARY SPRA)
Zone # 4-035 N  I    0 ASME Status                                    O  N  G T Sec XI                                          R  S  E H Summary      Examination Area    Categ                                            E  I 0 E Number      Identification /ISO# Item No    Method        Data Sheet Number      C  G  M R                Remarks 111500    2"-RC-1410-33          R-A    C VT-2          4.2-005                  X  -  - - 10/30/2006 - VT-2 complete. No VALVE 4-313 TO PIPE    R1.12                                                        Recordable Indications.
ISO# 5614-P-782-S SH. 1 111600    2"-RC-1410-34          R-A    C VT-2          4.2-005                  X  -  - - 10/30/2006 - VT-2 complete. No PIPE TO TEE            Rl.12                                                        Recordable Indications.
ISO# 5614-P-782-S SH. 1
 
DATE: 03/06/2007                            Turkey Point Nuclear Plant [PTN] - Unit 4                                        Page 12 REVISION: 0                                  Inservice Inspection Results Summary Interval 4, Period 1, Outage 2 (06)
Completed Components (C, R, B, P, A, E)
RESIDUAL HEAT REMOVAL TO RCS LOOP A COLD LEG Zone # 4-037 N  I    0 ASME Status                                    0  N  G T Sec XI                                          R  S  E H Summary      Examination Area    Categ                                            E  I 0 E Number      Identification/ISO # Item No    Method        Data Sheet Number      C  G  M R                  Remarks 117100    4-876A                B-M-2  P VT-3          4.3-004                  X        11/12/2006 - VT-3 complete. No VALVE INTERNAL        B12.50                                                      Recordable Indications. Examined partial SURFACE                                                                            internals (Disk was not removed) and seating surfaces ISO# 5614-P-509-S SH. 1 117200    4-876A BOLTING        B-G-2  B VT-I          4.1-007                  X        11/12/2006 - VT-I complete. No
          -VALVE BOLTING        B7.70                                                      Recordable Indications.
ISO# 5614-P-509-S SH. 1
 
DATE: 03/06/2007                              Turkey Point Nuclear Plant [PTN] -- Unit 4                                      Page 13 REVISION: 0                                    Inservice Inspection Results Summary Interval 4, Period 1, Outage 2 (06)
Completed Components (C, R, B, P, A, E)
HIGH HEAD SAFETY INJECTION LOOP A INSIDE CTM' Zone # 4-040 N    I  0 ASME Status                                    0    N  G T Sec XI                                          R  S  E H Summary      Examination Area      Categ                                            E  I  0 E Number      Identification/ ISO # Item No    Method        Data Sheet Number C        G  M R                  Remarks 128100    2"-SI-1401-1            R-A    C VT-2          4.2-006                  X          10/30/2006 - VT-2 complete. No VALVE 4-873A TO PIPE R1.12                                                            Recordable Indications.
ISO# 5614-P-512-S SH. 1 128200    2"-SI-1401-2            R-A    C VT-2          4.2-006                  X  -  - -  10/30/2006 - VT-2 complete. No PIPE TO ELBOW          R1.12                                                        Recordable Indications.
ISO# 5614-P-512-S SH. 1 128300    2"-SI-1401-3            R-A    C VT-2          4.2-006                  X  -  -  - 10/30/2006 - VT-2 complete. No ELBOW TO PIPE          RI.I2                                                        Recordable Indications.
ISO# 5614-P-512-S SH. 1 128400    2"-SI-1401-4            R-A    C VT-2          4.2-006                X    -  -  - 10/30/2006 - VT-2 complete. No PIPE TO TEE            R1.12                                                        Recordable Indications.
ISO# 5614-P-512-S SH. 1 128450    2"-SI-1401-5            R-A    C VT-2          4.2-006                X    -  - -  10/30/2006 - VT-2 complete. No TEE TO REDUCING        RI.12                                                        Recordable Indications.
INSERT ISO# 5614-P-512-S SH. 1 128500    2"-SI-1401-6            R-A    C VT-2          4.2-006                X    -  - -  10/30/2006 - VT-2 complete. No TEE TO PIPE            RI.12                                                        Recordable Indications.
ISO# 5614-P-512-S SH. 1 128600    2"-SI-1401-7            R-A    C VT-2          4.2-006                X    -  - -  10/30/2006 - VT-2 complete. No PIPE TO VALVE 4-868A RI. 12                                                          Recordable Indications.
ISO# 5614-P-512-S SH. 1 128700    2"-SI-1401-8            R-A    C VT-2          4.2-006                X    -  - - :10/30/2006 - VT-2 complete. No VALVE 4-868A TO PIPE RI.12                                                            Recordable Indications.
ISO# 5614-P-512-S SH. 1 128800    2"-SI-1401-9            R-A    C VT-2          4.2-006                X        -  10/30/2006 - VT-2 complete. No PIPE TO ELBOW          RI.12                                                        Recordable Indications.
ISO# 5614-P-512-S SH. 1
 
DATE: 03/06/2007                              Turkey Point Nuclear Plant [PTN] - Unit 4                                    Page 14 REVISION: 0                                    Inservice Inspection Results Summary Interval 4, Period 1, Outage 2 (06)
Completed Components (C, R, B, P, A, E)
HIGH HEAD SAFETY INJECTION LOOP A INSIDE CTMTr Zone # 4-040 N    I  0 ASME  Status                                  0    N  G T Sec XI                                          R    S  E H Summary      Examination Area    Categ                                            E    I O E Number      Identification /ISO# Item No    Method        Data Sheet Number C        G M  R                Remarks 128900  2"-SI-1401-10          R-A    C VT-2          4.2-006                X          10/30/2006 - VT-2 complete. No ELBOW TO PIPE          Rl.12                                                        Recordable Indications.
ISO# 5614-P-512-S SH. 1 129000  2"-SI-1401-11          R-A    C VT-2          4.2-006                X          10/30/2006 - VT-2 complete. No PIPE TO COUPLING      Rl.12                                                        Recordable Indications.
ISO# 5614-P-512-S SH. 1 129100  2"-SI-1401-12          R-A    C VT-2          4.2-006                X    - - - 10/30/2006 - VT-2 complete. No COUPLING TO PIPE      RI.12                                                        Recordable Indications.
ISO# 5614-P-512-S SH. 1 129200    2"-SI-1401-13          R-A    C VT-2          4.2-006                X    - - - 10/30/2006 - VT-2 complete. No PIPE TO COUPLING      RI.12                                                        Recordable Indications.
ISO# 5614-P-512-S SH. 2 129300    2"-SI-1401-14          R-A    C VT-2          4.2-006                X    - - - 10/30/2006 - VT-2 complete. No COUPLING TO PIPE      R1.12                                                        Recordable Indications.
ISO# 5614-P-512-S SH. 2 129400    2"-SI-1401-15          R-A    C VT-2          4.2-006                X    - - - 10/30/2006 - VT-2 complete. No PIPE TO ELBOW          R1.12                                                        Recordable Indications.
ISO# 5614-P-512-S SH. 2 129500    2"-SI-1401-16          R-A    C VT-2          4.2-006                X    - - - 10/30/2006 - VT-2 complete. No ELBOW TO PIPE          R1.12                                                        Recordable Indications.
ISO# 5614-P-512-S SH. 2 129600    2"-SI-1401-17          R-A    C VT-2          4.2-006                X    - - - 10/30/2006 - VT-2 complete. No PIPE TO ELBOW          R1.12                                                        Recordable Indications.
ISO# 5614-P-512-S SH. 2 129700    2"-SI-1401-18          R-A    C VT-2          4.2-006                X    -  - - 10/30/2006 - VT-2 complete. No ELBOW TO PIPE          Rl.12                                                        Recordable Indications.
ISO# 5614-P-512-S SH. 2
 
DATE: 03/06/2007                              Turkey Point Nuclear Plant [PTN] - Unit 4                                    Page 15 REVISION: 0                                    Inservice Inspection Results Summary Interval 4, Period 1, Outage 2 (06)
Completed Components (C, R, B, P, A, E)
HIGH HEAD SAFETY INJECTION LOOP A INSIDE CTMT Zone # 4-040 N  I  0 ASME  Status                                    0  N G T Sec XI                                          R  S E H Summary      Examination Area      Categ                                            E  I 0 E Number      Identification/ ISO # Item No    Method        Data Sheet Number      C  G M R                Remarks 129800  2"-SI-1401-19.          R-A    C VT-2          4.2-006                  X          10/30/2006 - VT-2 complete. No PIPE TO EL3OW          RI.12                                                        Recordable Indications.
ISO# 5614-P-512-S SH. 2 129900  2"-SI-1401-20          R-A    C VT-2          4.2-006                  X  - -  - 10/30/2006 - VT-2 complete. No ELBOW TO PIPE          R1.12                                                        Recordable Indications.
ISO# 5614-P-512-S SH. 2 129930  2"-SI-1401-32          R-A    C VT-2          4.2-006                  X  - -  - 10/30/2006 - VT-2 complete. No PIPE TO TEE            RI.12                                                        Recordable Indications.
ISO# 5614-P-512-S SH. 2 129950  2"-SI-1401-33          R-A    C VT-2          4.2-006                  X  - - -  10/30/2006 - VT-2 complete. No TEE TO REDUCING        RI.12                                                        Recordable Indications.
INSERT ISO# 5614-P-512-S SH. 2 129970  2"-SI-1401-34          R-A    C VT-2          4.2-006                  X  - -  - 10/30/2006 - VT-2 complete. No TEE TO PIPE            RI.12                                                        Recordable Indications.
ISO# 5614-P-512-S SH. 2 130000  2"-SI-1401-21          R-A    C VT-2          4.2-006                  X  - -  - 10/30/2006 - VT-2 complete. No PIPE TO ELI3OW          R1.12                                                        Recordable Indications.
ISO# 5614-P-512-S SH. 2 130100  2"-SI-1401-22          R-A    C VT-2          4.2-006                  X          10/30/2006 - VT-2 complete. No ELBOW TO PIPE          RI.12                                                        Recordable Indications.
ISO# 5614-P-512-S SH. 2 130200  2"-SI-1401-23          R-A    C VT-2          4.2-006                  X  - - -  10/30/2006 - VT-2 complete. No PIPE TO EL3OW          RI.12                                                        Recordable Indications.
ISO# 5614-P-512-S SH. 2 130300  2"-SI-1401-24          R-A    C VT-2          4.2-006                  X  - - -  10/30/2006 - VT-2 complete. No ELBOW TO PIPE          RI.12                                                        Recordable Indications.
ISO# 5614-P-512-S SH. 2
 
DATE: 03/06/2007                              Turkey Point Nuclear Plant [PTN] -- Unit 4                                      Page 16 REVISION: 0                                    Inservice Inspection Results Summary Interval 4, Period 1, Outage 2 (06)
Completed Components (C, R, B, P, A, E)
HIGH HEAD SAFETY INJECTION LOOP A INSIDE CTMIT Zone # 4-040 N  I    0 ASME Status                                    0  N  G T Sec XI                                          R  S  E H Summary      Examination Area      Categ                                            E    I 0 E Number      Identification /lSO # Item No    Method        Data Sheet Number      C  G  M R                  Remarks 130400  2"-SI-1401-25          R-A    C VT-2          4.2-006                  X    -  -  - 10/30/2006 - VT-2 complete. No PIPE TO COUPLING        Rl.12                                                          Recordable Indications.
ISO# 5614-P-512-S SH. 2 130500  2"-SI-1401-26          R-A    C VT-2          4.2-006                  X    -  -  - 10/30/2006 - VT-2 complete. No COUPLING TO PIPE        Rl.12                                                          Recordable Indications.
ISO# 5614-P-512-S SH. 2 130600  2"-SI-1401-27          R-A    C VT-2          4.2-006                  X    -  -  - 10/30/2006 - VT-2 complete. No PIPE TO ELBOW          R1.12                                                          Recordable Indications.
ISO# 5614-P-512-S SH. 2 130700  2"-SI-1401-28          R-A    C VT-2          4.2-006                X    -  -  - 10/30/2006 - VT-2 complete. No ELBOW TO PIPE          RI.12                                                          Recordable Indications.
ISO# 5614-P-512-S SH. 2 130800  2"-SI-1401-29          R-A    C VT-2          4.2-006                X    -  -  - 10/30/2006 - VT-2 complete. No PIPE TO ELBOW          Rl.12                                                          Recordable Indications.
ISO# 5614-P-512-S SH. 2 130900  2"-SI-1401-30          R-A    C VT-2          4.2-006                X    -  - -  10/30/2006 - VT-2 complete. No ELBOW TO PIPE          R1.12                                                          Recordable Indications.
ISO# 5614-P-512-S SH. 2 131000  2"-SI-1401-31          R-A    C VT-2          4.2-006                X    -  - -  10/30/2006 - VT-2 complete. No PIPE TO BRANCH          R1.12                                                          Recordable Indications.
CONNECTION ISO# 5614-P-512-S SH. 2
 
DATE: 03/06/2007                            Turkey Point Nuclear Plant [PTN] - Unit 4                                          Page 17 REVISION: 0                                  Inservice Inspection Results Summary Interval 4, Period 1, Outage 2 (06)
Completed Components (C, R, B, P, A, E)
HIGH HEAD SAFETY INJECTION LOOP B INSIDE CTMT Zone # 4-041 N  I      0 ASME Status                                      0  N  G  T Sec XI                                          R  S  E  H Summary      Examination Area    Categ                                            E  I 0  E Number      Identification ISO # Item No    Method        Data Sheet Number      C  G  M  R                  Remarks 132400  2"-SI-1402-1          R-A    C VT-2          4.2-007                X    -  -  -  10/30/2006 - VT-2 complete. No VALVE 4-873B TO PIPE R1.12                                                              Recordable Indications.
ISO# 5614-P-513-S SH. 1 132500  2"-SI-1402-2          R-A    C VT-2          4.2-007                  X        -  . 10/30/2006 - VT-2 complete. No PIPE TO TEE            R1.12                                                            Recordable Indications.
ISO# 5614-P-513-S SH. 1 132550  2"-SI-1402-3          R-A    C VT-2          4.2-007                  X  -  -  -  10/30/2006 - VT-2 complete. No TEE TO REDUCING        Rl.12                                                            Recordable Indications.
INSERT ISO# 5614-P-513-S SH. 1 132600  2"-SI-1402-4          R-A    C VT-2          4.2-007                  X  -  -  -  10/30/2006 - VT-2 complete. No TEE TO PIPE            R1.12                                                            Recordable Indications.
ISO# 5614-P-513-S SH. 1 132700  2"-SI-1402-5          R-A    C VT-2          4.2-007                  X  -  -  -  10/30/2006 - VT-2 complete. No PIPE TO VALVE 4-868B R1.12                                                              Recordable Indications.
ISO# 5614-P-513-S SH. 1 132800  2"-SI-1402-6          R-A    C VT-2          4.2-007                X    -  -  -  10/30/2006 - VT-2 complete. No VALVE 4-868B TO PIPE Rl.12                                                              Recordable Indications.
ISO# 5614-P-513-S SH. 1 132900  2"-SI-1402-7          R-A    C VT-2          4.2-007                X    -  -  -  10/30/2006 - VT-2 complete. No PIPE TO ELBOW          R1.12                                                            Recordable Indications.
ISO# 5614-P-513-S SH. 1 133000  2"-SI-1402-8          R-A    C VT-2          4.2-007                X              10/30/2006 - VT-2 complete. No ELBOW TO PIPE          R1.12                                                            Recordable Indications.
ISO# 5614-P-513-S SH. 1 133100  2"-SI-1402-9          R-A    C VT-2          4.2-007                X              10/30/2006 - VT-2 complete. No PIPE TO ELBOW          R1.12                                                            Recordable Indications.
ISO# 5614-P-513-S SH. 1
 
DATE: 03/06/2007                              Turkey Point Nuclear Plant [PTN] - Unit 4                                    Page 18 REVISION: 0                                    Inservice Inspection Results Summary Interval 4, Period 1, Outage 2 (06)
Completed Components (C, R, B, P, A, E)
HIGH HEAD SAFETY INJECTION LOOP B INSIDE CTMT Zone # 4-041 N  I  0 ASME  Status                                    0  N G T Sec XI                                          R  S E H Summary      Examination Area      Categ                                            E  I O E Number      Identification /ISO # Item No    Method        Data Sheet Number      C  G M R                Remarks 133200  2"-SI-1402-10          R-A    C VT-2          4.2-007                  X        10/30/2006 - VT-2 complete. No ELBOW TO PIPE          Rl.12                                                      Recordable Indications.
ISO# 5614-P-513-S SH. 1 133300  2"-SI-1402-38          R-A    C VT-2          4.2-007                  X  - - - 10/30/2006 - VT-2 complete. No PIPE TO TEE            R1.12                                                      Recordable Indications.
ISO# 5614-P-513-S SH. 1 133350  2"-SI-1402-39          R-A    C VT-2          4.2-007                  X  - - - 10/30/2006 - VT-2 complete. No TEE TO REDUCING        R1.12                                                      Recordable Indications.
INSERT ISO# 5614-P-513-S SH. 1 133400  2"-SI-1402-40          R-A    C VT-2          4.2-007                  X  - - - 10/30/2006 - VT-2 complete. No TEE TO PIPE            R1.12                                                      Recordable Indications.
ISO# 5614-P-513-S SH. 1 133500    2"-SI-1402-11          R-A    C VT-2          4.2-007                  X  - - - 10/30/2006 - VT-2 complete. No PIPE TO ELBOW          R1.12                                                      Recordable Indications.
ISO# 5614-P-513-S SH. 1 133600    2"-SI-1402-12          R-A    C VT-2          4.2-007                  X  - - - 10/30/2006 - VT-2 complete. No ELBOW TO PIPE          RI.12                                                      Recordable Indications.
ISO# 5614-P-513-S SH. 1 133700    2"-SI-1402-13          R-A    C VT-2          4.2-007                  X  - - - 10/30/2006 - VT-2 complete. No PIPE TO ELBOW          R1.12                                                      Recordable Indications.
ISO# 5614-P-513-S SH. 1 133800    2"-SI-1402-14          R-A    C VT-2          4.2-007                  X  -  - 10/30/2006 - VT-2 complete. No ELBOW TO PIPE          Rl.12                                                      Recordable Indications.
ISO# 5614-P-513-S SH. 1 133900    2"-SI-1402-15          R-A    C VT-2          4.2-007                  X  - - - 10/30/2006 - VT-2 complete. No PIPE TO ELBOW          R1.12                                                      Recordable Indications.
ISO# 5614-P-513-S SH. 1
 
DATE: 03/06/2007                            Turkey Point Nuclear Plant [PTN] -- Unit 4                                      Page 19 REVISION: 0                                  Inservice Inspection Results Summary Interval 4, Period 1, Outage 2 (06)
Completed Components (C, R, B, P, A, E)
HIGH HEAD SAFETY INJECTION LOOP B INSIDE CTMrr Zone # 4-041 N  I    0 ASME Status                                      0  N  G  T Sec XI                                          R  S  E  H Summary      Examination Area    Categ                                            E  I 0  E Number      Identification /ISO# Item No    Method        Data Sheet Number      C  G  M  R                Remarks 134000  2"-SI-1402-16          R-A    C VT-2          4.2-007                  X    - -  - 10/30/2006 - VT-2 complete. No ELBOW TO PIPE          RI.12                                                        Recordable Indications.
ISO# 5614-P-513-S SH. 1 134300  2"-SI-1402-19          R-A    C VT-2          4.2-007                  X    - -  - 10/30/2006 - VT-2 complete. No PIPE TO ELBOW          Rl.12                                                        Recordable Indications.
ISO# 5614-P-513-S SH. 1 134400  2"-SI-1402-20          R-A    C VT-2          4.2-007                  X    - -  - 10/30/2006 - VT-2 complete. No ELBOW TO PIPE          Rl.12                                                        Recordable Indications.
ISO# 5614-P-513-S SH. 1 134500  2"-SI-1402-21          R-A    C VT-2          4.2-007                  X          10/30/2006 - VT-2 complete. No PIPE TO ELBOW          R1.12                                                        Recordable Indications.
ISO# 5614-P-513-S SH. 1 134600  2"-SI-1402-22          R-A    C VT-2          4.2-007                  X          10/30/2006 - VT-2 complete. No ELBOW TO PIPE          RI.12                                                        Recordable Indications.
ISO# 5614-P-513-S SH. 1 134620  2"-SI-1402-43          R-A    C VT-2          4.2-007                  X          10/30/2006 - VT-2 complete. No PIPE TO ELBOW          RI.12                                                        Recordable Indications.
ISO# 5614-P-513-S SH. 1 134630  2"-SI-1402-44          R-A    C VT-2          4.2-007                  X    - -  - 10/30/2006 - VT-2 complete. No ELBOW TO PIPE          R1.12                                                        Recordable Indications.
ISO# 5614-P-513-S SH. 1 134700  2"-SI-1402-23          R-A    C VT-2          4.2-007                  X    -  - - 10/30/2006 - VT-2 complete. No PIPE TO COUPLING      Rl.12                                                        Recordable Indications.
ISO# 5614-P-513-S SH. 1 134800  2"-SI-1402-24          R-A    C VT-2          4.2-007                  X    -  - - 10/30/2006 - VT-2 complete. No COUPLING TO PIPE      Rl.12                                                        Recordable Indications.
ISO# 5614-P-513-S SH. 1
 
DATE: 03/06/2007                              Turkey Point Nuclear Plant [PTN] - Unit 4                                      Page 20 REVISION: 0                                    Inservice Inspection Results Summary Interval 4, Period 1, Outage 2 (06)
Completed Components (C, R, B, P, A, E)
HIGH HEAD SAFETY INJECTION LOOP B INSIDE CTMI" Zone # 4-041 N    I    0 ASME  Status                                  0    N  G T Sec XI                                          R    S  E H Summary      Examination Area      Categ                                            E    I 0 E Number      Identification /ISO # Item No    Method        Data Sheet Number      C    G  M R                Remarks 134900  2"-SI-1402-25          R-A    C VT-2          4.2-007                X            10/30/2006 - VT-2 complete. No PIPE TO ELBOW          Rl.12                                                        Recordable Indications.
ISO# 5614-P-513-S SH. 1 135000  2"-SI-1402-26          R-A    C VT-2          4.2-007                X      - - - 10/30/2006 - VT-2 complete. No ELBOW TO PIPE          R1.12                                                        Recordable Indications.
ISO# 5614-P-513-S SH. 2 135100  2"-SI-1402-27          R-A    C VT-2          4.2-007                X      - - - 10/30/2006 - VT-2 complete. No PIPE TO ELBOW          Rl.12                                                        Recordable Indications.
ISO# 5614-P-513-S SH. 2 135200  2"-SI-1402-28          R-A    C VT-2          4.2-007                X            10/30/2006 - VT-2 complete. No ELBOW TO PIPE          R1.12                                                        Recordable Indications.
ISc# 5614-P-513-S SH. 2 135300    2"-SI-1402-29          R-A    C VT-2          4.2-007                X            10/30/2006 - VT-2 complete. No PIPE TO COUPLING        Rl.12                                                        Recordable Indications.
ISO# 5614-P-513-S SH. 2 135400    2"-SI-1402-30          R-A    C VT-2          4.2-007'                X            10/30/2006 - VT-2 complete. No COUPLING TO PIPE        R1.12                                                        Recordable Indications.
ISO# 5614-P-513-S SH. 2 135420    2"-SI-1402-41          R-A    C VT-2          4.2-007                X    -  - - 10/30/2006 - VT-2 complete. No PIPE TO ELBOW          R1.12                                                        Recordable Indications.
ISO# 5614-P-513-S SH. 2 135430    2"-SI-1402-42          R-A    C VT-2          4.2-007                X    -  - - 10/30/2006 - VT-2 complete. No ELBOW TO PIPE          R1.12                                                        Recordable Indications.
ISO# 5614-P-513-S SH. 2 135500    2"-SI-1402-31          R-A    C VT-2          4.2-007                X            10/30/2006 - VT-2 complete. No PIPE TO ELBOW          R1.12                                                        Recordable Indications.
ISO# 5614-P-513-S SH. 2
 
DATE: 03/06/2007                              Turkey Point Nuclear Plant [PTN] -- Unit 4                                    Page 21 REVISION: 0                                    Inservice Inspection Results Summary Interval 4, Period 1, Outage 2 (06)
Completed Components (C, R, B, P, A, E)
HIGH HEAD SAFETY INJECTION LOOP B INSIDE CTM'T Zone # 4-041 N    I    0 ASME  Status                                    0    N  G T Sec Xl                                          R    S  E H Summary      Examination Area      Categ                                            E    I 0 E Number      Identification /ISO # Item No    Method        Data Sheet Number      C    G  M R                Remarks 135600    2"-SI-1402-32          R-A    C VT-2          4.2-007                  X          10/30/2006 - VT-2 complete. No ELBOW TO PIPE          Rl.12                                                        Recordable Indications.
ISO# 5614-P-513-S SH. 2 135700    2"-SI-1402-33          R-A    C VT-2          4.2-007                  X          10/30/2006 - VT-2 complete. No PIPE TO ELBOW          R1.12                                                        Recordable Indications.
ISO# 5614-P-513-S SH. 2 135800    2"-SI-1402-34          R-A    C VT-2          4.2-007                  X          10/30/2006 - VT-2 complete. No ELBOW TO PIPE          Rl.12                                                        Recordable Indications.
ISO# 5614-P-513-S SH. 2 135900    2"-SI-1402-35          R-A    C VT-2          4.2-007                X      - - - 10/30/2006 - VT-2 complete. No PIPE TO ELBOW          R1.12                                                        Recordable Indications.
ISO# 5614-P-513-S SH. 2 136000    2"-SI-1402-36          R-A    C VT-2          4.2-007                  X          10/30/2006 - VT-2 complete. No ELBOW TO PIPE          R1.12                                                        Recordable Indications.
ISO# 5614-P-513-S SH. 2 136100    2"-SI-1402-37          R-A    C VT-2          4.2-007                  X        - 10/30/2006 - VT-2 complete. No PIPE TO BRANCH          Rl.12                                                        Recordable Indications.
CONNECTION ISO# 5614-P-513-S SH. 2
 
DATE: 03/06/2007                            Turkey Point Nuclear Plant [PTN] -- Unit 4                                        Page 22 REVISION: 0                                  Inservice Inspection Results Summary Interval 4, Period 1, Outage 2 (06)
Completed Components (C, R, B, P, A, E)
HIGH HEAD SAFETY INJECTION LOOP C INSIDE CTMT Zone # 4-042 N  I      0 ASME Status                                    0    N  G  T Sec XI                                          R  S  E  H Summary      Examination Area    Categ                                            E    I 0  E Number      Identification ISO # Item No    Method        Data Sheet Number      C  G  M  R                  Remarks 137600    2"-SI-1403-1          R-A    C VT-2          4.2-008                  X    -  -  - 10/30/2006 - VT-2 complete. No VALVE 4-873C TO PIPE Rl.12                                                            Recordable Indications.
ISO# 5614-P-514-S SH. 1 137700    2"-SI-1403-2          R-A    C VT-2          4.2-008                  X    -  -  - 10/30/2006 - VT-2 complete. No PIPE TO ELBOW          R1.12                                                          Recordable Indications.
ISO# 5614-P-514-S SH. 1 137800    2"-SI-1403-3          R-A    C VT-2          4.2-008                  X    -  -  - 10/30/2006 - VT-2 complete. No ELBOW TO PIPE          R1.12                                                          Recordable Indications.
ISO# 5614-P-514-S SH. 1 137900    2"-$1-1403-4          R-A    C VT-2          4.2-008                  X    -  -  - 10/30/2006 - VT-2 complete. No PIPE TO TEE            Rl.12                                                          Recordable Indications.
ISO# 5614-P-514-S SH. 1 137950    2"-SI-1403-5          R-A    C VT-2          4.2-008                X    -  -  - 10/30/2006 - VT-2 complete. No TEE TO REDUCING        R1.12                                                          Recordable Indications.
INSERT ISO# 5614-P-514-S SH. 1 138000    2"-SI-1403-6          R-A    C VT-2          4.2-008                X              10/30/2006 - VT-2 complete. No TEE TO PIPE            R1.12                                                          Recordable Indications.
ISO# 5614-P-514-S SH. 1 138100    2"-$1-1403-7          R-A    C VT-2          4.2-008                X    -  -  -  10/30/2006 - VT-2 complete. No PIPE TO VALVE 4-868C RI.12                                                            Recordable Indications.
ISO# 5614-P-514-S SH. 1 138200    2"-SI-1403-8          R-A    C VT-2          4.2-008                X    -  -  -  10/30/2006 - VT-2 complete. No VALVE 4-868C TO PIPE R1.12                                                            Recordable Indications.
ISO# 5614-P-514-S SH. 1 138300    2"-SI-1403-9          R-A    C VT-2          4.2-008                X    -  -  -  10/30/2006 - VT-2 complete. No PIPE TO ELBOW          R1.12                                                          Recordable Indications.
ISO# 5614-P-514-S SH. 1
 
DATE: 03/06/2007                              Turkey Point Nuclear Plant [PTN] -- Unit 4                                    Page 23 REVISION: 0                                    Inservice Inspection Results Summary Interval 4, Period 1, Outage 2 (06)
Completed Components (C, R, B, P, A, E)
HIGH HEAD SAFETY INJECTION LOOP C INSIDE CTMT Zone # 4-042 N  I    0 ASME Status                                    0    N G T Sec XI                                          R  S  E H Summary      Examination Area      Categ                                            E  I 0 E Number      Identification /ISO#  Item No    Method        Data Sheet Number      C  G  M R                Remarks 138400    2"-SI-1403-10            R-A    C VT-2          4.2-008                  X    - - - 10/30/2006 - VT-2 complete. No ELBOW TO PIPE          - Rl.12                                                        Recordable Indications.
ISO# 5614-P-514-S SH. 1 138500  2"-SI-1403-11            R-A    C VT-2          4.2-008                  X    - - - 10/30/2006 - VT-2 complete. No PIPE TO ELBOW            R1.12                                                        Recordable Indications.
ISO# 5614-P-514-S SH. 1 138600  2"-SI-1403-12            R-A    C VT-2          4.2-008                  X    - - - 10/30/2006 - VT-2 complete. No ELBOW TO PIPE            R1.12                                                        Recordable Indications.
ISO# 5614-P-514-S SH. 1 138700  2"-SI-1403-13            R-A    C VT-2          4.2-008                  X    - - - 10/30/2006 - VT-2 complete. No PIPE TO ELBOW            R1.2                                                        Recordable Indications.
ISO# 5614-P-514-S SH. 1 138800    2"-SI-1403-14            R-A    C VT-2          4.2-008                  X    - - - 10/30/2006 - VT-2 complete. No ELBOW TO PIPE            R1.12                                                        Recordable Indications.
ISO# 5614-P-514-S SH. 1 138900    2"-SI-1403-15            R-A    C VT-2          4.2-008                  X    -  - 10/30/2006 - VT-2 complete. No PIPE TO ELBOW            RI.12                                                        Recordable Indications.
ISO# 5614-P-514-S SH. 1 139000    2"-SI-1403-16            R-A    C VT-2          4.2-008                  X          10/30/2006 - VT-2 complete. No ELBOW TO PIPE            R1.12                                                        Recordable Indications.
ISO# 5614-P-514-S SH. 2 139100    2"-SI-1403-17            R-A    C VT-2          4.2-008                  X    - - - 10/30/2006 - VT-2 complete. No PIPE TO ELBOW            R1.12                                                        Recordable Indications.
ISO# 5614-P-514-S SH. 2 139200    2"-SI-1403-18            R-A    C VT-2          4.2-008                  X    - - - 10/30/2006 - VT-2 complete. No ELBOW TO PIPE            R1,12                                                        Recordable Indications.
ISO# 5614-P-514-S SH. 2
 
DATE: 03/06/2007                                Turkey Point Nuclear Plant [PTN] - Unit 4                                      Page 24 REVISION: 0                                      Inservice Inspection Results Summary Interval 4, Period 1, Outage 2 (06)
Completed Components (C, R, B, P, A, E)
HIGH HEAD SAFETY INJECTION LOOP C INSIDE CTrT Zone # 4-042 N  I    0 ASME  Status                                    0  N  G  T Sec XI                                          R  S  E  H Summary      Examination Area      Categ                                            E    I 0  E Number      Identification /ISO #  Item No    Method        Data Sheet Number      C  G  M  R                  Remarks 139300    2"-SI-1403-19          R-A      C VT-2          4.2-008                  X  -  -  - 10/30/2006 - VT-2 complete. No PIPE TO COUPLING        R1.12                                                          Recordable Indications.
ISO# 5614-P-514-S SH. 2 139400    2"-SI-1403-20          R-A      C VT-2          4.2-008                  X    -  -  - 10/30/2006 - VT-2 complete. No COUPLING TO PIPE        RI.12                                                          Recordable Indications.
ISO# 5614-P-514-S SH. 2 139500    2"-SI-1403-21          R-A      C VT-2          4.2-008                  X    -  -  - 10/30/2006 - VT-2 complete. No PIPE TO ELBOW          R1.12                                                          Recordable Indications.
ISO# 5614-P-514-S SH. 2 139600    2"-SI-1403-22          R-A      C VT-2          4.2-008                  X            10/30/2006 - VT-2 complete. No ELBOW TO PIPE          Rl.12                                                          Recordable Indications.
ISO# 5614-P-514-S SH. 2 139700    2"-SI-1403-23          R-A      C VT-2          4.2-008                  X  -  -  - 10/30/2006 - VT-2 complete. No PIPE TO ELBOW          R1.12                                                          Recordable Indications.
ISO# 5614-P-514-S SH. 2 139800    2"-SI-1403-24 .        R-A      C VT-2          4.2-008                X    -  -  - 10/30/2006 - VT-2 complete. No ELBOW TO PIPE          Rl.12                                                          Recordable Indications.
ISO# 5614-P-514-S SH. 2 139900    2"-SI-1403-25          R-A      C VT-2          4.2-008                X    -  -  -  10/30/2006 - VT-2 complete. No PIPE TO BRANCH          R1.12                                                          Recordable Indications.
CONNECTION ISO# 5614-P-514-S SH. 2
 
DATE: 03/06/2007                              Turkey Point Nuclear Plant [PTN] -- Unit 4                                    Page 25 REVISION: 0                                    Inservice Inspection Results Summary Interval 4, Period 1, Outage 2 (06)
Completed Components (C, R, B, P, A, E)
CHEMICAL & VOLUME CONTROL SEAL INJECTION LO, Zone # 4-050 N    I    0 ASME  Status                                    0    N G T Sec XI                                          R    S E H Summary      Examination Area    Categ                                            E    I 0 E Number      Identification ISO # Item No      Method        Data Sheet Number      C    G  M R                Remarks 175890    3/4"-CH-1439A-1        R-A      C VT-2          4.2-009                  X          12/02/2006 - VT-2 complete. No RCP 4P-200A TO        R1.12                                                          Recordable Indications.
CONNECTION ISO# 5614-M-3047 SH.3 175892    3/4"-CH-1439A-2        R-A      C VT-2          4.2-009                  X-          12/02/2006 - VT-2 complete. No CONNECTION TO PIPE R1.12                                                              Recordable Indications.
ISO# 5614-M-3047 SH.3 175894    3/4"-CH-1439A-3        R-A      C VT-2          4.2-009                  X    - - - 12/02/2006 - VT-2 complete. No PIPE TO FLANGE        Rl.12                                                          Recordable Indications.
ISO# 5614-M-3047 SH.3
 
DATE: 0310612007                              Turkey Point Nuclear Plant [PTNI -- Unit 4                                    Page 26 REVISION: 0                                    Inservice Inspection Results Summary Interval 4, Period 1, Outage 2 (06)
Completed Components (C, R, B, P, A, E)
CHEMICAL & VOLUME CONTROL SEAL INJECTION LO0 Zone # 4-051 N  I    0 ASME Status                                    O    N  G T Sec XI                                          R  S  E H Summary      Examination Area      Categ                                            E  I 0 E Number      Identification IISO # Item No    Method        Data Sheet Number C        G  M R                Remarks 180880  3/4"-CH-1440A-1        R-A    C VT-2          4.2-010                X    - - - 12/02/2006 - VT-2 complete. No RCP 4P-200C TO          Rl.12                                                        Recordable Indications.
CONNECTION ISO# 5614-M-3047 SH.3 180882  3/4"-CH-1440A-2        R-A    C VT-2          4.2-010                X    - - - 12/02/2006 - VT-2 complete. No CONNECTION TO PIPE RI.12                                                            Recordable Indications.
ISO# 5614-M-3047 SH.3 180884  3/4"-CH-1440A-3        R-A    C VT-2          4.2-010                X    - - - 12/02/2006 - VT-2 complete. No PIPE TO FLANGE          RI.12                                                        Recordable Indications.
ISO# 5614-M-3047 SH.3
 
DATE: 03/06/2007                              Turkey Point Nuclear Plant [PTN] -- Unit 4                                    Page 27 REVISION: 0                                    Inservice Inspection Results Summary Interval 4, Period 1, Outage 2 (06)
Completed Components (C, R, B, P, A, E)
CHEMICAL & VOLUME CONTROL SEAL INJECTION LO, Zone # 4-052 N    I    0 ASME  Status                                    0    N  G T Sec XI                                          R    S  E H Summary      Examination Area      Categ                                            E    I 0 E Number      Identification /ISO # Item No    Method        Data Sheet Number      C    G  M R                Remarks 186568    3/4"-CH-1441A-1        R-A    C VT-2          4.2-011                  X          12/02/2006 - VT-2 complete. No RCP 4P-200C TO          Rl.12                                                        Recordable Indications.
CONNECTION ISO# 5614-M-3047 SH.3 186570    3/4"-CH-1441A-2        R-A    C VT-2          4.2-011                  X          12/02/2006 - VT-2 complete. No CONNECTION TO PIPE Rl.12                                                              Recordable Indications.
ISON 5614-M-3047 SH.3 186572    3/4"-CH-1441A-3        R-A    C VT-2          4.2-011                  X          12/02/2006 - VT-2 complete. No PIPE TO ORIFICE        R1.12                                                        Recordable Indications.
ISO# 5614-M-3047 SH.3
 
DATE: 03/06/2007                              Turkey Point Nuclear Plant [PTN] - Unit 4                                        Page 28 REVISION: 0                                    Inservice Inspection Results Summary Interval 4, Period 1, Outage 2 (06)
Completed Components (C, R, B, P, A, E)
REACTOR COOLANT PUMP Zone # 4-055 N  I    0 ASME  Status                                  0    N G T Sec XI                                          R  S  E H Summary      Examination Area      Categ                                            E    I 0 E Number      Identification /ISO # Item No    Method        Data Sheet Number      C    G  M R                Remarks 195500  RCP FLYWHEEL 1S-74P'RG 1.14    C PT            740153                            X 8/14/2006 - PT complete. Removed FLYWHEEL                          UT            15689                  X    - - - rounded indication at keyway. Performed by Curtis-Wright Electro-Mechanical Corp.
ISO# 5614-M-4007                                                                          8/15/2006 - UT complete. No Recordable Indications. Performed by Curtis-Wright Electro-Mechanical Corp.
 
DATE: 03/06/2007                            Turkey Point Nuclear Plant [PTN] -- Unit 4                                      Page 29 REVISION: 0                                  Inservice Inspection Results Summary Interval 4, Period 1, Outage 2 (06)
Completed Components (C, R, B, P, A, E)
CHEMICAL & VOLUME CONTROL, REGENERATIVE HEA Zone # 4-059 N  I    0 ASME Status                                      0  N  G T Sec XI                                          R  S  E H Summary      Examination Area    Categ                                            E  I 0 E Number      Identification/ ISO# Item No    Method        Data Sheet Number      C  G  M R                Remarks 199290    RGX 4E200                      C VT-2          4.2-012                  X    - - - 10/30/2006 - VT-2 complete. No VISUAL FOR LEAKAGE              VT-2          4.2-014                  X    - - - Recordable Indications 12/2/2006 - VT-2 complete. No Recordable Indications ISO# 5614-M-4009 SH.1
 
DATE: 03/06/2007                              Turkey Point Nuclear Plant [PTN] -- Unit 4                                      Page 30 REVISION: 0                                    Inservice Inspection Results Summary Interval 4, Period 1, Outage 2 (06)
Completed Components (C, R, B, P, A, E)
STEAM GENERATOR A SECONDARY SIDE Zone # 4-060 N  I    0 ASME Status                                      0  N  G T Sec XI                                          R  S  E H Summary      Examination Area      Categ                                            E    I 0 E Number      Identification /ISO # Item No    Method        Data Sheet Number      C  G  M R              Remarks 205300  4-SGA-SS                        A VT            4.4-001                  X    -  - - 11/9/2007 - VT complete. No recordable SECONDARY SIDE                                                                        indications EXAMINATION ISO# 5614-M-4003
 
DATE: 03/06/2007                              Turkey Point Nuclear Plant [PTN] -- Unit 4                                          Page 31 REVISION: 0                                    Inservice Inspection Results Summary Interval 4, Period 1, Outage 2 (06) .
Completed Components (C, R, B, P, A, E)
STEAM GENERATOR B SECONDARY SIDE Zone # 4-061 N    I    0 ASME Status                                    0    N  G T Sec XI                                          R    S  E H Summary      Examination Area    Categ                                            E      I O E Number      Identification /ISO# Item No    Method        Data Sheet Number      C    G  M R                Remarks 206100  4-SGB-FW              C-B    C MT            2.2-001                  X            11/11/2006 -MT complete. No FEEDWATER NOZZLE      C2.21    UT            5.1-001                  -      - - - Recordable Indications.
TO SHELL                        0L2.25                                  X    -  - - 11/11/2006 - UT complete. Acceptable 45S2.25 AX                              X            spot mcsusion recordeo win me 6o aeg ISO# 5614-M-4004                      45S2.25 CIR                            X            from the Shell side.
60S2.25 AX                              -      - - X 60S2.25 CIR                            X    -  - -
206200  4-SGB-FW IRS          C-B    C UT            5.13-001                -    -  - - 11/11/2006 - UT complete. No FEEDWATER NOZZLE      C2.22                                            -    -  - - Recordable Indications. Integral INSIDE RADIUS                    45S2.25AX                              X            attachment observed while performing SECTION                                                                              the inner radius examination. Physical ISO# 5614-M-4004                                                                          verification was performed from inside generator. Both insulation rings were removed for examination.
206600  4-SGB-SS                      A VT            4.4-003                  X    -  - - 11/11/2006 - Visual complete. No SECONDARY SIDE                                                                        Recordable Indications.
EXAMINATION ISO# 5614-M-4004
 
DATE: 03/06/2007                              Turkey Point Nuclear Plant [PTN] - Unit 4                                      Page 32 REVISION: 0                                    Inservice Inspection Results Summary Interval 4, Period 1, Outage 2 (06)
Completed Components (C, R, B, P, A, E)
STEAM GENERATOR C SECONDARY SIDE Zone # 4-062 N  I    0 ASME  Status                                    0  N  G T Sec Xi                                          R  S  E H Summary      Examination Area      Categ                                            E    I 0 E Number      Identification/ ISO # Item No      Method      Data Sheet Number C        G  M R              Remarks 207900    4-SGC-SS                        A VT            NDE 4.4-002              X    - - - 11/9/2007 - VT complete. No recordable SECONDARY SIDE                                                                      indications EXAMINATION ISO# 561 4-M-4005
 
DATE: 03/06/2007                            Turkey Point Nuclear. Plant [PTNI -- Unit 4                                      Page 33 REVISION: 0                                    Inservice Inspection Results Summary Interval 4, Period 1, Outage 2 (06)
Completed Components (C, R, B, P, A, E)
MAIN FEEDWATER SYSTEM LOOP A Zone # 4-111 N I        0 ASME Status                                    0 N    G  T Sec XI                                          R S    E  H Summary      Examination Area    Categ                                            E l  0  E Number      Identification /ISO# Item No    Method        Data Sheet Number      C G    M  R              Remarks 284460    Augmented Exam        AUG    A UT            5.16-001                  -  -  -  11/7/2006 - UT complete. Geometry FROM NOZZLE RAMP                60S2.25AX                                      X    recorded.
TO 1 PIPE DIA. ON                70S2.25AX                                      X ELBOW                            60S5.O0AX                                      X ISO# 5614-P-557-S SH. 1              70S5.OOAX                                      X
 
DATE: 03/06/2007                              Turkey Point Nuclear Plant [PTN] -- Unit 4                                        Page 34 REVISION: 0                                    Inservice Inspection Results Summary Interval 4, Period 1, Outage 2 (06)
Completed Components (C, R, B, P, A, E)
MAIN FEEDWATER SYSTEM LOOP B Zone # 4-112 N I      0 ASME Status                                    0 N    G T Sec XI                                          R S    E H Summary      Examination.Area      Categ                                            E l  0 E Number      Identification /ISO # Item No    Method        Data Sheet Number      C G    M R                Remarks 286980    Augmented Exam          AUG    A UT            5.16-002                  -  - - - 11/9/2006 - UT complete. Ge6metry FROM NOZZLE RAMP                  60S2.25AX                                      X  recorded. Backing ring was also observed.
TO 1 PIPE DIA. ON                70S2.25AX                                      X ELBOW ISO# 5614-P-558-S SH. 1
 
DATE: 03/06/2007                              Turkey Point Nuclear Plant [PTN] -- Unit 4                                    Page 35 REVISION: 0                                    Inservice Inspection Results Summary Interval 4, Period 1, Outage 2 (06)
Completed Components (C, R, B, P, A, E)
MAIN FEEDWATER SYSTEM LOOP C Zone # 4-113 NI1      0 ASME Status                                      0 N G T Sec XI                                          R S E H Summary      Examination Area      Categ                                            E 1 0 E Number      Identification /IISO# Item No [  Method        Data Sheet Number C G M R                        Remarks 289650    Augmented Exam          AUG    A UT            5.16-003--                        - 11/8/2006 - UT complete. Geometry FROM NOZZLE RAMP                  60S2.25AX                                -    X - recorded.
TO 1 DIA. ON ELBOW                70S2.25AX                                --    X -
60S5.OOAX                                --    X -
ISO# 5614-P-789-S SH. 1                70S5.OOAX                                -  - X -
 
DATE: 03/06/2007                            Turkey Point Nuclear Plant [PTN] -- Unit 4                                      Page 36 REVISION: 0                                  Inservice Inspection Results Summary Interval 4, Period 1, Outage 2 (06)
Completed Components (C, R, B, P, A, E)
RESIDUAL HEAT EXCHANGER B Zone # 4-118 N  I    0 ASME Status                                      0  N  G T Sec XI                                          R  S  E H Summary      Examination Area    Categ                                            E    I 0 E Number      Identification /ISO# Item No    Method        Data Sheet Number      C  G  M R                Remarks 293200    4-RHE-133              C-B    C VT-2          4.2-013                  X    -  - - 11/2/2006 - VT-2 complete. No INLET NOZZLE TO        C2.33                                                        Recordable Indications.
SHELL ISO# 5614-M-4011 293204    4-RHE-B5              C-B    C VT-2          4.2-013                  X    -  - - 11/2/2006 - VT-2 complete. No OUTLET NOZZLE TO      C2.33                                                        Recordable Indications.
SHELL ISO# 5614-M-4011
 
TURKEY POINT UNIT 4 2006 REFUELING OUTAGE Summary of Inservice Inspection IWE Examinations Attachment 2
 
DATE: 03/06/2007                                IWE Prograrn-AJI Plants [IWE] - Unit 4                                              Page 1 REVISION: 0                                    Inservice Inspection Results Summary Interval 1, Period 3, Outage 1 (06)
Completed Components (C, R, B, P, A, E)
METALLUC CONTAINMENT LINER Zone # 4-001 N  I      0 ASME  Status                                    0  N  G  T Sec XI                                          R  S  E  H Summary      Examination Area      Categ                                            E  I  0  E Number      Identification /ISO # Item No    Method        Data Sheet Number      C  G  M  R                  Remarks 410000    CONTAINMENT LINER E-A          C GEN.          4.7-020                  X  -  -  - 11/4/06 - General Visual Complete.
LINER                  El.11 PLATE-GENERAL VISUAL ISO#
410010    PENETRATION #1          E-A    C GEN.          4.7-020                  X  -  -  - 11/4/06 - General Visual Complete.
RESID.HT.REMOVAL        E 1.11 TYPEI DETAIL3 ISO#
410020    PENETRATION #2          E-A    C GEN.          4.7-020                  X    -  -  - 11/4/06 - General Visual Complete.
RESID.HT.REMOVAL        E1.11 TYPEI DETAIL3
"-- IS 410030    PENETRATION #3          E-A    C GEN.          4.7-020                  X  -  -  - 11/4/06 - General Visual Complete.
R/C COOLING IN TYPEI E1.ll DETAIL3 ISO#
410040    PENETRATION #4          E-A    C GEN.          4.7-020                  X  -  -  - 11/4/06 - General Visual Complete.
R/C COOLING OUT        El.l1 TYPEI DETAIL3 ISO#
410050    PENETRATION #5          E-A    C GEN.          4.7-020                  X  -  -  -  11/4/06 - General Visual Complete.
PZR RELIEF TANK        El.l1 VENT TYPEV DETAIL12 ISO#
410060    PENETRATION #6          E-A    C GEN.          4.7-020                  X  -  -  -  11/4/06 - General Visual Complete.
PZRRELIEFTANKN2        EL.11 SUPPLY TYPEV DETAIL12 ISO#
410070    PENETRATION #7          E-A    C GEN.          4.7-020                  X  -  -  - 11/4/06 - General Visual Complete.
PZR RELIEF TANK H20 E1.11 DEMIN. TYPEI DETAIL3 ISO#
410080    PENETRATION #8          E-A    C GEN.          4.7-020                  X  -  -  - 11/4/06 - General Visual Complete.
PZR STEAM SPACE        E 1.11 SAMP. TYPEIV DETAIL9 ISO#
 
DATE: 03/06/2007                                IWE Program-All Plants [IWE] - Unit 4                                              Page 2 REVISION: 0                                      Inservice Inspection Results Summary Interval 1, Period 3, Outage 1 (06)
Completed Components (C, R, B, P, A, E)
METALUC CONTAINMENT LINER Zone # 4-001 N I    0 ASME  Status                                    0  N G  T Sec XI                                          R  S E  H Summary      Examination Area      Categ                                            E I 0  E Number      Identification I ISO # Item No    Method        Data Sheet Number      C  G M  R                Remarks 410090    PENETRATION #9          E-A    C GEN.          4.7-020                  X  - -  - 11/4/06 - General Visual Complete.
PZR LIQUID SPACE        ElIl SAMP. TYPEIV DETAIL9 ISO#
410100    PENETRATION #10          E-A    C GEN.          4.7-020                X      .-  11/4/06 - General Visual Complete.
R/C DRAIN TANK VENT El.11 TYPEI DETAIL3 ISO#
410110    PENETRATION #11          E-A    C GEN.          4.7-020                  X  - -  - 11/4/06 - General Visual Complete.
LOW HEAD SAFTEY          E 1.11 INJ. TYPEI DETAIL3 ISO#
410120    PENETRATION #12          E-A    C GEN.          4.7-020                X  - -  -  11/4/06 - General Visual Complete.
EXCESS LETDOWN HX        El.I IN TYPEI DETAIL3 ISO#
410130    PENETRATION #13          E-A    C GEN.          4.7-020                X          11/4/06 - General Visual Complete.
EXCESSLETDOWNHX          El.11 OUT TYPEI DETAIL3' ISO#
410140    PENETRATION #14          E-A    C GEN.          4.7-020                X  - -  -  11/4/06 - General Visual Complete, LETDOWN TO NON          El.11 REGEN HX TYPEI DETAIL3 ISO#
410150    PENETRATION #15          E-A    C GEN.          4.7-020                X  - -  -  11/4/06 - General Visual Complete.
CHARGINGTOREGEN          E1.11 HX TYPEI DETAIL3 ISO#
410160    PENETRATION #16          E-A    C GEN.          4.7-020                X  - -  -  11/4/06 - General Visual Complete.
SPARE TYPEI DETAIL3 EIlli ISO#
410170    PENETRATION #17          E-A    C GEN.          4,7-020                X  - -  -  11/4/06 - General Visual Complete.
SAFETY INJ. TEST &      El.11 PURGE TYPEI DETAIL3 ISO#
 
DATE: 03/06/2007                                IWE Program-All Plants ((WE] - Unit 4                                            Page 3 REVISION: 0                                    Inservice Inspection Results Summary Interval 1, Period 3, Outage 1 (06)
Completed Components (C, R, B, P, A, E)
METALMC CONTAINMENT LINER Zone # 4-001 N I    0 ASME  Status                                  0  N  G  T Sec XI                                          R S  E H Summary      Examination Area      Categ                                            E  I 0  E Number    Identification I ISO # Item No    Method        Data Sheet Number      C  G  M  R                Remarks 410180    PENETRATION #18        E-A    C GEN.          4.7-020                X  -  - - 11/4/06 - General Visual Complete.
SAFETY INJECTION        E 1.11 TYPEI DETAIL3 ISO#
410190    PENETRATION #19(2) E-A          C GEN.          4.7-020                X  -  - - 11/4/06 - General Visual Complete.
CONTAINMENT SPRAY El. 11 TYPEI DETAIL3 ISO#
410200    PENETRATION #20        E-A    C GEN.          4.7-020                X  -  - - 11/4/06 - General Visual Complete.
R/C 1OTLEG SAMPLE      E 1.11 TYPEIV DETAIL9 ISO#
410210    PENETRATION #21        E-A    C GEN.          4.7-020                X  -  - - 11/4/06 - General Visual Complete.
VENT COOLER CW          El.11 LINE TYPEI DETAIL3 ISO#
410220    PENETRATION #22        E-A    C GEN.          4.7-020                X  -  - - 11/4/06 - General Visual Complete.
VENT COOLER CW          El.11 RETURN TYPEI DETAIL3 ISO#
410230    PENETRATION #23        E-A    C GEN.          4.7-020                X  -  - - 11/4/06 - General Visual Complete.
CONTSUMP                E1.ll PUMP/HOLD UP TYPEI DETAIL3 ISO#
410240    PENETRATION #24 (3)    E-A    C GEN.          4.7-020                X  -  - - 11/4/06 - General Visual Complete.
CHARGEPUMP DIS TO      El.11 RC PUMP TYPEI DETAIL3 ISO#
410250    PENETRATION #25        E-A    C GEN.          4.7-020                X  -  - - 11/4/06 - General Visual Complete.
COOLANTPUMPIDIS ,      E1.ll TO RC PUMP TYPEI DETAIL3 ISO#
410260    PENETRATION #31        E-A    C GEN.          4.7-020                X  - -  - 11/4/06 - General Visual Complete.
RCDRAINTKH2ANAL E1.ll TYPEIV DETAIL9 ISO#
 
DATE: 03/06/2007                                  IWE Program-All Plants ((WE] - Unit 4                                              Page 4 REVISION: 0                                      Inservice Inspection Results Summary Interval 1, Period 3, Outage 1 (06)
Completed Components (C, R, B, P, A, E)
METALUC CONTAINMENT LINER Zone # 4-001 N  I      0 ASME Status                                    0  N  G  T Sec XI                                          R  S  E  H Summary      Examination Area        Categ                                            E  I 0  E Number      Identification /ISO#    Item No    Method        Data Sheet Number      C  G  M  R                Remarks 410270    PENETRATION #32          E-A    C GEN.          4.7-020                  X    -  -  - 11/4/06 - General Visual Complete.
CONT AIR SAMPLE IN        El 11 TYPEI DETAIL3 ISO#
410280    PENETRATION #33          E-A    C GEN.          4.7-020                  X    -  -  - 11/4/06 - General Visual Complete.
CONT AIR SAMPLE          El 11    GEN.          4.7-030                  X    -  -  - 11/8/06 - General Visual Complete.
OUT TYPEI DETAIL3 ISO#
410290    PENETRATION #37          E-A    C GEN.          4.7-020                  X    -  -  - 11/4/06 - General Visual Complete.
PLUGGED                  EII E
W/CONCRETE TYPEVI DETAIL13 ISO#
410300    PENETRATION #43          E-A    C GEN.          4.7-020                  X    -  -  - 11/4/06 - General Visual Complete.
R/CPUMPCWOUTLET          EIl.
TYPEI DETAIL3 ISO#
410310    PENETRATION #44 (3)      E-A    C GEN.          4.7-020                  X    -  -  - 11/4/06 - General Visual Complete.
CWTOEMERGCONT            El.11 COOLERS TYPEI DETAIL3 ISO#
410320    PENETRATION #45 (3)      E-A    C GEN.          4.7-020                  X    -  -  - 11/4/06 - General Visual Complete.
CW FROM EMERG            ElI.
CONT COOLERS TYPEI DETAIL3 ISO#
410330    PENETRATION #51          E-A    C GEN.          4.7-020                  X  -  -  - 11/4/06 - General Visual Complete.
SPARE TYPEI DETAIL3 E1.11 1ISO#
410340    PENETRATION #52          E-A    C GEN.          4.7-020                  X  -  -  -  11/4/06 - General Visual Complete.
R/C DRAIN TANK            EI.ll DISCH. TYPEI DETAIL3 ISO#
410350    PENETRATION #64B      (2 E-A    C GEN.          4.7-020                  X  -  -  -  11/4/06 - General Visual Complete.
S/G SAMPLE TYPEV          ELI.
ISO#
 
DATE: 03/06/2007                                  IWE Program-AJl Plants ((WE] -- Unit 4                                            Page 5 REVISION: 0                                      Inservice Inspection Results Summary Interval 1, Period 3, Outage 1 (06)
Completed Components (C, R, B, P, A, E)
METALMC CONTAINMENT LINER Zone # 4-001 N I    0 ASME Status                                    0 N  G T Sec XI                                          R S  E H Summary      Examination Area        Categ                                            E  I 0 E Number    Identification IISO #    Item No    Method        Data Sheet Number      C G  M R                  Remarks 410351    pENETRATION#66A        (E-A      C GEN.          4.7-020                  X  - - -  11/4/06 - General Visual Complete.
SPARE                    El.
1I ISO#
410355    PENETRATION #64C        (E-A      C GEN.          4.7-020                  X        11/4/06 - General Visual Complete.
STEAM GENSAMPLE          Eli1 ISO#
410356    PENETRATION #66B        i E-A    C GEN.          4.7-020                  X  - -  - 11/4/06 - General Visual Complete.
SPARE                    El.11 ISO#
410360    PENETRATION #55          E-A    C GEN.          4.7-020                  X        11/4/06 - General Visual Complete.
ACCUM. SAMPLE LINE E1.11 TYPEIV DETAIL9 ISO#
410370    PENETRATION #56          E-A    C GEN.          4.7-020                  X  - -  - 11/4/06 - General Visual Complete.
SPARE TYPEI              El.I1 DETAIL3 ISO#
410390    PENETRATION #59          E-A    C GEN.          4.7-020                  X        11/4/06 - General Visual Complete.
HIGH HEAD INJ. TO        E1.11 LOOP B TYPEI DETAIL3 ISO#
410400    PENETRATION #60          E-A    C GEN.          4.7-020                  X        11/4/06 - General Visual Complete.
HIGH HEAD INJ. TO        El.11 LOOP C TYPEI DETAIL3 ISO#
410410    PENETRATION #61B          E-A    C GEN.          4.7-020                  X  - - -  11/4/06 - General Visual Complete.
PZR DEAD WEIGHT          El.11 TESTER TYPEVI DETAIL13 ISO#
410420    PENETRATION #61A          E-A    C GEN.          4.7-020                  X  - - -  11/4/06 - General Visual Complete.
SPARE TYPE I              E 1.11                                                      Accessible areas only)
DETAIL3 ISO#
 
DATE: 03/06/2007                                IWE Program-AJI Plants [WE] -- Unit 4                                              Page 6 REVISION: 0                                    Inservice Inspection Results Summary Interval 1, Period 3, Outage 1 (06)
Completed Components (C, R, B, P, A, E)
METALMC CONTAINMENT LINER Zone # 4-001 N  I      0 ASME Status                                    0  N  G  T Sec XI                                          R  S  E  H Summary      Examination Area      Categ                                            E  I 0  E Number      Identification IISO # Item No    Method        Data Sheet Number      C  G  M  R                  Remarks 410430    PENETRATION #63        E-A    C GEN.          4.7-020                X    -  -  - 11/4/06 - General Visual Complete.
INSTR. AIR BLEED        El.11 TYPEI DETAIL3 ISO#
410440    PENETRATION #64 A      E-A    C GEN.          4.7-020                X    -  -  - 11/4/06 - General Visual Complete.
S/G SAMPLE TYPEI        E1.11 DETAIL3 ISO#
410450    CONTAINMENT LINER E-A          C VT-3          4.7-020                X    -  -  - 11/4/06 - Visual Complete.
LINER PLATE- VISUAL El.12 ISO#
410460    PENETRATION #1          E-A    C VT-3          4.7-020                X    -  -  - 11/4/06 - Visual Complete.
RESID.HT.REMOVAL        El.12 TYPEI DETAIL3 ISO#
410470    PENETRATION #2          E-A    C VT-3          4.7-020                X    - -  - 11/4/06 - Visual Complete.
RESID.HT.REMOVAL        El.12 TYPEI DETAIL3 ISO#
410480    PENETRATION #3          E-A    C VT-3          4.7-020                X  -  -  - 11/4/06 - Visual Complete.
R/C COOLING IN TYPEI El.12 DETAIL3 ISO#
410490    PENETRATION #4          E-A    C VT-3          4.7-020                X  -  -  - 11/4/06 - Visual Complete.
R/C COOLING OUT        E1.12 TYPEI DETAIL3 ISO#
410500    PENETRATION #5          E-A    C VT-3          4.7-020                X  -  -  -  11/4/06 - Visual Complete.
PZR RELIEF TANK        El.12 VENT TYPEV DETAIL12 ISO#
410510    PENETRATION #6          E-A    C VT-3          4.7-020                X  -  -  -  11/4/06 - Visual Complete.
PZRRELIEFTANKN2        E1.12 SUPPLY TYPEV DETAIL 12 ISO#
 
DATE: 03/06/2007                                IWE Program-All Plants [IWE] -- Unit 4                                    Page 7 REVISION: 0                                    Inservice Inspection Results Summary Interval 1, Period 3, Outage 1 (06)
Completed Components (C, R, B, P, A, E)
METAILUC CONTAINMENT UNER Zone # 4-001 N I    0 ASME Status                                    0 N  G  T Sec XI                                          R S  E  H Summary      Examination Area      Categ                                            E  I 0  E Number      Identification / ISO # Item No    Method        Data Sheet Number      C G  M  R                Remarks 410520    PENETRATION #7          E-A    C VT-3          4.7-020                  X        11/4/06 - Visual Complete.
PZR RELIEF TANK H20      E1.12 DEMIN. TYPEI DETAIL3 ISO#
410530    PENETRATION #8          E-A    C VT-3          4.7-020                  X  -  - - 11/4/06 - Visual Complete.
PZR STEAM SPACE          E1.12 SAMP. TYPEIV DETAIL9 ISO 410540    PENETRATION #9          E-A    C VT-3          4.7-020                  X  -  - - 11/4/06 - Visual Complete PZR LIQUID SPACE        E1.12 SAMP. TYPEIV DETAIL9 ISO#
410550    PENETRATION #10          E-A    C VT-3          4.7-020                  X  -  - - 11/4/06 - Visual Complete.
R/C DRAIN TANK VENT E 1.12 TYPEI DETAIL3 ISO#
410560    PENETRATION #11          E-A    C VT-3          4.7-020                  X        11/4/06 - Visual Complete.
LOW HEAD SAFTEY          E1.12 INJ. TYPEI DETAIL3 ISO#
410570    PENETRATION #12          E-A    C VT-3          4.7-020                  X  -  - - 11/4/06 - Visual Complete.
EXCESSLETDOWNHX          E1.12 IN TYPEI DETAIL3 ISO#
410580    PENETRATION #13          E-A    C VT-3          4.7-020                X  -  - - 11/4/06 - Visual Complete.
EXCESS LETDOWNHX        E1.12 OUT TYPEI DETAIL3 ISO#
410590    PENETRATION #14          E-A    C VT-3          4.7-020                X  -  -  - 11/4/06 - Visual Complete.
LETDOWN TO NON          E1.12 REGEN -IX TYPEI DETAIL3 ISO 410600    PENETRATION #15          E-A    C VT-3          4.7-020                X  -  -  - 11/4/06 - Visual Complete.
CHARGING TO REGEN        El.12 HX TYPEI DETAIL3 ISOf
 
DATE: 03/06/2007                                  IWE Program-All Plants ((WE] -- Unit 4                                    Page 8 REVISION: 0                                      Inservice Inspection Results Summary Interval 1, Period 3, Outage 1 (06)
Completed Components (C, R, B, P, A, E)
METALUC CONTAINMENT LINER Zone # 4-001 N I    0 ASME  Status                                  0  N  G  T Sec Xl                                          R S  E H Summary        Examination Area      Categ                                            E  I 0  E Number      Identification /ISO #  Item No    Method        Data Sheet Number      C  G  M  R                Remarks 410610    PENETRATION #16        E-A      C VT-3          4.7-020                X  -  - - 11/4/06 - Visual Complete.
SPARE TYPEI DETAIL3 E1.12 ISO#
410620    PENETRATION #17        E-A      C VT-3          4.7-020                X  -  - - 11/4/06 - Visual Complete.
SAFETY INJ. TEST &      E1.12 PURGE TYPEI DETAIL3 ISO#
410630    PENETRATION #18        E-A      C VT-3          4.7-020                X          11/4/06 - Visual Complete.
SAFETY INJECTION        EI.12 TYPEI DETAIL3 ISO#
410640    PENETRATION #19 (2) E-A          C VT-3          4.7-020                X  -  - - 11/4/06 - Visual Complete.
CONTAINMENT SPRAY El. 12 TYPEI DETAIL3 ISO#
410650    PENETRATION #20        E-A      C VT-3          4.7-020                X  -  - - 11/4/06 - Visual Complete.
R/C HOTLEG SAMPLE      E1.12 TYPEIV DETAIL9 ISO#
410660    PENETRATION #21        E-A      C VT-3          4.7-020                X  -  - - 11/4/06 - Visual Complete.
VENT COOLER CW          El.12 LINE TYPEI DETAIL3 ISO3#
410670    PENETRATION #22        E-A      C VT-3          4.7-020                X  -  - - 11/4/06 - Visual Complete.
VENT COOLER CW          El.12 RETURN TYPEI DETAIL3 ISO#
410680    PENETRATION #23        E-A      C VT-3          4.7-020                X  -  -  - 11/4/06 - Visual Complete.
CONTSUMP                E1.12 PUMP/HOLD UP TYPEI DETAIL3 ISO#
410690    PENETRATION #24 (3)    E-A      C VT-3          4.7-020                X  -  -  - 11/4/06 - Visual Complete.
CHARGEPUMP DIS TO      El.12 RC PUMP TYPEI DETAIL3 ISO#
 
DATE: 03/06/2007                                  IWE Program-All Plants [IWE] -- Unit 4                                          Page 9 REVISION: 0                                      Inservice Inspection Results Summary Interval 1, Period 3, Outage 1 (06)
Completed Components (C, R, B, P, A, E)
METALMC CONTAINMENT LINER Zone # 4-001 N I    0 ASME  Status                                    0 N  G  T Sec XI                                          R S  E  H Summary      Examination Area        Categ                                            E  I 0  E Number      Identification / ISO #  Item No    Method        Data Sheet Number      C G  M  R                  Remarks 410700    PENETRATION #25          E-A      C VT-3          4.7-020                  X          11/4/06 - Visual Complete.
COOLANT PUMP DIS        E1.12 TO RC PUMP TYPEI DETAIL ISO#
410710    PENETRATION #31          E-A      C VT-3          4.7-020                  X          11/4/06 - Visual Complete.
RC DRAIN TK H2 ANAL El.12 TYPEIV DETAIL9 ISO#
410720    PENETRATION #32          E-A      C VT-3          4.7-020                  X  -  - -  11/4/06 - Visual Complete.
CONTAIRSAMPLEIN          El.12 TYPEI DETAIL3 ISO#
410730    PENETRATION #33          E-A      C VT-3          4.7-030                  X        " 11/8/06 - Visual Complete.
CONT AIR SAMPLE          E1.12 OUT TYPEI DETAIL3 ISO#
410740    PENETRATION #33 (BOI E-G          C VT-i          4.7-030                  X -  -  -  11/8/06 - VT-I Visual Complete.
BOLTING                  ES.10 (PENETRATION 33 TYPEI DETAIL3)
ISO#
410750    PENETRATION #37          E-A      C VT-3          4.7-020                X            11/4/06 - Visual Complete.
PLUGGED                  E1.12 W/CONCRETE TYPEVI DETAIL13 ISO#
410760    PENETRATION #43          E-A      C VT-3          4.7-020                X            11/4/06 - Visual Complete.
R/CPUMPCWOUTLET E£.12 TYPEI DETAIL3 ISO#
410770    PENETRATION #44 (3)      E-A      C VT-3          4.7-020                X            11/4/06 - Visual Complete.
CWTOEMERGCONT            E1.12 COOLERS TYPEI DETAIL3 ISO#
410780    PENETRATION #45 (3) E-A          C VT-3          4.7-020                X            11/4/06 - Visual Complete.
CW FROM EMERG            E£.12 CONT COOLERS TYPEI DETAIL3 ISO#
 
DATE: 03/06/2007                                    IWE Program-All Plants [IWE] -- Unit 4                                      Page 10 REVISION: 0                                        Inservice Inspection Results Summary Interval 1, Period 3, Outage 1 (06)
Completed Components (C, R, B, P, A, E)
METALUC CONTAINMENT LINER Zone # 4-001 N  I      0 ASME Status                                      0  N  G  T Sec XI                                            R  S  E  H Summary      Examination Area        Categ                                              E  I 0  E Number      Identification I ISO #  Item No    Method        Data Sheet Number      C  G  M  R                  Remarks 410790    PENETRATION #51            E-A      C VT-3          4.7-020                  X            11/4/06 - Visual Complete.
SPARE TYPEI DETAIL3 El.12 ISO#
410800    PENETRATION #52            E-A      C VT-3          4.7-020                  X    -  -  - 11/4/06 - Visual Complete.
R/C DRAIN TANK            El.12 DISCH. TYPEI DETAIL3 ISO#
410810    PENETRATION #64B        (:E-A      C VT-3          4.7-020                  X            11/4/06 - Visual Complete.
S/G SAMPLE TYPEV          E1.12 ISO#
410811    PENETRATION #66A        (E-A      .C VT-3          4.7-020                  X  -  -  -  11/4/06 - Visual Complete.
SPARE                      EI.12 ISO#
410815    PENETRATION #64C          E-A      C VT-3          4.7-020                  X            11/4/06 - Visual Complete.
S/G SAMPLE TYPE V          El.12 ISO#
410816    PENETRATION #66B          E-A      C VT-3          4.7-020                  X  -  -  - 11/4/06 - Visual Complete.
SPARE                      E1.12 ISO#
410820    PENETRATION #55            E-A      C VT-3          4.7-020                X    -  -  -  11/4/06 - Visual Complete.
ACCUM. SAMPLE LINE        El.12 TYPEIV DETAIL9 ISO#
410830    PENETRATION #56            E-A      C VT-3          4.7-020                X            11/4/06 - Visual Complete.
SPARE TYPEI                E1.12 DETAIL3 ISO#
410850    PENETRATION #59            E-A      C VT-3          4.7-020                X    -  -  -  11/4/06 - Visual Complete.
HIGH HEAD INJ. TO          E1.12 LOOP B TYPEI DETAIL3 ISO#
 
DATE: 03/06/2007                                  IWE Program-AJI Plants [RWE] -- Unit 4                                          Page 11 REVISION: 0                                      Inservice Inspection Results Summary Interval 1, Period 3, Outage 1 (06)
Completed Components (C, R, B, P, A, E)
METALUC CONTAINMENT LINER Zone # 4-001 N I    0 ASME  Status                                    0 N  G T SecXI                                            R S  E H Summary        Examination Area      Categ                                            E  I 0 E Number      Identification /ISO # Item No    Method        Data Sheet Number        C G  M R                  Remarks 410860    PENETRATION #60        E-A    C VT-3          4.7-020                  X  - -    11/4/06 - Visual Complete.
HIGH HEAD 1NJ. TO      EI.12 LOOP C TYPEI DETAIL3 ISO3#
410870    PENETRATION #61B        E-A    C VT-3          4.7-020                  X  - -  - 11/4/06 - Visual Complete.
PZR DEAD WEIGHT        El.12 TESTER TYPEVI DETAIL13 ISO#
410880    PENETRATION #61A        E-A    C VT-3          4.7-020                  X  - -  - 11/4/06 - Visual Complete. Accessible SPARE TYPE I            EI.12                                                        area only DETAIL3 ISO#
410890    PENETRATION #63        E-A    C VT-3          4.7-020                  X  - -  - 11/4/06 - Visual Complete.
INSTR. AIR BLEED        El.12 TYPEI DETAIL3 ISO#
410900    PENETRATION #64 A      E-A    C VT-3          4.7-020                  X  - - -  11/4/06 - Visual Complete.
S/G SAMPLE TYPEI        E1.12 DETAIL3 ISO#
410910    LINER PLATE @ AZIMU E-C        C VT-1          4.7-020                  X          11/4/06 - VT-I Visual Complete.
VISIBLE SURFACES        E4.11 ISO#
410930    MOISTURE BARRIER        E-D    A VT-3          4.7-031                  X  - -  - 11/8/06 - Visual Complete.
LINER PLATE TO          E5.30    VT-3          4.7-037                  X          11/15/06 - Visual Complete Post Coating FLOOR (MOISTURE                                                                      Inspection of Leak Chase Channel BARRIER)
ISO#
 
DATE: 03/06/2007                              IWE Program-All Plants ((WE] -- Unit 4                                            Page 12 REVISION: 0                                  Inservice Inspection Results Summary Interval 1, Period 3, Outage 1 (06)
Completed Components (C, R, B, P, A, E)
METALUC CONTAINMENT LINER Zone # 4-002 N  I    0 ASME Status                                      0  N  G T Sec XI                                          R  S  E H Summary      Examination Area    Categ                                            E  I 0 E Number      Identification /ISO# Item No    Method      Data Sheet Number        C  G  M R                  Remarks 410940    CONTAINMENT LINER E-A        C GEN.          4.7-008                X    -  -  - 11/2/06 - General Visual Complete LINER                  ElI.
PLATE-GENERAL VISUAL ISO#
410950    PENETRATION 39        E-A    C GEN.          4.7-009                X    -  -  - 11/2/06 - General Visual Complete FUEL TRANSFER        El 11                                                        (Accessible Flange Only)
TUBE-GENERAL VISUAL (inaccessible)
ISO#
410970    CONTAINMENT LINER E-A        C VT-3          4.7-008                X    -  - -  11/2/06 - Visual Complete LINER PLATE VISUAL El.11 ISO#
410980    PENETRATION 39        E-A    C VT-3          4.7-009                X    -  - -  11/2/06 - Visual Complete (Accessible FUEL TRANSFER TUBE    El 11                                                        Flange Only)
          - VISUAL ISO#
410990    PENETRATION 39 BOLl E-G        C VT-I          4.7-021                X    -  - -  11/7/06 - Visual (VT-1) Complete BOLTING (FUEL          E8. 10 TRANSFER TUBE)
ISO#
411020    MOISTURE BARRIER      E-D    C VT-3          4.7-005                X    -  - -  10/31/06 - Visual Complete LINER PLATE TO        E5.30 FLOOR (MOISTURE BARRIER)
ISO#
 
DATE: 03/06/2007                                IWE Program-AJI Plants ((WE] -- Unit 4                                            Page 13 REVISION: 0                                    Inservice Inspection Results Summary Interval 1, Period 3, Outage 1 (06)
Completed Components (C, R, B, P, A, E)
METALIJC CONTAINMENT LINER Zone # 4-003 N  I    0 ASME Status                                    0  N  G T Sec XI                                          R  S  E H Summary      Examination Area      Categ                                            E  I 0 E Number      Identification/ ISO # Item No    Method      Data Sheet Number        C  G  M R                  Remarks 411030    LINER PLATE            E-A    C GEN.          4.7-010                  X        11/2/06 - General Visual Complete LINER PLATE            El.11 (GENERAL VISUAL)
ISO#
411040    PENETRATION 40          E-A    C GEN.          4.7-032                  X  - - - 11/9/06 - General Visual Complete.
EQUIPMENT HATCH        E1.11 (GENERAL VISUAL) lSO#
411050    LINER PLATE            E-A    C VT-3          4.7-010                  X        11"/2/06 - Visual Complete LINER PLATE (VISUAL) El.12 ISO#
411060    PENETRATION 40          E-A    C VT-3          4.7-032                  X  -  - - 11/9/06 - Visual Complete.
EQUIPMENT HATCH        E1.12 (VISUAL)
ISO#
411070    PENETRATION 40 BOLI E-G        P VT-1          4.7-034                  - -  - X 11/14/06 - VT-i Visual Complete. 19 BOLTING                E8. 10    VT-1          4.7-038                  X  - - - failed bolts, 7 failed washers and 2 failed (PENETRATION 40                                                                    nuts. CR2006-33269 initiated.
EQUIPMENT HATCH)                                                                    11/20/06 - VT-I Visual Complete. 19 new ISO#                                                                                    bolts, 7 new washers and 2 new nuts per CR2006-33269 411110    MOISTURE BARRIER        E-D    C VT-3          4.7-006                  X        10/31/06 - Visual Complete LINER PLATE TO          E5.30 FLOOR (MOISTURE BARRIER)
ISO#
 
DATE: 03/06/2007                                IWE Program-All Plants ((WE] -- Unit 4                                          Page 14 REVISION: 0                                    Inservice Inspection Results Summary Interval 1, Period 3, Outage 1 (06)
Completed Components (C, R, B, P, A, E)
METALUC CONTAINMENT LINER Zone # 4-004 N  I    0 ASME Status                                      0  N  G  T Sec XI                                          R  S  E  H Summary      Examination Area      Categ                                            E  I O  E Number      Identification / ISO # Item No    Method        Data Sheet Number      C  G  M  R                  Remarks 411120    LINER PLATE              E-A    C GEN.          4.7-007A                X          11/2/06 - General Visual Complete.
LINER PLATE              E.l1l (GENERAL VISUAL)
ISO#
411130    PENETRATION 28 (3)      E-A    C GEN.          4.7-007A                          X 11/2/06 - General Visual Complete.
S/G BLOWDOWN            El.11    GEN.          4.7-007B                X  -  - - CR2006-31781 initiated for rust and SPECIAL DETAIL 15                                                                    coatings failure.
11/15/06- General Visual (Post Coating) 411140    PENETRATION 29          E-A    C GEN.          4.7-007A                X  -  - - 11/2/06 - General Visual Complete.
INSTRUMENT AIR          El.11 TYPE I DETAIL3 ISO#
                                                                                            --  11/2/06  - General Visual Complete.
411160    PENETRATION 30          E-A    C GEN.          4.7-007A                X  -
SPARE TYPE I            El.I DETAIL3 ISO#
11/2/06 - General Visual Complete.
411180    PENETRATION 65 A        E-A    C GEN.          4.7-007A                X  -
CONT.                    El.1 ITEGRETY&LEAK RATE TYPE I DETAIL3 ISO#
411185    PENETRATION 65 B        E-A    C GEN.          4.7-007A                X  -  - - 11/2/06 - General Visual Complete.
CONT.                    E.l1l ITEGRETY&LEAK RATE TYPE I DETAIL3 ISO#
411186    PENETRATION 65 C        E-A    C GEN.          4.7-007A                X  -    - 11/2/06 - General Visual Complete.
CONT.                    El.11 ITEGRETY&LEAK RATE TYPE I DETAIL3 ISO#
411190    LINER PLATE              E-A    C VT-3          4.7-007A                X  -  - - 11/2/06 - Visual Complete.
LINER PLATE (VISUAL) El. 12 ISO#
411200    PENETRATION 28 (3)      E-A    C VT-3          4.7-007A                  - -  - X 11/2/06 - Visual Complete.
S/G BLOWDOWN            E1.12    VT-3          4.7-00713                X  -  - - CR2006-31781 initiated for rust and SPECIAL DETAIL15                                                                      coatings failure.
11/15/06 - Visual Complete. Post ISO#                                                                                      Coating.
 
DATE: 03/06/2007                                IWE Program-AJI Plants ((WE] -- Unit 4                                        Page 15 REVISION: 0                                    Inservice Inspection Results Summary Interval 1, Period 3, Outage 1 (06)
Completed Components (C, R, B, P, A, E)
METALUC CONTAINMENT LINER Zone # 4-004 N I    0 ASME  Status                                  0  N  G T Sec XI                                          R S  E H Summary      Examination Area      Categ                                            E  I 0 E Number      Identification IISO # Item No    Method        Data Sheet Number      C  G  M R                Remarks 411210    PENETRATION 29          E-A    C VT-3          4.7-007A                X  - - - 11/2/06 - Visual Complete.
INSTRUMENT AIR          El.12 TYPE I DETAIL3 ISO#
411220    PENETRATION 30          E-A    C VT-3          4.7-007A                X  - - - 11/2/06 - Visual Complete.
SPARE TYPE I            El.12 DETAIL3 ISO#
411230    PENETRATION 65 A        E-A    C VT-3          4.7-007A                X  - - - 11/2/06 - Visual Complete.
CONT.                  El.12 ITEGRETY&LEAK RATE TYPE I DETAIL3 ISO#
411235    PENETRATION 65 B        E-A    C VT-3          4.7-007A                X  - - - 11/2/06 - Visual Complete.
CONT.                  E1.12 ITEGRETY&LEAK RATE TYPE I DETAIL3 ISO#
411236    PENETRATION 65 C        E-A    C VT-3          4.7-007A                X        11/2/06 - Visual Complete.
CONT.                  El.12 ITEGRETY&LEAK RATE TYPE I DETAIL3 ISO#
411240    PENETRATION 65 A BO*E-G        C VT-1          4.7-007A                X  - - - 11/2/06 - Visual (VT-1) Complete.
BOLTING                E8. 10 (PENETRATION 65 A TYPE I)
ISO#
411300    MOISTURE BARRIER        E-D    A VT-3          4.7-004                X        10/31/06 - Visual Complete LINER PLATE TO          E5.30 FLOOR (MOISTURE BARRIER)
ISO#
 
DATE: 03/06/2007                              [WE Program-All Plants [IWE] -- Unit 4                                          Page 16 REVISION: 0                                  Inservice Inspection Results Summary Interval 1, Period 3, Outage 1 (06)
Completed Components (C, R, B, P, A, E)
METALUC CONTAINMENT LINER Zone # 4-005 N  1  0 ASME Status                                      0  N G T SecXl                                            R  S E H Summary      Examination Area    Categ                                            E  I 0 E Number      Identification /ISO# Item No    Method        Data Sheet Number      C  G M R                  Remarks 411310    LINER PLATE            E-A    C GEN.          4.7-012A                X          11/2/06 - General Visual Complete LINER PLATE            El.11 (GENERAL VISUAL)
ISO#
411320    PENETRATION 38B (28) E-A      C GEN.          4.7-012A                  - - - X ,11/2/06 -General Visual Complete.
ELECTRICAL            El 11    GEN.          4.7-012B                X          CR2006-31908 initiated for coatings PENETRATIONS                                                                        failure and corrosion at Pen T4P37.
TYPEIII                                                                            11/15/06 - General Visual Complete. Post ISO                                                                                      Coating.
411330    PENETRATION 41        E-A    C GEN.          4.7-012A                X          11/2/06 - General Visual Complete PERSONNEL AIRLOCK      E1.11 SPECIAL ISO#
411340    LINER PLATE            E-A    C VT-3          4.7-012A                X          11/2/06.- Visual Complete.
LINER PLATE (VISUAL) El. 12 ISO#
411350    PENETRATION 38B (28) E-A      C VT-3          4.7-012A                        X  11/2/06 - Visual Complete.
ELECTRICAL            EI.12    VT-3          4.7-012B                X  - - -  CR2006-31908 initiated for coatings PENETRATIONS                                                                        failure and corrosion at Pen T4P37.
TYPEIII                                                                            11/15/06 - Visual Complete. Post ISO#                                                                                    Coating.
411360    PENETRATION 41        E-A    C VT-3          4.7-012A                X          11/2/06 - Visual Complete.
PERSONNEL AIRLOCK      E1.12 SPECIAL ISO#
411380    PENETRATION 41        E-D    C VT-3          4.7-013                        X  11/3/06 - Visual Complete.
PERSONNEL AIRLOCK      E5.10                                                        CR2006-31913 initiated for gouge impact SEALS SPECIAL                                                                      damage to hatch door ISO#
411390    PENETRATION 41        E-D    C VT-3          4.7-013,                        X  11/3/06 - Visual Complete.
PERSONNEL AIRLOCK      E5.20                                                        CR2006-31913 initiated for gouge impact GASKETS SPECIAL                                                                    damage to hatch door ISO#
411440    MOISTURE BARRIER      E-D    A VT-3          4.7-003                  X  - - -  10/31/06 - Visual Complete LINER PLATE TO        E5.30 FLOOR (MOISTURE BARRIER)
ISO#
 
DATE: 03/06/2007                                  IWE Program-All Plants [IWE] - Unit 4                                            Page 17 REVISION: 0                                      Inservice Inspection Results Summary Interval 1, Period 3, Outage 1 (06)
Completed Components (C, R, B, P, A, E)
METALUC CONTAINMENT LINER Zone # 4-006 N  I      0 ASME Status                                    0  N  G  T Sec XI                                          R  S  E  H Summary        Examination Area      Categ                                            E  I 0  E Number      Identification I ISO # Item No    Method        Data Sheet Number      C  G  M  R                Remarks 411450    LINERPLATE              E-A    C GEN.          4.7-011                  X    -  - - 11/2/06 - General Visual Complete LINER PLATE              E1.ll (GENERAL VISUAL)
ISO#
411460    PENETRATION 38A (28)E-A          C GEN.          4.7-011                  X        - 11/2/06 - General Visual Complete ELECTRICAL              El.11
          ,PENETRATIONS TYPEIII ISO#
411470    PENETRATION 48B (2)      E-A    C GEN.          4.7-011                  X          11/2/06 - General Visual Complete ELECTRICAL PEN. (RC      El.11 PUMP) TYPEIII ISO#
411475    PENETRATION 48C (2)      E-A    C GEN.          4.7-011                  X    -  - - 11/2/06 - General Visual Complete ELECTRICAL PEN. (RC      El.11 PUMP) TYPEIII ISO#
411480    PENETRATION 46 (3)      E-A    C GEN.          4.7-011                  X    -  - - 11/2/06 - General Visual Complete CONT. PRESSURE          El 11 INSTR. TYPEI DETAIL3 ISO#
411490    PENETRATION 36          E-A    C GEN.          4.7-011                  X    -  - - 11/2/06 - General Visual Complete CONTAINMENT PURGE El. 11 SPECIAL DETAIL2 ISO#
411500    LINER PLATE              E-A    C VT-3          4.7-011                  X    -  - - 11/2/06 - Visual Complete LINER PLATE(VISUAL)      El.12 ISO#
411510    PENETRATION 38A (28)E-A          C VT-3          4.7-011                X    -  -  - 11/2/06 - Visual Complete ELECTRICAL              E1.12 PENETRATIONS TYPEIII ISO#
411520    PENETRATION 48B (2)      E-A    C VT-3          4.7-011                  X  -  -  - 11/2/06 - Visual Complete ELECTRICAL PEN. (RC      El.12 PUMP) TYPEIII ISO#
 
DATE: 03/06/2007                                IWE Program-All Plants ((WE] - Unit 4                                        Page 18 REVISION: 0                                    Inservice Inspection Results Summary Interval 1, Period 3, Outage 1 (06)
Completed Components (C, R, B, P, A, E)
METALUC CONTAINMENT LINER Zone # 4-006 N I    0 ASME Status                                    0  N  G T Sec XI                                          R  S  E H Summary      Examination Area      Categ                                            E  I 0 E Number      Identification IISO # Item No    Method      Data Sheet Number      C  G  M R                Remarks 411525    PENETRATION 48C (2)    E-A    C VT-3          4.7-011                X  - - - 11/2/06 - Visual Complete ELECTRICAL PEN. (RC    El.12 PUMP) TYPEIII ISO#
411530    PENETRATION 36          E-A    C VT-3          4.7-011                X  - - - 11/2/06 - Visual Complete CONTAINMENT PURGE El. 12 SPECIAL DETAIL2 ISO#
411540    PENETRATION 46 (3)      E-A    C VT-3          4.7-011                X  - - - 11/2/06 - Visual Complete CONT. PRESSURE          E1.12 INSTR. TYPEI DETAIL3 ISO#
411550    PENETRATION 36 (BOL' E-G        C VT-i          4.7-033                X  - - - 11/10/06 - VT-I Visual Complete.
BOLTING                E8.10 (PENETRATION 36)
SPECIAL DETAIL2 ISO#
411580    MOISTURE BARRIER        E-D    A VT-3          4.7-002                X  - - - 10/31/06 - Visual Complete LINER PLATE TO          E5.30    VT-3          4.7-036                X  - - - 11/15/06 - Visual Complete Post Coating FLOOR (MOISTURE                                                                    Inspection of Leak Chase Channel BARRIER)
ISO#
 
DATE: 03/06/2007                                [WE Programn-All Plants ((WE] -- Unit 4                                        Page 19 REVISION: 0                                    Inservice Inspection Results Summary Interval 1, Period 3, Outage 1 (06)
Completed Components (C, R, B, P, A, E)
METALUC CONTAINMENT LINER Zone # 4-007 N I    0 ASME  Status                                    O  N  G T Sec XI                                            R S  E H Summary      Examination Area      Categ                                            E  I 0 E Number      Identification/ ISO # Item No    Method        Data Sheet Number      C  G  M R                Remarks 411590    LINER PLATE            E-A    C GEN.          4.7-019                  X  - - - 11/3/06 - General Visual Complete.
LINER PLATE            El.11 (GENERAL VISUAL)
ISO#
411600    LINER PLATE            E-A    C VT-3          4.7-019                  X        11/3/06 - Visual Complete.
LINER PLATE(            El.12 VISUAL)
ISO#
 
DATE: 03/06/2007                                IWE Program-All Plants ((WE] - Unit 4                                            Page 20 REVISION: 0                                    Inservice Inspection Results Summary
                                                . Interval 1, Period 3, Outage 1 (06)
Completed Components (C, R, B, P, A, E)
METALUC CONTAINMENT UNER Zone # 4-008 N  I      0 ASME  Status                                    0  N    G T Sec XI                                            R  S    E H Summary      Examination Area      Categ                                              E  I  0 E Number      Identification /ISO # Item No    Method        Data Sheet Number        C  G    M R                Remarks 411630    LINER PLATE            E-A    C GEN.            4.7-018                  X  -  - - 11/3/06 - General Visual Complete.
LINER PLATE            El.11 (GENERAL VISUAL)
ISO#
411640    PENETRATION 49          E-A    C GEN.            4.7-029                  X  -  - - 11/7/06 - General Visual Complete.
EMERGENCY ESCAPE        E 1.11 HATCH SPECIAL DETAIL3 ISO#
411650    LINER PLATE            E-A    C VT-3            4.7-018                  X    -    11/3/06 - Visual Complete.
LINER PLATE (VISUAL) El. 12 ISO#
411660    PENETRATION 49          E-A    C VT-3            4.7-029                  X  -  - - 11/7/06 - Visual Complete.
EMERGENCY ESCAPE        E1.12 HATCH SPECIAL DETAIL3 ISO#
 
DATE: 03/06/2007                              IWE Program-AJl Plants ((WE] -- Unit 4                                          Page 21 REVISION: 0                                  Inservice Inspection Results Summary Interval 1, Period 3, Outage 1 (06)
Completed Components (C, R, B, P, A, E)
METALLUC CONTAINMENT LINER Zone # 4-009 N  I    0 ASME Status                                    0  N  G T Sec XI                                          R  S  E H Summary      Examination Area    Categ                                            E  I 0 E Number      Identification /ISO# Item No    Method        Data Sheet Number        C  G  M R                Remarks 411720    LINER PLATE            E-A    C GEN.          4.7-017                  X          11/3/06 - General Visual Complete.
LINER PLATE            El. 11 (GENERAL VISUAL)
ISO#
411730    LINER PLATE            E-A    C VT-3          4.7-017                  X  -  - - 11/3/06 - Visual Complete.
LINER PLATE (VISUAL) E1.12 ISO#
 
DATE: 03/06/2007                                WE Programn-AJI Plants ((WE] -- Unit 4                                          Page 22 REVISION: 0                                    Inservice Inspection Results Summary Interval 1, Period 3, Outage 1 (06)
Completed Components (C, R, B, P, A, E)
METALMC CONTAINMENT LINER Zone# 4-010 N  I    0 ASME Status                                      0  N  G T Sec XI                                          R  S  E H Summary      Examination Area      Categ                                            E  I 0 E Number      Identification. lSO # Item No    Method        Data Sheet Number      C  G  M R                Remarks 411760    LINER PLATE            E-A    C GEN.          4.7-016                  X  -  - - 11/3/06 - General Visual Complete.
LINER PLATE            El.11 (GENERAL VISUAL)
ISO#
411770    PENETRATION 27 (3)      E-A    C GEN.          4.7-016                  X  -  - - 11/3/06 - General Visual Complete.
FEEDWATER SPECIAL      El.11 DETAIL4 ISO#
411775    PENETRATION 26 A        E-A    C GEN.          4.7-016                  X  -  - - 11/3/06 - General Visual Complete.
MAIN STEAM SPECIAL      EI.ll DETAIL4 ISO#
411780    LINER PLATE            E-A    C VT-3          4.7-016                  X  -  - - 11/3/06 - Visual Complete.
LINER PLATE (VISUAL) El. 12 ISO#
411790    PENETRATION 27 (3)      E-A    C VT-3          4.7-016                  X  -  - - 11/3/06 - Visual Complete.
FEEDWATER SPECIAL      El.12 DETAIL4 ISO#
411795    PENETRATION 26 A        E-A    C VT-3          4.7-016                  X  -  - - 11/3/06 - Visual Complete.
MAIN STEAM SPECIAL      El.12 DETAIL4 ISO#
 
DATE: 03/06/2007                              IWE Program-All Plants [IWE] -- Unit 4                                            Page 23 REVISION: 0                                  Inservice Inspection Results Summary Interval 1, Period 3, Outage 1 (06)
Completed Components (C, R, B, P, A, E)
METALUC CONTAINMENT LINER Zone # 4-011 N    I  0 ASME Status                                      0 N    G T Sec XI                                          R S    E H Summary      Examination Area    Categ                                            E l    0 E Number      Identification ISO # Item No    Method        Data Sheet Number      C G    M R                  Remarks 411820    LINER PLATE            E-A    C GEN.          4.7-015                X            11/3/06 - General Visual Complete.
LINER PLATE            El.11 (GENERAL VISUAL)
ISO#
411830    PENETRATION 48A (4) E-A        C GEN.          4.7-015                X    -  -  - 11/3/06 - General Visual Complete, R/C PUMP POWER        El.11 TYPEIII DETAIL ISO#
411840    PENETRATION 26 B      E-A    C GEN.          4.7-015                X    -  -  - 11/3/06 - General Visual Complete.
MAIN STEAM SPECIAL    El.11 DETAIL4 ISO#
411845    PENETRATION 26 C      E-A    C GEN.          4.7-015                  X    -  -  - 11/3/06 - General Visual Complete.
MAIN STEAM SPECIAL    E.l1l DETAIL4 ISO#
411850    LINER PLATE            E-A    C VT-3          4.7-015                x          - 11/3/06 - Visual Complete.
LINER PLATE            El.12 (GENERAL VISUAL)
ISO#
411860    PENETRATION 48A (4) E-A        C VT-3          4.7-015                X          - 11/3/06 - Visual Complete.
RC PUMP POWER          E1.12 TYPEIII ISO#L 411870    PENETRATION 26 B      E-A    C VT-3          4.7-015                X            11/3/06 - Visual Complete.
MAIN STEAM SPECIAL    El.12 DETAIL4 ISO#
411875    PENETRATION 26 C      E-A    C VT-3          4.7-015                X    -  - -  11/3/06 - Visual Complete.
MAIN STEAM SPECIAL    El.12 DETAIL4 ISO#
 
DATE: 03/06/2007                              IWE Program-All Plants ((WE] -- Unit 4                                        Page 24 REVISION: 0                                    Inservice Inspection Results Summary Interval 1, Period 3, Outage 1 (06)
Completed Components (C, R, B, P, A, E)
METALUC CONTAINMENT LINER Zone # 4-012 N I    0 ASME  Status                                  0  N  G T Sec XI                                          R S  E H Summary      Examination Area    Categ                                            E  I 0 E Number      Identification /ISO# Item No    Method      Data Sheet Number      C  G  M R                Remarks 411900    LINER PLATE            E-A    C GEN.          4.7-014                X  - - - 11/3/06 - General Visual Complete.
LINER PLATE            El.11 (GENERAL VISUAL)
ISC#
411910    LINER PLATE            E-A    C VT-3          4.7-014                X  - - - 11/3/06 - Visual Complete.
LINER PLATE            El.12 VISUAL)
ISOI
 
DATE: 03/06/2007                                IWE Program-All Plants [IWE] - Unit 4                                          Page 25 REVISION: 0                                    Inservice Inspection Results Summary Interval 1, Period 3, Outage 1 (06)
Completed Components (C, R, B, P, A, E)
METALLIC CONTAINMENT LINER Zone # 4-013 N  I    0 ASME  Status                                  O  N  G T Sec XI                                          R  S  E H Summary      Examination Area      Categ                                            E  I 0 E Number      Identification /ISO # Item No    Method      Data Sheet Number      C  G  M R                Remarks 411940    LINER PLATE            E-A    C GEN.          4.7-022                X  -  - - 11/6/06 - General Visual Complete.
LINER PLATE            El.11 (GENERAL VISUAL)
ISO#
411950    LINER PLATE            E-A    C VT-3          4.7-022                X  -  - - 11/6/06 - Visual Complete.
LINER PLATE(VISUAL) E1.12 ISO#
 
DAME: 03/0612007                                IWE Program-AJl Plants ((WE] - Unit 4                                          Page 26 REVISION: 0                                    Inservice Inspection Results Summary Interval 1, Period 3, Outage 1 (06)
Completed Components (C, R, B, P, A, E)
METALUC CONTAINMENT LINER Zone # 4-014 N I      0 ASME Status                                      0 N    G T Sec XA                                          R S    E H Summary      Examination Area      Categ                                            E l  0 E Number      Identification/ ISO # Item No    Method        Data Sheet Number        C G    M R                Remarks 411980    LINER PLATE            E-A    C GEN.          4.7-023                  X    - - - 11/6/06 - General Visual Complete.
LINER PLATE            El.11 (GENERAL VISUAL)
ISO#
411990    LINER PLATE            E-A    C VT-3          4.7-023                  X    - - - 11/6/06 - Visual Complete.
LINER PLATE            El.12 (GENERAL VISUAL)
ISO#
 
DATE: 03/06/2007                              IWE Program-All Plants ((WE] - Unit 4                                          Page 27 REVISION: 0                                  Inservice Inspection Results Summary Interval 1, Period 3, Outage 1 (06)
Completed Components (C, R, B, P, A, E)
METALUC CONTAINMENT LINER Zone# 4-015 N  I    0 ASME Status                                    0  N  G T Sec XI                                          R  S  E H Summary      Examination Area    Categ                                            E  I 0 E Number      Identification /ISO# Item No    Method        Data Sheet Number      C  G  M R                Remarks 412020    LINER PLATE            E-A    C GEN.          4.7-024                  X  -  - - 11/6/06 - General Visual Complete.
LINER PLATE            El.11 (GENERAL VISUAL)
ISO#
412030    LINER PLATE            E-A    C VT-3          4.7-024                  X    - - - 11/6/06 - Visual Complete.
LINER PLATE (VISUAL) El.12 ISO#
 
DATE: 03/06/2007                                IWE Program-AJI Plants ((WE] -- Unit 4                                        Page 28 REVISION: 0                                    Inservice Inspection Results Summary Interval 1, Period 3, Outage 1 (06)
Completed Components (C, R, B, P, A, E)
METALUC CONTAINMENT LINER Zone # 4-016 NI    0 ASME Status                                      0 N  G T Sec XI                                          R S  E H Summary      Examination Area      Categ                                            E I 0 E Number      Identification/ ISO # Item No    Method        Data Sheet Number      C G  M R                Remarks 412060    LINER PLATE            E-A    C GEN.          4.7-025                X        11/6/06 - General Visual Complete.
LINER PLATE            El.11 (GENERAL VISUAL)
ISO#
412070    LINER PLATE            E-A    C VT-3          4.7-025                  X        11/6/06 - Visual Complete.
LINER PLATE (VISUAL) E1.12 ISO#
 
DATE: 03/06/2007                              IWE Program-All Plants ((WE] - Unit 4                                          Page 29 REVISION: 0                                  Inservice Inspection Results Summary Interval 1, Period 3, Outage 1 (06)
Completed Components (C, R, B, P, A, E)
METALMC CONTAINMENT LINER Zone # 4-017 N I    0 ASME Status                                      0  N  G T Sec XI                                          R  S  E H Summary      Examination Area    Categ                                            E  I 0 E Number      Identification /ISO# Item No    Method      Data Sheet Number        C G  M R                Remarks 412100    LINER PLATE            E-A    C GEN.          4.7-026                  X  - - - 11/6/06 - General Visual Complete.
LINER PLATE            El.11 (GENERAL VISUAL)
IScO 412110    LINER PLATE            E-A    C VT-3          4.7-026                  X        11/6/06 - Visual Complete.
LINER PLATE(          E1.12 VISUAL)
ISO#
 
DATE: 03/0612007                                IWE Program-AJI Plants ((WE] -- Unit 4                                          Page 30 REVISION: 0                                    Inservice Inspection Results Summary Interval 1, Period 3, Outage 1 (06)
Completed Components (C, R, B, P, A, E)
METALMC CONTAINMENT LINER Zone # 4-018 N  I    0 ASME Status                                      0  N  G T Sec XI                                          R  S  E H Summary      Examination Area      Categ                                            E  I 0 E Number      Identification / ISO # Item No    Method        Data Sheet Number        C  G  M R                Remarks 412140    LINER PLATE              E-A    C GEN.          4.7-027                  X          11/6/06 - General Visual Complete.
LINER PLATE              El.11 (GENERAL VISUAL)
ISO#
412150    PENETRATION 35          E-A    C GEN.          4.7-027                  X          11/6/06 - General Visual Complete.
CONTAINMENT PURGE El.11 SPECIAL DETAIL2 ISO#
412170    LINER PLATE              E-A    C VT-3          4.7-027                  X  -  - - 11/6/06 - Visual Complete.
LINER PLATE (VISUAL El.12 ISO#
412180    PENETRATION 35          E-A    C VT-3          4.7-027                  X  -  - - 11/6/06 - Visual Complete.
CONTAINMENT PURGE El. 12 SPECIAL DETAIL2 ISO#
 
DATE: 03/06/2007                              IWE Program-All Plants [WE] -- Unit 4                                        Page 31 REVISION: 0                                    Inservice Inspection Results Summary Interval 1, Period 3, Outage 1 (06)
Completed Components (C, R, B, P, A, E)
METALUC CONTAINMENT LINER Zone# 4-019 N I    0 ASME  Status                                    0 N  G T Sec XI                                          R S  E H Summary      Examination Area    Categ                                            E  I O E Number    Identification IISO # Item No    Method      Data Sheet Number        C G  M R                Remarks 412210    LINER PLATE (DOME)    E-A    C GEN.          4.7-028                *X  - - - 11/6/06 - General Visual Complete.
DOME (GENERAL          El.11 VISUAL)
ISO#
412220    LINER PLATE(DOME)      E-A    C VT-3          4.7-028                  X  - - - 11/6/06 - Visual-Complete.
DOME (VISUAL)          E1.12 ISO#
 
DATE: 03/06/2007                                IWE Program-AJI Plants ((WE] -- Unit 4                                            Page 32 REVISION: 0                                    Inservice Inspection Results Summary Interval 1, Period 3, Outage 1 (06)
Completed Components (C, R, B, P, A, E)
METALUC CONTAINMENT LINER Zone # 4-020 N  I    0 ASME Status                                      0  N  G T Sec XI                                          R  S  E H Summary      Examination Area      Categ                                            E  I 0 E Number      Identification /ISO # Item No    Method        Data Sheet Number      C  G  M R                Remarks 412260    LINER PLATE            E-A    C GEN            4.7-035                  X          11/14/06 - General Visual Complete.
NORTH RECIRC SUMP      El 1I1 ISO# 5610-C-150 412280    LINER PLATE            E-A    C VT-3          4.7-035                  X          11/7/06 - Visual Complete.
NORTHIRECIRC SUMP      E1.12 ISO# 5610.-C-150 412290    LINER PLATE            E-A    C GEN.          4.7-001                  -  - - X 10/31/06 - General Visual Complete.
RX SUMP AREA            El.l1    GEN.          4.7-041                  X          Total coating failure. Reference CR-2005-15475.
11/29/06 - General Visual Complete.
ISO# 5610-C-150                                                                          Preservice examination completed after repair per CR 2006-34489.
412295    LINER PLATE            E-A    C VT-3          4.7-001                  X          10/31/06 - Visual Complete RX SUMP AREA            El.12 ISO# 5610-C-150 412340    LINER PLATE            E-C    C VT-i          4.7-039                  -  -  - X 11/26/06 - VT-i Complete.
RX SUMP                E4.11    VT-i          4.7-040                X          Through-wall indication was observed (AUGMENTED VT-i)                                                                    along with other pitted areas. Reference CR 2005-15475.
ISO# 5610-C-150                                                                          11/28/06 - VT-1 Complete.
412350    LINER PLATE            E-C    C VOL.          5.18-002                  -  -  - X 11/26/06 -. UT.Complete. Pit readings RX SUMP                E4.12    VOL.          5.18-003                X          taken on bottom liner plate. Surrounding (AUGMENTED VOL)                                                                      metal around through-wall hole is .262 inches. Four other pit areas noted below ISO# 5610-C-150                                                                          nominal wall. Reference CR2005-15474 11/28/06 - UT Complete. Additional UT thickness required by Engineering to complete 100 percent scan of bottom plate. All readings above .254 inches.
 
TURKEY POINT UNIT 4 2006 REFUELING OUTAGE Summary of Visual Examinations and Functional Testing of Snubbers Attachment 3
 
f MECHANICAL SHOCK ARRESTOR FINAL REPORT TURKEY POINT UNIT 4 2006 CYCLE 23 REFUELING OUTAGE P.O. # 00081442 Rel. 006 WO #36010029 01 Commercial Service Date: December 1972 Prepared by:
Inservice Inspection Group Florida Power and Light Turkey Point Nuclear 9760 S.W. 344 St.
Florida City, FL 33035
ýý C--ý Date Origineb
                                            ,i)7/07 "igfid by:-                        /date Dat7 APjP roved by:                            Date
 
Mechanical shock arrestors (snubbers) were visually inspected/handstroked and functionally tested under purchase order #00051896 by Basic-PSA personnel in accordance with the following plant procedures:
O-OSP-105.1 O-OSP-105.2 A technical specification visual inspection, ASME Section XI VT-3 and a hand stroking was performed at the following tag locations:
                                                                                      /
4-1007                4-1032      4-1033      4-1034      4-1035        4-1036 4-1037                4-1038      4-1040      4-1042      4-1043        4-1047 4-1048                4-1050      4-1058      4-1059      4-1061        4-1062 4-1063                4-1064      4-1065      4-1066      4-1067        4-1068 4-1070                4-1071      4-1072      4-1074      4-1075        4-1076 4-1077                4-1078      4-1080      4-1082      4-1083        4-1084 4-1100 A technical specification visual inspection, ASME Section XI VT-3, NO HAND STROKE, and a functional test were performed at the following tag locations:
4-1041                4-1038      4-1069      4-1073      4-1081        4-1085 4-1083 4-1005                4-1006      4-1046      4-1049 4-1039 Italics indicates SR Sample snubbers Bold indicates QR Sample snubbers Underline indicates previous rebuilds A technical specification visual inspection, ASME Section XI VT-3 and a hand stroking was performed at the following tag locations. Upon completion of the technical specification visual inspection, ASME Section XI VT-3 and the hand stroking, snubbers 4-1055 and 4-1057 were changed out with previously rebuilt and functionally tested snubbers. The removed snubbers were rebuilt and functionally tested and will be utilized as spares for future outages.
4-1044                4-1045      4-1051      4-1052      4-1053        4-1054 4-1055                4-1056      4-1057 Word:ptnsfo2/vol. 1/common/frpl198
 
The attached report details the snubber inspection/testing performed for Florida Power &
Light Company, Turkey Point Nuclear Unit 4. These test and inspections were performed during the Unit 4 Cycle 23 2006 refueling outage between the dates of October 30W and November 11, 2006.
The following Condition Reports were generated during the inspection period.
CR#                    Tag#
CR 2006-31165          4-1005 - PSA 35 Visual inspection on tag 4-1005 was SAT and the L dimension was SAT. Snubber (S/N 1206) was removed and transported to the test trailer for functional testing. Functional test 1, 2, and 3 were SAT, however test 4 did not meet the acceptance criteria. The snubber was dis-assembled and inspected showing several signs of wear and vibration. Due to the magnitude of worn parts the snubber was replaced with tested S/N 42849.
CR 2006-31569          4-1039 - PSA 35 Visual inspection on tag 4-1039 noted a worn load pin and rear bracket has elongated holes. The snubber functionally tested SAT, dis-assembled and found to have several worn parts, including, spherical bearing, torque carrier assembly, capstan, capstan spring and clutch spring. The worn parts were replaced; snubber was re-assembled and as left tested SAT.
 
TURKEY POINT NUCLEAR PLANT Unit 4 Cycle 23-2006 OUTAGE
 
==SUMMARY==
REPORT -WO 36010029 01 TAG # SERIAL # REPLACE- VISUAL S      FUNCTIONAL S    L DIMEN  S HAND-    S          INSPECTION
 
==SUMMARY==
FUNCTIONAL TEST
 
==SUMMARY==
 
MENT SIN INSPECT T        INSPECT    T          T STROKE    T DATE  A        DATE    A          A    ?      A T                ýT          T          T 4-1005 42879    N/A    11/112006 PASS 10/31/2006PASS  27.375  PASS  NO N/A    An As-left Visual Inspection was            FUNCTIONAL TEST PERFORMED?            YES SATand a Funtional Test of the New Snubber was performed. SAT. The              STATUS PASS            (NIA IF NOT PERFORMED) transition end piece was torqued to 150 ft. lbs. (Torque wrench M875, cal due                    TENSION COMPRESSION CRITERIA 4/1/07). Prior to re-Installation, spherical bearings and load pins were lubricated          TEST 1 54.3        155.9        1000.0 with neolube UTC # 449261, snubber TEST 2 74.2        155.9        1000.0 was installed. Load Studs were torqued to 125 ft. lbs. (M878, cal due 411107. CR        TEST 3 .004        .003          .02g's 2006-31165 was generated.
TEST 4 174.0        105.1        1000.0 TEST SAMPLE?        YES SAMPLE CLASS QR DATE REINSTALLED:                  11/01/06 4-1005  1206  42879  0/30/2006 PASS  10130/06 PASS  27.25  PASS  NO N/A    Visual inspection-SAT, L dimension          FUNCTIONAL TEST PERFORMED?            YES was SAT. Snubber (SIN 1206) was removed and transported to the test          STATUS    PASS        (N/A IF NOT PERFORMED) trailer for functional testing. Functional test 1, 2, and 3 were SAT, test 4 failed                  TENSION  COMPRESSION CRITERIA the acceptance criteria. The snubber was dis-assembled and inspected                  TEST 1  163.6      193.1        2500.0 showing several signs of wear and vibration. Due to the magnitude of worn          TEST 2  191.7      618.1        2500.0 parts, the snubber was removed from              TEST 3  0.003      0.019        .02g's service and discarded. It was replaced with a new Snubber SIN 42879.                    TEST 4  1689.4    9326.2        2500.0 TEST SAMPLE?        YES SAMPLE CLASSQR DATE REINSTALLED:
 
TAG # SERIAL # REPLACE- VISUAL S      FUNCTIONAL S  L DIMEN  S HAND-      S        INSPECTION
 
==SUMMARY==
FUNCTIONAL TEST
 
==SUMMARY==
 
MENT SIN INSPECT T      INSPECT    T          T STROKE    T DATE  A      DATE    A          A    ?      A T              IT T            T 4-1006 8087      N/A  0/31/2006 PASS  10/30/06 PASS  26.5  PASS  NO N/A    As-left Functional Test- SAT. Transition FUNCTIONAL TEST PERFORMED?                NO end piece torqued to 150 ft lbs. (Torque wrench M875, cal due 411/07). Priorto    STATUS    PASS        (N/A IF NOT PERFORMED) re-installation, spherical bearings and load pin were lubricated with neolube                TENSION COMPRESSION CRITERIA UTC # 449261. Snubber was re-installed. As Left Visual was performed-    TEST 1  79.0      110.2        .1000.0 SAT.                                        TEST 2  123.1      135.7          1000.0 TEST 3  .003      .002            .02g's TEST 4  120.3      142.6          1000.0 TEST SAMPLE?        N/A SAMPLE CLASS N/A DATE REINSTALLED:                    10/31/06 4-1006 8087    N/A    0/30/2006 PASS 10/30/06 PASS  26.00  PASS  NO. N/A  Visual inspection-SAT, L dimension      FUNCTIONAL TEST PERFORMED?            YES was SAT. Snubber was removed and transported to the test trailer for      STATUS    PASS        (NIA IF NOT PERFORMED) functional testing. The functional test was SAT. Snubber was dis-assembled                    TENSION COMPRESSION CRITERIA and re-greased as-left functional test-SAT. Transition end piece torqued to        TEST 1  334.0      158.6          2500.0 150 ft lbs. (Torque wrench M875, cal TEST 2  1166.6    204.1          2500.0 due 4/1107). Spherical bearings and load pin were lubricated with neolube        TEST 3  0.006      0.007          .02g's UTC #449261. Snubber was re-installed. As Left Visual was performed-    TEST 4  495.1      163.8          2500.0 SAT.
TEST SAMPLE?        YES SAMPLE CLASS OR DATE REINSTALLED:                    10/31/06
 
TAG # SERIAL # REPLACE- VISUAL S      FUNCTIONAL S  L DIMEN  S HAND-    S        INSPECTION
 
==SUMMARY==
FUNCTIONAL TEST
 
==SUMMARY==
 
MENT SIN INSPECT T      INSPECT    T          T STROKE  T DATE    A      DATE    A          A    ?    A T                T          T          T 4-1007 6521    N/A    013012006 PASS    N/A    N/A  27.25  PASS YES PASS Visual Inspection-SAT,"U' Dimension      FUNCTIONAL TEST PERFORMED?            NO Acceptable, Handstroke-SAT.Prior to re-installation, spherical bearings and load  STATUS N/A            (NIA IF NOT PERFORMED) pin were lubricated with neolube UTC #
449261.                                              TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE?        NO SAMPLE CLASS NfA DATE REINSTALl 4-1032  3707    N/A    11/7/2006 PASS    N/A    NWA 25.875  PASS YES PASS Visual Inspection-SAT,"L" Dimension      FUNCTIONAL TEST PERFORMED?            NO Acceptable, Handstroke-SAT. Prior to re-installation, spherical bearings and load  STATUS N/A            (NIA IF NOT PERFORMED) pin were lubricated with neolube UTC #
449261.                                              TENSION COMPRE SSION CRITERIA TEST I TEST 2 TEST 3 TEST 4 TEST SAMPLE?        NO SAMPLE CLASS NIA DATE REINSTALLED:
 
TAG # SERIAL # REPLACE- VISUAL S                FUNCTIONAL S          L DIMEN    S HAND-            S          INSPECTION
 
==SUMMARY==
FUNCTIONAL TEST
 
==SUMMARY==
 
MENT SIN INSPECT T            INSPECT      T                  T STROKE          T DATE A              DATE        A                  A      ?          A T                      T                  T                  T
. .. i..
      .      I.
mi..m. m *
            .........      m ma..              . -            e m..........t....am.
                                                                        .  .m. .. a
                                                                                  . a.. .  *a . . . . main m          .  .ma, I -. a..
a r. .
m am a., ...
                                                                                                                                                          .  . *........... I .m.ma. amem..... .w ...
m  ....m .... m.,s i..      - B 4-1033    7001      N/A    11/7/2006 PASS        N/A      N/A      26.375    PASS    YES PASS        Visual lnspection-SAT,"L Dimension                FUNCTIONAL TEST PERFORMED?                        NO Acceptable, Handstroke-SAT. Prior to re-installation, spherical bearings and load          STATUS N/A                  (N/A IF NOT PERFORMED) pin were lubricated with neolube UTC #
449261.                                                              TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE?              NO SAMPLE CLASS N/A DATE REINSTALLED:
4-1034  16243      N/A    11/8/2006 PASS        NIA      N/A      20.876    PASS    YES PASS        Visual Inspection-SAT,"L" Dimension              FUNCTIONAL TEST PERFORMED?                        N/A Acceptable, Handstroke-SAT. Prior to re-installation, spherical bearings and load          STATUS N/A                  (NIA IF NOT PERFORMED) pin were lubricated with neolube UTC #
449261.                                                              TENSION COMPRESSION CRITERIA TEST I TEST 2 TEST 3 TEST 4 TEST SAMPLE?              NO SAMPLE CLASS N/A DATE REINSTALLED:
 
TAG # SERIAL # REPLACE- VISUAL S      FUNCTIONAL S    L DIMEN  S HAND-    S        INSPECTION
 
==SUMMARY==
FUNCTIONAL TEST
 
==SUMMARY==
 
MENT SIN INSPECT T      INSPECT    T          T STROKE  T DATE    A      DATE      A          A    ?    A T                T          T          T 4-1035  11439  N/A    11/8/2006 PASS    NIA    N/A  20.750  PASS YES PASS Visual Inspection-SAT,"L" Dimension      FUNCTIONAL TEST PERFORMED?            NO Acceptable, Handstroke-SAT. Prior to re-installation, spherical bearings and load  STATUS NIA            (NfA IF NOT PERFORMED) pin were lubricated with neolube UTC #
449261.                                                TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE?          NO SAMPLE CLASS N/A DATE REINSTALl 4-1036 .16154  N/A    11/8/2006 PASS    N/A    N/A  19.00  PASS YES PASS Visual Inspection-SAT,""U Dimension      FUNCTIONAL TEST PERFORMED?            NO Acceptable, Handstroke-SAT. Prior to re-installation, spherical bearings and load  STATUS N/A            (NIA IF NOT PERFORMED) pin were lubricated with neolube UTC #
449261.                                                TENSION COMPRE,.SSION CRITERIA TEST I TEST 2 TEST 3 TEST 4 TEST SAMPLE?          NO SAMPLE CLASS N/A DATE REINSTALLED:
 
TAG # SERIAL# REPLACE- VISUAL S      FUNCTIONAL S  L DIMEN  S HAND-    S        INSPECTION
 
==SUMMARY==
FUNCTIONAL TEST
 
==SUMMARY==
 
MENTSIN INSPECT T        INSPECT    T          T STROKE  T DATE  A      DATE    A          A    ?    A T                T          T          T 4-1037 11930  N/A    11/8/2006 PASS    N/A    N/A  26.25  PASS YES PASS Visual Inspection-SAT,"L' Dimension      FUNCTIONAL TEST PERFORMED?            NO Acceptable, Handstroke-SAT. Prior to re-installation, spherical bearings and load  STATUS N/A            (N/A IF NOT PERFORMED) pin were lubricated with neolube UTC #
449261.                                                TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE?        NO SAMPLE CLASS N/A DATE REINSTALLED:
4-1038 29497  N/A    11/512006 PASS    N/A    N/A  9.875  PASS YES PASS Visual lnspection-SAT,"L" Dimension      FUNCTIONAL TEST PERFORMED?            NO Acceptable, Handstroke-SAT. Prior to re-installation, spherical bearings and load  STATUS N/A            (N/A IF NOT PERFORMED) pin were lubricated with neolube UTC #
449261.                                                TENSION COMPRESSION CRITERIA TEST I TEST 2 TEST 3 TEST 4 TEST SAMPLE?        NO SAMPLE CLASS N/A DATE REINSTALLED:
 
TAG # SERIAL # REPLACE- VISUAL S            FUNCTIONAL S        L DIMEN  S HAND-      S        INSPECTION
 
==SUMMARY==
FUNCTIONAL TEST
 
==SUMMARY==
 
MENT SIN INSPECT T          INSPECT      T            T STROKE      T DATE    A          DATE      A            A      ?      A T                    T              T            T
            ........................................ ........ ..N          . I  i          I .
I..=w    . m=*
                                                                                                      . ti.
                                                                                                          .  .    .    .  .  . m .    . i=  . i..
                                                                                                                                                  .          *.. fl.**
                                                                                                                                                        . we...            I 1*
                                                                                                                                                                            ...        . h= ftI
                                                                                                                                                                                  *.*I......
* I
* 4-1039 42872      N/A    0131/2006 FAIL    10/31/06 PASS    25.750  PASS    NO N/A  Visual inspection on snubber 4-1039          FUNCTIONAL TEST PERFORMED?                            YES noted a worn load pin and rear bracket has elongated holes. The snubber was          STATUS    PASS                    (N/A IF NOTPERFORMEDj removed and transferred to the test trailerfor a scheduled functional test.                    TENSION COMPRESSION CRITERIA The as- found functional test was SAT.
During dis-assembly of the snubber the          TEST 1    819.3              272.2              2500.0 following parts were noted as being              TEST 2    2035.0              1522.5            2500,0 worn: spherical bearing, torque carrier assembly, capstan, capstan spring and            TEST 3    0.006              0.001              .02g's clutch spring. CR 2006-31569 was generated. The worn parts were                  TEST 4      1520.1            1204.7            2500.0 replaced.
TEST SAMPLE?                NO SAMPLE CLASS N/A DATE REINSTALLED:                                  11/08/06 4-1039 42872      N/A    11/9/2006 PASS    11/02/06 PASS      25.5    PASS    NO N/A  Snubber was as- left functional tested      FUNCTIONAL TEST PERFORMED?                            YES after parts were replaced-SAT.The snubber was re-installed and a as-left        STATUS PASS                      (NIA IF NOT PERFORMED)
Visual performed- SAT. Load studs were torqued to 10 ft. lbs (M877 cal due date                    TENSION COMPRESSION CRITERIA 4/2/07). Prior to re-installation, spherical bearings and load pin were lubricated            TEST 1 81.2                    121.4              1000.0 with neolube UTC # 449261.The TEST 2 212.6                  158.4              1000.0 component end of the snubber was visually inspected by use of the                TEST 3 .004                    .016              .02g9s manbasket -SAT.
TEST 4 369.9                  134.8              1000.0 TEST SAMPLE?                NO SAMPLE CLASS NIA DATE REINSTALLED:                                  11/08/06
 
TAG # SERIAL # REPLACE- VISUAL S      FUNCTIONAL S    L DIMEN  S HAND-    S        INSPECTION
 
==SUMMARY==
FUNCTIONAL TEST
 
==SUMMARY==
 
MENT S/N INSPECT T      INSPECT      T          T STROKE    T DATE    A      DATE      A          A    ?      A T                  T          T          T 4.1040 17419    N/A    111112006 PASS    N/A    NIA  16.750  PASS YES PASS  Visual lnspection-SAT,"L' Dimension          FUNCTIONAL TEST PERFORMED?            NO Acceptable, Handstroke-SAT. Prior to re-installation, spherical bearings and load    STATUS N/A            (N/A IF NOT PERFORMED) pin were lubricated with neolube UTC #
449261.                                                  TENSION COMPRESSION CRITERIA TEST I TEST 2 TEST 3 TEST 4 TEST SAMPLE?        NO SAMPLE CLASSN/A DATE REINSTALLED:
4-1041 19721    NIA    11/5/2006 PASS  11/05106 PASS  17.500  PASS  NO NIA  Visual Inspection-SAT,' Dimension            FUNCTIONAL TEST PERFORMED?            Yes Acceptable, and Functional-SAT.
Extension bolts torqued to 120 in lbs.        STATUS PASS          (N/A IF NOT PERFORMED)
(torque wrench SIN M1 008, cal due date 12/9106. Prior ta re-installation, spherical              TENSION COMPRESSION CRITERIA bearings and load pin were lubricated with neolube UTC 449261. As-left visual        TEST 1 8.1          16.3          300.0 inspection-SAT.                                TEST 2    29.6      28.8          300.0 TEST 3    0.004    0.004        .02g's TEST 4    26.7      31.8          300.0 TEST SAMPLE?        YES SAMPLE CLASSSR DATE REINSTALLED:                11105/06
 
TAG # SERIAL # REPLACE- VISUAL S      FUNCTIONAL S    L DIMEN  S HAND-    S        INSPECTION
 
==SUMMARY==
FUNCTIONAL TEST
 
==SUMMARY==
 
MENT S/N INSPECT T      INSPECT    T          T STROKE  T DATE  A      DATE    A          A    ?    A T                T          T          T 4-1042 19727    NIA    11/6/2006 PASS    N/A    N/A  17.437  PASS YES PASS Visual Inspectlon-SAT,"U' Dimension      FUNCTIONAL TEST PERFORMED?              NO Acceptable, Handstroke-SAT. Prior to re-Installation, spherical bearings and load  STATUS N/A              (NIA IF NOT PERFORMED) pin were lubricated with neolube UTC #
449261.                                                TENSION COMPRESSION CRITERIA TEST1 TEST 2 TEST 3 TEST 4 TEST SAMPLE?          NO SAMPLE CLASS N/A DATE REINSTALLED:
4-1043 27099    N/A    11/6/2006 PASS    N/A    N/A  17.50  PASS YES PASS Visual Inspection-SAT,"L" Dimension      FUNCTIONAL TEST PERFORMED?              NO Acceptable, Handstroke-SAT. Prior to re-installation, spherical bearings and    STATUS    N/A          (N/A IF NOT PERFORMED) load pin were lubricated with neolube UTC # 449261.                                          TENSION COMPRESSION CRITERIA TEST I TEST 2 TEST 3 TEST 4 TEST SAMPLE?          NO SAMPLE CLASS N/A DATE REINSTALLED:
 
TAG # SERIAL # REPLACE- VISUAL S      FUNCTIONAL S    L DIMEN  S HAND-    S        INSPECTION
 
==SUMMARY==
FUNCTIONAL TEST
 
==SUMMARY==
 
MENT SIN INSPECT T        INSPECT    T          T .STROKE  T DATE A          DATE    A          A    ?    A T                T          T          T 4-1044 12377    N/A    .11/2/2006 PASS    N/A    N/A  21.625  PASS  YES PASS Visual Inspection-SAT,"L Dimension      FUNCTIONAL TEST PERFORMED?            NO Acceptable, Handstroke-SAT. Prior to re-installation, spher[cal bearings and  STATUS    N/A          (N/A IF NOT PERFORMED) load pin were lubricated with neolube UTC #449261.                                          TENSION COMPRESSION CRITERIA TESTI TEST 2 TEST3 TEST 4 TEST SAMPLE?          NO SAMPLE CLASS NIA DATE REINSTALLED:
4-1046 16245    N/A    1112/2006 PASS    N/A    N/A  21.00  PASS  YES PASS Visual Inspection-SAT,"L" Dimension    FUNCTIONAL TEST PERFORMED?            NO Acceptable, Handstroke-SAT. Prior to re-installation, spherical bearings and  STATUS    NIA          (NIA IF NOT PERFORMED) load pin were lubricated with neolube UTC # 449261.                                        TENSION COMPRESSION CRITERIA TEST I TEST 2 TEST 3 TEST 4 TEST SAMPLE?          NO SAMPLE CLASS N/A DATE REINSTALLED:
 
TAG # SERIAL # REPLACE- VISUAL S              FUNCTIONAL S              L DIMEN      S HAND-            S            INSPECTION
 
==SUMMARY==
FUNCTIONAL TEST
 
==SUMMARY==
 
MENT SIN INSPECT T            INSPECT        T                      T STROKE          T DATE A            DATE        A                      A      ?          A T                    T                      T                  T
....  ..... .. .  . . . . . *. "t... .......        . ..... .mttff....
                                                  .........                  t ...
                                                                                . . . . - f. = t - l.Itmft    fth=.....t.
                                                                                                        .. .R...                  .  .ft- ft. S. ..... ft .. .
5.. fIftftftftft .. . ft . . I . .....nT
                                                                                                                                                                          .                      t
                                                                                                                                                                                                              ...... I ft.
4-1046    187      NIA    111612006 PASS      11/06106 PASS              19.00      PASS    NO NIA            Visual Inspection-SAT,"U' Dimension                FUNCTIONAL TEST PERFORMED?                    YES Acceptable, and Functional-SAT.
Transition tube bolts torqued to 36 ft              STATUS    PASS                (NIA IF NOT PERFORMED) lbs. (torque wrench SIN M867, cal due date 3/28/07). Prior to re-installation,                          TENSION COMPRESSION CRITERIA spherical bearings and load pin were lubricated with neolube UTC 449261.                  TEST 1      33.4            27.3            750.0 As-left visual inspection-SAT.                        TEST 2      47.3            33.8            750.0 TEST 3      0.012          0.010          .02g's TEST 4      49.4            33.7            750.0 TEST SAMPLE?              YES SAMPLE CLASSQR DATE REINSTALLED:                          11/07/06 4-1047    185      N/A    111612006 PASS        N/A      N/A          19.062      PASS    YES PASS            Visual Inspection-SAT,"'L Dimension                FUNCTIONAL TEST PERFORMED?                      NO Acceptable, Handstroke-SAT. Prior to re-installation, spherical bearings and load          STATUS N/A                    (N/A IF NOT PERFORMED) pin were lubricated with neolube UTC #
449261.                                                          TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE?                NO SAMPLE CLASS N/A DATE REINSTALLED:
 
TAG#  SERIAL# REPLACE- VISUAL S      FUNCTIONAL S    L DIMEN  S HAND-    S        INSPECTION
 
==SUMMARY==
FUNCTIONAL TEST
 
==SUMMARY==
 
MENTSIN INSPECT T        INSPECT    T            T STROKE    T DATE    A      DATE    A            A    ?      A T                T            T          T 4-1048  4251  N/A    111612006 PASS    N/A    NIA  20.125  PASS  YES PASS  Visual Inspection-SAT,"L" Dimension        FUNCTIONAL TEST PERFORMED?              NO Acceptable, Handstroke-SAT. Prior to re-Installation, spherical bearings and load  STATUS N/A            (N/A IF NOT PERFORMED) pin were lubricated with neolube UTC #
449261.                                                TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE?          NO SAMPLE CLASS N/A DATE REINSTALLED:
4-1049  10169  N/A    1116/2006 PASS 11/06/06 PASS  19.50  PASS  NO N/A  Visual Inspection-SAT,.L" Dimension        FUNCTIONAL TEST PERFORMED?            YES Acceptable, and Functional-SAT.
Transition tube bolts torqued to 36 ft      STATUS    PASS        (N/A IF NOT PERFORMED) lbs. (torque wrench S/N M867, cal due date 3/28107). Prior to re-installation,                TENSION COMPRESSION CRITERIA spherical bearings and load pin were lubricated with neolube UTC 449261.            TEST 1  23.3      32.3          750.0 As-left visual inspection-SAT.                                    99.6 TEST 2  36.1                    750.0 TEST 3  0.016      0.015        .02g's TEST 4  48.0      72.2          750.0 TEST SAMPLE?        YES SAMPLE CLASSQR DATE REINSTALLED:                  11/07/06
 
TAG # SERIAL# REPLACE- VISUAL S                          FUNCTIONAL S    L DIMEN  S HAND-          S          INSPECTION
 
==SUMMARY==
FUNCTIONAL TEST
 
==SUMMARY==
 
MENT S/N INSPECT T                INSPECT    T          T STROKE        T DATE A                DATE      A          A      ?      A T                        T          T              T
.h.- . fl    hi-. ..i i.
          .i.ii
            . .          *    = i.i            i .i.. .
                                            .i.,.i                  i  -    i.      ii*    i . .. S  *.. . .1  u  .      i... i    .-.. . . . . .i .. . .
                                                                                                                                                  ..              . . . . .. . . . . . ..  . . . .. . .. .. . .. .5.. . .. -
4-1050      12374          N/A    1116/2006 PASS            N/A    N/A  18,500  PASS    YES PASS      Visual Inspection-SAT,"'" Dimension        FUNCTIONAL TEST PERFORMED?                              NO Acceptable, Handstroke-SAT. Prior to re-installation, spherical bearings and load      STATUS N/A                          (NIA IF NOT PERFORMED) pin were lubricated with neolube UTC A 449261.                                                                TENSION COMPRESSION CRITERIA TEST I TEST 2 TEST 3 TEST 4 TEST SAMPLE?                          NO SAMPLE CLASS N/A DATE REINSTALLED:
4-1051      10174          N/A    11/212006 PASS            NIA    N/A  21.875  PASS    YES PASS      Visual lnspection-SATfL" Dimension          FUNCTIONAL TEST PERFORMED?                              NO Acceptable, Handstroke-SAT. Prior to re-installation, spherical bearings and load      STATUS N/A                          (N/A IF NOT PERFORMED) pin were lubricated with'neolube UTC #
449261.                                                                TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE?                          NO SAMPLE CLASS N/A DATE REINSTALLED:
 
TAG#  SERIAL# REPLACE- VISUAL S      FUNCTIONAL S    LDIMEN  S HAND-    S        INSPECTION
 
==SUMMARY==
FUNCTIONAL TEST
 
==SUMMARY==
 
MENT SIN INSPECT T      INSPECT    T          T STROKE  T DATE A        DATE    A          A    ?    A T                T          T          T 4-1052  17904  N/A    11/2/2006 PASS    N/A    N/A. 22.50  PASS YES PASS Visual Inspection-SAT,"U' Dimension      FUNCTIONAL TEST PERFORMED?          NO Acceptable, Handstroke-SAT. Prior to re-installation, spherical bearings and load  STATUS N/A          (N/A IF NOT PERFORMED) pin were lubricated with neolube UTC #
449261.                                              TENSION COMPRESSION CRITERIA TEST I TEST 2 TEST 3 TEST 4 TEST SAMPLE?        NO SAMPLE CLASS NIA DATE REINSTALLED:
4-1053  10172  N/A    11/2/2006 PASS    N/A    N/A  21.625  PASS YES PASS Visual Inspection-SAT,"U' Dimension      FUNCTIONAL TEST PERFORMED?          NO Acceptable, Handstroke-SAT. Prior to re-installation, spherical bearings and load  STATUS N/A          (N/A IF NOT PERFORMED) pin were lubricated with neolube UTC #
449261.                                              TENSION COMPREISSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE?        NO SAMPLE CLASS N/A DATE REINSTALLED:
 
TAG # SERIAL # REPLACE- VISUAL S      FUNCTIONAL S  L DIMEN  S HAND-    S        INSPECTION
 
==SUMMARY==
FUNCTIONAL TEST
 
==SUMMARY==
 
MENT SIN INSPECT T      INSPECT T              T STROKE    T DATE  A      DATE    A          A    ?      A T                T          T          T 4-1054 15718    N/A    11/2/2006 PASS    N/A    N/A  21.00  PASS  YES PASS  Visual Inspection-SAT,"L" Dimension        FUNCTIONAL TEST PERFORMED?              NO Acceptable, Handstroke-SAT. Prior to re-installation, spherical bearings and load  STATUS    N/A          (NIA IF NOT PERFORMED) pin were lubricated with neolube UTC #
449261.                                                  TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE?          NO SAMPLE CLASS N/A DATE REINSTALLED:
4-1055 16241  16251  111212006 PASS 11/03/06 PASS  21.00  PASS  NO N/A  Visual Inspection-SAT,"L Dimension        FUNCTIONAL TEST PERFORMED?            YES Acceptable. S/N 16241 was removed and tranported to the test trailer for a    STATUS PASS            (N/A IF NOT PERFORMED) funcional test, the test was SAT. The snubber was dis-assembled and re-                        TENSION COMPRESSION CRITERIA greased. S/N 16251 was removed from dry storage and functionally tested for        TEST I    24.3      43.2          750.0 change-out, the test was SAT. The TEST 2 49.8        65A4          750.0 extension bolts were torqued to 36 ft. lbs using torque wrench M868 (cal due              TEST 3 0.017        0.018        .02g's 3/28/07. Prior to installation, spherical bearings and load pin were lubricated          TEST 4 69.0        50.5          750.0 with neolube UTC # 449261. As-Left Visual Inspection was SAT. S/N 16241 will be placed in dry storage as a spare TEST SAMPLE?            NO SAMPLE CLASS N/A snubber. This was a scheduled change out snubber.
DATE REINSTALLED:                  11/02/06
 
TAG # SERIAL # REPLACE- VISUAL S                      FUNCTIONAL S        L DIMEN      S HAND-        S          INSPECTION
 
==SUMMARY==
FUNCTIONAL TEST
 
==SUMMARY==
 
MENT SIN INSPECT T                INSPECT T                      T STROKE        T DATE    A          DATE      A                A      ?        A T                      T                T              T
.. a...... .t ... ... ..... .... .....                                              fI .....................
VI.......a..I......... I-........................-                  mm                                                                                ft tu.mamm,..
I...................................ft.........taI,...... ......................            aI ma.........
4-1056    12392        N/A      11/2/2006 PASS          N/A      N/A    21.25      PASS    YES PASS      Visual Inspection-SAT,"U' Dimension      FUNCTIONAL TEST PERFORMED?                      NO Acceptable, Handstroke-SAT. Prior to re-installation, spherical bearings and load  STATUS N/A                  (N/A IF NOT PERFORMED) pin werelubricated with neolube UTC #
449261.                                                    TENSION COMPRESSION CRITERIA TEST I TEST 2 TEST 3 TEST 4 TEST SAMPLE?              NO SAMPLE CLASS N/A DATE REINSTALLED:
4-1057    27089      17424      11/2/2006 PASS        11/03/06 PASS      18.50    PASS    NO N/A        Visual Inspection-SAT,"L2 Dimension      FUNCTIONAL TEST PERFORMED?                  YES Acceptable. SIN 27089 was removed and tranported to the test trailer for a    STATUS    PASS            (NIA IF NOT PERFORMED) funcional test, the test was SAT. The snubber was dis-assembled and re-                          TENSION COMPRESSION CRITERIA greased. S/N 17424 was removed from dry storage and functionally tested for        TEST 1    18.0        21.8          300.0 change out, the test was SAT. The              TEST 2    22.5        22.4          300.0 extension piece was torqued to 120 in.
lbs using torque wrench M1008 (cal due        TEST 3      0.004        0.004          .02's 12/9/06. Prior to installation, spherical bearings and load pin were lubricated          TEST 4      24.7        20.8          300.0 with neolube UTC # 449261. As-Left Visual Inspection was SAT. S/N 27089 will be placed in dry storage as a spare  TEST SAMPLE?              NO SAMPLE CLASSN/A snubber. This was a scheduled change out snubber.
DATE REINSTALLED:                        11/02/06
 
TAG # SERIAL # REPLACE- VISUAL S      FUNCTIONAL S    L DIMEN  S HAND-    S        INSPECTION
 
==SUMMARY==
FUNCTIONAL TEST
 
==SUMMARY==
 
MENTS/N INSPECT T        INSPECT    T          T STROKE  T DATE  A      DATE      A          A    7    A T                T          T          T 4-1068 21379    N/A    11/412006 PASS    N/A    N/A  16.50  PASS YES PASS Visual Inspection-SAT,"U' Dimension      FUNCTIONAL TEST PERFORMED?            NO Acceptable, Handstroke-SAT. Prior to re-installation, spherical bearings and load  STATUS N/A          (N/A IF NOT PERFORMED) pin were lubricated with neolube UTC #    .
449261.                                                TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST3 TEST 4 TEST SAMPLE?        NO SAMPLE CLASS N/A DATE REINSTALLED:
4-1059 27103    N/A    11/4/2006 PASS    N/A    N/A  17.00  PASS YES PASS Visual Inspectlon-SAT,"U' Dimension      FUNCTIONAL TEST PERFORMED?            NO Acceptable, Handstroke-SAT. Prior to re-installation, spherical bearings and load  STATUS N/A          (N/A IF NOT PERFORMED) pin were lubricated with neolube UTC #
449261.                                              TENSION COMPRESSION CRITERIA TEST I TEST 2 TEST3 TEST 4 TEST SAMPLE?        NO SAMPLE CLASS N/A DATE REINSTALLED:
 
TAG # SERIAL # REPLACE- VISUAL S      FUNCTIONAL S  L DIMEN  S HAND-    S        INSPECTION
 
==SUMMARY==
FUNCTIONAL TEST
 
==SUMMARY==
 
MENT S/N INSPECT T      .INSPECT    T          T STROKE  T DATE  A      DATE    A          A    ?    A T                T          T          T 4-1061 19722    N/A    11/412006 PASS    N/A    N/A  17.00  PASS YES PASS Visual Inspectlon-SAT,"L" Dimension      FUNCTIONAL TEST PERFORMED?          NO Acceptable, Handstroke-SAT. Prior to re-installation, spherical bearings and load  STATUS N/A          (N/A IF NOT PERFORMED) pin were lubricated with neolube UTC #
449261.                                              TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE?        NO SAMPLE CLASSN/A DATE REINSTALLED:
4-1062 27076    N/A    111412006 PASS    N/A    N/A  17.125  PASS YES PASS Visual Inspection-SAT,"L" Dimension      FUNCTIONAL TEST PERFORMED?          NO Acceptable, Handstroke-SAT. Prior to re-installation, spherical bearings and load  STATUS N/A          (N/A IF NOT PERFORMED) pin were lubricated with neolube UTC #
449261.                                              TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE?        NO SAMPLE CLASS N/A DATE REINSTALLED:
 
TAG # SERIAL # REPLACE- VISUAL S            FUNCTIONAL S              LDIMEN        S HAND-          S          INSPECTION
 
==SUMMARY==
FUNCTIONAL TEST
 
==SUMMARY==
 
MENT SIN INSPECT T            INSPECT          T                    T STROKE        T DATE    A            DATE          A                    A        ?      A T                          T                    T                T
..... . ..  .                  ... .. .. -..u. ..  ..m. .. ft.. . u . ...
                                                                =          =I.U Ul  i. S. -.    . =  I.a.  . uS .  .  . I ........... At. .  . . t    lftt        5*5 555 fo tfi I . . 1.  *. .    . - =
                                                                                                                                                                                                        . u..
4-1063    27098  N/A    111412006 PASS          N/A          N/A        17.50      PASS      YES PASS  Visual Inspection-SAT,.L" Dimension        FUNCTIONAL TEST PERFORMED?                  NO Acceptable, Handstroke-SAT. Prior to re-Installation, spherical bearings and load    STATUS N/A              (NIA IF NOT PERFORMED) pin were lubricated with neolube UTC #
449261.                                                  TENSION COMPRESSION CRITERIA TEST 4 TEST 2 TEST 3 TEST 4 TEST SAMPLE?          NO SAMPLE CLASS NA DATE REINSTALLED:
4-1064  27077  N/A    11/3/2006 PASS          N/A          N/A        17.00      PASS      YES PASS  Visual Inspection-SAT,"L" Dimension        FUNCTIONAL TEST PERFORMED?                  NO Acceptable, Handstroke-SAT. Prior to re-installation, spherical bearings and load    STATUS N/A              (WA IF NOT PERFORMED) pin were lubricated with neolube UTC #
449261.                                                  TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? .        NO SAMPLE CLASS N/A DATE REINSTALLED:
 
TAG#  SERIAL# REPLACE- VISUAL S      FUNCTIONAL S    LDIMEN  S HAND-    S        INSPECTION
 
==SUMMARY==
FUNCTIONAL TEST
 
==SUMMARY==
 
MENTSIN INSPECT T        INSPECT    T        T STROKE  T DATE  A      DATE      A        A    ?    A T                T        T          T 4-1065  20873  NIA    11/3/2006 PASS    N/A    NIA  15.625 PASS YES PASS Visual Inspection-SAT,"LS Dimension      FUNCTIONAL TEST PERFORMED?            NO Acceptable, Handstroke-SAT. Prior to re-installation, spherical bearings and load  STATUS N/A            (NIA IF NOT PERFORMED) pin were lubricated with neolube UTC #
449261.                                                TENSION COMPRESSION CRITERIA TEST I TEST 2 TEST 3 TEST 4 TEST SAMPLE?        NO SAMPLE CLASS N/A DATE REINSTALLED:
4-1066  27094  N/A    11/4/2006 PASS    N/A    N/A    16.50 PASS YES PASS Visual Inspection-SAT,"L" Dimension      FUNCTIONAL TEST PERFORMED?            NO Acceptable, Handstroke-SAT.Prior to re-installation, spherical bearings and load  STATUS N/A            (N/A IF NOT PERFORMED) pin were lubricated with neolu be UTC #
449261.                                                TENSION COMPRESSION CRITERIA TEST I TEST 2 TEST 3 TEST 4 TEST SAMPLE?        NO SAMPLE CLASS N/A DATE REINSTALLED:
 
TAG 9 SERIAL # REPLACE- VISUAL S        FUNCTIONAL S      LDIMEN      S HAND-                        S        INSPECTION
 
==SUMMARY==
FUNCTIONAL TEST
 
==SUMMARY==
 
MENT SIN INSPECT T          INSPECT      T              T STROKE                      T DATE A            DATE      A              A      ?                      A T                    T              T                              T
                              ............................................  ..........................                  1-.......... I................  ..........l.......t...  .......... ........... .
4-1067 27097    N/A    1114/2005 PASS      NIA    NIA    17.00    PASS    YES PASS                  Visual lnspection-SAT,"U' Dimension        FUNCTIONAL TEST PERFORMED?                    NO Acceptable, Handstroke-SAT.Prior to re-installation, spherical bearings and load    STATUS N/A                (N/A IF NOT PERFORMED) pin were lubricated with neolube UTC #
449261.                                                    TENSION COMPRESSION CRITERIA TEST I TEST 2 TEST 3 TEST 4 TEST SAMPLE?              NO SAMPLE CLASS N/A DATE REINSTALLED:
4-1068 27085    N/A    11/4/2006 PASS      N/A      N/A    17.375    PASS    YES PASS                  Visual Inspection-SAT,"L" Dimension        FUNCTIONAL TEST PERFORMED?                    NO Acceptable, Handstroke-SAT.Prior to re-installation, spherical bearings and load    STATUS N/A                (N/A IF NOT PERFORMED) pin were lubricated with neolube UTC #
449261.                                                    TENSION COMPRESSION CRITERIA TEST I TEST 2 TEST 3 TEST 4 TEST SAMPLE?              NO SAMPLE CLASS N/A DATE REINSTALL
 
TAG # SERIAL # REPLACE- VISUAL S      FUNCTIONAL S    L DIMEN  S HAND-    S        INSPECTION
 
==SUMMARY==
FUNCTIONAL TEST
 
==SUMMARY==
 
MENT SIN INSPECT T      INSPECT    T          T STROKE    T DATE A        DATE    A          A    ?      A T                T          T          T 4-1069 10033    N/A    0/31/2006 PASS  1111/06 PASS  27.125  PASS  NO N/A  Visual Inspection-SAT,"U' Dimension        FUNCTIONAL TEST PERFORMED?            YES Acceptable, and Functional-SAT.
Extension piece torqued to 150 ft lbs.      STATUS PASS            (NIA IF NOT PERFORMED)
(torque wrench S/N M875, cal due date 4/1107. Prior to re-installation, spherical            - TENSION COMPRESSION CRITERIA bearings and load pin were lubricated with neolube UTC 449261. As-left visual        TEST 1 168.9        210.5        2500.0 inspection-SAT.                                TESST 2  18R Q      20 7          2    0fl TEST 3  0.006      0.002        .02g's TEST 4  123.1      211.8        2500.0 TEST SAMPLE?        YES SAMPLE CLASS SR DATE REINSTALLED:                11/03/06 4-1070 10036    N/A    0/31/2006 PASS    N/A    N/A  26.50  PASS YES PASS  Visual Inspection-SAT,"L' Dimension        FUNCTIONAL TEST PERFORMED?            NO Acceptable, Handstroke-SAT. Prior to re-installation, Spherical bearings and load    STATUS N/A            (N/A IF NOT PERFORMED) pin were lubricated with neolube UTC #
449261.                                                  TENSION COMPRE,SSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE?          NO SAMPLE CLASSN/A DATE REINSTALLED:
 
TAG # SERIAL # REPLACE- VISUAL S      FUNCTIONAL S    LDIMEN  S HAND-    S          INSPECTION
 
==SUMMARY==
FUNCTIONAL TEST
 
==SUMMARY==
 
MENTS/N INSPECT T        INSPECT    T          T STROKE  T DATE    A      DATE    A          A    ?    A T                T          T          T 4-1071 17899    NIA    11/9/2006 PASS    N/A    N/A  20.50  PASS YES PASS  Visual Inspection-SAT,"L" Dimension        FUNCTIONAL TEST PERFORMED?            NO
                                                                            -Acceptable, Handstroke-SAT. Prior to re-installation, spherical bearings and load  STATUS N/A            (N/A IF NOT PERFORMED) pin were lubricated with neolube UTC ff 449261.                                                TENSION COMPRESSION CRITERIA TEST I TEST 2 TEST 3 TEST 4 TEST SAMPLE?        NO SAMPLE CLASS N/A DATE REINSTALLED:
4-1072 16235    N/A  11/9/2006 PASS    NIA    NIA  21-625  PASS YES PASS. Visual Inspection-SAT,"L" Dimension        FUNCTIONAL TEST PERFORMED?            NO Acceptable, Handstroke-SAT. Prior to re-installation, spherical bearings and load  STATUS N/A            (NIA IF NOT PERFORMED) pin were lubricated with neolube UTC #
449261.                                                TENSION COMPRESSION CRITERIA TEST I TEST 2 TEST 3 TEST 4 TEST SAMPLE?        NO SAMPLE CLASS N/A DATE REINSTALLED:
 
TAG # SERIAL # REPLACE- VISUAL S      FUNCTIONAL S    L DIMEN  S HAND-    S        INSPECTION
 
==SUMMARY==
FUNCTIONAL TEST
 
==SUMMARY==
 
MENT SIN INSPECT T      INSPECT    T          T STROKE    T DATE A        DATE      A          A    ?      A T                T          T          T 4-1073  3941    16241  11/912006 PASS  11/09106 PASS  21.50  PASS  NO N/A  Visual Inspectlon-SAT,"L" Dimension      FUNCTIONAL TEST PERFORMED?          YES Acceptable, and Functional-SAT. Due to dose and time the snubber was replaced STATUS PASS              (NIA IF NOT PERFORMED) with a tested spare (S/N 16241),
extension piece was torqued to 37 ft                  TENSION COMPRESSION CRITERIA lbs. (torque wrench SIN M867, cal due date 3128107. Prior to re-installation,      TEST 1 214.1      228.8        750.0 spherical bearings and load pin were          TEST 2 333.2      359.4        750.0 lubricated with neolube UTC 449261.
As-left visual Inspection-SAT. S/N 3941      TEST 3 0.007      0.004        .02g's will be placed in stores as a spare.
TEST4 192.6        198.8        750.0 TEST SAMPLE?        YES SAMPLECLASSSR DATE REINSTALLED:                11/09106 4-1074 19298    N/A  0131/2006 PASS    N/A    NZA  17.687  PASS YES PASS  Visual lnspection-SAT,"L Dimension        FUNCTIONAL TEST PERFORMED?            NO Acceptable, Handstroke-SAT.Prlor to re-installation, spherical bearings and load  STATUS N/A            (NIA IF NOT PERFORMED) pin were lubricated with neolube UTC #
449261.                                              TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE?        NO SAMPLE CLASS N/A DATE REINSTALLED:
 
TAG # SERIAL # REPLACE- VISUAL S "    FUNCTIONAL S    L DIMEN  S HAND-    S        INSPECTION
 
==SUMMARY==
FUNCTIONAL TEST
 
==SUMMARY==
 
MENT SIN INSPECT T      INSPECT    T          T STROKE  T DATE  A      DATE    A          A    ?    A T                T          T          T 4-1075  19297  N/A    0/31/2006 PASS    N/A    N/A  15.875  PASS YES PASS Visual Inspection-SAT,"L" Dimension      FUNCTIONAL TEST PERFORMED?            NO Acceptable, Handstroke-SAT. Prior to re-installation, spherical bearings and load  STATUS. NIA          (N/A IF NOT PERFORMED) pin were lubricated with neolube UTO #
449261.                                              TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE?        NO SAMPLE CLASS NIA DATE REINSTALLED:
4-1076 24414A  N/A    11/1/2006 PASS    NIA    N/A  12.750  PASS YES PASS Visual Inspection-SAT,"L" Dimension      FUNCTIONAL TEST PERFORMED?            NO Acceptable, Handstroke-SAT. Prior to re-installation, Spherical bearings and load  STATUS N/A            (NIA IF NOT PERFORMED) pin were lubricated with neolube UTC #
449261.                                              TENSION COMPRESSION CRITERIA TEST I TEST 2 TEST 3 TEST 4 TEST SAMPLE?        NO SAMPLE CLASS N/A DATE REINSTALLED:
 
TAG # SERIAL # REPLACE- VISUAL S      FUNCTIONAL S  L DIMEN  S HAND-    S        INSPECTION
 
==SUMMARY==
FUNCTIONAL TEST
 
==SUMMARY==
 
MENTSIN INSPECT T        INSPECT    T          T STROKE  *T DATE  A      DATE    A          A    ?    A T                T          T          T 4-1077  18014  N/A    1111/2006 PASS    N/A    N/A  13.625  PASS YES PASS Visual Inspection-SAT,"U' Dimension      FUNCTIONAL TEST PERFORMED?            NO Acceptable, Handstroke-SAT. Prior to re-installation, spherical bearings and load  STATUS N/A            (N/A IF NOT PERFORMED) pin were lubricated with neolube UTC #
449261.                                                TENSION COMPRESSION CRITERIA TEST I TEST 2 TEST 3 TEST 4 TEST SAMPLE?        NO SAMPLE CLASS N/A DATE REINSTALLED:
4-1078 24430A  N/A    11/1/2006 PASS    NIA    N/A  14.125  PASS YES PASS Visual Inspection-SAT,"L" Dimension      FUNCTIONAL TEST PERFORMED?            NO Acceptable, Handstroke-SAT. Prior to re-installation, spherical bearings and load  STATUS N/A            (N/A IF NOT PERFORMED) pin were lubricated with neolube UTC #
449261.                                                TENSION COMPRE=SSION CRITERIA TEST I TEST 2 TEST 3 TEST 4 TEST SAMPLE?        NO SAMPLE CLASS N/A DATE REINSTALLED:
 
TAG # SERIAL # REPLACE- VISUAL S      FUNCTIONAL S  L DIMEN  S HAND-    S        INSPECTION
 
==SUMMARY==
FUNCTIONAL TEST
 
==SUMMARY==
 
MENTSIN INSPECT T        INSPECT    T          T STROKE    T DATE    A      DATE    A          A    ?      A T                T          T          T 4-1079 23227    N/A    11/2/2006 PASS  1112106 PASS  13.125  PASS  NO NIA  Visual lnspectlon-SAT,"L"Dimension        FUNCTIONAL TEST PERFORMED?            Yes was SAT. Snubber was removed and transported to the test trailer for        STATUS    PASS        (N/A IF NOT PERFORMED) functional testing. The functional test was SAT. Transition end piece torqued                  TENSION COMPRESSION CRITERIA to 45 in lbs. (Torque wrench M1 008, cal due 12/9/06). Prior to re-installation,      TEST 1  13.2      5.5          75.0 spherical bearings and load pin were          TEST 2  15.1      7.0          75.0 lubricated with neolube UTC # 449261.
Snubber was re-installed. Final as-left      TEST 3  0.004      0.005        .02g's visual was SAT.
TEST 4  14.1      8.2          75.0 TEST SAMPLE?        YES SAMPLE CLASS SR DATE REINSTALLED:                  11103/06 4-1080 24431    N/A    11/7/2006 PASS    NIA    N/A  11.750  PASS YES PASS  Visual Inspection-SAT,"L" Dimension      FUNCTIONAL TEST PERFORMED?            NO Acceptable, Handstroke-SAT. Prior to re-installation, spherical bearings and load  STATUS NiA            (N/A IF NOT PERFORMED) pin were lubricated with neolube UTC #
449261.                                                TENSION COMPRESSION CRITERIA TEST I TEST 2 TEST 3 TEST 4 TEST SAMPLE?          NO SAMPLE CLASS N/A DATE REINSTALLED:
 
TAG # SERIAL # REPLACE- VISUAL S      FUNCTIONAL S    LDIMEN  S HAND-    S        INSPECTION
 
==SUMMARY==
FUNCTIONAL TEST
 
==SUMMARY==
 
MENTS/N INSPECT T        INSPECT    T        T STROKE    T DATE    A      DATE      A        A    ?      A T                T        T          T 4-1081 19295    N/A    11/2/2006 PASS  11/02/06 PASS  15.875 PASS  NO N/A  Visual Inspection-SAT,"L" Dimension        FUNCTIONAL TEST PERFORMED?            YES Acceptable, and Functional-SAT.
Extension piece torqued to 120 fItlbs.      STATUS PASS            (N/A IF NOT PERFORMED)
(torque wrench S/N M1008, cal due date 4/1/07. Prior to re-installation, spherical              TENSION COMPRESSION CRITERIA bearings and load pin were lubricated with neolube UTC 449261. As-left visual        TEST 1 11.7          10.8          300.0 inspection-SAT.                                ý-&ý ,  4A Q        n          inn n TEST 3    0.010      0.011        0.2g's TEST 4    24.3      10.7          300.0 TEST SAMPLE?        YES SAMPLE CLASS SR DATE REINSTALLED:                  11/03/06 4-1082 19296    N/A    11/3/2006 PASS    N/A    N/A  17.750 PASS YES PASS  Visual Inspection-SAT,"U' Dimension        FUNCTIONAL TEST PERFORMED?            NO Acceptable, Handstroke-SAT. Prior to re-installation, spherical bearings and load    STATUS N/A            (NIA IF NOT PERFORMED) pin were lubricated with neolube UTC #
449261.                                                TENSION COMPRE!$SION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE?          NO SAMPLE CLASSN/A DATE REINSTALl
 
TAG # SERIAL # REPLACE- VISUAL S      FUNCTIONAL S  L DIMEN  S HAND-    S        INSPECTION
 
==SUMMARY==
FUNCTIONAL TEST
 
==SUMMARY==
 
MENTSIN INSPECT T        INSPECT    T          T STROKE  T DATE A        DATE    A          A    ?    A T                T          T          T 4-1083 24408A  N/A    1115/2006 PASS    N/A    N/A  13,750  PASS YES PASS Visual Inspection-SAT,"L" Dimension      FUNCTIONAL TEST PERFORMED?          NO Acceptable, Handstroke-SAT. Prior to re-installation, spherical bearings and load  STATUS N/A          (N/A IF NOT PERFORMED) pin were lubricated with neoluba UTC #
449261.                                              TENSION COMPRESSION CRITERIA TESTI TEST 2 TEST 3 TEST 4 TEST SAMPLE?        NO SAMPLE CLASS N/A DATE REINSTALLED:
4-1084  23229  N/A    11/512006 PASS    NIA    NIA  12.875  PASS YES PASS Visual Inspection-SAT,"Ln Dimension      FUNCTIONAL TEST PERFORMED?          NO Acceptable, Handstroke-SAT. Prior to re-installation, spherical bearings and load  STATUS N/A          (N/A IF NOT PERFORMED) pin were lubricated with neolube UTC #
449261.                                              TENSION COMPRESSION CRITERIA TEST I TEST 2 TEST 3 TEST 4 TEST SAMPLE?        NO SAMPLE CLASS NA DATE REINSTALLED:
 
TAG # SERIAL # REPLACE- VISUAL S      FUNCTIONAL S  L DIMEN  S HAND-    S        INSPECTION
 
==SUMMARY==
FUNCTIONAL TEST
 
==SUMMARY==
 
MENT S/N INSPECT T      INSPECT    T          T STROKE    T DATE  A      DATE    A          A    ?      A T                T          T          T 4-1085 33622    NWA  1117/2006 PASS 11/07/06 PASS  10.125  PASS  NO N/A  Visual Inspection-SAT,"L" Dimension        FUNCTIONAL TEST PERFORMED?          YES Acceptable. The snubber was removed and transported to the test trailer for a    STATUS PASS          (NIA IF NOT PERFORMED) functional test, test was SAT. Prior to re-Installation, spherical bearings and load                TENSION COMPRESSION CRITERIA pin were lubricated with neolube UTC #
449261. The snubber was re-installed.          TEST 1 3.0        2.0          17.5 As-Left final visual inspection was SAT.        TEST 2  46*        R          175 TEST 3  0.013    0.013        .02g's TEST 4  4.7      2.2          17..5 TEST SAMPLE?        YES SAMPLE CLASSSR DATE REINSTALLED:                11/07/06 4-1100 29498    N/A    11/3/2006 PASS    N/A    N/A  11.375  PASS YES PASS  Visual Inspection-SAT,"U' Dimension        FUNCTIONAL TEST PERFORMED?            NO Acceptable, Handstroke-SAT. v spherical bearings and load pin ware        STATUS N/A            (N/A IF NOT PERFORMED) lubricated with neolube UTC # 449261.
TENSION COMPRESSION CRITERIA TEST I TEST 2 TEST 3 TEST 4 TEST SAMPLE?        NO SAMPLE CLASS N/A DATE REINSTALLED:
 
TURKEY POINT UNIT 4 2004 REFUELING OUTAGE Summary of System Pressure Testing Attachment 4
 
TURKEY POINT UNIT 4 CYCLE 23 SYSTEM PRESSURE TESTING FINAL REPORT Owner:                      Florida Power and Light Company 700 Universe Blvd.
Juno Beach, Florida, 33408 Plant:                      Florida Power and Light Company Turkey Point Nuclear Power Plant Unit 4 9760 SW 344h St.
Florida City, Florida, 33035 Commercial Service Date:    September 7, 1973 Cycle 23 Service Dates:      6/13/2006 to 12/9/2006 Refueling Outage Dates:      10/30/2006 to 12/9/2006 Prepared By:                                  Date:          0-Glc7 Reviewed By                                    Date:        /  7 Approved By:    6_                            Date:
                                                    -/--?--
Page 1 of 9
 
Acronyms:
ADM:      Administrative AFW:      Auxiliary Feedwater ASME:    American Society of Mechanical Engineers CB:      Containment Building CSS:      Containment Spray System CST:      Condensate Storage Tank CCW:      Component Cooling Water CVCS:    Chemical Volume Control System ECC:      Emergency Containment Cooler ECCS:    Emergency Core Cooling System EDG:      Emergency Diesel Generator FW:      Feedwater HX:      Heat Exchanger ICW:      Intake Cooling Water MS:      Main Steam NDE:      Nondestructive Examination PWO:      Plant Work Order PZR:      Pressurizer RCP:      Reactor Coolant Pump RCS:      Reactor Coolant System RHR:      Residual Heat Removal RO:      Restricting Orifice RV:      Relief Valve RX:      Reactor SFPC:    Spent Fuel Pool Cooling SI:      Safety Injection SIA:      Safety Injection Accumulators SG:      Steam Generator XJ:      Expansion Joint WO:      Work Order WR:      Work Request Page 3 of 9
 
Test Package Development:
The specific pressure test boundaries were selected after review of the applicable plant operating diagram/code boundary drawings. The piping systems were broken into sub systems. The sub-systems were selected based on Technical Specifications operability requirements, acceptable isolation points and availability of test connections and vent valves. The sub-systems were then assigned test package numbers, which could be tested in entirety, or based on availability could be broken down further into numerous tests within the specific sub-system.
The pressure test package numbers contain six (6) segments of Information, Sample: 04-CCW-301 10 -L-01 1'1 1"      t'    ft 1  2    3456
: 1.          Unit Number (00) common to both units 3 and 4. (03) Unit 3 specific and (04) Unit 4 specific.
: 2.          System abbreviation
: 3.          System number [First (2) digits].
: 4.          Sub-system number [(2) or (3) digits].
: 5.          Type of test (H) Hydrostatic, (P) Pneumatic, (L) Leakage
: 6.          Number of test performed within the specific sub-system.
PRESSURE TESTS THAT WERE PERFORMED DURING CYCLE 23 CONDENSATE STORAGE SYSTEM (18) 04-CST-1801-L-01              Test Date: 09/26/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section Xl periodic pressure test requirements. No leakage was observed.
INTAKE COOLING WATER SYSTEM (19) 04-ICW-1970-L-01              Test Date: 09/26/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section XI periodic pressure test requirements. No leakage was observed.
04-1CW-19151-L-01            Test Date: 06/09/2006 This test performed due to the replacement of 4A lCW pump, expansion joint and elbow per WO#34013744-01. There was no leakage observed.
04-ICW-19153-L-01            Test Date: 06/23/2005 This test performed due to the replacement of valve 4-50-321 per WO#35006945-01. There was no leakage observed.
Page 4 of 9
 
Abstract This report details the pressure testing of selected ASME Class 1, 2 and 3 piping and components of Florida Power and Light Company's Unit 4 Turkey Point Nuclear Power Station. These tests were performed during Unit 4 cycle 23. The refueling outage occurred between the dates of 10/30/2006 and 12/9/2006. The complete cycle 23 was from 6/13/2006 to 12/9/2006. This pressure testing is being reported following the second outage of the first period for fourth ten-year interval for Turkey Point Unit 4. Piping and components were selected and tested in accordance with Section XI of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code "Rules for Inservice Inspection of Nuclear Power Components", 1998 Edition, 2000 addenda with specific relief as granted under 10 CFR 50.55a.
Procedures The following Florida Power and Light (FPL) procedures and documents have been implemented to provide instructional guidance for the performance of the required ASME XI pressure testing and subsequent inspections.
0-ADM-523          ASME Section XI Pressure Tests for Quality Group A, B, C Systems/Components.
4-OSP-041.25        RCS Overpressure Leak Testing 4-OSP-045.1        ASME Section XI Quality Group A Bolting Examination NDE-4.2            Visual Examination VT-2 Conducted During System Pressure Tests.
System Summary The following safety related Class 1, 2, and 3 systems, or sections thereof were pressure tested in accordance with the requirements of the 1998 Edition, 2000 addenda ASME Section XI Code.
System Name                    System Number Condensate Storage                  18 Intake Cooling Water                19 Emergency Diesel Generator          22 Component Cooling Water              30 Spent Fuel Pool Cooling              33 Reactor Coolant                      41 Chemical and Volume Control          47 Residual Heat Removal                50 Containment Building                51 Safety Injection                    62 Safety Injection Accumulators        64 Containment Spray                    68 Main Steam                          72 Feedwater                            74 Auxiliary Feedwater                  75 Page 2 of 9
 
04-ICW-19156-L-01          Test Date: 11/17/2005 This test performed due to the replacement of valve 4-50-331 per WO#35006946-01. There was no leakage observed.
04-ICW-19165-L-01          Test Date: 07/13/2006 This test performed due to the replacement of pipe collar assembly upstream of 4-50-409 per WO#36016269-01. There was no leakage observed.
04-ICW-19166-L-01          Test Date: 11/18/2006 This test performed due to the replacement of valves 4-50-409 and 4-50-410 per WO#36016269-02. There was no leakage observed.
EMERGENCY DIESEL GENERATOR (22) 04-EDG-2202-L-01          Test Date: 11/11/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section XI periodic pressure test requirements. No leakage was observed.
04-EDG-2203-L-01          Test Date: 11/12/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section XI periodic pressure test requirements. No leakage was observed.
04-EDG-2204-L-01          Test Date: 11/10/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section Xl periodic pressure test requirements. No leakage was observed.
04-EDG-2207-L-01          Test Date: 11/16/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section Xl periodic pressure test requirements. No leakage was observed.
04-EDG-2209-L-01          Test Date: 11/14/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section Xl periodic pressure test requirements. No leakage was observed.
COMPONENT COOLING WATER SYSTEM (30) 04-CCW-30202-L-01          Test Date: 10/29/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section Xl periodic pressure test requirements. No leakage was observed.
04-CCW-30203-L-01          Test Date: 10/29/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section XI periodic pressure test requirements. No leakage was observed.
04-CCW-30204-L-01          Test Date: 10/29/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section XI periodic pressure test requirements. No leakage was observed.
04-CCW-30205-L-01          Test Date: 10/26/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section XA periodic pressure test requirements. No leakage was observed.
04-CCW-30207-L-01          Test Date: 11/01/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section XI periodic pressure test requirements. No leakage was observed.
04-CCW-30208-L-01          Test Date: 11/01/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section XI periodic pressure test requirements. No leakage was observed.
Page 5 of 9
 
04-CCW-30209-L-01          Test Date: 11/01/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section XI periodic pressure test requirements. No leakage was observed.
04-CCW-30210-L-01          Test Date: 10/29/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section Xl periodic pressure test requirements. No leakage was observed.
04-CCW-3021 1-L-01          Test Date: 10/26/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section Xl periodic pressure test requirements. No leakage was observed.
04-CCW-30212-L-01          Test Date: 10/26/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section Xl periodic pressure test requirements. No leakage was observed.
04-CCW-30213-L-01          Test Date: 10/26/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section XI periodic pressure test requirements. No leakage was observed.
SPENT FUEL PIT COOLING SYSTEM (33) 04-SFPC-3328-L-01          Test Date: 02/15/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section Xl periodic pressure test requirements. No leakage was observed.
REACTOR COOLANT SYSTEM (41) 04-RCS-4111-L-02            Test Date: 04/06/2006 This test involved the leakage test of the Reactor Coolant System piping inside containment following the Unit 4 Cycle 23 Refueling Outage. This leakage test also addressed the following replacements:
Component            Work Order #          Description RV-4-551A            36005400-01                Remove, install spare RV-4-551B            36005401-01                Remove, install spare RV-4-551 C          36005402-01                Remove, install spare 4T237                36009715-01                Replace RVLMS adapter hub 4T237                34014097-01                Replace CET Column There was active leakage noted during the exam. The Excess Letdown Heat Exchanger (4E202) had a 5 DPM leak from channel head flange. Leakage was evaluated on CR2006-35378.
CHEMICAL AND VOLUME CONTROL SYSTEM (47) 04-CVCS-4747-L-01          Test Date: 08/15/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section XI periodic pressure test requirements. No leakage was observed.
04-CVCS-4748-L-01          Test Date: 08/14/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section Xl periodic pressure test requirements. No leakage was observed.
Page 6 of 9
 
04-CVCS-4749-L-01          Test Date: 08/15/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section Xl periodic pressure test requirements. No leakage was observed.
04-CVCS-4753-L-01          Test Date: 08/15/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section Xl periodic pressure test requirements. No leakage was observed.
04-CVCS-4792-L-01          Test Date: 12/03/2006 This test performed due to replacement of 4B Charging pump block assembly per WO#35016220-01. There was no leakage observed during this test.
04-CVCS-4795-L-01          Test Date: 06/08/2006 This test performed due to replacement of 4A Charging Pump Block Assembly per WO#35022936-01. There was no leakage observed during this test.
04-CVCS-4796-L-01          Test Date: 12/03/2006 This test performed due to replacement of valve 4-293B per WO#36013195-01.
There was no leakage observed during this test.
04-CVCS-4797-L-01          Test Date: 12/03/2006 This test performed due to replacement of valve 4-293A per WO#36013194-01.
There was no leakage observed during this test.
RESIDUAL HEAT REMOVAL SYSTEM (50) 04-RHR-5014-L-01          Test Date: 03/06/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section Xl periodic pressure test requirements. No leakage was observed.
04-RHR-5017-L-01          Test Date: 03/22/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section Xl periodic pressure test requirements. No leakage was observed.
04-RHR-5026-L-01          Test Date: 01/28/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section Xl periodic pressure test requirements. No leakage was observed.
CONTAINMENT BUILDING (51) 04-CB-5103-L-01            Test Date: 06/22/2005 This test performed to meet requirements for temporary repair to S/G Blowdown sample line per WO#35016235-02 SAFETY INJECTION SYSTEM (62) 04-SIS-6224-L-01          Test Date: 11/03/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section Xl periodic pressure test requirements. No leakage was observed.
04-SIS-6229-L-01          Test Date: 03/10/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section XI periodic pressure test requirements. No leakage was observed.
04-SIS-6230-L-01          Test Date: 02/24/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section Xl periodic pressure test requirements. No leakage was observed.
Page 7 of 9
 
04-SIS-6236-L-01          Test Date: 03/12/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section XI periodic pressure test requirements. No leakage was observed.
SAFETY INJECTION ACCUMULATOR SYSTEM (64) 04-SIA-6402-L-01          Test Date: 10/30/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section Xl periodic pressure test requirements. No leakage was observed.
CONTAINMENT SPRAY SYSTEM (68) 04-CSS-6814-L-01          Test Date: 01/31/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section Xl periodic pressure test requirements. No leakage was observed.
MAIN STEAM SYSTEM (72) 04-SG-7201 -L-01          Test Date: 09/28/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section XI periodic pressure test requirements. No leakage was observed.
04-SG-7202-L-01            Test Date: 09/28/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section Xl periodic pressure test requirements. No leakage was observed.
04-SG-7203-L-01            Test Date: 09/28/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section Xl periodic pressure test requirements. No leakage was observed.
04-SG-7217-L-01            Test Date: 02/15/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section Xl periodic pressure test requirements. No leakage was observed.
04-SG-7235-L-01            Test Date: 12/03/2006 This test was performed due to replacement of valve RV-4-1406 per WO#34002222-01. There was no leakage observed during this test.
04-SG-7236-L-01            Test Date: 12/03/2006 This test was performed due to replacement of valve RV-4-1410 per WO#35019831-01. There was no leakage observed during this test.
04-SG-7237-L-01            Test Date: 12/03/2006 This test was performed due to replacement of valve RV-4-1405 per WO#32002439-01. There was no leakage observed during this test.
04-SG-7238-L-01            Test Date: 12/03/2006 This test was performed due to replacement of valve RV-4-1407 per WO#35028688-01. There was no leakage observed during this test.
FEEDWATER SYSTEM (74) 04-FW-7422-L-01            Test Date: 10/09/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section XI periodic pressure test requirements. No leakage was observed.
Page 8 of 9
 
04-FW-7423-L-01            Test Date: 10/09/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section Xl periodic pressure test requirements. No leakage was observed.
04-FW-7424-L-01              Test Date: 10/09/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section Xl periodic pressure test requirements. No leakage was observed.
04-FW-7428-L-01              Test Date: 10/09/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section Xl periodic pressure test requirements. No leakage was observed.
04-FW-7429-L-01              Test Date: 10/09/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section XI periodic pressure test requirements. No leakage was observed.
04-FW-7430-L-01              Test Date: 10/09/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section XI periodic pressure test requirements. No leakage was observed.
AUXILARY FEEDWATER SYSTEM (75) 04-AFW-7501-L-01            Test Date: 06/05/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section XI periodic pressure test requirements. No leakage was observed.
04-AFW-7502-L-01            Test Date: 06/05/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section Xl periodic pressure test requirements. No leakage was observed.
04-AFW-7546-L-01            Test Date: 06/19/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section XI periodic pressure test requirements. No leakage was observed.
04-AFW-7547-L-01            Test Date: 06/19/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section Xl periodic pressure test requirements, No leakage was observed.
04-AFW-7548-L-01            Test Date: 06/19/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section XI periodic pressure test requirements. No leakage was observed.
BOLTED JOINT EXAMINATIONS The bolted joint examinations were performed in accordance with 4-OSP-045.1 for ASME Class I bolting. The examinations consisted of all insulated bolted connections. The insulation was removed for inspection. The inspections identified four bolted connections that had evidence of leakage. They are listed below with the corresponding condition report number. All leakage was evaluated by engineering as required by ASME Xl.
Component            Condition Report Number              Code Class RV-4-551A                    2006-31663                        A RV-4-551 B                    2006-31663                      A 4E202                          2006-31595                      A 4-876A                        2006-31773                      A Page 9 of 9
 
TURKEY POINT UNIT 4 2004 REFUELING OUTAGE NIS-BB Attachment 5
 
0-IPL                                                    Inter-Office Correspondence To:              D. Slivon                                                      Date:          February 1, 2007 From:            Wolfgang Heise                                                Department:    ENG / CSI
 
==Subject:==
Turkey Point Unit 4 EOC 22                                    CSI-NDE-07-003 Final S/G Tube Examination Results "NIS-BB Report" This report addresses Plant Technical Specification Section 4.4.5.5 b. The attached information provides the summarized results for the in-service inspection of steam generator tubing, which is to be submitted to the Commission within twelve months of the examination completion date.
: 1. In-service examination and plugging of the Turkey Point Unit 4 steam generator tubing was completed between November 7, 2006 and November 16, 2006. The number and extent of tubes examined is 100% of all in-service tubes in S/G's 4A, 4B and 4C, using the bobbin coil technique from tube end to tube end in row 3 and higher. The bobbin coil technique was also used to examine the hot leg and cold leg straight sections of rows 1 and 2 in all three S/G's. Rotating Plus Point probe techniques were employed to examine 100% of the hot leg tube expansion transitions to an extent of +3" to -17" in all three steam generators. Approximately 50% of the row 1 and 2 u-bends were also examined with the Plus Point probe. Additional Plus Point probe examinations consisted of a minimum 50% sample of hot leg dings L> 5.0 volts), 50% of u-bend region dings and 50% of dents/dings at hot leg structures.
The total tube count is shown under "Total Tubes Examined" on the attached "FORM NIS-BB "OWNERS' DATA REPORT FOR EDDY CURRENT EXAMINATION RESULTS" (Attachment 1).
: 2. The location and percent of wall thickness penetration for indications reported is summarized on the attached "FORM NIS-BB" under "Location of Indications". Only mechanical wear damage at anti-vibration bars (AVB), broached tube support plates and baffle plates were sized for continued service, using qualified sizing techniques. Corrosion type indications are plugged on detection when encountered. No corrosion type indications were reported during this examination.
: 3. Six (6) tubes were plugged during this examination as is summarized in the upper portion of the attached "FORM NIS-BB". All tubes were plugged due to the presence of tube wear most likely caused by a foreign object at the top of the cold leg tubesheet in S/G 4A. FOSAR/SSI investigation established that a foreign object was no longer present. The wear signals were in very close proximity to the expansion transition and as such, did not allow sizing using a qualified technique, therefore, all six tubes were conservatively (preventively) plugged based on detection and assigned an SVI (single volumetric indication) code. None of the indications required in situ pressure testing.
: 4. Attachments 2, 3 and 4 for steam generators 4A, 4B and 4C respectively provide the EOC-22 examination results which includes the "All tubes Plugged Listing" for SIG 4A only along with listings of the other damage encountered, "40% - 100%", 20 - 39% and 1 - 19%" for all steam generators. These listings are the source documents used for preparation of the "Form NIS-BB".
 
D. Slivon                                                                                ENG-CSI-07-003 NISBB February 1, 2007 Page 2 of 9
: 5. The examination results have been classified as category C-2 in S/G 4A, and C-1 in S/G 4B and 4C according to Plant Technical Specification Section 4.4.5.2. Accordingly, the next examination will be required within 40 calendar months. Reporting of the result classifications is not required by Plant Technical Specification Section 4.4.5.5. Accordingly, this information is provided for internal use only.
If we can be of further assistance, please let us know.
Q                  K*.-
Prepared By: CSI ET 15rincipal Level Ill                      Date:
Verified By:    WM                ](J                        Date o7 CSI  ECT Level III Reviewed By:    /    M  . Z          6
* Date:      ? 1/o7 CSI S/G Tchnical Spec~ ist Reviewed By:    Qr CO9WSupervisor-lnspectiori Date:        ý-/F7/o 7 Approved By:                                                  Date:        f  f
* Manager CSI Attachments:
cc:
RD Gil                w/o attachments GP Alexander          w/o attachments GL Boyers RW Pell              w/o attachments O Hanek W Wolters              Areva-NP (PTN-4 S/G EOC22 Final Report)
CSI-NDE File
 
D. Slivon                                                                                                        ENG-CSI-07-003 NISBB February 1, 2007 Page 3 of 9 ATTACHMENT 1 FORM NSBOW                    R$DAAEPORT FO                    DD      URREN't EAINATION.RESU.LT-S
                                            ~rejuied y the provisoso h~~A~                  OERLS EYCURR'ENTE    EXMATPO1M RESULTS PLANT:                        Turkey Point Unit 4 EXAMINATION DATE: November 7, 2006 to November 16, 2006 STEAM                TOTAL            TOTAL            TOTAL                TUBES                    TUBES                TOTAL GENERATOR                TUBES            TUBES            TUBES        PREVENTIVELY PLUGGED              PLUGGE              PLUGGED (3214 Tubes)          EXAMINED            20%-            >40%,                  (PTP)                        D                TUBES 39%              SVI                                            THIS              IN S/G OUTAGE 4E210A (Bobbin)            3191                0                0                      0                        0              See RPC 4E210B (Bobbin)            3201                0                0                      0                        0              See RPC 4E21 OC (Bobbin)            3203              2(1)              0                      0                        0              See RPC 4E210A (RPC)              3191                0                6                      0                        6                  29 4E210B(RPC)                3201                0                0                      0                        0                  13 4E210C (RPC)              3203                0                0                      0                        0                  11 LOCATION OF INDICATIONS (20% - 100%, PIT & VOL, WAR, PLP, SVI)
AVB          Tube                Tube      Freespan        Top of        Top of            Total            Total STEAM              Bars      Supports            Supports    6H,thru 6C    Tubesheet    Tubesheet        Indications      Indications GENERATOR                (1)      1 thru 6            1 thru 6    UBEND          to #1        to #1          20%-39%          >40% &
C/L                H/L                    Support C/L  Support H/L                            SVI 4E210A (Bobbin)            0            0                  0            0              0            0                0                0 4E210B (Bobbin)            0            0                  0            0              0            0                0                0 4E210C (Bobbin)            2            0                  0            0              0            0                2                0 4E210A (RPC)              0            0                  0            0            6o7-          0                0                6(2) 4E2103 (RPC)              0            0                  0            0              0            0                0                0 4E2100 (RPC)              0            0                  0            0              0            0                0                0 LOCATION OF INDICATIONS (1% - 19%) Bobbin Probe and Rotating +PtTM AVB          Tube                Tube      Freespan        Top of        Top of            Total            Total STEAM              Bars      Supports            Supports    6H thru 60    Tubesheet    Tubesheet          Indications      Indications GENERATOR                (1)      1 thru 6          1 thru 6      UBEND          to #1        to #1          1%-19%            1%-39%
C/A                HIL                    Support OIL  Support H/L          Bobbin            Left in Only            Service 4E210A (Bobbin)            7            0                1            0              0            0                7                8()
4E210B (Bobbin)            13          1(4)                1(5)          0              0            1 (6)            13              16(7_
4E210C (Bobbin)            17            0                1M()          0              0            0                17                20 Remarks:
: 1. Mechanical wear damage at anti-vibration bars (AVB) was depth sized using qualified bobbin coil sizing technique.
: 2. Six tubes in 4A were conservatively plugged as SVI, based on detection of rotating probe responses caused by possible foreign object wear at the cold leg top of tubesheet
: 3. Bobbin coil indication located at the 2rd hot leg broached support was confirmed to be - 5% wear (WAR) by rotating probe
: 4. Bobbin coil indication located at the 4th cold leg broached support was confirmed to be - 13% wear (WAR) by rotating probe
: 5. Bobbin coil indication located at the 2rd hot leg broached support was confirmed to be - 16% wear (WAR) by rotating probe
: 6. Bobbin coil indication located at the hot leg baffle plate was confirmed to be - 16% wear (WAR) by rotating probe
: 7. Total Indications (1%-39%) also includes the bobbin WAR indications confirmed by the rotating probe
: 8. A wear indication was identified at the 6 h hot leg broached support. A depth of -10% was measured using a qualified +PT rT sizing technique.
 
D. Slivon                                                                        ENG-CSI-07-003 NISBB February 1, 2007 Page 4 of 9 Areva NP                                  Attachment 2 Customer Name: Turkey Point Unit 4                Component: S/G A                      Page 1 of 2 All  Tubes Plugged Listing ROW COL VOLTS        DEG CHN IND %TW LOCATION            EXT EXT UTILI  UTIL2    CAL#    LEG  PROBE 35    68  0.11      77    4    SVI    TSC    -0.05    TSC TSC 16    21998.1    48  COLD    720PP 35    69  0.48      108  4    SVI    TSC    -0.01    TSC TSC 36    21998.1    48  COLD    720PP 35    70  0.91      83    4    SVI    TSC  +0.01      TSC TSC 51    21998.1    48  COLD    720PP 35    71  0.36      74    4    SVT    TSC  +0.00      TSC TSC 29    21998.1    47  COLD    720PP 35    72  0.12      102  4    SVI    TSC    +0.03    TSC TSC 17    21998.1    45  COLD    720PP 36    74  0.62      80    4    SVI    TSC    +0.04    TSC TSC 43    21998.1    45  COLD    720PP Total Tubes        : 6 Total Records: 6 Note:  The UTILl field    shows the estimated depth based on rotating      +PTT "
sizing techniques.
Tubes with Bobbin >= 40% TWD,            PIT and VOL Indications ROW LINE VOLTS        DEG CHN IND %TW LOCATION                  EXT EXT    CAL # LEG          PROBE NONE REPORTED Total Tubes        : 0 Total Records: 0 Tubes with Bobbin 20-39% TWD Indications ROW LINE VOLTS        DEG CHN IND %TW LOCATION                  EXT EXT    CAL # LEG          PROBE NONE REPORTED Total Tubes        : 0 Total Records: 0 Tubes with Bobbin 1-19% AVB TWD Indications ROW LINE VOLTS        DEG CHN IND %TW LOCATION                  EXT EXT    CAL # LEG          PROBE 26    20    0.18      107  P2  TWD 7  AVi      +0.37          TEH  TEC    10      COLD      720UL 37    65    0.52      30    P2  TWD 14  AV2      +0.13          TEH  TEC    15      COLD      720UL 0.50      139  P2  TWD 14  AV3      +0.19          TEH  TEC    15      COLD      720UL 0.75      64    P2  TWD 19  AV4      -0.02          TEH  TEC    15      COLD      720UL 33    72    0.59      61    P2  TWD 17  AVI      +0.04          TEH  TEC    18      COLD      720UL 32    74    0.47      97    P2  TWD 11  AVI      +0.06          TEH  TEC    17      COLD      720UL 33    78    0.45      59    P2  TWD 18  AV3      +0.19          TEH  TEC    18      COLD      720UL Total Tubes        : 5 Total Records: 7
 
D. Slivon                                                              ENG-CSI-07-003 NISBB February 1, 2007 Page 5 of 9 Areva NP                            Attachment 2 Customer Name: Turkey Point Unit 4          Component: S/G A                  Page 2 of 2 Tubes with Bobbin DSI confirmed with RPC as Wear (WAR)
ROW LINE VOLTS DEG CHN IND %TW LOCATION              EXT EXT UTILI UTIL2  CAL# LEG    PROBE 4    58    0.34    54 P1 DSI    02H  +0.46      06H TEH                1  HOT    720UL 0.12    99 P5 WAR    02H  +0.54      02H 02H  5            43  HOT  720PP Total Tubes      : 1 Total Records: 2 Notes:
: 1) DSI designates a Distorted Support Indication reported by bobbin coil probe.
: 2) The UTILl field shows the estimated depth based on qualified rotating +PTTM coil sizing which confirms the presence of wear (WAR).
End SIG A Data
 
D. Slivon                                                                      ENG-CSI-07-003 NISBB February 1, 2007 Page 6 of 9 Areva NP                                    Attachment    3 Customer Name:      Turkey Point Unit 4            Component:  S/G B                    Page 1 of 2 Tubes with Bobbin >= 40% TWD,            PIT and VOL Indications ROW LINE VOLTS        DEG CHN  IND %TW LOCATION                  EXT EXT    CAL # LEG            PROBE NONE REPORTED Total Tubes        : 0 Total Records: 0 Tubes with Bobbin 20-39% TWD Indications ROW LINE VOLTS        DEG CHN IND %TW LOCATION                  EXT EXT    CAL # LEG            PROBE NONE REPORTED Total Tubes        : 0 Total Records: 0 Tubes with Bobbin 1 to 19% TWD Indications ROW LINE VOLTS        DEG CHN  IND %TW LOCATION                  EXT EXT    CAL # LEG            PROBE 21    6    0.36      65    P2 TWD 11  AV3      +0.00            TEH  TEC  2      COLD          720UL 31    13    0.37      88    P2 TWD 12  AV4      +0.02            TEH  TEC  2      COLD          720UL 33    16    0.35      0    P2 TWD 9  AV4      +0.00            TEH  TEC  1      COLD          720UL 34    46    0.46      140  P2 TWD 11  AV2      -0.51            TEH  TEC  8      COLD          720UL 23    50    0.47      113  P2 TWD 10  AV3      -0.10            TEH  TEC  14    COLD          720UL 35    54    0.61      50    P2 TWD 12  AV3      +0.42            TEH  TEC  14    COLD          720UL 38    58    0.41      0    P2 TWD 11  AV3      +0.19            TEH  TEC  17    COLD          720UL 30    65    0.48      112  P2 TWD 15  AV2      +0.19            TEH  TEC  19    COLD          720UL 27    72    0.35 - 0        P2 TWD 12  AVl      +0.04            TEH  TEC  25    COLD          720UL 0.40      0    P2 TWD 13  AV2      +0.04            TEH  TEC  25    COLD          720UL 30    73    0.31      0    P2 TWD 11  AV2      +0.37            TEH  TEC  25    COLD          720UL 0.30      0    P2 TWD 11  AV3      -0.09            TEH  TEC  25    COLD          720UL 0.40      0    P2 TWD 13  AV4      -0.13            TEH  TEC  25    COLD          720UL Total Tubes        : 10 Total Records: 13 Tubes with Bobbin DSI confirmed with RPC WAR from TSH to 01H ROW LINE VOLTS        DEG CHN IND %TW LOCATION          EXT EXT  UTILl UTIL2    CAL#    LEG  PROBE 40    26    0.35      100 P1  DSI    BAH      -0.2 5  TEH TEC                  8      COLD 720UL 0.11      105 P5  WAR    BAH      -0.2 7  BAN BAN    16  96910.1    53      HOT  720PP Total Tubes      : 1 Total Records: 2 Notes:
: 1)    DSI designates a Distorted Support Indication reported by bobbin coil probe.
: 2)    The UTILI field    shows the estimated depth based on qualified      rotating    +PTý coil    sizing which confirms the presence of wear (WAR).
 
D. Slivon                                                                  ENG-CSI-07-003 NISBB February 1, 2007 Page 7 of 9 Areva NP                              Attachment    3 Customer Name: Turkey Point Unit 4                Component: SIG B                Page 2 of 2 Tubes with Bobbin DSI confirmed with RPC WAR at Hot Leg Supports ROW LINE VOLTS        DEG CHN IND %TW LOCATION        EXT EXT UTILI UTIL2  CAL# LEG    PROBE 31    60    1.70    147 P1  DSI    02H      -0.25  TEH TEC                16  COLD 720UL 0.27    0  P5  WAR    02H      -0.25  02H 02H  16  96910.1  56  HOT 720PP Total Tubes        : 1 Total Records: 2 Notes:
1);    DSI designates a Distorted Support Indication reported by bobbin coil probe.
: 2)    The UTILI field shows the estimated depth based on qualified rotating +PTTM coil sizing which confirms the presence of wear (WAR).
Tubes with Bobbin DSI confirmed with RPC WAR at Cold Leg Supports ROW LINE VOLTS        DEG CHN IND %TW LOCATION        EXT EXT UTILl UTIL2  CAL# LEG    PROBE 44    38    0.82    102 P1  DSI    04C      +0.64  TEH TEC                9    COLD 720UL 0.27    0  P5  WAR    04C      +0.57  04C 04C  13  96910.1  47  COLD 720PP Total Tubes        : 1 Total Records:      2 Notes:
: 1)    DSI designates a Distorted Support Indication reported by bobbin coil probe.
: 2)    The UTILl field shows the estimated depth based on qualified rotating +PT' coil sizing which confirms the presence of wear (WAR).
End SIG B data
 
D. Slivon                                                                ENG-CSI-07-003 NISBB February 1,2007 Page 8 of 9 Areva NP                              Attachment 4 Customer Name: Turkey Point Unit 4              Component: S/G C              Page 1 of 1 Tubes with Bobbin >= 40% TWD,          PIT and VOL Indications ROW LINE VOLTS        DEG CHN IND %TW LOCATION                EXT EXT CAL # LEG        PROBE NONE REPORTED Total Tubes      : 0 Total Records: 0 Tubes with Bobbin 20-39% TWD Indications ROW LINE VOLTS        DEG CHN IND %TW LOCATION                EXT EXT CAL # LEG        PROBE 32    70    0.65      85 P2  TWD 20  AVI      +0.26          TEH TEC 14    COLD      720UL 35    31    0.77      122 P2  TWD 27  AV2      +0.35          TEH TEC 7      COLD      720UL Total Tubes      : 2 Total Records: 2 Tubes with Bobbin 1 to 19% TWD Indications ROW LINE VOLTS        DEG CHN IND %TW LOCATION                EXT EXT CAL # LEG        PROBE 12    4    0 .27    74  P2  TWD 13  AV4      +0.15          TEH TEC 6      COLD      720UL 13    4    0.30      114 P2  TWD 13  AV4      +0.17          TEH TEC 5      COLD      720UL 22    7    0.27      147 P2  TWD 13  AV2      +0.17          TEH TEC 3      COLD      720UL 24    12    0.35      98  P2  TWD 15  AV4      +0.00          TEH TEC 3      COLD      720UL 32    16    0 .48    45  P2  TWD 16  AV2      +0.09          TEH TEC 4      COLD      720UL 34    17    0.30      57  P2  TWD 14  AVl      -0.13          TEH TEC 3      COLD      720UL 13    44    0.19      152 P2  TWD 10  AV3      -0.60          TEH TEC 23    COLD      720UL 40    68    0.24      65  P2  TWD 12  AV2      +0.11          TEH TEC 15    COLD      720UL 32    70    0 .56    119 P2  TWD 18  AV3      +0.02          TEH TEC 14    COLD      720UL 37    73    0.28      92  P2  TWD 13  AV3      -0.30          TEH TEC 15    COLD      720UL 36    74    0.27      90  P2  TWD 13  AV3      -0.02          TEH TEC 15    COLD      720UL 34    75    0.29      0  P2  TWD 12  AV4      +0.00          TEH TEC 16    COLD      720UL 33    76    0.28      74  P2  TWD 10  AVl      +0.13          TEH TEC 18    COLD      720UL 27    80    0.32      0  P2  TWD 15  AV3      -0.11          TEH TEC 17    COLD      720UL 22    82    0. 22    0  P2  TWD 11  AVI      +0.28          TEH TEC 17    COLD      720UL 26    82    0.27      0  P2  TWD 13  AVI      +0.21          TEH TEC 17    COLD      720UL 22    83    0 .29    58  P2  TWD 11  AV4      -0.04          TEH TEC 18    COLD      720UL Total Tubes      - 17 Total Records: 17
 
D. Slivon                                                                    ENG-CSI-07-003 NISBB February 1, 2007 Page 9 of 9 Areva NP                              Attachment 4 Customer Name: Turkey Point Unit 4              Component: S/G C                    Page 2    of 2 Tube with confirmed RPC WAR at Hot Leg Support ROW LINE VOLTS      DEG CHN IND %TW LOCATION          EXT EXT  UTILl UTIL2    CAL# LEG      PROBE 35    75    0.21    0    P5 WAR    06H    +0.29    06H 06H  10  96910.1    56    HOT  720PP Note:
The UTILl field  shows the estimated depth based on qualified    rotating    -+PTTM coil  sizing which confirms the presence of wear (WAR).
End S/G C Data
 
TURKEY POINT UNIT 4 2006 REFUELING OUTAGE NIS-2
 
Abstract The attached NIS-2 reports detail the repair/replacement of Class 1, 2 and 3 piping and components for Florida Power and Light Company, Turkey Point Unit 4. These repairs or replacements were performed prior to and during the Fall 2006 refueling outage, between the dates of June 14, 2005 and December 8, 2006.
Piping and components were inspected/tested in accordance with Section XI of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, "Rules for Inservice Inspection of Nuclear Power Components," 1998 Edition up to and including the 2000 Addenda.
Class MC components were inspected/tested in accordance with Section XI of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, "Rules for Inservice Inspection of Nuclear Power Components," 1992 Edition with 1992 Addenda.
 
NIS-2 LOG 06-001-4  1/5/2006        34014207-01 12/8/2006 06-002-4 11/16/2006      35029657-01 12/8/2006 06-003-4 11/16/2006      35029070-01 12/8/2006 06-004-4 11/15/2006      36011921-01 12/8/2006 06-005-4 11/16/2006      35022992-01 12/8/2006 06-006-4 11/16/2006      35022990-01 12/8/2006 06-007-4 11/16/2006      35014825-01 12/8/2006 06-008-4 11/17/2006      35027155-01 12/8/2006 06-009-4 11/17/2006      35016220-01 12/8/2006 06-010-4 11/21/2006      35006945-01 12/8/2006 06-011-4 11/21/2006      34010088-01 1/08/2007 06-012-4 11/17/2006      35006946-01 1/08/2007 06-013-4 12/29/2006      36010029-01 1/19/2007 06-014-4 11/28/2006      35022936-01 1/19/2007 06-015-4 12/28/2006      36011213-01 1/19/2007 06-016-4 11/29/2006      36016269-01 1/08/2007 06-017-4 12/13/2006      34011170-01 1/18/2007 06-018-4 11/28/2006      36016269-02 1/09/2007 06-019-4 11/29/2006      34013744-01 1/19/2007 06-020-4 12/28/2006      36011924-01 1/19/2007 06-021-4 12/28/2006      35020910-01 1/19/2007 06-022-4 12/28/2006      35019542-01 1/18/2007 06-023-4 12/28/2006.      35019543-01 1/19/2007 06-024-4 12/28/2006      35019541-01 1/19/2007 06-025-4 12/28/2006      36023673-01 1/19/2007 06-026-4 12/18/2006      32002437-01 1/18/2007 06-027-4 12/18/2006      34002222-01 1/18/2007
 
  *eportNo.*Repo rt Datet WorkiOrder Ni'umberi%,! ANII Certification 06-028-4      12/18/2006      35028688-01              1/18/2007 06-029-4      12/18/2006      35019831-01              1/17/2007 06-030-4      12/13/2006      36005400-01              1/19/2007 06-031-4      12/13/2006      36005401-01              1/17/2007 06-032-4      12/13/2006    36005402-01              1/17/2007 06-033-4      12/13/2006    35020912-01              1/17/2007 06-034-4      12/13/2006    36013194-01              1/17/2007 06-035-4      12/13/2006    36013195-01              1/17/2007 06-036-4      12/13/2006    35015455-01              1/17/2007 06-037-4      12/13/2006    36017280-01              1/18/2007 06-038-4      12/18/2006    36011117-01              1/18/2007 06-039-4      12/18/2006    36017279-01              1/18/2007 06-040-4      12/18/2006    34014097-01              1/19/2007 06-041-4      12/18/2006    35020523-01              1/19/2007 06-042-4      12/13/2006    36009715-01              1/19/2007 06-043-4      12/29/2006    36012421-IA              1/19/2007
 
FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
: 1. Owner                          Florida Power and Light Co.                              Date                          1/5/2006 Name 700 Universe Blvd. Juno Beach, FL 33408                            Sheet                1              of              2 Address Turkey Point Plant                                    Unit                                  4
: 2. Plant Name                                                      WO#- 34014207-01                  CR#:        N/A 9760 SW344 Street Florida City, FL 33035 Add&ess                                                              Repair Organization, P.O. No Job No., etc.
3- Work Performed by              Florida Power and Light Co.                                Type Code Symbol Stamp                        N/A Narme Authorization Number                            N/A 9760 SW 344 Street Florida City, FL 33035 Expiration Date                                N/A Address
: 4. Identification of System:            Spent Fuel Pit Cooling              System #:  3        Quality Group                          C
: 5. (a) Applicable Construction Code                        B31.1                            19 55 Edition,      N/A    Addenda,            N/A      Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements              19 98 Edition,    2000    Addenda,            N/A      Code Case
: 6. Identification of Components Corrected or Removed and Installed Components ASME Corrected,            Code Name of                      Name of Mfg      Mfg Serial  National            Other                    Year      Removed or            Stamp Component                                        Number      Board        Identification                  Built        Installed          Yes/No Spent fuel cooling pump A              N/A            N/A        N/A                  4-911                  N/A        Corrected discharge check valve                                                                                                                            N
__  _    _          _    I._        _  i                _            _    _    _    _            _        __                      _
: 7. Description of Work:
Replace bonnet bolting
: 8. Tests Conducted:        Hydrostatic:        N/A                  Pneumatic        NZA              Nominal Operating Pressure                  N/A Other              N/A              Pressure      N/A    psig          Test Temperature            N/A      deg F 06-001-4
 
Sheet 2 of 2 FORM NIS-2 (Back)
: 9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section XI.
Type Code Symbol Stamp                                                  NIA Certificate of Authorization No.                    N/A                  Expiration Date:                  N/A Signed                                    O,                                            Date      I1          0 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have inspected the components described in this Owners Report during the period of          g O.,            to  /Z- 8-06 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners' Report in accordance with the requirements of ASME Code, Section X1.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this inspection.
Commissions      le 40'7                  //, ý,
                        -        Inspector's Signature                              National Board. State, Providence, and Endorsements Date        /2,-  F-04 06-001-4
 
FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI Florida Power and Light Co.                            Date                        11/.16/2006
: 1. Owner Name 700 Universe Blvd. Juno Beach, FL 33408                          Sheet                1              of                2 Address Turkey Point Plant                                  Unit                                  4
: 2. Plant Name                                                    WO#:    35029657-01                CR#:        N/A 9760 SW.344 Street Florida City, FL 33035 Address                                                            Repair Organlzation. P.O, No, Job No., etc.
: 3. Work Performed by              Florida Power and Light Co.                              Type Code Symbol Stamp                          NIA Name Authorization Number                            N/A 9760 SW 344 Street Florida City, FL 33035                                                                        N/A Expiration Date Address
: 4. Identification of System:          Component Cooling Water              System #:  30
* Quality Group                          C
: 5. (a) Applicable Construction Code          __      __  B31.1                            19 55 Edition,      N/A      Addenda,          N/A      Code Case (b) Applicable Edition of Section X! Utilized for Repairs or Replacements            19 98 Edition,    2000      Addenda,          N/A      Code Case
: 6. Identification of Components Corrected or Removed and Installed Components ASME Corrected,            Code Name of                      Name of Mfg      Mfg Serial National            Other                    Year        Removed or            Stamp Component                                      Number      Board          Identification                Built        Installed          Yes/No Basket strainer for 4A CCW              N/A            N/A      N/A                BS-4-1402                N/A          Corrected Heat exchanger
: 7. Description of Work:
Replace one cover nut
: 8. Tests Conducted:        Hydrostatic:        N/A                Pneumatic        N/A              Nominal Operating Pressure                  N/A Other            N/A              Pressure      N/A    psig          Test Temperature            N/A        deg F 06-002A4
 
Sheet 2 of 2 FORM NIS-2 (Back)
: 9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section Xl.
Type Code Symbol Stamp                                                    N/A Certificate of Authorization No-                    N/A                  Expiration D;ate:                N/A Signed          E                                                                      Date -it                10-*
(0 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have inspected the components described In this Owners Report during the period of _            I.o/            to IZ-?- 0('
and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code, Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
__                          ~~~~Commissions      3        7    44        5  iJ Inspectors Signature                              National Board, State, Providence, and Endorsements Date          /j-06-002-4
 
FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl
: 1. Owner                          Florida Power and Light Co.                                  Date                          11/16/2006 Name 700 Universe Blvd. Juno Beach, FL 33408                                Sheet              1                        of            2 Address
: 2. Plant                              Turkey Point Plant                                        Unit                                          4 Name                                                          WOt. 35029070-01                          CR#:      N/A 9760 SW 344 Street Florida City, FL 33035 Address                                                                Repair Organizaion, P.O. No, Job No, etc,
: 3. Work Performed by              Florida Power and Liaht Co.                                  Type Code Symbol Stamp                                  N/A Name Authorization Number                                    N/A 9760 SW 344 Street Florida City, FL 33035 Address                                              Expiration Date                                        NtA
: 4. Identification of System:          Component Cooling Water      _      _System #:        30      Quality Group                                  C
: 5. (a) Applicable Construction Code                    ASME VIII                              1965 Edition,      66        Addenda,                  NIA  Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements                19 98 Edition,    2000      Addenda,                  N/A  Code Case
: 6. Identification of Components Corrected or Removed and Installed Components
                                                                                                                        --                                      "ASME Corrected,          Code Name of                      Name of Mfg    Mfg Serial National                  Other                    Year                Removed or          Stamp Component                                        Number      Board            Identification                Built                Installed        Yes/No 4C CCW Heat Exchanger                  N/A            N/A        N/A                    4E207C                    N/A                Corrected N
4                L________  !. _____  4. ______________________              L...................I____________      +/- _______
: 7. Description of Work:
Replace four studs on channel head 8, Tests Conducted:        Hydrostatic:        N/A                Pneumatic              N/A              Nominal Operating Pressure                        N/A Other              N/A              Pressure        N/A      psig        Test Temperature                    N/A      deg F 06-003-4
 
Sheet 2 of 2 FORM NIS-2 (Back)
: 9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section XI.
Type Code Symbol Stamp                                                    N/A Certificate of Authorization No.                      N/A                    Expiration Date:                  N/A Signed        6      i"ý                Os~ ~                                              Date      % 4_24 o ,
U          Owner or Owners Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have inspected the components described in this Owners Report during the period of                          4      t5"-2.-o to                -
and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code, Section XI, By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, conceming the examinations and corrective measures described in this Owners' ReporL Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Commissions              477 Inspectors Signature                                  National Board, State, Providence, and Endorsements Date            /Z-e.'-    04 06-003-4
 
r FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
: 1. Owner                          Florida Power and Ught Co.                              Date                        11/15/2006 Name 700 Universe Blvd, Juno Beach, FL 33408                          Sheet              1                of              2 Address
: 2. Plant                              Turkey Point Plant                                  Unit                                  4 Name                                                    WO#-. 36011921-01                  CR#:        N/A 9760 SW 344 Street Florida City, FL. 33035 Address                                                            Repair Orga*,,allon, P.O. No, Job No., etc.
: 3. Work Performed by            Florida Power and Light Co.                              Type Code Symbol Stamp                        NIA Name Authorization Number                            N/A, 9760 SW 344 Street Florida City, FL 33035 Address                                        Expiration Date                                N/A
: 4. Identification of System:          Component Cooling Water              System #:-  30      Quality Group                          C
: 5. (a) Applicable Construction Code                    ASME VIII                  -      19 65 Edition,      66      Addenda,            N/A    Code Case (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements            19 98 Edition,    2000    Addenda,            N/A    Code Case
: 6. Identification of Components Corrected or Removed and Installed Components ASME Corrected,              Code Name of                    Name of Mfg      Mfg Serial National            Other                    Year        Removed or            Stamp Component                                      Number      Board        Identification                Built          Installed          Yes/No 46 COW Heat Exchanger                N/A          N/A        N/A                4E207B                  N/A          Corrected              N
: 7. Description of Work:
Replaced three studs and six nuts
: 8. Tests Conducted:        Hydrostatic:        N/A                Pneumatic          N/A            Nominal Operating Pressure                  N/A Other              N/A              Pressure      N/A    psig        Test Temperature            N/A        deg F 06-004-4
 
Sheet 2 of 2 FORM NIS-2 (Back)
: 9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.
CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this replacement conforms to the rules of the ASME Code. Section XI.
Type Code Symbol Stamp                                                  NIA Certificate of Authorization No.                      N/A                Expiration Date:                  N/A Signed          iý5 ý,ý                                        Md-                      Date            24      oc4O.
61      Owner or Owner's Designee, Title    r CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have inspected the components described in this Owners Report during the period of          7- 6--                to  /?-b'--o and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners' Report In accordance with the requirements of ASME Code, Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Commissions      /S' 417?',/ C,          I ,,
Inspector's Signature                              National Board, State, Providence, and Endorsements Date                /2'- 9-oh 06-004-4
 
FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
: 1. Owner                              Florida Power and Light Co.                          Date                        11/16/2006 Name 700 Universe Blvd. Juno Beach, FL 33408                          Sheet                I                of                2 Address
*, D,+                                    Turkey Point Plant                                Unit                                  4 f*.° p l*lJl Name                                                    WO#:    35022992-01                CR#:        NIA 9760 SW 344 Street Florida City, FL 33035 Address                                                          Repair Organization, P.O. No, Job No., etc.
3, Work Performed by                Florida Power and Lioht Co.                            Type Code Symbol Stamp                          N/A Name Authorization Number                            N/A 9760 SW 344 Street Flodda City, FL 33035 Expiration Date                                N/A Address
: 4. Identification of System:              Component Cooling Water            .System #M. 3.0      Quality Group                          C 19 65 Edition,      66      Addenda,            N/A      Code Case
: 5. (a) Applicable Construction Code                      ASME VIII (b) Applicable Edition of Section XI Utilized for Repairs or Replacements          19 98 Edition,    2000    Addenda,            N/A      Code Case
: 6. Identification of Components Corrected or Removed and Installed Components ASME Corrected,              Code Name of                    Name of Mfg      Mfg Serial National          Other                    Year        Removed or              Stamp Component                                      Number I Board            Identlfication                Built          Installed          Yes/No 48 CCW Heat Exchanger                N/A            NIA      N/A                4E207B                  N/A        Corrected
: 7. Description of Work:
Replaced two studs and nuts on channel head
: 8. Tests Conducted:          Hydrostatic:        N/A                Pneumatic        N/A              Nominal Operating Pressure                  N/A Other              N/A            Pressure    N/A    psig          Test Temperature            NIA      deg F 06-005-4
 
Sheet 2 of 2 FORM NIS-2 (Back) 9, Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section XI.
Type Code Symbol Stamp                                                    NIA Certificate of Authorization No.                      N/A                  Expiration Date:                  N/A Signed                  __                          25~              __            _    DtemI2gr Date
                                                                                  /
(. Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have inspected the components described in this Owners Report during the period of        11- 9-0os              to    Z- 8 O4.
and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code, Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty,' expressed or implied, concerning the examinations and corrective measures described In this Owners' Report, Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this Inspection.
Commissions      J      P7            1-C,I/ X Inspector's Signature                                National Board, State, Providence, and Endorsements
                            /Z- 9,0 6 Date 06-005-4
 
FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xi
: 1. Owner                          Florida Power and Light Co,                            Date                        11/1612006 Name 700 Universe Blvd. Juno Beach, FL 33408                        Sheet                1              of                2 Address
: 2. Plant                              Turkey Point Plant                                  Unit                                  4 Name                                                    WO#:    35022990-01                CR#:        N/A 9760 SW 344 Street Florida City, FL 33035 Address                                                            Ropair Organization, P.,O.No, Job No,, etc.
: 3. Work Performed by            Florida Power and Liaht Co.                              Type Code Symb ol Stamp                        N/A Name Authorization Numnber                          N/A 9760 SW 344 Street Florida City, FL 33035                                                                        N/A Expiration Date Address
: 4. Identification of System:          Component Cooling Water              System #:  30      Quality GroupD p
: 5. (a) Applicable Construction Code                    ASME VilI                          19 65 Edition,      66      Addenda,            N/A      Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements            19 98 Edition,    2000    Addenda,            N/A      Code Case
: 6. Identification of Components Corrected or Removed and Installed Components ASME Corrected,              Code Name of                      Name of Mfg    Mfg Serial  National          Other                      Year        Removed or,            Stamp Component                                      Number      Board        Identification                Built        installed            Yes/No 4A CCW Heat Exchanger                N/A            N/A        N/A                4E207A                  N/A          Corrected
: 7. Description of Work:
Replaced 13 studs and nuts on channel head
: 8. Tests Conducted:        Hydrostatic:      NIA                Pneumatic          N/A              Nominal Operating Pressure                  N/A Other              N/A            Pressure      N/A    psig          Test Temperature            N/A        deg F 06-006-4
 
Sheet 2 of 2 FORM NIS-2 (Back)
: 9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section XI.
Type Code Symbol Stamp          TypeCodeSymol SampNIA Certificate of Authorization No.                      N/A                  Expiration Date:                N/A Signed                                                                                  Date        1I  1241 0('0 U        Owne~ror Owner's Designee, Title    '"
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have inspected the components described in this Owners Report during the period of          2-Z4-6            -  to    /_-,_'          ____,
and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code, Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Commissions    (4077 * *                ''.
Inspectors Signature                                National Board, State, Providence, and Endorsements Date            /____                __
06-006-4
 
FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
: 1. Owner                          Florida Power and Light Co.                            Date                        11/16/2006 Name 700 Universe Blvd. Juno Beach, FL 33408                        Sheet                1                of              2 Address
: 2. Plant                              Turkey Point Plant                                  Unit                                  4 Name                                                    WO#: 35014825-01                  CR#:        N/A 9760 SW 344 Street Florida City, FL 33035 Address                                                            Repair Organization, P.O. No, Job No., etc.
: 3. Work Performed by          _Forida Power and Uiht Co.                                  Type Code Symbol Stamp                          N/A Name Authorization Number          _N/A 9760 SW 344 Street Florida City, FL 33035 Expiration Date                                  N/A Address
: 4. Identification of System:          Component Cooling Water              System #:  30      Quality Group                          C 19 65 Edition,      66      Addenda,            N/A    Code Case
: 5. (a) Applicable Construction Code                    ASME VIII (b) Applicable Edition of Section XI Utilized for Repairs or Replacements            19 98 Edition,    2000      Addenda,            N/A    Code Case
: 6. Identification of Components Corrected or Removed and Installed Components Name of                      Name of Mfg    Mfg Serial National            Other                    Year Corrected, Removed or 1 ASME Code Stamp Component                                      Number      Board        Identification                Built        Installed          Yes/No 4B CCW Heat Exchanger                N/A            N/A        N/A                4E207B                  N/A          Corrected                N 7, Description of Work:
Replace six studs and nuts on channel head with new
: 8. Tests Conducted:        Hydrostatic:      N/A                Pneumatic          NIA            Nominal Operating Pressure                  N/A Other              N/A            Pressure      N/A    psig          Test Temperature            N/A        deg F 06-007-4
 
Sheet 2 of 2 FORM NIS-2 (Back)
: 9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section XI.
Type Code Symbol Stamp                                                  N/A Certificate of Authorization No.                      N/A                Expiration Date:                  N/A Signed                                                                                  Date        ii24fI        a c VIJ      Owner or Owner's Designee,1.T CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have inspected the components described in this Owners Report during the period of            9- -y- as<"        to    12- *- p,&
and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners' Report In accordance with tHe .requirements of ASME Code, Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector norhis employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
* _____________________                            Commissions      f      7'        ,~44 Inspector's Signature                              National Board, State, Providence, and Endorsements Date                67- 0 06-007-4
 
FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl
: 1. Owner                          Florida Power and Light Co.                            Date                        11/17/2006 Name 700 Universe Blvd. Juno Beach, FL 33408                            Sheet                1              of              2 Address Turkey Point Plant                                    Unit                                  4
: 2. Plant Name                                                      WO#f:  35027155-01                CR#:        N/A 9760 SW 344 Street Florida City, FL 33035 Address                                                            Repair Organization, P.O. No, Job No., etc.
: 3. Work Performed by              Florlda Power and Light Co.                              Type Code Symbol Stamp                          N/A Name Authorization Number                            N/A 9760 SW 344 Street Florida City, FL 33035 Expiration Date                                  N/A Address
: 4. Identification of System:              Intake Cooling Water              System    _ 19      Quality Group                          C
: 5. (a) Applicable Construction Code                      B31.1                            19 55 Edition,      N/A    Addenda,            N/A      Code Case (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements            19 98 Edition,      20*0    Addenda,            N/A      Code Case
: 6. Identification of Components Corrected or Removed and Installed Components ASME Corrected,            Code Name of                      Name of Mfg    Mfg Serial  National          Other                      Year        Removed or              Stamp Component                                      Number      Board          Identification                Built        Installed          Yes/No 4A ICW pump discharge check              NIA          D2886        NIA                4-50-311                N/A          Removed valve                                                                                                                                    N Check Valve                    N/A          D4678        N/A                4-50-311                NIA          Installed              N
: 7. Description of Work:
Replace valve and bolting
: 8. Tests Conducted:        Hydrostatic:          25                Pneumatic          92              Nominal Operating Pressure                    X Other              NIA            Pressure      25    psig          Test Temperature            92.1    ' deg F 06-008-4
 
Sheet 2 of 2 FORM NIS-2 (Back)
: 9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section XI.
Type Code Symbol Stamp                                                  N/A Certificate of Authorization No.                        N/A                Expiration Date:                N/A Plejf            fla Signed                                                                                      te            Pt2-,4    o(~
Signed
__________                -  >...~.
1 (I wner or OTwner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned,, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have inspected the components described in this Owners Report during the period of              z-      e-.      to    /Z-7-806 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code, Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable In any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Commissions                        _.      _____
Inspector's Signature                              National Board, Slate, Providence, and Endorsements z-oC7 Date 06-008-4
 
FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
: 1. Owner                          Florida Power and Light Co.                            Date                        11/17/2006 Name 700 Universe Blvd. Juno Beach, FL 33408                          Sheet                1              of              2 Address
: 2. Plant                              Turkey Point Plant                                  Unit                                  4 Name                                                    WO#:    35016220-01                CR#:        N/A 9760 SW 344 Street Florida City, FL 33035 Address                                                            Repair Organization, P.O. No, Job No., etc,
: 3. Work Performed by            FloridaPower and .~ghtCo.                                Type Code Symbol Stamp                          N/A Name Authorization Number                            N/A 9760 SW 344 Street Florida City, FL 33035 Address Expiration Date                                N/A
: 4. Identification of System:        CVCS Charging and Letdown              System #. 47      Quality Group                          B
: 5. (a) Applicable Construction Code                      B31.1                            19 55 Edition,      NIA    Addenda,            NIA      Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements            19 98 Edition,    2000    Addenda,            N/A      Code Case
: 6. Identification of Components Corrected or Removed and Installed Components ASME Corrected,              Code Name of                    Name of Mfg      Mfg Serial  National            Other                    Year      Removed or              Stamp Component                                      Number      Board        Identification                Built        Installed          Yes/No 4B Charging Pump                  N/A            N/A        N/A                4P201 B                  N/A        Corrected Work:
: 7. Description of Replace pump block assembly with spare
: 8. Tests Conducted:      Hydrostatic:        N/A                Pneumatic          N/A            Nominal Operating Pressure                    x Other              N/A            Pressure      2350    pslg          Test Temperature            113      deg F 06-009-4
 
Sheet 2 of 2 FORM NIS-2 (Back)
: 9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.
CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this replacement conforms to the rules of the ASME Code, Section XI.
Type Code Symbol Stamp                                                  N/A Certificate of Authorization No,                        N/A                Expiration Date:                N/A Signed          6 I>-,                        O~E. $~t                                  Date A, Date      II    2&#xfd;51qjv-a      OwneFrr Owner's Designee, Titleo CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have inspected the components described in this Owners Report during the period of            6-.-0.o--s            to /2-'
and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code, Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable In any manner for any personal injury or property damage or a loss of any kind arising from or connected with this Inspection.
b    -
____._._-_-*  -*        Commissions        r/ 4z ? 4 , c          , --      _
Inspector's Signature                              National Board, State, Providence, and Endorsements Date          /2- 6.- &
06-009-4
 
FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
: 1. Owner                          Florida Power and Light Co.                              Date                        11/21/2006 Name 700 Universe Blvd. Juno Beach, FL 33408                          Sheet                1                  of              2 Address
: 2. Plant                              Turkey Point Plant____        _                      Unit                                    4 Name                                                      WO#: 35006945-01                    CR#:        N/A 9760 SW 344 Street Florida City, FL 33035 Address                                                            Repair Organl*ration, P.O. No. Job No., etc.
3..Work Performed by            Florida Power and Light Co.                                Type Code Symbol Stamp                            N/A Name Authorization Number                              N/A 9760 SW 344 Street Florida City, FL 33035 Expiration Date                                  N/A Address
: 4. Identification of System:              Intake Cooling Water _System              9:  19      Quality Group                            C
: 5. (a) Applicable Construction Code                      1B31.1                            19 55 Edition,      N/A      Addenda,            N/A    Code Case (b) ApplicableEdition of Section XI Utilized for Repairs or Replacements              19 98 Edition,    2000      Addenda,            N/A    Code Case
: 6. Identification of Components Corrected or Removed and Installed Components NoASME Corrected,              Code Name of                      Name of Mfg    Mfg Serial  National            Other                      Year        Removed or              Stamp Component                                      Number      Board          Identification                Built          Installed          Yes/No 4B ICW pump discharge check              NIA          D2664      NIA                  4-50-321                N/A            Removed valve Check Valve                    N/A          D3576      N/A                  4-50-321                N/A            Installed              N
: 7. Description of Work:
Replace check valve and bolting
: 8. Tests Conducted:      Hydrostatic:        N/A                Pneumatic          N/A              Nominal Operating Pressure                      X Other                N/A            Pressure      17.5    psig          Test Temperature              84.7      deg F 06-010-4
 
Sheet 2 of 2 FORM NIS-2 (Back)
: 9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section XI.
Type Code Symbol Stamp                                                  N/A Certificate of Authorization No.                      NIA                Expiration Date:                  N/A Signed                                            056 Moe Owner or Owner's Designee, Titiej Date      If11    S      O5(
(
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have insppcted the components described in this Owners Report during the period of            5-/2-0S            to    /2?*2-04 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code, Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
                          .... ______ ,        _____._________                      Commissions      A-                2*7ZC. '4, Inspector's Signature                              Nattonal Board, State, Providence, and Endorsements Date            -
06-010-4
 
FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl
: 1. Owner                          Florida Power and Light Co.                          Date                        11/21/2006 Name 700 Universe Blvd. Juno Beach, FL 33408                        Sheet                1                of                2 Address Turkey Point Plant                                Unit                                  4
: 2. Plant Name                                                    WO#: 34010088-01                  CR#t        N/A 9760 SW 344 Street Florida City, FL 33035 Addres.                                                          Repair Organization, P.0. No, Job No., etc.
: 3. Work Performed by            Florida Power and Light Co.                            Type Code Symbol Stamp                        NIA Name Authorization Number                            NWA 9760 SW 344 Street Florida City, FL 33035 Expiration Date                                N/A Address
: 4. Identification of System:        Turbine Plant Cooling Water          System# :  8      Quality Group                          C
: 5. (a) Applicable Construction Code                      B31.1                          1955 Edition,      N/A    Addenda,            N/A      Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements          19 98 Edition,    2000    Addenda,            N/A      Code Case
: 6. Identification of Components Corrected or Removed and Installed Components NoaASME Corrected,            Code Name of                      Name of Mfg    Mfg Serial  National          Other                    Year        Removed or            Stamp Component                                      Number      Board        Identification                Built        Installed            Yes/No Backwash Valve                  N/A            N/A        /NA              4-50-315                N/A          Corrected N
: 7. Description of Work:
Replace bolting on backwash valve
: 8. Tests Conducted:        Hydrostatic:      N/A                Pneumatic        N/A              Nominal Operating Pressure                  N/A Other              N/A              Pressure    N/A    psig          Test Temperature            N/A        deg F 06-011-4
 
Sheet 2 of 2 FORM NIS-2 (Back) 9, Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.
CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this replacement conforms to the rules of the ASME Code, Section XI.
Type Code Symbol Stamp                                                    N/A Certificate of Authorization No.                      N/A                  Expiration Date:                  N/A Signed                                                                                    Date -J                [0(,
                                                                                    /#
C    Owner ordner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have Inspected the components described in this Owners Report during the period of            5, *1-0._      -- to          8-a 7 h-and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code, Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
                          =_  ____                ____            ___Commissions                                          4 Inspector's Signature                                NaLional Board. State, Providence. and Endorsements Date      14-07 06-011-4
 
FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
: 1. Owner                          Florida Power and Light Co.                            Date                        11/17/2006 Name 700 Universe Blvd. Juno Beach, FL 33408                          Sheet                                of                2 Address
: 2. Plant                              Turkey Point Plant                                  Unit                                  4 Name                                                    WO#: 35006946-01                  CR#:        N/A 9760 SW 344 Street Florida City, FL 33035 Address                                                          Repair Organization, P.O. No, Job No., etc.
: 3. Work Performed by            Florida Power and Light Co.                              Type Code Symbol Stamp                          N/A Name Authorization Number                            N/A 9760 SW 344 Street Florida City, FL 33035 Expiration Date                                N/A Address.
: 4. Identification of System:              Intake Cooling Water            System #:      9      Quality Group                          C 19 55 Edition,      N/A    Addenda,            N/A    Code Case
: 5. (a) Applicable Construction Code                      B31.1 (b) Applicable Edition of Section XI Utilized for Repairs or Replacements            19 98 Edition,    2000      Addenda,            N/A    Code Case
: 6. Identification of Components Corrected or Removed and Installed Components ASME Corrected,            Code Name of                      Name of Mfg    Mfg Serial  National            Other                      Year      Removed or            Stamp Component                                      Number      Board          Identification                Built        installed          Yes/No 4C ICW pump discharge check                N/A        D2663        N/A                4-50-331                  N/A        Removed valve                                                                                                                                  N Check Valve                    N/A        D4186        N/A                4-50-331                  N/A          Installed              N Elbow                        NIA          N/A        N/A                    N/A                                  installed
: 7. Description of Work:
Replace valve, expansion joint, elbow and bolting
: 8. Tests Conducted:        Hydrostatic:          18              Pneumatic          85              Nominal Operating Pressure                    X Other                N/A            Pressure        18    psig        Test Temperature            85.3      deg F 06-012-4
 
Sheet 2 of 2 FORM NIS-2 (Back)
: 9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section XI.
Type Code Symbol Stamp                                                    N/A Certificate of Authorization No.                      N/A                  Expiration Date:                  N/A Signed                                                                                    Date                  3      i 0    Owner or owner's Designee, T          ite CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartforl, Connecticut, have inspected the components described In this Owners Report during the period of_          _    _- ____-        to    /-    -o7 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code, Section Xl.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
______ ______Commissions                            iC 4'?                      r)v Inspector's Signature                                National Board, State, Providence, and Endorsements Date _            -________            _
06-b12-4
 
FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
: 1. Owner                          Florida Power and Light Co.                            Date                              12/29/2006 Name 700 Universe Blvd. Juno Beach, FL 33408                          Sheet                  I                of              2 Address Turkey Point Plant                                  Unit                                      4
: 2. Plant Name                                                      WO#: 36010029-01                      CR#.        N/A 9760 SW 344 Street Florida City, FL 33035 Address                                                              Repair Orgenlzatlon, P.O. No, Job No., etc.
: 3. Work Performed by              Florida Power and Light Co.                              Type Code Symbol Stamp                            N/A Name Authorization Number                              N/A 9760 SW 344 Street Florida City, FL .33035 Expiration Date                                    N/A Address
: 4. Identification of System:                  Main Steam                    .System #:  72      Quality Group                            B
: 5. (a) Applicable Construction Code                      1B31.1                          19 55 Edition, .......N/A....... Addenda, Addenda,        N/A    Code Case 19 98 Edition,    ....
200)0_.      _Addenda,          N/A    Code Case (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements
: 6. Identification of Components Corrected or Removed and Installed Components I ASME Corrected,            Code ame of Name                          of Mfg  Mfg Serial  National            Other                          Year    Removed or            Stamp Component                                      Number      Board          Identification                      Built      Installed          Yes/No Main Steam Snubber Support              PSA          42872      N/A                  4-1039                        N/A        Corrected N
: 7. Description of Work:
Replace snubber Internal parts during overhaul
: 8. Tests Conducted:        Hydrostatic:        N/A                Pneumatic          N/A              Nominal Operating Pressure                    N/A Other            VT-3            Pressure      NIA    psig          Test Temperature                N/A      deg F 06-013-4
 
Sheet 2 of 2 FORM NIS-2 (Back)
: 9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.
CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this replacement conforms to the rules of the ASME Code, Section XI.
Type Code Symbol Stamp                                                      NIA Certificate of Authorization No.                          N/A                Expiration Date:                N/A V..
                                                                    'Di            r,,-4                Date                  &
                                      -'-I -~--~--~------------*
                                      &      Owner or Owner's DesIgnee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT.$f Hartford, Connecticut, have inspected the components described In this Owners Report during the period of __                                  to  /---a  "-- 7 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners' Report in accordance with the requirements of ASME Code, Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this Inspection.
Commissions /                        C- . Al,    -J Inspector's Signature                                  National Board, State, Providence, and Endorsements Date 06-013-4
 
FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI Florida Power and Light Co.                            Date                        11/28/2006
: 1. Owner Name 700 Universe Blvd. Juno Beach, FL 33408                            Sheet                1                of              2 Address Turkey Point Plant                                  Unit                                    4
: 2. Plant Name                                                      WO#:  35022936-01                CR#:        N/A 9760 SW 344 Street Florida City, FL 33035 Address                                                            Repair Organization, P.O. No, Job No, etc.
:3.Work Performed by              Florida Power and Lght Co.                                Type Code Symbol Stamp                          NIA Name Authorization Number                            N/A 9760 SW 344 Street Florida City, FL 33035 Expiration Date                                NIA Address
: 4. Identification of System:        CVCS Charging and Letdown              System #:  47      Quality 'Group                          B
: 5. (a) Applicable Construction Code                      B31,1                            19 55 Edition,    NiA      Addenda,            N/A      Code Case (b) Applicable Edition of Section Xf Utilized for Repairs or Replacements            19 96 Edition,    2000      Addenda,            N/A      Code Case
: 6. Identification of Components Corrected or Removed and installed Components ASME Corrected,            Code Name of                      Name of Mfg      Mfg Serial  National          Other                      Year        Removed or            Stamp Component                                      Number        Board        Identification                Built        Installed          Yes/No 4A Charging Pump                  N/A          274162        N/A                4P201A                  N/A          Removed Pump Block Assembly                  N/A        RU05124        N/A                4P201A                  N/A          Installed              N BK-1
: 7. Description of Work:
Replace the pump "block assembly"
: 8. Tests Conducted:        Hydrostatic:        N/A                Pneumatic          N/A            Nominal Operating Pressure                  N/A Other              NIA              Pressure    2310    psig        Test Temperature              114        deg F 06-014-4
 
Sheet 2 of 2 FORM NIS-2 (Back)
: 9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section XI.
Type Code Symbol Stamp                                                  N/A Certificate of Authorization No.                      N/A                  Expiration Date:                N/A Signed          &#xfd;A-,,,&#xfd;                                                                  Date -I      W07 U)      Owner'-or Owner's Designee, Title    /
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have inspected the components described in this Owners Report during the period of            -r- z___o 4___    to      /-e f '--,7        c.e .
and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code, Section Xi.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, conceming the examinations and corrective measures described In this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this inspection.
1-6    6 ~        4                      Commissions 1-'        47.7 64 6,Y ZJ Inspector's Signature                              National Board, State, Providence, and Endorsements Date        /-i,-o 7 06-014-4
 
FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
: 1. Owner                          Florida Power and Light Co.                            Date                        12/28/2006 Name 700 Universe Blvd. Juno Beach, FL 33408                          Sheet                1              of                2 Address
: 2. Plant                              Turkey Point Plant                                  Unit                                  4 Name WO#:    36011213-01                CR#:.        NIA 9760 SW 344 Street Florida City, FL 33035.
Address                                                          Repair Organization, P.O. No, Job No., etc.
: 3. Work Performedd by            Florida Power and Liaht Co                                Type Code Symbol Stamp                        N/A Name Authorization Number                          N/A 9760 SW 344 Street Florida City, FL 33035 Address                                        Expiration Date                                N/A
: 4. Identification of System:              Intake Cooling Water              System #:  I9      Quality Group                          C
: 5. (a) Applicable Construction Code                      B31.1                            19 55 Edition,    NIA    Addenda,            N/A      Code Case (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements            19 98 Edition,    2000    Addenda,            N/A      Code Case
: 6. Identification of Components Corrected or Removed and Installed Components ASME Corrected,              Code Name of                      Name of Mfg    Mfg Serial  National          Other                    Year        Removed or            Stamp Component                                      Number      Board        Identification                Built        Installed            Yes/No ICW Flanges                    N/A            N/A        N/A              POV-4-4882                N/A        Corrected N
: 7. Description of Work:
Replace bolting at flange to POV-4-4882
: 8. Tests Conducted:        Hydrostatic:        N/A                Pneumatic        N/A              Nominal Operating Pressure                  NIA Other              N/A            Pressure      N/A    psig          TestTemperature            N/A        deg F 06-015-4
 
Sheet 2 of 2 FORM NIS-2 (Back)
: 9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section XI.
Type Code Symbol Stamp                                                  N/A Certificate of Authorization No.                      N/A                  Expiration Date:                N/A Signed 6~L~ 0 5                                          M C) 4/
V-            Date      I          0_-
0      Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I,the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBT of Hartford, Connecticut, have Inspected the components described in this Owners Report during the period of _            14 -o47'          to      f (13-07 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code, Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal Injury or property damage or a loss-of any kind arising from or connected with this inspection.
nsetr SgCommissions                                                    1'::?- 2e          E Inspector's Signature                              National Board, State, Providence, and Endorsements Date__________                            _
06-015-4
 
FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
: 1. Owner                          Florida Power and Light Co.                            Date                        S11/29/2006 Name 700 Universe Blvd. Juno Beach, FL 33408                        Sheet                1                                  2of Address Turkey Point Plant                                  Unit                                  4
: 2. Plant Name                                                    WO#:  36016269-01                CR#:        N/A 9760 SW 344 Street Florida City, FL 33035 Address                                                          Repair Organization, P.O. No, Job No., etc.
: 3. Work Performed by            Florida Power and Light Co.                              Type Code Symbol Stamp                          NIA Name Authorization Number                            NIA 9760 SW 344 Street Florida City, FL 33035                                                                        NIA Expiration Date Address
: 4. Identification of System:              Intake Cooling Water            System #:    19      Quality Group                          C
: 5. (a) Applipable Construction Code                      B31.1                          19 55 Edition,      N/A    Addenda,            N/A      Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements            19 98 Edition,    2000      Addenda,          N/A      Code Case
: 6. Identification of Components Corrected or Removed and Installed Components ASME Corrected,              Code Name of                      Name of Mfg    Mfg Serial National            Other                      Year      Removed or              Stamp Component                                        Number      Board          Identification                Built        Installed            Yes/No Pipe Collar/Clamp assembly              N/A          N/A        N/A              Pipe Collar                N/A        Corrected
: 7. Description of Work:
Replace pipe collartclamp assembly
: 8. Tests Conducted:        Hydrostatic:        N/A              Pneumatic          N/A            Nominal Operating Pressure                    X Other                N/A            Pressure        18    psig        Test Temperature              83        deg F 06-016-4
 
Sheet 2 of 2 FORM NIS-2 (Back)
: 9. Remarks MECHANICAL CONNECTION. NO WELDING REQUIRED.
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section XI.
Type Code Symbol Stamp                                                    N/A Certificate of Authorization No.                      N/A                  Expiration Date:                    N/A Signed 61      Owner or Owners Designee, Title        J Date          a      ,        _3to CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartfo&#xfd;, Connecticut, have inspected the components described In this Owners Report during the period of            7-________ to              /- 0        ;7 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners' Report in accordance with the requirements of ASME Code, Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
_____            __      __Commissions                      A&#xfd;4?7 I~ , Y 1 Inspector's Signature                                National Beoard, State, Providence, and Endorsements Date  ___              7 06-016-4
 
FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl Florida Power and Light Co.                            Date                          12/13/2006
: 1. Owner Name 700 Universe Blvd. Juno Beach, FL 33408                          Sheet                1                                  2of Address Turkey Point Plant                                  Unit                                  4 2, Plant Name                                                    WO#: 34011170-01                  CR#:        N/A 9760 SW 344 Street Florida City, FL 33035 Address                                                          Repair Organization, P.O, No, Job No., etc.
: 3. Work Performed by              Florida Power and Light Co.                              Type Code Symbol Stamp                        N/A Name Authorization Number                            N/A 9760 SW 344 Street Florida City, FL 33035                                                                          N/A Address Expiration Date
: 4. Identification of System: __    ___    Auxiliary Feedwater              System #:  75      Quality Group                          C
: 5. (a) Applicable Construction Code      _.              B31.1                            19 55 Edition,      N ./A.........
Addenda,          N/A      Code Case (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements            19 98 Edition,    2000      Addenda,          N/A      Code Case
: 6. Identification of Components Corrected or Removed and Installed Components ASME Corrected,              Code Name of                      Name of Mfg    Mfg Serial  National            Other                      Year      Removed or              Stamp Component                                      Number      Board        Identification                  Built        Installed            Yes/No Aux Feed Steam Supply Check                N/A          N/A        N/A                4-10-083                  N/A        Corrected Valve LA
: 7. Description of Work:
Replace valve plugs
: 8. Tests Conducted:        Hydrostatic:        N/A                Pneumatic        N/A              Nominal Operating Pressure                  N/A Other              N/A            Pressure      WA    psig          Test Temperature            N/A      deg F 06-017-4
 
Sheet 2 of 2 FORM NIS-2 (Back)
: 9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section XI.
Type Code Symbol Stamp                                                  N/A Certificate of Authorization No.                        N/A                Expiration Date:                N/A Signed                                                                                  Date ....
: 0)      Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartfrd, Connecticut, have.nspected the components described In this Owners Report during the period of
* ZY-O                  to  /,,/.O      7 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report In accordance with the requirements of ASME Code, Section Xl.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described In this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
_______________Commissions                          A4-7              C, , ,-
                                                                                                                            ,/?f Inspector's Signature                              National Board, State, Providence, and Endorsements Date      /-_-__      2 06-017-4
 
FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xi
: 1. Owner                          Florida Power and Light Co.                              Date                        11/28/2006 Name 700 Universe Blvd. Juno Beach, FL 33408                            Sheet                1                of                  2 Address Tujrkiv Pnlnt Plant                                    Unit                                  4.
: 2. Plant              .                * ",:*'*a ............
Name WO#:    36016269-02                CR#:          NIA 9760 SW 344 Street Florida City, FL 33035 Address                                                            Repair OrganizatTon, P.O. No, Job No., etc.
: 3. Work Performed by        -    Florida Power and Light Co.
Type Code Symbol Stamp                  _            /A Name Authorization Number                              N/A 9760 SW 344 Street Florida City, FL 33035 Expiration Date                                  NIA Address
: 4. Identification of System:                Intake Cooling Water                System #:  I9      Quality Group                          C
: 5. (a) Applicable Construction Code                            B31.1                          19 55 Edition,    N./A    Addenda,          .....N/A. Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements                19 98 Edition,    2000    Addenda,              N/A      Code Case
: 6. Identification of Components Corrected or Removed and Installed Components ASME Corrected,              Code Name of                        Name of Mfg        Mfg Serial National          Other                      Year        Removed or              Stamp Component                                            Number      Board        Identification                  Built        Installed            Yes/No Isolation Valve, iCW to Lube                  N/A            N/A      N/A              4-50-409                  N/A          Installed water                                                                                                                                        N Check Valve                        N/A          N//A      N/A              4-50-410                  N/A          Installed                N
: 7. Description of Work:
Replace valves 4-50-409 and 410
: 8. Tests Conducted:        Hydrostatic:            N/A              Pneumatic        N/A              Nominal Operating Pressure                      X Other                      NIA          Pressure    24      pslg        Test Temperature              82          deg F 06-018-4
 
Sheet 2 of 2 FORM NIS-2 (Back)
: 9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section Xl.
Type Code Symbol Stamp                                                  N/A Certificate of Authorization No.                      N/A                  Expiration Date:                N/A qinnpd              &deg;        2 Sinned O5~  t-,
Owner or Owner's Designee, Titde Date      i9~
                                  '9 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, gonnecticut, havenspected the components described in this Owners Report during the period of _            g-ze- o0,        to    /-  '.- _,7 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners' Report in accordance with the requirements of ASME Code, Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
_                                              Commissions            37-2        6 S~ X4~ 2-T)
Inspector's Signature                              National Board, State, Providence. and Endorsements Date                    7 06-018-4
 
FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
: 1. Owner                          Florida Power and Light Co.                            Date                        11/29/2006 Name 700 Universe Blvd. Juno Beach, FL 33408                          Sheet                1              of                2 Address Turkey Point Plant
.2. Plant                                                                                  Unit                                  4 Name WO#:    34013744-01                CR#:        N/A 9760 SW 344 Street Florida City, FL 33035 Address                                                          Repair Organization, P.O. No, Job No., etc.
: 3. Work Performed by              Florida Power and Liaht Co.                              Type Code Symbol Stamp                        N/A Name Authorization Number                            N/A 9760 SW 344 Street Florida City, FL 33035 Expiration Date                                N/A Address
: 4. Identification of System:              Intake Cooling Water              System #:  19      Quality Group                          C
: 5. (a) Applicable Construction Code                      B31.1                            19 55 Edition,      N/A    Addenda,            N/A      Code Case (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements            19 98 Edition,    2000    Addenda,            N/A      Code Case
: 6. Identification of Components Corrected or Removed and Installed Components ASME Corrected.            Code Name of                      Name of Mfg    Mfg Serial  National            Other                    Year        Removed or            Stamp Component                                        Number      Board        Identification                Built        Installed          Yes/No 4A ICW Pump                    N/A          IST-3      N/A                  4P9A                  N/A          Removed
                                                                                                                                                            -N ICW Pump                      NIA          IST-1      N/A                  4P9A                  N/A          Installed                N Expansion Joint                N/A            N/A      N/A                XJ-4-1406                N/A            Installed              N
: 7. Description of Work:
Replace pump, expansion joint and bolting.
: 8. Tests Conducted:        Hydrostatic:        N/A                Pneumatic        N/A              Nominal Operating Pressure                . X Other              N/A            Pressure      52    psig          Test Temperature            92        deg F 06-019-4
 
Sheet 2 of 2 FORM NIS-2 (Back)
: 9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.
CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this replacement conforms to the rules of the ASME Code, Section Xl.
Type Code Symbol Stamp                                                  N/A Certificate of Authorization No.                        N/A                Expiration Date:                  N/A
____Date 1- [t Owner or Owner's Designee, Title
                                  --u CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, ronnecticut, have inspected the components described in this Owners Report during the perlod of                /-'--          to      f-9--'*07 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code, Section Xi.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described In this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable In any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
_____            __________                        ~Commissions /              ,(          ~d ~
Inspector's Signature                                National Soard, State, Providence, and Endorsements Date 06-019-4
 
FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
: 1. Owner                          Florida Power and Light Co.                            Date                        12/28/2006 Name 700 Universe Blvd. Juno Beach, FL 33405                            Sheet                I              of              2 Address Turkey Point Plant                                    Unit                                  4
: 2. Plant Name                                                      WO#- 36011924-01                  CR#:        N/A 9760 SW 344 Street Florida City, FL 33035 Address                                                            Repair Organization, P.O. No, Job No,, etr.
: 3. Work Performed by            Florida Power and Liriht Co.                              Type Code Symbol Stamp                          N/A Name Authorization Number                            NIA 9760 SW 344 Street Florida City, FL 33035                                                                            N/A Address Expiration Date
: 4. Identification of System:              Steam Generators                  System #:  71      Quality Group                          A
: 5. (a) Applicable Construction Code                      B31.1                            19 55 Edition,      N/A    Addenda,            N/A      Code Case (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements            19 98 Edition,    2000    Addenda,            N/A      Code Case
: 6. Identification of Components Corrected or Removed and Installed Components I  ASME Corrected,              Code Name of                    Name of Mfg      Mfg Serial  National            Other                    Year        Removed or              Stamp Component                                      Number      Board          Identification                Built        Installed          Yes/No P          4B Steam Generator                NIA            N/A        N/A                4E210B                  N/A          Corrected
* N
: 7. Description of Work:
Replace handhole cover
: 8. Tests Conducted:    " Hydrostatic:        N/A                Pneumatic          NIA              Nominal Operating Pressure                    X Other              N/A              Pressure      2280    psig          Test Temperature            547      deg F 06-020-4
 
Sheet 2 of 2 FORM NIS-2 (Back)
: 9. Remarks :MECHANICAL CONNECTION, NO WELDING REQUIRED.
CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this replacement conforms to the rules of the ASME Code, Section XI.
Type Code Symbol Stamp                                                  N/A Certificate of Authorization No.                      N/A                Expiration Date:                  N/A
                                                                                                  .... Da Signed                                                                                      ie _      f&#xfd;_
S/
6        Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of. Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have nspected the components described in this Owners Report during the period of _            A          9    to    1- /V-'--,?
and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report In accordance with the requirements of ASME Code, Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable In any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Commissions -          ve4      nd Ed,Ale e, a/72 Inspector's Signature                              National Board, State, Providence, and Endorsements Date        _-,__-_-__7' 06-020-4
 
FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI 1.Owner                            Florida Power and Light Co.                            Date                        12/28/2006 Name 700 Universe Blvd. Juno Beach, FL 33408                          Sheet                1                of                2 Address
: 2. Plant                              Turkey Point Plant.                                Unit                                  4 Nam                                                      WO#: 35020910-01                  CR#:        N/A 9760 SW 344 Street Florida City, FL 33035 Address                                                            Repair Organization, P.O. No, Job No., etc.
: 3. Work Performed by      _      Florida Power and Light Co.                              Type Code Symbol Stamp                        N/A Name Authorization Number                            N/A 9760 SW 344 Street Florida City, FL 33035 Expiration Date                                NIA Address
: 4. Identification of System:        CVCS Charging and Letdown            . System #:  47      Quality Group                          A            _      _
: 5. (a) Applicable Construction Code                      B31.1                            19 55 Edition,      NIA    Addenda,            N/A      Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements            19 98 Edition,    2000    Addenda,            N/A      Code Case
: 6. Identification of Components Corrected or Removed and Installed Components
                                                                                                                                    !                    ASME Corrected,              Code Name of                      Name of Mfg      Mfg Serial  National          Other                      Year        Removed or              Stamp Component                                      Number      Board        Identification                Built        Installed            Yes/No Seal Water Injection Check              N/A            N/A        N/A                4-298D                  N/A          Corrected Valve                                                                                                                                  N
: 7. Description of Work:
Reweld bonnet seal weld B.Tests Conducted:        Hydrostatic:        N/A                Pneumatic        N/A              Nominal Operating Pressure                  N/A Other              NIA              Pressure      N/A    psIg          Test Temperature            N/A      deg F 06-021-4
 
Sheet 2 of 2 FORM NIS-2 (Back)
: 9. Remarks ALL WELDING PERFORMED IN ACCORDANCE WITH THE FPL WELD CONTROL MANUAL.
CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this replacement conforms to the rules of the ASME Code, Section XI.
Type Code Symbol Stamp                                                  N/A Certificate of Authorization No.                      N/A                Expiration Date:                N/A Signed                                                                                  Date    _._        9    07 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and
            'the state of Florida and employed by HSBCT of Hartford, Connecticut, have inspected the components described in this Owners Report during the period of              _-/3-- 0(        to    i- t .o' and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code, Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report, Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
                                                        "< ~Commissions
                                                            ~~~~~                                                72(        4,/
Inspector's Signature                              National Board. Slate, Providence, and Endorsements Date 06-021-4
 
FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
: 1. Owner                          Florida Power and Light Co.                                  Date                        12/28/2006 Name 700 Universe Blvd. Juno Beach, FL 33408                                Sheet                1                of                  2 Address 2, Plant                              Turkev Point Plant
                                      ...... J ............
Unit                                    4 Name                                                        WO#: 35019542-01                    CR#:        N/A 9760 SW 344 Street Florida City, FL 33035 Address                                                              Repair Organization, P.O. No, Job No., etc.
: 3. Work Performed by  by        Florida Power and Llaht Co.                                    Type Code Symbol Stamp __                        N/A
: 3. Work Performed                              Name Authorization Number                              N/A 9760 SW 344 Street Florida City, FL 33035 Expiration Date                                  N/A Address
: 4. Identification of System:      Containment Emergency Filters                  System #:  56      Quality Group                            B 19 55 Edition,      N/A    Addenda,              N/A      Code Case
: 5. (a) Applicable Construction Code                              B31.1 (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements                  19 98 Edition,    2000      Addenda,            N/A      Code Case
: 6. Identification of Components Corrected or Removed and Installed Components ASME Corrected,              Code Name of                          Name of Mfg        Mfg Serial  National            Other                    Year        Removed or              Stamp Component                                              Number      Board        Identification                Built          Installed          Yes/No Emergency Filter Isolation                N/A              N/A        N/A              SV-4-2907                N'A        .      ro.rected Valve                                                                                                                                          N
: 7. Description of Work:
Reweld bonnet seal weld after valve overhaul
: 8. Tests Conducted:      Hydrostatic:              N/A                Pneumatic        N/A              Nominal Operating Pressure                    X Other                      N/A          Pressure      N/A    psig          Test Temperature              N/A        deg F 06-022-4
 
Sheet 2 of 2 FORM NIS-2 (Back)
: 9. Remarks ALLWELDING PERFORMED IN ACCORDANCE WITH THE FPL WELD CONTROL MANUAL.
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section Xl.
Type Code Symbol Stamp                                                    NIA Certificate of Authorization No,                      N/A                  Expiration Date:                NIA
                    &#xfd;QnnE31                                                                _    _  Date                      7 62        Owner or Owner's Designee, Title          /
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Cpnnecticut, ,avejnspected the camponents described In this Owners Report during the period of                4  .-.- O    to    //*--,"
and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners' Report in accordance with the requirements of ASME Code, Section XI.
By signing thiscertificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection, i.-e* e<                  *    ---
* Commissions            -                    -
Inspector's Signature                              National Board, State. Providence, and Endorsements Date  ___                            _'  _
06-022-4
 
FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
: 1. Owner                          Florida Power and Light Co.                          Date                        12/28/2006 Name 700 Universe Blvd. Juno Beach, FL 33408                        Sheet                1              of              2 Address
: 2. Plant                              Turkey Point Plant                                  Unit                                  4 Name                                                    WO#:    35019543-01                CR#:        N/A 9760 SW 344 Street Florida City, FL 33035 Address                                                            Repair Organization, P.O. No, Job NO., etc.
: 3. Work Performed by            Florida Power and Light Co.                              Type Code Symbol Stamp                          N/A Name Authorization Number.                          N/A 9760 SW 344 Street Florida City, FL 33035 Expiration Date                                  N/A Address
: 4. Identification of System:      Containment Emergency Filters          System #:  56      Quality Group                          B
: 5. (a) Applicable Construction Code                      B31.1                            19 55 Edition,      N/A      Addenda,          N/A    Code Case (b)Applicable Edition of Section XI Utilized for Repairs or Replacements            19 98 Edition,    2000      Addenda,          N/A    Code Case
: 6. Idenlificatlon of Components Corrected or Removed and Installed Components ASME Corrected,              Code Name of                      Name of Mfg    Mfg Serial  National          Other                      Year      Removed or              Stamp Component                                      Number      Board        Identification                Built        Installed          Yes/No Emergency Filter Isolation            N/A          N/A        N/A              SV-4-2908                NIA          Corrected Valve                                                                                                                                  N
: 7. Description of Work:
Reweld bonnet seal weld after valve overhaul
: 8. Tests Conducted:      Hydrostatic:        N/A                Pneumatic        N/A              Nominal Operating Pressure                N/A Other              N/A              Pressure    N/A    psig          Test Temperature            N/A      deg F 06-023-4
 
Sheet 2 of 2 FORM NIS-2 (Back)
: 9. Remarks ALL WELDING PERFORMED IN ACCORDANCE WITH THE FPL WELD CONTROL MANUAL.
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section XI.
Type Code Symbol Stamp                                                  N/A Certificate of Authorization No.                      NIA                Expiration Date:                N/A SigOned                              owno        s    r-n,    M                      Date                  DlI Owner or Owner's Designee, Title7 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT H rtford Connecticut, have Inspected the components described in this Owners Report during the period of _        __-____-0_ __        to        /-,_9-_ -        _
and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners' Report In accordance with the requirements of ASME Code, Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Commissions
                          * -/    Inspectors Signature                              Natonal Board, State, Providence, and Endorsements Date        /-,9-a2 06-023-4
 
FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl
: 1. Owner                          Florida Power and Light Co.                          Date                        12/28/2006 Name 700 Universe Blvd. Juno Beach, FL 33408.                        Sheet                11              of              2
: 2. Plant                              Turkey Point Plant                                  Unit                                  4 Name                                                    WO#-. 35019541,-01                CR#:        N/A 9760 SW 344 Street Florida City, FL 33035 Address                                                          Repair Organization, P.O. No, Job ND, etc.
: 3. Work Performed by            Florida Power and Light Co.                              Type Code Symbol Stamp                          N/A Name Authorization Number                            N/A 9760 SW 344 Street Florida City, FL 33036 Address Expiration Date                                N/A
: 4. Identification of System:      Containment Emergency Filters            System #:  566-    Quality Group                          B 19 55 Edition,      N/A    Addenda,            N/A    Code Case
: 6. (a) Applicable Construction Code                      B31.1 (b) Applicable Edition of Section XI Utilized for Repairs or Replacements            19 98 Edition,    2000    Addenda,            N/A    Code Case
: 6. Identification of Components Corrected or Removed and Installed Components ASME Corrected,            Code Name of                      Name of Mfg    Mfg Serial National            Other                    Year        Removed or            Stamp Component                                      Number      Board        Identification                Built        Installed          Yes/No Emergency Filter Isolation            N/A            N/A        N/A              SV-4-2905                N/A          Corrected Valve                                                                                                                                N
: 7. DescrIption of Work:
Reweld bonnet seal weld after valve overhaul
: 8. Tests Conducted:        Hydrostatic:      N/A                Pneumatic          N/A            Nominal Operating Pressure                  N/A Other              N/A            Pressure      N/A    psig          Test Temperature            N/A        deg F 06-024-4
 
Sheet 2 of 2 FORM NIS-2 (Back)
: 9. Remarks ALL WELDING PERFORMED IN ACCORDANCE WITH THE FPL WELD CONTROL MANUAL.
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section XI.
Type Code Symbol Stamp                                                  NIA Certificate of Authorization No.                      N/A                  Expiration Date:                N/A Signed          6c~ 0 5,c                                                              Date        I    cj        "7 I2        Owner or Owner's Designee, Title /
CERTIFICATE OF INSERVICE INSPECTION 1,the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartfor Connecticut, have inspected the components described in this Owners Report during the'period of            2-onb -c            to    h    ie              copnnsd2 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code, Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this inspection.
_______________                            ~Commissions A          ?(~4A Inspectors Signature                              Natonal Board, State, Providence, and Endorsements Date          /*/      --
06-024-4
 
FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl 1, Owner                            Florida Power and Light Co.                              Date                          12/28/2006 Name 700 Universe Blvd. Juno Beach, FL 33408                              Sheet                1                of                2 Address Turkey Point Plant                                    Unit                                    4
: 2. Plant Name                                                      WO#: 36023673-01                  CR#:        N/A 9760 SW 344 Street Florida City, FL 33035 Address                                                            Repair Organization. P.O. No, Job No., etc.
: 3. Work. Performed by              Florida Power and Light Co.                                Type Code Symbol Stamp                          N/A Name Authorization Number              _      __    N/A 9760 SW 344 Street Florida City, FL 33035 Expiration Date                                N/A Address
: 4. Identification of System:              Residual Heat Removal                System #:  50      Quality Group                          A
: 5. (a) Applicable Construction Code                          B31.1                            19 55 Edition,      N/A    Addenda,            N/A      Code Case (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements                19 98 Edition,      2000      Addenda,          N/A      Code Case
: 6. identification of Components Corrected or Removed and Installed Components ASME Corrected,              Code Name of                          Name.of Mfg    Mfg Serial  National            Other                      Year      Removed or              Stamp Component                                          Number      Board          Identification                  Built        Installed            Yes/No RHRto Loop A RCS Check                      N/A          N/A        N/A                  4-876A                    N/A        Corrected Valve
__________________________[ ___________]  ________    .1______-          ._____________                                                ________
: 7. Description or Wovr:
Replace bonnet bolting
: 8. Tests Conducted:        Hydrostatic:          N/A              Pneumatic          N/A              Nominal Operating Pressure                  N/A Other                N/A            Pressure      N/A    psig          Test Temperature            N/A        deg F 06-025-4
 
Sheet 2 of 2 FORM NIS-2 (Back)
: 9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section XI.
Type Code Symbol Stamp                                                  N/A Certificate of Authorization No.                      N/A                  Expiration Date:                N/A Signed                                                                                  Date          510-7 Ut      Owner or Owner's Designee, Title '
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Haeford, Connecticut, have inspected the components described in this Owners Report during the period of_          '-    _              to    i-/,--      ;
and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners' Report in accordance with the requirements of ASME Code, Section Xl.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this inspection.
Commissions 9C,                        -'
                                                                                                                              , 1        ---
Inspector's Signature                              National Board, State, Providence, and Endorsements Date          1/-*      0o,2" 06-025-4
 
FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl
: 1. Owner                          Florida Power and Light Co.                            Date                        12/1812006 Name 700 Universe Blvd. Juno Beach, FL 33408                          Sheet                                of                2 Address
: 2. Plant                              Turkey Point Plant                                  Unit                                  4 Name                                                      WO#: 32002437-01                  CR#:        N/A 9760 SW 344 Street Florida City, FL 33035 Address                                                          Repair Organizatlon, P.O. No, Job No., etc,
: 3. Work Performed by              Florida Power and Light Co.                              Type Code Symbol Stamp                        N/A Name Authorization Number                          N/A 9760 SW 344 Street Florida City, FL 33035 Expiration Date                                N/A Address
: 4. Identification of System:                  Main Steam                    -System M, 72      Quality Group  ___          ___B_______
: 5. (a) Applicable Construction Code                      B31,1                            19 55 Edition,    N/A    Addenda,            N/A      Code Case (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements            19 98 Edition,    2000    Addenda,            N/A      Code Case
: 6. Identification of Components Corrected or Removed and Installed Components ASME Corrected,              Code Name of                      Name of Mfg      Mfg Serial  National          Other                    Year        Removed or              Stamp Component                                      Number      Board        Identification                Built        Installed            Yes/No Main Steam Safety Valve              N/A        BL0400        N/A              RV-4-1405                N/A        Corrected Main Steam Safety Valve              N/A        DA07605        N/A              RV-4-1405                N/A          Installed              N
: 7. Description of Work:
Replace Valve and Bolting
: 8. Tests Conducted:        Hydrostatic:        NIA                Pneumatic        N/A              Nominal Operating Pressure                    X Other              N/A            Pressure      993    psig        Test Temperature            544        deg F 06-026-4
 
Sheet 2 of 2 FORM NIS-2 (Back)
: 9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section X1.
Type Code Symbol Stamp                                                  N/A Certificate of Authorization No.                      N/A                Expiration Date:                  N/A
                                                  --- 05,6 (\4v/                                      ate40              0 Signed I
Date --    llf&#xfd; 107
                                        . Owner or Owners Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have inspected the components described in this Owners Report during the period of              iO-Z4 -Oa to _______o____
and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code, Section XI.
By signing this certificate neither the Inspector nor his employe& makes any warranty, expressed or implied, concerning the examinations and corrective measures described In this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
CommissionsF              ?          C Inspector's Signature                              National Board, Slate. Providence, and Endorsements Date            /-'* l-      2 06-026-4
 
FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
: 1. Owner                          Florida Power and Light Co.                                  Date                        12/'18/2006 Name 700 Universe Blvd. Juno Beach, FL 33408                                Sheet                1              of                2 Address
: 2. Plant                              Turkey Point Plant                                        Unit Name WO#: 34002222- 01                CR#:        N/A 9760 SW 344 Street Florida City, FL 33035 Address                                                                  Repair Organizatlon, P.O. No, Job No., etc.
: 3. Work Performed by              Florida Power and Light Co.                                    Type Code Symbol Stamp                          N/A Name Authorization Number                            NIA 9760 SW 344 Street Florida City, FL 33035 Address                                              Expiration Date                                  N/A
: 4. Identification of System:                  Main Steam                    System#:        72      Quality Group                          B 19 55 Edition,      NIA    Addenda,            N/A      Code Case
: 5. (a) Applicable Construction Code                      B31.1.
(b) Applicable Edition of Section X1 Utilized for Repairs or Replacements                  19 98 Edition,    2000    Addenda,            N.A      Code Case
: 6. Identification of Components Corrected or Removed and Installed Components ASME Corrected,              Code Name of                      Name of Mfg    Mfg Serial    National                Other                    Year        Removed or              Stamp Component                                      Number    i Board              Identification                Built        Installed          Yes/No Main Steam Safety Valve              N/A        BL0403        N/A                    RV-4-1406                N/A          Removed Main Steam Safety Valve              N/A        BL00404        N/A                    RV-4-1406                N/A          Installed              N 4                            -~        4. ________________________                                          .      ________
: 7. Description of Work:
Replace Valve and Bolting
: 8. Tests Conducted:        Hydrostatic:        N/A                Pneumatic              N/A              Nominal Operating Pressure                    X Other            N/A              Pressure          993      psig          Test Temperature            544      deg F 06-027-4
 
Sheet 2 of 2 FORM NIS-2 (Back)
: 9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section XI.
Type Code Symbol Stamp                                                  NIA Certificate of Authorization No.                      N/A                Expiration Date:                  N/A Signed        6    )
lu
                                        "  _          o~ rvTh(-
Owner or Owner's Designee, Title' J
Date      I    9 107 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford Connecticut, have ipspected the components described in this Owners Report during the period of            g)- z.*o&#xfd;          to    /-/V-,07 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners' Report In accordance with the requirements of ASME Code, Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable In any manner for any personal injury or property damage or a loss of any kind arising from or connected with this Inspection.
Commissions        ,c,                4- s')
Inspector's Signature                              National Board, State, Providence. and Endorsements Date          /-/9,07 06-027-4
 
FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
: 1. Owner                          Florida Power and Light Co.                            Date                        12/182006 Name 700 Universe Blvd. Juno Beach, FL 33408                          Sheet                1              of                2 Address 2, Plant                              Turkey Point Plant                                  Unit                                  4 Name                                                    WO#: 35028688-01                  CR#:        N/A 9760 SW 344 Street Florida City, FL 33035 Address                                                            Repair Organization, P.O. No, Job No. at,
: 3. Work Performed by              Florida Power and Lliht Co.                              Type Code Symbol Stamp                          N/A Name Authorization Number                            N/A 9760 SW 344 Street Florida City, FL 33035 Expiration Date                                  N/A Address
: 4. Identification of System:                  Main Steam                    -System #:  72      Quality Group                          B
: 5. (a) Applicable Construction Code                      B31.1                            19 55 Edition,      N/A    Addenda,            N/A      Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements            19 98 Edition,    2000    Addenda,            N/A      Code Case
: 6. Identification of Components Corrected or Removed and Installed Components ASME Corrected,              Code Name of                      Name of Mfg      Mfg Serial  National            Other                    Year        Removed or              Stamp Component                                      Number      Board        Identification                Built        Installed            Yes/No Main Steam Safety Valve              N/A        BL0406        N/A              RV-4-1407                N/A          Removed Main Steam Safety Valve              NIA        BL00397      N/A              RV-4-1407                NIA          Installed              N
: 7. Description of Work:
Replace Valve and Bolting 8: Tests Conducted:        Hydrostatic:        N/A                Pneumatic          N/A            Nominal Operating Pressure                    X Other              N/A            Pressure      993    psig          Test Temperature            544        deg F 06-028-4
 
Sheet 2 of 2 FORM NIS-2 (Back)
: 9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.
CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this replacement conforms to the rules of the ASME Code, Section XI.
Type Code Symbol Stamp                                                    N/A Certificate of Authorization No.                      NIA                  Expiration Date:                  N/A VV'\ q j-                Date        I'*o        7 Signed I"
O      Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have inspected the components described in this Owners Report during the period of          10-W-04              to ______/            ____0"    _
and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report In accordance with the requirements of ASME Code, Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable In any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
                                      ~
Inspectors Signature
                                                              ~Commissions                              . A;- 0177L<        A, Ali. jJ National Board, State, Providence, and Endorsements Date          1-    1,9 7 06-028-4
 
FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI 1, Owner                          Florida Power and Light Co.                          Date                        12/18/2006 Name 700 Universe Blvd. Juno Beach, FL 33408                          Sheet                I              of                2 Address
: 2. Plant                              Turkey Point Plant                                Unit                                  4 Name                                                    WO#: 35019831-01                  OR#:        N/A 9760 SW 344 Street Florida City, FL 33035 Address                                                          Repair Organizaston, P.O. No, Job No., etc,
: 3. Work Performed by              Florida Power and Liht Co.                              Type Code Symbol Stamp                        NIA Name Authorization Number                            N/A 9760 SW 344 Street Florida City, FL 33035                                                                        N/A Expiration Date Address
: 4. Identification of System:                  Main Steam                    System #  72      Quality Group                          B
: 5. (a) Applicable Construction Code                        B31.1                          19 55 Edition,      N/A_. Addenda,          N/A.Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements          19 98 Edition,    2000      Addenda,          NiA      Code Case
: 6. Identification of Components Corrected or Removed and Installed Components ASME Corrected,              Code Name of                      Name of Mfg      Mfg Serial  National          Other                    Year        Removed or              Stamp Component                                      Number      Board        Identification                Built        Installed            Yes/No Main Stearn Safety Valve              N/A        BLO401        N/A              RV-4-1410                N/A          Removed                  N Main Steam Safety Valve              N/A        DA07606      N/A              RV-4-1410                N/A          Installed                N
: 7. Description of Work:
Replace Valve and Bolting
: 8. Tests Conducted:        Hydrostatic;        N/A                Pneumatic        N/A              Nominal Operating Pressure                    X Other              NIA              Pressure    998    pslg        Test Temperature            544      deg F 06-029-4
 
Sheet 2 of 2 FORM NIS-2 (Back)
: 9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section XI.
Type Code Symbol Stamp                                                  N/A Certificate of Authorization No.                        N/A              Expiration Daate:                N/A "I.nn d W
e,                                                                      Date              01 d
0        Owner or Owner's Designee, Title    -J CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford Connecticut, have Inspected the components described in this Owners Report during theperiod of              /0--___ _ _,      to    /-'17-and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners' Report in accordance with the requirements of ASME Code, Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described In this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable In any manner for-any personal Injury or property damage or a loss of any kind arising from or connected with this inspection.
_______________Commissions                                              IL                , ,,    )
Inspector's Signature                              National Board, State, Providence, and Endorsements.
Date  ___        /7      _____
06-029-4
 
FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xi
: 1. Owner                          Florida Power and Light Co.                            Date                          12/13/2006 Name 700 Universe Blvd. Juno Beach, FL 33408                          Sheet                I                of              2 Address
: 2. Plant                              Turkey Point Plant                                  Unit                                    4 Name                                                    WO#:    36005400-01                CR#:        N/A 9760 SW 344 Street Florida City, FL 33035 Address                                                          Repair Organizatilon, P.O. No, Job No., ede.
: 3. Work Performed by              Florida Power and Uight Co.                              Type Code Symbol Stamp                          N/A Nmer 9760 SW 344 Street Florida City, FL 33035                        Authorization Number                            N/A Expiration Date                                NIA Address
: 4. Identification of System:                Reactor Coolant _System                #:  41      Quality Group                          A 19 55 Edition,      N/A..__. Addends,            N/A    Code Case
: 5. (a) Applicable Construction Code        .B31.1 (b) Applicable Edition of Section XI Utilized for Repairs or Replacements            19 98 Edition. 2000      Addenda,            N/A      Code Case
: 6. Identification of Components Corrected or Removed and Installed Components ASME Corrected,              Code Name of                      Name of Mfg      Mfg Serial  National          Other                      Year      Removed or              Stamp Component                                        Number      Board        Identification                Built        Installed            Yes/No Pressurizer Safety Valve              N/A        H51249-      NIA              RV-4-551A                  N/A          Removed 1579                                                                                          N Pressurizer Safety Valve              N/A        H51249-      N/A              RV-4-551A                  NIA          Installed              N 1580 7.. Description of Work:
Replace valve and bolting
: 8. Tests Conducted:        Hydrostatic:        NIA                Pneumatic        N/A              Nominal Operating Pressure                    X Other              N/A              Pressure    2280    pslg          Test Temperature            547        deg F 06-030-4
 
Sheet 2 of 2 FORM NIS-2 (Back)
: 9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.
CERTIFICATE OF COMPLIANCE We certify that the statements made in, the report are correct and this replacement conforms to the rules of the ASME Code, Section XI.
Type Code Symbol Stamp                                                    N/A Certificate of Authorization No.                      NIA                    Expiration Date:                N/A Signed        6 J-,&#xfd;                                                    I Date        1~/9 i0        Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBQT of Hartford, Connecticut, have inspected the components described in this Owners Report during the period of          4----- .              to    ,-,,v3e-and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners' Report in accordance with the requirements of ASME Code, Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Commissions      /                  '
Inspector's Signature                                National Board, State, Providence, and Endorsements Date 06-030-4
 
FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI 1.Owner                            Florida Power and Light Co.                          Date                        12113/2008 Name 700 Universe Blvd. Juno Beach, FL 33408                        Sheet                I                of                2 Address
: 2. Plant                              Turkey Point Plant                                  Unit                                  4 Name                                                    WO#:    36005401-01                CR#:        NIA 9760 SW 344 Street Florida City, FL 33035 Address                                                          Repair Organization, P.O. No, Job No., etc.
: 3. Work Performed by        __Florida Power and Light Co.                                Type Code Symbol Stamp                          N/A Name Authorization Number                            N/A 9760 SW 344 Street Florida City, FL 33035 Address                                        Expiration Date                                N/A
: 4. Identification of System:                Reactor Coolant                System #:  41      Quality Group                          A 19 55 Edition ,    N/A__ Addenda,              N/A      Code Case
: 5. (a) Applicable Construction Code                      B31. 1 (b) Applicable Edition of Section XAUtilized for Repairs or Replacements            19 98 Edition,    2000    Addenda,            NIA      Code Case
: 6. Identification of Components Corrected or Removed and Installed Components ASME Corrected,              Code Name of                      Name of Mfg    Mfg Serial  National            Other                    Year        Removed or            Stamp Component                                      Number      Board        Identification                Built        Installed          Yes/No Pressurizer Safety Valve            N/A        N69877-      N/A              RV-4-551 B                N/A          Removed 00-0004                                                                                        N Pressurizer Safety Valve            N/A        N69877-      N/A              RV-4-551B                N/A          Installed              N 01-0009 I1
: 7. L)escriptlon or WorK:
Replace valve and bolting
: 8. Tests Conducted:        Hydrostatic:      WA                  Pneumatic        N/A              Nominal Operating Pressure                    X Other              N/A            Pressure    2280    psig        Test Temperature            647      deg F 06-031-4
 
Sheet 2 of 2 FORM NIS-2 (Back)
: 9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section Xl.
Type Code Symbol Stamp                                                    N/A Certificate of Authorization No.                      N/A                  Expiration Date:                  N/A Signed                                                                                    Date              9_0_-7
                                      )      Owner orowner's Designee, Title /
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have Inspected the components described in this Owners Report during the period of              4-ze-c-o              to /-/7-47 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners' Report In accordance with the requirements of ASME Code, Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report, Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
____________-Commissions                          /21          4-z C,~            _
Inspector's Signature                                National Board, State, Providence, and Endorsements Date 06-031-4
 
FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI 1.Owner                            Florida Power and Light Co.                            Date                          12/13/2006 Name 700 Universe Blvd. Juno Beach, FL 33408                            Sheet                  1              of              2 Addrou
: 2. Plant                              Turkey Point Plant                                  Unit                                    4 Name                                                      WO#:    36005402-01                CR#-.        NIA 9760 SW 344 Street Florida City, FL 33035 Address                                                              Repair Organization, P.O. No, Job No., ets.
: 3. Work Performed by              Florida Power and Li lt Co.                              Type Code Symbol Stamp                            N/A Name Authorization Number                              N/A 9760 SW 344 Street Florida City, FL 33035 Expiration Date                                    N/A Address
: 4. Identification of System:                                                .System #:  41      Quality Group 1955 Edition,      _...N/A      Addenda,          N/A      Code Case
: 5. (a) Applicable Construction Code                        B31 1 (b) Applicable Edition of Section XI Utilized for Repairs or Replacements            19 98 Edition,      2000      Addenda,          N/A      Code Case
: 6. Identification of Components Corrected or Removed and Installed Components ASME Corrected,            Code Name of                      Name of Mfg      Mfg Serial  National          Other                        Year        Removed or            Stamp Component                                      Number      Board          Identification                  Built        Installed          Yes/No Pressurizer Safety Valve              N/A        H51249-      NIA              RV-4-551 C                  NIA          Removed 1581 Pressurizer Safety Valve              N/A        N69877-      N/A              RV-4-551C                    N/A          Installed              N 01-0008
: 7. Description of Work:
Replace Valve and Bolting
: 8. Tests Conducted:        Hydrostatic:        NIA                Pneumatic          N/A              Nominal Operating Pressure                      X Other              N/A              Pressure      2280    psig          Test Temperature              547      deg F 06-032-4
 
Sheet 2 of 2 FORM NIS-2 (Back)
: 9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.
CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this replacement conforms to the rules of the ASME Code, Section XI.
Type Code Symbol Stamp                                                  N/A Certificate of Authorization No.                      N/A                  Expiration Date:                N/A Date                (07 Sinned Owner or Owner's Designee, Title/
(
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have inspected the components described in this Owners Report during the period of _              4 -Ze 40      to      i-fl7-07 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners' Report in accordance with the requirements of ASME Code, Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
__________                            Commissions fC/72,4(. C,*                    -.)
Inspector's Signature                              National Board, State, Providence, and Endorsements Date        /7        2 06-032-4
 
FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl 1.Owner                            Florida Power and Light Co.                            Date                          12/ 13/2006 Name 700 Universe Blvd. Juno Beach, FL 33408                          Sheet                  1              of                  2 Address
: 2. Plant                              Turkey Point Plant                                  Unit                                    4 IName                                                    WO#:      35020912-01                CR#:          N/A 9760 SW 344 Street Florida City, FL 33035 Addres                                                              Repair Organization. P.O, No, Job No., etc.
: 3. Work Performed by              Florida Power and Light Co.                              Type Code Symbol Stamp                            NIA Name Authorization Number                              N/A 976C SW 344 Street Florida City, FL 33035 ExpirationDate                                    N/A Address
: 4. Identification of System:              Main Feedwater                    System #:  74      Quality Group                            B 19 55 Edition ....... N/A      Addenda,          N/A        Code Case
: 5. (a) Applicable Construction Code                        B31.1 (b) Applicable Edition of Section Xl Utilized for Repairs or Replacer nents          19 98 Edition,      200..0    Addenda,            ...... ....Code Case N/.A
: 6. Identification of Components Corrected or Removed and Installed Components ASME Corrected,              Code Name of                      Name of Mfg      Mfg Serial  National            Other                      Year        Removed or              Stamp Component                                        Number      Board        Identification                  'Built        Installed            Yes/No Feedwater bypass check valve            N/A            N/A        N/A                4-20-131                    N/A        Corrected                N
: 7. Description of Work:
Replace bonnet bolting
: 8. Tests Conducted:        Hydrostatic:        N/A                Pneumatic        NIA              Nominal Operating Pressure.                      N/A Other              NIA              Pressure      NIA    psig          Test Temperature              N/A        deg F 06-033-4
 
Sheet 2 of 2 FORM NIS-2 (Back)
: 9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section XI.
Type Code Symbol Stamp                                                  NIA Certificate of Authorization No.                      N/A                  Expiration Date:                  N/A 02 Signed                                                                                  Date
: 6)        Ovir or Owner's Designee, Titli/
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have Inspected the components described in this Owners Report during the period of                //-_2._____
                                                                      ,_-- (& to __-1/_7-0__
and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report In accordance with the requirements of ASME Code, Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described In this Owners' Report Furthermore, neither the Inspector nor his employer shall be liable In any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this inspection.
Commissions                          4 e Inspector's Signature                                National Board, State, Providence. and Endorsements Date          /7-06-033-4
 
FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
: 1. Owner                            Florida Power and Light Co.                          Date                        12113/2006 Naone 700 Universe Blvd. Juno Beach, FL 33408                          Sheet                1                of              2 Address Turkey Point Plant                                  Unit                                    4
: 2. Plant Name                                                    WO#: 36013194-01                    CR#:      N/A 9760 SW 344 Street Florida City, FL 33035 Address                                                          Repair Organ*zation, PO. No, Job No., etc.
: 3. Work Performed by              Florida Power and Light Co.                              Type Code Symbol Stamp                          N/A Name Authorization Number                            N/A 9760 SW 344 Street Florida City, FL 33035                                                                          N/A Address Expiration Date
: 4. Identification of System:              charging and letdown            -System #:  47      Quality Group                          6
: 5. (a) Applicable Construction Code                        B31.1                            19 55 Edition,      N/A    Addenda,            N/A    Code Case (b) Applicable Edition of Section Xi Utilized for Repairs or Replacements              19 98 Edition,    2000      Addenda,            N/A    Code Case
: 6. Identification of Components Corrected or Removed and Installed Components ASME Corrected,            Code Name of                        Name of Mfg    Mfg Serial National            Other                      Year        Removed or            Stamp Component                                        Number      Board          Identification                Built          Installed        Yes/No Seal water injection filter              N/A          N/A        N/A                  4-293A                  N/A            Installed isolation valve                                                                                                                            N Pipe Support                    N/A          NIA        N/A                    H-5                  N/A          Corrected              N rtt
: 7. Description of Work:
Replace valve and section of pipe by welding and reweld removed support
: 8. Tests Conducted:        Hydrostatic:        NVA              Pneumatic          N/A              Nominal Operating Pressure                  X Other                N/A            Pressure      2364    psig          Test Temperature              99        deg F 06-034-4
 
Sheet 2 of 2 FORM NIS-2 (Back)
: 9. Remarks ALL WELDING PERFORMED IN ACCORDANCE WITH THE FPL WELD CONTROL MANUAL.
CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this replacement conforms to the rules of the ASME Code, Section XI.
Type Code Symbol Stamp                                                  N/A Certificate of Authorization No.                      N/A                Expiration Date:                  N/A Signed                                                                                  Date      '    c        "7 0      Owneror Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have inspected the components described in this Owners Report during the period of          Ii-  - O            to    7/.- /7--7 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code, Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable In any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
_ _  __    _    _    _    _            Commissions                            L+
                                                                                                                              -4A2        l Inspector's Signature                              National Board, State, Providence, and Endorsements Date    /-. /7-0 7 06-034-4
 
FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl 1.Owner                            Florida Power and Light Co.                          Date                        12113/2006 Name 700 Universe Blvd. Juno Beach, FL 33408                        Sheet                I              of              2 Address
: 2. Plant                              Turkey Point Plant                                Unit                                  4 Name                                                    WO#:    36013195-01                CR#:        N/A 9760 SW 344 Street Florida City, FL 33035 Address                                                          Repair Organization, P.O. No, Job No., etc,
: 3. Work Performed by              Florida Power and Light Co.                            Type Code Symbol Stamp                          N/A Name Authorization Number                            N/A 9760 SW 344 Street Florida City, FL 33035 Address                                      Expiration Date                                N/A
: 4. Identification of System:        CVCS Charging and Letdown              System #:  47      Quality Group
: 5. (a) Applicable Construction Code                      B31.1                          19 55 Edition,      N/A    Addenda,            N/A    Code Case (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements          19 98 Edition,    2000    Addenda,            N/A    Code Case
: 6. Identification of Components Corrected or Removed and Installed Components ASME Corrected,            Code Nameof                      Name of Mfg      Mfg Serial  National          Other                      Year        Removed or              Stamp Component                                      Number      Board        Identification                Built        Installed          Yes/No Seal Water Filter Isolation Valve          NWA            N/A        N/A                4-293B                  N/A          Installed              N
: 7. Description of Work:
Replace valve and section of pipe by welding
: 8. Tests Conducted:        Hydrostatic:        N/A                Pneumatic        N/A              Nominal Operating Pressure                    X Other              N/A              Pressure    2364    psig          Test Temperature            99        deg F 06-035-4
 
Sheet 2 of 2 FORM NIS-2 (Back)
: 9. Remarks ALL WELDING PERFORMED IN ACCORDANCE WITH THE FPL WELD CONTROL MANUAL.
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section Xl.
Type Code Symbol Stamp                                                  N/A Certificate of Authorization No.                      N/A                Expiration Date:                  N/A Signed 04A /                        Date        I )        O 0.
Signed
                            -      -~r~- ~
Owiner or Owner's Designee, Title aI CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have Inspected the components described in this Owners Report during the period of _          'A 9-e<            to    j7Y - 77 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners' Report in accordance with the requirements of ASME Code, Section XI.
By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described In this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this Inspection.
Commissions      -    /2J177    14 C,      l, I Inspector's Signature                              National Board, State, Providence. and Endorsements Date      1          _    _
06-035-4
 
FORM NIS.2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
: 1. Owner                          Florida Power and Light Co.                            Date                          12/12/2006 Name 700 Universe Blvd. Juno Beach, FL 33408                          Sheet                1                of                2 Address Turkey Point Plant                                  Unit                                    4
: 2. Plant
                                          . Name                                                    WO#: 35015455-01                    CR#:        N/A 9760 SW 344 Street Florida City, FL 33035 Address                                                            Repair OrganizatioN, P.O. No, Job No., etc.
: 3. Work Performed by            Florida Power and Light Co.                              Type Code Symbo l Stamp                          N/A Name Authorization Numnber                            N/A 9760 SW 344 Street Florida City, FL 33035                                                                            N/A Expiration Date Address
: 4. Identification of System:              Containment Spray                System #:  68      Quality Grou PB
: 5. (a) Applicable Construction Code                      B31.1                            19 55 Edition,    . N/A. Addenda,            N/A.... Code
                                                                                                                                          .....          de Case Case 1998 Edition,      2000      Addenda,            N/A      Code Case (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements
: 6. Identification of Components Corrected or Removed and'installed Components ASME Corrected,              Code Name of                      Name of Mfg    Mfg Serial  National            Other                      Year        Removed or              Stamp Component                                      Number      Board          Identification                  Built          Installed          Yes/No CSP A discharge check valve              N/A          N/A        N/A                  4-890A                  N/A          Corrected                N
: 7. Description of Work:
Replace Bolting material
: 8. Tests Conducted:        Hydrostatic:        N/A                Pneumatic          N/A              Nominal Operating Pressure                    N/A Other              N/A            Pressure      N/A    psig          Test Temperature              N/A      deg F 06-036-4
 
Sheet 2 of 2 FORM NIS-2 (Back) 9, Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section Xl.
Type Code Symbol Stamp                                                  N/A Certificate of Authorization No.                      N/A                Expiration D.ate:                N/A 5lInn f=
d            --
Date Sinned 6'      Owner or Owner's Designee, Title I CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have inspectpd the components described In this Owners Report during the period of        /0-3/.-1.'6            to      /7      06 7 c.. /-o7 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code, Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described In this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable In any manner for any personal injury or.property damage or a loss of any kind arising from or connected with this Inspection.
Commissions 42' 77/                  C "O&#xfd; 4    *)
Inspector's Signature                              National Board, Slate, Providence, and Endorsemerfs Date          /-/ 7-,o K 7 o7 08-038-4
 
FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
: 1. Owner                          Florida Power and Light Co.                            Date                          1211312006 Name 700 Universe Blvd. Juno Beach, FL 33408                        Sheet                1                of              2 Address
: 2. Plant                              Turkey Point Plant                                  Unit                                    4 Name                                                    WO#:    36017280-01                CR#:      N/A 9760 SW 344 Street Florida City, FL 33035 Address                                                            tRepalr urganization, P.O. NO,Job No. etc.
: 3. Work Performed by            Florida Power and Light Co.                              Type Code Symbol Stamp                          N/A Name Authorization Number                            N/A 9760 SW 344 Street Florida City, FL 33035 Expiration Date                                  N/A Address
: 4. Identification of System:              Containment Spray              System #:    68      Quality Group                            B
: 5. (a) Applicable Construction Code                      B31.1                            19 55 Edition,      N/A      Addenda,          N/A    Code Case (b) Applicable Edition of Section X1Utilized for Repairs or Replacements            19 98 Edition,    2000      Addenda,          N/A    Code Case
: 6. Identification of Components Corrected or Removed and Installed Components ASME Corrected,            Code Name of                      Name of Mfg    Mfg Serial  National            Other                    Year        Removed or            Stamp Component                                      Number      Board          Identification                Built          Installed          Yes/No CSP discharge check valve              N/A          N/A        N/A                  4-890B                  N/A          Corrected N
: 7. Description of Work:
Replace bolting material
: 8. Tests Conducted:        Hydrostatic:      NIA                Pneumatic          NIA              Nominal Operating Pressure                  N/A Other              N/A            Pressure      WA    psig          Test Temperature              N/A      deg F 06-037-4
 
Sheet 2 of 2 FORM NIS-2 (Back)
: 9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section XI.
Type Code Symbol Stamp                                                  N/A Certificate of Authorization No.                        N/A              Expiration Date:                  N/A Signed                                                                                  Date          191)o-7 J*
Owner or Owner's Designee, Title      /
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartf rd, Connecticut, have inspected the components described in this Owners Report during the period of          .-      8.-' ,?      to    /./i? O7 -
and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners' Report In accordance with the requirements of ASME Code, Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this inspection.
_____________Commissions                              &#xfd;z2n2 Inspector's Signature                              National Board, State, Providence, and Endorsements Date            A/ X 7 06-037-4
 
FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
: 1. Owner                          Florida Power and Light Co.                            Date                        12/18/2006 Nerm 700 Universe Blvd. Juno Beach, FL 33408                          Sheet                1                of                2 Address Turkey Point Plant              ._                Unit                                  4
: 2. Plant Name                                                      WO#: 36011117-01                  CR#:        N/A 9760 SW 344 Street Florida City, FL. 33035 Address                                                            Repair Organization, P.O. No, Job No., etc.
: 3. Work Performed by              Florida Power and Ught Co.                              Type Code Symbol Stamp                          NIA Name Authorization Number                            N/A 9760 SW 344 Street Florida City, FL 33035 Expiration Date                                N/A Address
: 4. Identification of System:          Component Cooling Water              System #:  30      Quality Group                          C
: 5. (a) Applicable Construction Code                      B31.1                            19 55 Edition,      N/A      Addenda,          N/A      Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements            19 98 Edition,    2000      Addenda,          NIA      Code Case
: 6. Identification of Components Corrected or Removed and Installed Components ASME Corrected,            Code Name of                      Name of Mfg      Mfg Serial National            Other                    Year        Removed or            Stamp Component                                        Number      Board        Identification                Built        Installed          Yes/No CCW Pipe Support                  NIA            N/A        N/A              4-ACH-100                N/A          Corrected                N
: 7. Description of Work:
Modify support per PCM
: 8. Tests Conducted:        Hydrostatic:        N/A                Pneumatic        N/A              Nominal Operating Pressure                  NIA    '
Other            VT-3              Pressure      N/A    psig          Test Temperature            N/A      deg F 08-038-4
 
Sheet 2 of 2 FORM NIS-2 (Back)
: 9. Remarks ALL WELDING PERFORMED IN ACCORDANCE WITH THE FPL WELD CONTROL MANUAL.
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section XI.
Type Code Symbol Stamp                                                  N/A Certificate of Authorization No,                      N/A                Expiration Date:                  NIA Signed                                                              124c*1              Data A~                0 -7 (2      Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have inspected the components described in this Owners Report during the period of          iO- 3o0- o0          to    /f/e-- ,
and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners' Report In accordance with the requirements of ASME Code, Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described In this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Commissions              4 77 (4X          Al,    __
Inspector's Signature                              National Board, State, Providence, and Endorsements Date                    -7 06-038-4
 
FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
: 1. Owner                          Florida Power and Light Co.                            Date                      12118/2006 700 Universe Blvd. Juno Beach, FL 33408                        Sheet              I                of.              2 Address Turkey Point Plant                                Unit                                  4
: 2. Plant Name                                                    WO#: 36017279-01                  CR#:        NIA 9760 SW 344 Street Florida City, FL 33035 Address                                                          Repair Organjzatio , P.O. No, Job No, etc,
: 3. Work Performed hb  -3 Florida Power and Liaht Co.                            Type Code Symbol Stamp                        N/A Name Authorization Number                            N/A 9760 SW 344 Street Florida City, FL 33035                                                                        N/A Address Expiration Date 4, Identification of System:                Safety Injection                System #. 62 _ Quality Group                            B
: 6. (a) Applicable Construction Code                      831.1                          19 55 Edition,      NIA    Addenda,            N/A      Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements          19 98 Edition,. 2000    Addenda,            N/A      Code Case
: 6. Identification of Components Corrected or Removed and installed Components Name of                      Name of Mfg    Mfg Serial National Component                                        Number      Board ECCS Suction Isolation Valve            N/A            N/A        N/A
: 7. DescriDtion of Work:
Replace bonnet bolting
: 8. Tests Conducted:        Hydrostatic:        N/A                Pneumatic        N/A            Nominal Operating Pressure                  N/A Other              N/A              Pressure      N/A    psig        Test Temperature            N/A      deg F 06-039-4
 
Sheet 2 of 2 FORM NIS-2 (Back)
: 9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section XI.
Type Code Symbol Stamp                                                    N/A Certificate of Authorization No.                      N/A                    Expiration Date:                N/A Signed O    er C2$~rT Owner's Designee, Title Date      4 0~
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have Inspected the components described in this Owners Report during the period of          '_ O6                to  J - h-'    -7 and state that to the beat of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code, Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied; concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable In any manner for any personal injury or property damage or a toss of any kind arising from or connected with this Inspection.
__  __    _    _Commissions                                  77 7 L,4 c, 2!,-r Inspector's Signature                                National Board, State, Providence, and Endorserments Date        ,/--/_ -0__7 06-039-4
 
FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl
: 1. Owner                          Florida Power and Light Co.                            Date                        12/16/2006 N      om e
700 Universe Blvd. Juno Beach, FL 33408                          Sheet                1                of              2 Address
: 2. Plant                              Turkey Point Plant                                  Unit                                  4 Name                                                      WO#, 34014097-01                  CR#:        N/A 9760 SW 344 Street Florida City, FL 33035 Address                                                            RepaIr Orgardzatlon, P.O. No, Job No,, etc.
: 3. Work Performed by              Florida Power and Lght Co.                              Type Code Symbol Stamp                        N/A Name Authorization Number                            N/A 9760 SW 344 Street Florida City, FL 33035 Expiration Date                                N/A Address
: 4. Identification of System:                Reactor Vessel                  -System #:  43      Quality Group                          A
: 5. (a) Applicable Construction Code                      ASME III                          19 86 Edition,      N/A    Addenda,.          N/A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements            19 98 Edition,    2000    Addenda,            N/A      Code Case
: 6. Identification of Components Corrected or Removed and Installed Components ASME Corrected,              Code Name of                      Name of Mfg      Mfg Serial  National            Other                    Year      Removed or              Stamp Component                                      Number      Board        Identification                Built        Installed            Yes/No Reactor Vessel                  N/A            N/A        NIA                4T237                  N/A        Corrected N
: 7. Description of Work:
Replace CET Column #53
: 8. Tests Conducted:        Hydrostatic:        NIA                Pneumatic          N/A              Nominal Operating Pressure                    X Other              N/A              Pressure    2280    psig          Test Temperature            547        deg F 06-040-4
 
Sheet 2 of 2 FORM NIS-2 (Back)
: 9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section XI.
Type Code Symbol Stamp                                                  N/A Certificate of Authorization No.                      N/A                Expiration Date:                  N/A Sinned            L            &#xfd;                                                    ___Date          f5J-c 6'      Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT 9f Hartford, Connecticut have inspected the components described in this 0
Owners Report during the period of                  Tw-
                                                                  -      C'to        /-'---*
and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report In accordance with the requirements of ASME Code, Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable In any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this inspection.
_-      __e_                _                    NatCommissions          o              41
                                                                                                                          , Car nr Inspector's Signature                              National Board, State, Providence, and Endorsements Date        /$          '
06-040-4
 
FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
: 1. Owner                            Florida Power and Light Co.                            Date                        12118/2006 Name 700 Universe Blvd. Juno Beach, FL 33408                            Sheet                1                of                2 Address
: 2. Plant                                          ..... Plant TurkeyO Point                                        Unit                                  4 Name                                                      WO#: 35020523-1 B                  CR#:        N/A 9760 SW 344 Street Florida City, FL 33035 Address                                                            Repair Orgardztllon, P.O. No, Job No,, etc.
: 3. Work Performed by              Florida Power and Light Co.                              Type Code Symbol Stamp                          NIA Name Authorization Number                            N/A 9760 SW 344 Street Florida City, FL 33035 Expiration Date                                N/A Address
: 4. Identification of System"        Containment Airlocks I Hatches            System #-    I      Quality Group                          B 19 NA Edition,. N/A      Addenda,            N/A      Code Case
: 5. (a) Applicable Construction Code                FPL Spec. 5610-C-47 (b) Applicable Edition of Section XI Utilized for Repairs or Replacements              19 98 Edition,    2000    Addenda,            N/A      Code Case
: 6. Identification of Components Corrected or Removed and Installed Components ASME Corrected,              Code Name of                      Name of Mfg        Mfg Serial National          Other                    Year        Removed or              Stamp Component                                            Number      Board        Identification                Built        Installed            Yes/No Containment Liner Plate                NIA              N/A        N/A              Liner Plate              N/A        Corrected
(. Descnption or work:
Repair hole in liner plate
: 8. Tests Conducted:        Hydrostatic:        N/A                  Pneumatic        N/A              Nominal Operating Pressure                  N/A Other                N/A              Pressure    N/A    psig          Test Temperature            N/A      deg F 06-041-4
 
Sheet 2 of 2 FORM NIS-2 (Back)
: 9. Remarks ALL WELDING PERFORMED IN ACCORDANCE WITH THE FPL WELD CONTROL MANUAL CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this repair conforms to the rules of the ASME Code, Section XI.
Type Code Symbol Stamp                                                  N/A Certificate of Authorization No.                      N/A                  Expiration Diate:                N/A Signed        -6L,&#xfd;                                            Inv)                      Date            I e.10 -7
                                                                                    /
Ownegr Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut have inspected the components described In this Owners Report during the period of                          '    'l-7O to (I/.-1          '
and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code, Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
_    _1_01                                  Commissions AZ -77              (
* Inspector's Signature                                National Board, State, Providence, and Endorsements Date    ___            _-          _    _
06-041-4
 
FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl
: 1. Owner                          Florida Power and Light Co.                            Date                        12/13/2006 Name 700 Universe Blvd. Juno Beach, FL 33408                        Sheet                1                of                2 Address
: 2. Plant                              Turkey Point Plant                                  Unit                                  4 Name                                                      WO#: 36009715-01                  CR#:        N/A 9760 SW 344 Street Florida City, FL 33035 Address                                                            Repair OrganIzallon, P.O. No, Job No., etc.
: 3. Work Performed by            Florida Power and Light Co.                              Type Code Symbol Stamp                        N/A Name Authorization Number                            NIA 9760 SW 344 Street Florida City, FL 33035 Expiration Date                                N/A Address
: 4. identification of System:              Reactor Coolant                System 4F. 43      Quality Group                          A
: 5. (a) Applicable Construction Code                    ASME III                          19 89 Edition,      N/A    Addenda,            N/A      Code Case (b) Applicable Edition of Section X1 Utilized for Repairs or Replacements            19 98 Edition,    2000    Addenda,            N/A      Code Case
: 6. Identification of Components Corrected or Removed and Installed Components I                                    ASME Corrected,            Code Name of                    Name of Mfg      Mfg Serial  National            Other                  j Year        Removed or              Stamp Component                                      Number        oBard        Identification                Built        installed            Yes/No Reactor Vessel RVLIMS                NIA            N/A        N/A                4T237                  N/A          CorrectedN Adapter Hub                                                                                                                              N
: 7. Description of Work:
Replace RVLIMS Adaptor Hubs
: 8. Tests Conducted:      Hydrostatic:        N/A                Pneumatic        N/A              Nominal Operating Pressure                    x Other              N/A              Pressure    2280    psig          Test Temperature            547        deg F 06-042-4
 
Sheet 2 of 2 FORM NIS-2 (Back)
: 9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section XI, Type Code Symbol Stamp                                                  NIA Certificate of Authorization No.                      NfA                Expiration Date:                  N/A Signed 6i'-                                ) E-MC                              Date      ,    *S      7 0        Owner or Owner's Designee, Title1 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBC.T of Hartford Connecticut, havee spe*jed the components described In this Owners Report during the period of            .                  to      /
and state that to the best of my know)edge and belief, the Owner has performed examinations and taken corrective measures described In this Owners' Report in accordance with the requirements of ASME Code, Section Xl.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
____Commissions                                              f1' 7          If,      __
Inspector's Signature                              National Board, State, Providence, and Endorsements Date            /_        __-___7 06-042-4
 
FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl Florida Power and Light Co.                          Date                        12/29/2006
: 1. Owner Name 700 Universe Blvd. Juno Beach, FL 3340B                          Sheet                1                of              2 Address Turkey Point Plant                                  Unit                                  4
: 2. Plant Name                                                    WO#: 36012421-1A                    CR#:      N/A 9760 SW 344 Street Florida City, FL 33035 Address                                                            Repair Organization, P.O. No, Job No, etc.
: 3. Work Performed by            Florida Power and Light Co.                              Type Code Symbol Stamp                          N/A Name Authorization Number                            WA 9760 SW 344 Street Florida City, FL 33035 Expiration Date                                  N/A Address 4, Identification of System:      Containment Airlocks / Hatches          System #:  51      Quality Group                          B
: 5. (a) Applicable Construction Code                      B31.1                          19 55 Edition,      N/A    Addenda,            N/A      Code Case (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements          19 98 Edition,    2000    Addenda,        .. N/A      Code Case
: 6. Identification of Components Corrected or Removed and Installed Components ASME Corrected,            Code Name of                      Name of Mfg      Mfg Serial National            Other                    Year        Removed or            Stamp Component                                        Ntmber      Board        Identification                Bulk          Installed          Yes/No Equipment hatch                  N/A            N/A        N/A                4S10                  N/A          Corrected
: 7. Description of Work:
Replace hatch bolting
: 8. Tests Conducted:        Hydrostatic:        N/A                Pneumatic        N/A              Nominal Operating Pressure                  N/A Other            VT-1              Pressure    N/A    psig          Test Temperature            N/A      deg F 06-043-4
 
Sheet 2 of 2 FORM NIS-2 (Back)
: 9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section XI.
Type Code Symbol Stamp                                                  NIA Certificate of Aulhorlzatlon No.                      N/A                Expiration Daate:                N/A Signed                                        0 "s6            M-4C, V                  Date                ; f,0 -.7 (U    Owner or Owner's Designee, Title    /
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford Connecticut, have inspected the components described in this Owners Report during the period of              //1Zo-24-0      to  /-_/-_ _    _0?
and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code, Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this Inspection.